PRE-CONSTRUCTION | PROJECT MANAGEMENT | CLOSEOUT & COMPLETION

Page 2: PRE-CONSTRUCTION | PROJECT MANAGEMENT | CLOSEOUT & … · Preliminary Budgeting Estimation Final Bid Submission Project Management – Following the pre-construction phase, our team

TABLE OF CONTENTS

I. Proposal

II. Construction Services

III. Responsibilities

IV. Who Are We?

V. Meet the Team

VI. Our Why

VII. Mission & Objective

VIII. Testimonials

IX. Project Schedule

X. Our Projects

XI. Project Highlights

XII. Clients

Page 3: PRE-CONSTRUCTION | PROJECT MANAGEMENT | CLOSEOUT & … · Preliminary Budgeting Estimation Final Bid Submission Project Management – Following the pre-construction phase, our team

FINALYGC.COM | FINALYGC

130 West 29th Street New York, NY 10001

P: (212) 760 – 0335 F: (212) 760 – 0353

FINALY GENERAL CONTRACTING CORP.

Finaly General Contractors presents, for your

consideration

Proposal for Construction Services

Page 4: PRE-CONSTRUCTION | PROJECT MANAGEMENT | CLOSEOUT & … · Preliminary Budgeting Estimation Final Bid Submission Project Management – Following the pre-construction phase, our team

CONSTRUCTION SERVICES Pre-construction - For successful completion of a project, the effort put forth leading up to

the start of the construction is critical. Decisions made during the pre-construction phase

can save the client significant amount of time and money. Therefore, as an obligation to our

clients, Finaly offers a wide range of pre-construction services. By understanding the unique

needs and challenges of our clients, we at Finaly can apply our extensive experience to best

suite your needs. Our services for the pre-construction phase include:

✓ Planning ✓ Scheduling

✓ Site Survey ✓ Trade-by-trade Subcontractor Budgeting

✓ Site Logistics ✓ Assessment of Construction Feasibility

✓ Preliminary Budgeting Estimation ✓ Final Bid Submission

Project Management – Following the pre-construction phase, our team of highly qualified

professionals comes in action to professionally supervise and coordinate all construction

related activities. This is to our commitment to ensure our clients that their new facility will

be completed within a timely and efficient schedule, while maximizing the most out of their

economical budget. By providing customized resources tailored to the demands of our

clients, we provide a complete solution that our clients depend on for all their ongoing and

future projects. Our services in this area include:

✓ Permits & Insurance ✓ Group Meetings with Clients and Subs

✓ Site Supervision ✓ Reporting Status of Financial Resources

✓ Scheduling ✓ Reporting Project Status

✓ Procurement

✓ Cost & Quality Control

✓ Inspection & Punch List Completing

✓ Close Out/Hand-Over

Closeout & Completion – “Start the way you mean to finish” meaning start well, end well,

is a philosophy we have adopted here at Finaly. From the inception of the project till the

end, our clients are part of our family. Together we work towards building modern spaces

that serve a purpose and look aesthetically pleasing. At the end of the project and after the

successful completion of all the construction related activities, the hand-over process

begins. Here, we offer services that include:

✓ Final Inspections ✓ Occupancy

✓ Punch List Completion ✓ Commissioning

✓ Project Closeout/Hand-Over

Page 5: PRE-CONSTRUCTION | PROJECT MANAGEMENT | CLOSEOUT & … · Preliminary Budgeting Estimation Final Bid Submission Project Management – Following the pre-construction phase, our team

Supers Project Managers

Darrell Vernaci 20+ yrs

Jimmy Gross20+ yrs

Marcus Atkinson20+ yrs

Edward Pitre Sr.30+ yrs

Peter Pitre30+ yrs

Vlad Barshtak10+ yrs

Office Personnel

Christine BarshtakPresident &Head of Finances

Joey Profeta15+ yrs

Megan Kilroy5+ yrs

EstimatingPersonnel

Michael Vignola1+ yrs

Jeffrey Cooke15+ yrs

Jennifer Pyon VP of Finance

Lisa TuminelloAccounting/APM

Amanda AbrewOffice Manager

Mark Plummer ChiefEstimator

Utkarsha KoranneEstimator

Edward Pitre Sr. Founder

Vlad BarshtakDirector of Operations

Finaly General Contracting Corp.

