Change Request
Phone:
Job: 19050 Bonner Springs Govt Services
Number:
Date:
64
3/9/20
To: DANA GOULD
SFS ARCHITECTURE
1150 GRAND BLVD
SUITE 400
KANSAS CITY, MO 64106
Ph: (816)474-1397 Fax: (816)421-8024
Description: PR-14 City Hall - Ground and First Floor Mechanical Soffits
We are pleased to offer the following specifications and pricing to make the following changes:
Additional ceiling soffit at room G07, G15, 109, 117 and modified ductwork layout
Description Material Subcontract Other PriceLabor Equipment
DRYWALL SYSTEMS $3,432.00$3,432.00
DEMOLITION $-816.00$-816.00
$2,616.00Subtotal:
$26.16Bond 1.00%$2,616.00
$514.80KBS Sub Fee 15.00%$3,432.00
$-81.60KBS General Fee 10.00%-$816.00
$3,075.36Total:
If you have any questions, please contact me at 785-266-4222.
Date:
Approved by:Submitted by: DENNIS TANNER
KBS CONSTRUCTORS, INC.
Page 1 of 1
REVIEWED BY: DANA GOULD, SFSDATE: MARCH 26, 2020
ACCEPTED
PROPOSAL REQUEST (PR) BONNER SPRINGS GOVERNMENT SERVICES CENTER CITY OF BONNER SPRINGS, KANSAS PR NO. 014 ISSUED: 01 / 30 / 2020
1 sfs architecture inc | 2100 central suite #31 kansas city missouri 64108 | o.816.474.1397 f.816.421.8024 www.sfsarch.com
TO DOCUMENTS TITLED: BONNER SPRINGS GOVERNMENT SERVICES CENTER CENTENNIAL CITY HALL BID DOCUMENTS ISSUED: 02 / 22 / 2019
ARCHITECT-OF-RECORD: CONTRACTOR: CONTRACT DATED: ISSUED BY:
SFS Architecture Inc. 2100 Central Suite 31 Kansas City Missouri 64108 KBS Constructors, Inc. 06 / 12 / 2019 Dirk Henke, SFS
Please provide an itemized proposal for the changes in the Contract Sum and Contract Time for proposed
modifications to the Contract Documents described herein. Submit proposal within thirty days or notify the
Architect in writing of the day on which a proposal is anticipated.
THIS IS NOT A CHANGE ORDER, CONSTRUCTION CHANGE DIRECTIVE, OR DIRECTION
TO PROCEED WITH THE WORK DESCRIBED HEREIN.
Description:
1. Requesting pricing to provide soffits at Ground and First floor per the attached Drawings. Intent is
to reroute mechanical ductwork in order to avoid structural conflicts.
Drawings:
1. A133 – GROUND FLOOR REFLECTED CEILING PLAN
a. See revision clouds for additional Ceiling soffit scope at Rooms G07 and G15.
b. Revise mechanical ductwork per dashed lines: route under floor joists N-S and feed up into
ducts running between floor joists E-W as per original design.
2. A134 – FIRST FLOOR REFLECTED CEILING PLAN
a. See revision clouds for additional Ceiling soffit scope at Rooms 109 and 117.
b. Revise mechanical ductwork per dashed lines: route under floor joists N-S and feed up into
ducts running between floor joists E-W as per original design.
END OF PROPOSAL REQUEST
ALIGNTYP.
ALIGNTYP.
ALIGN
ALIG
N
ALIG
N
TYPE#'-#"AFF
REFLECTED CEILING PLAN SYMBOLS
ROOM NAME
####
ROOM NAME
ROOM NUMBER
CEILING MATERIAL AND FINISH TYPECEILING HEIGHT
GYPSUM BOARD
?
OR
ACOUSTICAL CEILING TILE
DIFFUSER/RETURN GRILL. RE: MECHANICAL
RECESSED LIGHT FIXTURE. RE: ELECTRICAL.
REFLECTED CEILING PLAN KEYNOTE
1. THE 1918 BUILDING IS LISTED ON THE NATIONAL REGISTER OF HISTORIC PLACES. THE PROJECT IS PURSUING HISTORIC TAX CREDITS, AND THEREFORE, ALL WORK SHALL COMPLY WITH THE SECRETARY OF THE INTERIOR'S STANDARDS FOR REHABILITATION.
