Pre-Application Consultation Report Land to the rear of Unit 6A Coed Darcy Business Park, Llandarcy, Neath On behalf of Peak Gen Power 5 Limited June 2019

Upload: others

Post on 25-Sep-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Pre-Application Consultation Report€¦ · CONSULTATION REPORT LAND TO THE REAR OF UNIT 6A COED DARCY BUSINESS PARK, LLANDARCY, NEATH ON BEHALF OF PEAK GEN POWER 5 LIMITED June 2019

Pre-Application Consultation Report

Land to the rear of Unit 6A Coed Darcy Business Park, Llandarcy, Neath

On behalf of Peak Gen Power 5 Limited

June 2019

Page 2: Pre-Application Consultation Report€¦ · CONSULTATION REPORT LAND TO THE REAR OF UNIT 6A COED DARCY BUSINESS PARK, LLANDARCY, NEATH ON BEHALF OF PEAK GEN POWER 5 LIMITED June 2019

PRE-APPLICATION CONSULTATION REPORT

LAND TO THE REAR OF UNIT 6A COED DARCY BUSINESS PARK, LLANDARCY, NEATH ON

BEHALF OF

PEAK GEN POWER 5 LIMITED

June 2019

Project Ref: 28845/A3/TE/JA 28845/A3/TE/JA

Status: Draft Final

Doc: P1 P1

Date: May 2019 June 2019

Prepared by: Thomas Edmunds Thomas Edmunds

Checked by: Joe Ayoubkhani Joe Ayoubkhani

Authorised by: Ben Lewis Ben Lewis

Barton Willmore LLP Greyfriars House

Greyfriars Road Cardiff

CF10 3AL

Tel: 02920 660910 Ref: 28845/A3/TE/JA

Date: June 2019

Email: [email protected]

COPYRIGHT

The contents of this document must not be copied or reproduced in whole or in part without

the written consent of Barton Willmore LLP.

All Barton Willmore stationery is produced using recycled or FSC paper and vegetable oil based

inks.

Page 3: Pre-Application Consultation Report€¦ · CONSULTATION REPORT LAND TO THE REAR OF UNIT 6A COED DARCY BUSINESS PARK, LLANDARCY, NEATH ON BEHALF OF PEAK GEN POWER 5 LIMITED June 2019

Land to the rear of Unit 6A, Coed Darcy Business Park Introduction

CONTENTS

1 INTRODUCTION ............................................................................................................. 2

2 CONSULTATION PROCESS .............................................................................................. 5

3 SUMMARY OF CONSULTATION RESPONSES ...................................................................... 7

4 RESPONSE TO FEEDBACK ..............................................................................................11

5 CONCLUSIONS ..............................................................................................................13

APPENDICES

Appendix 1 Extract of the consultation website

Appendix 2 Copy of site notice

Appendix 3 Photographic evidence of the site notices erected

Appendix 4 Evidence of households that were sent notices

Appendix 5 Notice letter to surrounding landowners and list of consultees

Appendix 6 Letter to Community Council

Appendix 7 Letter to County Councillor

Appendix 8 Notice letters to Specialist consultees

Appendix 9 Community consultees responses

Appendix 10 Specialist consultees responses

Appendix 11 Correspondence with NRW regarding clarification to HRA

Appendix 12 Copy of Newspaper Notice

28845/A3/TE/JA -1- June 2019

Page 4: Pre-Application Consultation Report€¦ · CONSULTATION REPORT LAND TO THE REAR OF UNIT 6A COED DARCY BUSINESS PARK, LLANDARCY, NEATH ON BEHALF OF PEAK GEN POWER 5 LIMITED June 2019

Land to the rear of Unit 6A, Coed Darcy Business Park Introduction

1 INTRODUCTION

1.1 This Pre-Application Consultation (“PAC”) Report has been prepared by Barton Willmore LLP

(“Barton Willmore”) on behalf of our client, Peak Gen Power 5 Limited (“the Applicant”), in

support of a part retrospective application for an existing electricity generation operating

reserve compound to support the National Grid at Land to the rear of Unit 6A Coed Darcy

Business Park, Llandarcy, Neath Port Talbot . This report sets out the statutory pre- application

consultation process undertaken by the Applicant prior to the submission of the application.

1.2 The full description of the proposed development is as follows:

“Part retrospective application for an existing electricity generation

operating reserve compound to support the National Grid comprising 10 no.

generating containers, together with associated switchgear, site access,

boundary treatments and ancillary plant and equipment with proposed

installation of additional ancillary plant and equipment including the

installation of Selective Catalytic Reduction units”

1.3 As the scheme comprises of an electricity generating station with an installed generating

capacity of between 10 and 350MW, as detailed in Section 2, Paragraph 3 of the Developments

of National Significance (Specified Criteria, Fees and Fees for Deemed Applications) (Wales)

(Amendment) Regulations 2019, it falls within the definition of a ‘Development of National

Significance (DNS), for the purposes of s62 (D) of the Planning (Wales) Act 2015 (“the Wales

Act”). Consequently, this application is therefore made to the Welsh Ministers.

Legislative Context

1.4 Part 2 Article 8 of the Developments of National Significance (Procedure) (Wales) Order

(DNSPWO) 2016 requires that the applicant must publicise the proposed application by:

a) Giving requisite notice –

i. By site display in at least one place on or near the land to which the proposed

application relates for not less than 42 days;

ii. In writing to any owner or occupier of any land adjoining the land to which

the proposed application relates; and

28845/A3/TE/JA -2- June 2019

Page 5: Pre-Application Consultation Report€¦ · CONSULTATION REPORT LAND TO THE REAR OF UNIT 6A COED DARCY BUSINESS PARK, LLANDARCY, NEATH ON BEHALF OF PEAK GEN POWER 5 LIMITED June 2019

Land to the rear of Unit 6A, Coed Darcy Business Park Introduction

iii. By publication of the notice in a newspaper circulating in the locality in which

the land to which the proposed application relates is situated;

b) Publishing the following information on a website maintained by the applicant, for not

less than 42 days beginning with each day on which each of the notices referred to

in subparagraph (a) or article 9(2) are given –

i. The draft application form published by the Welsh Ministers under article

12(1)(a) (or a farm substantially to the like effect), including the specified in

or referred to in the form;

ii. A plan which identifies the land to which the proposed application relates;

iii. Any other plans, drawings and information necessary to describe the

development which is the subject of the proposed application;

iv. A copy of the notice required by article 6 which has not lapsed under paragraph

(3) of that article;

v. The design and access statement required by article 14;

vi. Subject to article 12(3), the particulars or evidence required by the Welsh

Ministers under section 62(3) of the 1990 Act (applications for planning

permission) (1);

vii. Where applicable, a statement referred to as the environmental statement for

the proposed development; and

viii. A written statement about any secondary consent (2) connected with the

proposed application (3) in respect of which the applicant considers a decision

on that consent is to be made or should be made by the Welsh Ministers,

together with the draft application form and documents associated with such

consents.

1.5 Article 9 of the DNSPWO requires that the following persons or descriptions of persons are

consulted for the purposes of section 61Z (4) of the 1990 Act:

• Any community consultee;

• Any specialist consultee; and

• Any relevant person.

1.6 This Report confirms the extent of the pre-application consultation that has been undertaken

by the Applicant prior to the submission of this planning application to the Welsh Ministers in

accordance with the DNSPWO 2016.

28845/A3/TE/JA -3- June 2019

Page 6: Pre-Application Consultation Report€¦ · CONSULTATION REPORT LAND TO THE REAR OF UNIT 6A COED DARCY BUSINESS PARK, LLANDARCY, NEATH ON BEHALF OF PEAK GEN POWER 5 LIMITED June 2019

Land to the rear of Unit 6A, Coed Darcy Business Park Introduction

1.7 A separate pre-application engagement outside of the statutory pre-application

consultation is documented within the planning Statement of Common Ground submitted in

support of the application. A Statement of Common Ground has also been produced with NRW

and accompanies the application.

28845/A3/TE/JA -4- June 2019

Page 7: Pre-Application Consultation Report€¦ · CONSULTATION REPORT LAND TO THE REAR OF UNIT 6A COED DARCY BUSINESS PARK, LLANDARCY, NEATH ON BEHALF OF PEAK GEN POWER 5 LIMITED June 2019

Land to the rear of Unit 6A, Coed Darcy Business Park Consultation Process

2 CONSULTATION PROCESS

2.1 This Section summaries the statutory consultation process undertaken by the Applicant in

accordance with the requirements set out within the DNS (Wales) Regulations 2016.

Draft Planning Application Package

2.2 A full set of draft planning application documentation was made available online

(www.peakgenllandarcy.co.uk) from 21st March 2019 for a period of 46 days, exceeding the

minimum 42 day consultation period. The website remained open until the 6th May 2019 to

allow all consultees to view the documents freely on a private computer or at any public library

during normal opening hours. An extract of the webpage can be found at Appendix 1.

Site Notices

2.3 Five Site Notices (in both English and Welsh) were erected by the Applicant directly adjacent

to and near the location of the site. A copy of the Site Notices can be found at Appendix 2.

The location of Notices can be found in Appendix 3 and photographic evidence of the Site

Notices in situ can be found at Appendix 4.

Adjoining Landowners / Occupiers

2.4 Notice letters (addressed to the owner / occupier) accompanied by a copy of the Site Notice

were posted by recorded delivery to adjoining and surrounding properties on 21st March 2019

and where royal mail recorded delivery confirmed that it was not possible to deliver to

addresses, a further letter was hand delivered on the 5th April 2019. A copy of the letter and

list of consultees can be found at Appendix 5.

Community Consultees

2.5 In terms of community consultees, the relevant consultees were confirmed by NPTCBC in its

pre-application advice letter dated the 28 th August 2018. On the 21st March 2019, Barton

Willmore (acting on behalf of the Applicant) gave requisite notice in writing (by post) to

Coedffranc West Community Council (the relevant Community Council for the area) and to

Councillor Clarke (the local Ward Member for Coedffranc West Community Council). Copies of

the relevant letters and notices can be found at Appendix 6 and Appendix 7 respectively.

28845/A3/TE/JA -5- June 2019

Page 8: Pre-Application Consultation Report€¦ · CONSULTATION REPORT LAND TO THE REAR OF UNIT 6A COED DARCY BUSINESS PARK, LLANDARCY, NEATH ON BEHALF OF PEAK GEN POWER 5 LIMITED June 2019

Land to the rear of Unit 6A, Coed Darcy Business Park Consultation Process

Specialist Consultees

2.6 In accordance with Article 9 of the DNSPWO and DNS (Wales) Regulations 2016, the

Applicant is required to consult all relevant specialist consultees . These consultees include:

• Network Rail;

• Welsh Government;

• Welsh Ministers;

• The local highway authority concerned (Neath Port Talbot County

Borough Council Highways Authority;

• Natural Resources Wales (South West Wales Office);

• Health and Safety Executive;

• Cadw;

• Dwr Cymru Welsh Water; and

• The Coal Authority.

2.7 The notice letters issued to the above consultees can be found at Appendix 8.

28845/A3/TE/JA -6- June 2019

Page 9: Pre-Application Consultation Report€¦ · CONSULTATION REPORT LAND TO THE REAR OF UNIT 6A COED DARCY BUSINESS PARK, LLANDARCY, NEATH ON BEHALF OF PEAK GEN POWER 5 LIMITED June 2019

Land to the rear of Unit 6A, Coed Darcy Business Park Summary of consultation responses

3

3.1

3.2

3.3

SUMMARY OF CONSULTATION RESPONSES

This Section summarises the responses received via the statutory pre -application consultation

process undertaken by the Applicant and sets out the Applicant’s response to the feedback

received. All comments received between 21st March 2019 and 6th May 2019 have been

considered.

Summary of Public Consultation Responses

During the public consultation process, no responses were received from members of the

public by post and/or email.

Summary of Community Consultee Responses

With regards to community consultees, the Applicant received one response in total, which

came from Coedffranc West Community Council (the relevant Community Council for the

area). The Applicant did not receive a response from Councillor Clarke (the local Ward Member for

Coedffranc West Community Council) [a copy of the response is provided within Appendix 9].

The response by the Community Council is set out below:

• Coedffranc West Community Council confirmed that with regards to this part

retrospective planning application for the land at the rear of Unit 6A Coed Darcy Business

Park, Llandarcy, the Council members do not have any observations at this point.

Summary of Specialist Consultee Responses

3.4 In addition to the public and community consultation responses received and summarised

above, six responses were also received from specialist consultees including:

• Welsh Government;

• The local highway authority concerned (Neath Port Talbot County

Borough Council Highways Authority;

• Cadw;

• Natural Resources Wales;

• Dwr Cymru Welsh Water; and

• The Coal Authority.

28845/A3/TE/JA -7- June 2019

Page 10: Pre-Application Consultation Report€¦ · CONSULTATION REPORT LAND TO THE REAR OF UNIT 6A COED DARCY BUSINESS PARK, LLANDARCY, NEATH ON BEHALF OF PEAK GEN POWER 5 LIMITED June 2019

Land to the rear of Unit 6A, Coed Darcy Business Park Summary of consultation responses

3.5 Copies of each consultation response can be found at Appendix 10. In accordance with part

3 of section 9 of the DNSPWO 2016, table 1 sets out the responses from the specialist

consultees.

Table 1: Specialist Consultees Responses

Specialist Consultee Response

Network Rail The Applicant did not receive a response from Network Rail.

Welsh Ministers The Applicant did not receive a response from Welsh Ministers.

Welsh Government The Welsh Government confirmed that they have no objection on

trunk road grounds.

