[ppt]closing plenary reports - ieee standards association ... · web viewjuly 2011 802.11 july 2011...

97
doc.: IEEE 802.11-11/1075r1 Report July 2011 Adrian Stephens, Intel Corp Slide 1 802.11 July 2011 Closing Plenary Reports Date: 2011-07-22 N am e C om pany A ddress Phone em ail A drian Stephens Intel Corporation +44 792 008 4900 (m obile) [email protected] Authors:

Upload: duongthien

Post on 21-Apr-2018

212 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: [PPT]Closing Plenary Reports - IEEE Standards Association ... · Web viewJuly 2011 802.11 July 2011 Closing Plenary Reports Date: 2011-07-22 Authors: Adrian Stephens, Intel Corporation

doc.: IEEE 802.11-11/1075r1

Report

July 2011

Adrian Stephens, Intel CorporationSlide 1

802.11 July 2011 Closing Plenary ReportsDate: 2011-07-22

Name Company Address Phone email Adrian Stephens Intel

Corporation +44 792 008

4900 (mobile) [email protected]

Authors:

Page 2: [PPT]Closing Plenary Reports - IEEE Standards Association ... · Web viewJuly 2011 802.11 July 2011 Closing Plenary Reports Date: 2011-07-22 Authors: Adrian Stephens, Intel Corporation

doc.: IEEE 802.11-11/1075r1

Report

July 2011

Adrian Stephens, Intel CorporationSlide 2

Abstract

• This document is a digest of the closing reports of all 802.11 sub-groups for presentation at the July 2011 closing plenary meeting.

Page 3: [PPT]Closing Plenary Reports - IEEE Standards Association ... · Web viewJuly 2011 802.11 July 2011 Closing Plenary Reports Date: 2011-07-22 Authors: Adrian Stephens, Intel Corporation

doc.: IEEE 802.11-11/1075r1

Report Slide 3

802.11 WG Editor’s Meeting (July ‘11)Date: 2011-06-01

Name Affiliation Address Phone email Peter Ecclesine Cisco Systems 170 W. Tasman Dr.,

MS SJ-14-4, San Jose, CA 95134-1706

+1-408-527-0815 [email protected]

Authors:

Adrian Stephens, Intel Corporationfrom slide 1/7 of 11-11/0849r2 by Peter Ecclesine (Cisco Systems)

July 2011

Page 4: [PPT]Closing Plenary Reports - IEEE Standards Association ... · Web viewJuly 2011 802.11 July 2011 Closing Plenary Reports Date: 2011-07-22 Authors: Adrian Stephens, Intel Corporation

doc.: IEEE 802.11-11/1075r1

Report Slide 4

Volunteer Editor Contacts• TGs – Kazuyuki Sakoda – [email protected] • TGmb – Adrian Stephens – [email protected]• TGaa – Alex Ashley – [email protected] • TGac – Robert Stacey – [email protected] • TGad – Carlos Cordeiro – [email protected] • TGae – Henry Ptasinski – [email protected] • TGaf – Peter Ecclesine – [email protected] • TGah – Minyoung Park – [email protected]• TGai – Tom Siep – [email protected] • Editors Emeritus:

– TGk – Joe Kwak– [email protected]– TGp – Wayne Fisher – [email protected] – TGr – Bill Marshall – [email protected]– TGu – Necati Canpolat – [email protected] – TGv – Emily Qi – [email protected] – TGw – Nancy Cam-Winget – [email protected] – TGz – Menzo Wentink – [email protected]

Adrian Stephens, Intel Corporation

July 2011

from slide 2/7 of 11-11/0849r2 by Peter Ecclesine (Cisco Systems)

July 2011

Page 5: [PPT]Closing Plenary Reports - IEEE Standards Association ... · Web viewJuly 2011 802.11 July 2011 Closing Plenary Reports Date: 2011-07-22 Authors: Adrian Stephens, Intel Corporation

doc.: IEEE 802.11-11/1075r1

Report Slide 5

ANA Announcements• Current ANA announced to group is 802.11-11-0270r6. (2011 Jul 12)

– See https://mentor.ieee.org/802.11/dcn/11/11-11-0270-06-0000-ana-database.xls

– All new requests received by end of meeting will be uploaded and announced via 802.11 WG reflector

• Procedure for ANA is contained in 07/0827r0.– See http://mentor.ieee.org/802.11/public/07/11-07-0827-00-0000-assigned-number-authority-ana-mechanisms.ppt

• Editorial Guidance– ANA assignments should be done before the time of moving from WG LB to

Sponsor ballot.– If a resource number is not in the ANA Database, please use <ANA> in drafts!– Editors to replace any ANA controlled resources numbers with <ANA> upon

incorporation of material into drafts. – Editors need to check the ANA database to determine which resources are

controlled and ensure that values are requested from the ANA.

Adrian Stephens, Intel Corporation

July 2011

from slide 3/7 of 11-11/0849r2 by Peter Ecclesine (Cisco Systems)

July 2011

Page 6: [PPT]Closing Plenary Reports - IEEE Standards Association ... · Web viewJuly 2011 802.11 July 2011 Closing Plenary Reports Date: 2011-07-22 Authors: Adrian Stephens, Intel Corporation

doc.: IEEE 802.11-11/1075r1

Report

Editor’s discussion of 802.11 MDR• In May, we discussed holding draft reviews in

preparation for requesting approval from the Sponsor• 11-11/615r0 WG 11 MEC Process, 11-09/1034r1 802.11 Style Guide, 11-09/533r1

ARC Recommendation re MIB Attribute Types & Usage, and P802.11REVmb Draft 8.0 Annex C.2 Guidelines for 802.11 MIB authors and editors

• In July, after having performed the review of 11ae, 11aa and 11ad drafts, and refined the review and reporting process,

– See 11-11/872 TGaa, 11-11/873 TGae and 11-11/874 TGad MEC Reports

• The editors strawpolled of the draft review process– July 18 PM2 Editor’s meeting reviewed 11-11/615r3 Procedure, and a strawpoll

approved the procedures therein 7-0-0. Some editorial errors were noted and resolved in 11-11/615r4 WG802.11 MEC Procedures.

– We expect the process to be renamed the WG802.11 Mandatory Draft Review Process.

Adrian Stephens, Intel CorporationSlide 6from slide 4/7 of 11-11/0849r2 by Peter Ecclesine (Cisco Systems)

July 2011

Page 7: [PPT]Closing Plenary Reports - IEEE Standards Association ... · Web viewJuly 2011 802.11 July 2011 Closing Plenary Reports Date: 2011-07-22 Authors: Adrian Stephens, Intel Corporation

doc.: IEEE 802.11-11/1075r1

Report

802.11 Style Guide

• See 11-09-1034-03-0000-wg11-style-guide.doc

• Editor’s responsibility includes checking the 2009 IEEE Standards Style Manual when creating or updating drafts.

• Submissions with draft text should conform to both the WG11 Style Guide and IEEE Standards Style Manual

Slide 7 Adrian Stephens, Intel Corporationfrom slide 5/7 of 11-11/0849r2 by Peter Ecclesine (Cisco Systems)

July 2011

Page 8: [PPT]Closing Plenary Reports - IEEE Standards Association ... · Web viewJuly 2011 802.11 July 2011 Closing Plenary Reports Date: 2011-07-22 Authors: Adrian Stephens, Intel Corporation

doc.: IEEE 802.11-11/1075r1

Report Slide 8

Editor Amendment Ordering

Amendment Number Task Group REVCOM Date802.11 Amendment 8 TGv Feb 2011

802.11 Amendment 9 TGu Feb 2011

802.11 Amendment 10 TGs Sept 2011

802.11 Revision 802.11mb Mar 2012*est.

802.11-2011 Amendment 1 TGae Jun 2012

802.11-2011 Amendment 2 TGaa Jun 2012

802.11-2011 Amendment 3 TGad Dec 2012

802.11-2011 Amendment 4 TGaf Sep 2012

802.11-2011 Amendment 5 TGac Dec 2013

802.11-2011 Amendment 6 TGah July 2013

802.11-2011 Amendment 7 TGai Sept 2013

• Data as of July 2011• See http://grouper.ieee.org/groups/802/11/Reports/802.11_Timelines.htm

Amendment numbering is editorial! No need to make ballot comments on these dynamic numbers!

Adrian Stephens, Intel Corporationfrom slide 6/7 of 11-11/0849r2 by Peter Ecclesine (Cisco Systems)

July 2011

Page 9: [PPT]Closing Plenary Reports - IEEE Standards Association ... · Web viewJuly 2011 802.11 July 2011 Closing Plenary Reports Date: 2011-07-22 Authors: Adrian Stephens, Intel Corporation

doc.: IEEE 802.11-11/1075r1

Report

Most current doc shaded

green.TG Published or Draft Baseline DocumentsSource MEC

Style Guide Editor

Snapshot Date

Published

s mb ae aa ad af ac ah ai

s Y 12.0 Frame 8.0 Yes 2009 Kazuyuki Sakoda 19-Jul

mb Y 9.1 Frame 9.0 Yes 2009 Adrian Stephens 19-Jul

ae Y 12.0 9.0 5.0 OpenOffice 3.2

Yes 2009 Henry Ptasinski 19-Jul

aa Y 11.0 9.0 3.0 5.01 Word Yes 2009 Alex Ashley 19-Jul

ad Y 12.0 9.0 4.0 5.0 4.0 Word Yes 2009 Carlos Cordero 19-Jul

af Y 12.0 9.0 4.0 5.0 1.02 Frame 9.0 No 2009 Peter Ecclesine 19-Jul

ac Y 12.0 9.0 4.0 5.0 3.0 1.0 1.0 Frame 9.0 No 2009 Robert Stacey 19-Jul

ah Minyoung Park

ai Tom Siep

Changes from last report shown in red.