2. CEILING HEIGHTS INDICATED ARE MEASURED FROM MAIN FLOOR BENCHMARK ELEVATION OF 100'-0""."
3. WHERE RECESSED LIGHT FIXTURES ARE INDICATED TO BE INSTALLED IN ACOUSTICAL TILE CEILINGS, FIXTURES ARE TO BE INSTALLED AT CENTER OF TILE UNLESS NOTED OTHERWISE."
4. SPRINKLER HEADS SHALL BE INSTALLED AT CENTER OF ACOUSTICAL TILE WHEN REQUIRED IN AREAS WITH ACOUSTICAL TILE CEILINGS. EXACT LOCATIONS AT ALL OTHER VISUALLY PROMINENT LOCATIONS SHALL BE COORDINATED WITH ARCHITECT."
5. REFER TO ELECTRICAL DRAWINGS FOR LIGHT FIXTURE TYPES AND SPECIFICATIONS."
6. COORDINATE FINAL MOUNTING LOCATION OF EXIT SIGNS, HORN STROBES, AND OTHER CEILING MOUNTED FIRE EXIT DEVICES WITH ARCHITECT PRIOR TO INSTALL."
7. REFER TO MECHANICAL DRAWINGS FOR DIFFUSERS, THERMO-STATS, AND OTHER MECHANICAL RELATED EQUIPMENT AND DEVICES."
8. NON-EXPOSED: GYPSUM BOARD 5/8" TYPE 'X' (09 2116) SHALL BE INSTALLED AT ALL NON-EXPOSED, EXISTING WOOD CEILING / FLOOR FRAMING MEMBERS AND SHALL RECEIVE A LEVEL 1 'FIRE-TAPED' FINISH, WITH ALL PENETRATIONS SEALED WITH FIRESTOPPING / FIRE SEALANT (07 8400), TYP. THE FLOOR / CEILING ASSEMBLY IS NON-RATED AND THE FIRESTOPPING / FIRE SEALANT IS INTENDED TO SEAL ANY OPENINGS IN THE CEILING WHILE MAINTAINING A NON-RATED CONDITION, TYP.
9. EXPOSED: GYPSUM BOARD 5/8" TYPE 'X' (09 2116) SHALL BE INSTALLED AT ALL EXPOSED, EXISTING WOOD CEILING / FLOOR MEMBERS AND SHALL RECEIVE A LEVEL 4 FINISH, TYP. ALL PENETRATIONS THROUGH GYPSUM BOARD ATTACHED TO WOOD CEILING / FLOOR FRAMING LOCATED IN EXPOSED AREAS SHALL BE FITTED TIGHT TO THE ELEMENT PENETRATING THE GYPSUM BOARD, SPACKLED, AND SANDED SMOOTH FOR A CLEAN, FLUSH FINISH PRIOR TO RECEIVING FINISHES, TYP.
GENERAL NOTES - REFLECTED CEILING PLAN
CONFERENCE ROOM
G19
MEETING ROOM
G06
ELECTRICAL
G12
BREAK ROOM
G18
MEN
G04
WOMEN
G03
OFFICE
(PARKS+REC)G16
STORAGE / FUTURE
OFFICE(PARKS+REC)G15
OPEN OFFICE
(PARKS+REC)G14
INTERIOR EXIT STAIR
S03
EXIT ACCESS STAIR
S01
CONVENIENCE STAIR
S02
CIRC
G17
CIRC
G10
BUDGET + FINANCE
DIRECTOR
G07
ACT-19' - 0"AFF
P-110' - 0"AFF
P-111' - 10 5/8"AFF
P-111' - 0"AFF
P-111' - 0"AFF
G
E
D
C
B
A
1 2 3 4 5 6
xA
xB
xC
xD
x2x1
x3 x4
OPEN OFFICE
(BUDGET + FINANCE)
G09
P-111' - 10 5/8"AFF
WAITING
G11
ACT-19' - 0"AFF
CORRIDOR
G05
LOBBY
G01
P-111' - 0"AFF
MECH / MAINTENANCE
G02B
MOTHER'S ROOM
G02A
A4
A531
P-111' - 10 5/8"AFF
P-111' - 10 5/8"AFF
P-111' - 10 5/8"AFF
P-110' - 0"AFF
P-110' - 0"AFF
P-18' - 0"AFF
P-111' - 10 5/8"AFF
ACT-111' - 0"AFF
P-110' - 8"AFF
P-110' - 8"AFF
P-110' - 8"AFF
P-111' - 10 5/8"AFF
B1
A531
P-111' - 10 5/8"AFF
C1
C1
C1
CIRC
G02C
P-111' - 0"AFF
C1 C1
C1
C1
C1
C1A2
A531
SIM
A1
A531
A4
A531
SIM
P-19' - 0"AFF
B4
A531
SP-119' - 7 1/2"AFF
C4
P-119' - 7 1/2"AFF
C5
TYP.