The local highway authority

concerned (Neath Port Talbot

County Borough Council

Highways Authority)

Provided confirmation of no highway and drainage objections to the

proposed application.

Health and Safety Executive The Applicant did not receive a response from the Health and

Safety Executive.

Cadw Confirmed that the proposed development will not have any impact on

the scheduled monument GM291 (Llandarcy Round Cairn) or its setting

due to the intervening buildings, vegetation and natural topography.

Noted that there might be undesignated historic assets that could

be affected by the proposed development and it is advised that

consultation with the Historic Environment Record held by the

Glamorgan Gwent-Archaeological Trust should be undertaken;

and

Overall, no objections to the proposed development based on its

impacts on the scheduled monument.

Dwr Cymru Welsh Water The site is crossed by a private foul water only sewer, prior to

commencing operational development DCWW advises contacting the

owners of this asset. No foul water will be generated by development

proposals.

Advised that the applicant may need to apply to Dwr Cymru Welsh

Water for any connection to the public sewer under S106 of the Water

Industry Act 1991 if the connection to the public sewer network is

either via a lateral drain or via a new sewer because it is now a

mandatory requirement to first enter into a

Section 104 Adoption Agreement (Water Industry Act 1991).

28845/A3/TE/JA -8- June 2019

Page 11: Pre-Application Consultation Report€¦ · CONSULTATION REPORT LAND TO THE REAR OF UNIT 6A COED DARCY BUSINESS PARK, LLANDARCY, NEATH ON BEHALF OF PEAK GEN POWER 5 LIMITED June 2019

Land to the rear of Unit 6A, Coed Darcy Business Park Summary of consultation responses

Specialist Consultee Response

The applicant is also advised that some public sewers and lateral

drains may not be recorded on DCWW maps of public sewers

because they were originally privately owned and were

transferred into public ownership by nature of the Water Industry

(Schemes for Adoption of Private Sewers) Regulations 2011. The

presence of such assets may affect the proposal.

The Coal Authority Confirmed that the proposed development site falls within the coalfield,

however, it is located outside the defined Development High Risk Area

meaning that there are no recorded coal mining legacy hazards at

shallow depth that could pose a risk to land stability.

Accordingly, there is no requirement to submit a Coal Mining Risk

Assessment in support of a planning application for the redevelopment

of this site, The Coal Authority confirmed that Neath Port Talbot County

Council will not need to consult with The Coal Authority on any planning

application for this site.

Natural Resources Wales The operation will require a permit from NRW. It is encouraged that

the permit application runs parallel with the DNS Application.

No adverse comments relating to noise which will be c onsidered under

the environmental permit application.

Identified sensitive receptors (European and UK protected sites) within

2km of the site, which were correctly identified in December 2018

produced by AECOM, however, NRW consider that any effect on the

identified sites is unlikely as the air quality impact assessment report

shows the emission levels from the development to be low.

NRW stated that a HRA document is required to aid the competent

authority in assessing the application under Regulation 61 of the

Conservation of Habitats and Species Regulations 2010 (as

amended).

NRW confirms that additional landscaping for the purposes of visual

amenity is not required for the application.

28845/A3/TE/JA -9- June 2019

Page 12: Pre-Application Consultation Report€¦ · CONSULTATION REPORT LAND TO THE REAR OF UNIT 6A COED DARCY BUSINESS PARK, LLANDARCY, NEATH ON BEHALF OF PEAK GEN POWER 5 LIMITED June 2019

Land to the rear of Unit 6A, Coed Darcy Business Park Summary of consultation responses

28845/A3/TE/JA -10- June 2019

Page 13: Pre-Application Consultation Report€¦ · CONSULTATION REPORT LAND TO THE REAR OF UNIT 6A COED DARCY BUSINESS PARK, LLANDARCY, NEATH ON BEHALF OF PEAK GEN POWER 5 LIMITED June 2019

Land to the rear of Unit 6A, Coed Darcy Business Park Response to Feedback

4 RESPONSE TO FEEDBACK

4.1 This section sets out how account has been taken of the responses received via the pre-

application consultation process undertaken by the Applicant . Each issue is addressed in turn

below:

Public Responses

• The Applicant did not receive any public responses.

Community Consultee Responses

• No response required.

Neath Port Talbot County Council Highways Authority

• No response required.

Cadw

• No response required.

Natural Resources Wales

• A permit application will be submitted to NRW at the appropriate time.

• The Air Quality Impact Report (Ref: 60580051) submitted with the application confirms

that no significant impacts are predicted on ecological receptors. The applicant sought

additional clarification in respect of the need to undertake a standalone HRA report. NRW

confirmed the combination of the air quality report and an Ecology Statement Technical

Note (AECOM, October 2018) that will be submitted alongside this report as part of the

application is sufficient and therefore, the Applicant is not required to prepare a Habitat

Regulation Assessment Report is not required. This additional clarification is set out in

correspondence provided in Appendix 11.

Dŵr Cymru Welsh Water

• No response required. No connection to the public sewer is required.

28845/A3/TE/JA -11- June 2019

Page 14: Pre-Application Consultation Report€¦ · CONSULTATION REPORT LAND TO THE REAR OF UNIT 6A COED DARCY BUSINESS PARK, LLANDARCY, NEATH ON BEHALF OF PEAK GEN POWER 5 LIMITED June 2019

Land to the rear of Unit 6A, Coed Darcy Business Park Response to Feedback

Network Rail

• The Applicant did not receive a response from Network Rail.

Welsh Government

• No response required.

Welsh Ministers

• The Applicant did not receive a response from Welsh Ministers.

Coal Authority

• No response required.

Health and Safety Executive

• The Applicant did not receive a response from the Health and Safety Executive.

28845/A3/TE/JA -12- June 2019

Page 15: Pre-Application Consultation Report€¦ · CONSULTATION REPORT LAND TO THE REAR OF UNIT 6A COED DARCY BUSINESS PARK, LLANDARCY, NEATH ON BEHALF OF PEAK GEN POWER 5 LIMITED June 2019

Land to the rear of Unit 6A, Coed Darcy Business Park Conclusions

5 CONCLUSIONS

5.1 This Report demonstrates that the pre-application consultation undertaken by the Applicant

has met the requirements of the DNSPWO 2016 and Development of National Significance

(Wales) Regulations 2016 . Members of the public, together with community and specialist

consultees, have been given the opportunity to comment on the proposals.

5.2 Having considered the responses received, no additional action, amendments or further

clarification is required prior to submitting the application to the Welsh Ministers.

28845/A3/TE/JA -13- June 2019

Page 16: Pre-Application Consultation Report€¦ · CONSULTATION REPORT LAND TO THE REAR OF UNIT 6A COED DARCY BUSINESS PARK, LLANDARCY, NEATH ON BEHALF OF PEAK GEN POWER 5 LIMITED June 2019

Land to the rear of Unit 6A, Coed Darcy Business Park Appendices

Appendix 1 Extract of the consultation website

28845/A3/TE/JA June 2019

Page 17: Pre-Application Consultation Report€¦ · CONSULTATION REPORT LAND TO THE REAR OF UNIT 6A COED DARCY BUSINESS PARK, LLANDARCY, NEATH ON BEHALF OF PEAK GEN POWER 5 LIMITED June 2019

Land to the Rear of Unit 6A

Coed Darcy Business Park,

Llandarcy

Introduction

Development Summary

Pre-Application Consultation Documentation

Get in Touch

Land to the Rear of Unit 6A Coed Darcy Business Park, Llandarcy, Neath Port Talbot.

Peak Gen Power 5 Limited is preparing a planning application at land to the rear of Unit 6A Coed Darcy Business Park, Llandarcy, Neath Port Talbot for the following development:

“Part retrospective application for an existing electricity generation operatingreserve compound to supportthe National Gridcomprising10 no.generatingcontainers,togetherwithassociated switchgear, site access, boundary treatments and ancillary plant and equipment with proposed installation ofadditionalancillaryplant andequipmentincludingthe installation of Selective Catalytic Reduction units.”

Planning permission was granted on 21st January 2013 (Application Reference No. P2012/1061) for a 20MW electricity generation facility at the site. The planning permission has been implemented and the facility has been built and operated since 2013. However, certain pre-commencement planning conditions werenotsatisfied andfollowing the introduction ofnew legislation the facility nowqualifies asa Developmentof National Significance, which meansthatanewplanning application is required underthenew legislation to regularise theposition. Inaddition, Peak Genare seeking permission to install exhaust gas treatment to the generating units in order to comply with tighter emissions targets effective from January 2019 under the Environmental Permitting (England and Wales) (Amendment) Regulations 2018.

We are seeking your views on the development and have made the contents of the draft planning application available electronically via this webpage for public consultation. A copy of the formal Site Notice can be found here.

Peak Gen Power 5 Limited has instructed ateamofconsultants toundertake detailed technical surveys and assessments to support the planning application. This team includes Barton Willmore and AECOM.

Development Summary

The development is a 20-megawatt electricity generation facility providing electricity to meet consumer requirements at periods of peak electricity demand when there is insufficient electricity available to the National Grid from the UK's base load power stations. The facility is designed tomeetthe requirements of National Grid's contracts and sits in standby/idle mode ready to operate when called on by the National Grid to do so being fully operational and generating electricity in less than 5 minutes. Typically, the plant operatesforperiods ofnotmorethanthirty minutesatatimetotalling 500 hours or less in a year.

The application site is located within the Coed Darcy Strategic Regeneration Area (SRA) allocated by way of Policy SRA1 of the Neath Port Talbot County Borough Council Local Development Plan. It lies within thecommercial area ofthe SRA. Thesite, therefore, is located within a wholly industrial complex and the surrounding land is characterised by industrial buildings andcommercial storage. It is considered thatthenature, scaleand location ofthedevelopmentdonotconflict with theaimsofthe SRA. Thereasonwhythe facility is locatedwhere it is hasbeendictated bytheavailability ofasuitable connection

Page 18: Pre-Application Consultation Report€¦ · CONSULTATION REPORT LAND TO THE REAR OF UNIT 6A COED DARCY BUSINESS PARK, LLANDARCY, NEATH ON BEHALF OF PEAK GEN POWER 5 LIMITED June 2019

Land to the Rear of Unit 6A

Llandarcy

Introduction

Consultation

Get in Touch

point to the local electricity grid with available land zoned in planning policy terms as suitable for this type of use.

National Planning Policy (as set out in PPW Paragraph 5.7.13) supports development of this natureas it helps providevital exibility tosupportan increasing amountoflow carbon generation and to maintain security of supply. is type of development is essential supporting infrastructure which is needed to support the National Grid and continuous supplyofelectricity is essential fortheeconomyandsocietyasawhole.

As the scheme comprises an electricity generating station with an installed generating capacity ofbetween 10 and 50 MW,it falls within thede nition ofa‘Development of National Signi cance’ (DNS) under section 4 of the Developments of National

Signi cance (Speci ed Criteria and Prescribed Secondary Consents) (Wales) Regulations 2016, for thepurposes ofs62(D) ofthe Planning (Wales)Act 2015 ("the WalesAct"). is application is therefore madetothe Welsh Ministers seeking planning permission for development carried outbeforethedate oftheapplication without compliance with some conditions subject to which planning permission was granted.

e facility will additionally be operated under an environmental permit from Natural Resources Wales(NRW). e permit will ensure that the site is operated and monitored in a way that meets the environmental criteria set out in legislation and re uired by NRW.

Pre-Application Consultation Documentation

A1 Application Form (1MB)

A2 Site Location Plan, Barton Willmore, 28845-9000 Rev A (1MB)

A3 Existing Layout and Elevations Without SCR, LL SP-08 Rev A(1MB)

A4 Container Elevations Without SCR As Built, PG GA-01 Rev A (1MB)

A5 Bunded Clean Oil Storage Tank Detail, 033351-001 Sht1 (1MB)

A6 Bunded Clean Oil Storage Tank Detail, 033351-002 Sht2 (1MB)

A7 Storage Locker Elevation Details, ELL_STO808N01A (1MB)

A8 Transformer Elevation Details, WPS3143-GA-001 (1MB)

A9 WPD Switchroom Details, A2 24891 GA (1MB)

A10Proposed Layoutand Elevations WithSCR, LL SP-09Rev B(1MB)

A11 Container Elevations Without SCR As Built, PG GA-02 Rev B (1MB)

A12 AdBlue Bunded Storage Tank Details, 035266 Sht2 (1MB)

A13 Planning, Design and Access Statement, Barton Willmore, March 2019 (14MB)

A14 Construction Method Statement, AECOM, September 2018 (1MB)

A15 Ecology Statement Technical Note, AECOM, October 2018 (5MB)

A16 Ground Conditions Statement Technical Note, AECOM, October 2018 (1MB)

A17 Landscape and Visual Amenity Statement Technical Note, AECOM, October 2018

(1MB) A18 Air uality Assessment, AECOM, December 2018 (6MB)

A19 Memo concerning short-term NOx exceedences at Ancient Woodland, AECOM,

18/12/18 (1MB) A20 Review of Air uality Impact Assessment Report Rev 1, RPS, December 2018 (1MB) A21 Noise Assessment, March 2019 (1MB)

A22 Dra Drainage Report, AECOM, October 2018 (0.5MB)

A23 Statement of Common Ground with Natural Resources Wales (1MB)

Get in Touch

If you wish to make a comment on the proposed development, then please write to:

Peak Gen Power 5 Ltd Consultation

c/o Barton Willmore Greyfriars House Greyfriars Road

Page 19: Pre-Application Consultation Report€¦ · CONSULTATION REPORT LAND TO THE REAR OF UNIT 6A COED DARCY BUSINESS PARK, LLANDARCY, NEATH ON BEHALF OF PEAK GEN POWER 5 LIMITED June 2019

