BACKGROUND PAPER 5 Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon Vennemo Econ Pöyry, in association with Norplan and Power Planning Associates MARCH 2009 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

Upload: hoangnguyet

Post on 21-Apr-2018

216 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

BACKGROUND PAPER 5

Powering Up: Costing Power Infrastructure

Spending Needs in Sub-Saharan Africa

COUNTRY ANNEX

Orvika Rosnes and Haakon Vennemo Econ Pöyry, in association with Norplan and Power

Planning Associates

MARCH 2009

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

wb371432
Typewritten Text
61811 v3
wb371432
Typewritten Text
wb371432
Typewritten Text
wb371432
Typewritten Text
Page 2: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

© 2009 The International Bank for Reconstruction and Development / The World Bank

1818 H Street, NW

Washington, DC 20433 USA

Telephone: 202-473-1000

Internet: www.worldbank.org

E-mail: [email protected]

All rights reserved

A publication of the World Bank.

The World Bank

1818 H Sreet, NW

Washington, DC 20433 USA

The findings, interpretations, and conclusions expressed herein are those of the author(s) and do not necessarily reflect the views of the

Executive Directors of the International Bank for Reconstruction and Development / The World Bank or the governments they represent.

The World Bank does not guarantee the accuracy of the data included in this work. The boundaries, colors, denominations, and other

information shown on any map in this work do not imply any judgment on the part of The World Bank concerning the legal status of any territory or the endorsement or acceptance of such boundaries.

Rights and permissions

The material in this publication is copyrighted. Copying and/or transmitting portions or all of this work without permission may be a violation of applicable law. The International Bank for Reconstruction and Development / The World Bank encourages dissemination of its work and will normally grant permission to reproduce portions of the work promptly.

For permission to photocopy or reprint any part of this work, please send a request with complete information to the Copyright Clearance Center Inc., 222 Rosewood Drive, Danvers, MA 01923 USA; telephone: 978-750-8400; fax: 978-750-4470; Internet: www.copyright.com.

All other queries on rights and licenses, including subsidiary rights, should be addressed to the Office of the Publisher, The World Bank, 1818

H Street, NW, Washington, DC 20433 USA; fax: 202-522-2422; e-mail: [email protected].

Page 3: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

About AICD

This study is a product of the Africa Infrastructure Country

Diagnostic (AICD), a project designed to expand the

world’s knowledge of physical infrastructure in Africa.

AICD will provide a baseline against which future

improvements in infrastructure services can be measured,

making it possible to monitor the results achieved from

donor support. It should also provide a better empirical

foundation for prioritizing investments and designing

policy reforms in Africa’s infrastructure sectors.

AICD is based on an unprecedented effort to collect

detailed economic and technical data on African

infrastructure. The project has produced a series of reports

(such as this one) on public expenditure, spending needs,

and sector performance in each of the main infrastructure

sectors—energy, information and communication

technologies, irrigation, transport, and water and sanitation.

Africa’s Infrastructure—A Time for Transformation,

published by the World Bank in November 2009,

synthesizes the most significant findings of those reports.

AICD was commissioned by the Infrastructure Consortium

for Africa after the 2005 G-8 summit at Gleneagles, which

recognized the importance of scaling up donor finance for

infrastructure in support of Africa’s development.

The first phase of AICD focused on 24 countries that

together account for 85 percent of the gross domestic

product, population, and infrastructure aid flows of Sub-

Saharan Africa. The countries are: Benin, Burkina Faso,

Cape Verde, Cameroon, Chad, Côte d'Ivoire, the

Democratic Republic of Congo, Ethiopia, Ghana, Kenya,

Lesotho, Madagascar, Malawi, Mozambique, Namibia,

Niger, Nigeria, Rwanda, Senegal, South Africa, Sudan,

Tanzania, Uganda, and Zambia. Under a second phase of

the project, coverage is expanding to include as many other

African countries as possible.

Consistent with the genesis of the project, the main focus is

on the 48 countries south of the Sahara that face the most

severe infrastructure challenges. Some components of the

study also cover North African countries so as to provide a

broader point of reference. Unless otherwise stated,

therefore, the term “Africa” will be used throughout this

report as a shorthand for “Sub-Saharan Africa.”

Page 4: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

The World Bank is implementing AICD with the guidance

of a steering committee that represents the African Union,

the New Partnership for Africa’s Development (NEPAD),

Africa’s regional economic communities, the African

Development Bank, the Development Bank of Southern

Africa, and major infrastructure donors.

Financing for AICD is provided by a multidonor trust fund

to which the main contributors are the U.K.’s Department

for International Development, the Public Private

Infrastructure Advisory Facility, Agence Française de

Développement, the European Commission, and Germany’s

KfW Entwicklungsbank. The Sub-Saharan Africa Transport

Policy Program and the Water and Sanitation Program

provided technical support on data collection and analysis

pertaining to their respective sectors. A group of

distinguished peer reviewers from policy-making and

academic circles in Africa and beyond reviewed all of the

major outputs of the study to ensure the technical quality of

the work.

