39
New Innovative Anchor Solution for Deepwater Mooring Gravity Intalled Anchors Reduce Time and Costs of Marine Operations Jon Tore Lieng CTO Wokshop on Deepwater Subsea Tie-Back Damai Puri Resort & Spa, Kuching, Sarawak, Malaysia 24th-26th January 2011

Upload: others

Post on 19-Sep-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: PowerPoint Presentation...Title PowerPoint Presentation Author Jon Tore Lieng Created Date 1/26/2011 7:12:05 AM

New Innovative Anchor Solution for

Deepwater Mooring – Gravity Intalled

Anchors Reduce Time and Costs of

Marine Operations

Jon Tore Lieng – CTO Wokshop on Deepwater Subsea Tie-Back

Damai Puri Resort & Spa, Kuching, Sarawak, Malaysia

24th-26th January 2011

Page 2: PowerPoint Presentation...Title PowerPoint Presentation Author Jon Tore Lieng Created Date 1/26/2011 7:12:05 AM

• Technology developer and provider of

innovative anchor solutions for floating

structures

• Expertise in marine soil mechanics

• Located in Trondheim, Norway

Page 3: PowerPoint Presentation...Title PowerPoint Presentation Author Jon Tore Lieng Created Date 1/26/2011 7:12:05 AM

Available Anchor Types

Page 4: PowerPoint Presentation...Title PowerPoint Presentation Author Jon Tore Lieng Created Date 1/26/2011 7:12:05 AM

DENNLA – Bruce

Anchors

STEVMANTA – Vryhof

Anchor Types drag embedment -

VLA

Page 5: PowerPoint Presentation...Title PowerPoint Presentation Author Jon Tore Lieng Created Date 1/26/2011 7:12:05 AM

Suction

anchor

Anchor Types cont.

17

16

15

14

13

12

11

10

9

8

7

6

5

4

3

2

1

SEPLA

Suction

Embedded

Plate

Anchor

Pump

skid

D = 5-6.5m

L = 20-30m

Wdry = 120 – 250tons

20-30m

Soft

sediments

24

22

20

18

16

14

12

10

8

6

4

2

Page 6: PowerPoint Presentation...Title PowerPoint Presentation Author Jon Tore Lieng Created Date 1/26/2011 7:12:05 AM

Seabed Installation of Suction Anchors

1

2 • Positioning

• Monitoring of

- verticality

- heading

- clearance

Pump

skid

Monitoring of

- verticality

- diff. pressure

- penetration

Evacuation of

entrapped water

Recovery of

pump skid

lifting wire

Total time at seabed:

3–9 hours depending on

anchor dimensions and

sediments.

3

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

Page 7: PowerPoint Presentation...Title PowerPoint Presentation Author Jon Tore Lieng Created Date 1/26/2011 7:12:05 AM

Hydraulic

Pile hammer

D = 2-3m

L = 40-60m

Wdry= 100-200tons

Long Piles

Soft

sediments

56

52

48

44

40

36

32

28

24

20

16

12

8

4

Page 8: PowerPoint Presentation...Title PowerPoint Presentation Author Jon Tore Lieng Created Date 1/26/2011 7:12:05 AM

Criteria for Needed Deep Water Anchor as defined by Deep-water Technology program – Norwegian Research Council 1995

Anchor installation must be simple and cost effective

The anchor must not be complicated or too expensive to

fabricate

Allow for taut leg mooring

Page 9: PowerPoint Presentation...Title PowerPoint Presentation Author Jon Tore Lieng Created Date 1/26/2011 7:12:05 AM

Deep Penetrating Anchor – DPA™

Theoretical design

Page 10: PowerPoint Presentation...Title PowerPoint Presentation Author Jon Tore Lieng Created Date 1/26/2011 7:12:05 AM

Deep Penetrating Anchor – DPA™

12-18m

Typical inclined

capacities:

650 to 1450 tons

Dry weight:

60 – 150tons

Theoretical design

Page 11: PowerPoint Presentation...Title PowerPoint Presentation Author Jon Tore Lieng Created Date 1/26/2011 7:12:05 AM

A Real Torpedo

Page 12: PowerPoint Presentation...Title PowerPoint Presentation Author Jon Tore Lieng Created Date 1/26/2011 7:12:05 AM

Optimum fluid dynamic design

to achieve high velocity and deep penetration.