Cardi CF10 3AL

Alternatively, please email your comments to cardi @bartonwillmore.co.uk

Please provide comments by 6th May 2019

eapplication is programmed tobesubmitted to the Welsh Ministers in Spring 2019. Once submitted, you will be able to monitor its progress and make further comments via the Planning Inspectorate’s webpage at https://dns.planninginspectorate.gov.uk/projects/

ank you for visiting www.peakgenllandarcy.co.uk

Land to the Rear of Unit 6A

Llandarcy

Introduction

Consultation

Get in Touch

Page 20: Pre-Application Consultation Report€¦ · CONSULTATION REPORT LAND TO THE REAR OF UNIT 6A COED DARCY BUSINESS PARK, LLANDARCY, NEATH ON BEHALF OF PEAK GEN POWER 5 LIMITED June 2019

Land to the rear of Unit 6A, Coed Darcy Business Park Appendices

Appendix 2 Copy of site notice

28845/A3/TE/JA June 2019

Page 21: Pre-Application Consultation Report€¦ · CONSULTATION REPORT LAND TO THE REAR OF UNIT 6A COED DARCY BUSINESS PARK, LLANDARCY, NEATH ON BEHALF OF PEAK GEN POWER 5 LIMITED June 2019

SCHEDULE 1

Articles 8 and 9(5)

Publicity and consultation before applying for planning permission

The Developments of National Significance (Procedure) (Wales) Order 2016

PUBLICITY AND CONSULTATION BEFORE APPLYING FOR PLANNING PERMISSION

NOTICE UNDER ARTICLES 8 AND 9(2)

Purpose of this notice: this notice provides the opportunity to comment directly to the developer on a proposed Development of National Significance (DNS) prior to the submission of a planning application to the Welsh Ministers. Planning applications for DNS will be publicised by the Welsh Ministers and the relevant local planning authority; any comments provided in response to this notice will not prejudice your ability to make representations to the Welsh Ministers on any related DNS planning application. You should note that any comments submitted may be placed on the public file.

Proposed development at Land to the Rear of Unit 6A Coed Darcy Business Park, Llandarcy.

I give notice that Peak Gen Power 5 Limited

is intending to apply to the Welsh Ministers for planning permission in respect of Development of National Significance which is for an “Part retrospective application for an existing electricity generation operating reserve compound to support the National Grid comprising 10 no. generating containers, together with associated switchgear, site access, boundary treatments and ancillary plant and equipment with proposed installation of additional ancillary plant and equipment including the installation of Selective Catalytic Reduction units”

You may inspect copies of:

- the proposed application;

- the plans; and

- other supporting documents

online at www.peakgenllandarcy.co.uk

Anyone who wishes to make representations about this proposed development must write to the applicant’s agent at

[email protected] or

Barton Willmore, Greyfriars House, Greyfriars Road, Cardiff, CF10 3AL

by 6th May 2019

Signed

Date: 21/03/2019

Page 22: Pre-Application Consultation Report€¦ · CONSULTATION REPORT LAND TO THE REAR OF UNIT 6A COED DARCY BUSINESS PARK, LLANDARCY, NEATH ON BEHALF OF PEAK GEN POWER 5 LIMITED June 2019

ATODLEN 1

Erthyglau 8 a 9(5)

Cyhoeddusrwydd ac ymgynghori cyn gwneud cais am ganiatâd cynllunio

Gorchymyn Datblygiadau o Arwyddocâd Cenedlaethol (Gweithdrefn) (Cymru) 2016

CYHOEDDUSRWYDD AC YMGYNGHORI CYN GWNEUD CAIS AM GANIATÂD

CYNLLUNIO

HYSBYSIAD O DAN ERTHYGLAU 8 A 9(2)

Diben yr hysbysiad hwn: mae’r hysbysiad hwn yn rhoi cyfle i wneud sylwadau yn uniongyrchol i’r datblygwr ynglŷn â Datblygiad o Arwyddocâd Cenedlaethol (DAC) cyn bo cais am ganiatâd cynllunio wedi ei gyflwyno i Weinidogion Cymru. Bydd ceisiadau cynllunio ar gyfer DAC yn cael eu hysbysebu gan Weinidogion Cymru a’r awdurdod cynllunio lleol perthnasol; ni fydd unrhyw sylwadau a ddarperir gennych wrth ymateb i’r hysbysiad hwn yn lleihau dim ar eich gallu i gyflwyno sylwadau i Weinidogion Cymru ar unrhyw gais cynllunio DAC cysylltiedig. Dylech nodi y gellir gosod unrhyw sylwadau a gyflwynir gennych yn y ffeil gyhoeddus.

Datblygiad Arfaethedig yn Tir tu ôl i Uned 6A Coed Darcy Business Park, Llandarcy.

Rwyf yn hysbysu bod Peak Gen Power 5 Limited

yn bwriadu gwneud cais i Weinidogion Cymru am ganiatâd cynllunio mewn cysylltiad â Datblygiad o

Arwyddocâd Cenedlaethol sydd: “Cais rhannol ôl-weithredol ar gyfer gwaith cynhyrchu trydan i gefnogi’r Grid Cenedlaethol, gan gynnwys 10 generadur trydannol, ynghyd â switsys, mynediad i’r safle, triniaethau ffiniol ac offer a pheiriannau atodol, gan gynnwys gosodiad gorsaf ategol a gosodiad unedau Catalytig Dewisiol”

Gellwch archwilio copïau o’r canlynol:

- y cais arfaethedig;

- y planiau; a

- dogfennau ategol eraill

ar-lein yn www.peakgenllandarcy.co.uk

Dylai unrhyw un sy’n dymuno gwneud sylwadau ynglŷn â’r datblygiad arfaethedig hwn ysgrifennu at y

ceisydd/yr asiant yn

[email protected] neu

Barton Willmore, Greyfriars House, Greyfriars Road, Cardiff, CF10 3AL

erbyn 6th Mai 2019

Llofnod:

Dyddiad: 21/03/2019

Page 23: Pre-Application Consultation Report€¦ · CONSULTATION REPORT LAND TO THE REAR OF UNIT 6A COED DARCY BUSINESS PARK, LLANDARCY, NEATH ON BEHALF OF PEAK GEN POWER 5 LIMITED June 2019

SCHEDULE 2

Article 9(5)

Consultation before applying for planning permission

The Developments of National Significance (Procedure) (Wales) Order 2016

CONSULTATION BEFORE APPLYING FOR PLANNING PERMISSION - NOTICE UNDER

ARTICLE 9(3)

Purpose of this notice : this notice comprises a formal request for a pre-application consultation response under article 9(3) of the Developments of National Significance (Procedure) (Wales) Order 2016.

Proposed development at Land to the Rear of Unit 6A Coed Darcy Business Park, Llandarcy.

I give notice that Peak Gen Power 5 Limited

is intending to apply to the Welsh Ministers for planning permission in respect of Development of National Significance which is for “Part retrospective application for an existing electricity generation operating reserve compound to support the National Grid comprising 10 no. generating containers, together with associated switchgear, site access, boundary treatments and ancillary plant and equipment with proposed installation of additional ancillary plant and equipment including the installation of Selective Catalytic Reduction units”

A copy of the proposed application; plans; and other supporting documents can be viewed

online at www.peakgenllandarcy.co.uk

In accordance with the requirements of article 10 of the Developments of National Significance (Procedure) (Wales) Order 2016, a consultation response must be sent to [email protected] by 6th May 2019

Signed:

Date: 21/03/19

Page 24: Pre-Application Consultation Report€¦ · CONSULTATION REPORT LAND TO THE REAR OF UNIT 6A COED DARCY BUSINESS PARK, LLANDARCY, NEATH ON BEHALF OF PEAK GEN POWER 5 LIMITED June 2019

ATODLEN 2

Erthygl 9(5)

Ymgynghori cyn gwneud cais am ganiatâd cynllunio

Gorchymyn Datblygiadau o Arwyddocâd Cenedlaethol (Gweithdrefn) (Cymru) 2016

YMGYNGHORI CYN GWNEUD CAIS AM GANIATÂD CYNLLUNIO - HYSBYSIAD O DAN

ERTHYGL 9(3)

Diben yr hysbysiad hwn : mae’r hysbysiad hwn yn archiad ffurfiol am ymateb i ymgynghoriad cynymgeisio o dan erthygl 9(3) o Orchymyn Datblygiadau o Arwyddocâd Cenedlaethol (Gweithdrefn) (Cymru) 2016.

Datblygiad Arfaethedig yn Tir tu ôl i Uned 6A, Parc Busnes Coed Darcy, Llandarcy.

Rwyf yn hysbysu bod Peak Gen Power 5 Limited

yn bwriadu gwneud cais i Weinidogion Cymru am ganiatâd cynllunio mewn perthynas â Datblygiad o Arwyddocâd Cenedlaethol sydd: “Cais rhannol ôl-weithredol ar gyfer gwaith cynhyrchu trydan i gefnogi’r Grid Cenedlaethol, gan gynnwys 10 generadur trydannol, ynghyd â switsys, mynediad i’r safle, triniaethau ffiniol ac offer a pheiriannau atodol, gan gynnwys gosodiad gorsaf ategol a gosodiad unedau Catalytig Dewisiol.”

Mae copi o’r cais arfaethedig; planiau; a dogfennau ategol eraill wedi eu hatodi yma /ar gael i’w

harchwilio ar lein yn www.peakgenllandarcy.co.uk

Yn unol â gofynion erthygl 10 o Orchymyn Datblygiadau o Arwyddocâd Cenedlaethol (Gweithdrefn)

(Cymru) 2016, rhaid anfon ymateb i’r ymgynghoriad at [email protected]

erbyn 6th Mai 2019

Llofnod:

Dyddiad: 21/03/19

Page 25: Pre-Application Consultation Report€¦ · CONSULTATION REPORT LAND TO THE REAR OF UNIT 6A COED DARCY BUSINESS PARK, LLANDARCY, NEATH ON BEHALF OF PEAK GEN POWER 5 LIMITED June 2019

Land to the rear of Unit 6A, Coed Darcy Business Park Appendices

Appendix 3 Photographic evidence of the site notices erected

28845/A3/TE/JA June 2019

Page 26: Pre-Application Consultation Report€¦ · CONSULTATION REPORT LAND TO THE REAR OF UNIT 6A COED DARCY BUSINESS PARK, LLANDARCY, NEATH ON BEHALF OF PEAK GEN POWER 5 LIMITED June 2019

' ' '

'' \

I '

)'

I ' ''

' ' '

' ' ' \ \ \

, ,

1liji/ i 1!1 i

I'I" 1J, ·j ,1' 1// I I (

I ;

If,I11/1!1 !I jl!/ I I

I

Page 27: Pre-Application Consultation Report€¦ · CONSULTATION REPORT LAND TO THE REAR OF UNIT 6A COED DARCY BUSINESS PARK, LLANDARCY, NEATH ON BEHALF OF PEAK GEN POWER 5 LIMITED June 2019

- s--

Page 28: Pre-Application Consultation Report€¦ · CONSULTATION REPORT LAND TO THE REAR OF UNIT 6A COED DARCY BUSINESS PARK, LLANDARCY, NEATH ON BEHALF OF PEAK GEN POWER 5 LIMITED June 2019

..

I I '.'.I

·.l ' I'

" ." I ' y ..,

'·'

, I., -, - , .. ·! ', ·.'· '

..... 11

" .. I '

.,

I 'I

Page 29: Pre-Application Consultation Report€¦ · CONSULTATION REPORT LAND TO THE REAR OF UNIT 6A COED DARCY BUSINESS PARK, LLANDARCY, NEATH ON BEHALF OF PEAK GEN POWER 5 LIMITED June 2019

',:\: : ! '

.. J,....... . • ' •

.. •

• • ' •

" ...

' .

· .

...1' ' .

- : ·, ,_. . . . ,.

- .,, ·.,.-•..,.;_..,J ,·

1 - ' '1 "': . ' ,,,, . • ,!.. ,}-· • ' •• 'l - . ,.;' .,fl ,, ' .,.• .• • , . , ,

• ! 'li'jl, - ·;·.·/!·.J' '. .:: • • • . . ...- .

-'..1• ., •·:

" • ' ' •

• •.

•• ,, • •

• • •

' •· ·:-;•.1y""_1."t

; '. .• ' • • •

• . 1 • , ••...,.J . .,... • ,.i,-;•"'.

• •. • i l: • .,. • •

• ..· ..,r._....,... .··...;,,.._, • ''' • • • •

• • •

•., • "

• ' I ' '111 •• .., •.,',l • • •

' • ,n, • • I • I • ' •' .• ' • ,•

• 't • :•

• •

" . -- ·...,: J• : ,

• •• •• r' •

cl_ ·.·'. .1 . . ,l.. . •,.•- •,. I • '

• '•• ,•

•.•. \" I • .. •

• • I

' • -. ,·,••,1, ••;.• ; ,•,: • •·;•·· ·,!'• • • • •

• '. .,,.I ' ; • - • • •

I • •,.•( -• . ' . .• ,,t• ,.....,..-,, " •

'. . •· • • ' .''. ,.... :,' i ' ·' •

• ' . ••

. . . . .,, ' ' • • • - • • • • •• • •• I • ,... t ,, .•"-'-·1l. . ... • •

. ,•·.:;;:' ;\,,- . /• ,, . •, •·t ) , • •• • •• •

•' · •, '1: .' \- \ ,. ( • _ · . • .'J, •• ) · ··•i • ·,·I , • ( . e ..• • ' •

• ...' •--' •"l ', • • •

• . ·,.......,,\◄..