The data underlying AICD’s reports, as well as the reports

themselves, are available to the public through an

interactive Web site, www.infrastructureafrica.org, that

allows users to download customized data reports and

perform various simulations. Inquiries concerning the

availability of data sets should be directed to the editors at

the World Bank in Washington, DC.

Page 5: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

Annex 1 Country output tables

This appendix lists detailed output tables for the overall investment requirements in Sub-Saharan

Africa. We report country tables highlighting the difference in investment, refurbishment and variable

costs under each scenario, as well as investment and refurbishment volumes, capacity mix, cross-border

transmission capacity investments and energy trade.

Southern Africa Power Pool 3

Angola 3

Botswana 7

Democratic Republic of Congo 11

Lesotho 15

Malawi 19

Mozambique 23

Namibia 27

Republic of South Africa 31

Zambia 35

Zimbabwe 39

Nile Basin – East Africa Power Pool 44

Burundi 44

Djibouti 49

Egypt 53

Ethiopia 57

Kenya 62

Rwanda 66

Sudan 70

Tanzania 75

Uganda 79

Western Africa Power Pool 83

Benin 83

Burkina Faso 87

Côte d’Ivoire 91

Gambia 96

Ghana 100

Guinea 104

Guinea Bissau 109

Liberia 113

Mali 117

Mauritania 121

Niger 125

Nigeria 129

Senegal 133

Sierra Leone 137

Togo 141

Page 6: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE SPENDING NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

2

Central Africa Power Pool 145

Cameroon 145

Central African Republic 150

Chad 154

Republic of Congo (Br.) 158

Equatorial Guinea 162

Gabon 166

Islands States 170

Cape Verde 170

Madagascar 174

Mauritius 178

Regional totals for the island states 182

Page 7: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

3

Southern Africa Power Pool

Angola

Table A1.1 Overview: Angola 2015

Trade expansion Trade

stagnation

Low growth

Current

access rate

35% access

rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Imports (TWh) 8.9 9.6 11.0 0.1 8.8

Exports (TWh) 4.8 4.9 5.0 0.1 4.5

Net exports (TWh) -4.1 -4.7 -6.0 0.0 -4.3

Generation capacity - installed

(MW)

620 620 620 620 620

Generation capacity -

refurbishment (MW) 198 198 203 305 203

Generation capacity - new

investments (MW) 0 2 8 1 184 8

New cross-border transmission

(MW) 1 802 1 902 2 120 0 1 735

Target Access Rate 14 % 24 % 46 % 46 % 46 %

Generation capacity

mix (%):

Hydro

88 % 88 % 88 % 80 % 88 %

Coal 0 % 0 % 0 % 0 % 0 %

Gas 4 % 4 % 4 % 16 % 4 %

Other 7 % 8 % 8 % 3 % 8 %

Table A1.2 Possible Hydropower Expansion: Angola

Scenario Project* Planned capacity (MW) Lead time (years) Cost estimate (Mill. USD)

Trade expansion No new projects* - - -

Trade stagnation Medio Kwanza 6,700 10 Not available

* Plus mini-hydro in rural node

Page 8: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

4

Table A1.3 Annualized costs of capacity expansion (M$) – Angola

Trade

expansion

Trade

stagnation

Low

growth

Current

access rate

35% access

rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access

rates, trade

expansion

Generation Investment cost 0.1 0.7 2.6 288.8 2.6

Thermal 0.0 0.0 0.0 20.3 0.0

Hydro 0.0 0.0 0.0 265.9 0.0

Other 0.1 0.7 2.6 2.6 2.6

Rehabilitation cost 10.5 10.5 10.8 12.3 10.8

Thermal 0.0 0.0 0.0 1.5 0.0

Hydro 10.5 10.5 10.8 10.8 10.8

Other 0.0 0.0 0.0 0.0 0.0

Variable cost (fuel, O&M) 0.0 0.0 0.0 99.0 0.0

New capacity 0.0 0.0 0.0 49.2 0.0

Installed

capacity 0.0 0.0 0.0 49.8 0.0

T&D Investment cost 231 276 357 269 291

Cross-border

grid 78 81 87 0 73

Distribution

grid 139 139 139 139 87

Urban

connection 11 31 79 79 79

Rural

connection 2 24 51 51 51

Rehabilitation cost 38 38 38 38 38

Variable cost (existing

capacity) 78 78 78 78 78

Total Capital cost 280 325 408 609 342

Investment

Cost 231 277 359 558 293

Rehabilitation

cost 49 49 49 50 49

Variable cost 78 78 78 177 78

TOTAL 357 403 486 785 420

Page 9: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

5

Table A1.4 Annualized costs of capacity expansion (% of GDP in 2015) – Angola

Trade

expansion

Trade

stagnation Low growth

Current

access rate

35% access

rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Generation Investment cost 0.0 0.0 0.0 0.4 0.0

