Pre- Feasibility Report Environment Clearance of Proposed Brick Earth Mining project for M/S Fiza Ent Udyog at Village -Parasrampur,Tehsil-Raniganj,District-Pratapgarh,Uttar Pradesh Page 1 of 11 1. EXECUTIVE SUMMARY Application of mining for soil used in Brick Kiln of M/S Fiza Udyog from Khasra/Gata Nos- 352,39,293,366,Area-2.022 Hectare at Village-Parasrampur,Tehsil-Raniganj,District- Pratapgarh,Uttar Pradesh.The project has been proposed for an annual production of 6818 cubic meter soil by open cast manual mining from allotted Khasra/Gata Nos-352,39,293,366,Area- 2.022 Hectare at Village-Parasrampur,Tehsil-Raniganj,District-Pratapgarh,Uttar Pradesh. The order of Hon‟ble Supreme Court dated the 27 th February, 2012 in I.A. No.1213 of 2011 in Special Leave Petition (C) No.19628-19629 of 2009, in the matter of Deepak Kumar etc. Vs. State of Haryana and Others etc., prior environmental clearance has now become mandatory for mining of minor minerals irrespective of the area of mining lease. And whereas, the Hon‟ble National Green Tribunal, vide its order dated the 13 th January, 2015 in the matter regarding sand mining has directed for making a policy on environmental clearance for mining leases in cluster for minor minerals. As per Environment (Protection) Rules, 1986, MoEF & CC making certain amendments in EIA Notification, 2006 vide number S.O. 2588(E), dated 15 th Jan, 2016, the applicant is seeking prior environmental clearance for mining of minor minerals under category „B2‟ for less than and equal to five hectare from DEIAA of concerning District. Table1: Salient Feature of Project Items Details Project name M/S Fiza Ent Udyog of Mohd Sabil,S/o:M H M Haneef,30,Chaksara,Tehsil-Raniganj,District-Pratapgarh,Uttar Pradesh. Location of mine Khasra/Gata Nos-352,39,293,366 Location of Brick Kiln VillageParasrampu,Tehsil-Raniganj,District-Pratapgarh,Uttar Pradesh. Land Use Uncultivated Land Land Ownership Private Land Life of mine 5 Years

Upload: others

Post on 18-Jan-2021

13 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Pre- Feasibility Environment Clearance of Proposed Brick ...environmentclearance.nic.in/writereaddata/District/...Pre- Feasibility Report Environment Clearance of Proposed Brick Earth

Pre- Feasibility Report

Environment Clearance of Proposed Brick Earth Mining project for M/S Fiza Ent Udyog at Village -Parasrampur,Tehsil-Raniganj,District-Pratapgarh,Uttar Pradesh

Page 1 of 11

1. EXECUTIVE SUMMARY

Application of mining for soil used in Brick Kiln of M/S Fiza Udyog from Khasra/Gata Nos-

352,39,293,366,Area-2.022 Hectare at Village-Parasrampur,Tehsil-Raniganj,District-

Pratapgarh,Uttar Pradesh.The project has been proposed for an annual production of 6818 cubic

meter soil by open cast manual mining from allotted Khasra/Gata Nos-352,39,293,366,Area-

2.022 Hectare at Village-Parasrampur,Tehsil-Raniganj,District-Pratapgarh,Uttar Pradesh.

The order of Hon‟ble Supreme Court dated the 27th

February, 2012 in I.A. No.1213 of 2011 in

Special Leave Petition (C) No.19628-19629 of 2009, in the matter of Deepak Kumar etc. Vs.

State of Haryana and Others etc., prior environmental clearance has now become mandatory for

mining of minor minerals irrespective of the area of mining lease. And whereas, the Hon‟ble

National Green Tribunal, vide its order dated the 13th

January, 2015 in the matter regarding sand

mining has directed for making a policy on environmental clearance for mining leases in cluster

for minor minerals.

As per Environment (Protection) Rules, 1986, MoEF & CC making certain amendments in EIA

Notification, 2006 vide number S.O. 2588(E), dated 15th

Jan, 2016, the applicant is seeking prior

environmental clearance for mining of minor minerals under category „B2‟ for less than and

equal to five hectare from DEIAA of concerning District.