, I ' .; • • • • j, • •

• • • ,·,.,. j_ ' 'J' '' •..:../•..J' •• •

• • • • •

• . • ...........;.,, •i· ..:. ."·• . .'.' f ': •

• • • J • •

; .

' ' • •

I' •'• I .- ,

.

T . ! · . - . , , i f:• -

• • • •

•• • •

• • • •

',..... ' • •

-.-. . •' '"

.. ., '

" ., • •

'• •

• •

1lldl ,I1 •,!

. ..,. •'.·'• . . . '

:\•..., ,_

' I ,, f r_I . . . .

,.,, ..• .· '. . '

I ' . , 1' ' • .. . ..

. . .' . ' ; ', -•. ' · •.· ,i iiI ., ,. •.',.,-, _. '

: 1 I \

,

J

•:

)'' I I

'

'• •

Page 30: Pre-Application Consultation Report€¦ · CONSULTATION REPORT LAND TO THE REAR OF UNIT 6A COED DARCY BUSINESS PARK, LLANDARCY, NEATH ON BEHALF OF PEAK GEN POWER 5 LIMITED June 2019

' '

. ....' ' •,.•.,• ''

; •.-/.t' -,_.--..- - ., -.:• . ·-· •:

•"• •'

; -,:

,

'.; ' ": . , .. .. ,-,-·-. •-•-_; -• :: .,. 1·

1,;\\1·:1_, ' '; ' ii j . '; i ..

1 ' ' ' i

• .I I

• • . •• "

II •• •

• • .' ' • · • ' • • .• •

• • • • • •-

. ·.,-,,··- ..,'..,.-, ,·

.,._ ., •• C ' .,

'.! I .,_

..: . " •

.. -,_,,,, . . .·,.;, . . . . . .

- :tf,j;, .. .-..·....,.

Page 31: Pre-Application Consultation Report€¦ · CONSULTATION REPORT LAND TO THE REAR OF UNIT 6A COED DARCY BUSINESS PARK, LLANDARCY, NEATH ON BEHALF OF PEAK GEN POWER 5 LIMITED June 2019

., .. • • '•

• -- , '•••

" '. i' " , •

" I • ,

• • • • I !

., •

•• •

-- '

"

.'.' • "

' ' , ..-, .·

"

'

' •

• t•

'

Page 32: Pre-Application Consultation Report€¦ · CONSULTATION REPORT LAND TO THE REAR OF UNIT 6A COED DARCY BUSINESS PARK, LLANDARCY, NEATH ON BEHALF OF PEAK GEN POWER 5 LIMITED June 2019

i "' . •

j. ,

\ i , I/, I •

I •'.

' I' ... .

, ,,,• I ..' '

p I

II i 1/ '

I I

I'

If

) , ..

I'

I '·1 'I

\

I I I

,I \

I r'

] I

Page 33: Pre-Application Consultation Report€¦ · CONSULTATION REPORT LAND TO THE REAR OF UNIT 6A COED DARCY BUSINESS PARK, LLANDARCY, NEATH ON BEHALF OF PEAK GEN POWER 5 LIMITED June 2019

Land to the rear of Unit 6A, Coed Darcy Business Park Appendices

Appendix 4 Evidence of households that were sent notices

28845/A3/TE/JA June 2019

Page 34: Pre-Application Consultation Report€¦ · CONSULTATION REPORT LAND TO THE REAR OF UNIT 6A COED DARCY BUSINESS PARK, LLANDARCY, NEATH ON BEHALF OF PEAK GEN POWER 5 LIMITED June 2019

Name Adjoining Landowners

House Name/ Number Unit 12A, Llandarcy House

Street Darcy Business Park

Town/ City Llandarcy, Neath

Postcode SAlO 6EJ

Tracking No. GK87270041SGB

Unit 12, Llandarcy House Darcy Business Park Llandarcy, Neath SA106EJ GK872700432GB Disability Action Centre Darcy Business Park Llandarcy, Neath SA106EJ GK872700242GB Units Darcy Business Park Llandarcy, Neath SAl0 6EJ GK872700260GB Unit 16 Lian Coed Court, Darcy Business Park Llandarcy, Neath SAlO 6FG GK872700335GB Unit 12 Lian Coed Court, Darcy Business Park Llandarcy, Neath SAl0 6FG GK872700239GB Unit7 Lian Coed Court, Darcy Business Park Llandarcy, Neath SAl0 6FG GK872700551GB Unit4-5 Lian Coed Court, Darcy Business Park Llandarcy, Neath SAl0 6FG GK872700579GB Unit 1-2 Lian Coed Court, Darcy Business Park Llandarcy, Neath SAlO 6FG GK872700596GB Unit 6-6A Darcy Business Park Llandarcy, Neath SAlO 6EJ GK872700622GB Norton House Darcy Business Park Llandarcy, Neath SAlO 6EJ GK872700619GB Unit 8 Lian Coed Court, Darcy Business Park Llandarcy, Neath SAlO 6FG GK872700636GB Neath Ambulance Station, Unit 1-2 The Courtyard, Darcy Business Park Llandarcy, Neath SAlO 6EJ GK872700640GB Rugbi Industrial Supplies Ltd, Unit 4 The Courtyard, Darcy Business Park Llandarcy, Neath SAlO 6EJ GK872700450GB Department of Environment, Unit 6 The Courtyard, Darcy Business Park Llandarcy, Neath SAlO 6EJ GK872700477GB Unit 8-10 The Courtyard, Darcy Business Park Llandarcy, Neath SAlO 6EJ GK872700S25GB Unit 11 Llandarcy House, Darcy Business Park Llandarcy, Neath SAlO 6EJ GK872700S34GB Land lying to the South-East of Woodlands Llandarcy, Neath SAlO 6LQ GK872700287GB Bridge House Pen-Y-Heol Llandarcy, Neath SAlO 6LQ GK872700361GB St. Modwen Homes Two Devon Way, Longbridge Birmingham 631 2TS GK872700375GB

Councillor Helen Ceri Clarke 110 Dynevor Road Skewen Neath SAlO 6TH GK872700667GB Coedffranc Town Council Memorial Hall

Unit 11 Skewen Park (Off Wern Road) Lian Coed Court, Darcy Business Park

Skewen, Neath Llandarcy, Neath

SAlO 6DP SAl0 6FG

GK872700653GB

Unit 13 Lian Coed Court, Darcy Business Park Llandarcy, Neath SAlO 6FG

Unit 14 Lian Coed Court, Darcy Business Park Llandarcy, Neath SAlO 6FG

Unit 15 Lian Coed Court, Darcy Business Park Llandarcy, Neath SAlO 6FG

Unit 17 Lian Coed Court, Darcy Business Park Llandarcy, Neath SAlO 6FG

Unit 10 Unit 6-6A

Lian Coed Court, Darcy Business Park Lian Coed Court, Darcy Business Park

Llandarcy, Neath Llandarcy, Neath

SAlO 6FG SAl0 6FG

Specialist Consultees Units Network Rail, 5 Cadw

The Courtyard, Darcy Business Park Callaghan Square Welsh Government, Plas Carew

Llandarcy, Neath Cardiff Unit 5/7 Cefn Coed,

SAlO 6EJ CFl0 SBT Cardiff

CFlS 7QQ National Resources Wales (South West Wales Office) Maes Newydd Llandarcy Neath, Port Talbot SAlO 6JQ Neath Port Talbot County Borough Council Highways Authority The Quays Baglan Energy Park Briton Ferry SAU 2GG Minister of Economy & Transport Welsh Government 5th Floor, TY Hywel Cardiff Bay CF99 lNA Minister of Environment, Energy & Rural Affairs Welsh Government 5th Floor, TY Hywel Cardiff Bay CF99 lNA The Coal Authority

DWr Cymru Welsh Water 200 Lichfield Lane Developer Services

Mansfield P.O. Box 3146, Linea

Nottinghamshire Cardiff

NG18 4RG CF30 0EH

Health and Safety Executive Planning Division Welsh Government

Government Buildings Phase 1 Ty-Glas Avenue Cathays Park

Cardiff Cardiff

CF14 SSH CFlO 3NQ

Welsh Ministers 5th Floor Ty Hywel Cardiff Bay CF99 lNA

Page 35: Pre-Application Consultation Report€¦ · CONSULTATION REPORT LAND TO THE REAR OF UNIT 6A COED DARCY BUSINESS PARK, LLANDARCY, NEATH ON BEHALF OF PEAK GEN POWER 5 LIMITED June 2019

Land to the rear of Unit 6A, Coed Darcy Business Park Appendices

Appendix 5 Notice letter to surrounding landowners and list of consultees

28845/A3/TE/JA May 2019

Page 36: Pre-Application Consultation Report€¦ · CONSULTATION REPORT LAND TO THE REAR OF UNIT 6A COED DARCY BUSINESS PARK, LLANDARCY, NEATH ON BEHALF OF PEAK GEN POWER 5 LIMITED June 2019

Bridge House Pen-Y-Heol

Llandarcy, Neath SA10 6LQ

Dear Sir / Madam

Our Ref: 28845/A3/JA/nfi/lb

5th April 2019

RE: LAND TO THE REAR OF UNIT 6A COED DARCY BUSINESS PARK, LLANDARCY, NEATH PORT

TALBOT

As an adjoining landowner, I am writing to you today to notify you that PeakGen Power 5 Limited is preparing

a planning application at land to the rear of Unit 6A Coed Darcy Business Park, Llandarcy, Neath Port Talbot. The description of the proposed development is as follows:

“Part retrospective application for an existing electricity generation operating reserve compound to support the National Grid comprising 10 no.x 2 megawatt generating containers, together with associated switchgear, site access, boundary treatments and ancillary plant and equipment with proposed installation of additional ancillary plant and equipment including the installation of Selective Catalytic Reduction units”.

By way of background, planning permission was granted on the 21 st of January 2012 (Application

Reference Number: P2012/1061) for a 20MW electricity generation facility. The planning permission has

been implemented and the facility has been built and operated subsequently. However, certain pre- commencement planning conditions were not satisfied and following the introduction of new legislation

the facility now qualifies as a Development of National Significance, which means that a new planning application is required under the new legislation to regularise the position. I n addition, Peak Gen are

seeking permission to install exhaust gas treatment to the generating units in order to comply with tighter emissions targets effective from January 2019 under the Environmental Permitting (England and Wales)

(Amendment) Regulation s 2018.

We are seeking your views on the development and have made the contents of the draft planning application available electronically at http://www.peakgenllandarcy.co.uk

Development Summary

The development is a 20-megawatt electricity generation facility providing electricity to meet consumer requirements at periods of peak electricity demand when there is insufficient electricity available to the

National Grid from the UK's base load power stations. The fa cility is designed to meet the requirements of National Grid's contracts and sits in standby/idle mode ready to operate when called on by the National

Grid to do so being fully operational and generating electricity in less than 5 minutes. Typically, the plant

operates for periods of not more than thirty minutes at a time totalling 500 hours or less in a year.

Page 37: Pre-Application Consultation Report€¦ · CONSULTATION REPORT LAND TO THE REAR OF UNIT 6A COED DARCY BUSINESS PARK, LLANDARCY, NEATH ON BEHALF OF PEAK GEN POWER 5 LIMITED June 2019

28845/A3/JA/nfi/lb -2- 5th April 2019

The application site is located within the Coed Darcy Strategic Regeneration Area (SRA) allocated by way

of Policy SRA1 of the Neath Port Talbot County Borough Council Local Development Plan. It lies within the commercial area of the SRA. The site, therefore, is located within a wholly industrial complex and the

surrounding land is characterised by industrial buildings and commercial storage. It is considered that the nature, scale and location of the development do not conflict with the aims of the SRA. The reason why

the facility is located where it is has been dictated by the availability of a suitable connection point to the

local electricity grid with available land zoned in planning policy terms as suitable for this type of use.

National Planning Policy (as set out in PPW Paragraph 5.7.13) supports development of this nature as it

helps provide vital flexibility to support an increasing amount of low carbon generation and to maintain

security of supply. This type of development is essential supporting infrastructure which is needed to support the National Grid and continuous supply of electricity is essential for the economy and society as

a whole.

As the scheme comprises an electricity generating station with an installed generating capacity of between 10 and 50 MW, it falls within the definition of a ‘Development of National Significance’ (DNS) under section

4 of the Developments of National Significance (Specified Criteria and Prescribed Secondary Consents) (Wales) Regulations 2016, for the purposes of s62(D) of the Planning (Wales) Act 2015 ("the Wales

Act"). This application is therefore made to the Welsh Ministers seeking planning permission for

development carried out before the date of the application without compliance with some conditions subject to which planning permission was granted.

The facility will additionally be operated under an environmental permit from Natural Resources Wales (NRW). The permit will ensure that the site is operated and monitored in a way that meets the environmental criteria

set out in legislation and required by NRW.

Get in Touch

We are seeking your views on the development and have made the contents of the draft planning application

available electronically at http://www.peakgenllandarcy.co.uk

If you wish to make a comment on the proposed development, then please write to:

PeakGen Power 5 Limited Consultation c/o

Barton Willmore Greyfriars House

Greyfriars Road Cardiff CF10 3AL

Alternatively, please email your comments to [email protected]. Please provide comments

by 6th May 2019. The application is programmed to be submitted to the Welsh Ministers in Spring 2019. Once submitted, you will be able to monitor its progress and make further comments

via the Planning Inspectorate’s webpage at

http://dns.planninginspectorate.go.uk/projects/

If you write to us / email us we will only use your personal data for the purposes of the planning application

for Land to the Rear of Unit 6A Coed Darcy Business Park, Llandar cy, Neath Port Talbot and we will pass your address details to PeakGen Power 5 Limited for this purpose. If you would like us to contact you

with updates on the planning process, please notify us in your letter/email.