Thermal 0.0 0.0 0.0 0.0 0.0

Hydro 0.0 0.0 0.0 0.3 0.0

Other 0.0 0.0 0.0 0.0 0.0

Rehabilitation cost 0.0 0.0 0.0 0.0 0.0

Thermal 0.0 0.0 0.0 0.0 0.0

Hydro 0.0 0.0 0.0 0.0 0.0

Other 0.0 0.0 0.0 0.0 0.0

Variable cost (fuel, O&M) 0.0 0.0 0.0 0.1 0.0

New capacity 0.0 0.0 0.0 0.1 0.0

Existing

capacity 0.0 0.0 0.0 0.1 0.0

T&D Investment cost 0.3 0.3 0.4 0.3 0.5

Cross-border

grid 0.1 0.1 0.1 0.0 0.1

Distribution

grid 0.2 0.2 0.2 0.2 0.1

Urban

connection 0.0 0.0 0.1 0.1 0.1

Rural

connection 0.0 0.0 0.1 0.1 0.1

Rehabilitation cost 0.0 0.0 0.0 0.0 0.1

Variable cost (existing

capacity) 0.1 0.1 0.1 0.1 0.1

Total Capital cost 0.4 0.4 0.5 0.8 0.6

Investment

cost 0.3 0.3 0.5 0.7 0.5

Rehabilitation

cost 0.1 0.1 0.1 0.1 0.1

Variable cost 0.1 0.1 0.1 0.2 0.1

Total 0.5 0.5 0.6 1.0 0.7

Page 10: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

6

Table A1.5 Investment costs of capacity expansion (M$) – Angola

Trade

expansion

Trade

stagnation Low growth

Current access

rate

35% access

rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Generation Investment cost 0.5 6 20 2,250 20

Rehabilitation

cost 59 59 61 71 61

T&D Investment cost 1,860 2,222 2,873 2,170 2,341

Rehabilitation

cost 308 308 308 308 308

Total 2,228 2,595 3,262 4,799 2,730

Table A1.6 Investment costs of capacity expansion (% of GDP in 2015) – Angola

Trade

expansion

Trade

stagnation Low growth

Current access

rate

35% access

rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Generation Investment cost 0.0 % 0.0 % 0.0 % 2.8 % 0.0 %

Rehabilitation

cost 0.1 % 0.1 % 0.1 % 0.1 % 0.1 %

T&D Investment cost 2.3 % 2.8 % 3.6 % 2.7 % 3.8 %

Rehabilitation

cost 0.4 % 0.4 % 0.4 % 0.4 % 0.5 %

Total 2.8 % 3.3 % 4.1 % 6.1 % 4.5 %

Page 11: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

7

Botswana

Table A1.7 Overview: Botswana 2015

Trade expansion Trade

stagnation

Low growth

Current

access rate

35% access

rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Imports (TWh) 11.9 10.1 10.4 1.2 15.2

Exports (TWh) 7.8 6.0 6.2 6.5 11.8

Net Exports (TWh) -4.1 -4.1 -4.3 5.3 -3.3

Generation capacity -

installed (MW)

120 120 120 120 120

Generation capacity -

refurbishment (MW) 12 12 12 12 12

Generation capacity - new

investments (MW)* 0 0 6 1 206 6

New cross-border Transmission

(MW) 2 656 2 077 2 141 0 4 194

Target Access Rate 30 % 40 % 100 % 100 % 100 %

Generation capacity

mix (%):

Hydro

0 % 0 % 0 % 0 % 0 %

Coal 100 % 100 % 96 % 100 % 96 %

Gas 0 % 0 % 0 % 0 % 0 %

Other 0 % 0 % 4 % 0 % 4 %

* Mmamabula power plant (2 400 MW) is, for modelling purposes, assumed to be located in South Africa (in order to reflect the short distance between the power plant and the point where the power will be fed into the South African transmission grid). Consequently, the investment volumes and costs of Mmamabula are not included in the tables for Botswana, but in the tables for South Africa.

Table A1.8 Possible Hydropower Expansion: Botswana

Scenario Project* Planned capacity (MW) Lead time (years) Cost estimate (Mill. USD)

