Punjab Power Development Board Energy Department Government of the Punjab INVITATION OF EXPRESSION OF INTEREST (EOI) FOR DEVELOPMENT OF HYDROPOWER PROJECTS Government of the Punjab (the “GoPb”) is pursuing the development of small hydropower projects through Private sector investment in IPP mode under Punjab Power Generation Policy2006 (Revised–2009) (the “Policy”). Pursuant to Policy, Punjab Power Development Board (PPDB) invites EOIs from firms / consortium for development of following Raw Sites Hydropower Projects (the “HPPs”): Sr. # Project Name Capacity (MW) Rated Head (m) Plant Factor (%age) Rated Discharge (m 3 /s) 1 Rasul HPP Rasul Barrage, District Mandi Baha-Ud-Din 20.00 6.00 50.80 360 2 Trimmu Barrage, District Jhang 19.20 5.10 55.00 7536 3 Marala-Ravi (MR) Link Canal HPP RD. 249+850 and RD. 265+400, District Narowal 16.50 5.17 37.50 375 4 Punjnad HPP on Punjnad Barrage District Muzaffargarh 15.00 3.80 44.00 500 5 B.S. Link-I Canal HPP RD. 106+250, District Kasur 11.00 3.80 81.98 127 6 Qadirabad Balloki Link Canal (QBLC) HPP RD. 304 + 984 7.68 2.04 78.17 450 7 Lower Chenab Canal (LCC) HPP RD. 0 + 000 District Gujranwala 7.55 3.57 65.94 240 8 Lower Jhelum Feeder Canal HPP RD. 8+626, District Mandi Baha-Ud-Din 5.20 6.00 69.00 100 9 B.S. Link II Canal RD. 193 + 339, District Okara 5.00 4.10 68.00 254.88 10 Sahiwal HPP On LBDC at RD. 329+058 to RD. 340+850 District Sahiwal 4.80 3.35 68.97 164.67 11 L.B.D.C. HPP On LBDC at RD. 489 + 000, District Sahiwal 3.30 4.10 65.40 96 EXPRESSION OF INTEREST

Upload: ali-nawaz-khan

Post on 28-Jan-2016

2 views

Category:

Documents


0 download

DESCRIPTION

Punjab Power Development Board Ad

TRANSCRIPT

Page 1: PPDB Ad

Punjab Power Development Board

Energy Department

Government of the Punjab

INVITATION OF EXPRESSION OF INTEREST (EOI) FOR

DEVELOPMENT OF HYDROPOWER PROJECTS

Government of the Punjab (the “GoPb”) is pursuing the development of small hydropower

projects through Private sector investment in IPP mode under Punjab Power Generation

Policy–2006 (Revised–2009) (the “Policy”). Pursuant to Policy, Punjab Power Development

Board (PPDB) invites EOIs from firms / consortium for development of following Raw Sites

Hydropower Projects (the “HPPs”):

Sr. # Project Name Capacity

(MW)

Rated

Head

(m)

Plant

Factor

(%age)

Rated

Discharge

(m3/s)

1 Rasul HPP

Rasul Barrage, District Mandi Baha-Ud-Din 20.00 6.00 50.80 360

2 Trimmu Barrage, District Jhang 19.20 5.10 55.00 7536

3

Marala-Ravi (MR) Link Canal HPP

RD. 249+850 and RD. 265+400, District

Narowal

16.50 5.17 37.50 375

4 Punjnad HPP on Punjnad Barrage

District Muzaffargarh 15.00 3.80 44.00 500

5 B.S. Link-I Canal HPP

RD. 106+250, District Kasur 11.00 3.80 81.98 127

6 Qadirabad Balloki Link Canal (QBLC) HPP

RD. 304 + 984 7.68 2.04 78.17 450

7

Lower Chenab Canal (LCC) HPP RD. 0 +

000

District Gujranwala

7.55 3.57 65.94 240

8 Lower Jhelum Feeder Canal HPP

RD. 8+626, District Mandi Baha-Ud-Din 5.20 6.00 69.00 100

9 B.S. Link – II Canal

RD. 193 + 339, District Okara 5.00 4.10 68.00 254.88

10

Sahiwal HPP

On LBDC at RD. 329+058 to RD. 340+850

District Sahiwal

4.80 3.35 68.97 164.67

11 L.B.D.C. HPP

On LBDC at RD. 489 + 000, District Sahiwal 3.30 4.10 65.40 96

EXPRESSION OF INTEREST

Page 2: PPDB Ad

Notes:

1. Interested parties are requested to submit their Statement of Qualification (SOQ) on the

Performa to be purchased from the office of undersigned.

2. Interested company / consortium will get themselves registered with the Punjab Power

Development Board on payment of US $100/- or equivalent Pak Rupees as Registration

Fee. Already registered companies are eligible.

3. The Registered Sponsors may purchase Pre-Qualification Document (PQD) for the site of

choice, one each for selected site, on payment of US $1000/- or equivalent Pak Rupees

from the office of undersigned, to be submitted duly filled in to PPDB prior to dead line.

4. Each PQD will be evaluated and the Sponsor obtaining highest Qualifying Score will be

issued LOI to conduct feasibility study for development of the project in accordance with

the provision of the “Punjab Power Generation Policy 2006 Revised 2009”. Decision of

Punjab Power Development Board regarding award of Sites will be final.

5. A feasibility study completion period of four (4) months will be allowed for sites at Sr.

No. 1,3,4,5,6,7,8,10 and 11. The available information and earlier work done on these

sites will be shared with the Sponsor, free of cost, with award of LOI.

6. A feasibility study completion period of nine (9) months as per Policy will be allowed for

sites at Sr. No. 2 and 9

Deadline for SOQ submission is 17th

June 2015

Managing Director

Punjab Power Development Board (PPDB)

Government of the Punjab

Energy Department

1st Floor, Irrigation Secretariat, Old Anarkali, Lahore

Tel: +92-42 99213879, 99213-885-6

Fax: +92-42 99212796

Email: [email protected]

Website: www.energy.punjab.gov.pk