John Lopes3+ yrs

Nicholas Ayad3+ yrs

RESPONSIBILITIES

Page 6: PRE-CONSTRUCTION | PROJECT MANAGEMENT | CLOSEOUT & … · Preliminary Budgeting Estimation Final Bid Submission Project Management – Following the pre-construction phase, our team

Finaly General Contracting Corporation is a certified Woman Owned Business (by the City

of New York and the Women’s Business Enterprise National Council) that provides full-

service general contracting specializing in commercial interior renovations in the Greater

New York City area. Over the years, Finaly has accumulated an extensive portfolio of

projects working primarily in the corporate, retail, restaurant, healthcare, and education

sectors. Finaly's services include pre-construction budgeting, estimation, scheduling,

procurement, project management, commissioning, and sign-off coordination.

Finaly General Contracting is proud to have New York’s most prestigious real estate

developers, owners, and managers as their clients and maintains a reputation

substantiated by a roster of first tier commercial real estate managers including, SL Green

Realty, Empire State Realty, Tishman Speyer and RXR Realty just to name a few.

Additionally, Finaly offers and performs tenant-direct service work for valued friends and

clients at Fox Television, Normandy Real Estate Partners, Pride Global, TF Cornerstone,

and TP-ICAP.

Today, Finaly continues to be family owned and operated with Christine Pitre Barshtak

taking the helm in March of 2019. The company has grown to over 40 employees and

operates with a management team boasting well over 30 years of experience in the

construction industry. The experience combined with an ideology of building trust with

clients has contributed to the companies continued growth as well as strong client

retention.

Under Christine’s leadership Finaly is now also a proudly certified Women's Business

Enterprise bringing another level of prestige to the already deeply rooted stellar

reputation.

WHO ARE WE?

Page 7: PRE-CONSTRUCTION | PROJECT MANAGEMENT | CLOSEOUT & … · Preliminary Budgeting Estimation Final Bid Submission Project Management – Following the pre-construction phase, our team

MEET THE TEAM

Page 8: PRE-CONSTRUCTION | PROJECT MANAGEMENT | CLOSEOUT & … · Preliminary Budgeting Estimation Final Bid Submission Project Management – Following the pre-construction phase, our team

OUR WHY

At Finaly, we believe in giving back to the community. As a result, we are

committed towards being proud sponsors of some of the leading non-profit

organizations that work towards building a better and safer tomorrow.

The organizations we work with have their efforts concentrated in the areas of:

Health and Community life. Below, we have prepared a montage to

commemorate their efforts in helping the community.

Page 9: PRE-CONSTRUCTION | PROJECT MANAGEMENT | CLOSEOUT & … · Preliminary Budgeting Estimation Final Bid Submission Project Management – Following the pre-construction phase, our team

MISSION & OBJECTIVE

Finaly General Contracting Corp. specializes in commercial interior renovations in the

New York City area. Here we work towards bringing our clients vision to reality.

➢ At Finaly, we provide our clients with our dedicated, and knowledgeable staff

to execute projects on time, and on budget.

➢ At Finaly, we use the latest technology which guarantees efficient management

of the whole construction process.

➢ Finaly’s family values play a big role in fostering long-term relationships with

clients, employees and partners.

Page 10: PRE-CONSTRUCTION | PROJECT MANAGEMENT | CLOSEOUT & … · Preliminary Budgeting Estimation Final Bid Submission Project Management – Following the pre-construction phase, our team

TESTIMONIALS

I’ve worked with Finaly General Contractors on some of my most critical projects. Their

ability to execute within challenging schedule timeframes is one of the reasons that I often

select them. In addition, the high quality of site supervision ensures that their

subcontractors execute at the highest level of quality. I know that their supervision is going

to identify any potential issues before I do, which is something I value greatly.

You will benefit immensely from creating a relationship with Finaly General Contractors.

I think one of the characteristics that set Finaly apart from other companies is their

willingness to work with the client. For example, we were experimenting with prebuilding

suites at geared towards a more “techy” conceptual tenant. We must have made 1,000

changes to the scope and the budget and the Finaly Team never became frustrated, didn’t

nickel and dime us, and would come to the table with suggestions we didn’t even think of.