Trade expansion No new projects* - - -

Trade stagnation No new projects* - - -

*Only mini-hydro in rural node

Page 12: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

8

Table A1.9 Annualized costs of capacity expansion (M$) – Botswana

Trade

expansion

Trade

stagnation

Low

growth

Current

access rate

35% access

rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access

rates, trade

expansion

Generation Investment cost 0.0 0.1 2.1 196.4 2.1

Thermal 0.0 0.0 0.0 194.3 0.0

Hydro 0.0 0.0 0.0 0.0 0.0

Other 0.0 0.1 2.1 2.1 2.1

Rehabilitation cost 0.6 0.6 0.6 0.6 0.6

Thermal 0.6 0.6 0.6 0.6 0.6

Hydro 0.0 0.0 0.0 0.0 0.0

Other 0.0 0.0 0.0 0.0 0.0

Variable cost (fuel, O&M) 10.3 10.3 10.3 171.8 10.3

New capacity 0.0 0.0 0.0 161.5 0.0

Installed

capacity 10.3 10.3 10.3 10.3 10.3

T&D Investment cost 30 31 59 50 55

Cross-border 12 10 10 0 17

Distribution

grid 19 19 19 19 8

Urban

connection 0 2 7 7 7

Rural

connection 0 1 24 24 24

Rehabilitation cost 14 14 14 14 14

Variable cost (existing

capacity) 29 29 29 29 29

Total Capital cost 45 46 76 260 72

Investment

cost 30 31 61 246 57

Rehabilitation

cost 14 14 14 14 14

Variable cost 39 39 39 201 39

Total 84 85 115 461 111

Page 13: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

9

Table A1.10 Annualized costs of capacity expansion (% of GDP in 2015) – Botswana

Trade

expansion

Trade

stagnation

Low

growth

Current

access rate

35%

access

rate

National

targets for

access

rates

National

targets for

access

rates

National

targets for

access

rates,

trade

expansion

Generation Investment cost 0.0 0.0 0.0 1.3 0.0

Thermal 0.0 0.0 0.0 1.2 0.0

Hydro 0.0 0.0 0.0 0.0 0.0

Other 0.0 0.0 0.0 0.0 0.0

Rehabilitation cost 0.0 0.0 0.0 0.0 0.0

Thermal 0.0 0.0 0.0 0.0 0.0

Hydro 0.0 0.0 0.0 0.0 0.0

Other 0.0 0.0 0.0 0.0 0.0

Variable cost (fuel, O&M) 0.1 0.1 0.1 1.1 0.1

New capacity 0.0 0.0 0.0 1.0 0.0

Existing

capacity 0.1 0.1 0.1 0.1 0.1

T&D Investment cost 0.2 0.2 0.4 0.3 0.4

Cross-border 0.1 0.1 0.1 0.0 0.1

Distribution

grid 0.1 0.1 0.1 0.1 0.1

Urban

connection 0.0 0.0 0.0 0.0 0.1

Rural

connection 0.0 0.0 0.2 0.2 0.2

Rehabilitation cost 0.1 0.1 0.1 0.1 0.1

Variable cost (existing

capacity) 0.2 0.2 0.2 0.2 0.2

Total Capital cost 0.3 0.3 0.5 1.7 0.6

Investment

cost 0.2 0.2 0.4 1.6 0.4

Rehabilitation

cost 0.1 0.1 0.1 0.1 0.1

Variable cost 0.3 0.3 0.3 1.3 0.3

Total 0.5 0.5 0.7 2.9 0.9

Page 14: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

10

Table A1.11 Investment costs of capacity expansion (M$) – Botswana

Trade

expansion

Trade

stagnation Low growth

Current access

rate

35% access

rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Generation Investment cost 0.0 1 16 1,336 16

Rehabilitation

cost 4 4 4 4 4

T&D Investment cost 245 252 478 399 446

Rehabilitation

cost 111 111 111 111 111

Total 359 367 609 1,850 577

Table A1.12 Investment costs of capacity expansion (% of GDP in 2015) – Botswana

Trade

expansion

Trade

stagnation Low growth

Current access

rate

35% access

rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Generation Investment cost 0.0 % 0.0 % 0.1 % 8.5 % 0.1 %

Rehabilitation

cost 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

T&D Investment cost 1.6 % 1.6 % 3.1 % 2.6 % 3.5 %

Rehabilitation

cost 0.7 % 0.7 % 0.7 % 0.7 % 0.9 %

Total 2.3 % 2.3 % 3.9 % 11.8 % 4.5 %

Page 15: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

11

Democratic Republic of Congo

Table A1.13 Overview: DRC 2015

Trade expansion Trade

stagnation

Low growth

Current

access rate

35% access

rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Imports (TWh) 0.0 0.2 0.4 0.4 0.4

Exports (TWh) 49.9 50.7 52.2 2.7 50.1

Net Exports (TWh) 49.9 50.5 51.9 2.3 49.7

Generation capacity -

installed (MW)

0 0 0 0 0

Generation capacity -

refurbishment (MW) 2 224 2 230 2 236 2 236 2 236

Generation capacity - new

investments (MW) 7 169 7 604 8 401 761 7 972

New cross-border Transmission

(MW) 5 678 5 772 5 984 0 5 657

Target Access Rate 8 % 20 % 39 % 39 % 39 %

Generation capacity

mix (%):

Hydro

100 % 100 % 100 % 99 % 100 %

Coal 0 % 0 % 0 % 0 % 0 %

Gas 0 % 0 % 0 % 0 % 0 %

Other 0 % 0 % 0 % 1 % 0 %

Table A1.14 Possible Hydropower Expansion: Democratic Republic of Congo

Scenario Project* Planned capacity (MW) Lead time (years) Cost estimate (Mill. USD)

