ppt on mini water supply scheme
TRANSCRIPT
![Page 1: PPT on Mini Water Supply Scheme](https://reader035.vdocuments.us/reader035/viewer/2022062320/55d2bb37bb61eb552b8b45e3/html5/thumbnails/1.jpg)
1
Public Health Engineering Department, Govt of Bihar
Brief Overviewof
The Project
Construction of Mini Piped Water Supply Schemes with provision of suitable Treatment
Technology and solar pumps in Fluoride affected
habitations in Bihar
Arvind Kumar ( DFID- SWASTH)
![Page 2: PPT on Mini Water Supply Scheme](https://reader035.vdocuments.us/reader035/viewer/2022062320/55d2bb37bb61eb552b8b45e3/html5/thumbnails/2.jpg)
Ground water is perhaps the most accepted source particularly in areas where safe and dependable surface water sources are not available within easy reach or not available at all.
Ground water is generally considered as a safe source but in recent times research and investigations have shown that quality of ground water has deteriorated at many locations thus making it unfit for use for human consumption. In Bihar excessive levels of arsenic and fluoride in ground water have been noticed in many areas.
Public Health Engineering Department, being conscious of this serious problem has decided to install small water purification plants for treating ground water drawn through tube wells and supplying the treated safe water local through stand posts to the consumers.
2
Objective of Scheme
![Page 3: PPT on Mini Water Supply Scheme](https://reader035.vdocuments.us/reader035/viewer/2022062320/55d2bb37bb61eb552b8b45e3/html5/thumbnails/3.jpg)
SALIENT FEATURES OF THE SCHEME
• Capacity of Plant. - 40000 liters /day
• Borewell Discharge 5100/6000 liters/Hr• Benefitted Population – 1000• Per Capita per day Supply of Water- 40 liters• Operation Time of Plant /day - 8 Hours• Capacity of Overhead tank - 5000 liters • Genset for Non Sun days Operation.• Use of rustproof vessels & pipes. • Three Months Trial Run , & thereafter Six Months of O& M
3
![Page 4: PPT on Mini Water Supply Scheme](https://reader035.vdocuments.us/reader035/viewer/2022062320/55d2bb37bb61eb552b8b45e3/html5/thumbnails/4.jpg)
SEQUENCE OF THE PROJECT CONSTRUCTION
Marking of land
Bore well Construction
Testing of Raw water
Commencement of Civil Work
Completion of Civil Work
Solar Panel Installation
Pipe line & Stand Post Plant Installation
Commencement of Trial Run
Site Selection
![Page 5: PPT on Mini Water Supply Scheme](https://reader035.vdocuments.us/reader035/viewer/2022062320/55d2bb37bb61eb552b8b45e3/html5/thumbnails/5.jpg)
5
MAJOR COMPONENTS OF THE PROJECT
SITE DEVELOPMENT & BOUNADRY WALL
WATER (BOREWELL)
TREATMENT PLANT BUILDING
ENERGY (SOLAR SYSTEM)
TREATMENT UNIT
DISTRIBUTION SYSTEM
STAND POSTS
![Page 6: PPT on Mini Water Supply Scheme](https://reader035.vdocuments.us/reader035/viewer/2022062320/55d2bb37bb61eb552b8b45e3/html5/thumbnails/6.jpg)
SITE DEVELOPMENT & BOUNDARY WALL
• Plant Building
• Boundary Wall
• Storage System
• Gate
• Approach Road
• Landscaping
6
![Page 7: PPT on Mini Water Supply Scheme](https://reader035.vdocuments.us/reader035/viewer/2022062320/55d2bb37bb61eb552b8b45e3/html5/thumbnails/7.jpg)
7
TubewellSchematic Drawing
![Page 8: PPT on Mini Water Supply Scheme](https://reader035.vdocuments.us/reader035/viewer/2022062320/55d2bb37bb61eb552b8b45e3/html5/thumbnails/8.jpg)
BUILDING
One R.C.C/ Brick Masonary housing Treatment Plant and auxiliary units. The building has one room Treatment Plant, one room for Operator , one store and one Toilet with necessary facilities
8
![Page 9: PPT on Mini Water Supply Scheme](https://reader035.vdocuments.us/reader035/viewer/2022062320/55d2bb37bb61eb552b8b45e3/html5/thumbnails/9.jpg)
Solar System
9
Submersible PumpSecurity features:
• Protection against dry running• Protection from Over/Under
Voltage• Protection from Overload• Protection from Over Temperature
Solar PV module array is of high efficiency Solar Modules utilizing Crystalline Silicon Solar PV cells. The modules are warranted for power output conforming to IEC-61215, ISPRA Italy, IECQ (PV-GAP), MNES & BIS standards.
