P PR RE E - - F FE EA AS S I I B BI I L L I I T TY Y R RE EP PO OR RT T ENVIRONMENTAL CLEARANCE FOR 9.38 ACRE/ 3.79 HA STONE MINING PROJECT OF M/S. DILIP BUILDCON LTD. LOCATED NEAR MOUZA–CHARAKMARA , P.S.– BAHARAGORA, DISTRICT–EAST SINGHBHUM, STATE–JHARKHAND . ‘B’ CAT PROJECT PROPONENT M/S DILIP BUIDCON LTD. NOMINATED OWNER- SRI JAYPRAKASH CHATURVEDI, ADDRESS:-MAHATO HOUSE, NEAR CENTRAL BANK, GHATSILA, DIST-EAST SINGHBHUM, STATE- JHARKHAND. MOB NO-7033592588. PAGE 1 CONSULTANTS SATHI PLANNERS PVT. LTD. REG. OFFICE: LAKE AVENUE, BEHIND CAMBRIAN PUBLIC SCHOOL, KANKE ROAD, RANCHI- 834008, JHARKHAND. T TA AB BL LE E O OF F C CO ON NT TE EN NT T 1. EXECUTIVE SUMMARY ......................................................................................................................................................... 5 1.1 Salient feature of the project .................................................................................................................................... 5 2. INTRODUCTION OF THE...................................................................................................................................................... 9 PROJECT/BACKGROUND INFORMATION .............................................................................................................................. 9 2.1 PROJECT PROPONENT ....................................................................................................................................................... 9 2.2 ADDRESS OF THE LESSEE ................................................................................................................................................. 9 2.3 MINING LEASE AREA & LEASE BACKGROUND.............................................................................................................. 9 2.4 BRIEF DESCRIPTION OF NATURE OF PROJECT: ........................................................................................................... 9 2.5 NEED FOR THE PROJECT AND ITS IMPORTANCE TO THE COUNTRY AND REGION .................................................. 10 2.6 EXTENT OF MECHANISM............................................................................................................................................... 10 2.7 LOADING EQUIPMENT .................................................................................................................................................... 10 2.8 DRILLING & BLASTING .................................................................................................................................................. 11 2.9 DEMAND AND SUPPLY GAP ........................................................................................................................................... 12 2.10 IMPORTS V/S INDIGENOUS PRODUCTION ................................................................................................................... 12 2.11 EXPORT POSSIBILITY ...................................................................................................................................................... 12 2.12 DOMESTIC/EXPORTS MARKETS ................................................................................................................................... 13 2.13 EMPLOYMENT GENERATION (DIRECT & INDIRECT) DUE TO THE PROJECT .......................................................... 13 3. PROJECT DESCRIPTION .................................................................................................................................................... 14 3.1 TYPE OF PROJECT INCLUDING INTERLINKED AND INTERDEPENDENT PROJECTS, IF ANY ................................... 14 3.2 LOCATION (MAP SHOWING GENERAL LOCATION, SPECIFIC LOCATION, AND PROJECT BOUNDARY & PROJECT SITE LAYOUT) WITH COORDINATES. ........................................................................................................................................... 14 3.3 DETAILS OF ALTERNATE SITES CONSIDERED AND THE BASIS OF SELECTING THE PROPOSED SITE, PARTICULARLY THE ENVIRONMENTAL CONSIDERATIONS GONE INTO SHOULD BE HIGHLIGHTED. .................................. 14 3.4 SIZE AND MAGNITUDE OF OPERATION........................................................................................................................ 15

Upload: ngonhu

Post on 03-Dec-2018

213 views

Category:

Documents


0 download

TRANSCRIPT

PPRREE--FFEEAASSIIBBIILLIITTYY RREEPPOORRTT ENVIRONMENTAL CLEARANCE FOR 9.38 ACRE/ 3.79 HA STONE MINING PROJECT

OF M/S. DILIP BUILDCON LTD. LOCATED NEAR MOUZA–CHARAKMARA , P.S.–

BAHARAGORA, DISTRICT–EAST SINGHBHUM, STATE–JHARKHAND .

‘B’ CAT

PROJECT PROPONENT

M/S DILIP BUIDCON LTD.

NOMINATED OWNER- SRI JAYPRAKASH CHATURVEDI,

ADDRESS:-MAHATO HOUSE, NEAR CENTRAL BANK, GHATSILA,

DIST-EAST SINGHBHUM, STATE- JHARKHAND.

MOB NO-7033592588.

PAGE 1

CONSULTANTS

SATHI PLANNERS PVT. LTD.

REG. OFFICE: LAKE AVENUE, BEHIND

CAMBRIAN PUBLIC SCHOOL, KANKE

ROAD, RANCHI- 834008, JHARKHAND.

TTAABBLLEE OOFF CCOONNTTEENNTT 1. EXECUTIVE SUMMARY ......................................................................................................................................................... 5

1.1 Salient feature of the project .................................................................................................................................... 5

2. INTRODUCTION OF THE ...................................................................................................................................................... 9

PROJECT/BACKGROUND INFORMATION .............................................................................................................................. 9

2.1 PPRROOJJEECCTT PPRROOPPOONNEENNTT ....................................................................................................................................................... 9

2.2 AADDDDRREESSSS OOFF TTHHEE LLEESSSSEEEE ................................................................................................................................................. 9

22..33 MMIINNIINNGG LLEEAASSEE AARREEAA && LLEEAASSEE BBAACCKKGGRROOUUNNDD .............................................................................................................. 9

22..44 BBRRIIEEFF DDEESSCCRRIIPPTTIIOONN OOFF NNAATTUURREE OOFF PPRROOJJEECCTT:: ........................................................................................................... 9

22..55 NNEEEEDD FFOORR TTHHEE PPRROOJJEECCTT AANNDD IITTSS IIMMPPOORRTTAANNCCEE TTOO TTHHEE CCOOUUNNTTRRYY AANNDD RREEGGIIOONN .................................................. 10

22..66 EEXXTTEENNTT OOFF MMEECCHHAANNIISSMM ............................................................................................................................................... 10

22..77 LLOOAADDIINNGG EEQQUUIIPPMMEENNTT .................................................................................................................................................... 10

22..88 DDRRIILLLLIINNGG && BBLLAASSTTIINNGG .................................................................................................................................................. 11

22..99 DDEEMMAANNDD AANNDD SSUUPPPPLLYY GGAAPP ........................................................................................................................................... 12

22..1100 IIMMPPOORRTTSS VV//SS IINNDDIIGGEENNOOUUSS PPRROODDUUCCTTIIOONN ................................................................................................................... 12

22..1111 EEXXPPOORRTT PPOOSSSSIIBBIILLIITTYY ...................................................................................................................................................... 12

22..1122 DDOOMMEESSTTIICC//EEXXPPOORRTTSS MMAARRKKEETTSS ................................................................................................................................... 13

22..1133 EEMMPPLLOOYYMMEENNTT GGEENNEERRAATTIIOONN ((DDIIRREECCTT && IINNDDIIRREECCTT)) DDUUEE TTOO TTHHEE PPRROOJJEECCTT .......................................................... 13

3. PROJECT DESCRIPTION .................................................................................................................................................... 14

33..11 TTYYPPEE OOFF PPRROOJJEECCTT IINNCCLLUUDDIINNGG IINNTTEERRLLIINNKKEEDD AANNDD IINNTTEERRDDEEPPEENNDDEENNTT PPRROOJJEECCTTSS,, IIFF AANNYY ................................... 14

33..22 LLOOCCAATTIIOONN ((MMAAPP SSHHOOWWIINNGG GGEENNEERRAALL LLOOCCAATTIIOONN,, SSPPEECCIIFFIICC LLOOCCAATTIIOONN,, AANNDD PPRROOJJEECCTT BBOOUUNNDDAARRYY && PPRROOJJEECCTT

SSIITTEE LLAAYYOOUUTT)) WWIITTHH CCOOOORRDDIINNAATTEESS.. ........................................................................................................................................... 14

33..33 DDEETTAAIILLSS OOFF AALLTTEERRNNAATTEE SSIITTEESS CCOONNSSIIDDEERREEDD AANNDD TTHHEE BBAASSIISS OOFF SSEELLEECCTTIINNGG TTHHEE PPRROOPPOOSSEEDD SSIITTEE,,

PPAARRTTIICCUULLAARRLLYY TTHHEE EENNVVIIRROONNMMEENNTTAALL CCOONNSSIIDDEERRAATTIIOONNSS GGOONNEE IINNTTOO SSHHOOUULLDD BBEE HHIIGGHHLLIIGGHHTTEEDD.. .................................. 14

33..44 SSIIZZEE AANNDD MMAAGGNNIITTUUDDEE OOFF OOPPEERRAATTIIOONN........................................................................................................................ 15

PPRREE--FFEEAASSIIBBIILLIITTYY RREEPPOORRTT ENVIRONMENTAL CLEARANCE FOR 9.38 ACRE/ 3.79 HA STONE MINING PROJECT

OF M/S. DILIP BUILDCON LTD. LOCATED NEAR MOUZA–CHARAKMARA , P.S.–

BAHARAGORA, DISTRICT–EAST SINGHBHUM, STATE–JHARKHAND.

BB

PROJECT PROPONENT

M/S DILIP BUIDCON LTD.

NOMINATED OWNER- SRI JAYPRAKASH CHATURVEDI,

ADDRESS:-MAHATO HOUSE, NEAR CENTRAL BANK, GHATSILA,

DIST-EAST SINGHBHUM, STATE- JHARKHAND.

MOB NO-7033592588.

PAGE 2

CONSULTANTS

SATHI PLANNERS PVT. LTD.

REG. OFFICE: LAKE AVENUE, BEHIND CAMBRIAN PUBLIC SCHOOL, KANKE ROAD, RANCHI- 834008, JHARKHAND.

33..55 PPRROOJJEECCTT DDEESSCCRRIIPPTTIIOONN WWIITTHH PPRROOCCEESSSS DDEETTAAIILLSS ((AA SSCCHHEEMMAATTIICC DDIIAAGGRRAAMM//FFLLOOWW CCHHAARRTT SSHHOOWWIINNGG TTHHEE

PPRROOJJEECCTT LLAAYYOOUUTT,, CCOOMMPPOONNEENNTTSS OOFF TTHHEE PPRROOJJEECCTT EETTCC.. SSHHOOUULLDD BBEE GGIIVVEENN)) ....................................................................... 15

33..66 RRAAWW MMAATTEERRIIAALL RREEQQUUIIRREEDD AALLOONNGG WWIITTHH EESSTTIIMMAATTEEDD QQUUAANNTTIITTYY,, LLIIKKEELLYY SSOOUURRCCEE,, MMAARRKKEETTIINNGG AARREEAA OOFF FFIINNAALL

PPRROODDUUCCTTSS//SS,, MMOODDEE OOFF TTRRAANNSSPPOORRTT OOFF RRAAWW MMAATTEERRIIAALL AANNDD FFIINNIISSHHEEDD PPRROODDUUCCTT.. ........................................................ 15

33..77 RREESSOOUURRCCEE OOPPTTIIMMIIZZAATTIIOONN//RREECCYYCCLLIINNGG AANNDD RREEUUSSEE EENNVVIISSAAGGEEDD IINN TTHHEE PPRROOJJEECCTT,, IIFF AANNYY,, SSHHOOUULLDD BBEE BBRRIIEEFFLLYY

OOUUTTLLIINNEEDD.. ....................................................................................................................................................................................... 16

33..88 AAVVAAIILLAABBIILLIITTYY OOFF WWAATTEERR IITTSS SSOOUURRCCEE,, EENNEERRGGYY//PPOOWWEERR RREEQQUUIIRREEMMEENNTT AANNDD SSOOUURRCCEE SSHHOOUULLDD BBEE GGIIVVEENN ..... 16

33..99 QQUUAANNTTIITTYY OOFF WWAASSTTEESS TTOO BBEE GGEENNEERRAATTEEDD ((LLIIQQUUIIDD AANNDD SSOOLLIIDD )) AANNDD SSCCHHEEMMEE FFOORR TTHHEEIIRR

MMAANNAAGGEEMMEENNTT//DDIISSPPOOSSAALL ............................................................................................................................................................ 16

33..1100 SSCCHHEEMMAATTIICC RREEPPRREESSEENNTTAATTIIOONNSS OOFF TTHHEE FFEEAASSIIBBIILLIITTYY DDRRAAWWIINNGG WWHHIICCHH GGIIVVEE IINNFFOORRMMAATTIIOONN OOFF EEIIAA PPUURRPPOOSSEE

