Pre-Application Consultation Report
Land to the rear of Unit 6A Coed Darcy Business Park, Llandarcy, Neath
On behalf of Peak Gen Power 5 Limited
June 2019
PRE-APPLICATION CONSULTATION REPORT
LAND TO THE REAR OF UNIT 6A COED DARCY BUSINESS PARK, LLANDARCY, NEATH ON
BEHALF OF
PEAK GEN POWER 5 LIMITED
June 2019
Project Ref: 28845/A3/TE/JA 28845/A3/TE/JA
Status: Draft Final
Doc: P1 P1
Date: May 2019 June 2019
Prepared by: Thomas Edmunds Thomas Edmunds
Checked by: Joe Ayoubkhani Joe Ayoubkhani
Authorised by: Ben Lewis Ben Lewis
Barton Willmore LLP Greyfriars House
Greyfriars Road Cardiff
CF10 3AL
Tel: 02920 660910 Ref: 28845/A3/TE/JA
Date: June 2019
Email: [email protected]
COPYRIGHT
The contents of this document must not be copied or reproduced in whole or in part without
the written consent of Barton Willmore LLP.
All Barton Willmore stationery is produced using recycled or FSC paper and vegetable oil based
inks.
Land to the rear of Unit 6A, Coed Darcy Business Park Introduction
CONTENTS
1 INTRODUCTION ............................................................................................................. 2
2 CONSULTATION PROCESS .............................................................................................. 5
3 SUMMARY OF CONSULTATION RESPONSES ...................................................................... 7
4 RESPONSE TO FEEDBACK ..............................................................................................11
5 CONCLUSIONS ..............................................................................................................13
APPENDICES
Appendix 1 Extract of the consultation website
Appendix 2 Copy of site notice
Appendix 3 Photographic evidence of the site notices erected
Appendix 4 Evidence of households that were sent notices
Appendix 5 Notice letter to surrounding landowners and list of consultees
Appendix 6 Letter to Community Council
Appendix 7 Letter to County Councillor
Appendix 8 Notice letters to Specialist consultees
Appendix 9 Community consultees responses
Appendix 10 Specialist consultees responses
Appendix 11 Correspondence with NRW regarding clarification to HRA
Appendix 12 Copy of Newspaper Notice
28845/A3/TE/JA -1- June 2019
Land to the rear of Unit 6A, Coed Darcy Business Park Introduction
1 INTRODUCTION
1.1 This Pre-Application Consultation (“PAC”) Report has been prepared by Barton Willmore LLP
(“Barton Willmore”) on behalf of our client, Peak Gen Power 5 Limited (“the Applicant”), in
support of a part retrospective application for an existing electricity generation operating
reserve compound to support the National Grid at Land to the rear of Unit 6A Coed Darcy
Business Park, Llandarcy, Neath Port Talbot . This report sets out the statutory pre- application
consultation process undertaken by the Applicant prior to the submission of the application.
1.2 The full description of the proposed development is as follows:
“Part retrospective application for an existing electricity generation
operating reserve compound to support the National Grid comprising 10 no.
generating containers, together with associated switchgear, site access,
boundary treatments and ancillary plant and equipment with proposed
installation of additional ancillary plant and equipment including the
installation of Selective Catalytic Reduction units”
1.3 As the scheme comprises of an electricity generating station with an installed generating
capacity of between 10 and 350MW, as detailed in Section 2, Paragraph 3 of the Developments
of National Significance (Specified Criteria, Fees and Fees for Deemed Applications) (Wales)
(Amendment) Regulations 2019, it falls within the definition of a ‘Development of National
Significance (DNS), for the purposes of s62 (D) of the Planning (Wales) Act 2015 (“the Wales
Act”). Consequently, this application is therefore made to the Welsh Ministers.
Legislative Context
1.4 Part 2 Article 8 of the Developments of National Significance (Procedure) (Wales) Order
(DNSPWO) 2016 requires that the applicant must publicise the proposed application by:
a) Giving requisite notice –
i. By site display in at least one place on or near the land to which the proposed
application relates for not less than 42 days;
ii. In writing to any owner or occupier of any land adjoining the land to which
the proposed application relates; and
28845/A3/TE/JA -2- June 2019
Land to the rear of Unit 6A, Coed Darcy Business Park Introduction
iii. By publication of the notice in a newspaper circulating in the locality in which
the land to which the proposed application relates is situated;
b) Publishing the following information on a website maintained by the applicant, for not
less than 42 days beginning with each day on which each of the notices referred to
in subparagraph (a) or article 9(2) are given –
i. The draft application form published by the Welsh Ministers under article
12(1)(a) (or a farm substantially to the like effect), including the specified in
or referred to in the form;
ii. A plan which identifies the land to which the proposed application relates;
iii. Any other plans, drawings and information necessary to describe the
development which is the subject of the proposed application;
iv. A copy of the notice required by article 6 which has not lapsed under paragraph
(3) of that article;
v. The design and access statement required by article 14;
vi. Subject to article 12(3), the particulars or evidence required by the Welsh
Ministers under section 62(3) of the 1990 Act (applications for planning
permission) (1);
vii. Where applicable, a statement referred to as the environmental statement for
the proposed development; and
viii. A written statement about any secondary consent (2) connected with the
proposed application (3) in respect of which the applicant considers a decision
on that consent is to be made or should be made by the Welsh Ministers,
together with the draft application form and documents associated with such
consents.
1.5 Article 9 of the DNSPWO requires that the following persons or descriptions of persons are
consulted for the purposes of section 61Z (4) of the 1990 Act:
• Any community consultee;
• Any specialist consultee; and
• Any relevant person.
1.6 This Report confirms the extent of the pre-application consultation that has been undertaken
by the Applicant prior to the submission of this planning application to the Welsh Ministers in
accordance with the DNSPWO 2016.
28845/A3/TE/JA -3- June 2019
Land to the rear of Unit 6A, Coed Darcy Business Park Introduction
1.7 A separate pre-application engagement outside of the statutory pre-application
consultation is documented within the planning Statement of Common Ground submitted in
support of the application. A Statement of Common Ground has also been produced with NRW
and accompanies the application.
28845/A3/TE/JA -4- June 2019
Land to the rear of Unit 6A, Coed Darcy Business Park Consultation Process
2 CONSULTATION PROCESS
2.1 This Section summaries the statutory consultation process undertaken by the Applicant in
accordance with the requirements set out within the DNS (Wales) Regulations 2016.
Draft Planning Application Package
2.2 A full set of draft planning application documentation was made available online
(www.peakgenllandarcy.co.uk) from 21st March 2019 for a period of 46 days, exceeding the
minimum 42 day consultation period. The website remained open until the 6th May 2019 to
allow all consultees to view the documents freely on a private computer or at any public library
during normal opening hours. An extract of the webpage can be found at Appendix 1.
Site Notices
2.3 Five Site Notices (in both English and Welsh) were erected by the Applicant directly adjacent
to and near the location of the site. A copy of the Site Notices can be found at Appendix 2.
The location of Notices can be found in Appendix 3 and photographic evidence of the Site
Notices in situ can be found at Appendix 4.
Adjoining Landowners / Occupiers
2.4 Notice letters (addressed to the owner / occupier) accompanied by a copy of the Site Notice
were posted by recorded delivery to adjoining and surrounding properties on 21st March 2019
and where royal mail recorded delivery confirmed that it was not possible to deliver to
addresses, a further letter was hand delivered on the 5th April 2019. A copy of the letter and
list of consultees can be found at Appendix 5.
Community Consultees
2.5 In terms of community consultees, the relevant consultees were confirmed by NPTCBC in its
pre-application advice letter dated the 28 th August 2018. On the 21st March 2019, Barton
Willmore (acting on behalf of the Applicant) gave requisite notice in writing (by post) to
Coedffranc West Community Council (the relevant Community Council for the area) and to
Councillor Clarke (the local Ward Member for Coedffranc West Community Council). Copies of
the relevant letters and notices can be found at Appendix 6 and Appendix 7 respectively.
28845/A3/TE/JA -5- June 2019
Land to the rear of Unit 6A, Coed Darcy Business Park Consultation Process
Specialist Consultees
2.6 In accordance with Article 9 of the DNSPWO and DNS (Wales) Regulations 2016, the
Applicant is required to consult all relevant specialist consultees . These consultees include:
• Network Rail;
• Welsh Government;
• Welsh Ministers;
• The local highway authority concerned (Neath Port Talbot County
Borough Council Highways Authority;
• Natural Resources Wales (South West Wales Office);
• Health and Safety Executive;
• Cadw;
• Dwr Cymru Welsh Water; and
• The Coal Authority.
2.7 The notice letters issued to the above consultees can be found at Appendix 8.
28845/A3/TE/JA -6- June 2019
Land to the rear of Unit 6A, Coed Darcy Business Park Summary of consultation responses
3
3.1
3.2
3.3
SUMMARY OF CONSULTATION RESPONSES
This Section summarises the responses received via the statutory pre -application consultation
process undertaken by the Applicant and sets out the Applicant’s response to the feedback
received. All comments received between 21st March 2019 and 6th May 2019 have been
considered.
Summary of Public Consultation Responses
During the public consultation process, no responses were received from members of the
public by post and/or email.
Summary of Community Consultee Responses
With regards to community consultees, the Applicant received one response in total, which
came from Coedffranc West Community Council (the relevant Community Council for the
area). The Applicant did not receive a response from Councillor Clarke (the local Ward Member for
Coedffranc West Community Council) [a copy of the response is provided within Appendix 9].
The response by the Community Council is set out below:
• Coedffranc West Community Council confirmed that with regards to this part
retrospective planning application for the land at the rear of Unit 6A Coed Darcy Business
Park, Llandarcy, the Council members do not have any observations at this point.
Summary of Specialist Consultee Responses
3.4 In addition to the public and community consultation responses received and summarised
above, six responses were also received from specialist consultees including:
• Welsh Government;
• The local highway authority concerned (Neath Port Talbot County
Borough Council Highways Authority;
• Cadw;
• Natural Resources Wales;
• Dwr Cymru Welsh Water; and
• The Coal Authority.
28845/A3/TE/JA -7- June 2019
Land to the rear of Unit 6A, Coed Darcy Business Park Summary of consultation responses
3.5 Copies of each consultation response can be found at Appendix 10. In accordance with part
3 of section 9 of the DNSPWO 2016, table 1 sets out the responses from the specialist
consultees.
Table 1: Specialist Consultees Responses
Specialist Consultee Response
Network Rail The Applicant did not receive a response from Network Rail.
Welsh Ministers The Applicant did not receive a response from Welsh Ministers.
Welsh Government The Welsh Government confirmed that they have no objection on
trunk road grounds.
The local highway authority
concerned (Neath Port Talbot
County Borough Council
Highways Authority)
Provided confirmation of no highway and drainage objections to the
proposed application.
Health and Safety Executive The Applicant did not receive a response from the Health and
Safety Executive.
Cadw Confirmed that the proposed development will not have any impact on
the scheduled monument GM291 (Llandarcy Round Cairn) or its setting
due to the intervening buildings, vegetation and natural topography.
Noted that there might be undesignated historic assets that could
be affected by the proposed development and it is advised that
consultation with the Historic Environment Record held by the
Glamorgan Gwent-Archaeological Trust should be undertaken;
and
Overall, no objections to the proposed development based on its
impacts on the scheduled monument.