They are very good at adhering to schedule but will also effectively manage expectations if

I am asking for something that is not feasible or that will adversely affect the budget.

Another strength is their level of workmanship, particularly with carpentry and flooring. I’ve

had to bring Finaly in on multiple occasions to correct the work of other contractors that

did not meet my expectations.

Construction projects can be incredibly stressful if you don’t have the right team. I am

confident that Finaly will make the process as seamless for you as possible!

Page 11: PRE-CONSTRUCTION | PROJECT MANAGEMENT | CLOSEOUT & … · Preliminary Budgeting Estimation Final Bid Submission Project Management – Following the pre-construction phase, our team

PR

OJE

CT

SC

HE

DU

LE -

SA

MP

LE

Page 12: PRE-CONSTRUCTION | PROJECT MANAGEMENT | CLOSEOUT & … · Preliminary Budgeting Estimation Final Bid Submission Project Management – Following the pre-construction phase, our team

OUR PROJECTS

SL Green

Colonial Consulting

810 7th Ave – 32nd Floor

Interior Renovation:

Full Floor Buildout

PM: John Lopes

Duration: 16 weeks

Architect: LB Architecture

Page 13: PRE-CONSTRUCTION | PROJECT MANAGEMENT | CLOSEOUT & … · Preliminary Budgeting Estimation Final Bid Submission Project Management – Following the pre-construction phase, our team

SL Green

Laidlaw & Co

521 5th Ave – 12th Floor

21,000 SF

PM: Peter Pitre

Duration: 10 weeks

Architect: LB Architecture

Page 14: PRE-CONSTRUCTION | PROJECT MANAGEMENT | CLOSEOUT & … · Preliminary Budgeting Estimation Final Bid Submission Project Management – Following the pre-construction phase, our team

Chelsea Capitol

776 Sixth Avenue

Interior Renovation:

Lobby - Stone

PM: Edward Pitre, Sr.

Duration: 24 weeks

Architect: S9ARCHITECTURE

Page 15: PRE-CONSTRUCTION | PROJECT MANAGEMENT | CLOSEOUT & … · Preliminary Budgeting Estimation Final Bid Submission Project Management – Following the pre-construction phase, our team

Rudin - Uncommon Schools

55 Broad Street, 3rd Floor

Interior Renovation –

Full Floor Buildout

PM: John Lopes

Duration: 16 weeks

Architect: 2Ki

Page 16: PRE-CONSTRUCTION | PROJECT MANAGEMENT | CLOSEOUT & … · Preliminary Budgeting Estimation Final Bid Submission Project Management – Following the pre-construction phase, our team

Anaplan

111 West 33rd Street – 26th Floor

Interior Renovation:

Tenant Improvement

PM: Vlad Barshtak

Duration: 12 weeks

Architect: Nelson Architects

Page 17: PRE-CONSTRUCTION | PROJECT MANAGEMENT | CLOSEOUT & … · Preliminary Budgeting Estimation Final Bid Submission Project Management – Following the pre-construction phase, our team

Empire State Realty Trust

111 West 33rd Street – 8th Floor

Interior Renovation: Tenant Improvement

PM: Megan Kilroy

Duration: 16 weeks

Architect: Nelson Architects

Page 18: PRE-CONSTRUCTION | PROJECT MANAGEMENT | CLOSEOUT & … · Preliminary Budgeting Estimation Final Bid Submission Project Management – Following the pre-construction phase, our team
Page 19: PRE-CONSTRUCTION | PROJECT MANAGEMENT | CLOSEOUT & … · Preliminary Budgeting Estimation Final Bid Submission Project Management – Following the pre-construction phase, our team

Savanna – Douglas Winthrop

521 Fifth Avenue – 19th Floor

Interior Renovation:

Tenant Improvement

PM: Megan Kilroy

Duration: 16 weeks

Architect: Nelson Architects

Page 20: PRE-CONSTRUCTION | PROJECT MANAGEMENT | CLOSEOUT & … · Preliminary Budgeting Estimation Final Bid Submission Project Management – Following the pre-construction phase, our team