![Page 10: PPT on Mini Water Supply Scheme](https://reader035.vdocuments.us/reader035/viewer/2022062320/55d2bb37bb61eb552b8b45e3/html5/thumbnails/10.jpg)
10
WATER TREATMENT PLANT
SOLAR OPERATED PUMP
OXIDATION CHAMBER
IRON REMOVAL FILTER
ALUM DOSER
FLUORIDE/ ARSENIC REMOVAL UNIT
CONTROL PANEL
![Page 11: PPT on Mini Water Supply Scheme](https://reader035.vdocuments.us/reader035/viewer/2022062320/55d2bb37bb61eb552b8b45e3/html5/thumbnails/11.jpg)
SEQUENCE OF TREATMENT PROCESS
PUMPED BY SOLAR PUMP
OXIDATION CHAMBER
IRON REMOVAL FILTER
ALUM DOZER
FLUORIDE REMOVAL FILTER
OVER HEAD TANK
POTABLE WATER AT STANDPOSTFOR VILLAGERS
DISTRIBUTION SYSTEM
Raw water
![Page 12: PPT on Mini Water Supply Scheme](https://reader035.vdocuments.us/reader035/viewer/2022062320/55d2bb37bb61eb552b8b45e3/html5/thumbnails/12.jpg)
12
The Treatment System
FLUORIDEREMOVAL FILTER
IRON REMOVAL FILTER
OXIDATION CHAMBER
ALUMDOSINGUNIT
Treatment Plant : A Overview
![Page 13: PPT on Mini Water Supply Scheme](https://reader035.vdocuments.us/reader035/viewer/2022062320/55d2bb37bb61eb552b8b45e3/html5/thumbnails/13.jpg)
Components of Treatment Plant…….
• One cylindrical MS/ FRP Vessel (400 mm dia X 1200 mm) filled with media
• For oxidizing & removal of Iron from raw water.
• The high oxidizing capacity catalytic media is Manganese Dioxide Granules – 12 mm to 25 mm (Natural Mineral) for oxidizing iron in raw water for its quick precipitation in IRF.
• The system provides for auto backwash of the filter bed.
• No regular maintenance required only media needs to be replaced once in a year
13
Contd…
Oxidation Chamber :
![Page 14: PPT on Mini Water Supply Scheme](https://reader035.vdocuments.us/reader035/viewer/2022062320/55d2bb37bb61eb552b8b45e3/html5/thumbnails/14.jpg)
14
Iron Removal Filter (IRF)
Components of Treatment Plant.
Contd…
Process Flow Diagram:
One cylindrical FRP Vessel (Size – 36” x 72”) with Top & Bottom distribution Kit, Air valve & 1.5" Side Mounted Multiport Valve (MPV-F).(Opening Pressure - 4–10 Bar)The vessel is filled with gravel, course sand and green sand (natural mineral) for further oxidation of residual iron and also filtration of water to make it free from precipitated and deposited iron on filter bed. The media needs to be replaced once in a year
![Page 15: PPT on Mini Water Supply Scheme](https://reader035.vdocuments.us/reader035/viewer/2022062320/55d2bb37bb61eb552b8b45e3/html5/thumbnails/15.jpg)
• The Iron Removal Filter (IRF) and the Fluoride Removal Filter (FRF) are equipped with a Multiport Filter Valve (MPV-Filter type) and a Multiport Softener Valve (MPV-Softener type) respectively.
15
Components of Treatment Plant…….
• The Multiport Valve (MPV) controls the flow of water through the granular media of a filter. The handle on top of the MPV can be set at any of the slotted positions to select the necessary function of the valve.
Contd…
Multiport Valve :
![Page 16: PPT on Mini Water Supply Scheme](https://reader035.vdocuments.us/reader035/viewer/2022062320/55d2bb37bb61eb552b8b45e3/html5/thumbnails/16.jpg)
16
Components of Treatment Plant…….
Contd…
Alum Dosing System
This purpose of this unit is for pH correction for adjustment of pH of water to the range of 5.5 to 6.5 to suit filtering media in FRF/ARF
The system comprises of 8 gallons capacity MS Cast vessel with 50 mm Ventury fitted with PVC flexible pipes and brass taps
It operates automatically and hydraulically for direct dosing of saturated alum solution
No regular maintenance required other than replenishing of chemical once it gets consumed.