Slide 9

July 2011 Draft Development Snapshot

Slide 9 Adrian Stephens, Intel Corporation

July 2011

from slide 7/7 of 11-11/0849r2 by Peter Ecclesine (Cisco Systems)

July 2011

Page 10: [PPT]Closing Plenary Reports - IEEE Standards Association ... · Web viewJuly 2011 802.11 July 2011 Closing Plenary Reports Date: 2011-07-22 Authors: Adrian Stephens, Intel Corporation

doc.: IEEE 802.11-11/1075r1

Report Adrian Stephens, Intel CorporationSlide 10

Closing ReportDate: 2011-07-22

Name Company Address Phone email

Clint Chaplin Samsung Electronics 3000 Orchard Parkway San Jose, Ca 95134

+1 408 544 2740 firstname dot lastname at gmail dot com

Authors:

from slide 1/3 of 11-11/1062r0 by Clint Chaplin, Chair (Samsung)

July 2011

Page 11: [PPT]Closing Plenary Reports - IEEE Standards Association ... · Web viewJuly 2011 802.11 July 2011 Closing Plenary Reports Date: 2011-07-22 Authors: Adrian Stephens, Intel Corporation

doc.: IEEE 802.11-11/1075r1

Report Adrian Stephens, Intel CorporationSlide 11

Abstract

Closing report for WNG SC for July 2011, San Francisco, CA, USA

from slide 2/3 of 11-11/1062r0 by Clint Chaplin, Chair (Samsung)

July 2011

Page 12: [PPT]Closing Plenary Reports - IEEE Standards Association ... · Web viewJuly 2011 802.11 July 2011 Closing Plenary Reports Date: 2011-07-22 Authors: Adrian Stephens, Intel Corporation

doc.: IEEE 802.11-11/1075r1

Report Adrian Stephens, Intel CorporationSlide 12

• Presentations at July 2011 meeting– Improving the Case for Wireless LAN Transmit Power Control—

including to better service Mobile Telephones? (11-11-1036-00-0wng-improving-tpc-case.ppt) – Lawrence Zuckerman

– Channel Contention with a Large Number of Devices (11-11-0953-00-0wng-channel-contention-with-a-large-number-of-devices.ppt) – Ed Reuss

– PTC Radio and System Architecture (11-11-1032-00-0wng-positive-train-control-radio-and-system-architecture.ppt) – Jia-Ru Li

• Minutes– 11-11-1043-00-0wng-july-2011-meeting-minutes.doc

• Plans for September 2011– 1 2 hour session

from slide 3/3 of 11-11/1062r0 by Clint Chaplin, Chair (Samsung)

July 2011

Page 13: [PPT]Closing Plenary Reports - IEEE Standards Association ... · Web viewJuly 2011 802.11 July 2011 Closing Plenary Reports Date: 2011-07-22 Authors: Adrian Stephens, Intel Corporation

doc.: IEEE 802.11-11/1075r1

Report Adrian Stephens, Intel CorporationSlide 13

ARC Closing Report Date: 2011-07-22

Name Affiliations Address Phone email Mark Hamilton Polycom, Inc. 1765 W 121st Ave,

Westminster, CO, 80234

720-872-7445 [email protected]

Authors:

from slide 1/5 of 11-11/1082r1 by Mark Hamilton, Polycom, Inc.

July 2011

Page 14: [PPT]Closing Plenary Reports - IEEE Standards Association ... · Web viewJuly 2011 802.11 July 2011 Closing Plenary Reports Date: 2011-07-22 Authors: Adrian Stephens, Intel Corporation

doc.: IEEE 802.11-11/1075r1

Report

Abstract

This document is the closing report for ARC SC, July 2011, San Francisco meeting

Adrian Stephens, Intel CorporationSlide 14from slide 2/5 of 11-11/1082r1 by Mark Hamilton, Polycom, Inc.

July 2011

Page 15: [PPT]Closing Plenary Reports - IEEE Standards Association ... · Web viewJuly 2011 802.11 July 2011 Closing Plenary Reports Date: 2011-07-22 Authors: Adrian Stephens, Intel Corporation

doc.: IEEE 802.11-11/1075r1

Report Adrian Stephens, Intel CorporationSlide 15

Work Completed• 802 Overview and Architecture Draft 1.2 letter ballot

– Provided several comment resolutions, all accepted• https://mentor.ieee.org/802.11/dcn/11/11-11-1053-00-0arc-802rev-d1-2-comm

ent-resolutions-v4.ods

– Proposed text for 802.11RM Annex, accepted• https://mentor.ieee.org/802.11/dcn/10/11-10-1450-00-0arc-802rev-802-11-rm-

proposal.docx

• Updated to Figure 4-12 in REVmb D9.0 to include 802.11u/802.21 concepts– Participated in comment resolution sessions

• Raised concern about 802 Overview and Architecture definition of “end station” and “bridge” versus 802.11 concepts– Will be discussed on teleconference(s); probably submit comment on next

ballot of 802 O&A• Minutes are in 11-11/1054

from slide 3/5 of 11-11/1082r1 by Mark Hamilton, Polycom, Inc.

July 2011

Page 16: [PPT]Closing Plenary Reports - IEEE Standards Association ... · Web viewJuly 2011 802.11 July 2011 Closing Plenary Reports Date: 2011-07-22 Authors: Adrian Stephens, Intel Corporation

doc.: IEEE 802.11-11/1075r1

Report Adrian Stephens, Intel CorporationSlide 16

Notable issues raised at 802 O&A sessions• Handling/mapping of EtherType in 802.11• Error rate requirements for 802 networks• Service availability upon device insertion/removal requirements

for 802 networks• See

https://mentor.ieee.org/802.11/dcn/11/11-11-1054-02-0arc-arc-sc-agenda-report-and-minutes.ppt for details

from slide 4/5 of 11-11/1082r1 by Mark Hamilton, Polycom, Inc.

July 2011

Page 17: [PPT]Closing Plenary Reports - IEEE Standards Association ... · Web viewJuly 2011 802.11 July 2011 Closing Plenary Reports Date: 2011-07-22 Authors: Adrian Stephens, Intel Corporation

doc.: IEEE 802.11-11/1075r1

Report Adrian Stephens, Intel CorporationSlide 17

September 2011 Goals• Respond to (expected) 802 Overview and Architecture

recirculation letter ballot• Formulate specific proposal for changes to “end station” and

“bridge” concepts in 802 O&A

from slide 5/5 of 11-11/1082r1 by Mark Hamilton, Polycom, Inc.

July 2011

Page 18: [PPT]Closing Plenary Reports - IEEE Standards Association ... · Web viewJuly 2011 802.11 July 2011 Closing Plenary Reports Date: 2011-07-22 Authors: Adrian Stephens, Intel Corporation

doc.: IEEE 802.11-11/1075r1

Report Adrian Stephens, Intel CorporationSlide 18

July 2011 Closing Report -TGmbDate: 2011-07-21

Name Affiliations Address Phone email Dorothy Stanley Aruba Networks 1322 Crossman Ave

Sunnyvale, CA 94089

+1 630-363-1389

[email protected]

Authors:

from slide 1/6 of 11-11/1092r0 by Dorothy Stanley (Aruba Networks)

July 2011

Page 19: [PPT]Closing Plenary Reports - IEEE Standards Association ... · Web viewJuly 2011 802.11 July 2011 Closing Plenary Reports Date: 2011-07-22 Authors: Adrian Stephens, Intel Corporation

doc.: IEEE 802.11-11/1075r1

Report Adrian Stephens, Intel CorporationSlide 19

Abstract

This document contains the TGmb closing report for July 2011.

from slide 2/6 of 11-11/1092r0 by Dorothy Stanley (Aruba Networks)

July 2011

Page 20: [PPT]Closing Plenary Reports - IEEE Standards Association ... · Web viewJuly 2011 802.11 July 2011 Closing Plenary Reports Date: 2011-07-22 Authors: Adrian Stephens, Intel Corporation

doc.: IEEE 802.11-11/1075r1

Report Adrian Stephens, Intel CorporationSlide 20Slide 20

Accomplishments

• Completed Third Recirculation SB Comment Resolution (D9.0)– 208 comments (+17 post SB)– Fourth Recirculation SB (20 day) to start later in August,

incorporating 11s amendment

• Scheduled teleconference calls on – September 13, 30– 10am Eastern (7am Pacific), 2 hours

from slide 3/6 of 11-11/1092r0 by Dorothy Stanley (Aruba Networks)

July 2011

Page 21: [PPT]Closing Plenary Reports - IEEE Standards Association ... · Web viewJuly 2011 802.11 July 2011 Closing Plenary Reports Date: 2011-07-22 Authors: Adrian Stephens, Intel Corporation

doc.: IEEE 802.11-11/1075r1

Report Adrian Stephens, Intel CorporationSlide 21Slide 21

Current TGmb Plan of Record May 2008 – Issue Call for Comment/Input July 2008 – begin process input and old Interpretation requests

Acknowledge previous Task Group referrals Sept 2008 – PAR revision process started Nov 2008 – close receipt of new input Nov 2008 – WG/EC approval of PAR Revision Dec 2008 – NesCom/SASB approval PAR Revision May 2009 – First WG Letter ballot Nov 2009 – Recirc start July 2010 – Conditional Sponsor Ballot Approval from EC August 2010 – Form Sponsor Pool (45 days) – Closes Sept 14 November 2010 – Initial Sponsor Ballot completion• Jan 2011 – Sponsor Recirc. Start• Nov 2011 – WG/EC Final Approval• March 2012 – RevCom/SASB Approval

from slide 4/6 of 11-11/1092r0 by Dorothy Stanley (Aruba Networks)

July 2011

Page 22: [PPT]Closing Plenary Reports - IEEE Standards Association ... · Web viewJuly 2011 802.11 July 2011 Closing Plenary Reports Date: 2011-07-22 Authors: Adrian Stephens, Intel Corporation

doc.: IEEE 802.11-11/1075r1

Report Adrian Stephens, Intel CorporationSlide 22Slide 22

Goals for September 2011

• Recirculation Sponsor Ballot comment resolution (D10.0)

from slide 5/6 of 11-11/1092r0 by Dorothy Stanley (Aruba Networks)