16

4. SITE ANALYSIS ...................................................................................................................................................................... 19

44..11 CCOONNNNEECCTTIIVVIITTYY ................................................................................................................................................................ 19

44..22 LLAANNDD FFOORRMM,, LLAANNDD UUSSEE AANNDD LLAANNDD OOWWNNEERRSSHHIIPP ....................................................................................................... 19

44..33 TTOOPPOOGGRRAAPPHHYY ................................................................................................................................................................... 19

44..44 GGEEOOLLOOGGYY .......................................................................................................................................................................... 19

44..55 EEXXIISSTTIINNGG LLAANNDD UUSSEE PPAATTTTEERRNN ((AAGGRRIICCUULLTTUURREE,, NNOONN--AAGGRRIICCUULLTTUURREE,, FFOORREESSTT,, WWAATTEERR BBOODDIIEESS ((IINNCCLLUUDDIINNGG

AARREEAA UUNNDDEERR CCRRZZ)))),, SSHHOORRTTEESSTT DDIISSTTAANNCCEESS FFRROOMM TTHHEE PPEERRIIPPHHEERRYY OOFF TTHHEE PPRROOJJEECCTT TTOO PPEERRIIPPHHEERRYY OOFF TTHHEE FFOORREESSTTSS,,

NNAATTIIOONNAALL PPAARRKK,, WWIILLDD LLIIFFEE SSAANNCCTTUUAARRYY,, EECCOO SSEENNSSIITTIIVVEE AARREEAASS,, WWAATTEERR BBOODDIIEESS ((DDIISSTTAANNCCEE FFRROOMM TTHHEE HHFFLL OOFF TTHHEE

RRIIVVEERR)),, CCRRZZ.. IINN CCAASSEE OOFF NNOOTTIIFFIIEEDD IINNDDUUSSTTRRIIAALL AARREEAA,, AA CCOOPPYY OOFF TTHHEE GGAAZZEETTTTEE NNOOTTIIFFIICCAATTIIOONN SSHHOOUULLDD BBEE

IINNDDUUSSTTRRIIAALL AARREEAA;; AA CCOOPPYY OOFF TTHHEE GGAAZZEETTTTEE NNOOTTIIFFIICCAATTIIOONN SSHHOOUULLDD BBEE GGIIVVEENN.. ............................................................. 21

44..66 EEXXIISSTTIINNGG IINNFFRRAASSTTRRUUCCTTUURREE ......................................................................................................................................... 21

44..77 CCLLIIMMAATTIICC DDAATTAA FFRROOMM SSEECCOONNDDAARRYY SSOOUURRCCEESS ....................................................... Error! Bookmark not defined.

44..88 SSOOCCIIAALL IINNFFRRAASSTTRRUUCCTTUURREE AAVVAAIILLAABBLLEE ........................................................................................................................ 22

5. PLANNING BRIEF ................................................................................................................................................................. 29

55..11 PPLLAANNNNIINNGG CCOONNCCEEPPTT ((TTYYPPEE OOFF IINNDDUUSSTTRRIIEESS,, FFAACCIILLIITTIIEESS,, TTRRAANNSSPPOORRTTAATTIIOONN EETTCC)) TTOOWWNN AANNDD CCOOUUNNTTRRYY

PPLLAANNNNIINNGG//DDEEVVEELLOOPPMMEENNTT AAUUTTHHOORRIITTYY CCLLAASSSSIIFFIICCAATTIIOONN ..................................................................................................... 29

55..22 PPOOPPUULLAATTIIOONN PPRROOJJEECCTTIIOONNSS ........................................................................................................................................... 29

55..33 LLAANNDD UUSSEE PPLLAANNNNIINNGG ((BBRREEAAKKUUPP AALLOONNGG WWIITTHH GGRREEEENN BBEELLTT EETTCC..)) ........................................................................ 29

PPRREE--FFEEAASSIIBBIILLIITTYY RREEPPOORRTT ENVIRONMENTAL CLEARANCE FOR 9.38 ACRE/ 3.79 HA STONE MINING PROJECT

OF M/S. DILIP BUILDCON LTD. LOCATED NEAR MOUZA–CHARAKMARA , P.S.–

BAHARAGORA, DISTRICT–EAST SINGHBHUM, STATE–JHARKHAND.

BB

PROJECT PROPONENT

M/S DILIP BUIDCON LTD.

NOMINATED OWNER- SRI JAYPRAKASH CHATURVEDI,

ADDRESS:-MAHATO HOUSE, NEAR CENTRAL BANK, GHATSILA,

DIST-EAST SINGHBHUM, STATE- JHARKHAND.

MOB NO-7033592588.

PAGE 3

CONSULTANTS

SATHI PLANNERS PVT. LTD.

REG. OFFICE: LAKE AVENUE, BEHIND CAMBRIAN PUBLIC SCHOOL, KANKE ROAD, RANCHI- 834008, JHARKHAND.

55..44 AASSSSEESSSSMMEENNTT OOFF IINNFFRRAASSTTRRUUCCTTUURREE DDEEMMAANNDD ((PPHHYYSSIICCAALL && SSOOCCIIAALL)) ................................................................... 29

55..55 AAMMEENNIITTIIEESS// FFAACCIILLIITTIIEESS ................................................................................................................................................ 30

5.6 EMP (Environment Management Plan) ...................................................... Error! Bookmark not defined.

6. PROPOSED INFRASTRUCTURE ...................................................................................................................................... 31

6.1 Afforestation: ......................................................................................................... Error! Bookmark not defined.

6.1.1 Progressive Afforestation during proposal period: .......................... Error! Bookmark not defined.

7. REHABILITATION AND RESETTLEMENT(R&R PLAN) ....................................................................................... 33

77..11 PPOOLLIICCYY TTOO AADDOOPPTTEEDD ((CCEENNTTRRAALL SSTTAATTEE)) IINN RREESSPPEECCTT OOFF TTHHEE PPRROOJJEECCTT AAFFFFEECCTTEEDD PPEERRSSOONN IINNCCLLUUDDIINNGG HHOOMMEE

OOUUTTSSEEEESS,, LLAANNDD OOUUTTSSEEEESS AANNDD LLAANNDDLLEESSSS LLAABBOOUURR .................................................................................................................. 33

8. PROJECT SCHEDULE AND COST ESTIMATES .......................................................................................................... 34

88..11 LLIIKKEELLYY DDAATTEE OOFF SSTTAARRTT OOFF CCOONNSSTTRRUUCCTTIIOONN AANNDD LLIIKKEELLYY DDAATTEE OOFF CCOOMMPPLLEETTIIOONN ((TTIIMMEE SSCCHHEEDDUULLEE FFOORR TTHHEE

PPRROOJJEECCTT TTOO BBEE GGIIVVEENN)) ................................................................................................................................................................. 34

88..22 EESSTTIIMMAATTEEDD PPRROOJJEECCTT CCOOSSTT AANNDD AALLOONNGG WWIITTHH AANNAALLYYSSIISS IINN TTEERRMMSS OOFF EECCOONNOOMMIICC VVIIAABBIILLIITTYY OOFF TTHHEEMM PPRROOJJEECCTT..

34

8.3 CSR Budget: .................................................................................................................................................................. 34

9. ANALYSIS OF PROPOSAL (FINAL RECOMMENDATION) CONCLUSION ....................................................... 35

LLIISSTT OOFF TTAABBLLEESS

Table 1.1:- Salient Features of the Project ............................................................................................................................... 5

Table 2-1:- Details of Extent of Mechanism ......................................................................................................................... 10

Table 2-2:- Details of Loading Equipment ............................................................................................................................ 10

Table 3-1:- Project Coordinates ................................................................................................................................................ 14

Table 3-2:- Details of Proposed Production ......................................................................................................................... 15

Table 4-1:- Details of Land use of the Mine Lease Area ................................................................................................... 19

Table 4-2:- Environmental Sensitivity ................................................................................................................................... 21

Table 4-3:- Climatological Data ........................................................................................... Error! Bookmark not defined.

Table 5-1:- Details of land Use breakup ......................................................................... Error! Bookmark not defined.

PPRREE--FFEEAASSIIBBIILLIITTYY RREEPPOORRTT ENVIRONMENTAL CLEARANCE FOR 9.38 ACRE/ 3.79 HA STONE MINING PROJECT

OF M/S. DILIP BUILDCON LTD. LOCATED NEAR MOUZA–CHARAKMARA , P.S.–

BAHARAGORA, DISTRICT–EAST SINGHBHUM, STATE–JHARKHAND.

BB

PROJECT PROPONENT

M/S DILIP BUIDCON LTD.

NOMINATED OWNER- SRI JAYPRAKASH CHATURVEDI,

ADDRESS:-MAHATO HOUSE, NEAR CENTRAL BANK, GHATSILA,

DIST-EAST SINGHBHUM, STATE- JHARKHAND.

MOB NO-7033592588.

PAGE 4

CONSULTANTS

SATHI PLANNERS PVT. LTD.

REG. OFFICE: LAKE AVENUE, BEHIND CAMBRIAN PUBLIC SCHOOL, KANKE ROAD, RANCHI- 834008, JHARKHAND.

Table 6-1: Year Wise Afforestation Program ............................................................... Error! Bookmark not defined.

Table 8-1: CSR Budget ................................................................................................................................................................. 34

LLIISSTT OOFF FFIIGGUURREESS

Figure 3.1 :- Prior Environmental Clearance process for category B2 ...................................................................... 18

PPRREE--FFEEAASSIIBBIILLIITTYY RREEPPOORRTT ENVIRONMENTAL CLEARANCE FOR 9.38 ACRE/ 3.79 HA STONE MINING PROJECT

OF M/S. DILIP BUILDCON LTD. LOCATED NEAR MOUZA–CHARAKMARA , P.S.–

BAHARAGORA, DISTRICT–EAST SINGHBHUM, STATE–JHARKHAND.

BB

PROJECT PROPONENT

M/S DILIP BUIDCON LTD.

NOMINATED OWNER- SRI JAYPRAKASH CHATURVEDI,

ADDRESS:-MAHATO HOUSE, NEAR CENTRAL BANK, GHATSILA,

DIST-EAST SINGHBHUM, STATE- JHARKHAND.

MOB NO-7033592588.

PAGE 5

CONSULTANTS

SATHI PLANNERS PVT. LTD.

REG. OFFICE: LAKE AVENUE, BEHIND CAMBRIAN PUBLIC SCHOOL, KANKE ROAD, RANCHI- 834008, JHARKHAND.

11.. EEXXEECCUUTTIIVVEE SSUUMMMMAARRYY The proposed stone mine area of 9.38 Acres/ 3.79 Ha is located near village – Charakmara, P.S. – Bharagora, District –East Singhbhum, State – Jharkhand. Open cast Mechanized mining will be used for mining and drilling & blasting is proposed for this project. M/s Dilip Buildcon has applied of Stone Mine in Charakmara mouza to DMO East Singhbhum. DMO East Singhbhum issued LOI in Favour of M/s Dilip Buildcon of Shri Jayprakash Chaturbedi & Partner, vide lease application recpt. letter No.-108/016(M), DT 17-12-16 From DMO (East Singhbhum ), Jamshedpur Office.

1.1 Salient feature of the project

Table 1.1:- Salient Features of the Project

Sl. No.

Parameters Description

1 Name of the project Charakmara Stone Mine, 2 Nature of the project Stone Mining Project, 3 Project Proponent M/s D,ilip Buildcon,

4 Lease Period Applied for mining Lease (application receipt. letter No.-108/016(M), DT 17-12-16 From DMO (East Singhbhum ), Jamshedpur Office.

5

Details of the Lease Area

Mines Area 9.38 Acres(3.79 Ha),

Plot No. 2, 3, 7, 8, 9, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 31, 32, 40, 43, 44, 47, 51, 52, 53, 54, 56, 59, 79, 82, 83, 84, 85, 86, 106, 107 &108.

Khata No. - 6 Total Lease area 3.79 Ha (9.38 Acres) 7 Capacity of the project 229522.5 TPA /823.275 TPD

8 Category of the project B2 9 Location of the project Village – Charakmara, P.S. – Baharagora, District, East Singhbhum,

Jamshedpur, State – Jharkhand.

10.

Lease area Coordinate

Points Latitude Longitude P1 22017’41.15” N 86040’26.58”E

P2 22017’41.30” N 86040’25.59”E

P3 22017’41.50” N 86040’21.00”E

P4 22017’42.45” N 86040’19.25”E

P5 22017’43.35” N 86040’20.15”E

PPRREE--FFEEAASSIIBBIILLIITTYY RREEPPOORRTT ENVIRONMENTAL CLEARANCE FOR 9.38 ACRE/ 3.79 HA STONE MINING PROJECT

OF M/S. DILIP BUILDCON LTD. LOCATED NEAR MOUZA–CHARAKMARA , P.S.–

BAHARAGORA, DISTRICT–EAST SINGHBHUM, STATE–JHARKHAND.