TYP.
P-111' - 11 1/2"AFF
P-111' - 5 1/2"AFF
C7 C7
ALIGNEQEQ
C8
ALIGN
20"
C12
EQ
3' -
0"
3' -
0"
EQ
EQ EQ EQ EQ EQ EQ
EQ EQ EQ EQEQ EQ EQ EQ EQEQ EQ
FLO
OR
LIN
E B
ELO
W
3' -
0"
EQ
EQ
3' -
0"
3' -
3"
8' -
0"
3' -
0"
3' -
0"
EQ
EQ
TY
P
EQ
TY
P
EQ
TYP
20"
EQ
EQ
3' -
0"
EQ EQ
34"
EQ EQ
4' - 6" 4' - 6"
P-19' - 0"AFF
3' - 6" 3' - 6"EQ EQ EQ
ACT-19' - 0"AFF
5' - 6" 5' - 6" 4' - 6"
6" TYP.
EQ
4' -
0"
EQ
EQ
EQ
EQ EQ
4' - 6" 4' - 6"
ALIGN ALIGN
EQ EQ
18" TYP.
18"
TY
P.
ALIG
N
EQ
EQ
6"
EQ
EQ
EQ
EQ
3' -
0"
3' -
0"
EQ
EQ
3' -
6"
3' -
6"
EQ EQ
EQ EQ
12"
ALIG
N
EQ EQ
6" TYP
4' -
8"
4' -
8"
EQ
EQ
EQ
EQ
6" TYP.
6"
B4
A531
SIM.
6" TYP.F
E.9
C.9
C14
EQ 8' - 0" EQ
1' - 0"
A1
A531
SIM
P-111' - 10 5/8"AFF
18"P-110' - 5"AFF
P-110' - 5"AFF
18"
31
31
© 2020 SFS ARCHITECTURE
2 1
0 0
C
e n
t r
a l
S t . S
u i
t e 3
1 K
a n
s a
s C
i t y
, M
O 6
4 1
0 8
(O)
8 1 6. 4
7 4. 1
3 9 7 (
F)
8 1 6. 4
2 1. 8
0 2 4 w
w
w
. s
f s
a r
c h. c
o m
sfsarchitecture
© 2
018
54321
D
C
B
A
MARK DATE DESCRIPTION
C:\U
sers
\dhe
nke
\Do
cu
men
ts\1
79
73
_B
on
ne
rSp
rin
gsG
overn
me
ntS
erv
ice
sC
en
ter_
R1
8_
dhe
nke
PW
D9T
.rvt
1/3
0/2
02
0 3
:58:5
4 P
M
01/30/20
A133
GROUND FLOORREFLECTEDCEILING PLAN
CIT
Y O
F B
ON
NE
R S
PR
ING
S, K
AN
SA
S
BO
NN
ER
SP
RIN
GS
GO
VE
RN
ME
NT
SE
RV
ICE
S C
EN
TE
RC
EN
TE
NN
IAL
CIT
Y H
AL
L
SFS PROJECT NO: 17973
ISSUE DATE: 01 / 30 / 2020
ISSUED FOR: BID DOCUMENTS
20
0 E
3R
D S
T.
