pre-class thursday 9-6-12 what do you think industrial engineers do?

40
Pre-Class Thursday 9-6- Pre-Class Thursday 9-6- 12 12 What do you think industrial engineers do?

Upload: gyles-sims

Post on 21-Jan-2016

220 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Pre-Class Thursday 9-6-12 What do you think industrial engineers do?

Pre-Class Thursday 9-6-12Pre-Class Thursday 9-6-12

What do you think industrial engineers do?

Page 2: Pre-Class Thursday 9-6-12 What do you think industrial engineers do?

Pre-Class Friday 9-7-12

During the recent Dezzlup Cup, the first four horses did well to finish ahead of the opposition. After Dinner was not last and the horse wearing blue was not third. Bitter Twist was before the horse in green. Dare Devil came first. Bitter Twist finished before After Dinner. Catch Me wore red but Bitter Twist did not wear yellow. Can you determine where each horse finished and the colors they wore?

# Name           Color1  Dare Devil    yellow2  Bitter Twist   blue3  After Dinner  green4  Catch Me      red

Page 3: Pre-Class Thursday 9-6-12 What do you think industrial engineers do?

Pre-Class Monday 9-10-12

Thinking back to the presentation by our guest speaker on Friday, what new thing did you learn about Civil or Traffic Engineers that you did not learn from

class (or know already)?

Page 4: Pre-Class Thursday 9-6-12 What do you think industrial engineers do?

Industrial EngineeringIndustrial Engineering“the design, improvement and

installation of integrated systems of people, material and energy”

Page 5: Pre-Class Thursday 9-6-12 What do you think industrial engineers do?

Industrial Engineering Industrial Engineering bumperstickerbumpersticker

“Engineers make things. Industrial engineers make things better.”

Page 6: Pre-Class Thursday 9-6-12 What do you think industrial engineers do?

What is an industrial engineer?

• To combine workers, machines, and materials in order to increase productivity and reduce waste

• Involves integration of technology, mathematical models, and management practices

• New machines that started the Industrial Revolution were invented by, what we would call, industrial engineers

• Average salary in 2005: $49,678 (2011: $77,090)• Starting salary in 2009: $55,067 (bachelor’s only)

Page 7: Pre-Class Thursday 9-6-12 What do you think industrial engineers do?

A Closer Look…(p. 69, 70)

• Four basic areas:– Production: plant layout, scheduling, optimization– Manufacturing: individual production– Human factors: interface of people to people or

machines (ergonomics)– Operations Research: optimization of systems

(Project Manager)• Divisions of Industrial:

– Aerospace and defense– Facilities Planning and Design– Manufacturing– Quality Control and Reliability– Utilities

Page 8: Pre-Class Thursday 9-6-12 What do you think industrial engineers do?

Stress Analysis (page 49)• Objective

– Determine employee health within the factory• Materials

– Stopwatch, backpack, books• Procedures

– Follow what is listed in the book• Questions

– What relationship do you see between heart rate and each situation?

– List and describe 3 improvements that could be made to help factory employees? Remember, it needs to be helpful to the employee and not a burden to the employer.

Page 9: Pre-Class Thursday 9-6-12 What do you think industrial engineers do?

Pre-ClassPre-Class TuesdayTuesday 9-11-129-11-12

What are the four basic areas of Industrial Engineering?

Page 10: Pre-Class Thursday 9-6-12 What do you think industrial engineers do?

Ergonomic Keyboard ($30-50)

Page 11: Pre-Class Thursday 9-6-12 What do you think industrial engineers do?

Non-qwerty Keyboard

Page 12: Pre-Class Thursday 9-6-12 What do you think industrial engineers do?

Dvorak Keyboard

Page 14: Pre-Class Thursday 9-6-12 What do you think industrial engineers do?

Lines at Amusement Parks

Problem– How to reduce the wait time at amusement parks

Materials– Computers/cellphones

Procedures/Questions– Find a roller coaster-type ride in an amusement park that everyone

has ridden or at least knows what it looks like.– What type of data do you need to know to reduce the wait time?– Are there problems with the line system being used now? Explain.– What will decrease the wait time? Explain.– Are there design improvements for the wait line? Explain.– To make any changes will involve many groups, describe what

would have to take place.

Page 15: Pre-Class Thursday 9-6-12 What do you think industrial engineers do?