BB

PROJECT PROPONENT

M/S DILIP BUIDCON LTD.

NOMINATED OWNER- SRI JAYPRAKASH CHATURVEDI,

ADDRESS:-MAHATO HOUSE, NEAR CENTRAL BANK, GHATSILA,

DIST-EAST SINGHBHUM, STATE- JHARKHAND.

MOB NO-7033592588.

PAGE 6

CONSULTANTS

SATHI PLANNERS PVT. LTD.

REG. OFFICE: LAKE AVENUE, BEHIND CAMBRIAN PUBLIC SCHOOL, KANKE ROAD, RANCHI- 834008, JHARKHAND.

Sl. No.

Parameters Description

P6 22017’45.30” N 86040’22.05”E P7 22017’47.56” N 86040’24.56”E

PPRREE--FFEEAASSIIBBIILLIITTYY RREEPPOORRTT ENVIRONMENTAL CLEARANCE FOR 9.38 ACRE/ 3.79 HA STONE MINING PROJECT

OF M/S. DILIP BUILDCON LTD. LOCATED NEAR MOUZA–CHARAKMARA , P.S.–

BAHARAGORA, DISTRICT–EAST SINGHBHUM, STATE–JHARKHAND.

BB

PROJECT PROPONENT

M/S DILIP BUIDCON LTD.

NOMINATED OWNER- SRI JAYPRAKASH CHATURVEDI,

ADDRESS:-MAHATO HOUSE, NEAR CENTRAL BANK, GHATSILA,

DIST-EAST SINGHBHUM, STATE- JHARKHAND.

MOB NO-7033592588.

PAGE 7

CONSULTANTS

SATHI PLANNERS PVT. LTD.

REG. OFFICE: LAKE AVENUE, BEHIND CAMBRIAN PUBLIC SCHOOL, KANKE ROAD, RANCHI- 834008, JHARKHAND.

Sl. No.

Parameters Description

P8 22017’42.02” N 86040’24.10”E P9 22017’45.55” N 86040’27.09”E

P10 22017’43.09” N 86040’28.05”E

11 Land Type Govt. Land Non Forest, 12 Method of Mining Opencast semi Mechanized mining method, 13 Operational days/year 300 days, 14 Life of Mines 3.00 Years

15

Total Water Requirement

Sl. No.

Purpose Water requirement

(KLD)

1 Drinking & domestic ( Man Power x 45 /1000. i.e ( 23x45/1000)

1.04

2 Afforestation/Greenbelt ( Area in ha (1.46) x 1.09 KLD per Ha)

1.59

3 Dust Suppression( Mining road(1 Acre= 4046 sq. M)(4046x0.20)/4 say road width +kachha Road)X 6.5 KLD per KM) (0.02+1.29) x 6.5

8.52

Total 11.14

16

Source of water

The Drinking & Domestic water need will be fulfilled by taking water from nearby village like Charakmara village. As soon as mine void is formed water for greenbelt and dust suppression will be met from water accumulated in mine void. For the purpose of Dust Suppression & Afforestation water from nearby Ponds and rain water Harvesting will be used.

17 Man power requirement

23 Persons

18

Nearest Railway Station / Airport along with distance in km.

Chakulia Railway Station at a distance of 21.0 km in north-east.

Birsa Munda Airport, Ranchi at about 180 km in NW direction from the lease area.

19

Nearest Town, city, District Headquarters along with distance in kms.

Nearest Town- Bahragora is situated at a distance of 5.65 km in south-east direction. District Headquarter- Jamshedpur, about 75.32 km from the lease area in N-W direction.

PPRREE--FFEEAASSIIBBIILLIITTYY RREEPPOORRTT ENVIRONMENTAL CLEARANCE FOR 9.38 ACRE/ 3.79 HA STONE MINING PROJECT

OF M/S. DILIP BUILDCON LTD. LOCATED NEAR MOUZA–CHARAKMARA , P.S.–

BAHARAGORA, DISTRICT–EAST SINGHBHUM, STATE–JHARKHAND.

BB

PROJECT PROPONENT

M/S DILIP BUIDCON LTD.

NOMINATED OWNER- SRI JAYPRAKASH CHATURVEDI,

ADDRESS:-MAHATO HOUSE, NEAR CENTRAL BANK, GHATSILA,

DIST-EAST SINGHBHUM, STATE- JHARKHAND.

MOB NO-7033592588.

PAGE 8

CONSULTANTS

SATHI PLANNERS PVT. LTD.

REG. OFFICE: LAKE AVENUE, BEHIND CAMBRIAN PUBLIC SCHOOL, KANKE ROAD, RANCHI- 834008, JHARKHAND.

20

Ecological Sensitive Areas (Wild life Sanctuaries, National Parks, Biosphere Reserves, Reserve/ Protected Forest etc)

Nearest forest is dense mixed jungle mainly saal situated at 4.5 km

away from the mine lease area in north-east direction.

Dense mixed jungle mainly cashewnut situated at 4.85 km away

from the mine lease area in east direction.

Dungridih jungle at 6.0 km away from the mine lease area in north-

west direction.

21 Historical Places None 22 Financial & Social

benefit Employment to local people directly or indirectly.

PPRREE--FFEEAASSIIBBIILLIITTYY RREEPPOORRTT ENVIRONMENTAL CLEARANCE FOR 9.38 ACRE/ 3.79 HA STONE MINING PROJECT OF

M/S. DILIP BUILDCON LTD. LOCATED NEAR MOUZA–CHARAKMARA , P.S.–

BAHARAGORA, DISTRICT–EAST SINGHBHUM, STATE–JHARKHAND.

BB

PROJECT PROPONENT

M/S DILIP BUIDCON LTD.

NOMINATED OWNER- SRI JAYPRAKASH CHATURVEDI,

ADDRESS:-MAHATO HOUSE, NEAR CENTRAL BANK, GHATSILA,

DIST-EAST SINGHBHUM, STATE- JHARKHAND.

MOB NO-7033592588.

PAGE 9

CONSULTANTS

SATHI PLANNERS PVT. LTD.

REG. OFFICE: LAKE AVENUE, BEHIND

CAMBRIAN PUBLIC SCHOOL, KANKE

ROAD, RANCHI- 834008, JHARKHAND.

22.. IINNTTRROODDUUCCTTIIOONN OOFF TTHHEE

PPRROOJJEECCTT//BBAACCKKGGRROOUUNNDD IINNFFOORRMMAATTIIOONN

2.1 PPRROOJJEECCTT PPRROOPPOONNEENNTT

M/s Dilip Buildcon Ltd.

Partner- Shri Jayprakash Chaturvedi & Partner.

2.2 AADDDDRREESSSS OOFF TTHHEE LLEESSSSEEEE

Shri Jayprakash Chaturvedi & Partner-

Mahato House, Near Central Bank, Ghatsila,

Dist-East Singhbhum,

State- Jharkhand.

MOB NO-7033592588

MMIINNIINNGG LLEEAASSEE AARREEAA && LLEEAASSEE BBAACCKKGGRROOUUNNDD

(1) M/S Dilip Buildcon Ltd has applied for Mining lease of Charakmara Stone Mine over an area of

11.76 acres in village–Charakmara, P.O.-Baharagora, P.S- Ghatsila, Dist.-East Singhbhum,

Jharkhand, as a captive stone mine for road construction work of N.H /S.H for three years only as a

development project of Govt. of India(Application receipt Letter. No. 108/016, dt. 17-12-16). The

company has been suggested verbally by the state Govt. to apply for the Mining lease, the area of

which is 9.38 acres.

Accordingly, M/S Dilip Buildcon Ltd has submitted an affidavit to District Mining Officer, Mines &

Geology Department, Dist. East Singhbhum, Jamshedpur, (Affidavit receipt No. 1596/21.03.17),

reducing the mining lease applied area from 11.76 Acres to 9.38 Acres.

The lease area is having Lat. N 22017’47.56” To N22017’41.15” & Long. E 86040’28.05” To

E86040’19.25”, Topo-sheet No.- 73J/11. Sri Jay Prakash Chaturvedi has been nominated as

Nominated Owner of the above said Mine.

BBRRIIEEFF DDEESSCCRRIIPPTTIIOONN OOFF NNAATTUURREE OOFF PPRROOJJEECCTT::

The applied mining lease area is 9.38 Acres and it is a Rayati land as per revenue record.

M/S Dilip Buildcon Ltd has applied for Mining lease of Charakmara Stone Mine over an area of

11.76 Acres, later the company has submitted an affidavit to reduce applied area to 9.38 Acres,

(Affidavit receipt No. 1596/21.03.17), in village–Charakmara, P.O.-Baharagora, P.S- Ghatsila,

Dist.-East Singhbhum, Jharkhand.

There will be use of Drilling & Blasting. Blasting in open cast mines is of utmost

importance, not only because it has to be compatible with the shovel/loader but also

preferably as will obviate the necessity of secondary blasting which is known to be very

costly. Drilling operation is proposed to carry out in the stone bench by compressed air

PPRREE--FFEEAASSIIBBIILLIITTYY RREEPPOORRTT ENVIRONMENTAL CLEARANCE FOR 9.38 ACRE/ 3.79 HA STONE MINING PROJECT

OF M/S. DILIP BUILDCON LTD. LOCATED NEAR MOUZA–CHARAKMARA , P.S.–

BAHARAGORA, DISTRICT–EAST SINGHBHUM, STATE–JHARKHAND.

BB

PROJECT PROPONENT

M/S DILIP BUIDCON LTD.

NOMINATED OWNER- SRI JAYPRAKASH CHATURVEDI,

ADDRESS:-MAHATO HOUSE, NEAR CENTRAL BANK, GHATSILA,

DIST-EAST SINGHBHUM, STATE- JHARKHAND.

MOB NO-7033592588.

PAGE 10

CONSULTANTS

SATHI PLANNERS PVT. LTD.

REG. OFFICE: LAKE AVENUE, BEHIND CAMBRIAN PUBLIC SCHOOL, KANKE ROAD, RANCHI- 834008, JHARKHAND.

crawler mounted wagon drill & depth of the hole will be 6 m plus 0.18 m (6 inches) sub-

level drilling to avoid the toe at the face having 100 mm dia. of hole. The volume of stone

per hole will be 45 cum. Considering the powder factor 2.25 cum/kg of explosive each

hole will be charged with 20 kg of explosive. The blasting operation will be carried out in

day time with all the statutory precautions. The blasted rock will be shifted to crusher to

the stock yard with the help of 1.2 cum excavator on to 25 tons / 10 cum dumpers and

transported to surface crusher.

22..33 NNEEEEDD FFOORR TTHHEE PPRROOJJEECCTT AANNDD IITTSS IIMMPPOORRTTAANNCCEE TTOO TTHHEE CCOOUUNNTTRRYY AANNDD RREEGGIIOONN

The Project is a mining lease for stone mine that should be used for infrastructure

development. The material is used for construction of building, railways, bridges and road etc.

The impact due to mining on the socio-economic front will be beneficial due to providing the

employment to the local villagers during mine activity. Total 23 staff will be required for this

mine and 23 peoples will directly be benefited by mining through employment. With

continuation of mining, other infrastructural developments will increase the socio-economic

status of the local inhabitants.

22..44 EEXXTTEENNTT OOFF MMEECCHHAANNIISSMM

Table 2-1:- Details of Extent of Mechanism

Sl. No. Type Nos. Size/Capacity Mode 0f Operation 1 Wagon Drill 01 100 mm dia Compressed/air 2 Compressor 01 50 L/s Diesel 3 Excavator 02 1.2 m3 Diesel 4 Tippers 25 tons 06 25 tones Diesel

5 Dozer (Optional) 00 65 H.P. Diesel

6 Grader(Optional) 00 175 H.P. Diesel

7 Water tanker 01 12000. Liters Diesel 8 Diesel Pump 01 5/10 HP Diesel 9 D.G. Set 01 60 KVA Diesel

22..55 LLOOAADDIINNGG EEQQUUIIPPMMEENNTT

Table 2-2:- Details of Loading Equipment

Type No. Bucket Capacity

In m3 Motive Power

Excavator 2 1.2 Diesel

PPRREE--FFEEAASSIIBBIILLIITTYY RREEPPOORRTT ENVIRONMENTAL CLEARANCE FOR 9.38 ACRE/ 3.79 HA STONE MINING PROJECT

OF M/S. DILIP BUILDCON LTD. LOCATED NEAR MOUZA–CHARAKMARA , P.S.–

BAHARAGORA, DISTRICT–EAST SINGHBHUM, STATE–JHARKHAND.