Dwr Cymru Welsh Water The site is crossed by a private foul water only sewer, prior to
commencing operational development DCWW advises contacting the
owners of this asset. No foul water will be generated by development
proposals.
Advised that the applicant may need to apply to Dwr Cymru Welsh
Water for any connection to the public sewer under S106 of the Water
Industry Act 1991 if the connection to the public sewer network is
either via a lateral drain or via a new sewer because it is now a
mandatory requirement to first enter into a
Section 104 Adoption Agreement (Water Industry Act 1991).
28845/A3/TE/JA -8- June 2019
Land to the rear of Unit 6A, Coed Darcy Business Park Summary of consultation responses
Specialist Consultee Response
The applicant is also advised that some public sewers and lateral
drains may not be recorded on DCWW maps of public sewers
because they were originally privately owned and were
transferred into public ownership by nature of the Water Industry
(Schemes for Adoption of Private Sewers) Regulations 2011. The
presence of such assets may affect the proposal.
The Coal Authority Confirmed that the proposed development site falls within the coalfield,
however, it is located outside the defined Development High Risk Area
meaning that there are no recorded coal mining legacy hazards at
shallow depth that could pose a risk to land stability.
Accordingly, there is no requirement to submit a Coal Mining Risk
Assessment in support of a planning application for the redevelopment
of this site, The Coal Authority confirmed that Neath Port Talbot County
Council will not need to consult with The Coal Authority on any planning
application for this site.
Natural Resources Wales The operation will require a permit from NRW. It is encouraged that
the permit application runs parallel with the DNS Application.
No adverse comments relating to noise which will be c onsidered under
the environmental permit application.
Identified sensitive receptors (European and UK protected sites) within
2km of the site, which were correctly identified in December 2018
produced by AECOM, however, NRW consider that any effect on the
identified sites is unlikely as the air quality impact assessment report
shows the emission levels from the development to be low.
NRW stated that a HRA document is required to aid the competent
authority in assessing the application under Regulation 61 of the
Conservation of Habitats and Species Regulations 2010 (as
amended).
NRW confirms that additional landscaping for the purposes of visual
amenity is not required for the application.
28845/A3/TE/JA -9- June 2019
Land to the rear of Unit 6A, Coed Darcy Business Park Summary of consultation responses
28845/A3/TE/JA -10- June 2019
Land to the rear of Unit 6A, Coed Darcy Business Park Response to Feedback
4 RESPONSE TO FEEDBACK
4.1 This section sets out how account has been taken of the responses received via the pre-
application consultation process undertaken by the Applicant . Each issue is addressed in turn
below:
Public Responses
• The Applicant did not receive any public responses.
Community Consultee Responses
• No response required.
Neath Port Talbot County Council Highways Authority
• No response required.
Cadw
• No response required.
Natural Resources Wales
• A permit application will be submitted to NRW at the appropriate time.
• The Air Quality Impact Report (Ref: 60580051) submitted with the application confirms
that no significant impacts are predicted on ecological receptors. The applicant sought
additional clarification in respect of the need to undertake a standalone HRA report. NRW
confirmed the combination of the air quality report and an Ecology Statement Technical
Note (AECOM, October 2018) that will be submitted alongside this report as part of the
application is sufficient and therefore, the Applicant is not required to prepare a Habitat
Regulation Assessment Report is not required. This additional clarification is set out in
correspondence provided in Appendix 11.
Dŵr Cymru Welsh Water
• No response required. No connection to the public sewer is required.
28845/A3/TE/JA -11- June 2019
Land to the rear of Unit 6A, Coed Darcy Business Park Response to Feedback
Network Rail
• The Applicant did not receive a response from Network Rail.
Welsh Government
• No response required.
Welsh Ministers
• The Applicant did not receive a response from Welsh Ministers.
Coal Authority
• No response required.
Health and Safety Executive
• The Applicant did not receive a response from the Health and Safety Executive.
28845/A3/TE/JA -12- June 2019
Land to the rear of Unit 6A, Coed Darcy Business Park Conclusions
5 CONCLUSIONS
5.1 This Report demonstrates that the pre-application consultation undertaken by the Applicant
has met the requirements of the DNSPWO 2016 and Development of National Significance
(Wales) Regulations 2016 . Members of the public, together with community and specialist
consultees, have been given the opportunity to comment on the proposals.
5.2 Having considered the responses received, no additional action, amendments or further
clarification is required prior to submitting the application to the Welsh Ministers.
28845/A3/TE/JA -13- June 2019
Land to the rear of Unit 6A, Coed Darcy Business Park Appendices
Appendix 1 Extract of the consultation website
28845/A3/TE/JA June 2019
Land to the Rear of Unit 6A
Coed Darcy Business Park,
Llandarcy
Introduction
Development Summary
Pre-Application Consultation Documentation
Get in Touch
Land to the Rear of Unit 6A Coed Darcy Business Park, Llandarcy, Neath Port Talbot.
Peak Gen Power 5 Limited is preparing a planning application at land to the rear of Unit 6A Coed Darcy Business Park, Llandarcy, Neath Port Talbot for the following development:
“Part retrospective application for an existing electricity generation operatingreserve compound to supportthe National Gridcomprising10 no.generatingcontainers,togetherwithassociated switchgear, site access, boundary treatments and ancillary plant and equipment with proposed installation ofadditionalancillaryplant andequipmentincludingthe installation of Selective Catalytic Reduction units.”
Planning permission was granted on 21st January 2013 (Application Reference No. P2012/1061) for a 20MW electricity generation facility at the site. The planning permission has been implemented and the facility has been built and operated since 2013. However, certain pre-commencement planning conditions werenotsatisfied andfollowing the introduction ofnew legislation the facility nowqualifies asa Developmentof National Significance, which meansthatanewplanning application is required underthenew legislation to regularise theposition. Inaddition, Peak Genare seeking permission to install exhaust gas treatment to the generating units in order to comply with tighter emissions targets effective from January 2019 under the Environmental Permitting (England and Wales) (Amendment) Regulations 2018.
We are seeking your views on the development and have made the contents of the draft planning application available electronically via this webpage for public consultation. A copy of the formal Site Notice can be found here.
Peak Gen Power 5 Limited has instructed ateamofconsultants toundertake detailed technical surveys and assessments to support the planning application. This team includes Barton Willmore and AECOM.
Development Summary
The development is a 20-megawatt electricity generation facility providing electricity to meet consumer requirements at periods of peak electricity demand when there is insufficient electricity available to the National Grid from the UK's base load power stations. The facility is designed tomeetthe requirements of National Grid's contracts and sits in standby/idle mode ready to operate when called on by the National Grid to do so being fully operational and generating electricity in less than 5 minutes. Typically, the plant operatesforperiods ofnotmorethanthirty minutesatatimetotalling 500 hours or less in a year.
The application site is located within the Coed Darcy Strategic Regeneration Area (SRA) allocated by way of Policy SRA1 of the Neath Port Talbot County Borough Council Local Development Plan. It lies within thecommercial area ofthe SRA. Thesite, therefore, is located within a wholly industrial complex and the surrounding land is characterised by industrial buildings andcommercial storage. It is considered thatthenature, scaleand location ofthedevelopmentdonotconflict with theaimsofthe SRA. Thereasonwhythe facility is locatedwhere it is hasbeendictated bytheavailability ofasuitable connection
Land to the Rear of Unit 6A
Llandarcy
Introduction
Consultation
Get in Touch
point to the local electricity grid with available land zoned in planning policy terms as suitable for this type of use.
National Planning Policy (as set out in PPW Paragraph 5.7.13) supports development of this natureas it helps providevital exibility tosupportan increasing amountoflow carbon generation and to maintain security of supply. is type of development is essential supporting infrastructure which is needed to support the National Grid and continuous supplyofelectricity is essential fortheeconomyandsocietyasawhole.
As the scheme comprises an electricity generating station with an installed generating capacity ofbetween 10 and 50 MW,it falls within thede nition ofa‘Development of National Signi cance’ (DNS) under section 4 of the Developments of National
Signi cance (Speci ed Criteria and Prescribed Secondary Consents) (Wales) Regulations 2016, for thepurposes ofs62(D) ofthe Planning (Wales)Act 2015 ("the WalesAct"). is application is therefore madetothe Welsh Ministers seeking planning permission for development carried outbeforethedate oftheapplication without compliance with some conditions subject to which planning permission was granted.
e facility will additionally be operated under an environmental permit from Natural Resources Wales(NRW). e permit will ensure that the site is operated and monitored in a way that meets the environmental criteria set out in legislation and re uired by NRW.
Pre-Application Consultation Documentation
A1 Application Form (1MB)
A2 Site Location Plan, Barton Willmore, 28845-9000 Rev A (1MB)
A3 Existing Layout and Elevations Without SCR, LL SP-08 Rev A(1MB)
A4 Container Elevations Without SCR As Built, PG GA-01 Rev A (1MB)
A5 Bunded Clean Oil Storage Tank Detail, 033351-001 Sht1 (1MB)
A6 Bunded Clean Oil Storage Tank Detail, 033351-002 Sht2 (1MB)
A7 Storage Locker Elevation Details, ELL_STO808N01A (1MB)
A8 Transformer Elevation Details, WPS3143-GA-001 (1MB)
A9 WPD Switchroom Details, A2 24891 GA (1MB)
A10Proposed Layoutand Elevations WithSCR, LL SP-09Rev B(1MB)
A11 Container Elevations Without SCR As Built, PG GA-02 Rev B (1MB)
A12 AdBlue Bunded Storage Tank Details, 035266 Sht2 (1MB)
A13 Planning, Design and Access Statement, Barton Willmore, March 2019 (14MB)
A14 Construction Method Statement, AECOM, September 2018 (1MB)
A15 Ecology Statement Technical Note, AECOM, October 2018 (5MB)
A16 Ground Conditions Statement Technical Note, AECOM, October 2018 (1MB)
A17 Landscape and Visual Amenity Statement Technical Note, AECOM, October 2018
(1MB) A18 Air uality Assessment, AECOM, December 2018 (6MB)
A19 Memo concerning short-term NOx exceedences at Ancient Woodland, AECOM,
18/12/18 (1MB) A20 Review of Air uality Impact Assessment Report Rev 1, RPS, December 2018 (1MB) A21 Noise Assessment, March 2019 (1MB)
A22 Dra Drainage Report, AECOM, October 2018 (0.5MB)
A23 Statement of Common Ground with Natural Resources Wales (1MB)
Get in Touch
If you wish to make a comment on the proposed development, then please write to:
Peak Gen Power 5 Ltd Consultation
c/o Barton Willmore Greyfriars House Greyfriars Road
Cardi CF10 3AL
Alternatively, please email your comments to cardi @bartonwillmore.co.uk
Please provide comments by 6th May 2019
eapplication is programmed tobesubmitted to the Welsh Ministers in Spring 2019. Once submitted, you will be able to monitor its progress and make further comments via the Planning Inspectorate’s webpage at https://dns.planninginspectorate.gov.uk/projects/
ank you for visiting www.peakgenllandarcy.co.uk
Land to the Rear of Unit 6A
Llandarcy
Introduction
Consultation
Get in Touch
Land to the rear of Unit 6A, Coed Darcy Business Park Appendices
Appendix 2 Copy of site notice
28845/A3/TE/JA June 2019
SCHEDULE 1
Articles 8 and 9(5)
Publicity and consultation before applying for planning permission
The Developments of National Significance (Procedure) (Wales) Order 2016
PUBLICITY AND CONSULTATION BEFORE APPLYING FOR PLANNING PERMISSION
NOTICE UNDER ARTICLES 8 AND 9(2)
Purpose of this notice: this notice provides the opportunity to comment directly to the developer on a proposed Development of National Significance (DNS) prior to the submission of a planning application to the Welsh Ministers. Planning applications for DNS will be publicised by the Welsh Ministers and the relevant local planning authority; any comments provided in response to this notice will not prejudice your ability to make representations to the Welsh Ministers on any related DNS planning application. You should note that any comments submitted may be placed on the public file.