Table1: Salient Feature of Project

Items Details

Project name M/S Fiza Ent Udyog of Mohd Sabil,S/o:M H M

Haneef,30,Chaksara,Tehsil-Raniganj,District-Pratapgarh,Uttar

Pradesh.

Location of mine Khasra/Gata Nos-352,39,293,366

Location of Brick Kiln VillageParasrampu,Tehsil-Raniganj,District-Pratapgarh,Uttar Pradesh.

Land Use Uncultivated Land

Land Ownership Private Land

Life of mine 5 Years

Page 2: Pre- Feasibility Environment Clearance of Proposed Brick ...environmentclearance.nic.in/writereaddata/District/...Pre- Feasibility Report Environment Clearance of Proposed Brick Earth

Pre- Feasibility Report

Environment Clearance of Proposed Brick Earth Mining project for M/S Fiza Ent Udyog at Village -Parasrampur,Tehsil-Raniganj,District-Pratapgarh,Uttar Pradesh

Page 2 of 11

Proposed production

of mine

Lease period : 5 Years

Proposed Capacity: 6818 cum/Annum (8182 TPA)

Table: Available Minable Reserve

Latitude

&Longitude

Gata

No &

Area

(ha)

Area

(sqm)

Ben

ch

Area

excludin

g bund

wall

(sqm)

Dep

th (

m) Top

soil

(cum)

Minable

Reserve

(cum)

25°49'57.64"

N 352

(0.208) 2080

I 1976 1.00 301 1675

82°

3'20.25"E

II 1934 1.00 - 1934

25°49'57.43"

N 39

(0.417) 4170

I 3962 1.00 604 3358

82°

3'16.57"E

II 3878 1.00 - 3878

25°50'0.47"N 293

(0.529) 5290

I 5026 1.00 766 4260

82° 3'8.37"E II 4920 1.00 - 4920

25°49'55.77"

N 366

(0.868) 8680

I 8246 1.00 1257 6989

82° 3'9.74"E II 8072 1.00 - 8072

Total 2.0220 20220.0 2927 35086

As per brick kiln capacity (15 Paya), yearly production of bricks are

22.5 Lac/season for that the required volume of brick clay will be

6818 cum/ annum @330 bricks in one cubic meter .The total mineable

reserves of soil of area is 35086 m3 or 42103 tons with proposed rate

of production 6818 Cum and the expected life of mine is 5 years

Table: Year wise production

Year

Soil

Reserve

(cum/yr)

Soil

Reserve

(Ton/yr)

Brick

prepared

(lakh/yr)

Ist 6818 8182 22.5

IInd 6818 8182 22.5

IIIrd 6818 8182 22.5

IVth 6818 8182 22.5

Vth 6818 8182 22.5

Total 34090 40908 112.5

Page 3: Pre- Feasibility Environment Clearance of Proposed Brick ...environmentclearance.nic.in/writereaddata/District/...Pre- Feasibility Report Environment Clearance of Proposed Brick Earth

Pre- Feasibility Report

Environment Clearance of Proposed Brick Earth Mining project for M/S Fiza Ent Udyog at Village -Parasrampur,Tehsil-Raniganj,District-Pratapgarh,Uttar Pradesh

Page 3 of 11

Method of mining Open-cast Manual mining

River Sai River 0.8 Km (N)

Topography Undeveloped flat with gentle slope

Minerals of mine Brick Earth

Estimated cost Rs. 22.0 Lac

Water demand 5.0 KLD

Sources of water Drinking water supply will be met by nearby dugwell/ borewells or

private tankers.

Ultimate depth of

Mining

2.0 m

Man power Not More than 20 Labors

Nearest

railway station Dandupur Railway Station:3.5 km in South West direction.