Trade expansion Nzilo II 120 4 No estimate

Zongo II 150 4 No estimate

Inga III 3,500 5 1,730

Grand Inga 1 6,000 12 4,025

Trade stagnation Nzilo II 120 4 No estimate

Zongo II 150 4 No estimate

Inga III 3,500 5 1,730

* Plus mini-hydro in rural node

Page 16: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

12

Table A1.15 Annualized costs of capacity expansion (M$) – DRC

Trade

expansion

Trade

stagnation

Low

growth

Current

access rate

35%

access

Rate

National

targets for

access

rates

National

targets for

access

rates

National

targets for

access

rates, trade

expansion

Generation Investment cost 652 697 774 80 735

Thermal 0 0 0 0 0

Hydro 652 689 760 66 721

Other 0 8 14 14 14

Rehabilitation cost 110 110 110 110 110

Thermal 0 0 0 0 0

Hydro 110 110 110 110 110

Other 0 0 0 0 0

Variable cost (fuel, O&M) 0 0 0 0 0

New capacity 0 0 0 0 0

Installed

capa

city

0 0 0 0 0

T&D Investment cost 109 275 500 446 493

Cross-border 53 53 54 0 53

Distribution

grid 29 29 29 29 23

Urban

connection 24 104 256 256 256

Rural

connection 3 89 162 162 162

Rehabilitation cost 38 38 38 38 38

Variable cost (existing capacity) 49 49 49 49 49

Total Capital cost 909 1,120 1,423 674 1,377

Investment

cost 761 972 1,275 526 1,228

Rehabilitation

cost 148 148 148 148 148

Variable cost 49 49 49 49 49

Total 958 1,169 1,472 723 1,426

Page 17: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

13

Table A1.16 Annualized costs of capacity expansion (% of GDP in 2015) – DRC

Trade

expansion

Trade

stagnation

Low

growth

Current

access

rate

35%

access

rate

National

targets for

access

rates

National

targets for

access

rates

National

targets for

access

rates, trade

expansion

Generation Investment cost 5.8 6.2 6.9 0.7 7.1

Thermal 0.0 0.0 0.0 0.0 0.0

Hydro 5.8 6.2 6.8 0.6 6.9

Other 0.0 0.1 0.1 0.1 0.1

Rehabilitation cost 1.0 1.0 1.0 1.0 1.1

Thermal 0.0 0.0 0.0 0.0 0.0

Hydro 1.0 1.0 1.0 1.0 1.1

Other 0.0 0.0 0.0 0.0 0.0

Variable cost (fuel, O&M) 0.0 0.0 0.0 0.0 0.0

New capacity 0.0 0.0 0.0 0.0 0.0

Existing

capacity 0.0 0.0 0.0 0.0 0.0

T&D Investment cost 1.0 2.5 4.5 4.0 4.7

Cross-border 0.5 0.5 0.5 0.0 0.5

Distribution

grid 0.3 0.3 0.3 0.3 0.2

Urban

connection 0.2 0.9 2.3 2.3 2.5

Rural

connection 0.0 0.8 1.4 1.4 1.6

Rehabilitation cost 0.3 0.3 0.3 0.3 0.4

Variable cost (existing

capacity) 0.4 0.4 0.4 0.4 0.5

Total Capital cost 8.1 10.0 12.7 6.0 13.2

Investment

cost 6.8 8.7 11.4 4.7 11.8

Rehabilitation

cost 1.3 1.3 1.3 1.3 1.4

Variable cost 0.4 0.4 0.4 0.4 0.5

Total 8.6 10.5 13.2 6.5 13.7

Page 18: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

14

Table A1.17 Investment costs of capacity expansion (M$) – DRC

Trade

expansion

Trade

stagnation Low growth

Current access

rate

35% access

rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Generation Investment cost 4,616.2 4,940 5,491 573 5,215

Rehabilitation

cost 620 622 623 623 623

T&D Investment cost 877 2,216 4,029 3,593 3,971

Rehabilitation

cost 307 307 307 307 307

Total 6,421 8,085 10,451 5,097 10,117

Table A1.18 Investment costs of capacity expansion (% of GDP in 2015) – DRC

Trade

expansion

Trade

stagnation Low growth

Current access

rate

35% access

rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Generation Investment cost 41.3 44.2 49.1 5.1 50.1

Rehabilitation

cost

5.5 5.6 5.6 5.6 6.0

T&D Investment cost 7.8 19.8 36.0 32.1 38.2

Rehabilitation

cost

2.7 2.7 2.7 2.7 3.0

Total 57.4 72.3 93.5 45.6 97.2

Page 19: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

15

Lesotho

Table A1.19 Overview: Lesotho 2015

Trade expansion Trade

stagnation

Low growth

Current

access rate

35% access

rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Imports (TWh) 0.6 0.6 0.7 0.7 0.5

Exports (TWh) 0.0 0.0 0.0 0.0 0.0

Net Exports (TWh) -0.6 -0.6 -0.7 -0.7 -0.5

Generation capacity -

installed (MW)

