South Australia is well on its way to having a

North-South transport network

fast, efficient and comprehensive

Page 2: PowerPoint Presentation...Title PowerPoint Presentation Author Cassandra McNeilly Created Date 10/24/2014 10:20:43 AM
Page 3: PowerPoint Presentation...Title PowerPoint Presentation Author Cassandra McNeilly Created Date 10/24/2014 10:20:43 AM
Page 4: PowerPoint Presentation...Title PowerPoint Presentation Author Cassandra McNeilly Created Date 10/24/2014 10:20:43 AM

Adelaide’s North-South Corridor

78km running between Gawler and Old Noarlunga

Page 5: PowerPoint Presentation...Title PowerPoint Presentation Author Cassandra McNeilly Created Date 10/24/2014 10:20:43 AM

Adelaide’s North-South Corridor

Southern Expressway duplication

[completed 2014]

Page 6: PowerPoint Presentation...Title PowerPoint Presentation Author Cassandra McNeilly Created Date 10/24/2014 10:20:43 AM

Adelaide’s North-South Corridor

Darlington Upgrade project

[due for completion 2018]

Page 7: PowerPoint Presentation...Title PowerPoint Presentation Author Cassandra McNeilly Created Date 10/24/2014 10:20:43 AM

Adelaide’s North-South Corridor

Potential Future Projects

Gallipoli Underpass & Tram Overpass

[completed 2009]

Page 8: PowerPoint Presentation...Title PowerPoint Presentation Author Cassandra McNeilly Created Date 10/24/2014 10:20:43 AM

Adelaide’s North-South Corridor

South Road Superway

[completed 2014]

Page 9: PowerPoint Presentation...Title PowerPoint Presentation Author Cassandra McNeilly Created Date 10/24/2014 10:20:43 AM

Adelaide’s North-South Corridor

Northern Connector

[proposed future project]

Page 10: PowerPoint Presentation...Title PowerPoint Presentation Author Cassandra McNeilly Created Date 10/24/2014 10:20:43 AM

Adelaide’s North-South Corridor

Northern Expressway

[completed 2010]

Page 11: PowerPoint Presentation...Title PowerPoint Presentation Author Cassandra McNeilly Created Date 10/24/2014 10:20:43 AM

Adelaide’s North-South Corridor

Torrens Road to River Torrens [due for completion 2018]

Page 12: PowerPoint Presentation...Title PowerPoint Presentation Author Cassandra McNeilly Created Date 10/24/2014 10:20:43 AM

What is it? 3.7km upgrade of South Road from

just north of Torrens Road to just

south of the River Torrens

River Torrens

Page 13: PowerPoint Presentation...Title PowerPoint Presentation Author Cassandra McNeilly Created Date 10/24/2014 10:20:43 AM

What is it?

1.4km section of lowered

(non-stop) motorway, approx

8m below the existing surface

under Port and Grange roads

Page 14: PowerPoint Presentation...Title PowerPoint Presentation Author Cassandra McNeilly Created Date 10/24/2014 10:20:43 AM

What is it?

An overpass of the

Outer Harbor rail line

Page 15: PowerPoint Presentation...Title PowerPoint Presentation Author Cassandra McNeilly Created Date 10/24/2014 10:20:43 AM

What is it?

Intersection upgrades at

Torrens Road, Hawker Street,

Hurtle Street, Port Road,

Grange Road/Manton Street

and Ashwin Parade/West

Thebarton Road

Improved cycling &

pedestrian facilities Landscaping & noise barriers

Page 16: PowerPoint Presentation...Title PowerPoint Presentation Author Cassandra McNeilly Created Date 10/24/2014 10:20:43 AM

What is it? Parallel surface (at-grade)

roads along the length of the lowered

motorway to connect most local roads

and arterial roads to South Road

Page 17: PowerPoint Presentation...Title PowerPoint Presentation Author Cassandra McNeilly Created Date 10/24/2014 10:20:43 AM

Completion

of works

by end of

2018

Commence

Alliance with

successful

proponent

SECOND

QUARTER

OF 2015:

DESIGN AND

MAJOR

CONSTRUCTION

WORKS TO

BEGIN

Request for

Proposal

CLOSES LATE

MARCH

2015

Project Timeline

Short listing

of two

proponents

MID TO LATE

OCTOBER

2014

Expression

of Interest

phase

CLOSED MID

SEPTEMBER

2014

Page 18: PowerPoint Presentation...Title PowerPoint Presentation Author Cassandra McNeilly Created Date 10/24/2014 10:20:43 AM

Thank you. www.infrastructure.sa.gov.au/t2t