Nearest highway NH 231-3.7 Km (W)

Nearest Airport Allahabad Airport : 55 Km (S)

Nearest Town /city Pratapgarh 10 km (NW)

Seismic zone Zone-III (As per 1893:2002)

* Approximate aerial distances

2. INTRODUCTION OF THE PROJECT/BACKGROUND INFORMATION

2.1 Identification of Project and Project Proponent

Application of mining for soil used in Brick kiln of Brick Earth Mining project M/S Fiza Ent

Udyog from Khasra/Gata Nos-352,39,293,366,Area-2.022 Hectare at Village-

Parasrampur,Tehsil-Raniganj,District-Pratapgarh,Uttar Pradesh of of Mohd Sabil,S/o:M H M

Haneef,30,Chaksara,Tehsil-Raniganj,District-Pratapgarh,Uttar Pradesh.

2.2 Brief description of the nature of the project

Brick kiln are seasonal unit are either in small sector or in cottage sector. Clay brick industry in

India uses soil as raw material and slack (small size) coal as fuel. Estimate of total mineable

Page 4: Pre- Feasibility Environment Clearance of Proposed Brick ...environmentclearance.nic.in/writereaddata/District/...Pre- Feasibility Report Environment Clearance of Proposed Brick Earth

Pre- Feasibility Report

Environment Clearance of Proposed Brick Earth Mining project for M/S Fiza Ent Udyog at Village -Parasrampur,Tehsil-Raniganj,District-Pratapgarh,Uttar Pradesh

Page 4 of 11

reserve quantity comes to be 35086 m3 or 42103 tons up to permissible depth of 2.0 m. As per

Brick Kiln capacity yearly production of bricks are 22.5 Lac bricks/ season for that the required

volume of brick clay will be 6818 cum/Annum. .

2.3 Need for the project and its importance to the country and region

The production of Brick Earth will benefit to the state in the form of royalty. Apart from this

project operation will provide employment directly and indirectly to the people residing in

vicinity, thus improving the Socio-economic status of the area.

2.4 Demands-Supply Gap

Bricks are produced in India in small or cottage scale brick kilns and Clamps, operates

seasonally. The raw materials in the brick kilns include soil, coal, paddy husk, wood & locally

available agro wastes to some extent. There are large variations in quality of soils available in

different parts of the country and also in brick manufacturing process.

Brick are good building material for construction activities but quality of brick differs place to

place. There are large variations in quality of soil available in different part of the country and

also brick manufacturing process. Brick kiln are seasonal unit are either in small sector or in

cottage sector. Clay brick industry in India uses soil as raw material and slack (small size) coal as

fuel.

2.5 Import vs. Indigenous:

Import does not apply in the present case as Brick is indigenously available at number of mines

under operation in Uttar Pradesh.

2.6 Export Possibility:

Export possibility is neither plausible nor there is any such demand.

2.7 Domestic/ Export Markets

Due to the increased industrial and infrastructural growth of the rural and urban areas demand of

Brick is very high. Construction companies and local vendors in the nearby town and cities are

the potential market for the brick made up of brick clay.

2.8 Employment Generation

Page 5: Pre- Feasibility Environment Clearance of Proposed Brick ...environmentclearance.nic.in/writereaddata/District/...Pre- Feasibility Report Environment Clearance of Proposed Brick Earth

Pre- Feasibility Report

Environment Clearance of Proposed Brick Earth Mining project for M/S Fiza Ent Udyog at Village -Parasrampur,Tehsil-Raniganj,District-Pratapgarh,Uttar Pradesh

Page 5 of 11

About 20 local labors shall be engaged through project proponent for extraction of soil, molding

and loading of brick and handling of mineral in mining area, besides, watch and ward and

plantation activity with proper maintenance.

3. PROJECT DESCRIPTION

3.1 Type of project including, interlinked and interdependent projects, if any

This is a mining project for Brick Earth Excavation and the project shall not involve any

interlinked and interdependent projects.

3.2 Location (map showing general location and project boundary and project site) with

coordinates.