July 2011

Page 23: [PPT]Closing Plenary Reports - IEEE Standards Association ... · Web viewJuly 2011 802.11 July 2011 Closing Plenary Reports Date: 2011-07-22 Authors: Adrian Stephens, Intel Corporation

doc.: IEEE 802.11-11/1075r1

Report Adrian Stephens, Intel CorporationSlide 23

References

from slide 6/6 of 11-11/1092r0 by Dorothy Stanley (Aruba Networks)

July 2011

Page 24: [PPT]Closing Plenary Reports - IEEE Standards Association ... · Web viewJuly 2011 802.11 July 2011 Closing Plenary Reports Date: 2011-07-22 Authors: Adrian Stephens, Intel Corporation

doc.: IEEE 802.11-11/1075r1

Report Adrian Stephens, Intel CorporationSlide 24

TGs SF Closing ReportDate: 2011-07-22

Author:

Name Address Affiliation Phone Email

Dee Denteneer HTC 37; 5656 AE Eindhoven; The Netherlands

Philips +31 40 2749743

[email protected]

from slide 1/6 of 11-11/1083r1 by Dee Denteneer (Philips)

July 2011

Page 25: [PPT]Closing Plenary Reports - IEEE Standards Association ... · Web viewJuly 2011 802.11 July 2011 Closing Plenary Reports Date: 2011-07-22 Authors: Adrian Stephens, Intel Corporation

doc.: IEEE 802.11-11/1075r1

Report Adrian Stephens, Intel CorporationSlide 25

Abstract

TGs closing report for the July 2011 meeting.

from slide 2/6 of 11-11/1083r1 by Dee Denteneer (Philips)

July 2011

Page 26: [PPT]Closing Plenary Reports - IEEE Standards Association ... · Web viewJuly 2011 802.11 July 2011 Closing Plenary Reports Date: 2011-07-22 Authors: Adrian Stephens, Intel Corporation

doc.: IEEE 802.11-11/1075r1

Report Adrian Stephens, Intel CorporationSlide 26

Status

• Discussed a number of suggestions made by the Publication Editor

• Prepared the report 11-11-0990r3 to the EC to request approval to forward D12.0 to RevCom

• Prepared a press release 11-11-984r7

from slide 3/6 of 11-11/1083r1 by Dee Denteneer (Philips)

July 2011

Page 27: [PPT]Closing Plenary Reports - IEEE Standards Association ... · Web viewJuly 2011 802.11 July 2011 Closing Plenary Reports Date: 2011-07-22 Authors: Adrian Stephens, Intel Corporation

doc.: IEEE 802.11-11/1075r1

Report Adrian Stephens, Intel CorporationSlide 27

Plan

• To disband the group once approval to forward D12.0 to RevCom has been obtained

from slide 4/6 of 11-11/1083r1 by Dee Denteneer (Philips)

July 2011

Page 28: [PPT]Closing Plenary Reports - IEEE Standards Association ... · Web viewJuly 2011 802.11 July 2011 Closing Plenary Reports Date: 2011-07-22 Authors: Adrian Stephens, Intel Corporation

doc.: IEEE 802.11-11/1075r1

Report Adrian Stephens, Intel CorporationSlide 28

Motion• Moved to approve document 11-11-0990r3 as the

report to the IEEE 802 Executive Committee on the requirements for approval to forward P802.11s to RevCom, and

• Request the IEEE 802 Executive Committee to forward P802.11s to RevCom.

• Moved by Dee Denteneer on behalf of TGs• TGs vote:

– Moved: Stephen McCann Seconded: Dan Harkins – Honorary Seconder: Donald E. Eastlake– Result: 8-0-0

from slide 5/6 of 11-11/1083r1 by Dee Denteneer (Philips)

July 2011

Page 29: [PPT]Closing Plenary Reports - IEEE Standards Association ... · Web viewJuly 2011 802.11 July 2011 Closing Plenary Reports Date: 2011-07-22 Authors: Adrian Stephens, Intel Corporation

doc.: IEEE 802.11-11/1075r1

Report Adrian Stephens, Intel CorporationSlide 29

Motion• Moved to approve document 11-11-0984r7 “TGs Press

Release” and forward it to the IEEE-SA Marketing Director in preparation for ExCom ballot.

• To authorise the IEEE 802.11 WG chair to make any necessary editorial changes.

• Moved by Dee Denteneer on behalf of TGs

• TGs vote: – Moved: Dan Harkins Seconded: Peter Yee– Result: 4-0-0

from slide 6/6 of 11-11/1083r1 by Dee Denteneer (Philips)

July 2011

Page 30: [PPT]Closing Plenary Reports - IEEE Standards Association ... · Web viewJuly 2011 802.11 July 2011 Closing Plenary Reports Date: 2011-07-22 Authors: Adrian Stephens, Intel Corporation

doc.: IEEE 802.11-11/1075r1

Report

802.11aa – Robust Audio Video Transport Streaming San Francisco Closing Report

Date: 2011-07-21

Authors:Name Affiliation Address Phone email Ganesh Venkatesan Intel Corporation JF3-336 2111NE 25th Ave +1 503 334 6720 Ganesh.Venkatesan@intel

.com Alex Ashley NDS Ltd One London Road, Staines,

Middlesex, TW18 4EX, England

+44 1784 848770 [email protected]

Adrian Stephens, Intel CorporationSlide 30from slide 1/7 of 11-11/1071r0 by Ganesh Venkatesan, Intel Corporation et al

July 2011

Page 31: [PPT]Closing Plenary Reports - IEEE Standards Association ... · Web viewJuly 2011 802.11 July 2011 Closing Plenary Reports Date: 2011-07-22 Authors: Adrian Stephens, Intel Corporation

doc.: IEEE 802.11-11/1075r1

Report

Technical Presentations

Slide 31 Adrian Stephens, Intel CorporationSlide 31

Document number Title Author(s)

1 11/920 LB179 GCR Comment Resolutions Alex Ashley

2 11/923 LB179 OBSS Comment Resolutions Alex Ashley

3 11/903 LB179/MEC Editorial Comment Resolutions Alex Ashley

4 11/939 Resolution to CID #4112 Ganesh Venkatesan

5 11/941 LB179 SCS Comment Resolutions Ganesh Venkatesan

6 11/1005 Sponsor Ballot Request Ganesh Venkatesan

from slide 2/7 of 11-11/1071r0 by Ganesh Venkatesan, Intel Corporation et al

July 2011

Page 32: [PPT]Closing Plenary Reports - IEEE Standards Association ... · Web viewJuly 2011 802.11 July 2011 Closing Plenary Reports Date: 2011-07-22 Authors: Adrian Stephens, Intel Corporation

doc.: IEEE 802.11-11/1075r1

Report

LB179 Comment Resolution Status

Adrian Stephens, Intel CorporationSlide 32

Blank Accept Principle Declined, Withdrawn

Total

Editor   31 16 16 63GCR   3 12 2, 13 30

General     1   1

Interworking   1     1

OBSS   4 19 3 26

SCS     6 5 11

Total   39 54 39 132

100% Resolved

from slide 3/7 of 11-11/1071r0 by Ganesh Venkatesan, Intel Corporation et al

July 2011

Page 33: [PPT]Closing Plenary Reports - IEEE Standards Association ... · Web viewJuly 2011 802.11 July 2011 Closing Plenary Reports Date: 2011-07-22 Authors: Adrian Stephens, Intel Corporation

doc.: IEEE 802.11-11/1075r1

Report

Joint Meeting with 802.1AVB• Discussed TGaa timeline going forward• In the March meeting we committed to bring in details on the following

but the details are not ready yet:– what are the .11k/v capabilities are at the devices?– On what 802.11 parameters, can triggers be set?– what 802.11 action frames are used to set triggers?– what reports are generated?

• No updates on MaxRes and STA-Bridge issues.• Provided a comment on 802.1BA• All 6 .1AVB suite of specifications are done. The team is working on AVB

Rev 2– Redundant flows to listeners, – SRP over prioritized QoS– .1AS updates to auto-detect support for .1AS over mediums like Moca.

Adrian Stephens, Intel CorporationSlide 33from slide 4/7 of 11-11/1071r0 by Ganesh Venkatesan, Intel Corporation et al

July 2011

Page 34: [PPT]Closing Plenary Reports - IEEE Standards Association ... · Web viewJuly 2011 802.11 July 2011 Closing Plenary Reports Date: 2011-07-22 Authors: Adrian Stephens, Intel Corporation

doc.: IEEE 802.11-11/1075r1

Report

Change of TGaa Chair

• Graham Smith (DSP Group) was unanimously elected as the chair of TGaa

Adrian Stephens, Intel CorporationSlide 34from slide 5/7 of 11-11/1071r0 by Ganesh Venkatesan, Intel Corporation et al

July 2011

Page 35: [PPT]Closing Plenary Reports - IEEE Standards Association ... · Web viewJuly 2011 802.11 July 2011 Closing Plenary Reports Date: 2011-07-22 Authors: Adrian Stephens, Intel Corporation

doc.: IEEE 802.11-11/1075r1

Report Slide 35

Teleconferences

Aug 15, Sep 01, Oct 24, 27, 31, Nov 03 2011

1130-1330 Hrs ET

Adrian Stephens, Intel CorporationSlide 35from slide 6/7 of 11-11/1071r0 by Ganesh Venkatesan, Intel Corporation et al

July 2011

Page 36: [PPT]Closing Plenary Reports - IEEE Standards Association ... · Web viewJuly 2011 802.11 July 2011 Closing Plenary Reports Date: 2011-07-22 Authors: Adrian Stephens, Intel Corporation

doc.: IEEE 802.11-11/1075r1

Report Slide 36

Plans• After the July 2011 meeting

– Complete Draft 6.0 recirculation, clean recirculation and satisfy all conditions in order to start Sponsor Ballot