BB

PROJECT PROPONENT

M/S DILIP BUIDCON LTD.

NOMINATED OWNER- SRI JAYPRAKASH CHATURVEDI,

ADDRESS:-MAHATO HOUSE, NEAR CENTRAL BANK, GHATSILA,

DIST-EAST SINGHBHUM, STATE- JHARKHAND.

MOB NO-7033592588.

PAGE 11

CONSULTANTS

SATHI PLANNERS PVT. LTD.

REG. OFFICE: LAKE AVENUE, BEHIND CAMBRIAN PUBLIC SCHOOL, KANKE ROAD, RANCHI- 834008, JHARKHAND.

22..66 DDRRIILLLLIINNGG && BBLLAASSTTIINNGG

Drilling and blasting operations will be carried on strictly as per the provision of Rule

106 of MMR, 1961 with due approval from DGMS under the strict supervision of qualified

persons. For storage and issue of explosives, the relevant provisions of Indian Explosives

Rules, 1983 will be followed.

Blasting time is generally fixed at lunch-break interval or after the working shift-taking

all required precautions, like marking the danger zone with red flags, use of warning

signals and providing blasting shelters etc will be taken.

Although the mine is far away from any population, precautions will be taken to minimize

nuisance, caused by blasting. All necessary safety precautions are being taken in

accordance with the explosive act. Precautions are also taken as per permission given

under MMR, 1961 106(2) (b) by the Director of Mine’s Safety for deep hole drilling &

Blasting and also for the usage of heavy earth moving machinery.

Vibration: In order to minimize vibration the precautions shall be taken:

1. Blast holes shall be initiated by non-electric (NONEL) down-the-hole (DTH)

delay detonators.

2. Care shall be taken to ensure that effective burden is not excessive and the face

shall be kept sufficiently long. The burden shall be kept at 2.5 m & spacing shall

be 3.0 m.

3. Optimum charge per delay shall be kept as low as possible.

4 The depth of the hole shall be normally 6 m, which excludes about 0.18 meter of

sub grade drilling, i.e. about 3% of the depth of the hole. The diameter of the

hole shall be 100 mm.

5. Adoption of two row blasting and V pattern of firing.

4. The firing of maximum possible No. of blast holes towards free face.

5. Use of delay detonators between the holes and rows of blasting.

Noise: The following steps shall be taken to minimize pollution by noise.

1. Blasting pattern shall be well designed & blasted periodically rather than couple of

hastily unplanned blast daily. All the explosive and the NONEL detonator shall be put

within the blast hole & instead of detonating fuse, NONEL trunk-line-delay-

detonator shall be used for trunk line connections.

2. Blasting shall be planned to minimize boulders, so that secondary blasting shall be

reduced.

PPRREE--FFEEAASSIIBBIILLIITTYY RREEPPOORRTT ENVIRONMENTAL CLEARANCE FOR 9.38 ACRE/ 3.79 HA STONE MINING PROJECT

OF M/S. DILIP BUILDCON LTD. LOCATED NEAR MOUZA–CHARAKMARA , P.S.–

BAHARAGORA, DISTRICT–EAST SINGHBHUM, STATE–JHARKHAND.

BB

PROJECT PROPONENT

M/S DILIP BUIDCON LTD.

NOMINATED OWNER- SRI JAYPRAKASH CHATURVEDI,

ADDRESS:-MAHATO HOUSE, NEAR CENTRAL BANK, GHATSILA,

DIST-EAST SINGHBHUM, STATE- JHARKHAND.

MOB NO-7033592588.

PAGE 12

CONSULTANTS

SATHI PLANNERS PVT. LTD.

REG. OFFICE: LAKE AVENUE, BEHIND CAMBRIAN PUBLIC SCHOOL, KANKE ROAD, RANCHI- 834008, JHARKHAND.

3. Green belt with trees of varying height shall be developed around the quarry to

absorb the blast noise & reduce noise.

Fly Rocks:

While blasting, if the holes will not be properly designed and charged, the main thrust of

the blast will be upwards and instead of fragmenting the rock, there will be an outward

surge resulting in rock fragments flying. In order to prevent fly rocks following steps

shall be taken:

1. Stemming length shall be kept more than or equal to the burden.

2. Inter-row delay shall be selected in such a way that each row pushes its burden

forward rather than in an upward direction.

3. Toe formation shall be avoided by proper design of drilling and blasting as toe hole

blasting involves increased risk of fly rocks.

4. To avoid fly rock problem at the edge of hill, light charged muffle blasting shall be

under taken.

Explosive Consumption Bench Height 6.0 m Burden 2.5 m Spacing 3.0 m Depth of Hole 6.0 m Powder Factor 2.25cum/kg Charge per hole 20 kg Avg. Production /day 823.275 Mt/304.92 cum /day Number of holes/day 304.92 /45= 6.78 say 7 hole/day

22..77 DDEEMMAANNDD AANNDD SSUUPPPPLLYY GGAAPP

As mentioned above, there is large demand of stone for construction and other activities in the country/ region. It is the essential raw material for construction of building, check dams, roads, bridges etc. Presently there is a shortage in supply of these materials as compared to the demand.

22..88 IIMMPPOORRTTSS VV//SS IINNDDIIGGEENNOOUUSS PPRROODDUUCCTTIIOONN

Development needs will be met only through indigenous produced stone.

22..99 EEXXPPOORRTT PPOOSSSSIIBBIILLIITTYY

There is no proposal to export the stone. However, stone produced from the mine will full-fill the needs of the region and will be sold to the nearest market.

PPRREE--FFEEAASSIIBBIILLIITTYY RREEPPOORRTT ENVIRONMENTAL CLEARANCE FOR 9.38 ACRE/ 3.79 HA STONE MINING PROJECT

OF M/S. DILIP BUILDCON LTD. LOCATED NEAR MOUZA–CHARAKMARA , P.S.–

BAHARAGORA, DISTRICT–EAST SINGHBHUM, STATE–JHARKHAND.

BB

PROJECT PROPONENT

M/S DILIP BUIDCON LTD.

NOMINATED OWNER- SRI JAYPRAKASH CHATURVEDI,

ADDRESS:-MAHATO HOUSE, NEAR CENTRAL BANK, GHATSILA,

DIST-EAST SINGHBHUM, STATE- JHARKHAND.

MOB NO-7033592588.

PAGE 13

CONSULTANTS

SATHI PLANNERS PVT. LTD.

REG. OFFICE: LAKE AVENUE, BEHIND CAMBRIAN PUBLIC SCHOOL, KANKE ROAD, RANCHI- 834008, JHARKHAND.

22..1100 DDOOMMEESSTTIICC//EEXXPPOORRTTSS MMAARRKKEETTSS

The proposed mining activity is for indigenous consumption only for constructions in different types of sites. There is no proposal to export the mineral.

22..1111 EEMMPPLLOOYYMMEENNTT GGEENNEERRAATTIIOONN ((DDIIRREECCTT && IINNDDIIRREECCTT)) DDUUEE TTOO TTHHEE PPRROOJJEECCTT

There will be 23 skilled and unskilled workers required for the mines who will be recruited from neighboring villages on contractual basis.

Table 0-3: Employment Potential

Sl. No. Designation Working forces per day

1 Manager Mines/Geologist Part time 0

2 Mining Mate/ Blaster 1

3 Mechanic 0 4 Electrician 1 5 Service Vehicle Operator/ water tanker 1 6 Excavator/ JCB Operator 2 7 Dozer operator 0 8 Grader Operator 0 9 Dumper /Tractor Operator 6

10 Drill Operators 1 11 Drill Helper 1 12 Compounder 0 13 Clerk 1 14 Trip Man 1 15 Semi-Skilled Worker 4 16 Unskilled workers 4

Total 23

PPRREE--FFEEAASSIIBBIILLIITTYY RREEPPOORRTT ENVIRONMENTAL CLEARANCE FOR 9.38 ACRE/ 3.79 HA STONE MINING PROJECT OF

M/S. DILIP BUILDCON LTD. LOCATED NEAR MOUZA–CHARAKMARA , P.S.–

BAHARAGORA, DISTRICT–EAST SINGHBHUM, STATE–JHARKHAND.

BB

PROJECT PROPONENT

M/S DILIP BUIDCON LTD.

NOMINATED OWNER- SRI JAYPRAKASH CHATURVEDI,

ADDRESS:-MAHATO HOUSE, NEAR CENTRAL BANK, GHATSILA,

DIST-EAST SINGHBHUM, STATE- JHARKHAND.

MOB NO-7033592588.

PAGE 14

CONSULTANTS

SATHI PLANNERS PVT. LTD.

REG. OFFICE: LAKE AVENUE, BEHIND

CAMBRIAN PUBLIC SCHOOL, KANKE

ROAD, RANCHI- 834008, JHARKHAND.

33.. PPRROOJJEECCTT DDEESSCCRRIIPPTTIIOONN

33..11 TTYYPPEE OOFF PPRROOJJEECCTT IINNCCLLUUDDIINNGG IINNTTEERRLLIINNKKEEDD AANNDD IINNTTEERRDDEEPPEENNDDEENNTT PPRROOJJEECCTTSS,, IIFF AANNYY

As per notification of Ministry of Environment and Forest (MOEF), New Delhi projects <

5 ha and < 25 ha falls in category “B2” as in this case the lease area is 3.79 hectare, so this

is also falls in “B2” category.

33..22 LLOOCCAATTIIOONN ((MMAAPP SSHHOOWWIINNGG GGEENNEERRAALL LLOOCCAATTIIOONN,, SSPPEECCIIFFIICC LLOOCCAATTIIOONN,, AANNDD PPRROOJJEECCTT BBOOUUNNDDAARRYY &&

PPRROOJJEECCTT SSIITTEE LLAAYYOOUUTT)) WWIITTHH CCOOOORRDDIINNAATTEESS..

This is a proposed Mining project and located at Charakmara village, P.S. – Baharagora,

District –East Singhbhum, State – Jharkhand over an area of 3.79 Ha. The details of the

project co-ordinate are described in below Table 3.1. Location map and coordinate map is

attached as Annexure-1 & Annexure-2.

Table 3-1:- Project Coordinates

Points Latitude Longitude P1 22017’41.15” N 86040’26.58”E

P2 22017’41.30” N 86040’25.59”E

P3 22017’41.50” N 86040’21.00”E

P4 22017’42.45” N 86040’19.25”E

P5 22017’43.35” N 86040’20.15”E

P6 22017’45.30” N 86040’22.05”E

P7 22017’47.56” N 86040’24.56”E

P8 22017’42.02” N 86040’24.10”E

P9 22017’45.55” N 86040’27.09”E

P10 22017’43.09” N 86040’28.05”E

DDEETTAAIILLSS OOFF AALLTTEERRNNAATTEE SSIITTEESS CCOONNSSIIDDEERREEDD AANNDD TTHHEE BBAASSIISS OOFF SSEELLEECCTTIINNGG TTHHEE PPRROOPPOOSSEEDD SSIITTEE,,

PPAARRTTIICCUULLAARRLLYY TTHHEE EENNVVIIRROONNMMEENNTTAALL CCOONNSSIIDDEERRAATTIIOONNSS GGOONNEE IINNTTOO SSHHOOUULLDD BBEE HHIIGGHHLLIIGGHHTTEEDD..

There is no alternative sites/location are considered as this is a mining project which is

site specific by nature.

PPRREE--FFEEAASSIIBBIILLIITTYY RREEPPOORRTT ENVIRONMENTAL CLEARANCE FOR 9.38 ACRE/ 3.79 HA STONE MINING PROJECT

OF M/S. DILIP BUILDCON LTD. LOCATED NEAR MOUZA–CHARAKMARA , P.S.–

BAHARAGORA, DISTRICT–EAST SINGHBHUM, STATE–JHARKHAND.

BB

PROJECT PROPONENT

M/S DILIP BUIDCON LTD.

NOMINATED OWNER- SRI JAYPRAKASH CHATURVEDI,

ADDRESS:-MAHATO HOUSE, NEAR CENTRAL BANK, GHATSILA,

DIST-EAST SINGHBHUM, STATE- JHARKHAND.

MOB NO-7033592588.

PAGE 15

CONSULTANTS

SATHI PLANNERS PVT. LTD.