Soil miming area is located Village-Parasrampur,Tehsil-Raniganj,District-Pratapgarh,Uttar

Pradesh which is connected to NH 231-3.7 Km (SW)Nearest Railway Station Dandupur Railway

Station:3.5 km in SouthWest direction from the Area and nearest Airport is Allahabad Airport :

55 Km (S).

Table: Site Co-ordinates

Khasra/

Gata No. Latitude Longitude

352 25°49'57.64"N 82° 3'20.25"E

39 25°49'57.43"N 82° 3'16.57"E

293 25°50'0.47"N 82° 3'8.37"E

366 25°49'55.77"N 82° 3'9.74"E

Page 6: Pre- Feasibility Environment Clearance of Proposed Brick ...environmentclearance.nic.in/writereaddata/District/...Pre- Feasibility Report Environment Clearance of Proposed Brick Earth

Pre- Feasibility Report

Environment Clearance of Proposed Brick Earth Mining project for M/S Fiza Ent Udyog at Village -Parasrampur,Tehsil-Raniganj,District-Pratapgarh,Uttar Pradesh

Page 6 of 11

Figure: - District Map

3.3 Details of alternate sites considered

Besides this any other alternative other than Brick Earth mining like mining of rock in-situ

quarry shall result in exorbitant cost, result in comparatively higher land degradation and cause

more environmental impacts.

3.4 Size or magnitude of operation

The proposed mine has lease agreement over an Area –2.022 Hectare. The project has been

proposed for an annual production of 6818 cum soil by open cast manual mining from the

Khasra/Gata Nos-352,39,293,366,Area-2.022 Hectare at Village-Parasrampur,Tehsil-

Raniganj,District-Pratapgarh,Uttar Pradesh.

3.5 Project description with process details (a schematic diagram/ flow chart showing the

project layout, component of project etc. should be given)a

The proposed project is to mine Brick Clay from plot (s) under agreement sustainably and

scientifically. Mining will be opencast and manual using hand tools only in the allotted plots

keeping the nearby plot (s) unaffected. Following geo-scientific methods are proposed to carry

out the activity. Mining will be confined to extraction of Brick Clay in its existing form from the

allotted plot(s) only. Mining of Brick Clay from the allotted plot(s) will be restricted to a

maximum depth of 2.0 m from the surface in proper bench form as per MCR-1960 and MMR

Page 7: Pre- Feasibility Environment Clearance of Proposed Brick ...environmentclearance.nic.in/writereaddata/District/...Pre- Feasibility Report Environment Clearance of Proposed Brick Earth

Pre- Feasibility Report

Environment Clearance of Proposed Brick Earth Mining project for M/S Fiza Ent Udyog at Village -Parasrampur,Tehsil-Raniganj,District-Pratapgarh,Uttar Pradesh

Page 7 of 11

1961. The width and height of bench will be 1.0 m x 1.0 m. Topsoil upto 6” depth will be

preserved to spread it after mining activity is completed to restore the fertility of land.

3.6 Raw material required along with estimated quantity:-

Table: Available Mineable Reserve:

Latitude

&Longitude

Gata

No &

Area

(ha)

Area

(sqm)

Ben

ch

Area

excluding

bund wall

(sqm)

Dep

th (

m)

Top

soil

(cum)

Minable

Reserve

(cum)

25°49'57.64"N

352

(0.208) 2080

I 1976 1.00 301 1675

82° 3'20.25"E

II 1934 1.00 - 1934

25°49'57.43"N

39

(0.417) 4170

I 3962 1.00 604 3358

82° 3'16.57"E

II 3878 1.00 - 3878

25°50'0.47"N

293

(0.529) 5290

I 5026 1.00 766 4260

82° 3'8.37"E

II 4920 1.00 - 4920

25°49'55.77"N

366

(0.868) 8680

I 8246 1.00 1257 6989

82° 3'9.74"E

II 8072 1.00 - 8072

Total 2.0220 20220.0 2927 35086

Page 8: Pre- Feasibility Environment Clearance of Proposed Brick ...environmentclearance.nic.in/writereaddata/District/...Pre- Feasibility Report Environment Clearance of Proposed Brick Earth

Pre- Feasibility Report

Environment Clearance of Proposed Brick Earth Mining project for M/S Fiza Ent Udyog at Village -Parasrampur,Tehsil-Raniganj,District-Pratapgarh,Uttar Pradesh

Page 8 of 11

Proposed method of mining:

Mining shall be carried out from top to downward through the formation of benches. The height

& width of benches shall be kept 1.0 m x 1.0 m with face slope 450.It shall be opencast manual

mine involves scooping the mineral through use of hand implements like spade, pick axe, shovel

and crowbar etc. In future top soil shall be scrapped by means manually and shall be used for the

purpose of plantation and rehabilitation. Indicate quantum of development & tonnage &

production expected in table below:

Table: Year wise production

Year

Soil

Reserve

(cum/yr)

Soil

Reserve

(Ton/yr)

Brick

prepared

(lakh/yr)

Ist 6818 8182 22.5

IInd 6818 8182 22.5

IIIrd 6818 8182 22.5

IVth 6818 8182 22.5

Vth 6818 8182 22.5

Total 34090 40908 112.5

3.7 Resource optimization/recycling and reuse envisaged in the project, if any, should be

briefly described.