Proposed development at Land to the Rear of Unit 6A Coed Darcy Business Park, Llandarcy.
I give notice that Peak Gen Power 5 Limited
is intending to apply to the Welsh Ministers for planning permission in respect of Development of National Significance which is for an “Part retrospective application for an existing electricity generation operating reserve compound to support the National Grid comprising 10 no. generating containers, together with associated switchgear, site access, boundary treatments and ancillary plant and equipment with proposed installation of additional ancillary plant and equipment including the installation of Selective Catalytic Reduction units”
You may inspect copies of:
- the proposed application;
- the plans; and
- other supporting documents
online at www.peakgenllandarcy.co.uk
Anyone who wishes to make representations about this proposed development must write to the applicant’s agent at
Barton Willmore, Greyfriars House, Greyfriars Road, Cardiff, CF10 3AL
by 6th May 2019
Signed
Date: 21/03/2019
ATODLEN 1
Erthyglau 8 a 9(5)
Cyhoeddusrwydd ac ymgynghori cyn gwneud cais am ganiatâd cynllunio
Gorchymyn Datblygiadau o Arwyddocâd Cenedlaethol (Gweithdrefn) (Cymru) 2016
CYHOEDDUSRWYDD AC YMGYNGHORI CYN GWNEUD CAIS AM GANIATÂD
CYNLLUNIO
HYSBYSIAD O DAN ERTHYGLAU 8 A 9(2)
Diben yr hysbysiad hwn: mae’r hysbysiad hwn yn rhoi cyfle i wneud sylwadau yn uniongyrchol i’r datblygwr ynglŷn â Datblygiad o Arwyddocâd Cenedlaethol (DAC) cyn bo cais am ganiatâd cynllunio wedi ei gyflwyno i Weinidogion Cymru. Bydd ceisiadau cynllunio ar gyfer DAC yn cael eu hysbysebu gan Weinidogion Cymru a’r awdurdod cynllunio lleol perthnasol; ni fydd unrhyw sylwadau a ddarperir gennych wrth ymateb i’r hysbysiad hwn yn lleihau dim ar eich gallu i gyflwyno sylwadau i Weinidogion Cymru ar unrhyw gais cynllunio DAC cysylltiedig. Dylech nodi y gellir gosod unrhyw sylwadau a gyflwynir gennych yn y ffeil gyhoeddus.
Datblygiad Arfaethedig yn Tir tu ôl i Uned 6A Coed Darcy Business Park, Llandarcy.
Rwyf yn hysbysu bod Peak Gen Power 5 Limited
yn bwriadu gwneud cais i Weinidogion Cymru am ganiatâd cynllunio mewn cysylltiad â Datblygiad o
Arwyddocâd Cenedlaethol sydd: “Cais rhannol ôl-weithredol ar gyfer gwaith cynhyrchu trydan i gefnogi’r Grid Cenedlaethol, gan gynnwys 10 generadur trydannol, ynghyd â switsys, mynediad i’r safle, triniaethau ffiniol ac offer a pheiriannau atodol, gan gynnwys gosodiad gorsaf ategol a gosodiad unedau Catalytig Dewisiol”
Gellwch archwilio copïau o’r canlynol:
- y cais arfaethedig;
- y planiau; a
- dogfennau ategol eraill
ar-lein yn www.peakgenllandarcy.co.uk
Dylai unrhyw un sy’n dymuno gwneud sylwadau ynglŷn â’r datblygiad arfaethedig hwn ysgrifennu at y
ceisydd/yr asiant yn
Barton Willmore, Greyfriars House, Greyfriars Road, Cardiff, CF10 3AL
erbyn 6th Mai 2019
Llofnod:
Dyddiad: 21/03/2019
SCHEDULE 2
Article 9(5)
Consultation before applying for planning permission
The Developments of National Significance (Procedure) (Wales) Order 2016
CONSULTATION BEFORE APPLYING FOR PLANNING PERMISSION - NOTICE UNDER
ARTICLE 9(3)
Purpose of this notice : this notice comprises a formal request for a pre-application consultation response under article 9(3) of the Developments of National Significance (Procedure) (Wales) Order 2016.
Proposed development at Land to the Rear of Unit 6A Coed Darcy Business Park, Llandarcy.
I give notice that Peak Gen Power 5 Limited
is intending to apply to the Welsh Ministers for planning permission in respect of Development of National Significance which is for “Part retrospective application for an existing electricity generation operating reserve compound to support the National Grid comprising 10 no. generating containers, together with associated switchgear, site access, boundary treatments and ancillary plant and equipment with proposed installation of additional ancillary plant and equipment including the installation of Selective Catalytic Reduction units”
A copy of the proposed application; plans; and other supporting documents can be viewed
online at www.peakgenllandarcy.co.uk
In accordance with the requirements of article 10 of the Developments of National Significance (Procedure) (Wales) Order 2016, a consultation response must be sent to [email protected] by 6th May 2019
Signed:
Date: 21/03/19
ATODLEN 2
Erthygl 9(5)
Ymgynghori cyn gwneud cais am ganiatâd cynllunio
Gorchymyn Datblygiadau o Arwyddocâd Cenedlaethol (Gweithdrefn) (Cymru) 2016
YMGYNGHORI CYN GWNEUD CAIS AM GANIATÂD CYNLLUNIO - HYSBYSIAD O DAN
ERTHYGL 9(3)
Diben yr hysbysiad hwn : mae’r hysbysiad hwn yn archiad ffurfiol am ymateb i ymgynghoriad cynymgeisio o dan erthygl 9(3) o Orchymyn Datblygiadau o Arwyddocâd Cenedlaethol (Gweithdrefn) (Cymru) 2016.
Datblygiad Arfaethedig yn Tir tu ôl i Uned 6A, Parc Busnes Coed Darcy, Llandarcy.
Rwyf yn hysbysu bod Peak Gen Power 5 Limited
yn bwriadu gwneud cais i Weinidogion Cymru am ganiatâd cynllunio mewn perthynas â Datblygiad o Arwyddocâd Cenedlaethol sydd: “Cais rhannol ôl-weithredol ar gyfer gwaith cynhyrchu trydan i gefnogi’r Grid Cenedlaethol, gan gynnwys 10 generadur trydannol, ynghyd â switsys, mynediad i’r safle, triniaethau ffiniol ac offer a pheiriannau atodol, gan gynnwys gosodiad gorsaf ategol a gosodiad unedau Catalytig Dewisiol.”
Mae copi o’r cais arfaethedig; planiau; a dogfennau ategol eraill wedi eu hatodi yma /ar gael i’w
harchwilio ar lein yn www.peakgenllandarcy.co.uk
Yn unol â gofynion erthygl 10 o Orchymyn Datblygiadau o Arwyddocâd Cenedlaethol (Gweithdrefn)
(Cymru) 2016, rhaid anfon ymateb i’r ymgynghoriad at [email protected]
erbyn 6th Mai 2019
Llofnod:
Dyddiad: 21/03/19
Land to the rear of Unit 6A, Coed Darcy Business Park Appendices
Appendix 3 Photographic evidence of the site notices erected
28845/A3/TE/JA June 2019
' ' '
'' \
I '
)'
I ' ''
' ' '
' ' ' \ \ \
, ,
1liji/ i 1!1 i
I'I" 1J, ·j ,1' 1// I I (
I ;
If,I11/1!1 !I jl!/ I I
I
- s--
..
I I '.'.I
·.l ' I'
" ." I ' y ..,
'·'
, I., -, - , .. ·! ', ·.'· '
..... 11
" .. I '
.,
I 'I
•
',:\: : ! '
.. J,....... . • ' •
.. •
• • ' •
" ...
' .
· .
...1' ' .
- : ·, ,_. . . . ,.
- .,, ·.,.-•..,.;_..,J ,·
1 - ' '1 "': . ' ,,,, . • ,!.. ,}-· • ' •• 'l - . ,.;' .,fl ,, ' .,.• .• • , . , ,
• ! 'li'jl, - ·;·.·/!·.J' '. .:: • • • . . ...- .
-'..1• ., •·:
" • ' ' •
• •.
•• ,, • •
• • •
' •· ·:-;•.1y""_1."t
; '. .• ' • • •
• . 1 • , ••...,.J . .,... • ,.i,-;•"'.
•
• •. • i l: • .,. • •
• ..· ..,r._....,... .··...;,,.._, • ''' • • • •
• • •
•
•., • "
• ' I ' '111 •• .., •.,',l • • •
' • ,n, • • I • I • ' •' .• ' • ,•
• 't • :•
• •
" . -- ·...,: J• : ,
• •• •• r' •
cl_ ·.·'. .1 . . ,l.. . •,.•- •,. I • '
• '•• ,•
•.•. \" I • .. •
•
• • I
' • -. ,·,••,1, ••;.• ; ,•,: • •·;•·· ·,!'• • • • •
• '. .,,.I ' ; • - • • •
I • •,.•( -• . ' . .• ,,t• ,.....,..-,, " •
'. . •· • • ' .''. ,.... :,' i ' ·' •
• ' . ••
. . . . .,, ' ' • • • - • • • • •• • •• I • ,... t ,, .•"-'-·1l. . ... • •
. ,•·.:;;:' ;\,,- . /• ,, . •, •·t ) , • •• • •• •
•' · •, '1: .' \- \ ,. ( • _ · . • .'J, •• ) · ··•i • ·,·I , • ( . e ..• • ' •
• ...' •--' •"l ', • • •
• . ·,.......,,\◄..
, I ' .; • • • • j, • •
• • • ,·,.,. j_ ' 'J' '' •..:../•..J' •• •
• • • • •
• . • ...........;.,, •i· ..:. ."·• . .'.' f ': •
• • • J • •
; .
•
' ' • •
I' •'• I .- ,
.
T . ! · . - . , , i f:• -
•
• • • •
•• • •
•
• • • •
',..... ' • •
-.-. . •' '"
.. ., '
" ., • •
'• •
•
• •
1lldl ,I1 •,!
. ..,. •'.·'• . . . '
:\•..., ,_
' I ,, f r_I . . . .
,.,, ..• .· '. . '
I ' . , 1' ' • .. . ..
. . .' . ' ; ', -•. ' · •.· ,i iiI ., ,. •.',.,-, _. '
: 1 I \
,
J
•
•
•:
)'' I I
'
'• •
' '
•
. ....' ' •,.•.,• ''
; •.-/.t' -,_.--..- - ., -.:• . ·-· •:
•"• •'
; -,:
,
'.; ' ": . , .. .. ,-,-·-. •-•-_; -• :: .,. 1·
1,;\\1·:1_, ' '; ' ii j . '; i ..