Page 38: Pre-Application Consultation Report€¦ · CONSULTATION REPORT LAND TO THE REAR OF UNIT 6A COED DARCY BUSINESS PARK, LLANDARCY, NEATH ON BEHALF OF PEAK GEN POWER 5 LIMITED June 2019

28845/A3/JA/nfi/lb -3- 5th April 2019

We will delete your personal data once we have processed your comments. If you would like us to contact you

with updates on the planning process, please notify us in your letter/email.

Yours Faithfully

BEN LEWIS

Infrastructure and Energy Director

Enc. Schedule 1 Notice

Page 39: Pre-Application Consultation Report€¦ · CONSULTATION REPORT LAND TO THE REAR OF UNIT 6A COED DARCY BUSINESS PARK, LLANDARCY, NEATH ON BEHALF OF PEAK GEN POWER 5 LIMITED June 2019

Land to the rear of Unit 6A, Coed Darcy Business Park Appendices

Appendix 6 Letter to Community Council

28845/A3/TE/JA June 2019

Page 40: Pre-Application Consultation Report€¦ · CONSULTATION REPORT LAND TO THE REAR OF UNIT 6A COED DARCY BUSINESS PARK, LLANDARCY, NEATH ON BEHALF OF PEAK GEN POWER 5 LIMITED June 2019

Coedffranc Town Council Memorial Hall

Skewen Park (Off Wern Road) Skewen, Neath SA10 6DP

Our Reference: 28845/A3/JA/nfi

21st March 2019

Dear Sir / Madam,

RE: Land to the Rear of Unit 6A Coed Darcy Business Park, Llandarcy, Neath Port Talbot

As a community consultee, I am writing to you today to notify you that PeakGen Power 5 Limited is preparing a

planning application at land to the rear of Unit 6A Coed Darcy Business Park, Llandarcy, Neath Port Talbot. The description of the proposed development is as follows :

“Part retrospective application for an existing electricity generation operating reserve compound to support the National Grid comprising 10 no.x 2 megawatt generating containers, together with associated switchgear, site access, boundary treatments and ancillary plant and equipment with proposed installation of additional ancillary plant and equipment including the in stallation of Selective Catalytic Reduction units”.

By way of background, planning permission was granted on the 21 st of January 2012 (Application Reference

Number: P2012/1061) for a 20MW electricity generation facility. The planning permission has been implemented and the facility has been built and operated subsequently. However, certain pre-

commencement planning conditions were not satisfied and following the introduction of new legislation the facility now qualifies as a Development of National Signifi cance, which means that a new planning

application is required under the new legislation to regularise the position. In addition, Peak Gen are seeking permission to install exhaust gas treatment to the generating units in order to comply with tighter

emissions targets effective from January 2019 under the Environmental Permitting (England and Wales) (Amendment) Regulations 2018.

We are seeking your views on the development and have made the contents of the draft planning application

available electronically at http://www.peakgenllandarcy.co.uk

Development Summary

The development is a 20-megawatt electricity generation facility providing electricity to meet consumer

requirements at periods of peak electricity demand when there is insufficient electricity available to the

National Grid from the UK's base load power stations. The facility is designed to meet the requirements of National Grid's contracts and sits in standby/idle mode ready to operate when called on by the National

Grid to do so being fully operational and generating electricity in less than 5 minutes. Typically, the plant operates for periods of not more than thirty minutes at a time totalling 500 hours or less in a year.

The application site is located within the Coed Darcy Strategic Regeneration Area (SRA) allocated by way of Policy SRA1 of the Neath Port Talbot County Borough Council Local Development Plan. It lies within the

commercial area of the SRA. The site, therefore, is located within a wholly industrial complex and the surrounding land is characterised by industrial buildings and commercial storage.

Page 41: Pre-Application Consultation Report€¦ · CONSULTATION REPORT LAND TO THE REAR OF UNIT 6A COED DARCY BUSINESS PARK, LLANDARCY, NEATH ON BEHALF OF PEAK GEN POWER 5 LIMITED June 2019

28845/A3/JA/nfi -2- 21st March 2019

It is considered that the nature, scale and location of the development do not conflict with the aims of the

SRA. The reason why the facility is located where it is has been dictated by the availability of a suitable connection point to the local electricity grid with available land zoned in planning policy terms as suitable

for this type of use.

National Planning Policy (as set out in PPW Paragraph 5.7.13) supports development of this nature as it

helps provide vital flexibility to support an increasing amount of low carbon generation and to maintain security of supply. This type of development is essential supporting infrastructure which is needed to

support the National Grid and continuous supply of electricity is essential for the economy and society as

a whole.

As the scheme comprises an electricity generating station with an installed generating capacity of between

10 and 50 MW, it falls within the definition of a ‘Development of National Significance’ (DNS) under section 4 of the Developments of National Significance (Specified Criteria and Prescribed Secondary Consents)

(Wales) Regulations 2016, for the purposes of s62(D) of the Planning (Wales) Act 2015 ("the Wales Act"). This application is therefore made to the Welsh Ministers seeking planning permission for

development carried out before the date of the application without compliance with some conditions subject to which planning permission was granted.

The facility will additionally be operated under an environmental permit from Natural Resources Wales (NRW).

The permit will ensure that the site is operated and monitored in a way that meets the environmental criteria set out in legislation and required by NRW.

Get in Touch

We are seeking your views on the development and have made the contents of the draft planning application available electronically at http://www.peakgenllandarcy.co.uk

If you wish to make a comment on the proposed development, then please write to:

PeakGen Power 5 Limited Consultation c/0 Barton Willmore

Greyfriars House Greyfriars Road

Cardiff CF10 3AL

Alternatively, please email your comments to [email protected]. Please provide comments by 6th May 2019. The application is programmed to be submitted to the Welsh Ministers in Spring

2019. Once submitted, you will be able to monitor its progress an d make further comments via the Planning Inspectorate’s webpage at

http://dns.planninginspectorate.go.uk/projects/

If you write to us / email us we will only use your personal data for the p urposes of the planning application

for Land to the Rear of Unit 6A Coed Darcy Business Park, Llandarcy, Neath Port Talbot and we will pass your address details to PeakGen Power 5 Limited for this purpose. If you would like us to contact you

with updates on the planning process, please notify us in your letter/ email. We will delete your personal data once we have processed your comments. If you would like us to contact you with updates on the

planning process, please notify us in your letter/ email.

Yours Faithfully,

Infrastructure and Energy Director

Enc. Schedule 1 Notice

Page 42: Pre-Application Consultation Report€¦ · CONSULTATION REPORT LAND TO THE REAR OF UNIT 6A COED DARCY BUSINESS PARK, LLANDARCY, NEATH ON BEHALF OF PEAK GEN POWER 5 LIMITED June 2019

Land to the rear of Unit 6A, Coed Darcy Business Park Appendices

Appendix 7 Letter to County Councillor

28845/A3/TE/JA June 2019

Page 43: Pre-Application Consultation Report€¦ · CONSULTATION REPORT LAND TO THE REAR OF UNIT 6A COED DARCY BUSINESS PARK, LLANDARCY, NEATH ON BEHALF OF PEAK GEN POWER 5 LIMITED June 2019

Councillor Helen Ceri Clarke 110 Dynevor Road

Skewen Neath

SA10 6TH

Dear Councillor Clarke,

Our Reference: 28845/A3/JA/nfi

21st March 2019

RE: Land to the Rear of Unit 6A Coed Darcy Business Park, Llandarcy, Neath Port Talbot

As a community consultee, I am writing to you today to notify you that PeakGen Power 5 Limited is preparing a

planning application at land to the rear of Unit 6A Coed Darcy Business Park, Llandarcy, Neath Port Talbot. The description of the proposed development is as follows :

“Part retrospective application for an existing electricity generation operating reserve compound to support the National Grid comprising 10 no.x 2 megawatt generating containers, together with associated switchgear, site access, boundary treatments and ancillary plant and equipment with proposed installation of additional ancillary plant and equipment including the installation of Selective Catalytic Reduction units”.

By way of background, planning permission was granted on the 21 st of January 2012 (Application Reference

Number: P2012/1061) for a 20MW electricity generation facility. The planning permission has been implemented and the facility has been built and operated subsequently. However, certain pre-

commencement planning conditions were not satisfied and following the introduction of new legislation the facility now qualifies as a Development of National Significance, which me ans that a new planning

application is required under the new legislation to regularise the position. In addition, Peak Gen are

seeking permission to install exhaust gas treatment to the generating units in order to comply with tighter emissions targets effective from January 2019 under the Environmental Permitting (England and Wales)

(Amendment) Regulations 2018.

We are seeking your views on the development and have made the contents of the draft planning application

available electronically at http://www.peakgenllandarcy.co.uk

Development Summary

The development is a 20-megawatt electricity generation facility providing electricity to meet consumer requirements at periods of peak electricity demand when there is insufficient electricity available to the

National Grid from the UK's base load power stations. The facility is designed to meet the requirements of National Grid's contracts and sits in standby/idle mode ready to operate when called on by the National Grid

to do so being fully operational and generating electricity in less than 5 minutes. Typically, the plant operates for periods of not more than thirty minutes at a time totalling 500 hours or less in a year.

The application site is located within the Coed Darcy Strategic Regeneration Area (SRA) allocated by way

of Policy SRA1 of the Neath Port Talbot County Borough Council Local Development Plan. It lies within the commercial area of the SRA. The site, therefore, is located within a wholly indus trial complex and the

surrounding land is characterised by industrial buildings and commercial storage.

Page 44: Pre-Application Consultation Report€¦ · CONSULTATION REPORT LAND TO THE REAR OF UNIT 6A COED DARCY BUSINESS PARK, LLANDARCY, NEATH ON BEHALF OF PEAK GEN POWER 5 LIMITED June 2019

28845/A3/JA/nfi -2- 21st March 2019

It is considered that the nature, scale and location of the development do not conflict with the aims of the

SRA. The reason why the facility is located where it is has been dictated by the availability of a suitable connection point to the local electricity grid with available land zoned in planning policy terms as suitable

for this type of use.

National Planning Policy (as set out in PPW Paragraph 5.7. 13) supports development of this nature as it

helps provide vital flexibility to support an increasing amount of low carbon generation and to maintain security of supply. This type of development is essential supporting infrastructure which is needed to

support the National Grid and continuous supply of electricity is essential for the economy and society as

a whole.

As the scheme comprises an electricity generating station with an installed generating capacity of between

10 and 50 MW, it falls within the definition of a ‘Development of National Significance’ (DNS) under section 4 of the Developments of National Significance (Specified Criteria and Prescribed Secondary Consents)

(Wales) Regulations 2016, for the purposes of s62(D) of the Planning (Wales) Act 2015 ("the Wales Act"). This application is therefore made to the Welsh Ministers seeking planning permission for

development carried out before the date of the application without compliance with some conditions subject to which planning permission was granted.

The facility will additionally be operated under an environmental permit from Natural Resources Wales

(NRW). The permit will ensure that the site is operated and monitored in a way that meets the environmental criteria set out in legislation and required by NRW.

Get in Touch

We are seeking your views on the development and have made the contents of the draft planning application available electronically at http://www.peakgenllandarcy.co.uk

If you wish to make a comment on the proposed development, then please write to:

PeakGen Power 5 Limited Consultation c/0 Barton Willmore

Greyfriars House Greyfriars Road

Cardiff CF10 3AL

Alternatively, please email your comments to [email protected]. Please provide comments by 6th May 2019. The application is programmed to be submitted to the Welsh Ministers in Spring

2019. Once submitted, you will be able to monitor its progress and make further comments via the Planning Inspectorate’s webpage at

http://dns.planninginspectorate.go.uk/projects/

If you write to us / email us we will only use your personal data for the purposes of the planning application

for Land to the Rear of Unit 6A Coed Darcy Business Park, Llandarcy, Neath Port Talbot and we will pass your address details to PeakGen Power 5 Limited for this purpose. If you would like us to contact you

with updates on the planning process, please notify us in your letter/ email. We will delete your personal data once we have processed your comments. If you would like us to contact you with updates on the

planning process, please notify us in your letter/ email.

Ben Lewis

Infrastructure and Energy Director

Enc. Schedule 1 Notice

Page 45: Pre-Application Consultation Report€¦ · CONSULTATION REPORT LAND TO THE REAR OF UNIT 6A COED DARCY BUSINESS PARK, LLANDARCY, NEATH ON BEHALF OF PEAK GEN POWER 5 LIMITED June 2019

Land to the rear of Unit 6A, Coed Darcy Business Park Appendices

Appendix 8 Notice letters to Specialist consultees

28845/A3/TE/JA June 2019

Page 46: Pre-Application Consultation Report€¦ · CONSULTATION REPORT LAND TO THE REAR OF UNIT 6A COED DARCY BUSINESS PARK, LLANDARCY, NEATH ON BEHALF OF PEAK GEN POWER 5 LIMITED June 2019

Cadw

Welsh Government, Plas Carew Unit

5/7 Cefn Coed, Parc Nantgarw Cardiff CF15 7QQ

Dear Sir / Madam,

Our Reference: 28845/A3/JA/nfi

21st March 2019

RE: Land to the Rear of Unit 6A Coed Darcy Business Park, Llandarcy, Neath Port Talbot

As a specialist consultee, I am writing to you today to notify you that PeakGen Power 5 Limited is preparing a

planning application at land to the rear of Unit 6A Coed Darcy Business Park, Llandarcy, Neath Port Talbot. The description of the proposed development is as follows :

“Part retrospective application for an existing electricity generation operating reserve compound to support the National Grid comprising 10 no.x 2 megawatt generating containers, together with associated switchgear, site access, boundary treatments and ancillary plant and equipment with proposed installation of additional ancillary plant and equipment including the installation of Selective Catalytic Reduction units”.