Pre-Class Wednesday 9-12-12Pre-Class Wednesday 9-12-12Costume Party Fiona, George, Rachel, and Patrick are planning their costumes for a party. Each will wear a different costume. There will be a pirate, a ghost, a Martian, and a gorilla.- No one will have a costume that begins with the same letter as the name of the person wearing it. - The Martian is a boy. - The gorilla is a girl. - Patrick likes science fiction and space characters. - Fiona didn't want to be a ghost this year.

Which costume will each of the party-goers wear?Fiona will be the gorilla. George will be the pirate.Rachel will be the ghost. Patrick will be the Martian.

Page 16: Pre-Class Thursday 9-6-12 What do you think industrial engineers do?

Systems EngineeringSystems Engineering

• Work with the overall design, development, manufacture, and operation of a complete system or product

• Responsible for integration of the product’s components

• Interface between each engineering group to meet customer specifications

Page 17: Pre-Class Thursday 9-6-12 What do you think industrial engineers do?

Production Floor Efficiency

• Materials– Rolling cube– Deck of cards

• Objective– Improve the efficiency of

a manufacturing business

• Procedures– Groups of 6 (5 minimum)– Designate roles based on

next slide– Attempt to complete the

task before other groups

Page 18: Pre-Class Thursday 9-6-12 What do you think industrial engineers do?

Floor Production RolesFloor Production Roles

1. Production

2. Runner

3. Sorter

4. Mover

5. Finisher

6. Recorder

• Starts with shuffled deck, flip 5 cards• Only have 5 cards showing at once• Deliver face cards 1-at-a-time from #1 to #3• Deliver # cards 1-at-a-time from #1 to #5• Roll even: do nothing• Roll odd: match A,K,Q,J in suites (1 card)• Move face sets to outbox (1 set at-a-time)• Move # sets to outbox (1 set at-a-time)• Roll even: stack red (1 card at-a-time)• Roll odd: stack black (1 card at-a-time)• Record times, improvements, and answers

Page 19: Pre-Class Thursday 9-6-12 What do you think industrial engineers do?

Getting Better

• Record the time it takes to complete your task.• Repeat task, but everyone must have a different job.• Record the time it takes to complete your task a second

time.• Make and record one adjustment to improve your time.• Repeat task, but everyone must have a different job.• Record the time it takes to complete your task a third

time.• Finally, make one more improvement, record it, change

roles, and repeat one final time.• Record the time it takes to complete your task a fourth

time.

Page 20: Pre-Class Thursday 9-6-12 What do you think industrial engineers do?

Analysis

1. Did your improvements lessen the time to complete the task?

2. What area/role was the biggest hold-up?

3. Did every area/role work equally?

4. Was your industrial team successful? Explain.

Page 22: Pre-Class Thursday 9-6-12 What do you think industrial engineers do?

Pre-Class Thursday 9-13-12

What is the difference between Industrial and Systems Engineering?

Page 23: Pre-Class Thursday 9-6-12 What do you think industrial engineers do?

Plane in a Box ProjectPlane in a Box ProjectObjective

To design an airplane and box to be assembled and “shipped”

Materials– Copy paper (graph or engineering paper, if desired)– Rulers– Scissors– Colored pencils/markers (optional)– Tape, staples, or paper clips

Groups– Four members max (preferred), three members min– Divide group into pairs (or two separate subgroups)

Background Information (p278)

Page 24: Pre-Class Thursday 9-6-12 What do you think industrial engineers do?

ProceduresProcedures

• Subgroup Plane– Design an airplane to fit in a box

• Must use 100% of paper (only one 8.5”x11” paper)• Must remain in one piece

– Write out specific plans (no other communication)• Subgroup Box

– Design a box to house the airplane• Must use 100% of paper (only one 8.5”x11” paper)• Must have four sides, a bottom, and open-able lid

– Write out specific plans (no other communication)• The Product

– Swap plans and construct

Page 25: Pre-Class Thursday 9-6-12 What do you think industrial engineers do?

Pre-Class Friday 9-14-12Pre-Class Friday 9-14-12

You are on your way to visit your Grandma, who lives at the end of the valley. It's her birthday, and you want to give her the cakes you've made.

Between your house and her house, you have to cross 7 bridges, and as it goes in the land of make believe, there is a troll under every bridge! Each troll, quite rightly, insists that you pay a troll toll. Before you can cross their bridge, you have to give them half of the cakes you are carrying, but as they are kind trolls, they each give you back a single cake.

How many cakes do you have to leave home with to make sure that you arrive at Grandma's with exactly 2 cakes?