Tishman Speyer

11 West 42nd Street

Interior Renovation: Suite A/B

PM: Vlad Barshtak

Duration: 8 weeks

Architect: TPG Architects

Page 21: PRE-CONSTRUCTION | PROJECT MANAGEMENT | CLOSEOUT & … · Preliminary Budgeting Estimation Final Bid Submission Project Management – Following the pre-construction phase, our team

Empire State Building

350 Fifth Avenue

Interior Renovation: Suite 4600

PM: Vlad / Amanda

Duration: 5 weeks

Architect: Nelson

Page 22: PRE-CONSTRUCTION | PROJECT MANAGEMENT | CLOSEOUT & … · Preliminary Budgeting Estimation Final Bid Submission Project Management – Following the pre-construction phase, our team

Empire State Realty Trust

1350 Broadway – 15th Floor

Interior Renovation:

Suite 1520 Whitebox

PM: Megan / Michael

Duration: 10 weeks

Architect: Nelson Architects

Page 23: PRE-CONSTRUCTION | PROJECT MANAGEMENT | CLOSEOUT & … · Preliminary Budgeting Estimation Final Bid Submission Project Management – Following the pre-construction phase, our team

Shorenstein Realty Services

1407 Broadway – 40th Floor

17,400 SF

Full floor build out

PM: Vlad Barshtak

Duration: 12 weeks

Architect: A/R Environetics

Page 24: PRE-CONSTRUCTION | PROJECT MANAGEMENT | CLOSEOUT & … · Preliminary Budgeting Estimation Final Bid Submission Project Management – Following the pre-construction phase, our team

Oxeon Partners

330 Hudson Street

16,097 SF - Full Floor Buildout

PM: Peter Pitre

Duration: 11 weeks

Architect: Studio PPark

Page 25: PRE-CONSTRUCTION | PROJECT MANAGEMENT | CLOSEOUT & … · Preliminary Budgeting Estimation Final Bid Submission Project Management – Following the pre-construction phase, our team

LGT Capital Partners

1133 Avenue of

Americas – 29th Floor

6,908 SF

PM: Peter Pitre

Duration: 17 weeks

Architect: Fogarty

Finger Architects

Page 26: PRE-CONSTRUCTION | PROJECT MANAGEMENT | CLOSEOUT & … · Preliminary Budgeting Estimation Final Bid Submission Project Management – Following the pre-construction phase, our team

Pride Technologies

420 Lexington Avenue –

29th and 30th Floors

11,200 SF

PM: Edward Pitre, Sr.

Duration: 11 weeks

Architect: Loffredo Brooks

Page 27: PRE-CONSTRUCTION | PROJECT MANAGEMENT | CLOSEOUT & … · Preliminary Budgeting Estimation Final Bid Submission Project Management – Following the pre-construction phase, our team

Rubenstein Public Relations

1301 Avenue of Americas - 13th FL - 10,500 SF

PM: Peter Pitre

Duration: 13 weeks

Architect: Kahn Architecture & Design

Page 28: PRE-CONSTRUCTION | PROJECT MANAGEMENT | CLOSEOUT & … · Preliminary Budgeting Estimation Final Bid Submission Project Management – Following the pre-construction phase, our team

Meister Seelig & Fein, LLP

125 Park Avenue – 7th and 8th Floor

49,000 SF

PM: Peter Pitre

Duration: 13 weeks

Architect: Gensler Architects

Page 29: PRE-CONSTRUCTION | PROJECT MANAGEMENT | CLOSEOUT & … · Preliminary Budgeting Estimation Final Bid Submission Project Management – Following the pre-construction phase, our team

Empire State Realty Trust

1400 Broadway – 7th Floor

34,500 SF

PM: Vlad Barshtak

Duration: 12 weeks

Architect: Nelson Architects

Page 30: PRE-CONSTRUCTION | PROJECT MANAGEMENT | CLOSEOUT & … · Preliminary Budgeting Estimation Final Bid Submission Project Management – Following the pre-construction phase, our team

Cli

en

tLo

cati

on

C

on

trac

t W

ith

Co

ntr

act

Am

ou

nt

Dat

e C

om

ple

ted

Re

fere

nce

Co

nta

ctR

efe

ren

ce E

-mai

l

Tu

ne

Co

re, I

nc.