Not applicable

3.8 Availability of water its source, energy/ power requirement and source

Water Requirement: Water requirement for human consumption, plantation and dust

suppression is 5 KLD, which shall be met from ground water resource from the nearby

village.

Power: No electrical power shall be required for operations.

3.9 Quantity of wastes to be generated (liquid and solid) and scheme for their management/

disposal.

Page 9: Pre- Feasibility Environment Clearance of Proposed Brick ...environmentclearance.nic.in/writereaddata/District/...Pre- Feasibility Report Environment Clearance of Proposed Brick Earth

Pre- Feasibility Report

Environment Clearance of Proposed Brick Earth Mining project for M/S Fiza Ent Udyog at Village -Parasrampur,Tehsil-Raniganj,District-Pratapgarh,Uttar Pradesh

Page 9 of 11

Solid waste generation & its disposal: No solid waste other than negligible quantity of silt/silty

clay, which gets deposited as crust material on the bed profile, shall be scrapped and deposited

into the mine pits or in the upper terraces earmarked for plantation

Liquid Effluent: There will be no waste water generation from mining activities.

4. SITE ANALYSIS

4.1 Connectivity: Soil miming area is located at located Village-Parasrampur,Tehsil-

Raniganj,District-Pratapgarh,Uttar Pradesh which is connected to NH 231-3.7 Km (SW)Nearest

Railway Station Dandupur Railway Station:3.5 km in SouthWest direction from the Area and

nearest Airport is Allahabad Airport : 55 Km (S).

4.2 Land form, land use and land ownership: The mine agreement area is agricultural private

land.

4.3 Topography (along with map): Agricultural plain

4.5 Existing infrastructure: The existing land use of mine lease area belongs to landuse

category “Uncultivated land” and shall continue to be so even after the current mining project is

over.

4.6 Geology: The geology of the district exposes nothing beyond Ordinary River borne alluvium

which is not old. The mineral products are few and unimportant. The minerals of commercial

value are the nodular limestone conglomerate known as kankar, brick and saltpetre. The soil in

the district is light sandy or dense clay of yellowish brown colour. The sand found in the rivers is

medium to coarse grained, greyish white to brownish in colour and is suitable for construction

purposes.

4.7 Geographical Structure

Location and Boundaries

The District lies between the paralleles of 25034' and 26

011' north latitude and between the

meridians of 81019' and 82

027' east longitude extending for some 110 km. from west to east. It is

bounded on the north by district Sultanpur,on the south by district Allahabad,on the east by

district Jaunpur and on the west by Fatehpur and north-east by district Rae Bareli. In the south-

Page 10: Pre- Feasibility Environment Clearance of Proposed Brick ...environmentclearance.nic.in/writereaddata/District/...Pre- Feasibility Report Environment Clearance of Proposed Brick Earth

Pre- Feasibility Report

Environment Clearance of Proposed Brick Earth Mining project for M/S Fiza Ent Udyog at Village -Parasrampur,Tehsil-Raniganj,District-Pratapgarh,Uttar Pradesh

Page 10 of 11

west the Ganga forms the boundary of the district for about 50 km. separating it from Fatehpur

and Allahabad and in the extreme north-east the Gomti forms the boundary for about 6 km.

4.8 Climatic conditions:

The district has four rain-gauge stations with record of three of them extending back to about 100

years.. The south-west monsoon usually arrives over the district by about the middle of June and

withdraws by the end of September. The average rainfall of the district is 1393.1 mm. About 87

percent of the annual rainfall is recorded during the period June to September, July being the

rainiest. The monsoon in the district generally advances from the south-west to the north-east.