75 75 75 75 75

Generation capacity -

refurbishment (MW) 0 0 0 0 0

Generation capacity - new

investments (MW) 0 0 0 0 0

New cross-border Transmission

(MW) 0 0 0 0 0

Target Access Rate 6 % 17 % 35 % 35 % 35 %

Generation capacity

mix (%):

Hydro

95 % 95 % 95 % 95 % 95 %

Coal 0 % 0 % 0 % 0 % 0 %

Gas 0 % 0 % 0 % 0 % 0 %

Other 5 % 5 % 5 % 5 % 5 %

Table A1.20 Possible Hydropower Expansion: Lesotho

Scenario Project* Planned capacity (MW) Lead time (years) Cost estimate (Mill. USD)

Trade expansion No new projects - - -

Trade stagnation No new projects - - -

*Only mini-hydro in rural node

Page 20: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

16

Table A1.21 Annualized costs of capacity expansion (M$) – Lesotho

Trade

expansion

Trade

stagnation

Low

growth

Current

access rate

35% access

rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access

rates, trade

expansion

Generation Investment cost 0 0 0.1 0.1 0.1

Thermal 0 0 0 0 0

Hydro 0 0 0 0 0

Other 0 0 0.1 0.1 0.1

Rehabilitation cost 0 0 0 0 0

Thermal 0 0 0 0 0

Hydro 0 0 0 0 0

Other 0 0 0 0 0

Variable cost (fuel, O&M) 0 0 0 0 0

New capacity 0 0 0 0 0

Installed

capacity 0 0 0 0 0

T&D Investment cost 6 10 0 17 14

Cross-border 0 0 0 0 0

Distribution

grid 6 6 6 6 3

Urban

connection 0 2 5 5 5

Rural

connection 0 1 6 6 6

Rehabilitation cost 2 2 2 2 2

Variable cost (existing

capacity) 7 7 7 7 7

Total Capital cost 8 12 19 19 16

Investment

Cost 6 10 17 17 14

Rehabilitation

cost 2 2 2 2 2

Variable cost 7 7 7 7 7

Total 15 18 25 25 22

Page 21: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

17

Table A1.22 Annualized costs of capacity expansion (% of GDP in 2015) – Lesotho

Trade

expansion

Trade

stagnation

Low

growth

Current

access rate

35%

access rate

National

targets for

access

rates

National

targets for

access

rates

National

targets for

access

rates, trade

expansion

Generation Investment cost 0.0 0.0 0.0 0.0 0.0

Thermal 0.0 0.0 0.0 0.0 0.0

Hydro 0.0 0.0 0.0 0.0 0.0

Other 0.0 0.0 0.0 0.0 0.0

Rehabilitation cost 0.0 0.0 0.0 0.0 0.0

Thermal 0.0 0.0 0.0 0.0 0.0

Hydro 0.0 0.0 0.0 0.0 0.0

Other 0.0 0.0 0.0 0.0 0.0

Variable cost (fuel, O&M) 0.0 0.0 0.0 0.0 0.0

New capacity 0.0 0.0 0.0 0.0 0.0

Existing

capacity 0.0 0.0 0.0 0.0 0.0

T&D Investment cost 0.3 0.4 0.8 0.8 0.8

Cross-border 0.0 0.0 0.0 0.0 0.0

Distribution

grid 0.3 0.3 0.3 0.3 0.2

Urban

connection 0.0 0.1 0.2 0.2 0.3

Rural

connection 0.0 0.1 0.3 0.3 0.3

Rehabilitation cost 0.1 0.1 0.1 0.1 0.1

Variable cost (existing

capacity) 0.3 0.3 0.3 0.3 0.4

Total Capital cost 0.4 0.5 0.9 0.9 0.9

Investment

cost 0.3 0.4 0.8 0.8 0.8

Rehabilitation

cost 0.1 0.1 0.1 0.1 0.1

Variable cost 0.3 0.3 0.3 0.3 0.4

Total 0.7 0.8 1.2 1.2 1.3

Page 22: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

18

Table A1.23 Investment costs of capacity expansion (M$) – Lesotho

Trade

expansion

Trade

stagnation Low growth

Current access

rate

35% access

rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Generation Investment cost 0.0 0 1 1 1

Rehabilitation

cost 0 0 0 0 0

T&D Investment cost 50 77 134 134 111

Rehabilitation

cost 17 17 17 17 17

Total 67 94 151 151 128

Table A1.24 Investment costs of capacity expansion (% of GDP in 2015) – Lesotho

Trade

expansion

Trade

stagnation Low growth

Current access

rate

35% access

rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Generation Investment cost 0.0 0.0 0.0 0.0 0.0

Rehabilitation

cost

0.0 0.0 0.0 0.0 0.0

T&D Investment cost 2.3 3.6 6.2 6.2 6.2

Rehabilitation

cost

0.8 0.8 0.8 0.8 0.9

Total 3.1 4.3 7.0 7.0 7.2

Page 23: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

19

Malawi

Table A1.25 Overview: Malawi 2015

Trade expansion Trade

stagnation

Low growth

Current

access rate

35% access

rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Imports (TWh) 1.3 2.1 1.8 0.0 1.3