4

5 M

ain

Str

ee

t, 7

th F

loo

r T

un

eC

ore

, In

c.

$90

3,9

13M

ay 2

020

Ro

nal

d Z

ecc

ard

irz

ecc

ard

i@cr

esa

.co

m

Un

com

mo

n S

cho

ols

55 B

road

Str

ee

t, 3

rd F

loo

rR

.J. M

ich

aels

& C

o.,

Inc.

$2,9

00

,00

0A

pri

l 20

20R

ich

ard

Be

rto

ldi

rich

ard

@rj

mic

hae

ls.n

et

Maj

est

ic P

rop

ert

y M

gm

t.11

1 T

hir

d A

ven

ue

, 1st

Flo

or

Maj

est

Pro

pe

rty

Mg

mt.

$60

0,0

0M

arch

20

20S

eth

Ko

bay

seth

k@m

ajp

rop

.co

m

SL

Gre

en

Re

alty

Co

rp.

810

7th

Ave

nu

e, 3

2nd

Flo

or

SL

Gre

en

Re

alty

Co

rp.

$1,5

16,8

06

Feb

ruar

y 20

20M

arc

Man

cin

im

arc.

man

cin

i@sl

gre

en

.co

m

Loca

l On

e, I

AT

SE

320

We

st 4

6th

Str

ee

t, 2

nd

Flo

or

Loca

l On

e, I

AT

SE

$1,0

54,3

80

Feb

ruar

y 20

20T

ob

y M

cDo

no

ug

htm

cdo

no

ug

h@

iats

e-lo

cal1

.org

Tis

hm

an S

pe

yer

175

Var

ick

Str

ee

t, 9

th &

10

th F

loo

rs

Tis

hm

an S

pe

yer

$4,6

00

,00

0Fe

bru

ary

2020

Ph

ilip

Zay

asp

zaya

s@ti

shm

ansp

eye

r.co

m

SL

Gre

en

Re

alty

Co

rp.

1350

Ave

nu

e o

f th

e A

me

rica

sS

L G

ree

n R

eal

ty C

orp

. $3

,10

0,0

00

Ap

ril 2

020

Dan

iel H

ust

er

Dan

iel.H

ust

er@

slg

ree

n.c

om

Em

pir

e S

tate

Re

alty

Tru

st

111

We

st 3

3rd

St,

15t

h &

20

th F

loo

rsE

mp

ire

Sta

te R

eal

ty T

rust

$3,0

00

,00

0D

ece

mb

er

2019

Bra

nd

on

Ne

me

thb

ne

me

th@

em

pir

est

ate

real

tytr

ust

.co

m

Em

pir

e S

tate

Re

alty

Tru

st

140

0 B

road

way

, 16

th, 1

7th

& 2

1st

Flo

ors

Em

pir

e S

tate

Re

alty

Tru

st$3

,50

0,0

00

+N

ove

mb

er

2019

Jess

e L

imjli

m@

em

pir

est

ate

real

tytr

ust

.co

m

Pri

de

Glo

bal

420

Le

xin

gto

n A

ven

ue

, 30

th &

31s

t FL

sP

rid

e G

lob

al$1

,49

5,29

1Fe

bru

ary

2019

Leo

Ru

sse

llle

o.r

uss

ell@

pri

de

glo

bal

.co

m

CB

RE

Inc

420

Le

x, 1

0-1

2th

FLo

ors

MT

AC

BR

E/M

TA

$1,1

96

,816

Oct

ob

er

2019

Mar

k M

ezz

ullo

MM

ezz

ullo

@m

tah

q.o

rg

SL

Gre

en

Re

alty

Co

rp.

1 M

adis

on

Ave

nu

e, 1

1FL

Mar

keti

ng

Ce

nte

rS

L G

ree

n R

eal

ty C

orp

. $5

29,4

54S

ep

tem

be

r 20

19C

raig

Hac

kett

crai

g.h

acke

tt@

slg

ree

n.c

om

SL

Gre

en

Re

alty

Co

rp.