– Start Sponsor Ballot

• At the Sep 2011 Meeting– Since the First Sponsor Ballot will be completed on

Oct 17, 2011, provide WG with a status update

Adrian Stephens, Intel CorporationSlide 36from slide 7/7 of 11-11/1071r0 by Ganesh Venkatesan, Intel Corporation et al

July 2011

Page 37: [PPT]Closing Plenary Reports - IEEE Standards Association ... · Web viewJuly 2011 802.11 July 2011 Closing Plenary Reports Date: 2011-07-22 Authors: Adrian Stephens, Intel Corporation

doc.: IEEE 802.11-11/1075r1

Report Adrian Stephens, Intel CorporationSlide 37

TGac July 2011 Closing ReportDate: 2011-07-21

Name Affiliations Address Phone email Osama Aboul-Magd Huawei Technologies 303 Terry Fox Drive,

Kanata, ONT, K2K-3J1 613-287-1405 Osama.aboulmagd@huaw

ei.com

Authors:

from slide 1/7 of 11-11/1086r0 by Osama Aboul-Magd (Huawei Technologies)

July 2011

Page 38: [PPT]Closing Plenary Reports - IEEE Standards Association ... · Web viewJuly 2011 802.11 July 2011 Closing Plenary Reports Date: 2011-07-22 Authors: Adrian Stephens, Intel Corporation

doc.: IEEE 802.11-11/1075r1

Report Adrian Stephens, Intel CorporationSlide 38

Abstract

This document is the closing report for the TGac for the July 2011 session.

from slide 2/7 of 11-11/1086r0 by Osama Aboul-Magd (Huawei Technologies)

July 2011

Page 39: [PPT]Closing Plenary Reports - IEEE Standards Association ... · Web viewJuly 2011 802.11 July 2011 Closing Plenary Reports Date: 2011-07-22 Authors: Adrian Stephens, Intel Corporation

doc.: IEEE 802.11-11/1075r1

Report

Work Completed • Comment resolution on D1.0

– MU: 1057r0, MU comments for motioning (20110719PM2)• MU-2011-07-19-PM2

– PHY: 1069r2, PHY Comments for Motion• PHY_07_19_11• PHY_07_21_1009• PHY_07_21_1042• PHY_07_21_11• PHY_07_21_954

– COEX: 11/1067-01-00ac-lb178-coex-comments-tgac-d1-0• COEX Ready for Motion 1

– MAC: 11/1021r3 lb178-comments-tgac-mac-d1-0• MAC_07_18_AM1• MAC_07_19_AM2• MAC_07_20_PM1• MAC_07_21_AM2• MAC_07_21_PM1

Adrian Stephens, Intel CorporationSlide 39from slide 3/7 of 11-11/1086r0 by Osama Aboul-Magd (Huawei Technologies)

July 2011

Page 40: [PPT]Closing Plenary Reports - IEEE Standards Association ... · Web viewJuly 2011 802.11 July 2011 Closing Plenary Reports Date: 2011-07-22 Authors: Adrian Stephens, Intel Corporation

doc.: IEEE 802.11-11/1075r1

Report

Work Completed (cntd)

• Number of technical comments resolved per Ad Hoc

Adrian Stephens, Intel CorporationSlide 40

Ad Hoc Number of CommentsMAC 81

PHY 84

MU 44

COEX 21

Total 230 + 10 Editorial

from slide 4/7 of 11-11/1086r0 by Osama Aboul-Magd (Huawei Technologies)

July 2011

Page 41: [PPT]Closing Plenary Reports - IEEE Standards Association ... · Web viewJuly 2011 802.11 July 2011 Closing Plenary Reports Date: 2011-07-22 Authors: Adrian Stephens, Intel Corporation

doc.: IEEE 802.11-11/1075r1

Report

Work Completed (cntd)

• Approved an ad hoc meeting on September 14-16, at Seoul, Korea to advance comment resolution work.

• Initiated discussion on GCMP related issues. The discussion is to be continued during the September IEEE 802.11 meeting

Adrian Stephens, Intel CorporationSlide 41from slide 5/7 of 11-11/1086r0 by Osama Aboul-Magd (Huawei Technologies)

July 2011

Page 42: [PPT]Closing Plenary Reports - IEEE Standards Association ... · Web viewJuly 2011 802.11 July 2011 Closing Plenary Reports Date: 2011-07-22 Authors: Adrian Stephens, Intel Corporation

doc.: IEEE 802.11-11/1075r1

Report Adrian Stephens, Intel CorporationSlide 42

September 2011 Goals

• Continue with comment resolution on D1.0.

from slide 6/7 of 11-11/1086r0 by Osama Aboul-Magd (Huawei Technologies)

July 2011

Page 43: [PPT]Closing Plenary Reports - IEEE Standards Association ... · Web viewJuly 2011 802.11 July 2011 Closing Plenary Reports Date: 2011-07-22 Authors: Adrian Stephens, Intel Corporation

doc.: IEEE 802.11-11/1075r1

Report Adrian Stephens, Intel CorporationSlide 43

Conference Call Times

• Previously Approved– Thursday July 28 20:00 -22:00– Thursday August 4 10:00 -12:00

• Aug 11,Aug 25, Sept 8, Sept 29, Oct 13– 20:00 – 22:00 ET

• Aug 18, Sept 1, Oct 6, – 10:00-12:00 ET

from slide 7/7 of 11-11/1086r0 by Osama Aboul-Magd (Huawei Technologies)

July 2011

Page 44: [PPT]Closing Plenary Reports - IEEE Standards Association ... · Web viewJuly 2011 802.11 July 2011 Closing Plenary Reports Date: 2011-07-22 Authors: Adrian Stephens, Intel Corporation

doc.: IEEE 802.11-11/1075r1

Report Adrian Stephens, Intel CorporationSlide 44

TGad July 2011 Closing ReportDate: 2011-07-21

Name Company Address Phone email Eldad Perahia Intel

Corporation 2111 NE 25th Ave Hillsboro, OR 97124

503-712-8081 [email protected]

Authors:

from slide 1/5 of 11-11/0980r0 by Eldad Perahia, Intel Corporation

July 2011

Page 45: [PPT]Closing Plenary Reports - IEEE Standards Association ... · Web viewJuly 2011 802.11 July 2011 Closing Plenary Reports Date: 2011-07-22 Authors: Adrian Stephens, Intel Corporation

doc.: IEEE 802.11-11/1075r1

Report Adrian Stephens, Intel CorporationSlide 45

Abstract

This document is the closing report for TGad for the July 2011 session.

from slide 2/5 of 11-11/0980r0 by Eldad Perahia, Intel Corporation

July 2011

Page 46: [PPT]Closing Plenary Reports - IEEE Standards Association ... · Web viewJuly 2011 802.11 July 2011 Closing Plenary Reports Date: 2011-07-22 Authors: Adrian Stephens, Intel Corporation

doc.: IEEE 802.11-11/1075r1

Report

Work Completed

• Resolved all comments on LB 177 this week• TG and WG approved motion for recirculation letter

ballot on D4.0• CWPAN liaison report (11/1034)

– Overview of proposed modification to TGad to support CWPAN requirements

– Plan to use Aug 18 conference call to continue discussion on CWPAN proposal

Adrian Stephens, Intel CorporationSlide 46from slide 3/5 of 11-11/0980r0 by Eldad Perahia, Intel Corporation

July 2011

Page 47: [PPT]Closing Plenary Reports - IEEE Standards Association ... · Web viewJuly 2011 802.11 July 2011 Closing Plenary Reports Date: 2011-07-22 Authors: Adrian Stephens, Intel Corporation

doc.: IEEE 802.11-11/1075r1

Report

Goals for September 2011

• Comment resolution on D4.0• More planning for Sponsor Ballot

Adrian Stephens, Intel CorporationSlide 47from slide 4/5 of 11-11/0980r0 by Eldad Perahia, Intel Corporation

July 2011

Page 48: [PPT]Closing Plenary Reports - IEEE Standards Association ... · Web viewJuly 2011 802.11 July 2011 Closing Plenary Reports Date: 2011-07-22 Authors: Adrian Stephens, Intel Corporation

doc.: IEEE 802.11-11/1075r1

Report

Conference call times

• Previously approved conference calls– July 28, Aug 11

• 10:00 – 12:00 ET– Aug 4

• 20:00-22:00 ET

• New conference calls– Not overlap with TGac– Aug 25, Sept 8, Sept 29, Oct

13• 10:00 – 12:00 ET

– Aug 18, Sept 1, Sept 15, Oct 6, • 20:00-22:00 ET

Adrian Stephens, Intel CorporationSlide 48from slide 5/5 of 11-11/0980r0 by Eldad Perahia, Intel Corporation

July 2011

Page 49: [PPT]Closing Plenary Reports - IEEE Standards Association ... · Web viewJuly 2011 802.11 July 2011 Closing Plenary Reports Date: 2011-07-22 Authors: Adrian Stephens, Intel Corporation

doc.: IEEE 802.11-11/1075r1

Report Adrian Stephens, Intel CorporationSlide 49

TGae Closing Report – July 2011Date: 2011-07-20

Name Affiliations Address Phone email Michael Montemurro Research in Motion 4701 Tahoe Blvd.