Page 26: Pre-Class Thursday 9-6-12 What do you think industrial engineers do?

The Product

• Each group will need three sets of plans: one for me and one for two other groups.

• Groups will split into plane-only and box-only.

• Groups will build each at the same time.

• To turn-in:– Your set of plans– Your positive comments on their plan– Your negative comments on their plan

Note: there cannot be more negative than positive comments

Page 27: Pre-Class Thursday 9-6-12 What do you think industrial engineers do?

Pre-Class for Monday 9-17-12

Write: “Guest Speaker:

Zine Smith.”

Page 28: Pre-Class Thursday 9-6-12 What do you think industrial engineers do?

Pre-Class Wednesday 2-1-12

Write: “Review for test.”

Page 29: Pre-Class Thursday 9-6-12 What do you think industrial engineers do?

The Product

• Each group will need three sets of plans: one for me and one for two other groups.

• Groups will split into plane-only and box-only.

• Groups will build each at the same time.

• To turn-in:– Your set of plans– Your positive comments on their plan– Your negative comments on their plan

Note: there cannot be more negative than positive comments

Page 30: Pre-Class Thursday 9-6-12 What do you think industrial engineers do?

Group ExchangeGroup Exchange

Plane

1 4

2 5

3 6

4 7

5 3

6 1

7 2

Box

1 3

2 4

5 6

3 7

6 2

4 1

7 5

Page 31: Pre-Class Thursday 9-6-12 What do you think industrial engineers do?

Group Exchange (4Group Exchange (4thth))

Plane

1 8

2 7

3 6

4 5

5 1

6 2

7 3

8 4

Box

1 3

2 4

5 6

8 7

6 8

4 1

3 5

7 2

Page 32: Pre-Class Thursday 9-6-12 What do you think industrial engineers do?

Group Exchange v1.5Group Exchange v1.5

Plane

3 7

4 2

6 3

5 4

1 5

2 6

7 1

Box

4 6

2 7

1 4

3 2

5 1

6 5

7 3

Page 33: Pre-Class Thursday 9-6-12 What do you think industrial engineers do?

Group Exchange 4v1.5Group Exchange 4v1.5

Plane3 14 26 3 5 82 4 1 77 58 6

Box4 78 31 6 3 8 2 5 5 16 27 4

Page 34: Pre-Class Thursday 9-6-12 What do you think industrial engineers do?

Pre-Class Thursday 8-26-10Pre-Class Thursday 8-26-10

Write: “Open house tonight!”

Page 35: Pre-Class Thursday 9-6-12 What do you think industrial engineers do?

Pre-Class Friday 2-4-11

What was the main change, if any, that your group made from Thursday’s blueprints to today’s blueprints?

Page 36: Pre-Class Thursday 9-6-12 What do you think industrial engineers do?

The Janitor’s DilemmaThe Janitor’s Dilemma

• Materials– Textbook– Calculator

• Objective– Improve the environment of school

• Procedures– Turn to page 316– Read the Case Study– Follow the instructions outlined thereafter

Page 37: Pre-Class Thursday 9-6-12 What do you think industrial engineers do?

Pre-Class for Friday 1-29-10

Write: “Weather day.”

Be sure to turn-in your Pre-classes for the week!

Page 38: Pre-Class Thursday 9-6-12 What do you think industrial engineers do?

Group ExchangeGroup Exchange

Plane

1 9

2 8

3 7

4 6

5 5

6 4

7 3

8 2

9 1

Box

1 3

2 4

5 7

6 8

9 2

4 1

7 6

8 5

3 9

Page 39: Pre-Class Thursday 9-6-12 What do you think industrial engineers do?

Group Exchange v1.5Group Exchange v1.5

Plane

3 1

4 2

6 3

5 9

1 4

2 7

9 8

7 5

8 6

Box

4 9

8 3

1 6

3 5

2 8

5 1

6 2

7 4

9 7

Page 40: Pre-Class Thursday 9-6-12 What do you think industrial engineers do?

The Great Pizza Factory (p36)Objective:

– to engineer an assembly line for making pizzas

Procedures:– Read the background information.– Using the types of engineers discussed, detail what each one

would do in this project.– Design an assembly line pizza factory.– Using one computer per group, research the necessary parts

and prices for production.– Give it a name and slogan for future marketing.

Questions: – Would something like this be possible? Explain.– Would something like this be practical? Explain.– What is the biggest selling point for this idea?– What is the biggest draw back to this idea?