BO
NN
ER
SP
RIN
GS
, K
S 6
60
12
LEGEND - KEYNOTES
C1 ± F.V. ACTUAL CEILING HEIGHT: GYPSUM BOARD, 5/8" TYPE 'X' (092116) ATTACHED DIRECTLY TO EXISTING WOOD CEILING / FLOORFRAMING MEMBERS.
C4 ± F.V. ACTUAL CEILING HEIGHT: SOUND ABSORBING CEILINGPANELS (09 8430) ATTACHED DIRECTLY TO EXISTING WOODCEILING FRAMING MEMBERS.
C5 ± F.V. ACTUAL CEILING HEIGHT: GYPSUM PLASTER SYSTEM (090320) ATTACHED DIRECTLY TO EXISTING WOOD CEILING FRAMINGMEMBERS.
C7 24" X 24" SQUARE, CEILING-MOUNTED, MUD-IN GFRG ACCESSPANEL (08 3100)
C8 12" X 12" SQUARE,CEILING-MOUNTED, PAINTED METAL ACCESSPANEL (08 3100)
C12 PROJECTOR, RE: ELECTRICAL AND TECHNOLOGY DRAWINGS
C14 PROVIDE 2-HOUR FIRE-RATED HORIZONTAL SHAFT ASSEMBLY ATWOOD FLOOR FRAMING CONSTRUCTION ABOVE, B1 / A527 SIM.(2-1/2" CH-STUD ON J-SHAPED STEEL RUNNERS WITH 1" TYPE 'SLX'GYPSUM BOARD ON TOP AND (2) LAYERS OF 1/2" TYPE 'C' GYPSUMBOARD ON BOTTOM). PROVIDE 11'-0" SUSPENDED GYPSUM BOARDASSEMBLY BELOW HORIZONTAL SHAFT ASSEMBLY (I.E. PLENUMSPACE) TO ACCOMMODATE LIGHT FIXTURES, RE: ELECTRICAL.
1/8" = 1'-0"A133
1 REFLECTED CEILING PLAN - GROUND FLOOR
N
15 11/06/19 RFI-097
29 01/15/20 ASI-012
31 01/30/20 PR-014
ALIGN
ALIG
N
TYPE#'-#"AFF
REFLECTED CEILING PLAN SYMBOLS
ROOM NAME
####
ROOM NAME
ROOM NUMBER
CEILING MATERIAL AND FINISH TYPECEILING HEIGHT
GYPSUM BOARD
?
OR
ACOUSTICAL CEILING TILE
DIFFUSER/RETURN GRILL. RE: MECHANICAL
RECESSED LIGHT FIXTURE. RE: ELECTRICAL.
REFLECTED CEILING PLAN KEYNOTE
1. THE 1918 BUILDING IS LISTED ON THE NATIONAL REGISTER OF HISTORIC PLACES. THE PROJECT IS PURSUING HISTORIC TAX CREDITS, AND THEREFORE, ALL WORK SHALL COMPLY WITH THE SECRETARY OF THE INTERIOR'S STANDARDS FOR REHABILITATION.
2. CEILING HEIGHTS INDICATED ARE MEASURED FROM MAIN FLOOR BENCHMARK ELEVATION OF 100'-0""."
3. WHERE RECESSED LIGHT FIXTURES ARE INDICATED TO BE INSTALLED IN ACOUSTICAL TILE CEILINGS, FIXTURES ARE TO BE INSTALLED AT CENTER OF TILE UNLESS NOTED OTHERWISE."
4. SPRINKLER HEADS SHALL BE INSTALLED AT CENTER OF ACOUSTICAL TILE WHEN REQUIRED IN AREAS WITH ACOUSTICAL TILE CEILINGS. EXACT LOCATIONS AT ALL OTHER VISUALLY PROMINENT LOCATIONS SHALL BE COORDINATED WITH ARCHITECT."
5. REFER TO ELECTRICAL DRAWINGS FOR LIGHT FIXTURE TYPES AND SPECIFICATIONS."
6. COORDINATE FINAL MOUNTING LOCATION OF EXIT SIGNS, HORN STROBES, AND OTHER CEILING MOUNTED FIRE EXIT DEVICES WITH ARCHITECT PRIOR TO INSTALL."