By way of background, planning permission was granted on the 21 st of January 2012 (Application Reference

Number: P2012/1061) for a 20MW electricity generation facility. The planning perm ission has been implemented and the facility has been built and operated subsequently. However, certain pre-

commencement planning conditions were not satisfied and following the introduction of new legislation the facility now qualifies as a Development of National Significance, which means that a new planning

application is required under the new legislation to regularise the position. In addition, Peak Gen are

seeking permission to install exhaust gas treatment to the generating units in order to comply with tighter emissions targets effective from January 2019 under the Environmental Permitting (England and Wales)

(Amendment) Regulations 2018.

We are seeking your views on the development and have made the contents of the draft planning application available electronically at http://www.peakgenllandarcy.co.uk

Development Summary

The development is a 20-megawatt electricity generation facility providing electricity to meet consumer

requirements at periods of peak electricity demand when there is insufficient electricity available to the

National Grid from the UK's base load power stations. The facility is designed to meet the requirements of National Grid's contracts and sits in standby/idle mode ready to operate when called on by the National

Grid to do so being fully operational and generating electricity in less than 5 minutes. Typically, the plant operates for periods of not more than thirty minutes at a time totalling 500 hours or less in a year.

The application site is located within the Coed Darcy Strategic Regeneration Area (SRA) allocated by way of Policy SRA1 of the Neath Port Talbot County Borough Council Local Development Plan. It lies within the

commercial area of the SRA. The site, therefore, is located within a wholly industrial complex and the

surrounding land is characterised by industrial buildings and commercial storage. It is considered that the nature, scale and location of the development do not conflict with the aims

Page 47: Pre-Application Consultation Report€¦ · CONSULTATION REPORT LAND TO THE REAR OF UNIT 6A COED DARCY BUSINESS PARK, LLANDARCY, NEATH ON BEHALF OF PEAK GEN POWER 5 LIMITED June 2019

28845/A3/JA/nfi -2- 21st March 2019

of the SRA. The reason why the facility is located where it is has been dictated by the availability of a

suitable connection point to the local electricity grid with available land zoned in planning policy terms as suitable for this type of use.

National Planning Policy ( as set out in PPW Paragraph 5.7.13) supports development of this nature as it

helps provide vital flexibility to support an increasing amount of low carbon generation and to maintain security of supply. This type of development is essential supporting infr astructure which is needed to

support the National Grid and continuous supply of electricity is essential for the economy and society as a whole.

As the scheme comprises an electricity generating station with an installed generating capacity of between

10 and 50 MW, it falls within the definition of a ‘Development of National Significance’ (DNS) under section 4 of the Developments of National Significance (Specified Criteria and Prescribed Secondary Consents)

(Wales) Regulations 2016, for the purposes of s 62(D) of the Planning (Wales) Act 2015 ("the Wales Act"). This application is therefore made to the Welsh Ministers seeking planning permission for

development carried out before the date of the application without compliance with some conditions subject to which planning permission was granted.

The facility will additionally be operated under an environmental permit from Natural Resources Wales (NRW).

The permit will ensure that the site is operated and monitored in a way that meets the environmental criteria set out in legislation and required by NRW.

Get in Touch

We are seeking your views on the development and have made the contents of the draft planning application available electronically at http://www.peakgenllandarcy.co.uk

If you wish to make a comment on the proposed development, then please write to:

PeakGen Power 5 Limited Consultation c/0 Barton Willmore

Greyfriars House Greyfriars Road

Cardiff

CF10 3AL

Alternatively, please email your comments to [email protected]. Please provide comments by 6th May 2019. The application is programmed to be submitted to the Welsh Ministers in Spring

2019. Once submitted, you will be able to monito r its progress and make further comments

via the Planning Inspectorate’s webpage at http://dns.planninginspectorate.go.uk/projects/

If you write to us / email us we will only use your personal data for the purposes of the planning application for Land to the Rear of Unit 6A Coed Darcy Business Park, Llandarcy, Neath Port Talbot and we will pass

your address details to PeakGen Power 5 Limited for this purpose. If you would like us to contact you with updates on the planning process, please notify us in your letter/ email. We will delete your personal

data once we have processed your comments. If you would like us to contact you with updates on the

planning process, please notify us in your letter/ email.

Yours Faithfully,

Ben Lewis

Infrastructure and Energy Director

Enc. Schedule 2 Notice

Page 48: Pre-Application Consultation Report€¦ · CONSULTATION REPORT LAND TO THE REAR OF UNIT 6A COED DARCY BUSINESS PARK, LLANDARCY, NEATH ON BEHALF OF PEAK GEN POWER 5 LIMITED June 2019

Land to the rear of Unit 6A, Coed Darcy Business Park Appendices

Appendix 9 Community consultees responses

28845/A3/TE/JA June 2019

Page 49: Pre-Application Consultation Report€¦ · CONSULTATION REPORT LAND TO THE REAR OF UNIT 6A COED DARCY BUSINESS PARK, LLANDARCY, NEATH ON BEHALF OF PEAK GEN POWER 5 LIMITED June 2019

From: Lianne Bowyer

To: Joe Ayoubkhani

Subject: FW: Ref: 28845/A3/JA/nfi

Date: 10 April 2019 11:29:00

Attachments: image001.png image002.png image003.png image006.jpg image007.png

FYI

Lianne Bowyer Branch Secretary

The information contained in this e-mail (and any attachments) is confidential and may be privileged. It may be read, copied and used only by the addressee, Barton Willmore accepts no liability for any subsequent alterations or additions incorporated by the addressee or a third party to the body text of this e-mail or any attachments. Barton Willmore accepts no responsibility for staff non-compliance with our IT Acceptable Use Policy.

From: Louise Thomas <[email protected]>

Sent: 10 April 2019 11:17

To: Cardiff <[email protected]>

Subject: Ref: 28845/A3/JA/nfi

Dear Sirs,

With regards to the pre-consultation planning application for the land at the rear of Unit 6A

Coed Darcy Business Park, Llandarcy,

please be advised that Coedffranc Town Council Members do not have any observations at this

point.

Kind regards,

Louise Thomas Clerical Assistant Coedffranc Town Council Tel: 01792817754

Fax: 01792817754

Office Opening Hours: Monday to Thursday 9am – 3pm

Friday 9am – 2.30pm

This email and any files transmitted with it are confidential and intended solely for the use

of the recipient(s) only. Any review, retransmission, dissemination or other use of, or

taking any action in reliance upon this information by persons or entitles other than the

intended recipient(s) is prohibited. If you have received this e-mail in error please notify the

sender immediately and destroy the material whether stored on a computer or otherwise.

Any views or opinions presented within this e-mail are solely those of the author and do not

necessarily represent those of Coedffranc Town Council.

Consider the Environment, Do you really need to print this email?

Page 50: Pre-Application Consultation Report€¦ · CONSULTATION REPORT LAND TO THE REAR OF UNIT 6A COED DARCY BUSINESS PARK, LLANDARCY, NEATH ON BEHALF OF PEAK GEN POWER 5 LIMITED June 2019

Land to the rear of Unit 6A, Coed Darcy Business Park Appendices

Appendix 10 Specialist consultees responses

28845/A3/TE/JA June 2019

Page 51: Pre-Application Consultation Report€¦ · CONSULTATION REPORT LAND TO THE REAR OF UNIT 6A COED DARCY BUSINESS PARK, LLANDARCY, NEATH ON BEHALF OF PEAK GEN POWER 5 LIMITED June 2019

Dear Mr. Lewis,

Plas Carew, Uned 5/7 Cefn Coed Parc Nantgarw, Caerdydd CF15 7QQ Ffôn 03000256000 Ebost [email protected] Gwefan www.cadw.llyw.cymru

Plas Carew, Unit 5/7 Cefn Coed Parc Nantgarw,Cardiff CF15 7QQ Tel 03000256000 Email [email protected] Web www.cadw.gov.wales

Pre-Planning Application – Part retrospective application for an existing electricity operation generation reserve compound to support the National Grid, comprising 10 no. x 2 megawatt generating containers, together with associated switchgear, site access, boundary treatment and ancillary plant and equipment, with proposed installation of additional ancillary plant and equipment, including the installation of Selective Catalytic Reduction units, Land to the rear of Unit 6A Coed Darcy Business Park, Llandarcy, Neath Port Talbot

Thank you for your letter of 21 March 2019 inviting our comments on the pre-planning application consultation for the proposed development described above.

Advice

The following comments are based on information made available to us as part of the pre-application consultation and we will review our comments when we are consulted on the final planning application.

Having carefully considered the information provided with this planning application, we have no objections to the impact of the proposed development on the scheduled monument.

Our role

Our statutory role in the planning process is to provide the local planning authority with an assessment concerned with the likely impact that the proposal will have on scheduled monuments, registered historic parks and gardens, registered historic landscapes where an Environmental Impact Assessment is required and development likely to have an impact on the outstanding universal value of a World Heritage Site. We do not provide an assessment of the likely impact of the development on listed buildings or conservation areas, as these are matters for the local authority. It is for the local planning authority to weigh our assessment against all the other material considerations in determining whether to approve planning permission.

Mae Gwasanaeth Amgylchedd Hanesyddol Llywodraeth Cymru (Cadw) yn hyrwyddo gwaith cadwraeth ar gyfer amgylchedd hanesyddol Cymru a gwerthfawrogiad ohono.

The Welsh Government Historic Environment Service (Cadw) promotes the conservation and appreciation of Wales’s historic environment.

Rydym yn croesawu gohebiaeth yn Gymraeg ac yn Saesneg.

Eich cyfeirnod Your reference

28845/A3/JA/nfi Ben Lewis Barton Willmore

By e-mail: [email protected]

Ein cyfeirnod Our reference

MR

Dyddiad Date

02 April 2019

Llinell uniongyrchol Direct line

0300 0255350

Ebost Email:

[email protected]

Page 52: Pre-Application Consultation Report€¦ · CONSULTATION REPORT LAND TO THE REAR OF UNIT 6A COED DARCY BUSINESS PARK, LLANDARCY, NEATH ON BEHALF OF PEAK GEN POWER 5 LIMITED June 2019

We welcome correspondence in both English and Welsh.

Page 53: Pre-Application Consultation Report€¦ · CONSULTATION REPORT LAND TO THE REAR OF UNIT 6A COED DARCY BUSINESS PARK, LLANDARCY, NEATH ON BEHALF OF PEAK GEN POWER 5 LIMITED June 2019

National Policy

Applications for planning permission are considered in light of the Welsh Government’s land use planning policy and guidance contained in Planning Policy Wales (PPW), Technical Advice Notes and related guidance.

PPW (Chapter 6 – The Historic Environment) explains that it is important that the planning system looks to protect, conserve and enhance the significance of historic assets. This will include consideration of the setting of an historic asset which might extend beyond its curtilage. Any change that impacts on an historic asset or its setting should be managed in a sensitive and sustainable way.

The conservation of archaeological remains and their settings is a material consideration in determining a planning application, whether those remains are a scheduled monument or not. Where nationally important archaeological remains are likely to be affected by proposed development, there should be a presumption in favour of their physical protection in situ. It will only be in exceptional circumstances that planning permission will be granted if development would result in a direct adverse impact on a scheduled monument (or an archaeological site shown to be of national importance).

Technical Advice Note 24: The Historic Environment elaborates by explaining that when considering development proposals that affect scheduled monuments or other nationally important archaeological remains, there should be a presumption in favour of their physical preservation in situ, i.e. a presumption against proposals which would involve significant alteration or cause damage, or would have a significant adverse impact causing harm within the setting of the remains.

Assessment

Scheduled monument Llandarcy Round Cairn (GM291) is located within a 1km buffer of the application area, but due to intervening buildings, vegetation and natural topography, the application area is not inter-visible with the scheduled monument. Therefore, the proposed development will have no impact on the scheduled monument GM291or its setting.

Finally, there may also be undesignated historic assets that could be affected by the proposed development and, if you have not already done so, we would advise that you consult the Historic Environment Record held by the Glamorgan-Gwent Archaeological Trust (www.ggat.org.uk).

Yours sincerely,

Moira Richards Diogelu a Pholisi / Protection and Policy

Page 54: Pre-Application Consultation Report€¦ · CONSULTATION REPORT LAND TO THE REAR OF UNIT 6A COED DARCY BUSINESS PARK, LLANDARCY, NEATH ON BEHALF OF PEAK GEN POWER 5 LIMITED June 2019

Developer Services PO Box 3146 Cardiff CF30 0EH

Tel: +44 (0)800 917 2652 Fax: +44 (0)2920 740472 E.mail: [email protected]

Gwasanaethau Datblygu Blwch Post 3146 Caerdydd CF30 0EH

Ffôn: +44 (0)800 917 2652 Ffacs: +44 (0)2920 740472 E.bost: [email protected]

Mr Ben Lewis Date:12/04/2019 Barton Willmore Our Ref: PPA0003928 Greyfriars House Greyfriars Road Cardiff

CF10 3AL

Dear Mr Lewis,

Site Address: Rear of Unit 6A Coed Darcy Business Park, Llandarcy, Neath Development: Part retrospective application for an existing electricity generation operating reserve compound to support National Grid

I refer to the Schedule 1C - Article 2D notice received and your formal request for a pre-application

consultation response before applying for planning permission from Dwr Cymru Welsh Water as a

‘Specialist Consultee’ as defined by Paragraph (y) of Schedule 4 of the Town & Country Planning

(Development Management Procedure) (Wales) (Amendment) Order 2016. It is acknowledged that the

consultation request relates to a major development site and thus seeks a substantive response within 28

days from the date of the notice, 22rd of March 2019, as per the requirements of Article 2E. This request

includes our views on the capacity of our network of assets and infrastructure to accommodate your

proposed development.