1 ' ' ' i
• .I I
• • . •• "
II •• •
• • .' ' • · • ' • • .• •
• • • • • •-
. ·.,-,,··- ..,'..,.-, ,·
.,._ ., •• C ' .,
'.! I .,_
..: . " •
.. -,_,,,, . . .·,.;, . . . . . .
- :tf,j;, .. .-..·....,.
•
•
., .. • • '•
• -- , '•••
" '. i' " , •
" I • ,
• • • • I !
., •
•• •
-- '
"
.'.' • "
' ' , ..-, .·
"
'
' •
• t•
'
i "' . •
j. ,
\ i , I/, I •
I •'.
' I' ... .
, ,,,• I ..' '
p I
II i 1/ '
I I
I'
If
) , ..
I'
I '·1 'I
\
I I I
,I \
I r'
] I
Land to the rear of Unit 6A, Coed Darcy Business Park Appendices
Appendix 4 Evidence of households that were sent notices
28845/A3/TE/JA June 2019
Name Adjoining Landowners
House Name/ Number Unit 12A, Llandarcy House
Street Darcy Business Park
Town/ City Llandarcy, Neath
Postcode SAlO 6EJ
Tracking No. GK87270041SGB
Unit 12, Llandarcy House Darcy Business Park Llandarcy, Neath SA106EJ GK872700432GB Disability Action Centre Darcy Business Park Llandarcy, Neath SA106EJ GK872700242GB Units Darcy Business Park Llandarcy, Neath SAl0 6EJ GK872700260GB Unit 16 Lian Coed Court, Darcy Business Park Llandarcy, Neath SAlO 6FG GK872700335GB Unit 12 Lian Coed Court, Darcy Business Park Llandarcy, Neath SAl0 6FG GK872700239GB Unit7 Lian Coed Court, Darcy Business Park Llandarcy, Neath SAl0 6FG GK872700551GB Unit4-5 Lian Coed Court, Darcy Business Park Llandarcy, Neath SAl0 6FG GK872700579GB Unit 1-2 Lian Coed Court, Darcy Business Park Llandarcy, Neath SAlO 6FG GK872700596GB Unit 6-6A Darcy Business Park Llandarcy, Neath SAlO 6EJ GK872700622GB Norton House Darcy Business Park Llandarcy, Neath SAlO 6EJ GK872700619GB Unit 8 Lian Coed Court, Darcy Business Park Llandarcy, Neath SAlO 6FG GK872700636GB Neath Ambulance Station, Unit 1-2 The Courtyard, Darcy Business Park Llandarcy, Neath SAlO 6EJ GK872700640GB Rugbi Industrial Supplies Ltd, Unit 4 The Courtyard, Darcy Business Park Llandarcy, Neath SAlO 6EJ GK872700450GB Department of Environment, Unit 6 The Courtyard, Darcy Business Park Llandarcy, Neath SAlO 6EJ GK872700477GB Unit 8-10 The Courtyard, Darcy Business Park Llandarcy, Neath SAlO 6EJ GK872700S25GB Unit 11 Llandarcy House, Darcy Business Park Llandarcy, Neath SAlO 6EJ GK872700S34GB Land lying to the South-East of Woodlands Llandarcy, Neath SAlO 6LQ GK872700287GB Bridge House Pen-Y-Heol Llandarcy, Neath SAlO 6LQ GK872700361GB St. Modwen Homes Two Devon Way, Longbridge Birmingham 631 2TS GK872700375GB
Councillor Helen Ceri Clarke 110 Dynevor Road Skewen Neath SAlO 6TH GK872700667GB Coedffranc Town Council Memorial Hall
Unit 11 Skewen Park (Off Wern Road) Lian Coed Court, Darcy Business Park
Skewen, Neath Llandarcy, Neath
SAlO 6DP SAl0 6FG
GK872700653GB
Unit 13 Lian Coed Court, Darcy Business Park Llandarcy, Neath SAlO 6FG
Unit 14 Lian Coed Court, Darcy Business Park Llandarcy, Neath SAlO 6FG
Unit 15 Lian Coed Court, Darcy Business Park Llandarcy, Neath SAlO 6FG
Unit 17 Lian Coed Court, Darcy Business Park Llandarcy, Neath SAlO 6FG
Unit 10 Unit 6-6A
Lian Coed Court, Darcy Business Park Lian Coed Court, Darcy Business Park
Llandarcy, Neath Llandarcy, Neath
SAlO 6FG SAl0 6FG
Specialist Consultees Units Network Rail, 5 Cadw
The Courtyard, Darcy Business Park Callaghan Square Welsh Government, Plas Carew
Llandarcy, Neath Cardiff Unit 5/7 Cefn Coed,
SAlO 6EJ CFl0 SBT Cardiff
CFlS 7QQ National Resources Wales (South West Wales Office) Maes Newydd Llandarcy Neath, Port Talbot SAlO 6JQ Neath Port Talbot County Borough Council Highways Authority The Quays Baglan Energy Park Briton Ferry SAU 2GG Minister of Economy & Transport Welsh Government 5th Floor, TY Hywel Cardiff Bay CF99 lNA Minister of Environment, Energy & Rural Affairs Welsh Government 5th Floor, TY Hywel Cardiff Bay CF99 lNA The Coal Authority
DWr Cymru Welsh Water 200 Lichfield Lane Developer Services
Mansfield P.O. Box 3146, Linea
Nottinghamshire Cardiff
NG18 4RG CF30 0EH
Health and Safety Executive Planning Division Welsh Government
Government Buildings Phase 1 Ty-Glas Avenue Cathays Park
Cardiff Cardiff
CF14 SSH CFlO 3NQ
Welsh Ministers 5th Floor Ty Hywel Cardiff Bay CF99 lNA
Land to the rear of Unit 6A, Coed Darcy Business Park Appendices
Appendix 5 Notice letter to surrounding landowners and list of consultees
28845/A3/TE/JA May 2019
Bridge House Pen-Y-Heol
Llandarcy, Neath SA10 6LQ
Dear Sir / Madam
Our Ref: 28845/A3/JA/nfi/lb
5th April 2019
RE: LAND TO THE REAR OF UNIT 6A COED DARCY BUSINESS PARK, LLANDARCY, NEATH PORT
TALBOT
As an adjoining landowner, I am writing to you today to notify you that PeakGen Power 5 Limited is preparing
a planning application at land to the rear of Unit 6A Coed Darcy Business Park, Llandarcy, Neath Port Talbot. The description of the proposed development is as follows:
“Part retrospective application for an existing electricity generation operating reserve compound to support the National Grid comprising 10 no.x 2 megawatt generating containers, together with associated switchgear, site access, boundary treatments and ancillary plant and equipment with proposed installation of additional ancillary plant and equipment including the installation of Selective Catalytic Reduction units”.
By way of background, planning permission was granted on the 21 st of January 2012 (Application
Reference Number: P2012/1061) for a 20MW electricity generation facility. The planning permission has
been implemented and the facility has been built and operated subsequently. However, certain pre- commencement planning conditions were not satisfied and following the introduction of new legislation
the facility now qualifies as a Development of National Significance, which means that a new planning application is required under the new legislation to regularise the position. I n addition, Peak Gen are
seeking permission to install exhaust gas treatment to the generating units in order to comply with tighter emissions targets effective from January 2019 under the Environmental Permitting (England and Wales)
(Amendment) Regulation s 2018.
We are seeking your views on the development and have made the contents of the draft planning application available electronically at http://www.peakgenllandarcy.co.uk
Development Summary
The development is a 20-megawatt electricity generation facility providing electricity to meet consumer requirements at periods of peak electricity demand when there is insufficient electricity available to the
National Grid from the UK's base load power stations. The fa cility is designed to meet the requirements of National Grid's contracts and sits in standby/idle mode ready to operate when called on by the National
Grid to do so being fully operational and generating electricity in less than 5 minutes. Typically, the plant
operates for periods of not more than thirty minutes at a time totalling 500 hours or less in a year.
28845/A3/JA/nfi/lb -2- 5th April 2019
The application site is located within the Coed Darcy Strategic Regeneration Area (SRA) allocated by way
of Policy SRA1 of the Neath Port Talbot County Borough Council Local Development Plan. It lies within the commercial area of the SRA. The site, therefore, is located within a wholly industrial complex and the
surrounding land is characterised by industrial buildings and commercial storage. It is considered that the nature, scale and location of the development do not conflict with the aims of the SRA. The reason why
the facility is located where it is has been dictated by the availability of a suitable connection point to the
local electricity grid with available land zoned in planning policy terms as suitable for this type of use.
National Planning Policy (as set out in PPW Paragraph 5.7.13) supports development of this nature as it
helps provide vital flexibility to support an increasing amount of low carbon generation and to maintain
security of supply. This type of development is essential supporting infrastructure which is needed to support the National Grid and continuous supply of electricity is essential for the economy and society as
a whole.
As the scheme comprises an electricity generating station with an installed generating capacity of between 10 and 50 MW, it falls within the definition of a ‘Development of National Significance’ (DNS) under section
4 of the Developments of National Significance (Specified Criteria and Prescribed Secondary Consents) (Wales) Regulations 2016, for the purposes of s62(D) of the Planning (Wales) Act 2015 ("the Wales
Act"). This application is therefore made to the Welsh Ministers seeking planning permission for
development carried out before the date of the application without compliance with some conditions subject to which planning permission was granted.
The facility will additionally be operated under an environmental permit from Natural Resources Wales (NRW). The permit will ensure that the site is operated and monitored in a way that meets the environmental criteria
set out in legislation and required by NRW.
Get in Touch
We are seeking your views on the development and have made the contents of the draft planning application
available electronically at http://www.peakgenllandarcy.co.uk
If you wish to make a comment on the proposed development, then please write to:
PeakGen Power 5 Limited Consultation c/o
Barton Willmore Greyfriars House
Greyfriars Road Cardiff CF10 3AL
Alternatively, please email your comments to [email protected]. Please provide comments
by 6th May 2019. The application is programmed to be submitted to the Welsh Ministers in Spring 2019. Once submitted, you will be able to monitor its progress and make further comments
via the Planning Inspectorate’s webpage at
http://dns.planninginspectorate.go.uk/projects/
If you write to us / email us we will only use your personal data for the purposes of the planning application
for Land to the Rear of Unit 6A Coed Darcy Business Park, Llandar cy, Neath Port Talbot and we will pass your address details to PeakGen Power 5 Limited for this purpose. If you would like us to contact you
with updates on the planning process, please notify us in your letter/email.
28845/A3/JA/nfi/lb -3- 5th April 2019
We will delete your personal data once we have processed your comments. If you would like us to contact you
with updates on the planning process, please notify us in your letter/email.
Yours Faithfully
BEN LEWIS
Infrastructure and Energy Director
Enc. Schedule 1 Notice
Land to the rear of Unit 6A, Coed Darcy Business Park Appendices
Appendix 6 Letter to Community Council
28845/A3/TE/JA June 2019
Coedffranc Town Council Memorial Hall
Skewen Park (Off Wern Road) Skewen, Neath SA10 6DP
Our Reference: 28845/A3/JA/nfi
21st March 2019
Dear Sir / Madam,
RE: Land to the Rear of Unit 6A Coed Darcy Business Park, Llandarcy, Neath Port Talbot
As a community consultee, I am writing to you today to notify you that PeakGen Power 5 Limited is preparing a
planning application at land to the rear of Unit 6A Coed Darcy Business Park, Llandarcy, Neath Port Talbot. The description of the proposed development is as follows :
“Part retrospective application for an existing electricity generation operating reserve compound to support the National Grid comprising 10 no.x 2 megawatt generating containers, together with associated switchgear, site access, boundary treatments and ancillary plant and equipment with proposed installation of additional ancillary plant and equipment including the in stallation of Selective Catalytic Reduction units”.