![Page 17: PPT on Mini Water Supply Scheme](https://reader035.vdocuments.us/reader035/viewer/2022062320/55d2bb37bb61eb552b8b45e3/html5/thumbnails/17.jpg)
17
Components of Treatment Plant…….
Contd…
Fluoride Removal Filter/ Media
• . One cylindrical FRP Vessel (Size – 36” x 72”) with Top & Bottom distribution Kit, air valve & 1.5" Side Mounted Multiport Valve (Opening Pressure : 4–10 Bar).
• The vessel is filled with gravel, course sand and Activated Alumina Grade AAFS50. (Certified by M/S Alcan U.S.A)
• It works on adsorption principle• The greater adsorptive capacity of
Activated Alumina AAFS50 makes it economical for one-time use and disposal.
• Spent material has met the Toxicity characteristic leaching procedure U.S.A (TCLP) and California Waste Extraction Test ( WET)Test
• Media Life 15/ 18 Months( expected ) depending on the concentration of Fluoride in raw water
• Backwash of Media Once a Month
![Page 18: PPT on Mini Water Supply Scheme](https://reader035.vdocuments.us/reader035/viewer/2022062320/55d2bb37bb61eb552b8b45e3/html5/thumbnails/18.jpg)
18
Components of Treatment Plant…….
Contd…
Internal Piping of the Treatment Plant :uPVC Pipes and Fittings have been used as:
uPVC pipes being lead free so are non-toxic and hence favoured for use in applications such as potable water pipes. Selected and used
Do not corrode and are totally unaffected by Acids, Alkalies and electrolytic corrosion from any source
Have extremely smooth bore due to which frictional losses are at minimum and flow rates are at the highest possible from any other pipe materials
Low friction loss & UV Resistant
Due to smoothness of inner surface of the pipe, it prevents Algai, Bacteria and Fungi Formation inside the pipe
Solvent joint plumbing system makes its pressure bearing capacity twice than that of the threaded pipe
The established aging factor of the commonly used pipe are not applicable on uPVC Pipe thus providing a very long life.
![Page 19: PPT on Mini Water Supply Scheme](https://reader035.vdocuments.us/reader035/viewer/2022062320/55d2bb37bb61eb552b8b45e3/html5/thumbnails/19.jpg)
19
Distribution Network System…….
Contd…
Distribution Network comprises of GI pipes of diameters ranging between 65mm to 20mm, covering an approximate total length of 1000 metres conforming to relevant standard and specification in trenches.
![Page 20: PPT on Mini Water Supply Scheme](https://reader035.vdocuments.us/reader035/viewer/2022062320/55d2bb37bb61eb552b8b45e3/html5/thumbnails/20.jpg)
20
Distribution Network System…….
Contd…
The system also includes 8 nos. of Stand Posts located at strategic points of the villages. The water being supplied from the overhead tank constructed on the roof of the treatment plant building.
![Page 21: PPT on Mini Water Supply Scheme](https://reader035.vdocuments.us/reader035/viewer/2022062320/55d2bb37bb61eb552b8b45e3/html5/thumbnails/21.jpg)
INNOVATIONS
Unique & compact building design to meet the specific purposes of rural water supply scheme
Use of latest technology for vessels and internal plumbing to reduce maintenance yet provide reliability and strength
Solar panels requires minimum maintenance .
21
![Page 22: PPT on Mini Water Supply Scheme](https://reader035.vdocuments.us/reader035/viewer/2022062320/55d2bb37bb61eb552b8b45e3/html5/thumbnails/22.jpg)
• Village-Kolakhurd ,Block-Jagdishpur
04/18/23
Village-Jogibeer,Block-Jagdishpur
22
![Page 23: PPT on Mini Water Supply Scheme](https://reader035.vdocuments.us/reader035/viewer/2022062320/55d2bb37bb61eb552b8b45e3/html5/thumbnails/23.jpg)
• Village –Rannuchak-1,Block-Nathnagar
Village-Rannuchak-2,Block-Nathnagar
23
![Page 24: PPT on Mini Water Supply Scheme](https://reader035.vdocuments.us/reader035/viewer/2022062320/55d2bb37bb61eb552b8b45e3/html5/thumbnails/24.jpg)
• Village-Makandpur-1,Block-Sultanganj
04/18/23
Village-Makandpur-2,Block-Nathnagar
24