Huge kinetic energy

derived through free-fall - no external energy source required.

Soil remolding during penetration

large friction resistance after consolidation

Principles of Anchor Concept:

Page 13: PowerPoint Presentation...Title PowerPoint Presentation Author Jon Tore Lieng Created Date 1/26/2011 7:12:05 AM

Installation

may be installed

with one vessel

Page 14: PowerPoint Presentation...Title PowerPoint Presentation Author Jon Tore Lieng Created Date 1/26/2011 7:12:05 AM

• Deep Penetrating Anchors for floating structures: – FPSOs/FPSs

– SPARs

– Riser Buoys

– MODUs

– Offshore Energy Power Units

• Geographical areas of use: – All areas where soft sea bed conditions are found

– No depth limitations

Page 15: PowerPoint Presentation...Title PowerPoint Presentation Author Jon Tore Lieng Created Date 1/26/2011 7:12:05 AM

Keynote paper OTC (2004):

”Torpedo/DPA anchors appear to be the most

promising option for improvement in cost

reduction and simplifying installation.”

Technology Assessment of Deepwater Anchors Clarence J. Ehlers, et al.

Sr. Facilities Engineer ChevronTexaco/Exploration & Production Technology Co.

DPS/Floating Systems Unit/Anchors, Moorings & Risers Team

Page 16: PowerPoint Presentation...Title PowerPoint Presentation Author Jon Tore Lieng Created Date 1/26/2011 7:12:05 AM

Suitable Geographical Areas

Page 17: PowerPoint Presentation...Title PowerPoint Presentation Author Jon Tore Lieng Created Date 1/26/2011 7:12:05 AM

Technological Development

• Extensive theoretical research – CFD & geotechnical

• Economical evaluation – cost comparison with other solutions

• Small (1:25) lab and large (1:3) scale testing - Troll Field

• Full-scale pilot at the Gjøa Field leading to a qualified anchor in Q4 2009

Page 18: PowerPoint Presentation...Title PowerPoint Presentation Author Jon Tore Lieng Created Date 1/26/2011 7:12:05 AM

Anchor velocity vs travelled distance

Anchor Velocity vs Drop Height - 75ton DPA

0

5

10

15

20

25

30

35

40

45

50

0 25 50 75 100 125 150 175 200 225 250

Drop height, (m):

An

ch

or

velo

cit

y, (m

/sec):

No drag resistance Viscos drag on anchor & chain

Assumed velocity 25m/sec at seabed

(70% of terminal velocity)

Drop height: minimum 50m

Terminal velocity: 37m/sec

Page 19: PowerPoint Presentation...Title PowerPoint Presentation Author Jon Tore Lieng Created Date 1/26/2011 7:12:05 AM

Hydrodynamic Stability - monitored test

0

5

10

15

20

25

30

35

0.0 2.0 4.0

Dro

p d

ista

nc

e, (m

):

Anchor Tilt, (dgr):

sensor disturba

Final tilt ~ 1 dgr.

Page 20: PowerPoint Presentation...Title PowerPoint Presentation Author Jon Tore Lieng Created Date 1/26/2011 7:12:05 AM

GJØA Full Scale Pilot

& Qualification

Page 21: PowerPoint Presentation...Title PowerPoint Presentation Author Jon Tore Lieng Created Date 1/26/2011 7:12:05 AM

Installation of two

80t DPA™s at the

Gjøa Field in the

North Sea

Page 22: PowerPoint Presentation...Title PowerPoint Presentation Author Jon Tore Lieng Created Date 1/26/2011 7:12:05 AM

Fabrication

Page 23: PowerPoint Presentation...Title PowerPoint Presentation Author Jon Tore Lieng Created Date 1/26/2011 7:12:05 AM

Fabrication - Nose

Page 24: PowerPoint Presentation...Title PowerPoint Presentation Author Jon Tore Lieng Created Date 1/26/2011 7:12:05 AM