Exports (TWh) 0.1 0.4 0.3 1.6 0.0

Net exports (TWh) -1.2 -1.7 -1.5 1.6 -1.3

Generation capacity -

installed (MW)

175 175 175 175 175

Generation capacity -

refurbishment (MW) 100 100 100 100 100

Generation capacity - new

investments (MW) 0 0 1 698 1

New cross-border

transmission (MW) 177 261 227 0 197

Target access rate 7 % 18 % 15 % 15 % 15 %

Generation capacity

mix (%):

Hyd

ro 92 % 92 % 91 % 98 % 91 %

Coal 0 % 0 % 0 % 0 % 0 %

Gas 6 % 6 % 6 % 2 % 6 %

Oth

er 3 % 3 % 3 % 1 % 3 %

Table A1.26 Possible Hydropower Expansion: Malawi

Scenario Project* Planned capacity (MW) Lead time (years) Cost estimate (Mill. USD)

Trade expansion No new projects* - -

Trade stagnation Songwe**

343 7 Notavailable

Kaphichira Phase II 58 4 50

Kholombizo 240 7 391

Fufu 100 6 141

* Plus mini-hydro in rural node

** Borders to Tanzania

Page 24: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

20

Table A1.27 Annualized costs of capacity expansion (M$) – Malawi

Trade

expansion

Trade

stagnation

Low

growth

Current

access rate

35% access

Rate

National

targets for

access

rates

National

targets for

access

rates

National

targets for

access

rates, trade

expansion

Generation Investment cost 0 0 0.3 135.0 0.3

Thermal 0 0 0 0 0

Hydro 0 0 0 134.8 0

Other 0 0 0.3 0.3 0.3

Rehabilitation cost 3.8 3.8 3.8 3.8 3.8

Thermal 0 0 0 0 0

Hydro 3.8 3.8 3.8 3.8 3.8

Other 0 0 0 0 0

Variable cost (fuel, O&M) 0 0 0 0 0

New capacity 0 0 0 0 0

Installed

capacity 0 0 0 0 0

T&D Investment cost 13 34 33 32 31

Cross-border 1 1 1 0 1

Distribution

grid 7 7 7 7 5

Urban

connection 5 26 17 17 17

Rural

connection 1 1 9 9 9

Rehabilitation cost 5 5 5 5 5

Variable cost (existing capacity) 14 14 14 14 14

Total Capital cost 22 43 43 176 41

Investment

cost 13 34 34 167 32

Rehabilitation

cost 9 9 9 9 9

Variable cost 14 14 14 14 14

Total 35 57 56 190 54

Page 25: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

21

Table A1.28 Annualized costs of capacity expansion (% of GDP in 2015) – Malawi

Trade

expansion

Trade

stagnation

Low

growth

Current

access

rate

35%

access

rate

National

targets for

access

rates

National

targets for

access

rates

National

targets for

access

rates, trade

expansion

Generation Investment cost 0.0 0.0 0.0 4.4 0.0

Thermal 0.0 0.0 0.0 0.0 0.0

Hydro 0.0 0.0 0.0 4.4 0.0

Other 0.0 0.0 0.0 0.0 0.0

Rehabilitation cost 0.1 0.1 0.1 0.1 0.1

Thermal 0.0 0.0 0.0 0.0 0.0

Hydro 0.1 0.1 0.1 0.1 0.1

Other 0.0 0.0 0.0 0.0 0.0

Variable cost (fuel, O&M) 0.0 0.0 0.0 0.0 0.0

New capacity 0.0 0.0 0.0 0.0 0.0

Existing

capacity 0.0 0.0 0.0 0.0 0.0

T&D Investment cost 0.4 1.1 1.1 1.1 1.1

Cross-border 0.0 0.0 0.0 0.0 0.0

Distribution

grid 0.2 0.2 0.2 0.2 0.2

Urban

connection 0.2 0.8 0.5 0.5 0.6

Rural

connection 0.0 0.0 0.3 0.3 0.3

Rehabilitation cost 0.2 0.2 0.2 0.2 0.2

Variable cost (existing

capacity) 0.4 0.4 0.4 0.4 0.5

Total Capital cost 0.7 1.4 1.4 5.7 1.4

Investment

cost 0.4 1.1 1.1 5.4 1.1

Rehabilitation

cost 0.3 0.3 0.3 0.3 0.3

Variable cost 0.4 0.4 0.4 0.4 0.5

Total 1.2 1.9 1.8 6.2 1.9

Page 26: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

22

Table A1.29 Investment costs of capacity expansion (M$) – Malawi

Trade

expansion

Trade

stagnation Low growth

Current access

rate

35% access

rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade expansion

Generation Investment cost 0.0 0 2 1,039 2

Rehabilitation

cost 22 22 22 22 22

T&D Investment cost 103 276 269 261 253

Rehabilitation

cost 42 42 42 42 42

Total 167 340 335 1,364 319

Table A1.30 Investment costs of capacity expansion (% of GDP in 2015) – Malawi

Trade

expansion

Trade

stagnation Low growth

Current access

rate

35% access

rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade expansion

Generation Investment cost 0.0 0.0 0.1 33.8 0.1

Rehabilitation

cost

0.7 0.7 0.7 0.7 0.8

T&D Investment cost 3.4 9.0 8.8 8.5 9.0

Rehabilitation

cost

1.4 1.4 1.4 1.4 1.5

Total 5.4 11.1 10.9 44.4 11.3

Page 27: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

23

Mozambique

Table A1.31 Overview: Mozambique 2015

Trade expansion Trade

stagnation

Low growth

Current

access rate

35% access

rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Imports (TWh) 12.7 13.4 13.2 7.0 12.5