REG. OFFICE: LAKE AVENUE, BEHIND CAMBRIAN PUBLIC SCHOOL, KANKE ROAD, RANCHI- 834008, JHARKHAND.

33..33 SSIIZZEE AANNDD MMAAGGNNIITTUUDDEE OOFF OOPPEERRAATTIIOONN

The mining will be carried out in the mine lease area by adopting fully mechanized

mining method. Proposed production details are shown in below:-

Table 3-2:- Details of Proposed Production

YEAR

PROD. Cum in

Situ.

DENSITY TON/CUM

TOTAL PROD. MT in

Situ

PROD. PER DAY MT. in

situ.

Total O.B cum in

Situ.

PROD. CUM in Situ /DAY

PROD. CFT in Situ/DAY

1ST 131625 2.7 355387.5 1184.63 18850 438.75 15494.28

2ND 90300 2.7 243810 812.7 9152 301.00 10629.69

3RD 52500 2.7 141750 472.5 26250 175.00 6180.06

4TH 0 2.7 0 0 0 0.00 0.00

5TH 0 2.7 0 0 0 0.00 0.00

TOTAL 274425 688567.5 823.275 54252 304.92 10768.01

33..44 PPRROOJJEECCTT DDEESSCCRRIIPPTTIIOONN WWIITTHH PPRROOCCEESSSS DDEETTAAIILLSS ((AA SSCCHHEEMMAATTIICC DDIIAAGGRRAAMM//FFLLOOWW CCHHAARRTT SSHHOOWWIINNGG

TTHHEE PPRROOJJEECCTT LLAAYYOOUUTT,, CCOOMMPPOONNEENNTTSS OOFF TTHHEE PPRROOJJEECCTT EETTCC.. SSHHOOUULLDD BBEE GGIIVVEENN))

The five year development program of the Stone mine are as follows:

Mining operation has been proposed to be mechanized open cast mining. No drilling was proposed during O.B. Removal.

Drilling operation will be carried out, only in the stone rock body by compressed air wagon drill 6m depth &100 mm dia. After control blasting, the blasted material will be loaded by 1.2 cum Excavator into Dumper (25 ton) and transported to the surface crusher. The stone rock bench will be kept max.6 m height & 5/ 6 m wide alternately to facilitate the movement of the HEMM. During the closure of the mine i.e. after 3 (Three) years the mineralized benches will be taken out judicially.

The proposed final bench slope will be restricted to 45o. Due approval from D.G.M.S, The mining operation will be carried out as per Rule -106 of MMR-1961 is proposed. Mining operation is proposed in general shift only (8AM to 5 PM).The average number of working days in a year would be 300 days/yr only (excluding holidays), the production will slow down trend during monsoon period. Total 23 unskilled, semi-skilled & highly skilled workers will be deployed by the lessee.

PPRREE--FFEEAASSIIBBIILLIITTYY RREEPPOORRTT ENVIRONMENTAL CLEARANCE FOR 9.38 ACRE/ 3.79 HA STONE MINING PROJECT

OF M/S. DILIP BUILDCON LTD. LOCATED NEAR MOUZA–CHARAKMARA , P.S.–

BAHARAGORA, DISTRICT–EAST SINGHBHUM, STATE–JHARKHAND.

BB

PROJECT PROPONENT

M/S DILIP BUIDCON LTD.

NOMINATED OWNER- SRI JAYPRAKASH CHATURVEDI,

ADDRESS:-MAHATO HOUSE, NEAR CENTRAL BANK, GHATSILA,

DIST-EAST SINGHBHUM, STATE- JHARKHAND.

MOB NO-7033592588.

PAGE 16

CONSULTANTS

SATHI PLANNERS PVT. LTD.

REG. OFFICE: LAKE AVENUE, BEHIND CAMBRIAN PUBLIC SCHOOL, KANKE ROAD, RANCHI- 834008, JHARKHAND.

33..55 RRAAWW MMAATTEERRIIAALL RREEQQUUIIRREEDD AALLOONNGG WWIITTHH EESSTTIIMMAATTEEDD QQUUAANNTTIITTYY,, LLIIKKEELLYY SSOOUURRCCEE,, MMAARRKKEETTIINNGG

AARREEAA OOFF FFIINNAALL PPRROODDUUCCTTSS//SS,, MMOODDEE OOFF TTRRAANNSSPPOORRTT OOFF RRAAWW MMAATTEERRIIAALL AANNDD FFIINNIISSHHEEDD PPRROODDUUCCTT..

No raw material will be required for mining of stone.

Marketing area: Collected stone will be sold to local market.

33..66 RREESSOOUURRCCEE OOPPTTIIMMIIZZAATTIIOONN//RREECCYYCCLLIINNGG AANNDD RREEUUSSEE EENNVVIISSAAGGEEDD IINN TTHHEE PPRROOJJEECCTT,, IIFF AANNYY,, SSHHOOUULLDD

BBEE BBRRIIEEFFLLYY OOUUTTLLIINNEEDD..

The proposed project is a minor mineral mining project, for stone mining site near Charakmara village. The pits created due to extraction and collection of material from mine area will be, converted to water body and reclaimed area will be converted to green belt.

33..77 AAVVAAIILLAABBIILLIITTYY OOFF WWAATTEERR IITTSS SSOOUURRCCEE,, EENNEERRGGYY//PPOOWWEERR RREEQQUUIIRREEMMEENNTT AANNDD SSOOUURRCCEE SSHHOOUULLDD BBEE

GGIIVVEENN

Total water requirement in the mine will be about 11.14 KLD for drinking & domestic use, dust suppression and plantation. Required water will be collected from nearby villages like Charakmara.

In hard rock areas, ground water occurs within the weathered zone (10-25 m thickness) and in the underlying fractures/joints. The ground water occurs both under unconfined condition and semi confined to confined condition. The unconfined condition exists in the weathered mantle portion of the rocks. Depth of weathered mantle varies from 15-34 m in general. Hydro-geological map of the district is shown in figure 3.

41.67% wells showing declining trend for all the period. Thus, all the blocks required for artificial

recharge through check dam, percolation tank, nala bandhara, gabion structures and contour

bunding and trenching

33..88 QQUUAANNTTIITTYY OOFF WWAASSTTEESS TTOO BBEE GGEENNEERRAATTEEDD ((LLIIQQUUIIDD AANNDD SSOOLLIIDD )) AANNDD SSCCHHEEMMEE FFOORR TTHHEEIIRR

MMAANNAAGGEEMMEENNTT//DDIISSPPOOSSAALL

A little quantity of top soil will be generated or removed from the mine. The OB will be removed and stacked in the dump yard located in the northern part corner of ML area.

33..99 SSCCHHEEMMAATTIICC RREEPPRREESSEENNTTAATTIIOONNSS OOFF TTHHEE FFEEAASSIIBBIILLIITTYY DDRRAAWWIINNGG WWHHIICCHH GGIIVVEE IINNFFOORRMMAATTIIOONN OOFF EEIIAA

PPUURRPPOOSSEE

As per the Environment Impact Assessment (EIA) notification dated 14th Sept. 2006 and amendment done so far, the proposal of mining lease falls under category B. EIA/EMP report note is required to get environmental clearance for this project from the DEIAA. The baseline studies will be undertaken as per schematic diagram given as Fig 3.1.

PPRREE--FFEEAASSIIBBIILLIITTYY RREEPPOORRTT ENVIRONMENTAL CLEARANCE FOR 9.38 ACRE/ 3.79 HA STONE MINING PROJECT

OF M/S. DILIP BUILDCON LTD. LOCATED NEAR MOUZA–CHARAKMARA , P.S.–

BAHARAGORA, DISTRICT–EAST SINGHBHUM, STATE–JHARKHAND.

BB

PROJECT PROPONENT

M/S DILIP BUIDCON LTD.

NOMINATED OWNER- SRI JAYPRAKASH CHATURVEDI,

ADDRESS:-MAHATO HOUSE, NEAR CENTRAL BANK, GHATSILA,

DIST-EAST SINGHBHUM, STATE- JHARKHAND.

MOB NO-7033592588.

PAGE 17

CONSULTANTS

SATHI PLANNERS PVT. LTD.

REG. OFFICE: LAKE AVENUE, BEHIND CAMBRIAN PUBLIC SCHOOL, KANKE ROAD, RANCHI- 834008, JHARKHAND.

PPRREE--FFEEAASSIIBBIILLIITTYY RREEPPOORRTT ENVIRONMENTAL CLEARANCE FOR 9.38 ACRE/ 3.79 HA STONE MINING PROJECT

OF M/S. DILIP BUILDCON LTD. LOCATED NEAR MOUZA–CHARAKMARA , P.S.–

BAHARAGORA, DISTRICT–EAST SINGHBHUM, STATE–JHARKHAND.

BB

PROJECT PROPONENT

M/S DILIP BUIDCON LTD.

NOMINATED OWNER- SRI JAYPRAKASH CHATURVEDI,

ADDRESS:-MAHATO HOUSE, NEAR CENTRAL BANK, GHATSILA,

DIST-EAST SINGHBHUM, STATE- JHARKHAND.

MOB NO-7033592588.

PAGE 18

CONSULTANTS

SATHI PLANNERS PVT. LTD.

REG. OFFICE: LAKE AVENUE, BEHIND CAMBRIAN PUBLIC SCHOOL, KANKE ROAD, RANCHI- 834008, JHARKHAND.

Figure 3.1 :- Prior Environmental Clearance process for category B

PPRREE--FFEEAASSIIBBIILLIITTYY RREEPPOORRTT ENVIRONMENTAL CLEARANCE FOR 9.38 ACRE/ 3.79 HA STONE MINING PROJECT

OF M/S. DILIP BUILDCON LTD. LOCATED NEAR MOUZA–CHARAKMARA , P.S.–

BAHARAGORA, DISTRICT–EAST SINGHBHUM, STATE–JHARKHAND.

BB

PROJECT PROPONENT

M/S DILIP BUIDCON LTD.

NOMINATED OWNER- SRI JAYPRAKASH CHATURVEDI,

ADDRESS:-MAHATO HOUSE, NEAR CENTRAL BANK, GHATSILA,

DIST-EAST SINGHBHUM, STATE- JHARKHAND.

MOB NO-7033592588.

PAGE 19

CONSULTANTS

SATHI PLANNERS PVT. LTD.

REG. OFFICE: LAKE AVENUE, BEHIND CAMBRIAN PUBLIC SCHOOL, KANKE ROAD, RANCHI- 834008, JHARKHAND.

44.. SSIITTEE AANNAALLYYSSIISS

44..11 CCOONNNNEECCTTIIVVIITTYY

The stone mine is located at village Charakmara, Block & P.S.- Baharagora, Dist- East

Singhbhum is located in Survey of India Topographical sheet No.- 73J/11 which can be

approached by fair weather pucca road(From NH-33.- 3.00 km north-south-west) from

Baharagora about 5.65 KM in north-west direction .The area is connected with village

road adjacent to mine lease area and meets National Highway which is just 3.00 km in

NE direction from the Lease Area. The nearest railway station is Chakulia Railway Station

and which is situated at 21 km in north-west direction from the mine lease area. Birsa

Munda Airport, Ranchi is the nearest airport in respect of mine lease area situated at a

distance of 180 km from the lease area in NW direction.

44..22 LLAANNDD FFOORRMM,, LLAANNDD UUSSEE AANNDD LLAANNDD OOWWNNEERRSSHHIIPP

The mine lease applied area is 9.38 Acres/ 3.79 Ha of Raiyat’s waste land as per revenue

records given by Circle Officer, Baharagora, East Singhbhum. The details of the land are

given in below Table 4.1:-

Table 4-1:- Details of Land use of the Mine Lease Area

Sl. No.

Plot No. & Village Area in hectare Type of land Ownership / Occupancy

1

Plot No.- 2, 3, 7, 8, 9, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 31, 32, 40, 43, 44, 47, 51, 52, 53, 54, 56, 59, 79, 82, 83, 84, 85, 86, 106, 107 &108. & Charakmara

3.79 Stone Mine

(Raiyaty land) Raiyaty land

44..33 TTOOPPOOGGRRAAPPHHYY

East Singhbhum district is situated in the South Eastern part of Jharkhand state. The district is situated in

the Northern Plain of India and eastern plateau and hill region.