Mississauga, ON. Canada. L4W 0B4

+1-905-629-4746 [email protected]

Authors:

from slide 1/5 of 11-11/1059r0 by Michael Montemurro, Research In Motion

July 2011

Page 50: [PPT]Closing Plenary Reports - IEEE Standards Association ... · Web viewJuly 2011 802.11 July 2011 Closing Plenary Reports Date: 2011-07-22 Authors: Adrian Stephens, Intel Corporation

doc.: IEEE 802.11-11/1075r1

Report Adrian Stephens, Intel CorporationSlide 50

Abstract

This document is the closing report for the TGae Task Group for the July 2011 session.

from slide 2/5 of 11-11/1059r0 by Michael Montemurro, Research In Motion

July 2011

Page 51: [PPT]Closing Plenary Reports - IEEE Standards Association ... · Web viewJuly 2011 802.11 July 2011 Closing Plenary Reports Date: 2011-07-22 Authors: Adrian Stephens, Intel Corporation

doc.: IEEE 802.11-11/1075r1

Report Adrian Stephens, Intel CorporationSlide 51

Work Completed• Completed Comment Resolution for LB 180

– https://mentor.ieee.org/802.11/dcn/11/11-11-0888-08-00ae-lb-180-comment-resolutions.xls

• Approved recirculation LB on Draft 5.0• Approved package for Conditional Sponsor Ballot

– https://mentor.ieee.org/802.11/dcn/11/11-11-0962-02-00ae-conditional-sb-request-to-ec.ppt

• Teleconferences:– Weekly teleconference on Wednesday Aug 10 at 11am ET for 1

hour.

from slide 3/5 of 11-11/1059r0 by Michael Montemurro, Research In Motion

July 2011

Page 52: [PPT]Closing Plenary Reports - IEEE Standards Association ... · Web viewJuly 2011 802.11 July 2011 Closing Plenary Reports Date: 2011-07-22 Authors: Adrian Stephens, Intel Corporation

doc.: IEEE 802.11-11/1075r1

Report Adrian Stephens, Intel CorporationSlide 52

TGae Timeline – July 2011 • Initial Working Group Letter Ballot: September ‘10• Re-circulation Working Group Letter Ballot: January

‘11• Form Sponsor Ballot Pool: May ’11• Mandatory Editorial Check: May ’11• Initial Sponsor Ballot: Aug ’11• Sponsor Ballot Recirculation: Nov ‘11• Final WG/EC Approval: Mar ‘12• RevCom/Standards Board Approval: June ‘12

from slide 4/5 of 11-11/1059r0 by Michael Montemurro, Research In Motion

July 2011

Page 53: [PPT]Closing Plenary Reports - IEEE Standards Association ... · Web viewJuly 2011 802.11 July 2011 Closing Plenary Reports Date: 2011-07-22 Authors: Adrian Stephens, Intel Corporation

doc.: IEEE 802.11-11/1075r1

Report Adrian Stephens, Intel CorporationSlide 53

September 2011 Goals• Resolve comments from initial Sponsor ballot• Prepare for recirculation Sponsor ballot

from slide 5/5 of 11-11/1059r0 by Michael Montemurro, Research In Motion

July 2011

Page 54: [PPT]Closing Plenary Reports - IEEE Standards Association ... · Web viewJuly 2011 802.11 July 2011 Closing Plenary Reports Date: 2011-07-22 Authors: Adrian Stephens, Intel Corporation

doc.: IEEE 802.11-11/1075r1

Report Adrian Stephens, Intel CorporationSlide 54

TGaf San Francisco Closing Report

Date: 2011-07-22

Name Affiliations Address Phone email Rich Kennedy Research In

Motion 7305 Napier Trail Austin, TX 78729

+1-972-207-3554 [email protected]

Peter Ecclesine Cisco 170 W. Tasman Dr., San Jose, CA, 95134

+1-408-527-0815 [email protected]

Authors:

from slide 1/9 of 11-11/1068r0 by Rich Kennedy, Research In Motion

July 2011

Page 55: [PPT]Closing Plenary Reports - IEEE Standards Association ... · Web viewJuly 2011 802.11 July 2011 Closing Plenary Reports Date: 2011-07-22 Authors: Adrian Stephens, Intel Corporation

doc.: IEEE 802.11-11/1075r1

Report Adrian Stephens, Intel CorporationSlide 55

AbstractThis presentation is the closing report for the eleventh

face-to-face meeting of IEEE 802.11 TGaf taking place the week of July 18, 2011 at the IEEE 802 Plenary in San Francisco.

from slide 2/9 of 11-11/1068r0 by Rich Kennedy, Research In Motion

July 2011

Page 56: [PPT]Closing Plenary Reports - IEEE Standards Association ... · Web viewJuly 2011 802.11 July 2011 Closing Plenary Reports Date: 2011-07-22 Authors: Adrian Stephens, Intel Corporation

doc.: IEEE 802.11-11/1075r1

Report

Agenda

• Approve meeting and teleconference minutes• Approve the LB171 comment spreadsheet in 11-

11/277r14• Approve draft P802.11af D1.02 as the working draft• Approve agreed to comment resolution submissions• Review of the progress since May• Comment resolution• PHY planning

Adrian Stephens, Intel CorporationSlide 56from slide 3/9 of 11-11/1068r0 by Rich Kennedy, Research In Motion

July 2011

Page 57: [PPT]Closing Plenary Reports - IEEE Standards Association ... · Web viewJuly 2011 802.11 July 2011 Closing Plenary Reports Date: 2011-07-22 Authors: Adrian Stephens, Intel Corporation

doc.: IEEE 802.11-11/1075r1

Report

TGaf Accomplishments • Resolved 151 comments

– 626 of 1302 comments have Approved resolutions• Met with TGac PHY experts to discuss how

TGaf can proceed prior to approval of the TGac draft

• Revised the P802.11af timeline• Planned for September ad hoc in Korea, and

weekly teleconferences– Tuesdays at 21:00 ET

Adrian Stephens, Intel CorporationSlide 57from slide 4/9 of 11-11/1068r0 by Rich Kennedy, Research In Motion

July 2011

Page 58: [PPT]Closing Plenary Reports - IEEE Standards Association ... · Web viewJuly 2011 802.11 July 2011 Closing Plenary Reports Date: 2011-07-22 Authors: Adrian Stephens, Intel Corporation

doc.: IEEE 802.11-11/1075r1

Report

Plans for September

• Ad hoc September 14 - 16 in the Korea– Sponsored by LG Electronics [Thank you!]

• Complete comment resolution• Prepare draft 2.0 and ask the WG to begin our

second Letter Ballot

Adrian Stephens, Intel CorporationSlide 58from slide 5/9 of 11-11/1068r0 by Rich Kennedy, Research In Motion

July 2011

Page 59: [PPT]Closing Plenary Reports - IEEE Standards Association ... · Web viewJuly 2011 802.11 July 2011 Closing Plenary Reports Date: 2011-07-22 Authors: Adrian Stephens, Intel Corporation

doc.: IEEE 802.11-11/1075r1

Report

TGaf ad hoc Motion

• Authorize TGaf to hold an ad-hoc meeting on September 14-16, 2011 in Seoul, ROK with the preferred venue being LG Electronics for the purpose of advancing the TGaf draft prior to the September IEEE 802 Wireless Interim in Okinawa, Japan.

• Moved: Peter Ecclesine, Cisco• Second• Result: x/x/x

Adrian Stephens, Intel CorporationSlide 59from slide 6/9 of 11-11/1068r0 by Rich Kennedy, Research In Motion

July 2011

Page 60: [PPT]Closing Plenary Reports - IEEE Standards Association ... · Web viewJuly 2011 802.11 July 2011 Closing Plenary Reports Date: 2011-07-22 Authors: Adrian Stephens, Intel Corporation

doc.: IEEE 802.11-11/1075r1

Report Adrian Stephens, Intel CorporationSlide 60

TGaf Timeline – Updated March 2011• New• Initial Working Group Letter Ballot: January 2011• Second Working Group Letter Ballot: September 2011• Recirculation Letter Ballot: November 2011• Form Sponsor Ballot Pool: February 2012• Initial Sponsor Ballot: March 2012• Recirculate Sponsor Ballot: May 2012• Final WG/EC Approval: July 2012• RevCom/Standards Board Approval: September 2012

from slide 7/9 of 11-11/1068r0 by Rich Kennedy, Research In Motion

July 2011

Page 61: [PPT]Closing Plenary Reports - IEEE Standards Association ... · Web viewJuly 2011 802.11 July 2011 Closing Plenary Reports Date: 2011-07-22 Authors: Adrian Stephens, Intel Corporation

doc.: IEEE 802.11-11/1075r1

Report Adrian Stephens, Intel CorporationSlide 61

TGaf Timeline – Updated July 2011• New• Initial Working Group Letter Ballot: January 2011• Second Working Group Letter Ballot: January 2012• Recirculation Letter Ballot: May 2012• Form Sponsor Ballot Pool: June 2012• Initial Sponsor Ballot: September 2012• Recirculate Sponsor Ballot: November 2012• Final WG/EC Approval: March 2013• RevCom/Standards Board Approval: March 2013

from slide 8/9 of 11-11/1068r0 by Rich Kennedy, Research In Motion

July 2011

Page 62: [PPT]Closing Plenary Reports - IEEE Standards Association ... · Web viewJuly 2011 802.11 July 2011 Closing Plenary Reports Date: 2011-07-22 Authors: Adrian Stephens, Intel Corporation

doc.: IEEE 802.11-11/1075r1

Report

Teleconferences

• Weekly on Tuesdays:• Time: 21:00 ET for 120 minutes

Adrian Stephens, Intel CorporationSlide 62from slide 9/9 of 11-11/1068r0 by Rich Kennedy, Research In Motion

July 2011

Page 63: [PPT]Closing Plenary Reports - IEEE Standards Association ... · Web viewJuly 2011 802.11 July 2011 Closing Plenary Reports Date: 2011-07-22 Authors: Adrian Stephens, Intel Corporation

doc.: IEEE 802.11-11/1075r1

Report Adrian Stephens, Intel CorporationSlide 63

IEEE 802.11ah Closing Report forJuly 2011Date: 2011-7-21

Name Affiliations Address Phone email David Halasz Aclara 2315 W. 9th Street

Austin, TX 78703 330-283-2715 dave.halasz@oaktreewirel

ess.com

Authors:

from slide 1/5 of 11-11/1088r0 by David Halasz, OakTree Wireless

July 2011

Page 64: [PPT]Closing Plenary Reports - IEEE Standards Association ... · Web viewJuly 2011 802.11 July 2011 Closing Plenary Reports Date: 2011-07-22 Authors: Adrian Stephens, Intel Corporation

doc.: IEEE 802.11-11/1075r1

Report

Activity in TGah

• Initial channel model document adopted!– 11-11-0968-01-00ah-channel-model-text.docx

