1

S p r i n g S e m e s t e rC a m p u s C o n s t r u c t i o n U p d a t e

M a r c h 2 0 1 9

2

1 I n t r o d u c t i o n s2 H o u s i n g M a s t e r P l a n3 O t h e r U p c o m i n g P r o j e c t s4 C u r r e n t C o n s t r u c t i o n P r o j e c t s

3

TCS Hall

HWAR@Skibo

ForbesForbes/Beeler

Scaife2.0 ANSYS

Hall

GSIA/Posner

Recent & Current Campus Projects

Design Process

Recent Completion

Under Construction

CohonAddition

Heinz

4721Fifth

MakerSpace

Tepper Quad

Fifth/Clyde

Fifth/Neville

ScottHall

4

H o u s i n g M a s t e r P l a n1 O v e r v i e w2 F i f t h / N e v i l l e3 F i f t h / C l y d e4 F o r b e s / B e e l e r5 C a m p u s “ H U B S ”

5

Housing Master Plan Goals

1. Strengthen the Neighborhood Concept.• Three vibrant neighborhoods with a mix of age-appropriate unit types• A meaningful hub in each neighborhood• Appropriate building sizes - small residence halls are inefficient, large halls can be impersonal• Enhance the campus community for students, faculty and staff

2. Maximize the value of existing housing inventory.• Consistent physical condition in all halls• Appropriate program spaces to support community building

3. Provide more on-campus student housing. • Capture unmet demand • Strategic approach to block-leasing

4. Contribute to an urban campus environment.• Institutional Master Plan – City of Pittsburgh• Simonds Principles for campus expansion and development

5. Establish a comprehensive approach. • 30 year-phasing plan that addresses facility condition issues and is financially feasible

6

The Neighborhood Concept

A residential experience that is unique to Carnegie Mellon

Vision• Three neighborhoods

that offer a mix of unit types to provide age-appropriate unit typology

• A neighborhood hub in each area

• Students could choose to live in the same neighborhood for multiple years and identify with the neighborhood community

7

Housing Master Plan

8

Housing Master Plan – Initial Projects

265 Beds

250-300 Beds

144-165 Beds Fifth/Neville

Fifth/Clyde

Forbes/Beeler

9

Housing Master Plan – Fifth/Neville

265 Beds

250-300 Beds

144-165 Beds Fifth/Neville

Fifth/Clyde

Forbes/Beeler

10

Fifth/Neville Apartments

11

Fifth/Neville Apartments

12

Fifth/Neville Apartments

13

Schedule

Outreach- Campus Town hall meeting 6 Mar 2019- Meeting with adjacent neighbors 7 Mar 2019- Presentations to BACA and SAC Mar/Apr 2019

Permitting- Site Plan Review May 2019- PLI review Jul 2019

Construction- Asbestos Abatement Summer 2019 - Construction Start Fall 2019- Substantial Completion Jun 2020- Occupancy July 2020

Fifth/Neville Apartments

14

Housing Master Plan – Fifth/Clyde

265 Beds

250-300 Beds

144-165 Beds Fifth/Neville

Fifth/Clyde

Forbes/Beeler

15

Fifth / Clyde Residence

16

Fifth / Clyde Residence

17

Fifth / Clyde Residence

18

Fifth / Clyde Residence

19

Fifth / Clyde Residence

20

Fifth / Clyde Residence

21

Fifth / Clyde Residence

22

Fifth / Clyde Residence Hall

23

Schedule

Outreach- Campus Town hall meeting 6 Mar 2019- Meeting with adjacent neighbors 7 Mar 2019- Presentations to BACA and SAC Mar/Apr 2019

Permitting- Special Exception @ ZBA May/Jun 2019- CDAP Jun 2019- Planning Commission Jul 2019

Construction- Foundations Fall 2019 – Spring 2020- Superstructure & Enclosure Summer 2020- Interior Work Fall 2020 – Spring 2021- Final Fit-out & Site Work Summer 2021- Occupancy August 2021

Fifth / Clyde Residence

24

Housing Master Plan – Forbes/Beeler

265 Beds

250-300 Beds

144-165 Beds Fifth/Neville

7Fifth/Clyde

Forbes/Beeler

25

Forbes/Beeler Residence

26

Forbes/Beeler Residence

27

Forbes/Beeler Residence

28

Schedule

Initial Outreach- Campus Town hall meeting 6 Mar 2019- Meeting with adjacent neighbors 7 Mar 2019- Presentations to BACA and SAC Mar/Apr 2019- Additional Outreach Fall 2019

Permitting- Special Exception @ ZBA Fall 2019- CDAP Winter 2020- Planning Commission Winter 2020

Construction- Demolition of Existing Building Spring 2020- Foundations Summer – Fall 2020- Superstructure & Enclosure Winter – Summer 2021- Interior Work Fall 2021 – Spring 2022- Final Fit-out & Site Work Summer 2022- Occupancy August 2022

Forbes/Beeler Residence

29

Campus “HUBS”

30

Fifth/Clyde “HUB” Concept

31

O t h e r U p c o m i n g P r o j e c t s- S c a i f e 2 . 0 / M a s t e r P l a n A m e n d m e n t- H e a l t h , W e l l n e s s , A t h l e t i c s &

R e c r e a t i o n C e n t e r U p d a t e

32

( C O N C E P T U A L R E N D E R I N G )

Scaife 2.0 Concept

33

Master Plan Text Amendment

34

Zoning Map Amendment

36

Zoning Map Amendment

37

Zoning Map Amendment

38

Outreach To-Date- Bellefield Area Citizens Association 11 Dec 2018- Squirrel Hill Urban Coalition 18 Dec 2018- Oakland Task Force 8 Jan 2019- Oakland Planning and Devel Corp Mar 2019

Approval Process- City Council Briefings Feb / Mar 2019- Application to City Planning Mar 2019- Planning Commission May 2019- City Council Jun 2019

Design / Construction Process- Select AE and CM Teams Spring 2019- Design process Summer 2019 – Spring 2020- Demo Scaife Winter / Spring 2020- Construction Summer 2020 – End of 2022

IMP Amendment and Scaife 2.0 Schedule

39

Health, Wellness, Athletics and Recreation Center @ Skibo Gym

Current Status: On Hold- Initial design estimates

were higher than budgeted- Current regional market is

driving prices higher- University is reviewing

options for moving forward- Project is still a major

priority for University

40

C u r r e n t C a m p u s P r o j e c t s- A N S Y S H a l l- T C S H a l l- F o r b e s B e t t e r m e n t

41

ANSYS Hall

42

Opens July 2019

ANSYS Hall

43

TCS Hall

44

Opens Spring 2020

TCS Hall

45

Forbes Betterment Project

R e b u i l t I n t e r s e c t i o n

N e w P e d e s t r i a n I n t e r s e c t i o n

Beeler

Margaret MorrisonR e p a v i n g

46

Tepper School ofBusiness

HamburgHall

Warner Hall

Tepper Quad

Cyert HallMorewood

Gardens

Forbes Ave Vision

47

Completion Summer 2019

Forbes Betterment

48

GSIA/Posner