44..44 GGEEOOLLOOGGYY

East Singhbhum district has remarkably unique geological history. From Beharagora in

the South East up to East of Jamshedpur a major thrust zone is present which further

PPRREE--FFEEAASSIIBBIILLIITTYY RREEPPOORRTT ENVIRONMENTAL CLEARANCE FOR 9.38 ACRE/ 3.79 HA STONE MINING PROJECT

OF M/S. DILIP BUILDCON LTD. LOCATED NEAR MOUZA–CHARAKMARA , P.S.–

BAHARAGORA, DISTRICT–EAST SINGHBHUM, STATE–JHARKHAND.

BB

PROJECT PROPONENT

M/S DILIP BUIDCON LTD.

NOMINATED OWNER- SRI JAYPRAKASH CHATURVEDI,

ADDRESS:-MAHATO HOUSE, NEAR CENTRAL BANK, GHATSILA,

DIST-EAST SINGHBHUM, STATE- JHARKHAND.

MOB NO-7033592588.

PAGE 20

CONSULTANTS

SATHI PLANNERS PVT. LTD.

REG. OFFICE: LAKE AVENUE, BEHIND CAMBRIAN PUBLIC SCHOOL, KANKE ROAD, RANCHI- 834008, JHARKHAND.

enters in to Saraikela Kharsawan district. The shear zone separates a northern terrain of

highly metamorphosed rocks and southern terrain of relatively less metamorphosed

rocks. Sarkar and Saha (1977) have shown that this shear zone separates two

Precambrian provinces of the Indian shield: an older province in the south which

stabilized after the Iron ore orogenic cycle closing about 2900 million years ago and

younger province in the north that underwent the Singhbhum orogenic cycle closing at

about 850 million years ago.

The study area is situated in the south of this thrust zone and a general stratigraphic sequence of this area is given below-

Geology of East Singhbhum District Age Group Lithology Tertiaries Gravel bed, older alluvium

Dalma Volcanics Lower proterozoic

Epidiorite, Hornblende Schist, Volcanics tuffs, Quartzite, Carbon phyllite

Singhbhum group Mica schist , phyllite, Quartzite Singhbhum granite

RAJMAHAL BASALLTS AND INTERTRAPPEANS:-The Rajmahal hill range is represented by

Rajmahal Group of rocks. The rocks are basaltic lava ranging in thickness from 45m to

450 m. In basalt the intertrappeans are represented by tuffs, clay stones and siltstone.

Some of the rocks silicified and porcelenides. These are 40 m thick. There are 4 to 15

different volcanic flows. The rocks are of Jurassic to cretaceous age. Radiometric age of

these rocks varies from 11.8 to 70 million years. These rocks are extended for 125 Km

up to 24 degree latitude in Sahebganj near river Ganges.

GONDWANA SUPER GROUP:- Gondawana Supergroup formations are present in the area is

being discussed in brief. The Gondwanaqs are represented by alternation of

argillaceous and erinaceous sediments and intervened with numerous coal seams. They

are located in Dumka and other adjacent areas like Godda, Giridih, Dhanbad, Chatra,

Bokaro etc.

PPRREE--FFEEAASSIIBBIILLIITTYY RREEPPOORRTT ENVIRONMENTAL CLEARANCE FOR 9.38 ACRE/ 3.79 HA STONE MINING PROJECT

OF M/S. DILIP BUILDCON LTD. LOCATED NEAR MOUZA–CHARAKMARA , P.S.–

BAHARAGORA, DISTRICT–EAST SINGHBHUM, STATE–JHARKHAND.

BB

PROJECT PROPONENT

M/S DILIP BUIDCON LTD.

NOMINATED OWNER- SRI JAYPRAKASH CHATURVEDI,

ADDRESS:-MAHATO HOUSE, NEAR CENTRAL BANK, GHATSILA,

DIST-EAST SINGHBHUM, STATE- JHARKHAND.

MOB NO-7033592588.

PAGE 21

CONSULTANTS

SATHI PLANNERS PVT. LTD.

REG. OFFICE: LAKE AVENUE, BEHIND CAMBRIAN PUBLIC SCHOOL, KANKE ROAD, RANCHI- 834008, JHARKHAND.

44..55 EEXXIISSTTIINNGG LLAANNDD UUSSEE PPAATTTTEERRNN ((AAGGRRIICCUULLTTUURREE,, NNOONN--AAGGRRIICCUULLTTUURREE,, FFOORREESSTT,, WWAATTEERR BBOODDIIEESS

((IINNCCLLUUDDIINNGG AARREEAA UUNNDDEERR CCRRZZ)))),, SSHHOORRTTEESSTT DDIISSTTAANNCCEESS FFRROOMM TTHHEE PPEERRIIPPHHEERRYY OOFF TTHHEE PPRROOJJEECCTT

TTOO PPEERRIIPPHHEERRYY OOFF TTHHEE FFOORREESSTTSS,, NNAATTIIOONNAALL PPAARRKK,, WWIILLDD LLIIFFEE SSAANNCCTTUUAARRYY,, EECCOO SSEENNSSIITTIIVVEE AARREEAASS,,

WWAATTEERR BBOODDIIEESS ((DDIISSTTAANNCCEE FFRROOMM TTHHEE HHFFLL OOFF TTHHEE RRIIVVEERR)),, CCRRZZ.. IINN CCAASSEE OOFF NNOOTTIIFFIIEEDD

IINNDDUUSSTTRRIIAALL AARREEAA,, AA CCOOPPYY OOFF TTHHEE GGAAZZEETTTTEE NNOOTTIIFFIICCAATTIIOONN SSHHOOUULLDD BBEE IINNDDUUSSTTRRIIAALL AARREEAA;; AA

CCOOPPYY OOFF TTHHEE GGAAZZEETTTTEE NNOOTTIIFFIICCAATTIIOONN SSHHOOUULLDD BBEE GGIIVVEENN..

Nearest forest is PF situated at 4.50 Km away from the mine lease area in north-east direction.

Table 4-2:- Environmental Sensitivity

Forest PF/RF Distance Direction

Dense mixed jungle mainly Saal 4.5 KM NORTH-EAST

Dense mixed jungle mainly Cashewnut 4.85 KM EAST

Dungridih jungle 6.00 KM NORTH-WWEST

Water Bodies River Bodies Distance Direction

Sabarnarekha River 1.20 km west

Gurajuri Khal 0.50 km North

Asanjora Khal 3.20 km North

44..66 EEXXIISSTTIINNGG IINNFFRRAASSTTRRUUCCTTUURREE

Access to the applied lease area

As such in the stone mining operation there is no approach road from the main

connecting road the proponent developed a private kachha road up the connecting road

with the help of waste material generated from the mine. The distance may vary from

some meters to few kilometers.

Availability of water

The Drinking & Domestic water need will be fulfilled by taking water from nearby village

like Charakmara village. As soon as mine void is formed water for greenbelt and dust

suppression will be met from water accumulated in mine void and also nearby river/

Ponds will be used.

PPRREE--FFEEAASSIIBBIILLIITTYY RREEPPOORRTT ENVIRONMENTAL CLEARANCE FOR 9.38 ACRE/ 3.79 HA STONE MINING PROJECT

OF M/S. DILIP BUILDCON LTD. LOCATED NEAR MOUZA–CHARAKMARA , P.S.–

BAHARAGORA, DISTRICT–EAST SINGHBHUM, STATE–JHARKHAND.

BB

PROJECT PROPONENT

M/S DILIP BUIDCON LTD.

NOMINATED OWNER- SRI JAYPRAKASH CHATURVEDI,

ADDRESS:-MAHATO HOUSE, NEAR CENTRAL BANK, GHATSILA,

DIST-EAST SINGHBHUM, STATE- JHARKHAND.

MOB NO-7033592588.

PAGE 22

CONSULTANTS

SATHI PLANNERS PVT. LTD.

REG. OFFICE: LAKE AVENUE, BEHIND CAMBRIAN PUBLIC SCHOOL, KANKE ROAD, RANCHI- 834008, JHARKHAND.

Climate

The climate of this region may be considered as extreme, being intensely hot in summer

and moderately cold in winter. The climate of the area is also characterized by a hot dry

summer and well-distributed rains in the monsoon season. The cold season commences

from December and lasts till the end of February. The hot season follows thereafter and

continues till about the third week of June. The southwest monsoon season is from the

middle/end of June to the end of September.

The Climate of the district is temperate. Annual rainfall is 1200 mm to 1400 mm. This

area comes under the path of south-west monsoon so sometimes it receives heavy rain

during July to September. During the summer seasons maximum temperature goes up

400 C - 450 C whereas in winter it has recorded a minimum of 80 C.

PPRREE--FFEEAASSIIBBIILLIITTYY RREEPPOORRTT ENVIRONMENTAL CLEARANCE FOR 9.38 ACRE/ 3.79 HA STONE MINING PROJECT

OF M/S. DILIP BUILDCON LTD. LOCATED NEAR MOUZA–CHARAKMARA , P.S.–

BAHARAGORA, DISTRICT–EAST SINGHBHUM, STATE–JHARKHAND.

BB

PROJECT PROPONENT

M/S DILIP BUIDCON LTD.

NOMINATED OWNER- SRI JAYPRAKASH CHATURVEDI,

ADDRESS:-MAHATO HOUSE, NEAR CENTRAL BANK, GHATSILA,

DIST-EAST SINGHBHUM, STATE- JHARKHAND.

MOB NO-7033592588.

PAGE 23

CONSULTANTS

SATHI PLANNERS PVT. LTD.

REG. OFFICE: LAKE AVENUE, BEHIND CAMBRIAN PUBLIC SCHOOL, KANKE ROAD, RANCHI- 834008, JHARKHAND.

PPRREE--FFEEAASSIIBBIILLIITTYY RREEPPOORRTT ENVIRONMENTAL CLEARANCE FOR 9.38 ACRE/ 3.79 HA STONE MINING PROJECT

OF M/S. DILIP BUILDCON LTD. LOCATED NEAR MOUZA–CHARAKMARA , P.S.–

BAHARAGORA, DISTRICT–EAST SINGHBHUM, STATE–JHARKHAND.

BB

PROJECT PROPONENT

M/S DILIP BUIDCON LTD.

NOMINATED OWNER- SRI JAYPRAKASH CHATURVEDI,

ADDRESS:-MAHATO HOUSE, NEAR CENTRAL BANK, GHATSILA,

DIST-EAST SINGHBHUM, STATE- JHARKHAND.

MOB NO-7033592588.

PAGE 24

CONSULTANTS

SATHI PLANNERS PVT. LTD.

REG. OFFICE: LAKE AVENUE, BEHIND CAMBRIAN PUBLIC SCHOOL, KANKE ROAD, RANCHI- 834008, JHARKHAND.

PPRREE--FFEEAASSIIBBIILLIITTYY RREEPPOORRTT ENVIRONMENTAL CLEARANCE FOR 9.38 ACRE/ 3.79 HA STONE MINING PROJECT

OF M/S. DILIP BUILDCON LTD. LOCATED NEAR MOUZA–CHARAKMARA , P.S.–

BAHARAGORA, DISTRICT–EAST SINGHBHUM, STATE–JHARKHAND.

BB

PROJECT PROPONENT

M/S DILIP BUIDCON LTD.

NOMINATED OWNER- SRI JAYPRAKASH CHATURVEDI,

ADDRESS:-MAHATO HOUSE, NEAR CENTRAL BANK, GHATSILA,

DIST-EAST SINGHBHUM, STATE- JHARKHAND.

MOB NO-7033592588.

PAGE 25

CONSULTANTS

SATHI PLANNERS PVT. LTD.

REG. OFFICE: LAKE AVENUE, BEHIND CAMBRIAN PUBLIC SCHOOL, KANKE ROAD, RANCHI- 834008, JHARKHAND.

PPRREE--FFEEAASSIIBBIILLIITTYY RREEPPOORRTT ENVIRONMENTAL CLEARANCE FOR 9.38 ACRE/ 3.79 HA STONE MINING PROJECT

OF M/S. DILIP BUILDCON LTD. LOCATED NEAR MOUZA–CHARAKMARA , P.S.–

BAHARAGORA, DISTRICT–EAST SINGHBHUM, STATE–JHARKHAND.

BB

PROJECT PROPONENT

M/S DILIP BUIDCON LTD.

NOMINATED OWNER- SRI JAYPRAKASH CHATURVEDI,

ADDRESS:-MAHATO HOUSE, NEAR CENTRAL BANK, GHATSILA,

DIST-EAST SINGHBHUM, STATE- JHARKHAND.

MOB NO-7033592588.

PAGE 26

CONSULTANTS

SATHI PLANNERS PVT. LTD.

REG. OFFICE: LAKE AVENUE, BEHIND CAMBRIAN PUBLIC SCHOOL, KANKE ROAD, RANCHI- 834008, JHARKHAND.