4.9 Social Infrastructure

The social infrastructure like educational facilities (primary and higher secondary schools,

degree college), drinking water supply, post and telegraph, public transportation and hospitals

are by and large are available in the study area.

5. PLANNING BRIEF

5.1 Planning Concept

The proposed project is to mine brick clay from plot(s) sustainably and scientifically. The minor

mineral (clay) will be excavated from the plot(s) as per mining rules and casting of raw bricks

will be done which will be transported to the kiln through horse cart, trolleys etc. through village

chak roads. Mining will be opencast Manual keeping nearby plot(s) unaffected. Maximum depth

of mining will be only up to 2.0 m as per agreement.

5.2 Population Projection

There is no projection of population as the mining activity will be carried out during day time

only.

5.3 Assessment of Infrastructure Demand (Physical & Social)

Adequate infrastructure facilities are available in the vicinity of mine lease area and due to the

mining activities; no extra infrastructure over and above the existing infrastructure is required.

5.4 Amenities/Facilities

Rest Shelter: Rest shelter along with first-aid station complying with all the provisions

of Mines Rules shall be provided by project proponent outside lease area

Page 11: Pre- Feasibility Environment Clearance of Proposed Brick ...environmentclearance.nic.in/writereaddata/District/...Pre- Feasibility Report Environment Clearance of Proposed Brick Earth

Pre- Feasibility Report

Environment Clearance of Proposed Brick Earth Mining project for M/S Fiza Ent Udyog at Village -Parasrampur,Tehsil-Raniganj,District-Pratapgarh,Uttar Pradesh

Page 11 of 11

Water Supply: Water will be supplied for human consumption, dust suppression and for

plantation.

Transport of Man and Material: The material from the mine will be transported by

trucks / tippers / tractor trolleys.

Security Arrangements: Appropriate security arrangement shall be made.

6.0 PROPOSED INFRASTRUCTURE:-

6.1 Industrial area (Processing Area): Temporary arrangements like site office, rest shelters &

approach roads etc shall be provided. No permanent infrastructure is proposed.

6.2 Residential Area (Non Processing Area): As the local person shall be employed, no

residential building / housing are proposed.

6.3 Green Belt: Plantation of soil binding grasses like Agave nector, Saccharum officinarum

(Munja), Cassia tora (Charata), Opuntia ficus indica, Aloe vera (Gheekwar), Euphorbia hirta

across the benches.

6.4 Connectivity: The lease area is connected to which are connected to rail and road

6.5 Social Infrastructure: In-line with the Social Responsibility Activities at other operational

sites, relevant developmental assistance shall be rendered depending on the local needs identified

through studies.

6.6 Drinking Water Management: Water requirement for drinking and operations will be 5.0

KLD, which will be met from underground water resource.

6.7 Sewerage System: No sewerage system is required as there is no domestic waste water will

be disposed.

6.8 Industrial Waste Management: Not applicable, as the mining activity will not be

generating any overburden or waste materials.

6.9 Solid Waste management: No solid waste generation is expected from the mining

operation.

Page 12: Pre- Feasibility Environment Clearance of Proposed Brick ...environmentclearance.nic.in/writereaddata/District/...Pre- Feasibility Report Environment Clearance of Proposed Brick Earth

Pre- Feasibility Report

Environment Clearance of Proposed Brick Earth Mining project for M/S Fiza Ent Udyog at Village -Parasrampur,Tehsil-Raniganj,District-Pratapgarh,Uttar Pradesh

Page 12 of 11

6.10 Power Requirement & Supply/ Source: No electrical power requirement for mining

activities.

Rehabilitation and Resettlement (R&R) Plan

The existing mine lease area is designated as private land and has no human settlements and

hence, no R & R is envisaged.

COST ESTIMATES

The capital cost of proposed project is estimated as Rs. 22.0 Lac.

CSR Cost- 3% of the project cost.

ANALYSIS OF PROPOSAL (FINAL RECOMMENDATION)

The proposed project is expected to provide employment to local people in different activities

such as Mining, sizing (sieving), transportation and plantation activities. The project activity will

not have any major impact on the environment.

***********