• Initial functional requirements and evaluation methodology adopted!– 11-11-0905-03-00ah-tgah-functional-requirements-and-evaluation

-methodology.doc

• Addition of leadership role– Joseph Teo Chee Ming - Secretary

Adrian Stephens, Intel CorporationSlide 64from slide 2/5 of 11-11/1088r0 by David Halasz, OakTree Wireless

July 2011

Page 65: [PPT]Closing Plenary Reports - IEEE Standards Association ... · Web viewJuly 2011 802.11 July 2011 Closing Plenary Reports Date: 2011-07-22 Authors: Adrian Stephens, Intel Corporation

doc.: IEEE 802.11-11/1075r1

Report

Going forward

•Get started on Specification framework•Updates to Channel Model And FR-EM as needed

Adrian Stephens, Intel CorporationSlide 65from slide 3/5 of 11-11/1088r0 by David Halasz, OakTree Wireless

July 2011

Page 66: [PPT]Closing Plenary Reports - IEEE Standards Association ... · Web viewJuly 2011 802.11 July 2011 Closing Plenary Reports Date: 2011-07-22 Authors: Adrian Stephens, Intel Corporation

doc.: IEEE 802.11-11/1075r1

Report

Teleconferences

• August 8th 6:30 PM ET 1.5 hours• August 22nd 6:30 PM ET 1.5 hours• September 11th 6:30 PM ET 1.5 hours

Adrian Stephens, Intel CorporationSlide 66from slide 4/5 of 11-11/1088r0 by David Halasz, OakTree Wireless

July 2011

Page 67: [PPT]Closing Plenary Reports - IEEE Standards Association ... · Web viewJuly 2011 802.11 July 2011 Closing Plenary Reports Date: 2011-07-22 Authors: Adrian Stephens, Intel Corporation

doc.: IEEE 802.11-11/1075r1

Report

Timeline

• Move out end time by 4 months– See 11/285 for details

Adrian Stephens, Intel CorporationSlide 67from slide 5/5 of 11-11/1088r0 by David Halasz, OakTree Wireless

July 2011

Page 68: [PPT]Closing Plenary Reports - IEEE Standards Association ... · Web viewJuly 2011 802.11 July 2011 Closing Plenary Reports Date: 2011-07-22 Authors: Adrian Stephens, Intel Corporation

doc.: IEEE 802.11-11/1075r1

Report Adrian Stephens, Intel CorporationSlide 68

IEEE 802.11TGaiClosing Report

Date: 2011-07-22

Authors:

Name Company Address Phone emailHiroshi MANO ROOT Inc. 8F TOC2 Bldg. 7-21-11 Nishi-

Gotanda, Shinagawa-ku, Tokyo 141-0031 JAPAN

+81-3-5719-7630 [email protected]

Marc Emmelmann Fraunhofer FOKUS

Fraunhofer FOKUSKaiserin-Augusta-Alle 3110589 BerlinGermany

+49-30-3463 7268

[email protected]

from slide 1/8 of 11-11/1090r0 by Hiroshi Mano (Root Inc.)

July 2011

Page 69: [PPT]Closing Plenary Reports - IEEE Standards Association ... · Web viewJuly 2011 802.11 July 2011 Closing Plenary Reports Date: 2011-07-22 Authors: Adrian Stephens, Intel Corporation

doc.: IEEE 802.11-11/1075r1

Report Adrian Stephens, Intel CorporationSlide 69

AbstractThis presentation is the closing report for the San Francisco

meeting of the IEEE 802.11 TGai.

from slide 2/8 of 11-11/1090r0 by Hiroshi Mano (Root Inc.)

July 2011

Page 70: [PPT]Closing Plenary Reports - IEEE Standards Association ... · Web viewJuly 2011 802.11 July 2011 Closing Plenary Reports Date: 2011-07-22 Authors: Adrian Stephens, Intel Corporation

doc.: IEEE 802.11-11/1075r1

Report

Plan for this weekSan Francisco , July 2011

• Official time slot – Monday AM1,PM1– Tuesday AM2, PM1– Wednesday PM1, PM2– Thursday PM1,PM2

• Goals for the Meeting:– Review and Approve the Palm Springs and Teleconference meeting

minutes– Presentation of submissions

• Approve Verification of TGai Requirements• Submission of Initial technical contribution

– TIME line of task group– Plan for September & Teleconference

Adrian Stephens, Intel CorporationSlide 70from slide 3/8 of 11-11/1090r0 by Hiroshi Mano (Root Inc.)

July 2011

Page 71: [PPT]Closing Plenary Reports - IEEE Standards Association ... · Web viewJuly 2011 802.11 July 2011 Closing Plenary Reports Date: 2011-07-22 Authors: Adrian Stephens, Intel Corporation

doc.: IEEE 802.11-11/1075r1

Report

Accomplishments TGai • Reviewed and Approved the Singapore and Teleconference meeting minutes• Approved TGai evaluation methodology document

• 11/0811r05 TGai evaluation methodology• Technical contribution

– 11/0976r1 TGai Authentication Protocol Proposal / Hitoshi Morioka (Root,Inc.) – 11/0977r1 TGai Upper Layer Setup Proposal / Hitoshi Morioka (Root,Inc.) – 11/1015r0 Network Selection Optimization / Gabor Bajko (Nokia) – 11/1012r0 IP address configuration during association / Gabor Bajko (Nokia) – 11/1014r0 IP address configuration during association / Gabor Bajko (Nokia) – 11/1000r1 TGai FILS proposal / Jihyun Lee (LG)– 11/1003r2 TGai Upper layer data for management frames / Hiroki Nakano (TNT)– 11/1047r0 Using Upper Layer Message IE in Tgai / Ping Fang (Huawei)– 11/1040r0 Editors Report / Tom Siep (CSR)– 11/0976r3 TGai Authentication Protocol Proposal / Hitoshi Morioka (Root,Inc.) – 11/1015r1 Optimize network selection / Marc Emmelmann (Fokus)– 11/1066r1 Fast Security Setup /Robert Moskowitz (Verizon )

• Approved Weekly Teleconference schedule• Approved Plan for July

• Submission of technical contribution• General submission

Adrian Stephens, Intel CorporationSlide 71from slide 4/8 of 11-11/1090r0 by Hiroshi Mano (Root Inc.)

July 2011

Page 72: [PPT]Closing Plenary Reports - IEEE Standards Association ... · Web viewJuly 2011 802.11 July 2011 Closing Plenary Reports Date: 2011-07-22 Authors: Adrian Stephens, Intel Corporation

doc.: IEEE 802.11-11/1075r1

Report

Motion to approve TGai evaluation methodology document

• Move to accept all changes to 11-11-0811-06 and upload the revised document as rev 07 to the server , accept 11-11-0811-07 as TGai evaluation methodology document.

• Mover : Marc Emmelmann (Fokus)• Second : Tom Siep (CSR)• Result   15 - 0 - 0

July 2011

Adrian Stephens, Intel CorporationSlide 72from slide 5/8 of 11-11/1090r0 by Hiroshi Mano (Root Inc.)

July 2011

Page 73: [PPT]Closing Plenary Reports - IEEE Standards Association ... · Web viewJuly 2011 802.11 July 2011 Closing Plenary Reports Date: 2011-07-22 Authors: Adrian Stephens, Intel Corporation

doc.: IEEE 802.11-11/1075r1

Report

Time line of TGai

PAR Approved, Modified, or Extended [Expires] 2010-12-08– WG Letter Ballots Initial / Recirc Mar 12 / Jul 12– Form Sponsor Ballot Pool / Reform Jan 13– MEC Done Jan13– IEEE-SA Sponsor Ballots Initial / Recirc Mar13/ Jul13– Final 802.11 WG Approval Jan 14– final or Conditional 802 EC Approval Jan 14– RevCom & Standards Board Final or

Continuous Process Approval Mar14– ANSI Approved N/A

Adrian Stephens, Intel CorporationSlide 73from slide 6/8 of 11-11/1090r0 by Hiroshi Mano (Root Inc.)

July 2011

Page 74: [PPT]Closing Plenary Reports - IEEE Standards Association ... · Web viewJuly 2011 802.11 July 2011 Closing Plenary Reports Date: 2011-07-22 Authors: Adrian Stephens, Intel Corporation

doc.: IEEE 802.11-11/1075r1

Report

Documents

• Approved Minutes– May 2011 Palm Springs session minutes, 11/11-0832-00-00ai-

may-2011-palm-springs-session-minutes.doc– May-July Teleconference minutes, 11/11-0837-07-00ai-may-july-

teleconference-minutes.doc

• Approved TGai evaluation methodology– 11/11-0811r05 TGai evaluation methodology

Adrian Stephens, Intel CorporationSlide 74from slide 7/8 of 11-11/1090r0 by Hiroshi Mano (Root Inc.)

July 2011

Page 75: [PPT]Closing Plenary Reports - IEEE Standards Association ... · Web viewJuly 2011 802.11 July 2011 Closing Plenary Reports Date: 2011-07-22 Authors: Adrian Stephens, Intel Corporation

doc.: IEEE 802.11-11/1075r1

Report

Thanks to all who participated!

Adrian Stephens, Intel CorporationSlide 75from slide 8/8 of 11-11/1090r0 by Hiroshi Mano (Root Inc.)