PPRREE--FFEEAASSIIBBIILLIITTYY RREEPPOORRTT ENVIRONMENTAL CLEARANCE FOR 9.38 ACRE/ 3.79 HA STONE MINING PROJECT

OF M/S. DILIP BUILDCON LTD. LOCATED NEAR MOUZA–CHARAKMARA , P.S.–

BAHARAGORA, DISTRICT–EAST SINGHBHUM, STATE–JHARKHAND.

BB

PROJECT PROPONENT

M/S DILIP BUIDCON LTD.

NOMINATED OWNER- SRI JAYPRAKASH CHATURVEDI,

ADDRESS:-MAHATO HOUSE, NEAR CENTRAL BANK, GHATSILA,

DIST-EAST SINGHBHUM, STATE- JHARKHAND.

MOB NO-7033592588.

PAGE 27

CONSULTANTS

SATHI PLANNERS PVT. LTD.

REG. OFFICE: LAKE AVENUE, BEHIND CAMBRIAN PUBLIC SCHOOL, KANKE ROAD, RANCHI- 834008, JHARKHAND.

PPRREE--FFEEAASSIIBBIILLIITTYY RREEPPOORRTT ENVIRONMENTAL CLEARANCE FOR 9.38 ACRE/ 3.79 HA STONE MINING PROJECT

OF M/S. DILIP BUILDCON LTD. LOCATED NEAR MOUZA–CHARAKMARA , P.S.–

BAHARAGORA, DISTRICT–EAST SINGHBHUM, STATE–JHARKHAND.

BB

PROJECT PROPONENT

M/S DILIP BUIDCON LTD.

NOMINATED OWNER- SRI JAYPRAKASH CHATURVEDI,

ADDRESS:-MAHATO HOUSE, NEAR CENTRAL BANK, GHATSILA,

DIST-EAST SINGHBHUM, STATE- JHARKHAND.

MOB NO-7033592588.

PAGE 28

CONSULTANTS

SATHI PLANNERS PVT. LTD.

REG. OFFICE: LAKE AVENUE, BEHIND CAMBRIAN PUBLIC SCHOOL, KANKE ROAD, RANCHI- 834008, JHARKHAND.

44..77 SSOOCCIIAALL IINNFFRRAASSTTRRUUCCTTUURREE AAVVAAIILLAABBLLEE The mining area is well connected by road to district Headquarter Jamshedpur, which is

at 75 km in NW direction from proposed mine site. All educational, banking, Recreational,

Medical facilities and other infrastructure are available in Ghatsila at a distance of 38 Km

in NW direction.

Rest Shelter

A temporary Rest shelter is proposed near mine site.

Drinking Water

The Drinking & Domestic water need will be fulfilled by taking water from nearby village like

Charakmara village.

PPRREE--FFEEAASSIIBBIILLIITTYY RREEPPOORRTT ENVIRONMENTAL CLEARANCE FOR 9.38 ACRE/ 3.79 HA STONE MINING PROJECT OF

M/S. DILIP BUILDCON LTD. LOCATED NEAR MOUZA–CHARAKMARA , P.S.–

BAHARAGORA, DISTRICT–EAST SINGHBHUM, STATE–JHARKHAND.

BB

PROJECT PROPONENT

M/S DILIP BUIDCON LTD.

NOMINATED OWNER- SRI JAYPRAKASH CHATURVEDI,

ADDRESS:-MAHATO HOUSE, NEAR CENTRAL BANK, GHATSILA,

DIST-EAST SINGHBHUM, STATE- JHARKHAND.

MOB NO-7033592588.

PAGE 29

CONSULTANTS

SATHI PLANNERS PVT. LTD.

REG. OFFICE: LAKE AVENUE, BEHIND

CAMBRIAN PUBLIC SCHOOL, KANKE

ROAD, RANCHI- 834008, JHARKHAND.

55.. PPLLAANNNNIINNGG BBRRIIEEFF 55..11 PPLLAANNNNIINNGG CCOONNCCEEPPTT ((TTYYPPEE OOFF IINNDDUUSSTTRRIIEESS,, FFAACCIILLIITTIIEESS,, TTRRAANNSSPPOORRTTAATTIIOONN EETTCC)) TTOOWWNN AANNDD

CCOOUUNNTTRRYY PPLLAANNNNIINNGG//DDEEVVEELLOOPPMMEENNTT AAUUTTHHOORRIITTYY CCLLAASSSSIIFFIICCAATTIIOONN

The project falls into the category of “Mining Industry”. The raw materials such as Stone available in this area are granted for mining purpose. The required semi- skilled and unskilled laborers are locally available. For transportation of material/minerals by tractor trolleys/tipper trucks/cart will be deployed.

55..22 PPOOPPUULLAATTIIOONN PPRROOJJEECCTTIIOONNSS

The project will employ most of the workers from nearby villages. Only supervisory staff will be hired from outside. There will not be any increase in population due to the project.

55..33 LLAANNDD UUSSEE PPLLAANNNNIINNGG ((BBRREEAAKKUUPP AALLOONNGG WWIITTHH GGRREEEENN BBEELLTT EETTCC..))

Approximate land use is as following for life of mine are given in below Table 5.1.

Sl. No.

Pattern of Utilization Present/Existing land

use pattern in

(acres)

Proposed Land use for current plan period for three (3) years

only (acres)

Land to be used in remaining period of the

life of the mine. (acres)

Land used at the

conceptual stage ie end

of mine life in (acres)

Area to be converted

in the conceptual

period

1 Mining Activities 0.00 5.58 0.00 5.58 Water Body 2 Rest Shelter & Blasting

Shelter 0.00 0.20 0.00 0.20 Green Belt

3 Dumping 0.00 0.20 0.00 0.20 Green Belt

4 Mining Road 0.00 0.20 0.00 0.20 Approach Road 5 Garland drain 0.00 0.30 0.00 0.30 Garland Drain 6 Green belt/Safety Zone 0.00 2.90 0.00 2.90 Green Belt

7 Stone Stock yards 0.00 0.00 0.00 0.00

8 Unutilized 9.38 0.00 0.00 0.00 Green Belt

9 Total

9.38 9.38 0.00 9.38

55..44 AASSSSEESSSSMMEENNTT OOFF IINNFFRRAASSTTRRUUCCTTUURREE DDEEMMAANNDD ((PPHHYYSSIICCAALL && SSOOCCIIAALL))

The road facility is already available which shall be used and properly maintained.

Preference will be given to local labourer from nearby villages. Other requisite

infrastructure as transport of mine labourers is available by way of jeep, two-wheeler.

PPRREE--FFEEAASSIIBBIILLIITTYY RREEPPOORRTT ENVIRONMENTAL CLEARANCE FOR 9.38 ACRE/ 3.79 HA STONE MINING PROJECT

OF M/S. DILIP BUILDCON LTD. LOCATED NEAR MOUZA–CHARAKMARA , P.S.–

BAHARAGORA, DISTRICT–EAST SINGHBHUM, STATE–JHARKHAND.

BB

PROJECT PROPONENT

M/S DILIP BUIDCON LTD.

NOMINATED OWNER- SRI JAYPRAKASH CHATURVEDI,

ADDRESS:-MAHATO HOUSE, NEAR CENTRAL BANK, GHATSILA,

DIST-EAST SINGHBHUM, STATE- JHARKHAND.

MOB NO-7033592588.

PAGE 30

CONSULTANTS

SATHI PLANNERS PVT. LTD.

REG. OFFICE: LAKE AVENUE, BEHIND CAMBRIAN PUBLIC SCHOOL, KANKE ROAD, RANCHI- 834008, JHARKHAND.

55..55 AAMMEENNIITTIIEESS// FFAACCIILLIITTIIEESS

The following activities are proposed for the welfare of labourers engaged in the extraction

of stone mining.

Drinking water,

Tankers will be deployed for the supply of drinking water in the project site.

Organizing of Health Camps,

One health camp after every two months shall be held in each of the mining gate.

First Aid kit and provision of anti-snake venom.

PPRREE--FFEEAASSIIBBIILLIITTYY RREEPPOORRTT ENVIRONMENTAL CLEARANCE FOR 9.38 ACRE/ 3.79 HA STONE MINING PROJECT

OF M/S. DILIP BUILDCON LTD. LOCATED NEAR MOUZA–CHARAKMARA , P.S.–

BAHARAGORA, DISTRICT–EAST SINGHBHUM, STATE–JHARKHAND.

BB

PROJECT PROPONENT

M/S DILIP BUIDCON LTD.

NOMINATED OWNER- SRI JAYPRAKASH CHATURVEDI,

ADDRESS:-MAHATO HOUSE, NEAR CENTRAL BANK, GHATSILA,

DIST-EAST SINGHBHUM, STATE- JHARKHAND.

MOB NO-7033592588.

PAGE 31

CONSULTANTS

SATHI PLANNERS PVT. LTD.

REG. OFFICE: LAKE AVENUE, BEHIND CAMBRIAN PUBLIC SCHOOL, KANKE ROAD, RANCHI- 834008, JHARKHAND.

66.. PPRROOPPOOSSEEDD IINNFFRRAASSTTRRUUCCTTUURREE 6.1 INDUSTRIAL AREA (PROCESSING AREA ).

The boulder generated from the mine is generally of various size 100 mm to 200 mm the bigger size boulders are manually broken to small size of 400 to 200 mm and it is fed to the ball mill crusher to small size of 50 mm to 5mm. in this process lot of dusts are generated and it is being arrested by providing proper water spray arrangement at suitable location.

6.2 RESIDENTIAL AREA (NON PROCESSING AREA).

Not applicable due to small activities.

6.3 GREEN BELT The common native plant species used to develop green belt in safety zone of all around

the mine lease boundary also in the barren area during conceptual plan period will be

Sal, Mango, Gulmohar, Neem, Bargad, Amaltas, Pipal, Teak, Arjuna, Kadamb, Ahhatwar

etc.

Progressive Afforestation during proposal period:

Table 6-3-1: Year Wise Afforestation Program Sl. No.

Year of Plantation

Target of Plantation Area to be covered in Ha Area of Plantation

1 I Yr 972 0.486 Safety/Barrier Zone

2 II Yr 972 0.486 Safety/Barrier Zone

3 III Yr 972 0.486 Safety/Barrier Zone

4 IV Yr 00 00 Safety/Barrier Zone

5 V Yr 00 00 Safety/Barrier Zone

2000 plant per Ha 2915 1.46 Safety/Barrier Zone

Proposed Afforestation Program along the transportation route

Zone Length(m) Description Numbers of Trees

Along approach road 1.29 200 plant per kilometer 258

No. of plants at 10 mts apart both sides plant .

( Both sides plantation will be done along approach kachha road ) 129 x 2 = 258 nos.

PPRREE--FFEEAASSIIBBIILLIITTYY RREEPPOORRTT ENVIRONMENTAL CLEARANCE FOR 9.38 ACRE/ 3.79 HA STONE MINING PROJECT

OF M/S. DILIP BUILDCON LTD. LOCATED NEAR MOUZA–CHARAKMARA , P.S.–

BAHARAGORA, DISTRICT–EAST SINGHBHUM, STATE–JHARKHAND.

BB

PROJECT PROPONENT

M/S DILIP BUIDCON LTD.

NOMINATED OWNER- SRI JAYPRAKASH CHATURVEDI,

ADDRESS:-MAHATO HOUSE, NEAR CENTRAL BANK, GHATSILA,

DIST-EAST SINGHBHUM, STATE- JHARKHAND.

MOB NO-7033592588.

PAGE 32

CONSULTANTS

SATHI PLANNERS PVT. LTD.

REG. OFFICE: LAKE AVENUE, BEHIND CAMBRIAN PUBLIC SCHOOL, KANKE ROAD, RANCHI- 834008, JHARKHAND.

6.4 SOCIAL INFRASTRUCTURE

Already discussed in point no 4.8 in Chapter 4

6.5 CONNECTIV ITY (TRAFFIC AND TRANSPORTATION ROAD/RAIL/METRO/

WATER WAYS ETC)

Already discussed in paragraph 4.1. in Chapter 4 .

6.6 SOLID WASTE MANAGEMENT

Not applicable

6.7 POWER REQUIREMENT & SUPPLY SOURCE.

Only Day Time working, so, no power Requirement (DG set required for

safety reasons).

PPRREE--FFEEAASSIIBBIILLIITTYY RREEPPOORRTT ENVIRONMENTAL CLEARANCE FOR 9.38 ACRE/ 3.79 HA STONE MINING PROJECT

OF M/S. DILIP BUILDCON LTD. LOCATED NEAR MOUZA–CHARAKMARA , P.S.–

BAHARAGORA, DISTRICT–EAST SINGHBHUM, STATE–JHARKHAND.