110

Eas

t 4

2nd

Str

ee

t - 9

th F

loo

rS

L G

ree

n R

eal

ty C

orp

. $5

99

,615

Se

pte

mb

er

2019

Dan

iel H

ust

er

Dan

iel.H

ust

er@

slg

ree

n.c

om

Em

pir

e S

tate

Re

alty

Tru

st14

00

Bro

adw

ay, 2

2nd

Flo

or

Em

pir

e S

tate

Re

alty

Tru

st$1

,658

,08

3A

ug

ust

20

19T

aylo

r T

. Bro

wn

tbro

wn

@e

mp

ire

stat

ere

alty

tru

st.c

om

SL

Gre

en

Re

alty

Co

rp.

11 M

adis

on

Ave

nu

e, 1

2th

FL

De

mo

/WB

SL

Gre

en

Re

alty

Co

rp.

$1,1

75,4

73S

ep

tem

be

r 20

19C

raig

Hac

kett

crai

g.h

acke

tt@

slg

ree

n.c

om

Be

aco

n C

apit

al57

5 5t

h A

ven

ue

, 27t

h F

loo

rB

eac

on

Cap

ital

$1,4

92,

48

0A

ug

ust

20

19Je

awan

Pe

rsau

dje

awan

p@

575f

ifth

.co

m

Be

aco

n C

apit

al57

5 5t

h A

ven

ue

, 25t

h &

26

th F

loo

rsB

eac

on

Cap

ital

$1,9

92,

528

Au

gu

st 2

019

Jeaw

an P

ers

aud

jeaw

anp

@57

5fif

th.c

om

Em

pir

e S

tate

Re

alty

Tru

st11

1 W

est

33r

d S

t, 2

6th

Flo

or

Te

nan

tE

mp

ire

Sta

te R

eal

ty T

rust

$60

7,6

79M

ay 2

019

Bra

nd

on

Ne

me

thb

ne

me

th@

em

pir

est

ate

real

tytr

ust

.co

m

Em

pir

e S

tate

Re

alty

Tru

st11

1 W

est

33r

d S

t, 8

th F

loo

rE

mp

ire

Sta

te R

eal

ty T

rust

$3,4

34,3

00

May

20

19B

ran

do

n N

em

eth

bn

em

eth

@e

mp

ire

stat

ere

alty

tru

st.c

om

Em

pir

e S

tate

Re

alty

Tru

st14

00

Bro

adw

ay, 2

6th

Flo

or

Em

pir

e S

tate

Re

alty

Tru

st$9

81,

315

May

20

19Je

sse

Lim

jlim

@e

mp

ire

stat

ere

alty

tru

st.c

om

Em

pir

e S

tate

Re

alty

Tru

st14

00

Bro

adw

ay, 6

th &

7th

Flo

ors

Em

pir

e S

tate

Re

alty

Tru

st$1

,525

,270

May

20

19Je

sse

Lim

jlim

@e

mp

ire

stat

ere

alty

tru

st.c

om

Tis

hm

an S

pe

yer

11 W

est

42n

d S

tre

et,

Su

ite

A &

BT

ish

man

Sp

eye

r$1

,618

,44

5A

pri

l 20

19K

rist

en

Pap

pas

KP

app

as@

Tis

hm

anS

pe

yer.

com

Tis

hm

an S

pe

yer

1230

6th

Ave

nu

e, 1

8th

& 1

9th

Flo

ors

Tis

hm

an S

pe

yer

$657

,70

4A

pri

l 20

19K

rist

en

Pap

pas

KP

app

as@

Tis

hm

anS

pe

yer.

com

Em

pir

e S

tate

Re

alty

Tru

st13

50 B

road

way

, Su

ite

170

0 P

reb

uild

Em

pir

e S

tate

Re

alty

Tru

st$1

,00

8,5

19M

arch

20

19W

en

di G

ibb

wg

ibb

@e

mp

ire

stat

ere

alty

tru

st.c

om

SL

Gre

en

Re

alty

Co

rp.

118

5 6

th A

ven

ue

, 19

th F

loo

rS

L G

ree

n R

eal

ty C

orp

. $5

12,5

75A

pri

l 20

19D

anie

l Hu

ste

rD

anie

l.Hu

ste

r@sl

gre

en

.co

m

SL

Gre

en

Re

alty

Co

rp.

521

5th

Ave

nu

e, 2

5th

Flo

or

SL

Gre

en

Re

alty

Co

rp.