By way of background, planning permission was granted on the 21 st of January 2012 (Application Reference
Number: P2012/1061) for a 20MW electricity generation facility. The planning permission has been implemented and the facility has been built and operated subsequently. However, certain pre-
commencement planning conditions were not satisfied and following the introduction of new legislation the facility now qualifies as a Development of National Signifi cance, which means that a new planning
application is required under the new legislation to regularise the position. In addition, Peak Gen are seeking permission to install exhaust gas treatment to the generating units in order to comply with tighter
emissions targets effective from January 2019 under the Environmental Permitting (England and Wales) (Amendment) Regulations 2018.
We are seeking your views on the development and have made the contents of the draft planning application
available electronically at http://www.peakgenllandarcy.co.uk
Development Summary
The development is a 20-megawatt electricity generation facility providing electricity to meet consumer
requirements at periods of peak electricity demand when there is insufficient electricity available to the
National Grid from the UK's base load power stations. The facility is designed to meet the requirements of National Grid's contracts and sits in standby/idle mode ready to operate when called on by the National
Grid to do so being fully operational and generating electricity in less than 5 minutes. Typically, the plant operates for periods of not more than thirty minutes at a time totalling 500 hours or less in a year.
The application site is located within the Coed Darcy Strategic Regeneration Area (SRA) allocated by way of Policy SRA1 of the Neath Port Talbot County Borough Council Local Development Plan. It lies within the
commercial area of the SRA. The site, therefore, is located within a wholly industrial complex and the surrounding land is characterised by industrial buildings and commercial storage.
28845/A3/JA/nfi -2- 21st March 2019
It is considered that the nature, scale and location of the development do not conflict with the aims of the
SRA. The reason why the facility is located where it is has been dictated by the availability of a suitable connection point to the local electricity grid with available land zoned in planning policy terms as suitable
for this type of use.
National Planning Policy (as set out in PPW Paragraph 5.7.13) supports development of this nature as it
helps provide vital flexibility to support an increasing amount of low carbon generation and to maintain security of supply. This type of development is essential supporting infrastructure which is needed to
support the National Grid and continuous supply of electricity is essential for the economy and society as
a whole.
As the scheme comprises an electricity generating station with an installed generating capacity of between
10 and 50 MW, it falls within the definition of a ‘Development of National Significance’ (DNS) under section 4 of the Developments of National Significance (Specified Criteria and Prescribed Secondary Consents)
(Wales) Regulations 2016, for the purposes of s62(D) of the Planning (Wales) Act 2015 ("the Wales Act"). This application is therefore made to the Welsh Ministers seeking planning permission for
development carried out before the date of the application without compliance with some conditions subject to which planning permission was granted.
The facility will additionally be operated under an environmental permit from Natural Resources Wales (NRW).
The permit will ensure that the site is operated and monitored in a way that meets the environmental criteria set out in legislation and required by NRW.
Get in Touch
We are seeking your views on the development and have made the contents of the draft planning application available electronically at http://www.peakgenllandarcy.co.uk
If you wish to make a comment on the proposed development, then please write to:
PeakGen Power 5 Limited Consultation c/0 Barton Willmore
Greyfriars House Greyfriars Road
Cardiff CF10 3AL
Alternatively, please email your comments to [email protected]. Please provide comments by 6th May 2019. The application is programmed to be submitted to the Welsh Ministers in Spring
2019. Once submitted, you will be able to monitor its progress an d make further comments via the Planning Inspectorate’s webpage at
http://dns.planninginspectorate.go.uk/projects/
If you write to us / email us we will only use your personal data for the p urposes of the planning application
for Land to the Rear of Unit 6A Coed Darcy Business Park, Llandarcy, Neath Port Talbot and we will pass your address details to PeakGen Power 5 Limited for this purpose. If you would like us to contact you
with updates on the planning process, please notify us in your letter/ email. We will delete your personal data once we have processed your comments. If you would like us to contact you with updates on the
planning process, please notify us in your letter/ email.
Yours Faithfully,
Infrastructure and Energy Director
Enc. Schedule 1 Notice
Land to the rear of Unit 6A, Coed Darcy Business Park Appendices
Appendix 7 Letter to County Councillor
28845/A3/TE/JA June 2019
Councillor Helen Ceri Clarke 110 Dynevor Road
Skewen Neath
SA10 6TH
Dear Councillor Clarke,
Our Reference: 28845/A3/JA/nfi
21st March 2019
RE: Land to the Rear of Unit 6A Coed Darcy Business Park, Llandarcy, Neath Port Talbot
As a community consultee, I am writing to you today to notify you that PeakGen Power 5 Limited is preparing a
planning application at land to the rear of Unit 6A Coed Darcy Business Park, Llandarcy, Neath Port Talbot. The description of the proposed development is as follows :
“Part retrospective application for an existing electricity generation operating reserve compound to support the National Grid comprising 10 no.x 2 megawatt generating containers, together with associated switchgear, site access, boundary treatments and ancillary plant and equipment with proposed installation of additional ancillary plant and equipment including the installation of Selective Catalytic Reduction units”.
By way of background, planning permission was granted on the 21 st of January 2012 (Application Reference
Number: P2012/1061) for a 20MW electricity generation facility. The planning permission has been implemented and the facility has been built and operated subsequently. However, certain pre-
commencement planning conditions were not satisfied and following the introduction of new legislation the facility now qualifies as a Development of National Significance, which me ans that a new planning
application is required under the new legislation to regularise the position. In addition, Peak Gen are
seeking permission to install exhaust gas treatment to the generating units in order to comply with tighter emissions targets effective from January 2019 under the Environmental Permitting (England and Wales)
(Amendment) Regulations 2018.
We are seeking your views on the development and have made the contents of the draft planning application
available electronically at http://www.peakgenllandarcy.co.uk
Development Summary
The development is a 20-megawatt electricity generation facility providing electricity to meet consumer requirements at periods of peak electricity demand when there is insufficient electricity available to the
National Grid from the UK's base load power stations. The facility is designed to meet the requirements of National Grid's contracts and sits in standby/idle mode ready to operate when called on by the National Grid
to do so being fully operational and generating electricity in less than 5 minutes. Typically, the plant operates for periods of not more than thirty minutes at a time totalling 500 hours or less in a year.
The application site is located within the Coed Darcy Strategic Regeneration Area (SRA) allocated by way
of Policy SRA1 of the Neath Port Talbot County Borough Council Local Development Plan. It lies within the commercial area of the SRA. The site, therefore, is located within a wholly indus trial complex and the
surrounding land is characterised by industrial buildings and commercial storage.
28845/A3/JA/nfi -2- 21st March 2019
It is considered that the nature, scale and location of the development do not conflict with the aims of the
SRA. The reason why the facility is located where it is has been dictated by the availability of a suitable connection point to the local electricity grid with available land zoned in planning policy terms as suitable
for this type of use.
National Planning Policy (as set out in PPW Paragraph 5.7. 13) supports development of this nature as it
helps provide vital flexibility to support an increasing amount of low carbon generation and to maintain security of supply. This type of development is essential supporting infrastructure which is needed to
support the National Grid and continuous supply of electricity is essential for the economy and society as
a whole.
As the scheme comprises an electricity generating station with an installed generating capacity of between
10 and 50 MW, it falls within the definition of a ‘Development of National Significance’ (DNS) under section 4 of the Developments of National Significance (Specified Criteria and Prescribed Secondary Consents)
(Wales) Regulations 2016, for the purposes of s62(D) of the Planning (Wales) Act 2015 ("the Wales Act"). This application is therefore made to the Welsh Ministers seeking planning permission for
development carried out before the date of the application without compliance with some conditions subject to which planning permission was granted.
The facility will additionally be operated under an environmental permit from Natural Resources Wales
(NRW). The permit will ensure that the site is operated and monitored in a way that meets the environmental criteria set out in legislation and required by NRW.
Get in Touch
We are seeking your views on the development and have made the contents of the draft planning application available electronically at http://www.peakgenllandarcy.co.uk
If you wish to make a comment on the proposed development, then please write to:
PeakGen Power 5 Limited Consultation c/0 Barton Willmore
Greyfriars House Greyfriars Road
Cardiff CF10 3AL
Alternatively, please email your comments to [email protected]. Please provide comments by 6th May 2019. The application is programmed to be submitted to the Welsh Ministers in Spring
2019. Once submitted, you will be able to monitor its progress and make further comments via the Planning Inspectorate’s webpage at
http://dns.planninginspectorate.go.uk/projects/
If you write to us / email us we will only use your personal data for the purposes of the planning application
for Land to the Rear of Unit 6A Coed Darcy Business Park, Llandarcy, Neath Port Talbot and we will pass your address details to PeakGen Power 5 Limited for this purpose. If you would like us to contact you
with updates on the planning process, please notify us in your letter/ email. We will delete your personal data once we have processed your comments. If you would like us to contact you with updates on the
planning process, please notify us in your letter/ email.
Ben Lewis
Infrastructure and Energy Director
Enc. Schedule 1 Notice
Land to the rear of Unit 6A, Coed Darcy Business Park Appendices
Appendix 8 Notice letters to Specialist consultees
28845/A3/TE/JA June 2019
Cadw
Welsh Government, Plas Carew Unit
5/7 Cefn Coed, Parc Nantgarw Cardiff CF15 7QQ
Dear Sir / Madam,
Our Reference: 28845/A3/JA/nfi
21st March 2019
RE: Land to the Rear of Unit 6A Coed Darcy Business Park, Llandarcy, Neath Port Talbot
As a specialist consultee, I am writing to you today to notify you that PeakGen Power 5 Limited is preparing a
planning application at land to the rear of Unit 6A Coed Darcy Business Park, Llandarcy, Neath Port Talbot. The description of the proposed development is as follows :
“Part retrospective application for an existing electricity generation operating reserve compound to support the National Grid comprising 10 no.x 2 megawatt generating containers, together with associated switchgear, site access, boundary treatments and ancillary plant and equipment with proposed installation of additional ancillary plant and equipment including the installation of Selective Catalytic Reduction units”.
By way of background, planning permission was granted on the 21 st of January 2012 (Application Reference
Number: P2012/1061) for a 20MW electricity generation facility. The planning perm ission has been implemented and the facility has been built and operated subsequently. However, certain pre-
commencement planning conditions were not satisfied and following the introduction of new legislation the facility now qualifies as a Development of National Significance, which means that a new planning
application is required under the new legislation to regularise the position. In addition, Peak Gen are
seeking permission to install exhaust gas treatment to the generating units in order to comply with tighter emissions targets effective from January 2019 under the Environmental Permitting (England and Wales)
(Amendment) Regulations 2018.
We are seeking your views on the development and have made the contents of the draft planning application available electronically at http://www.peakgenllandarcy.co.uk
Development Summary
The development is a 20-megawatt electricity generation facility providing electricity to meet consumer
requirements at periods of peak electricity demand when there is insufficient electricity available to the
National Grid from the UK's base load power stations. The facility is designed to meet the requirements of National Grid's contracts and sits in standby/idle mode ready to operate when called on by the National
Grid to do so being fully operational and generating electricity in less than 5 minutes. Typically, the plant operates for periods of not more than thirty minutes at a time totalling 500 hours or less in a year.