July 2011

Page 76: [PPT]Closing Plenary Reports - IEEE Standards Association ... · Web viewJuly 2011 802.11 July 2011 Closing Plenary Reports Date: 2011-07-22 Authors: Adrian Stephens, Intel Corporation

doc.: IEEE 802.11-11/1075r1

Report Adrian Stephens, Intel CorporationSlide 76

JTC1 ad hoc closing report (July 11)Date: 2011-7-22

Name Company Address Phone email

Andrew Myles Cisco [email protected]

Authors:

from slide 1/10 of 11-11/1091r0 by Andrew Myles, Cisco

July 2011

Page 77: [PPT]Closing Plenary Reports - IEEE Standards Association ... · Web viewJuly 2011 802.11 July 2011 Closing Plenary Reports Date: 2011-07-22 Authors: Adrian Stephens, Intel Corporation

doc.: IEEE 802.11-11/1075r1

Report Adrian Stephens, Intel CorporationSlide 77

Abstract

Closing report for JTC1 ad hocfor July 2011, San Francisco

from slide 2/10 of 11-11/1091r0 by Andrew Myles, Cisco

July 2011

Page 78: [PPT]Closing Plenary Reports - IEEE Standards Association ... · Web viewJuly 2011 802.11 July 2011 Closing Plenary Reports Date: 2011-07-22 Authors: Adrian Stephens, Intel Corporation

doc.: IEEE 802.11-11/1075r1

Report

JTC1 ad hoc focused on reporting of recent SC6 meeting

• Progress in San Francisco (July 2011)– Welcomed guest

• Chair of SC6 was present– Approved minutes from July in Palm Springs

• 11/0955– Reviewed extended goals

• Deals with 802 to SC6 issues– Reviewed SC6 meeting in San Diego

• Review attendance– IEEE 802 delegation (8 people) & ten NBs

• Review agenda– Many topics not related to 802 activities

Adrian Stephens, Intel CorporationSlide 78from slide 3/10 of 11-11/1091r0 by Andrew Myles, Cisco

July 2011

Page 79: [PPT]Closing Plenary Reports - IEEE Standards Association ... · Web viewJuly 2011 802.11 July 2011 Closing Plenary Reports Date: 2011-07-22 Authors: Adrian Stephens, Intel Corporation

doc.: IEEE 802.11-11/1075r1

Report

JTC1 ad hoc focused on reporting of recent SC6 meeting

• Progress in San Francisco (July 2011)• Discussed proposed 8802 series withdrawal

– Consensus of .1, .3, .11 participants that “international” is important & 802 should send standards to ISO as long as ISO does not amend our standards

– 802.11 will not send 802.11-2007 as interim update because 802.11-2012 is very close to completion

• Received WAPI report– WAPI still at NP stage & not at WD stage– A CRM will be held with 802 delegation in August, with the output to be

considered by SC6 NBs in Feb 2012– Not clear on process for WAPI project approval

Adrian Stephens, Intel CorporationSlide 79from slide 4/10 of 11-11/1091r0 by Andrew Myles, Cisco

July 2011

Page 80: [PPT]Closing Plenary Reports - IEEE Standards Association ... · Web viewJuly 2011 802.11 July 2011 Closing Plenary Reports Date: 2011-07-22 Authors: Adrian Stephens, Intel Corporation

doc.: IEEE 802.11-11/1075r1

Report

JTC1 ad hoc focused on reporting of recent SC6 meeting

• Progress in San Francisco (July 2011)• Received 802.1X/AE replacement report

– Will ask what additional function provided by TePA?– Will need to review TePA in longer term– Not clear if proposal will proceed in SC6

• Received 802.16 security replacement report– Not clear if proposal will proceed in SC6

• Received 802.11 replacement report (Thursday)– Explained 802.11ac and critiqued N-UHT– Late news: N-UHT proposal will proceed in SC6– Late news: N-UHT is linked to 5GHz spectrum– Decided need to liaise 802.11ac to SC6 ASAP

Adrian Stephens, Intel CorporationSlide 80from slide 5/10 of 11-11/1091r0 by Andrew Myles, Cisco

July 2011

Page 81: [PPT]Closing Plenary Reports - IEEE Standards Association ... · Web viewJuly 2011 802.11 July 2011 Closing Plenary Reports Date: 2011-07-22 Authors: Adrian Stephens, Intel Corporation

doc.: IEEE 802.11-11/1075r1

Report

IEEE 802 members are encouraged to participate in their SC6 NBs

• SC6 P-Members– Korea - KATS– Spain – AENOR– France – AFNOR– USA – ANSI– UK – BSI– Germany – DIN– Greece – ELOT– Russia - GOST R – Luxemburg – ILNAS– Tunisia – INNORPI

– Japan - JISC – Kazakhstan – KAZMEMST– Kenya – KEBS– Belgium - NBN – Netherlands – NEN– China – SAC– Canada – SCC– Finland – SFS– Switzerland – SNV– Czech Republic - UNMZ

Adrian Stephens, Intel Corporation

Slide 81from slide 6/10 of 11-11/1091r0 by Andrew Myles, Cisco

July 2011

Page 82: [PPT]Closing Plenary Reports - IEEE Standards Association ... · Web viewJuly 2011 802.11 July 2011 Closing Plenary Reports Date: 2011-07-22 Authors: Adrian Stephens, Intel Corporation

doc.: IEEE 802.11-11/1075r1

Report

JTC1 ad hoc will review results of WAPI comment resolution in Okinawa

• Plans for Okinawa (Sept 2011)– Bruce Kraemer will be acting Chair– Review results of WAPI comments resolution meetings– Review possible liaison to SC6 regarding 8802 series– ...

Adrian Stephens, Intel CorporationSlide 82from slide 7/10 of 11-11/1091r0 by Andrew Myles, Cisco

July 2011

Page 83: [PPT]Closing Plenary Reports - IEEE Standards Association ... · Web viewJuly 2011 802.11 July 2011 Closing Plenary Reports Date: 2011-07-22 Authors: Adrian Stephens, Intel Corporation

doc.: IEEE 802.11-11/1075r1

Report

Motion to empower HoD for WAPI teleconferences

• Motion– The IEEE 802.11 WG Chair is authorised to appoint a delegation

to the ISO/IEC JTC1/SC6/WG1 teleconference series to resolve comments on the WAPI NP proposal, and to approve any materials used by the delegation and positions proposed by the delegation

• Note: equivalent motion in ad hoc passed 21/0/0• Moved: • Seconded:

Adrian Stephens, Intel CorporationSlide 83from slide 8/10 of 11-11/1091r0 by Andrew Myles, Cisco

July 2011

Page 84: [PPT]Closing Plenary Reports - IEEE Standards Association ... · Web viewJuly 2011 802.11 July 2011 Closing Plenary Reports Date: 2011-07-22 Authors: Adrian Stephens, Intel Corporation

doc.: IEEE 802.11-11/1075r1

Report

Motion to liaise 802.11ac to SC6

• Motion– The IEEE 802.11 WG approves the following text be liaised to

SC6 by the 802.11 WG Chair• The IEEE 802.11 WG has previously committed to liaise Sponsor

Ballot draft standards to  ISO/IEC JTC1/SC6 to allow SC6 National Bodies an early opportunity to review standards that may be submitted to SC6 for ratification under the PSDO agreement.

• However, the IEEE 802.11 WG understands that a Letter Ballot draft of IEEE 802.11ac may be of interest to the National Body members of ISO/IEC JTC1/SC6, particularly as they consider the proposal from the China National Body for a New Project to develop a standard for an alternate PHY and MAC addressing similar market requirements, similar techniques and the same targeted spectrum.

Adrian Stephens, Intel CorporationSlide 84from slide 9/10 of 11-11/1091r0 by Andrew Myles, Cisco

July 2011

Page 85: [PPT]Closing Plenary Reports - IEEE Standards Association ... · Web viewJuly 2011 802.11 July 2011 Closing Plenary Reports Date: 2011-07-22 Authors: Adrian Stephens, Intel Corporation

doc.: IEEE 802.11-11/1075r1

Report

Motion to empower 802.11ac to SC6

•  It is the intent of the IEEE 802.11 WG to liaise a version of the draft of IEEE 802.11ac as soon as the draft passes 802.11 Working Group Letter Ballot. The 802.11ac Task Group is projected to finalize a letter-ballot by year end 2011.

• Note: equivalent motion not considered in ad hoc• Moved: Rolf deVegt• Seconded: Andrew Myles

Adrian Stephens, Intel CorporationSlide 85from slide 10/10 of 11-11/1091r0 by Andrew Myles, Cisco

July 2011

Page 86: [PPT]Closing Plenary Reports - IEEE Standards Association ... · Web viewJuly 2011 802.11 July 2011 Closing Plenary Reports Date: 2011-07-22 Authors: Adrian Stephens, Intel Corporation

doc.: IEEE 802.11-11/1075r1

Report Adrian Stephens, Intel CorporationSlide 86

RR-TAG (IEEE 802.18) Liaison Report

Date: 2011-07-22

Name Affiliations Address Phone email Rich Kennedy Research In

Motion 7305 Napier Trail Austin, TX 78729

+1-972-207-3554 [email protected]

Authors:

from slide 1/9 of 11-11/1065r0 by Rich Kennedy, Research In Motion

July 2011

Page 87: [PPT]Closing Plenary Reports - IEEE Standards Association ... · Web viewJuly 2011 802.11 July 2011 Closing Plenary Reports Date: 2011-07-22 Authors: Adrian Stephens, Intel Corporation

doc.: IEEE 802.11-11/1075r1

Report Adrian Stephens, Intel CorporationSlide 87

AbstractThis presentation is the liaison statement from the Radio

Regulatory Technical Advisory Group (802.18) to the IEEE 802.11 Working Group for the July, 2011 plenary meeting in San Francisco.

from slide 2/9 of 11-11/1065r0 by Rich Kennedy, Research In Motion

July 2011

Page 88: [PPT]Closing Plenary Reports - IEEE Standards Association ... · Web viewJuly 2011 802.11 July 2011 Closing Plenary Reports Date: 2011-07-22 Authors: Adrian Stephens, Intel Corporation

doc.: IEEE 802.11-11/1075r1

Report

RR-TAG Activities

• Introduced ITU-R documents of interest to IEEE 802 wireless groups

• 802.11 liaison presentation on bills before the US House of Representatives on opening the 5 GHz band and on auctioning spectrum for licensed and unlicensed use