Having reviewed the details submitted I would advise there is no objection to the proposed development

and offer the following standing advice which should be taken into account within any future planning

application for the development:

SEWERAGE

We note that no foul water will be generated by development proposals.

The site is crossed by a private foul water only sewer, prior to commencing operational development we

would advise contacting the owners of this asset.

Welsh Water is owned by Glas Cymru – a ‘not-for-profit’ company.

Mae Dŵr Cymru yn eiddo i Glas Cymru – cwmni ‘nid-er-elw’.

We welcome correspondence in Welsh and English

Dŵr Cymru Cyf, a limited company registered in Wales no 2366777. Registered office: Pentwyn Road, Nelson, Treharris, Mid Glamorgan CF46 6LY

Rydym yn croesawu gohebiaeth yn y Gymraeg neu yn Saesneg

Dŵr Cymru Cyf, cwmni cyfyngedig wedi’i gofrestru yng Nghymru rhif 2366777. Swyddfa gofrestredig: Heol Pentwyn Nelson, Treharris, Morgannwg Ganol CF46 6LY.

Page 55: Pre-Application Consultation Report€¦ · CONSULTATION REPORT LAND TO THE REAR OF UNIT 6A COED DARCY BUSINESS PARK, LLANDARCY, NEATH ON BEHALF OF PEAK GEN POWER 5 LIMITED June 2019

Advisory Notes

The applicant may need to apply to Dwr Cymru / Welsh Water for any connection to the public sewer under

S106 of the Water industry Act 1991. If the connection to the public sewer network is either via a lateral

drain (i.e. a drain which extends beyond the connecting property boundary) or via a new sewer (i.e. serves

more than one property), it is now a mandatory requirement to first enter into a Section 104 Adoption

Agreement (Water Industry Act 1991). The design of the sewers and lateral drains must also conform to the

Welsh Ministers Standards for Gravity Foul Sewers and Lateral Drains, and conform with the publication

"Sewers for Adoption"- 7th Edition. Further information can be obtained via the Developer Services pages

of www.dwrcymru.com

The applicant is also advised that some public sewers and lateral drains may not be recorded on our maps

of public sewers because they were originally privately owned and were transferred into public ownership

by nature of the Water Industry (Schemes for Adoption of Private Sewers) Regulations 2011. The presence

of such assets may affect the proposal. In order to assist us in dealing with the proposal the applicant may

contact Dwr Cymru Welsh Water to establish the location and status of the apparatus. Under the Water

Industry Act 1991 Dwr Cymru Welsh Water has rights of access to its apparatus at all times.

Please note that our response is based on the information provided in your enquiry and should the information change we reserve the right to make a new representation. Should you have any queries or wish to discuss any aspect of our response please do not hesitate to contact our dedicated team of planning officers, either on 0800 917 2652 or via email at [email protected]

Please quote our reference number in all communications and correspondence.

Yours faithfully,

Owain George Planning Liaison Manager Developer Services

Please Note that demands upon the water and sewerage systems change continually; consequently the

information given above should be regarded as reliable for a maximum period of 12 months from the date of this

letter.

Welsh Water is owned by Glas Cymru – a ‘not-for-profit’ company. Mae Dŵr Cymru yn eiddo i Glas Cymru – cwmni ‘nid-er-elw’.

We welcome correspondence in Welsh and English

Dŵr Cymru Cyf, a limited company registered in Wales no 2366777. Registered office: Pentwyn Road, Nelson, Treharris, Mid Glamorgan CF46 6LY

Rydym yn croesawu gohebiaeth yn y Gymraeg neu yn Saesneg

Dŵr Cymru Cyf, cwmni cyfyngedig wedi’i gofrestru yng Nghymru rhif 2366777. Swyddfa gofrestredig: Heol Pentwyn Nelson, Treharris, Morgannwg Ganol CF46 6LY.

Page 56: Pre-Application Consultation Report€¦ · CONSULTATION REPORT LAND TO THE REAR OF UNIT 6A COED DARCY BUSINESS PARK, LLANDARCY, NEATH ON BEHALF OF PEAK GEN POWER 5 LIMITED June 2019

NEATH PORT TALBOT COUNTY BOROUGH COUNCIL

The Town and Country Planning (Development Management Procedure) (Wales) Order 2015 (as amended)

HEAD OF ENGINEERING & TRANSPORT

OBSERVATIONS

PLANNING APPLICATION NO: N/3/19/0004/00 APPLICANT: Peak Gen Power Ltd. LOCATION: Land to the rear of Unit 6A Coed Darcy Business

Park, Llandarcy, Neath PROPOSAL: Part retrospective application for an exisiting

electricity generation operating reserve compound to support the National Grid comprising 10 no. generating containers, together with associated switchgear, site access, boundary treatments an ancillary plant and equipment with proposed installation of additional ancillary plant and equipment including the installation of Selective Catalytic reduction units

The Highway Authority, in responding to the above application, provides the following substantive response:

No comment □ No objection (subject to any specified conditions below)

Concerns have been identified (see below for how those concerns can be addressed by the applicant □ Objection - on the grounds set out below □

MY OBSERVATIONS ON THIS PAC PROPOSAL ARE AS FOLLOWS:-

Following on from our previous discussions and the details submitted for this PAC I can confirm that I have no highway and drainage objection to this application.

PAC REF: N419000400-JWG

Page 57: Pre-Application Consultation Report€¦ · CONSULTATION REPORT LAND TO THE REAR OF UNIT 6A COED DARCY BUSINESS PARK, LLANDARCY, NEATH ON BEHALF OF PEAK GEN POWER 5 LIMITED June 2019

200 Lichfield Lane

Mansfield

Nottinghamshire

NG18 4RG

T: 01623 637 119

E: planningconsultation@coal,gov.uk

www.gov.uk/coalauthority

For the attention of Mr Ben Lewis – Infrastructure and Energy Director

c/o Barton Willmore

[By email: [email protected]]

Your Ref: 28845/A3/JA/nfi

10 April 2019

Dear Mr Lewis

Town and Country Planning (Development Management Procedure) (Wales) Order 2012 (as

amended 2016)

Schedule 1C Article 2D - Consultation before applying for planning permission

Land to the rear of Unit 6A Coed Darcy Business Park, Llandarcy, Neath Port Talbot

Thank you for your notification of 21 March 2019 seeking the pre-application views of the Coal Authority

on the above.

I have checked the site location plan (Drawing No. 9000 Rev A) against our coal mining information and

can confirm that, whilst the proposed development site falls within the coalfield, it is located outside the

defined Development High Risk Area meaning that there are no recorded coal mining legacy hazards at

shallow depth that could pose a risk to land stability.

Accordingly, there is no requirement to submit a Coal Mining Risk Assessment in support of a planning

application for the redevelopment of this site. The Local Planning Authority will not consult the Coal

Authority on any planning application for this site.

Yours sincerely

D Roberts Deb Roberts M.Sc. MRTPI

Planning Manager

Page 58: Pre-Application Consultation Report€¦ · CONSULTATION REPORT LAND TO THE REAR OF UNIT 6A COED DARCY BUSINESS PARK, LLANDARCY, NEATH ON BEHALF OF PEAK GEN POWER 5 LIMITED June 2019

From: [email protected]

To: Cardiff

Cc: [email protected]

Subject: SCHEDULE 2 Land to the Rear of Unit 6A Coed Darcy Business Park, Llandarcy

Date: 10 April 2019 13:33:08

Proposed development at Land to the Rear of Unit 6A Coed Darcy Business Park, Llandarcy. I give notice that Peak Gen Power 5 Limited is intending to apply to the Welsh Ministers for planning permission in respect of Development of

National Significance which is for “Part retrospective application for an existing electricity generation

operating reserve compound to support the National Grid comprising 10 no. generating containers,

together with associated switchgear, site access, boundary treatments and ancillary plant and

equipment with proposed installation of additional ancillary plant and equipment including the

installation of Selective Catalytic Reduction units”

Dear Sir/Madam,

No objection on trunk road grounds.

Regards Richard Jones

Peiriannydd Ffyrdd / Route Engineer

Is-adran Rheoli'r Rhwydwaith - Network Management Division

Trafnidiaeth / Transport

Llywodraeth Cymru / Welsh Government

Parc Cathays / Cathays Park Caerdydd / Cardiff

Ffôn / Tel: 03000 256573

Sganiwyd y neges hon am bob feirws hysbys wrth iddi adael Llywodraeth Cymru. Mae Llywodraeth Cymru yn cymryd o ddifrif yr angen i ddiogelu eich data. Os cysylltwch â Llywodraeth Cymru, mae ein hysbysiad preifatrwydd yn esbonio sut rydym yn defnyddio eich gwybodaeth a sut rydym yn diogelu eich preifatrwydd. Rydym yn croesawu gohebiaeth yn Gymraeg. Byddwn yn anfon ateb yn Gymraeg i ohebiaeth a dderbynnir yn Gymraeg ac ni fydd gohebu yn Gymraeg yn arwain at oedi. On leaving the Welsh Government this email was scanned for all known viruses. The Welsh Government takes the protection of your data seriously. If you contact the Welsh Government then our Privacy Notice explains how we use your information and the ways in which we protect your privacy. We welcome receiving correspondence in Welsh. Any correspondence received in Welsh will be answered in Welsh and corresponding in Welsh will not lead to a delay in responding.

Page 59: Pre-Application Consultation Report€¦ · CONSULTATION REPORT LAND TO THE REAR OF UNIT 6A COED DARCY BUSINESS PARK, LLANDARCY, NEATH ON BEHALF OF PEAK GEN POWER 5 LIMITED June 2019

Land to the rear of Unit 6A, Coed Darcy Business Park Appendices

Appendix 11 Correspondence with NRW regarding clarification to HRA

28845/A3/TE/JA June 2019

Page 60: Pre-Application Consultation Report€¦ · CONSULTATION REPORT LAND TO THE REAR OF UNIT 6A COED DARCY BUSINESS PARK, LLANDARCY, NEATH ON BEHALF OF PEAK GEN POWER 5 LIMITED June 2019

From: Isaac, Rhian

To: Joe Ayoubkhani

Subject: RE: 3213487 - Rear of Unit 6A Coed Darcy Business Park (Stat Pre-app) DNS - NRW Respons NRW:01291926

Date: 23 May 2019 08:52:39

Attachments: image004.png image008.png image009.png image010.png image011.png image012.png image013.png image015.png

Hi Joe

Yes that’s correct

Rhian

Rhian Isaac Ymgynghorydd Cynllunio Datblygu / Development Planning Advisor Cyfoeth Naturiol Cymru / Natural Resources Wales 03000 653259 Maes Newydd, Llandarci / Maes Newydd, Llandarcy

www.cyfoethnaturiol.cymru / www.naturalresources.wales

Yn falch o arwain y ffordd at ddyfodol gwell i Gymru trwy reoli’r amgylchedd ac adnoddau naturiol yn gynaliadwy.

Proud to be leading the way to a better future for Wales by managing the environment and natural resources sustainably.

Croesewir gohebiaeth yn Gymraeg a byddwn yn ymateb yn Gymraeg, heb i hynny arwain at oedi Correspondence in Welsh is welcomed, and we will respond in Welsh without it leading to a delay

From: Joe Ayoubkhani <[email protected]>

Sent: 22 May 2019 11:25

To: Isaac, Rhian <[email protected]>

Subject: RE: 3213487 - Rear of Unit 6A Coed Darcy Business Park (Stat Pre-app) DNS - NRW

Respons NRW:01291926

Hi Rhian

Just to confirm, there is no requirement for the applicant to produce a standalone HRA report and the competent authority will be able to undertake the assessment based on the submitted standard application documents?

Thanks

Page 61: Pre-Application Consultation Report€¦ · CONSULTATION REPORT LAND TO THE REAR OF UNIT 6A COED DARCY BUSINESS PARK, LLANDARCY, NEATH ON BEHALF OF PEAK GEN POWER 5 LIMITED June 2019

Joe

Joe Ayoubkhani Planning Associate

The information contained in this e-mail (and any attachments) is confidential and may be privileged. It may be read, copied and used only by the addressee, Barton Willmore accepts no liability for any subsequent alterations or additions incorporated by the addressee or a third party to the body text of this e-mail or any attachments. Barton Willmore accepts no responsibility for staff non-compliance with our IT Acceptable Use Policy.

From: Isaac, Rhian <[email protected]>

Sent: 21 May 2019 11:40

To: Joe Ayoubkhani <[email protected]>

Subject: RE: 3213487 - Rear of Unit 6A Coed Darcy Business Park (Stat Pre-app) DNS - NRW

Respons NRW:01291926

Hi Joe,

You are correct, you will need to produce the evidence to inform the HRA.

Regards

Rhian

Rhian Isaac Ymgynghorydd Cynllunio Datblygu / Development Planning Advisor Cyfoeth Naturiol Cymru / Natural Resources Wales 03000 653259 Maes Newydd, Llandarci / Maes Newydd, Llandarcy

www.cyfoethnaturiol.cymru / www.naturalresources.wales

Yn falch o arwain y ffordd at ddyfodol gwell i Gymru trwy reoli’r amgylchedd ac adnoddau naturiol yn gynaliadwy.