7. REFER TO MECHANICAL DRAWINGS FOR DIFFUSERS, THERMO-STATS, AND OTHER MECHANICAL RELATED EQUIPMENT AND DEVICES."
8. NON-EXPOSED: GYPSUM BOARD 5/8" TYPE 'X' (09 2116) SHALL BE INSTALLED AT ALL NON-EXPOSED, EXISTING WOOD CEILING / FLOOR FRAMING MEMBERS AND SHALL RECEIVE A LEVEL 1 'FIRE-TAPED' FINISH, WITH ALL PENETRATIONS SEALED WITH FIRESTOPPING / FIRE SEALANT (07 8400), TYP. THE FLOOR / CEILING ASSEMBLY IS NON-RATED AND THE FIRESTOPPING / FIRE SEALANT IS INTENDED TO SEAL ANY OPENINGS IN THE CEILING WHILE MAINTAINING A NON-RATED CONDITION, TYP.
9. EXPOSED: GYPSUM BOARD 5/8" TYPE 'X' (09 2116) SHALL BE INSTALLED AT ALL EXPOSED, EXISTING WOOD CEILING / FLOOR MEMBERS AND SHALL RECEIVE A LEVEL 4 FINISH, TYP. ALL PENETRATIONS THROUGH GYPSUM BOARD ATTACHED TO WOOD CEILING / FLOOR FRAMING LOCATED IN EXPOSED AREAS SHALL BE FITTED TIGHT TO THE ELEMENT PENETRATING THE GYPSUM BOARD, SPACKLED, AND SANDED SMOOTH FOR A CLEAN, FLUSH FINISH PRIOR TO RECEIVING FINISHES, TYP.
GENERAL NOTES - REFLECTED CEILING PLAN
MEETING / OFFICE
(TIBLOW)
108
WARRANT FILES
111
OFFICE(MAYOR)110
CITY CLERK
109
MUNICIPAL COURT
CLERK
112
WOMEN
103
MEN
104
STORAGE ROOM
122
OPEN OFFICE
116
POLICE SIMULATION
ROOM
117
POLICE
118
STORAGE ROOM
121
INTERIOR EXIT STAIR
S03
CONVENIENCE STAIR
S02
CIRC
113
WAITING
114
P-111' - 7 5/8"AFF
ACT-19' - 0"AFF
P-111' - 7 5/8"AFF
ACT-19' - 0"AFF
ACT-19' - 0"AFF
P-111' - 7 5/8"AFF
G
E
D
C
B
A
1 2 3 4 5 6
xA
xB
xC
xD
x2x1
x3 x4
OPEN OFFICE
116
MECH / MAINTENANCE
102B
STORAGE
102A
P-111' - 7 5/8"AFF
P-111' - 7 5/8"AFF
P-111' - 7 5/8"AFF
P-111' - 7 5/8"AFF
P-111' - 7 5/8"AFF
P-111' - 7 5/8"AFF
P-111' - 7 5/8"AFF
P-111' - 7 5/8"AFF
CORRIDOR
107
P-111' - 7 5/8"AFF
P-110' - 8"AFF
P-110' - 8"AFF
P-111' - 7 5/8"AFF
P-111' - 7 5/8"AFF
P-110' - 9"AFF
LOBBY
101
A4
A531
SIMA4
A531
SIM
C1C1
C1
C1
C1
C1
C1
C1
C1
C1
C1
C1
C1
C1
CONVENIENCE STAIR
S04
P-111' - 7 5/8"AFF
C1
B4
A531
SIM.
PHONE BOOTH
106
P-411' - 7 5/8"AFF
C1
EQ
3' -
0"
3' -
0"
EQ
3' -
0"
3' -
0"
EQ
EQ
3' -
6"
3' -
6"
EQ EQ
EQ EQ
P-111' - 2 1/2"AFF
EQ EQ
ALIG
N
EQ
EQ
ALIG
N
EQ EQ
4' -
8"
4' -
8"
6" TYP.
18" TYP.
18"
TY
P.
EQ
± F
.V.
6' -
8 1
/2"
EQ
EQ
EQ
6"
TY
P.