$671

,926

Ap

ril 2

019

Cra

ig H

acke

ttcr

aig

.hac

kett

@sl

gre

en

.co

m

SL

Gre

en

Re

alty

Co

rp.

521

5th

Ave

nu

e, 3

0th

FL

Gra

me

rcy

Sp

ort

sS

L G

ree

n R

eal

ty C

orp

. $9

92,

590

Ap

ril 2

019

Cra

ig H

acke

ttcr

aig

.hac

kett

@sl

gre

en

.co

m

SL

Gre

en

Re

alty

Co

rp.

521

5th

Ave

nu

e, S

uit

e 6

20 P

reb

uild

SL

Gre

en

Re

alty

Co

rp.

$627

,89

1M

arch

20

19C

raig

Hac

kett

crai

g.h

acke

tt@

slg

ree

n.c

om

SL

Gre

en

Re

alty

Co

rp.

118

5 6

th A

ven

ue

, 16

-18

Fl D

em

o, 4

2 FL

BR

SL

Gre

en

Re

alty

Co

rp.

$1,6

29,6

85

Mar

ch 2

019

Dan

iel H

ust

er

Dan

iel.H

ust

er@

slg

ree

n.c

om

SL

Gre

en

Re

alty

Co

rp.

420

Le

xin

gto

n A

ven

ue

, Su

ite

616

S

L G

ree

n R

eal

ty C

orp

. $6

92,

94

3M

arch

20

19C

raig

Hac

kett

crai

g.h

acke

tt@

slg

ree

n.c

om

SL

Gre

en

Re

alty

Co

rp.

711

3rd

Ave

nu

e, 1

0th

FL

Bir

thri

gh

tS

L G

ree

n R

eal

ty C

orp

. $2

,44

2,0

04

Feb

ruar

y 20

19E

ric

Bar

tels

eri

.bar

tels

@sl

gre

en

.co

m

SL

Gre

en

Re

alty

Co

rp.

521

5th

Ave

nu

e, 1

9th

FL

Do

ug

las

Win

thro

pS

L G

ree

n R

eal

ty C

orp

. $1

,453

,424

Jan

uar

y 20

19C

raig

Hac

kett

crai

g.h

acke

tt@

slg

ree

n.c

om

SL

Gre

en

Re

alty

Co

rp.

810

7th

Ave

nu

e, S

uit

e 8

00

SL

Gre

en

Re

alty

Co

rp.

$60

4,2

35N

ove

mb

er

2018

Gia

nn

a C

ecc

hin

ig

ian

na.

cecc

hin

i@sl

gre

en

.co

m

SL

Gre

en

Re

alty

Co

rp.

810

7th

Ave

nu

e, 1

7th

& 3

5th

Flo

or

SL

Gre

en

Re

alty

Co

rp.

$1,6

06

,714

No

vem

be

r 20

18G

ian

na

Ce

cch

ini

gia

nn

a.ce

cch

ini@

slg

ree

n.c

om

Em

pir

e S

tate

Re

alty

Tru

st11

1 W

est

33r

d S

t, 2

6th

Flo

or

Full

FLE

mp

ire

Sta

te R

eal

ty T

rust

$1,1

57,0

73D

ece

mb

er

2018

Bra

nd

on

Ne

me

thb

ne

me

th@

em

pir

est

ate

real

tytr

ust

.co

m

Em

pir

e S

tate

Re

alty

Tru

st11

1 W

est

33r

d S

t, 1

4th

Flo

or

Em

pir

e S

tate

Re

alty

Tru

st$1

,525

,576

No

vem

be

r 20

18B

ran

do

n N

em

eth

bn

em

eth

@e

mp

ire

stat

ere

alty

tru

st.c

om

PR

OJE

CT

HIG

HLI

GH

TS

Page 31: PRE-CONSTRUCTION | PROJECT MANAGEMENT | CLOSEOUT & … · Preliminary Budgeting Estimation Final Bid Submission Project Management – Following the pre-construction phase, our team

CLIENTS

Page 32: PRE-CONSTRUCTION | PROJECT MANAGEMENT | CLOSEOUT & … · Preliminary Budgeting Estimation Final Bid Submission Project Management – Following the pre-construction phase, our team