DPA™s Ready for Transport to the

North Sea

Page 25: PowerPoint Presentation...Title PowerPoint Presentation Author Jon Tore Lieng Created Date 1/26/2011 7:12:05 AM

Flukes 4m x 6m

steel plates

1.2m diam.

shank

Massive tip

13m

80t DPA™ as

installed at the

Gjøa Field

Characteristic

capacity

~ 800t

Page 26: PowerPoint Presentation...Title PowerPoint Presentation Author Jon Tore Lieng Created Date 1/26/2011 7:12:05 AM

Gjøa Semi

NW

NE

SW

SE

Satellite F

Template E

Template D

Template C

Template B

All Templates

at 1850

orientation

NB! Not to scale.

Riser area

location

Gjøa field layout

N

Anchor

clusters

Typical Mooring Scheme

Page 27: PowerPoint Presentation...Title PowerPoint Presentation Author Jon Tore Lieng Created Date 1/26/2011 7:12:05 AM

DPA Locations at Gjøa

Template E

Template

BCD

DPA 1

DPA 2

DPAs to be used for

both Template sites

DPAs

1.5kM

apart

Stiffer

soil

Softer

soil

Page 28: PowerPoint Presentation...Title PowerPoint Presentation Author Jon Tore Lieng Created Date 1/26/2011 7:12:05 AM

±5o

Limited loading direction Omni-directional loading

Loading Direction

Page 29: PowerPoint Presentation...Title PowerPoint Presentation Author Jon Tore Lieng Created Date 1/26/2011 7:12:05 AM

Installation Vessel –

Island Vanguard

Page 30: PowerPoint Presentation...Title PowerPoint Presentation Author Jon Tore Lieng Created Date 1/26/2011 7:12:05 AM

Two DPA™s on Deck

Page 31: PowerPoint Presentation...Title PowerPoint Presentation Author Jon Tore Lieng Created Date 1/26/2011 7:12:05 AM

DPAs on Deck of Island Vanguard

Page 32: PowerPoint Presentation...Title PowerPoint Presentation Author Jon Tore Lieng Created Date 1/26/2011 7:12:05 AM

Container for instrumentation

Page 33: PowerPoint Presentation...Title PowerPoint Presentation Author Jon Tore Lieng Created Date 1/26/2011 7:12:05 AM

Markings on Chain and Retrieval

Wire for Instrumentation

Page 34: PowerPoint Presentation...Title PowerPoint Presentation Author Jon Tore Lieng Created Date 1/26/2011 7:12:05 AM

Anchor Drop

Configuration

Drop

height

50-75m

Loop

height

Installed anchor

Instrumentation

Permanent

mooring line

To stern roller Release

point

Trailing

chain

length

Page 35: PowerPoint Presentation...Title PowerPoint Presentation Author Jon Tore Lieng Created Date 1/26/2011 7:12:05 AM

As Installed DPAs at Gjøa

estimated

actual

estimated

actual

seabed

DPA 1 (North)

Stiffer soil

DPA 2 (South)

Softer soil

< 2o

< 2o

24m

≈ 30m

21m

27.5m

Accuracy in horizontal plane: ± 1.5m

Page 36: PowerPoint Presentation...Title PowerPoint Presentation Author Jon Tore Lieng Created Date 1/26/2011 7:12:05 AM

Qualified Technolgy

within Statoil

Page 37: PowerPoint Presentation...Title PowerPoint Presentation Author Jon Tore Lieng Created Date 1/26/2011 7:12:05 AM

Available AHTS for Efficient Installation

Page 38: PowerPoint Presentation...Title PowerPoint Presentation Author Jon Tore Lieng Created Date 1/26/2011 7:12:05 AM

Why DPA?

• Installation time and costs

• Standard Anchor Handling Vessel (AHTS)

• No external energy source required

• Precise horizontal positioning

Page 39: PowerPoint Presentation...Title PowerPoint Presentation Author Jon Tore Lieng Created Date 1/26/2011 7:12:05 AM

Why DPA? Cont.

• Independent of water depth

• No proof loading required

• High utilization of deck storage area

• More cost effective