EQ
EQ
EQ
EQ
4' - 6" 4' - 6"
EQ EQ
EQ EQ EQ EQEQ EQ EQ EQ EQEQ EQ
EQ
EQ
EQ EQ
P-19' - 0"AFF
EQ EQ
4' - 0" 4' - 0 1/8"
EQ EQ
FLOOR LINE BELOW
EQ
3' - 3 1/2"
EQ EQ
± F.V.
EQ 8' - 0" 8' - 0" 8' - 0" EQ
5' - 0" 5' - 0"
EQ EQ
EQ
EQ
EQ
EQ
EQ
EQ
EQ EQ EQ EQ
EQ
8' -
0"
8' -
0"
EQ
6" TYP.
EQ
EQ
6"
4"
B4
A531
SIM.
6" TYP.F
E.9
C.9
6" TYP.
EQ EQ
F5
F5
F5
F5 F5
F5 F5
F5 F5
X1 X1
P-19' - 0"AFF
A4
A134
3 3
C15
C16
C16
C15
C17
C17
C18
C20
C20
C19
C22
C22
C21
C21C21
P-110' - 2"AFF
18"
31
P-110' - 2"AFF
31
18"
GYPSUM BOARD CEILINGSUSPENSION SYSTEM (09 2216)
GYPSUM BOARD, 5/8" TYPE 'X'(09 2116)
STEEL STUDS, 3 5/8" AT 16" O.C.(09 2216)
GYPSUM BOARD, 5/8" TYPE 'X'(09 2116)
CONTINUOUS AT ALL EXISTING WOOD CEILING / FLOOR
FRAMING MEMBERS, TYP.
DUCTWORK (RE: MECH)
DIMENSIONAL LUMBERBLOCKING (06 1000)
AS REQUIRED TO SUPPORT CEILING / FRAMING, TYP.
© 2020 SFS ARCHITECTURE
2 1
0 0
C
e n
t r
a l
S t . S
u i
t e 3
1 K
a n
s a
s C
i t y
, M
O 6
4 1
0 8
(O)
8 1 6. 4
7 4. 1
3 9 7 (
F)
8 1 6. 4
2 1. 8
0 2 4 w
w
w
. s
f s
a r
c h. c
o m
sfsarchitecture
© 2
018
54321
D
C
B
A
MARK DATE DESCRIPTION
C:\U
sers
\dhe
nke
\Do
cu
men
ts\1
79
73
_B
on
ne
rSp
rin
gsG
overn
me
ntS
erv
ice
sC
en
ter_
R1
8_
dhe
nke
PW
D9T
.rvt
1/3
0/2
02
0 4
:00:4
8 P
M
01/30/20
A134
FIRST FLOORREFLECTEDCEILING PLAN
CIT
Y O
F B
ON
NE
R S
PR
ING
S, K
AN
SA
S
BO
NN
ER
SP
RIN
GS
GO
VE
RN
ME
NT
SE
RV
ICE
S C
EN
TE
RC
EN
TE
NN
IAL
CIT
Y H
AL
L
SFS PROJECT NO: 17973
ISSUE DATE: 01 / 30 / 2020
ISSUED FOR: BID DOCUMENTS
20
0 E
3R
D S
T.
BO
NN
ER
SP
RIN
GS
, K
S 6
60
12
1/8" = 1'-0"A134
1 REFLECTED CEILING PLAN - FIRST FLOOR
N
3/4" = 1'-0"A134
A4 SOFFIT DETAIL AT STAIR S04 - FIRST FLOOR
LEGEND - KEYNOTES- RCP
C1 ± F.V. ACTUAL CEILING HEIGHT: GYPSUM BOARD, 5/8" TYPE'X' (09 2116) ATTACHED DIRECTLY TO EXISTING WOODCEILING / FLOOR FRAMING MEMBERS.
C15 PROVIDE 1-1/4" SHALLOW BOX WITH 7/8" MUD RINGRECESSED INTO WALL. PROVIDE 1/2" CONDUIT WITHINWALL. NOTCH BRICK AND PATCH PLASTER WHEREREQUIRED.
C16 RE: ELECTRICAL FOR ALL WORK NOT SHOWN, AND NOTPERTAINING TO STORAGE ROOMS 121 AND 122, TYP.