The application site is located within the Coed Darcy Strategic Regeneration Area (SRA) allocated by way of Policy SRA1 of the Neath Port Talbot County Borough Council Local Development Plan. It lies within the
commercial area of the SRA. The site, therefore, is located within a wholly industrial complex and the
surrounding land is characterised by industrial buildings and commercial storage. It is considered that the nature, scale and location of the development do not conflict with the aims
28845/A3/JA/nfi -2- 21st March 2019
of the SRA. The reason why the facility is located where it is has been dictated by the availability of a
suitable connection point to the local electricity grid with available land zoned in planning policy terms as suitable for this type of use.
National Planning Policy ( as set out in PPW Paragraph 5.7.13) supports development of this nature as it
helps provide vital flexibility to support an increasing amount of low carbon generation and to maintain security of supply. This type of development is essential supporting infr astructure which is needed to
support the National Grid and continuous supply of electricity is essential for the economy and society as a whole.
As the scheme comprises an electricity generating station with an installed generating capacity of between
10 and 50 MW, it falls within the definition of a ‘Development of National Significance’ (DNS) under section 4 of the Developments of National Significance (Specified Criteria and Prescribed Secondary Consents)
(Wales) Regulations 2016, for the purposes of s 62(D) of the Planning (Wales) Act 2015 ("the Wales Act"). This application is therefore made to the Welsh Ministers seeking planning permission for
development carried out before the date of the application without compliance with some conditions subject to which planning permission was granted.
The facility will additionally be operated under an environmental permit from Natural Resources Wales (NRW).
The permit will ensure that the site is operated and monitored in a way that meets the environmental criteria set out in legislation and required by NRW.
Get in Touch
We are seeking your views on the development and have made the contents of the draft planning application available electronically at http://www.peakgenllandarcy.co.uk
If you wish to make a comment on the proposed development, then please write to:
PeakGen Power 5 Limited Consultation c/0 Barton Willmore
Greyfriars House Greyfriars Road
Cardiff
CF10 3AL
Alternatively, please email your comments to [email protected]. Please provide comments by 6th May 2019. The application is programmed to be submitted to the Welsh Ministers in Spring
2019. Once submitted, you will be able to monito r its progress and make further comments
via the Planning Inspectorate’s webpage at http://dns.planninginspectorate.go.uk/projects/
If you write to us / email us we will only use your personal data for the purposes of the planning application for Land to the Rear of Unit 6A Coed Darcy Business Park, Llandarcy, Neath Port Talbot and we will pass
your address details to PeakGen Power 5 Limited for this purpose. If you would like us to contact you with updates on the planning process, please notify us in your letter/ email. We will delete your personal
data once we have processed your comments. If you would like us to contact you with updates on the
planning process, please notify us in your letter/ email.
Yours Faithfully,
Ben Lewis
Infrastructure and Energy Director
Enc. Schedule 2 Notice
Land to the rear of Unit 6A, Coed Darcy Business Park Appendices
Appendix 9 Community consultees responses
28845/A3/TE/JA June 2019
From: Lianne Bowyer
To: Joe Ayoubkhani
Subject: FW: Ref: 28845/A3/JA/nfi
Date: 10 April 2019 11:29:00
Attachments: image001.png image002.png image003.png image006.jpg image007.png
FYI
Lianne Bowyer Branch Secretary
The information contained in this e-mail (and any attachments) is confidential and may be privileged. It may be read, copied and used only by the addressee, Barton Willmore accepts no liability for any subsequent alterations or additions incorporated by the addressee or a third party to the body text of this e-mail or any attachments. Barton Willmore accepts no responsibility for staff non-compliance with our IT Acceptable Use Policy.
From: Louise Thomas <[email protected]>
Sent: 10 April 2019 11:17
To: Cardiff <[email protected]>
Subject: Ref: 28845/A3/JA/nfi
Dear Sirs,
With regards to the pre-consultation planning application for the land at the rear of Unit 6A
Coed Darcy Business Park, Llandarcy,
please be advised that Coedffranc Town Council Members do not have any observations at this
point.
Kind regards,
Louise Thomas Clerical Assistant Coedffranc Town Council Tel: 01792817754
Fax: 01792817754
Office Opening Hours: Monday to Thursday 9am – 3pm
Friday 9am – 2.30pm
This email and any files transmitted with it are confidential and intended solely for the use
of the recipient(s) only. Any review, retransmission, dissemination or other use of, or
taking any action in reliance upon this information by persons or entitles other than the
intended recipient(s) is prohibited. If you have received this e-mail in error please notify the
sender immediately and destroy the material whether stored on a computer or otherwise.
Any views or opinions presented within this e-mail are solely those of the author and do not
necessarily represent those of Coedffranc Town Council.
Consider the Environment, Do you really need to print this email?
Land to the rear of Unit 6A, Coed Darcy Business Park Appendices
Appendix 10 Specialist consultees responses
28845/A3/TE/JA June 2019
Dear Mr. Lewis,
Plas Carew, Uned 5/7 Cefn Coed Parc Nantgarw, Caerdydd CF15 7QQ Ffôn 03000256000 Ebost [email protected] Gwefan www.cadw.llyw.cymru
Plas Carew, Unit 5/7 Cefn Coed Parc Nantgarw,Cardiff CF15 7QQ Tel 03000256000 Email [email protected] Web www.cadw.gov.wales
Pre-Planning Application – Part retrospective application for an existing electricity operation generation reserve compound to support the National Grid, comprising 10 no. x 2 megawatt generating containers, together with associated switchgear, site access, boundary treatment and ancillary plant and equipment, with proposed installation of additional ancillary plant and equipment, including the installation of Selective Catalytic Reduction units, Land to the rear of Unit 6A Coed Darcy Business Park, Llandarcy, Neath Port Talbot
Thank you for your letter of 21 March 2019 inviting our comments on the pre-planning application consultation for the proposed development described above.
Advice
The following comments are based on information made available to us as part of the pre-application consultation and we will review our comments when we are consulted on the final planning application.
Having carefully considered the information provided with this planning application, we have no objections to the impact of the proposed development on the scheduled monument.
Our role
Our statutory role in the planning process is to provide the local planning authority with an assessment concerned with the likely impact that the proposal will have on scheduled monuments, registered historic parks and gardens, registered historic landscapes where an Environmental Impact Assessment is required and development likely to have an impact on the outstanding universal value of a World Heritage Site. We do not provide an assessment of the likely impact of the development on listed buildings or conservation areas, as these are matters for the local authority. It is for the local planning authority to weigh our assessment against all the other material considerations in determining whether to approve planning permission.
Mae Gwasanaeth Amgylchedd Hanesyddol Llywodraeth Cymru (Cadw) yn hyrwyddo gwaith cadwraeth ar gyfer amgylchedd hanesyddol Cymru a gwerthfawrogiad ohono.
The Welsh Government Historic Environment Service (Cadw) promotes the conservation and appreciation of Wales’s historic environment.
Rydym yn croesawu gohebiaeth yn Gymraeg ac yn Saesneg.
Eich cyfeirnod Your reference
28845/A3/JA/nfi Ben Lewis Barton Willmore
By e-mail: [email protected]
Ein cyfeirnod Our reference
MR
Dyddiad Date
02 April 2019
Llinell uniongyrchol Direct line
0300 0255350
Ebost Email:
We welcome correspondence in both English and Welsh.
National Policy
Applications for planning permission are considered in light of the Welsh Government’s land use planning policy and guidance contained in Planning Policy Wales (PPW), Technical Advice Notes and related guidance.
PPW (Chapter 6 – The Historic Environment) explains that it is important that the planning system looks to protect, conserve and enhance the significance of historic assets. This will include consideration of the setting of an historic asset which might extend beyond its curtilage. Any change that impacts on an historic asset or its setting should be managed in a sensitive and sustainable way.
The conservation of archaeological remains and their settings is a material consideration in determining a planning application, whether those remains are a scheduled monument or not. Where nationally important archaeological remains are likely to be affected by proposed development, there should be a presumption in favour of their physical protection in situ. It will only be in exceptional circumstances that planning permission will be granted if development would result in a direct adverse impact on a scheduled monument (or an archaeological site shown to be of national importance).
Technical Advice Note 24: The Historic Environment elaborates by explaining that when considering development proposals that affect scheduled monuments or other nationally important archaeological remains, there should be a presumption in favour of their physical preservation in situ, i.e. a presumption against proposals which would involve significant alteration or cause damage, or would have a significant adverse impact causing harm within the setting of the remains.
Assessment
Scheduled monument Llandarcy Round Cairn (GM291) is located within a 1km buffer of the application area, but due to intervening buildings, vegetation and natural topography, the application area is not inter-visible with the scheduled monument. Therefore, the proposed development will have no impact on the scheduled monument GM291or its setting.
Finally, there may also be undesignated historic assets that could be affected by the proposed development and, if you have not already done so, we would advise that you consult the Historic Environment Record held by the Glamorgan-Gwent Archaeological Trust (www.ggat.org.uk).
Yours sincerely,
Moira Richards Diogelu a Pholisi / Protection and Policy
Developer Services PO Box 3146 Cardiff CF30 0EH
Tel: +44 (0)800 917 2652 Fax: +44 (0)2920 740472 E.mail: [email protected]
Gwasanaethau Datblygu Blwch Post 3146 Caerdydd CF30 0EH
Ffôn: +44 (0)800 917 2652 Ffacs: +44 (0)2920 740472 E.bost: [email protected]
Mr Ben Lewis Date:12/04/2019 Barton Willmore Our Ref: PPA0003928 Greyfriars House Greyfriars Road Cardiff
CF10 3AL
Dear Mr Lewis,
Site Address: Rear of Unit 6A Coed Darcy Business Park, Llandarcy, Neath Development: Part retrospective application for an existing electricity generation operating reserve compound to support National Grid
I refer to the Schedule 1C - Article 2D notice received and your formal request for a pre-application
consultation response before applying for planning permission from Dwr Cymru Welsh Water as a
‘Specialist Consultee’ as defined by Paragraph (y) of Schedule 4 of the Town & Country Planning
(Development Management Procedure) (Wales) (Amendment) Order 2016. It is acknowledged that the
consultation request relates to a major development site and thus seeks a substantive response within 28
days from the date of the notice, 22rd of March 2019, as per the requirements of Article 2E. This request
includes our views on the capacity of our network of assets and infrastructure to accommodate your
proposed development.
Having reviewed the details submitted I would advise there is no objection to the proposed development
and offer the following standing advice which should be taken into account within any future planning
application for the development:
SEWERAGE
We note that no foul water will be generated by development proposals.
The site is crossed by a private foul water only sewer, prior to commencing operational development we
would advise contacting the owners of this asset.
Welsh Water is owned by Glas Cymru – a ‘not-for-profit’ company.
Mae Dŵr Cymru yn eiddo i Glas Cymru – cwmni ‘nid-er-elw’.
We welcome correspondence in Welsh and English
Dŵr Cymru Cyf, a limited company registered in Wales no 2366777. Registered office: Pentwyn Road, Nelson, Treharris, Mid Glamorgan CF46 6LY
Rydym yn croesawu gohebiaeth yn y Gymraeg neu yn Saesneg
Dŵr Cymru Cyf, cwmni cyfyngedig wedi’i gofrestru yng Nghymru rhif 2366777. Swyddfa gofrestredig: Heol Pentwyn Nelson, Treharris, Morgannwg Ganol CF46 6LY.