BB

PROJECT PROPONENT

M/S DILIP BUIDCON LTD.

NOMINATED OWNER- SRI JAYPRAKASH CHATURVEDI,

ADDRESS:-MAHATO HOUSE, NEAR CENTRAL BANK, GHATSILA,

DIST-EAST SINGHBHUM, STATE- JHARKHAND.

MOB NO-7033592588.

PAGE 33

CONSULTANTS

SATHI PLANNERS PVT. LTD.

REG. OFFICE: LAKE AVENUE, BEHIND CAMBRIAN PUBLIC SCHOOL, KANKE ROAD, RANCHI- 834008, JHARKHAND.

77.. RREEHHAABBIILLIITTAATTIIOONN AANNDD RREESSEETTTTLLEEMMEENNTT((RR&&RR

PPLLAANN))

77..11 PPOOLLIICCYY TTOO BBEE AADDOOPPTTEEDD ((CCEENNTTRRAALL SSTTAATTEE)) IINN RREESSPPEECCTT OOFF TTHHEE PPRROOJJEECCTT AAFFFFEECCTTEEDD PPEERRSSOONN

IINNCCLLUUDDIINNGG HHOOMMEE OOUUTTSSEEEESS,, LLAANNDD OOUUTTSSEEEESS AANNDD LLAANNDDLLEESSSS LLAABBOOUURR

The mine lease is Raiyaty land and do not have habitation. Hence the mining activity does

not involve any displacement of human settlement. No public buildings, places,

monuments etc exist within the lease area or in the vicinity of the mine lease area. The

mining operation will not disturb/ relocate any village or need resettlement. Thus no

adverse impact is anticipated.

However, after 3 yrs plan period, backfilling may be started or that may be converted into

water reservoir if required. Estimation of area has not been done now. This will be planned

later. Under water pollution prevention plan, garland drain and retaining wall will be

constructed all around the dump, and pits. Sedimentation pond, unlined settling tank will

be constructed near the boundary area to provide a proper channel for water outflow. And

secondary settling pond will be connected to nearest water bodies.

PPRREE--FFEEAASSIIBBIILLIITTYY RREEPPOORRTT ENVIRONMENTAL CLEARANCE FOR 9.38 ACRE/ 3.79 HA STONE MINING PROJECT

OF M/S. DILIP BUILDCON LTD. LOCATED NEAR MOUZA–CHARAKMARA , P.S.–

BAHARAGORA, DISTRICT–EAST SINGHBHUM, STATE–JHARKHAND.

BB

PROJECT PROPONENT

M/S DILIP BUIDCON LTD.

NOMINATED OWNER- SRI JAYPRAKASH CHATURVEDI,

ADDRESS:-MAHATO HOUSE, NEAR CENTRAL BANK, GHATSILA,

DIST-EAST SINGHBHUM, STATE- JHARKHAND.

MOB NO-7033592588.

PAGE 34

CONSULTANTS

SATHI PLANNERS PVT. LTD.

REG. OFFICE: LAKE AVENUE, BEHIND CAMBRIAN PUBLIC SCHOOL, KANKE ROAD, RANCHI- 834008, JHARKHAND.

88.. PPRROOJJEECCTT SSCCHHEEDDUULLEE AANNDD CCOOSSTT EESSTTIIMMAATTEESS 88..11 LLIIKKEELLYY DDAATTEE OOFF SSTTAARRTT OOFF CCOONNSSTTRRUUCCTTIIOONN AANNDD LLIIKKEELLYY DDAATTEE OOFF CCOOMMPPLLEETTIIOONN ((TTIIMMEE SSCCHHEEDDUULLEE

FFOORR TTHHEE PPRROOJJEECCTT TTOO BBEE GGIIVVEENN))

Mining will be started after getting environmental clearance.

88..22 EESSTTIIMMAATTEEDD PPRROOJJEECCTT CCOOSSTT AANNDD AALLOONNGG WWIITTHH AANNAALLYYSSIISS IINN TTEERRMMSS OOFF EECCOONNOOMMIICC VVIIAABBIILLIITTYY OOFF

TTHHEEMM PPRROOJJEECCTT..

Cost of the project is Rs. 419.70 Lakhs. PROJECT COST SL. NO. HEADS RS (Lakhs)

1 TOTAL EQUIPMENT’S COST 376 Lakhs (Own equipment’s) 376.00

2 Land Revenue as per GOJ @ Rs.25000/acre 2.345

3 COST OF INFRASTRUCTURE 3.20

Total 381.545

4 CONTINGENCY 10 % 38.155

Grand Total 419.70

6 OPERATIONAL COST Per Year @ of Rs- 350 per/Cum prod. Per /year (91475 Cum/year)

320.16

8.3 CSR Budget: Table 8-1: CSR Budget

5/- per cum CSR Activities Spend for nearest villages .(10% increase per year) Sl. No. Activity Fund Allotted (In Rs.)Yearly

1. Water Supply including Drinking Water:(30 % ) 1. Installation & Repair of Hand Pumps/Tube Wells. In nearest village.

137212.5

2. Health ( 20 %) 1. Free Medicine & Health Checkup Camp every month time to time nearest villages.

91475

3. Social Empowerment (30 %) 1. Provide fees for a period of one year or more to the poor and meritorious, preferably girl students of the school in the operational area of the Company to enable them to get uninterrupted education.

137212.5

4. Sports and Culture (20 %) e.g. Donation for festival & other cultural programs.

91475

TOTAL 457375

PPRREE--FFEEAASSIIBBIILLIITTYY RREEPPOORRTT ENVIRONMENTAL CLEARANCE FOR 9.38 ACRE/ 3.79 HA STONE MINING PROJECT

OF M/S. DILIP BUILDCON LTD. LOCATED NEAR MOUZA–CHARAKMARA , P.S.–

BAHARAGORA, DISTRICT–EAST SINGHBHUM, STATE–JHARKHAND.

BB

PROJECT PROPONENT

M/S DILIP BUIDCON LTD.

NOMINATED OWNER- SRI JAYPRAKASH CHATURVEDI,

ADDRESS:-MAHATO HOUSE, NEAR CENTRAL BANK, GHATSILA,

DIST-EAST SINGHBHUM, STATE- JHARKHAND.

MOB NO-7033592588.

PAGE 35

CONSULTANTS

SATHI PLANNERS PVT. LTD.

REG. OFFICE: LAKE AVENUE, BEHIND CAMBRIAN PUBLIC SCHOOL, KANKE ROAD, RANCHI- 834008, JHARKHAND.

8.4 EMP (Environment Management Plan)

Sub-project specific Environmental Management Plan (EMP) has been formulated with an

intend to set out action required to avoid or mitigate all impacts and the responsibility for

taking each action. Responsibility is made legally binding when actions are subsequently

specified in contracts. Environmental Monitoring Plan (EMoP) has been prepared to ensure

that the intended environmental mitigations are realized and these results in desired benefits

to the target population causing minimal deterioration to the environmental parameters. All

costs for implementing the mitigation measures and monitoring plan will be included in the

Bill of Quantities (BOQ) by the contractor as implementation of the EMP will be the

responsibility of the contractor.

1. Air Pollution Control Measures

2. Water Pollution control Measures

3. Social Welfare Measures

4. Occupational Health Measures

Table 8.4 :- EMP Cost

ASPECTS ITEM OPERATIONAL

COST (RS.) Yearly

REMARKS

AIR POLLUTION NOSE MASK 30 NO;S Rs-35 /- each= 805/-( Avg. 4

week a month ) 805x4= 4200 per month 38,640/- Once a week

replaceable, and cost

can increase with

time Road Wetting(Sprinklers @1ltr/sq.m. and waste

Dump settling 12000 ltr Tank @ Rs.- 300/-

(1acre=4046 Sq.m ( 0.20 Mine road acre x 4046=

809.2 sq.m )

90,000/- Water tanker cost @

one tanker per day

for 300 days

Plantation along kuchha road will also be done 5

m interval both side approach road plantation.

Kachha road per plant 400 rupee ( applied area

to village road distance 200 m ) 40 Both site

1,03,200/- Re-plant the non-

surviving plants

watering and

protection from

PPRREE--FFEEAASSIIBBIILLIITTYY RREEPPOORRTT ENVIRONMENTAL CLEARANCE FOR 9.38 ACRE/ 3.79 HA STONE MINING PROJECT

OF M/S. DILIP BUILDCON LTD. LOCATED NEAR MOUZA–CHARAKMARA , P.S.–

BAHARAGORA, DISTRICT–EAST SINGHBHUM, STATE–JHARKHAND.

BB

PROJECT PROPONENT

M/S DILIP BUIDCON LTD.

NOMINATED OWNER- SRI JAYPRAKASH CHATURVEDI,

ADDRESS:-MAHATO HOUSE, NEAR CENTRAL BANK, GHATSILA,

DIST-EAST SINGHBHUM, STATE- JHARKHAND.

MOB NO-7033592588.

PAGE 36

CONSULTANTS

SATHI PLANNERS PVT. LTD.

REG. OFFICE: LAKE AVENUE, BEHIND CAMBRIAN PUBLIC SCHOOL, KANKE ROAD, RANCHI- 834008, JHARKHAND.

plantation 129 x2=258 plant x 400=1,03,200/- animals

1.46 Ha areas will be used for greenbelt

development.( @ 45/- per plant of Green

Belt/safety zone area 972 x 45 = 43,740/-) and

fencing cost of green belt

43,740/-

WATER

POLLUTION Construction of Garland Drain Garland drain and

ground dump will be established according to need

@ 8 m/- Sq.ft 1.00 ha = 107639.10 Sq Ft.( 0.30 x

107639.10 = 32,291.73 sq. ft Garland Drain area)

2,58,335/- Once only for the

lease period/life of

the mine

Construction of Siltaion Pond ( Settling Pond area 350 SQ m ) 20/- Per Sqm Labor

Cost

7,000/- Cost of Siltation Pond

NOISE

POLLUTION Maintenance of Machinery suitably - Rs- 10,000/-

per 4 month 40,000/- Including in main

Cost PPE's like Ear muff 23 no's - Rs- 50/- each 4,600/- Once in Four months

Occupational

Safety and

Health

Providing First aid kits - 2 No's and fire extinguishers - 2 No's Providing Personal protective equipments to all

employees (hand gloves) 540/- each

35,000/- 12,420/-

Once in year, replace

by Conducting periodical

checkup . Safety shoe twice in a

year, helmets once in

three years and hand

gloves thrice in a

year. Environmental monitoring

Ambient air quality studies -Once in a month - 2

locations Water quality studies - Once a year - 2 Locations Noise studies - Once in six months - 2 Locations

35,000/- 25,000/- 40,000/-

Will be done through

MoEF recognized

laboratories (Half Yearly

Monitoring) Total Cost 7,32,935/-

PPRREE--FFEEAASSIIBBIILLIITTYY RREEPPOORRTT ENVIRONMENTAL CLEARANCE FOR 9.38 ACRE/ 3.79 HA STONE MINING PROJECT

OF M/S. DILIP BUILDCON LTD. LOCATED NEAR MOUZA–CHARAKMARA , P.S.–

BAHARAGORA, DISTRICT–EAST SINGHBHUM, STATE–JHARKHAND.

BB

PROJECT PROPONENT

M/S DILIP BUIDCON LTD.

NOMINATED OWNER- SRI JAYPRAKASH CHATURVEDI,

ADDRESS:-MAHATO HOUSE, NEAR CENTRAL BANK, GHATSILA,

DIST-EAST SINGHBHUM, STATE- JHARKHAND.

MOB NO-7033592588.

PAGE 37

CONSULTANTS

SATHI PLANNERS PVT. LTD.

REG. OFFICE: LAKE AVENUE, BEHIND CAMBRIAN PUBLIC SCHOOL, KANKE ROAD, RANCHI- 834008, JHARKHAND.

99.. AANNAALLYYSSIISS OOFF PPRROOPPOOSSAALL ((FFIINNAALL

RREECCOOMMMMEENNDDAATTIIOONN)) CCOONNCCLLUUSSIIOONN

The project is of utmost importance to the area/ region for interest of mineral development

and improves the socio-economic conditions of the local habitants. The operation of the

proposed expansion project will bestow various social and economic benefits to the local

communities of the area in addition to the existing benefits due to provide better employment

opportunities and improvement in social infrastructure of the area, apart from increased

financial benefits accruing to state and central agencies by ways of taxes, royalties, etc.