C17 OCCUPANCY SENSOR, RE: ELECTRICAL
C18 CEILING MOUNTED MICROPHONE AND CAMERA, OWNERSUPPLIED CONTRACTOR PROVIDE CONDUIT FORCONNECTION, RE: ELECTRICAL
C19 CEILING MOUNTED PROJECTOR, OWNER SUPPLIED ANDINSTALLED, GC TO PROVIDE HDMI AND POWERCONNECTIONS, RE: ELECTRICAL
C20 WALL MOUNTED SPEAKERS, 8'-0" AFF, OWNER SUPPLIEDCONTRACTOR INSTALLED, RE: ELECTRICAL
C21 RS-3, BLACK OUT ROLLER SHADE ON WINDOW
C22 PENDANT LIGHT FIXTURE, 8'-6" AFF, RE: ELECTRICAL
2 07/25/19 ASI-003
4 11/22/19 PR-004-REV1
6 09/10/19 RFI-026
16 12/03/19 PR-008
31 01/30/20 PR-014
Description Material Carpenter Labor Hrs
PR 14Duct pentration demo (8 openings) -12 68.00$ (816.00)$
-$ (816.00)$
Bonner Springs Government Services Center COR064 Sub/Supplier Pricing -Drywall Systems: Page 1
*MetalStudFraming CHANGEORDER
DrywallSystems,Inc. *Drywall PROPOSAL3015PowerDriveKansasCity,KS66016 *AcousticalCeilings PR#14(913)397‐8966Fax(913)397‐8437 *EIFS Added Soffits at Ground
3919S.WestSt.Wichita,KS67217 3025S.CentennialRdSalina,KS *Insulation and First Floor Ceilings(316)942‐4994Fax(316)942‐4995 (785)823‐1000Fax(785)823‐1015
PROPOSAL SUBMITTED TO PHONE EMAIL
KBS Constructors 913‐422‐5300 [email protected] JOB NAME
14955 W 117th Street Bonner Springs Government Services CenterCITY, STATE AND ZIP CODE JOB LOCATION
Kansas City, KS 66062ARCHITECT DATE OF PLANS ATTN DATE
SFS Architecture 1/31/2019 Dennis Tanner 2/13/2020
We hereby submit specifications and estimates for all materials and labor for:
Added soffits in rooms G07 and G15 on the ground floor and in rooms 109 and 117 on the first floor
Labor: 42 HRS @ $65 $2,730.00
Material: $390.00
O&P(10%): $312.00
Proposed Amount: $3,432.00Exclusions:
We exclude all engineering calculations/drawings; permits; heating; ventilation; utilities; supply of job site waste receptacles;
temporary/dust partitions; wood framing, wood blocking and wood sheathing; miscellaneous blocking; flashings; soffit vents;
building wraps; joint sealers; fire proofing; fire stopping at penetrations by others; access panels; fire extinguisher cabinets;
supply/install of doors, frames and hardware; EIFS/Stucco Systems; demolition
All job site dumpsters supplied by others.
Any and all services or materials not specifically listed herein are excluded from scope of work.
A bond was not figured for this project but can be given at an additional cost.
Due to the current volatile market for steel and gypsum board products, we can only hold our material prices if proposal is accepted within
30 days of proposal date above. All deliveries of steel by us are subject to availability from suppliers because of current allocations imposed.
Payment to be made as follows: MONTHLY / NET UPON COMPLETION
All material is guaranteed to be as specified. All work to be completed in a workmanlike manner Authorized
according to standard practices. Any alteration or deviation from above specifications involving extra Signature ________________________________
costs will be executed only upon written orders, and will become an extra charge over and above the
estimate. All agreements contingent upon strikes, accidents or delays beyond our control. Owner to
carry fire, tornado and other necessary insurance. Our workers are fully cover by Workmen's
Compensation Insurance This proposal may be withdrawn by us if not accepted within 30 days
Acceptance of Proposal: The above prices, specifications, & conditions are satisfactory & are hereby accepted. You are
authorized to do the work as specified. Payment will be made as outlined above.
Date of Acceptance:___________________________ Signature:______________________________
Various Locations