Advisory Notes
The applicant may need to apply to Dwr Cymru / Welsh Water for any connection to the public sewer under
S106 of the Water industry Act 1991. If the connection to the public sewer network is either via a lateral
drain (i.e. a drain which extends beyond the connecting property boundary) or via a new sewer (i.e. serves
more than one property), it is now a mandatory requirement to first enter into a Section 104 Adoption
Agreement (Water Industry Act 1991). The design of the sewers and lateral drains must also conform to the
Welsh Ministers Standards for Gravity Foul Sewers and Lateral Drains, and conform with the publication
"Sewers for Adoption"- 7th Edition. Further information can be obtained via the Developer Services pages
of www.dwrcymru.com
The applicant is also advised that some public sewers and lateral drains may not be recorded on our maps
of public sewers because they were originally privately owned and were transferred into public ownership
by nature of the Water Industry (Schemes for Adoption of Private Sewers) Regulations 2011. The presence
of such assets may affect the proposal. In order to assist us in dealing with the proposal the applicant may
contact Dwr Cymru Welsh Water to establish the location and status of the apparatus. Under the Water
Industry Act 1991 Dwr Cymru Welsh Water has rights of access to its apparatus at all times.
Please note that our response is based on the information provided in your enquiry and should the information change we reserve the right to make a new representation. Should you have any queries or wish to discuss any aspect of our response please do not hesitate to contact our dedicated team of planning officers, either on 0800 917 2652 or via email at [email protected]
Please quote our reference number in all communications and correspondence.
Yours faithfully,
Owain George Planning Liaison Manager Developer Services
Please Note that demands upon the water and sewerage systems change continually; consequently the
information given above should be regarded as reliable for a maximum period of 12 months from the date of this
letter.
Welsh Water is owned by Glas Cymru – a ‘not-for-profit’ company. Mae Dŵr Cymru yn eiddo i Glas Cymru – cwmni ‘nid-er-elw’.
We welcome correspondence in Welsh and English
Dŵr Cymru Cyf, a limited company registered in Wales no 2366777. Registered office: Pentwyn Road, Nelson, Treharris, Mid Glamorgan CF46 6LY
Rydym yn croesawu gohebiaeth yn y Gymraeg neu yn Saesneg
Dŵr Cymru Cyf, cwmni cyfyngedig wedi’i gofrestru yng Nghymru rhif 2366777. Swyddfa gofrestredig: Heol Pentwyn Nelson, Treharris, Morgannwg Ganol CF46 6LY.
NEATH PORT TALBOT COUNTY BOROUGH COUNCIL
The Town and Country Planning (Development Management Procedure) (Wales) Order 2015 (as amended)
HEAD OF ENGINEERING & TRANSPORT
OBSERVATIONS
PLANNING APPLICATION NO: N/3/19/0004/00 APPLICANT: Peak Gen Power Ltd. LOCATION: Land to the rear of Unit 6A Coed Darcy Business
Park, Llandarcy, Neath PROPOSAL: Part retrospective application for an exisiting
electricity generation operating reserve compound to support the National Grid comprising 10 no. generating containers, together with associated switchgear, site access, boundary treatments an ancillary plant and equipment with proposed installation of additional ancillary plant and equipment including the installation of Selective Catalytic reduction units
The Highway Authority, in responding to the above application, provides the following substantive response:
No comment □ No objection (subject to any specified conditions below)
Concerns have been identified (see below for how those concerns can be addressed by the applicant □ Objection - on the grounds set out below □
MY OBSERVATIONS ON THIS PAC PROPOSAL ARE AS FOLLOWS:-
Following on from our previous discussions and the details submitted for this PAC I can confirm that I have no highway and drainage objection to this application.
PAC REF: N419000400-JWG
200 Lichfield Lane
Mansfield
Nottinghamshire
NG18 4RG
T: 01623 637 119
E: planningconsultation@coal,gov.uk
www.gov.uk/coalauthority
For the attention of Mr Ben Lewis – Infrastructure and Energy Director
c/o Barton Willmore
[By email: [email protected]]
Your Ref: 28845/A3/JA/nfi
10 April 2019
Dear Mr Lewis
Town and Country Planning (Development Management Procedure) (Wales) Order 2012 (as
amended 2016)
Schedule 1C Article 2D - Consultation before applying for planning permission
Land to the rear of Unit 6A Coed Darcy Business Park, Llandarcy, Neath Port Talbot
Thank you for your notification of 21 March 2019 seeking the pre-application views of the Coal Authority
on the above.
I have checked the site location plan (Drawing No. 9000 Rev A) against our coal mining information and
can confirm that, whilst the proposed development site falls within the coalfield, it is located outside the
defined Development High Risk Area meaning that there are no recorded coal mining legacy hazards at
shallow depth that could pose a risk to land stability.
Accordingly, there is no requirement to submit a Coal Mining Risk Assessment in support of a planning
application for the redevelopment of this site. The Local Planning Authority will not consult the Coal
Authority on any planning application for this site.
Yours sincerely
D Roberts Deb Roberts M.Sc. MRTPI
Planning Manager
From: [email protected]
To: Cardiff
Subject: SCHEDULE 2 Land to the Rear of Unit 6A Coed Darcy Business Park, Llandarcy
Date: 10 April 2019 13:33:08
Proposed development at Land to the Rear of Unit 6A Coed Darcy Business Park, Llandarcy. I give notice that Peak Gen Power 5 Limited is intending to apply to the Welsh Ministers for planning permission in respect of Development of
National Significance which is for “Part retrospective application for an existing electricity generation
operating reserve compound to support the National Grid comprising 10 no. generating containers,
together with associated switchgear, site access, boundary treatments and ancillary plant and
equipment with proposed installation of additional ancillary plant and equipment including the
installation of Selective Catalytic Reduction units”
Dear Sir/Madam,
No objection on trunk road grounds.
Regards Richard Jones
Peiriannydd Ffyrdd / Route Engineer
Is-adran Rheoli'r Rhwydwaith - Network Management Division
Trafnidiaeth / Transport
Llywodraeth Cymru / Welsh Government
Parc Cathays / Cathays Park Caerdydd / Cardiff
Ffôn / Tel: 03000 256573
Sganiwyd y neges hon am bob feirws hysbys wrth iddi adael Llywodraeth Cymru. Mae Llywodraeth Cymru yn cymryd o ddifrif yr angen i ddiogelu eich data. Os cysylltwch â Llywodraeth Cymru, mae ein hysbysiad preifatrwydd yn esbonio sut rydym yn defnyddio eich gwybodaeth a sut rydym yn diogelu eich preifatrwydd. Rydym yn croesawu gohebiaeth yn Gymraeg. Byddwn yn anfon ateb yn Gymraeg i ohebiaeth a dderbynnir yn Gymraeg ac ni fydd gohebu yn Gymraeg yn arwain at oedi. On leaving the Welsh Government this email was scanned for all known viruses. The Welsh Government takes the protection of your data seriously. If you contact the Welsh Government then our Privacy Notice explains how we use your information and the ways in which we protect your privacy. We welcome receiving correspondence in Welsh. Any correspondence received in Welsh will be answered in Welsh and corresponding in Welsh will not lead to a delay in responding.
Land to the rear of Unit 6A, Coed Darcy Business Park Appendices
Appendix 11 Correspondence with NRW regarding clarification to HRA
28845/A3/TE/JA June 2019
From: Isaac, Rhian
To: Joe Ayoubkhani
Subject: RE: 3213487 - Rear of Unit 6A Coed Darcy Business Park (Stat Pre-app) DNS - NRW Respons NRW:01291926
Date: 23 May 2019 08:52:39
Attachments: image004.png image008.png image009.png image010.png image011.png image012.png image013.png image015.png
Hi Joe
Yes that’s correct
Rhian
Rhian Isaac Ymgynghorydd Cynllunio Datblygu / Development Planning Advisor Cyfoeth Naturiol Cymru / Natural Resources Wales 03000 653259 Maes Newydd, Llandarci / Maes Newydd, Llandarcy
www.cyfoethnaturiol.cymru / www.naturalresources.wales
Yn falch o arwain y ffordd at ddyfodol gwell i Gymru trwy reoli’r amgylchedd ac adnoddau naturiol yn gynaliadwy.
Proud to be leading the way to a better future for Wales by managing the environment and natural resources sustainably.
Croesewir gohebiaeth yn Gymraeg a byddwn yn ymateb yn Gymraeg, heb i hynny arwain at oedi Correspondence in Welsh is welcomed, and we will respond in Welsh without it leading to a delay
From: Joe Ayoubkhani <[email protected]>
Sent: 22 May 2019 11:25
To: Isaac, Rhian <[email protected]>
Subject: RE: 3213487 - Rear of Unit 6A Coed Darcy Business Park (Stat Pre-app) DNS - NRW
Respons NRW:01291926
Hi Rhian
Just to confirm, there is no requirement for the applicant to produce a standalone HRA report and the competent authority will be able to undertake the assessment based on the submitted standard application documents?
Thanks
Joe
Joe Ayoubkhani Planning Associate
The information contained in this e-mail (and any attachments) is confidential and may be privileged. It may be read, copied and used only by the addressee, Barton Willmore accepts no liability for any subsequent alterations or additions incorporated by the addressee or a third party to the body text of this e-mail or any attachments. Barton Willmore accepts no responsibility for staff non-compliance with our IT Acceptable Use Policy.
From: Isaac, Rhian <[email protected]>
Sent: 21 May 2019 11:40
To: Joe Ayoubkhani <[email protected]>
Subject: RE: 3213487 - Rear of Unit 6A Coed Darcy Business Park (Stat Pre-app) DNS - NRW
Respons NRW:01291926
Hi Joe,
You are correct, you will need to produce the evidence to inform the HRA.
Regards
Rhian
Rhian Isaac Ymgynghorydd Cynllunio Datblygu / Development Planning Advisor Cyfoeth Naturiol Cymru / Natural Resources Wales 03000 653259 Maes Newydd, Llandarci / Maes Newydd, Llandarcy
www.cyfoethnaturiol.cymru / www.naturalresources.wales
Yn falch o arwain y ffordd at ddyfodol gwell i Gymru trwy reoli’r amgylchedd ac adnoddau naturiol yn gynaliadwy.
Proud to be leading the way to a better future for Wales by managing the environment and natural resources sustainably.
Croesewir gohebiaeth yn Gymraeg a byddwn yn ymateb yn Gymraeg, heb i hynny arwain at oedi Correspondence in Welsh is welcomed, and we will respond in Welsh without it leading to a delay
From: Joe Ayoubkhani <[email protected]>
Sent: 20 May 2019 17:16
To: Isaac, Rhian <[email protected]>
Subject: FW: 3213487 - Rear of Unit 6A Coed Darcy Business Park (Stat Pre-app) DNS - NRW
Consider the Environment, Do you really need to print this email?
Respons NRW:01291926
Dear Rhian
As discussed earlier today, please could you confirm that the applicant is not required to submit a standalone HRA document.
The Air Quality Impact Assessment Report, December 2018 (alongside other application documentation) will be submitted as part of the application.
