Page 1: PowerPoint Presentation Documents...•Gordie Howe International Bridge •I-696 •Flex Route 23 •Planet M. Segment One Coolidge Highway-South Boulevard Design Build (DB) 3.1 miles,
Page 2: PowerPoint Presentation Documents...•Gordie Howe International Bridge •I-696 •Flex Route 23 •Planet M. Segment One Coolidge Highway-South Boulevard Design Build (DB) 3.1 miles,
Page 3: PowerPoint Presentation Documents...•Gordie Howe International Bridge •I-696 •Flex Route 23 •Planet M. Segment One Coolidge Highway-South Boulevard Design Build (DB) 3.1 miles,
Page 4: PowerPoint Presentation Documents...•Gordie Howe International Bridge •I-696 •Flex Route 23 •Planet M. Segment One Coolidge Highway-South Boulevard Design Build (DB) 3.1 miles,
Page 5: PowerPoint Presentation Documents...•Gordie Howe International Bridge •I-696 •Flex Route 23 •Planet M. Segment One Coolidge Highway-South Boulevard Design Build (DB) 3.1 miles,

• I-75 Oakland County

• Gordie Howe International Bridge

• I-696• Flex Route 23

• Planet M

Page 6: PowerPoint Presentation Documents...•Gordie Howe International Bridge •I-696 •Flex Route 23 •Planet M. Segment One Coolidge Highway-South Boulevard Design Build (DB) 3.1 miles,
Page 7: PowerPoint Presentation Documents...•Gordie Howe International Bridge •I-696 •Flex Route 23 •Planet M. Segment One Coolidge Highway-South Boulevard Design Build (DB) 3.1 miles,

Segment One

Coolidge Highway-South Boulevard Design Build (DB)

3.1 miles, 8 bridges

open to traffic September 2017

Page 8: PowerPoint Presentation Documents...•Gordie Howe International Bridge •I-696 •Flex Route 23 •Planet M. Segment One Coolidge Highway-South Boulevard Design Build (DB) 3.1 miles,
Page 9: PowerPoint Presentation Documents...•Gordie Howe International Bridge •I-696 •Flex Route 23 •Planet M. Segment One Coolidge Highway-South Boulevard Design Build (DB) 3.1 miles,
Page 10: PowerPoint Presentation Documents...•Gordie Howe International Bridge •I-696 •Flex Route 23 •Planet M. Segment One Coolidge Highway-South Boulevard Design Build (DB) 3.1 miles,
Page 11: PowerPoint Presentation Documents...•Gordie Howe International Bridge •I-696 •Flex Route 23 •Planet M. Segment One Coolidge Highway-South Boulevard Design Build (DB) 3.1 miles,
Page 12: PowerPoint Presentation Documents...•Gordie Howe International Bridge •I-696 •Flex Route 23 •Planet M. Segment One Coolidge Highway-South Boulevard Design Build (DB) 3.1 miles,
Page 13: PowerPoint Presentation Documents...•Gordie Howe International Bridge •I-696 •Flex Route 23 •Planet M. Segment One Coolidge Highway-South Boulevard Design Build (DB) 3.1 miles,
Page 14: PowerPoint Presentation Documents...•Gordie Howe International Bridge •I-696 •Flex Route 23 •Planet M. Segment One Coolidge Highway-South Boulevard Design Build (DB) 3.1 miles,

• Will be among the top five longest bridges in North America

• 6 lanes – 3 in each direction

• 2.5 kilometres / 1.5 miles• Clear span of 850 metres /

0.53 miles• Multi-use path for

pedestrians and cyclists

Conceptual cable-stayed design Conceptual suspension design

Page 15: PowerPoint Presentation Documents...•Gordie Howe International Bridge •I-696 •Flex Route 23 •Planet M. Segment One Coolidge Highway-South Boulevard Design Build (DB) 3.1 miles,

Preliminary conceptual PIL booth design

Preliminary conceptual view from primary inspection

United States• Will be one of the largest US

ports along the US-Canada border and one of the largest anywhere in North America

• 68 hectares / 167 acres• 36 primary inspection booths• Outbound inspection facilities• Commercial exit control

booths

• Will be the largest Canadian port along the Canada-US border and one of the largest anywhere in North America

• 53 hectares / 130 acres• 24 primary inspection booths• Outbound inspection facilities• Toll collection facilities for

both US- and Canada-bound traffic

Canadian

Page 16: PowerPoint Presentation Documents...•Gordie Howe International Bridge •I-696 •Flex Route 23 •Planet M. Segment One Coolidge Highway-South Boulevard Design Build (DB) 3.1 miles,

• 3 kilometres or 1.8 miles of I-75 and interchange ramps

• 4 new crossing road bridges• 5 new pedestrian bridges• 4 long bridges crossing the railway and

connecting to I-75 to the US plaza

• Key intersections will also widened to allow transport trucks to make full uninterrupted turns

• Local road improvements• 4 ramps connecting I-75 to POE

Page 17: PowerPoint Presentation Documents...•Gordie Howe International Bridge •I-696 •Flex Route 23 •Planet M. Segment One Coolidge Highway-South Boulevard Design Build (DB) 3.1 miles,

West of I-75 to I-275▪ Pavement Repairs – evenings

and weekends▪ Drainage Structure Repairs

East of I-75 to I-94▪ Mainline and Ramp Inlay▪ Shoulder Repairs▪ Service Drive Repairs (2019)

Page 18: PowerPoint Presentation Documents...•Gordie Howe International Bridge •I-696 •Flex Route 23 •Planet M. Segment One Coolidge Highway-South Boulevard Design Build (DB) 3.1 miles,
Page 19: PowerPoint Presentation Documents...•Gordie Howe International Bridge •I-696 •Flex Route 23 •Planet M. Segment One Coolidge Highway-South Boulevard Design Build (DB) 3.1 miles,

US-23 FLEX ROUTE

SYSTEM

Page 21: PowerPoint Presentation Documents...•Gordie Howe International Bridge •I-696 •Flex Route 23 •Planet M. Segment One Coolidge Highway-South Boulevard Design Build (DB) 3.1 miles,
Page 22: PowerPoint Presentation Documents...•Gordie Howe International Bridge •I-696 •Flex Route 23 •Planet M. Segment One Coolidge Highway-South Boulevard Design Build (DB) 3.1 miles,

MICHIGANGLOBAL LEADER IN AUTOMATED TECH

8ORIGINALEQUIPMENTMANUFACTURERS7

GLOBALOR NORTH AMERICANR&D HQ’s

#1CONCENTRATIONIN ENGINEERINGTALENT

UNRIVALEDAUTOMOTIVE MANUFACTURING

RESEARCH & DEVELOPMENT