Proud to be leading the way to a better future for Wales by managing the environment and natural resources sustainably.

Croesewir gohebiaeth yn Gymraeg a byddwn yn ymateb yn Gymraeg, heb i hynny arwain at oedi Correspondence in Welsh is welcomed, and we will respond in Welsh without it leading to a delay

From: Joe Ayoubkhani <[email protected]>

Sent: 20 May 2019 17:16

To: Isaac, Rhian <[email protected]>

Subject: FW: 3213487 - Rear of Unit 6A Coed Darcy Business Park (Stat Pre-app) DNS - NRW

Consider the Environment, Do you really need to print this email?

Page 62: Pre-Application Consultation Report€¦ · CONSULTATION REPORT LAND TO THE REAR OF UNIT 6A COED DARCY BUSINESS PARK, LLANDARCY, NEATH ON BEHALF OF PEAK GEN POWER 5 LIMITED June 2019

Respons NRW:01291926

Dear Rhian

As discussed earlier today, please could you confirm that the applicant is not required to submit a standalone HRA document.

The Air Quality Impact Assessment Report, December 2018 (alongside other application documentation) will be submitted as part of the application.

Thanks

Joe

Joe Ayoubkhani Planning Associate

The information contained in this e-mail (and any attachments) is confidential and may be privileged. It may be read, copied and used only by the addressee, Barton Willmore accepts no liability for any subsequent alterations or additions incorporated by the addressee or a third party to the body text of this e-mail or any attachments. Barton Willmore accepts no responsibility for staff non-compliance with our IT Acceptable Use Policy.

------------------- Original Message ------------------- From: South West Planning MailBox Queue; Received: Fri May 03 2019 11:01:19 GMT+0100 (GMT Summer Time) To: Barton wilmore Barton wilmore; Cc: Ben Lewis;

Subject: 3213487 - Rear of Unit 6A Coed Darcy Business Park (Stat Pre-app) DNS - NRW Respons NRW:01291926

Dear Ben, Please find attached our response to the pre- application, if you have any queries please do not hesitate to contact me.

Kind Regards Rhian Isaac

Tîm Cynllunio Datblygu / Development Planning Team Cyfoeth Naturiol Cymru / Natural Resources Wales

Ffôn / Tel: 03000 653259 www.cyfoethnaturiolcymru.gov.uk / www.naturalresourceswales.gov.uk

Yn falch o arwain y ffordd at ddyfodol gwell i Gymru trwy reoli’r amgylchedd ac adnoddau naturiol yn gynaliadwy / Proud to be leading the way to a better future for Wales by managing the environment and natural resources sustainably.

Croesewir gohebiaeth yn Gymraeg a byddwn yn ymateb yn Gymraeg, heb i hynny arwain at oedi / Correspondence in Welsh is welcomed, and we will

Consider the Environment, Do you really need to print this email?

Page 63: Pre-Application Consultation Report€¦ · CONSULTATION REPORT LAND TO THE REAR OF UNIT 6A COED DARCY BUSINESS PARK, LLANDARCY, NEATH ON BEHALF OF PEAK GEN POWER 5 LIMITED June 2019

respond in Welsh without it leading to a delay.

Page 64: Pre-Application Consultation Report€¦ · CONSULTATION REPORT LAND TO THE REAR OF UNIT 6A COED DARCY BUSINESS PARK, LLANDARCY, NEATH ON BEHALF OF PEAK GEN POWER 5 LIMITED June 2019

Appendix 12 Copy of Newspaper Notice

Page 65: Pre-Application Consultation Report€¦ · CONSULTATION REPORT LAND TO THE REAR OF UNIT 6A COED DARCY BUSINESS PARK, LLANDARCY, NEATH ON BEHALF OF PEAK GEN POWER 5 LIMITED June 2019

Public Notices

Signed:

Date: 21/03/2019

Llofnod:

Dyddiad: 21/03/2019

SCHEDULE 1 Articles 8 and 9(5)

Publicity and consultation before applying for planning permission The Developments of National Significance

(Procedure) (Wales) Order 2016 PUBLICITY AND CONSULTATION BEFORE APPLYING FOR PLANNING

PERMISSION NOTICE UNDER ARTICLES 8 AND 9(2)

Purpose of this notice: this notice provides the opportunity to comment directly to the developer on a proposed Development of National Significance (DNS) prior to the submission of a planning

application to the Welsh Ministers. Planning applications for DNS will be publicised by the Welsh Ministers and the relevant local planning authority; any comments provided in response to this notice will not prejudice your ability to make representations to the Welsh Ministers

on any related DNS planning application. You should note that any comments submitted may be placed on the public file. Proposed development at Land to the Rear of Unit 6A

Coed Darcy Business Park, Llandarcy. I give notice that Peak Gen Power 5 Limited

is intending to apply to the Welsh Ministers for planning permission in respect of Development of National Significance which is for an “Part retrospective application for an existing electricity generation

operating reserve compound to support the National Grid comprising 10 no. generating containers, together with

associated switchgear, site access, boundary treatments and ancillary plant and equipment with proposed installation of

additional ancillary plant and equipment including the installation of Selective Catalytic Reduction units”

You may inspect copies of: - the proposed application;

- the plans; and - other supporting documents

online at www.peakgenllandarcy.co.uk Anyone who wishes to make representations about this proposed

development must write to the applicant’s agent at [email protected] or

Barton Willmore, Greyfriars House, Greyfriars Road, Cardiff, CF10 3AL by 6th May 2019

ATODLEN 1 Erthyglau 8 a 9(5)

Cyhoeddusrwydd ac ymgynghori cyn gwneud cais am ganiatâd cynllunio

Gorchymyn Datblygiadau o Arwyddocâd Cenedlaethol (Gweithdrefn) (Cymru) 2016

CYHOEDDUSRWYDD AC YMGYNGHORI CYN GWNEUD CAIS AM GANIATÂD CYNLLUNIO

HYSBYSIAD O DAN ERTHYGLAU 8 A 9(2) Diben yr hysbysiad hwn: mae’r hysbysiad hwn yn rhoi cyfle i

wneud sylwadau yn uniongyrchol i’r datblygwr ynglŷn â Datblygiad o Arwyddocâd Cenedlaethol (DAC) cyn bo cais am ganiatâd

cynllunio wedi ei gyflwyno i Weinidogion Cymru. Bydd ceisiadau cynllunio ar gyfer DAC yn cael eu hysbysebu gan Weinidogion Cymru a’r awdurdod cynllunio lleol perthnasol; ni fydd unrhyw

sylwadau a ddarperir gennych wrth ymateb i’r hysbysiad hwn yn lleihau dim ar eich gallu i gyflwyno sylwadau i Weinidogion Cymru

ar unrhyw gais cynllunio DAC cysylltiedig. Dylech nodi y gellir gosod unrhyw sylwadau a gyflwynir gennych yn y ffeil gyhoeddus.

Datblygiad Arfaethedig yn Tir tu ôl i Uned 6A Coed Darcy Business Park, Llandarcy.

Rwyf yn hysbysu bod Peak Gen Power 5 Limited yn bwriadu gwneud cais i Weinidogion Cymru am ganiatâd

cynllunio mewn cysylltiad â Datblygiad o Arwyddocâd Cenedlaethol sydd: “Cais rhannol ôl-weithredol ar

gyfer gwaith cynhyrchu trydan i gefnogi’r Grid Cenedlaethol, gan gynnwys 10 generadur trydannol, ynghyd â switsys, mynediad i’r

safle, triniaethau ffiniol ac offer a pheiriannau atodol, gan gynnwys gosodiad gorsaf ategol a gosodiad unedau Catalytig Dewisiol”

Gellwch archwilio copïau o’r canlynol: - y cais arfaethedig;

- y planiau; a - dogfennau ategol eraill

ar-lein yn www.peakgenllandarcy.co.uk Dylai unrhyw un sy’n dymuno gwneud sylwadau ynglŷn â’r

datblygiad arfaethedig hwn ysgrifennu at y ceisydd/yr asiant yn

[email protected] neu Barton Willmore, Greyfriars House, Greyfriars Road, Cardiff, CF10 3AL

erbyn 6th Mai 2019

NEATH PORT TALBOT COUNTY BOROUGH COUNCILTOWN AND COUNTRY PLANNING (DEVELOPMENT MANAGEMENT

PROCEDURE) (WALES) ORDER 2012Notice is hereby given that applications have been received by Neath Port Talbot County Borough Council for planning permission for the following developments:APPLICATIONS FOR LISTED BUILDING CONSENT:P2019/0179: Listed Building Consent for the construction of a single-storey flat-roof side extension; internal alternations comprising the conversion of the existing office space into a reception area with new roof-light above; new external double-doors with timber entrance canopy and associated pathway; internal wall alternations to accommodate an interview room, drivers room and toilet facilities; installation of new 4 No. air-conditioning units within chapel hall plus external condensing units to existing flat roof.Location: Margam Crematorium, Longland Lane, Margam, Port TalbotApplicant: Mr Simon Brennan, Property and Regeneration, NPTCBC.DEVELOPMENTS WHICH DO NOT ACCORD WITH DEVELOPMENT PLAN:P2019/0235: Permanent retention of change of use to fitness gym (Class D2) (including alteration to opening hours and class sizes that were previously restricted under planning application P2016/1018).Location: Unit 12 Lonlas Business Park, Lonlas, Neath, SA10 6SNApplicant: Baseline Fitness Limited.The proposals can be viewed online at www.npt.gov.uk/planningonline or at your nearest library, or during normal office hours 8.30 a.m. to 5.00 p.m. (4.30 p.m. Friday) at Neath Civic Centre; Port Talbot Civic Centre and The Quays, Briton Ferry. Representations can be made electronically through the Online Planning Register or by email to [email protected]. Or in writing to: The Quays, Brunel Way, Baglan Energy Park SA11 2GG. Comments should be submitted within 21 days of the date of this notice and quote the appropriate reference number.NICOLA PEARCEHEAD OF PLANNING & PUBLIC PROTECTIONDate: 21/03/2019

NEATH PORT TALBOT COUNTY BOROUGH COUNCILCYNGOR BWRDEISTREF SIROL CASTELL-NEDD PORT TALBOT

(PONTNEATHVAUGHAN LINK ROAD)(TEMPORARY ROAD CLOSURE)

ORDER 2019NOTICE is hereby given that Neath Port Talbot County Borough Council intend in not less than seven days from the date of this Notice to make an Order under Section 14(1) of the Road Traffic Regulation Act 1984 (as amended).The effect of the Order will be to temporarily prohibit vehicular traffic from proceeding along the length of road set out in the Schedule below whilst the Order is in force. During such periods as are indicated by traffic signs informing the public that the road is closed. In order for NPTCBC to restrict the use of the road in the interest of safety to the travelling public and parking concerns in the area it will be necessary to temporarily close the above road to vehicular traffic.The Order will come into force on the 3rd April 2019 and shall continue in force for a maximum duration of 18 months or until the works are completed, whichever is the sooner.

SCHEDULETemporary Road ClosurePontneathvaughan Link Road from B4242 to High Street will be closed from the junction of Pontneathvaughan Road in a northerly direction for a distance of approximately 25 metres along its length.There is no suitable alternate route for vehicular traffic. There will be no access for emergency vehicles while the Order is in force. DATED 21st MARCH 2019M C GRIFFITHSHEAD OF LEGAL SERVICES

NEATH PORT TALBOT COUNTY BOROUGH COUNCILCYNGOR BWRDEISTREF SIROL CASTELL-NEDD PORT TALBOT

(PANTDU, CWMAVON)(ONE WAY TRAFFIC) AND (NO ENTRY)

ORDER 2019NOTICE is given that the Council on the 19th March2019 made an Order in pursuance of its powers as contained in Sections 1 and 2 of the Road Traffic Regulation Act 1984 the effect of which is as set out in the Schedules below.A copy of the Order and plan may be inspected during office opening hours at the main reception desks in the Neath and Port Talbot Civic Centres and at the Pontardawe Library.The Order will come into force on the 25th March 2019.If any person wishes to question the validity of the Order or of any of its powers on the grounds that it or they are not within the powers conferred by the Act or that any requirements of the Act or of any instrument made under the Act has not been complied with, that person may, within 6 weeks from the date on which the Order is made, apply for that purpose to the High Court.

SCHEDULESSchedule 1 – One Way OrderPantdu, CwmavonFrom its northern junction with Cwmavon Road for a distance of approximately 215 metres in an anticlockwise direction.Schedule 2 – No Entry OrderPantdu, CwmavonProhibition of entry for vehicular traffic travelling in a clockwise direction on Pantdu from its southern junction with Cwmavon Road.DATED 21st MARCH 2019M C GRIFFITHSHEAD OF LEGAL SERVICES

All NewChantelle’s

of SkewenUnder New Management

DAVID ROBERT SMITH(Deceased)

Pursuant to the Trustee Act 1925any persons having a claim againstor an interest in the Estate of the aforementioned deceased, late of 27 Smyrna Street PlasmarlSwansea SA6 8LW, who died on13/06/2018, are required to sendparticulars thereof in writing to theundersigned Solicitors on or before31/05/2019, after which date theEstate will be distributed havingregard only to claims and interestsof which they have had notice.PETER LYNN AND PARTNERSSOLICITORS87 Newton Road MumblesSwansea SA3 4BN T553845

SOUTH WALES EVENING POST THURSDAY, MARCH 21, 2019 55