Thanks
Joe
Joe Ayoubkhani Planning Associate
The information contained in this e-mail (and any attachments) is confidential and may be privileged. It may be read, copied and used only by the addressee, Barton Willmore accepts no liability for any subsequent alterations or additions incorporated by the addressee or a third party to the body text of this e-mail or any attachments. Barton Willmore accepts no responsibility for staff non-compliance with our IT Acceptable Use Policy.
------------------- Original Message ------------------- From: South West Planning MailBox Queue; Received: Fri May 03 2019 11:01:19 GMT+0100 (GMT Summer Time) To: Barton wilmore Barton wilmore; Cc: Ben Lewis;
Subject: 3213487 - Rear of Unit 6A Coed Darcy Business Park (Stat Pre-app) DNS - NRW Respons NRW:01291926
Dear Ben, Please find attached our response to the pre- application, if you have any queries please do not hesitate to contact me.
Kind Regards Rhian Isaac
Tîm Cynllunio Datblygu / Development Planning Team Cyfoeth Naturiol Cymru / Natural Resources Wales
Ffôn / Tel: 03000 653259 www.cyfoethnaturiolcymru.gov.uk / www.naturalresourceswales.gov.uk
Yn falch o arwain y ffordd at ddyfodol gwell i Gymru trwy reoli’r amgylchedd ac adnoddau naturiol yn gynaliadwy / Proud to be leading the way to a better future for Wales by managing the environment and natural resources sustainably.
Croesewir gohebiaeth yn Gymraeg a byddwn yn ymateb yn Gymraeg, heb i hynny arwain at oedi / Correspondence in Welsh is welcomed, and we will
Consider the Environment, Do you really need to print this email?
respond in Welsh without it leading to a delay.
Appendix 12 Copy of Newspaper Notice
Public Notices
Signed:
Date: 21/03/2019
Llofnod:
Dyddiad: 21/03/2019
SCHEDULE 1 Articles 8 and 9(5)
Publicity and consultation before applying for planning permission The Developments of National Significance
(Procedure) (Wales) Order 2016 PUBLICITY AND CONSULTATION BEFORE APPLYING FOR PLANNING
PERMISSION NOTICE UNDER ARTICLES 8 AND 9(2)
Purpose of this notice: this notice provides the opportunity to comment directly to the developer on a proposed Development of National Significance (DNS) prior to the submission of a planning
application to the Welsh Ministers. Planning applications for DNS will be publicised by the Welsh Ministers and the relevant local planning authority; any comments provided in response to this notice will not prejudice your ability to make representations to the Welsh Ministers
on any related DNS planning application. You should note that any comments submitted may be placed on the public file. Proposed development at Land to the Rear of Unit 6A
Coed Darcy Business Park, Llandarcy. I give notice that Peak Gen Power 5 Limited
is intending to apply to the Welsh Ministers for planning permission in respect of Development of National Significance which is for an “Part retrospective application for an existing electricity generation
operating reserve compound to support the National Grid comprising 10 no. generating containers, together with
associated switchgear, site access, boundary treatments and ancillary plant and equipment with proposed installation of
additional ancillary plant and equipment including the installation of Selective Catalytic Reduction units”
You may inspect copies of: - the proposed application;
- the plans; and - other supporting documents
online at www.peakgenllandarcy.co.uk Anyone who wishes to make representations about this proposed
development must write to the applicant’s agent at [email protected] or
Barton Willmore, Greyfriars House, Greyfriars Road, Cardiff, CF10 3AL by 6th May 2019
ATODLEN 1 Erthyglau 8 a 9(5)
Cyhoeddusrwydd ac ymgynghori cyn gwneud cais am ganiatâd cynllunio
Gorchymyn Datblygiadau o Arwyddocâd Cenedlaethol (Gweithdrefn) (Cymru) 2016
CYHOEDDUSRWYDD AC YMGYNGHORI CYN GWNEUD CAIS AM GANIATÂD CYNLLUNIO
HYSBYSIAD O DAN ERTHYGLAU 8 A 9(2) Diben yr hysbysiad hwn: mae’r hysbysiad hwn yn rhoi cyfle i
wneud sylwadau yn uniongyrchol i’r datblygwr ynglŷn â Datblygiad o Arwyddocâd Cenedlaethol (DAC) cyn bo cais am ganiatâd
cynllunio wedi ei gyflwyno i Weinidogion Cymru. Bydd ceisiadau cynllunio ar gyfer DAC yn cael eu hysbysebu gan Weinidogion Cymru a’r awdurdod cynllunio lleol perthnasol; ni fydd unrhyw
sylwadau a ddarperir gennych wrth ymateb i’r hysbysiad hwn yn lleihau dim ar eich gallu i gyflwyno sylwadau i Weinidogion Cymru
ar unrhyw gais cynllunio DAC cysylltiedig. Dylech nodi y gellir gosod unrhyw sylwadau a gyflwynir gennych yn y ffeil gyhoeddus.
Datblygiad Arfaethedig yn Tir tu ôl i Uned 6A Coed Darcy Business Park, Llandarcy.
Rwyf yn hysbysu bod Peak Gen Power 5 Limited yn bwriadu gwneud cais i Weinidogion Cymru am ganiatâd
cynllunio mewn cysylltiad â Datblygiad o Arwyddocâd Cenedlaethol sydd: “Cais rhannol ôl-weithredol ar
gyfer gwaith cynhyrchu trydan i gefnogi’r Grid Cenedlaethol, gan gynnwys 10 generadur trydannol, ynghyd â switsys, mynediad i’r
safle, triniaethau ffiniol ac offer a pheiriannau atodol, gan gynnwys gosodiad gorsaf ategol a gosodiad unedau Catalytig Dewisiol”
Gellwch archwilio copïau o’r canlynol: - y cais arfaethedig;
- y planiau; a - dogfennau ategol eraill
ar-lein yn www.peakgenllandarcy.co.uk Dylai unrhyw un sy’n dymuno gwneud sylwadau ynglŷn â’r
datblygiad arfaethedig hwn ysgrifennu at y ceisydd/yr asiant yn
[email protected] neu Barton Willmore, Greyfriars House, Greyfriars Road, Cardiff, CF10 3AL
erbyn 6th Mai 2019
NEATH PORT TALBOT COUNTY BOROUGH COUNCILTOWN AND COUNTRY PLANNING (DEVELOPMENT MANAGEMENT
PROCEDURE) (WALES) ORDER 2012Notice is hereby given that applications have been received by Neath Port Talbot County Borough Council for planning permission for the following developments:APPLICATIONS FOR LISTED BUILDING CONSENT:P2019/0179: Listed Building Consent for the construction of a single-storey flat-roof side extension; internal alternations comprising the conversion of the existing office space into a reception area with new roof-light above; new external double-doors with timber entrance canopy and associated pathway; internal wall alternations to accommodate an interview room, drivers room and toilet facilities; installation of new 4 No. air-conditioning units within chapel hall plus external condensing units to existing flat roof.Location: Margam Crematorium, Longland Lane, Margam, Port TalbotApplicant: Mr Simon Brennan, Property and Regeneration, NPTCBC.DEVELOPMENTS WHICH DO NOT ACCORD WITH DEVELOPMENT PLAN:P2019/0235: Permanent retention of change of use to fitness gym (Class D2) (including alteration to opening hours and class sizes that were previously restricted under planning application P2016/1018).Location: Unit 12 Lonlas Business Park, Lonlas, Neath, SA10 6SNApplicant: Baseline Fitness Limited.The proposals can be viewed online at www.npt.gov.uk/planningonline or at your nearest library, or during normal office hours 8.30 a.m. to 5.00 p.m. (4.30 p.m. Friday) at Neath Civic Centre; Port Talbot Civic Centre and The Quays, Briton Ferry. Representations can be made electronically through the Online Planning Register or by email to [email protected]. Or in writing to: The Quays, Brunel Way, Baglan Energy Park SA11 2GG. Comments should be submitted within 21 days of the date of this notice and quote the appropriate reference number.NICOLA PEARCEHEAD OF PLANNING & PUBLIC PROTECTIONDate: 21/03/2019
NEATH PORT TALBOT COUNTY BOROUGH COUNCILCYNGOR BWRDEISTREF SIROL CASTELL-NEDD PORT TALBOT
(PONTNEATHVAUGHAN LINK ROAD)(TEMPORARY ROAD CLOSURE)
ORDER 2019NOTICE is hereby given that Neath Port Talbot County Borough Council intend in not less than seven days from the date of this Notice to make an Order under Section 14(1) of the Road Traffic Regulation Act 1984 (as amended).The effect of the Order will be to temporarily prohibit vehicular traffic from proceeding along the length of road set out in the Schedule below whilst the Order is in force. During such periods as are indicated by traffic signs informing the public that the road is closed. In order for NPTCBC to restrict the use of the road in the interest of safety to the travelling public and parking concerns in the area it will be necessary to temporarily close the above road to vehicular traffic.The Order will come into force on the 3rd April 2019 and shall continue in force for a maximum duration of 18 months or until the works are completed, whichever is the sooner.
SCHEDULETemporary Road ClosurePontneathvaughan Link Road from B4242 to High Street will be closed from the junction of Pontneathvaughan Road in a northerly direction for a distance of approximately 25 metres along its length.There is no suitable alternate route for vehicular traffic. There will be no access for emergency vehicles while the Order is in force. DATED 21st MARCH 2019M C GRIFFITHSHEAD OF LEGAL SERVICES
NEATH PORT TALBOT COUNTY BOROUGH COUNCILCYNGOR BWRDEISTREF SIROL CASTELL-NEDD PORT TALBOT
(PANTDU, CWMAVON)(ONE WAY TRAFFIC) AND (NO ENTRY)
ORDER 2019NOTICE is given that the Council on the 19th March2019 made an Order in pursuance of its powers as contained in Sections 1 and 2 of the Road Traffic Regulation Act 1984 the effect of which is as set out in the Schedules below.A copy of the Order and plan may be inspected during office opening hours at the main reception desks in the Neath and Port Talbot Civic Centres and at the Pontardawe Library.The Order will come into force on the 25th March 2019.If any person wishes to question the validity of the Order or of any of its powers on the grounds that it or they are not within the powers conferred by the Act or that any requirements of the Act or of any instrument made under the Act has not been complied with, that person may, within 6 weeks from the date on which the Order is made, apply for that purpose to the High Court.
SCHEDULESSchedule 1 – One Way OrderPantdu, CwmavonFrom its northern junction with Cwmavon Road for a distance of approximately 215 metres in an anticlockwise direction.Schedule 2 – No Entry OrderPantdu, CwmavonProhibition of entry for vehicular traffic travelling in a clockwise direction on Pantdu from its southern junction with Cwmavon Road.DATED 21st MARCH 2019M C GRIFFITHSHEAD OF LEGAL SERVICES
All NewChantelle’s
of SkewenUnder New Management
DAVID ROBERT SMITH(Deceased)
Pursuant to the Trustee Act 1925any persons having a claim againstor an interest in the Estate of the aforementioned deceased, late of 27 Smyrna Street PlasmarlSwansea SA6 8LW, who died on13/06/2018, are required to sendparticulars thereof in writing to theundersigned Solicitors on or before31/05/2019, after which date theEstate will be distributed havingregard only to claims and interestsof which they have had notice.PETER LYNN AND PARTNERSSOLICITORS87 Newton Road MumblesSwansea SA3 4BN T553845
SOUTH WALES EVENING POST THURSDAY, MARCH 21, 2019 55