• Reviewed two 802.16 documents for ITU-R

Slide 88 Adrian Stephens, Intel Corporationfrom slide 3/9 of 11-11/1065r0 by Rich Kennedy, Research In Motion

July 2011

Page 89: [PPT]Closing Plenary Reports - IEEE Standards Association ... · Web viewJuly 2011 802.11 July 2011 Closing Plenary Reports Date: 2011-07-22 Authors: Adrian Stephens, Intel Corporation

doc.: IEEE 802.11-11/1075r1

Report

ITU-R Documents

• WORKING DOCUMENT TOWARDS A PRELIMINARY DRAFT NEW REPORT ITU-R SM.[SMART_GRID], WP 1A, 18-11/49r1– Informational document on smart grid power management systems

• DRAFT NEW QUESTION ITU-R [PWRGRD]/1, WP 1A, 18-11/51r0– Impact on radiocommunication systems from wireless and wired

data transmission technologies used for the support of power grid management system

Adrian Stephens, Intel CorporationSlide 89from slide 4/9 of 11-11/1065r0 by Rich Kennedy, Research In Motion

July 2011

Page 90: [PPT]Closing Plenary Reports - IEEE Standards Association ... · Web viewJuly 2011 802.11 July 2011 Closing Plenary Reports Date: 2011-07-22 Authors: Adrian Stephens, Intel Corporation

doc.: IEEE 802.11-11/1075r1

Report

ITU-R Documents [2]

• PRELIMINARY DRAFT NEW RESOLUTION ITU-R[CRS], WP 1B, 18-11/52r0– Studies on the implementation and use of cognitive radio systems

(CRS)• CORRESPONDENCE GROUP ON NARROW-BAND WIRELESS

HOME NETWORKING, WP 1B, 18-11/53r0– Establishment of a correspondence group on narrow-band wireless home

networking, including terms of reference• MULTIPLE GIGABIT WIRELESS SYSTEMS IN FREQUENCIES

AROUND 60 GHz, WP 5A, 18-11/54r0– Liaison statement to external organizations on “Multi-gigabit Wireless

Systems Operating in Frequencies Around 60 GHz”

Adrian Stephens, Intel CorporationSlide 90from slide 5/9 of 11-11/1065r0 by Rich Kennedy, Research In Motion

July 2011

Page 91: [PPT]Closing Plenary Reports - IEEE Standards Association ... · Web viewJuly 2011 802.11 July 2011 Closing Plenary Reports Date: 2011-07-22 Authors: Adrian Stephens, Intel Corporation

doc.: IEEE 802.11-11/1075r1

Report

ITU-R Documents [3]

• PRELIMINARY DRAFT NEW REPORT ITU-R M.[LMS.WASN STUDY], WP 5A, 18-11/55r0

– System design guidelines for wide area sensor and/or actuator network (WASN) systems

• QUALITY OF SERVICE REQUIREMENTS AND OBJECTIVES FOR WIRELESS ACCESS SYSTEMS, WP 5A, 18-11/56r0

– Liaison statement to ITU-R Working party 5D, ITU-T Study groups 12, 15 and 16, and External organizations on “Quality of Service Requirements and Objectives for Wireless Access Systems”

• PRELIMINARY DRAFT NEW RECOMMENDATION ITU-R M.[LMS.WASN], WP 5A, 18-11/57r0

– Objectives, characteristics and functional requirements of wide-area sensor and/or actuator network (WASN) systems

Adrian Stephens, Intel CorporationSlide 91from slide 6/9 of 11-11/1065r0 by Rich Kennedy, Research In Motion

July 2011

Page 92: [PPT]Closing Plenary Reports - IEEE Standards Association ... · Web viewJuly 2011 802.11 July 2011 Closing Plenary Reports Date: 2011-07-22 Authors: Adrian Stephens, Intel Corporation

doc.: IEEE 802.11-11/1075r1

Report

References

• https://mentor.ieee.org/802.18/dcn/11/18-11-0060-00-0000-spectrum-for-innovation-act.pdf

• https://mentor.ieee.org/802.18/dcn/11/18-11-0061-00-0000-spectrum-innovation-act.pdf

• https://mentor.ieee.org/802.18/dcn/11/18-11-0062-00-0000-unlicensed-spectrum-memo.pdf

• https://mentor.ieee.org/802.18/dcn/11/18-11-0058-00-0000-summary-of-itu-r-documents.pptx

• https://mentor.ieee.org/802.18/dcn/11/18-11-0049-01-0000-working-document-towards-a-preliminary-draft-new-report-itu-r-sm-smart-grid.docx

Adrian Stephens, Intel CorporationSlide 92from slide 7/9 of 11-11/1065r0 by Rich Kennedy, Research In Motion

July 2011

Page 93: [PPT]Closing Plenary Reports - IEEE Standards Association ... · Web viewJuly 2011 802.11 July 2011 Closing Plenary Reports Date: 2011-07-22 Authors: Adrian Stephens, Intel Corporation

doc.: IEEE 802.11-11/1075r1

Report

References [2]

• https://mentor.ieee.org/802.18/dcn/11/18-11-0050-00-0000-further-collaboration-in-the-development-of-a-preliminary-draft-new-report.docx

• https://mentor.ieee.org/802.18/dcn/11/18-11-0051-00-IMTA-draft-new-question-itu-r-pwrgrd-1.pdf

• https://mentor.ieee.org/802.18/dcn/11/18-11-0052-00-0000-preliminary-draft-new-resolution-itu-r-crs.docx

• https://mentor.ieee.org/802.18/dcn/11/18-11-0053-00-0000-correspondence-group-on-narrow-band-wireless-home-networking.docx

Adrian Stephens, Intel CorporationSlide 93from slide 8/9 of 11-11/1065r0 by Rich Kennedy, Research In Motion

July 2011

Page 94: [PPT]Closing Plenary Reports - IEEE Standards Association ... · Web viewJuly 2011 802.11 July 2011 Closing Plenary Reports Date: 2011-07-22 Authors: Adrian Stephens, Intel Corporation

doc.: IEEE 802.11-11/1075r1

Report

References [3]

• https://mentor.ieee.org/802.18/dcn/11/18-11-0054-00-0000-multiple-gigabit-wireless-systems-in-frequencies-around-60-ghz.docx

• https://mentor.ieee.org/802.18/dcn/11/18-11-0055-00-0000-preliminary-draft-new-report-itu-r-m-lms-wasn-study.docx

• https://mentor.ieee.org/802.18/dcn/11/18-11-0056-00-0000-quality-of-service-requirements-and-objectives-for-wireless-access-systems.docx

• https://mentor.ieee.org/802.18/dcn/11/18-11-0057-00-0000-preliminary-draft-new-recommendation-itu-r-m-lms-wasn.docx

Adrian Stephens, Intel CorporationSlide 94from slide 9/9 of 11-11/1065r0 by Rich Kennedy, Research In Motion

July 2011

Page 95: [PPT]Closing Plenary Reports - IEEE Standards Association ... · Web viewJuly 2011 802.11 July 2011 Closing Plenary Reports Date: 2011-07-22 Authors: Adrian Stephens, Intel Corporation

doc.: IEEE 802.11-11/1075r1

Report

July 2011

Bruce Kraemer, MarvellSlide 95

Smart Grid ad hoc – July 2011

Date: 21 July 2011

Discussions during July Plenary meeting in San Francisco

Name Company Address Phone emailBruce Kraemer Marvell 5488 Marvell Lane,

Santa Clara, CA, 95054+1-321-751-3988 [email protected]

Tuesday Abstract: 1 – SGIP 2 - NIST PAP23- ITU Liaison

Thursday Abstract: 1- FERC2 - NIST PAP23- ITU Liaisons :WG18 docs 49,51,57

Page 96: [PPT]Closing Plenary Reports - IEEE Standards Association ... · Web viewJuly 2011 802.11 July 2011 Closing Plenary Reports Date: 2011-07-22 Authors: Adrian Stephens, Intel Corporation

doc.: IEEE 802.11-11/1075r1

Report

MEETING TOPICSJuly 2011

Bruce Kraemer, MarvellSlide 96

Meeting document 11-11-975

1 – SGIP activities2 - NIST PAP2 project status and plans to complete3- ITU Liaison regarding Smart Grid

WG 18 documents: 49, 51, 574- FERC Order dropping consideration of first 5 SGIP standardsFERC concluded that there is insufficient consensus to adopt the proposed standards at this time, pointing to “nearly unanimous” comments from the industry regarding cyber security concerns and the potential unintended consequences from adopting such standards too soon

Page 97: [PPT]Closing Plenary Reports - IEEE Standards Association ... · Web viewJuly 2011 802.11 July 2011 Closing Plenary Reports Date: 2011-07-22 Authors: Adrian Stephens, Intel Corporation

doc.: IEEE 802.11-11/1075r1

Report

PAP02- Phase 2-SDO Proposal –r1Intro•Thanks to Ron Cunningham for his diligent preparation of requirements for completion of Phase 2.•We propose that it is time for the wireless SDO’s to take a more active role in constructing the analyticProposal/Request•We request authorization from PAP2 members to form an “SDO subcommittee” committed to completing delivery of an operational analysis framework , and related descriptive text, in time for presentation to the Dec 05, 2011 SGIP board meeting.Goals•Example of deliverables include: Definition of propagation model, ability to calculate quantity of wireless equipment required to cover a given demographic/topographic area and description of statistical confidence in reported numbersUtility/GRID Input Requirements•Information regarding actor quantities by type, relative locations, topography, data traffic loadsSynchronization•“SDO subcommittee” will report progress to during currently scheduled biweekly PAP2 callsLogistics •“SDO subcommittee” will convene a series of teleconferences scheduled to optimize SDO participation but open to all PAP2. SDO subcommittee will self organize , assign/delegate work. develop a milestone based project schedule. Webinar facilities will be available.Membership•“SDO subcommittee” is a volunteer group initially underwritten by ATIS, IEEE, TIA, and WiMAX. Additional wireless SDO participants will be recruited