Exports (TWh) 19.1 19.2 19.1 9.2 20.2

Net exports (TWh) 6.4 5.8 5.9 2.1 7.7

Generation capacity -

installed (MW)

2 174 2 174 2 174 2 174 2 174

Generation capacity -

refurbishment (MW) 180 180 180 180 180

Generation capacity - new

investments (MW) 3 247 3 248 3 248 2 348 3 248

New cross-border transmission

(MW) 1 400 1 400 1 400 0 1 253

Target access rate 14 % 23 % 20 % 20 % 20 %

Generation capacity

mix (%):

Hydro

97 % 97 % 97 % 69 % 97 %

Coal 3 % 3 % 3 % 30 % 3 %

Gas 0 % 0 % 0 % 0 % 0 %

Other 0 % 0 % 0 % 0 % 0 %

Table A1.32 Possible Hydropower Expansion: Mozambique

Scenario Project* Planned capacity (MW) Lead time (years) Cost estimate (Mill. USD)

Trade expansion Boroma 160 7 150

Mpanda Uncua 1,300 10 2,000

Cahora Bassa North 850 5 771

Lurio 183 4 339

Lupata 654 8 1,215

Mazingir 40 4 55

Mawuzi III 60 3 119

Trade stagnation Boroma 160 7 150

Mpanda Uncua 1,300 10 2,000

* Plus mini-hydro in rural node

Page 28: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

24

Table A1.33 Annualized costs of capacity expansion (M$) – Mozambique

Trade

expansion

Trade

stagnation

Low

growth

Current

access rate

35% access

rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access

rates, trade

expansion

Generation Investment cost 605.6 605.9 605.9 407.3 605.9

Thermal 0.0 0.0 0.0 202.4 0.0

Hydro 605.6 605.6 605.6 204.6 605.6

Other 0.0 0.4 0.3 0.3 0.3

Rehabilitation cost 9.5 9.5 9.5 9.5 9.5

Thermal 4.3 4.3 4.3 4.3 4.3

Hydro 5.2 5.2 5.2 5.2 5.2

Other 0.0 0.0 0.0 0.0 0.0

Variable cost (fuel, O&M) 17.4 17.4 17.4 147.4 17.4

New capacity 0.0 0.0 0.0 130.0 0.0

Installed

capacity 17.4 17.4 17.4 17.4 17.4

T&D Investment cost 47 82 75 58 67

Cross-border 17 17 17 0 16

Distribution

grid 17 17 17 17 11

Urban

connection 12 34 28 28 28

Rural

connection 0 14 13 13 13

Rehabilitation cost 20 20 20 20 20

Variable cost (existing capacity) 43 43 43 43 43

Total Capital cost 682 718 711 494 703

Investment

Cost 653 688 681 465 673

Rehabilitation

cost 30 30 30 30 30

Variable cost 60 60 60 190 60

Total 742 778 771 685 763

Page 29: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

25

Table A1.34 Annualized costs of capacity expansion (% of GDP in 2015) – Mozambique

Trade

expansion

Trade

stagnation

Low

growth

Current

access rate

35%

access

rate

National

targets for

access

rates

National

targets for

access

rates

National

targets for

access

rates, trade

expansion

Generation Investment cost 6.2 6.2 6.2 4.2 6.8

Thermal 0.0 0.0 0.0 2.1 0.0

Hydro 6.2 6.2 6.2 2.1 6.8

Other 0.0 0.0 0.0 0.0 0.0

Rehabilitation cost 0.1 0.1 0.1 0.1 0.1

Thermal 0.0 0.0 0.0 0.0 0.0

Hydro 0.1 0.1 0.1 0.1 0.1

Other 0.0 0.0 0.0 0.0 0.0

Variable cost (fuel, O&M) 0.2 0.2 0.2 1.5 0.2

New capacity 0.0 0.0 0.0 1.3 0.0

Existing

capacity 0.2 0.2 0.2 0.2 0.2

T&D Investment cost 0.5 0.8 0.8 0.6 0.8

Cross-border 0.2 0.2 0.2 0.0 0.2

Distribution

grid 0.2 0.2 0.2 0.2 0.1

Urban

connection 0.1 0.3 0.3 0.3 0.3

Rural

connection 0.0 0.1 0.1 0.1 0.1

Rehabilitation cost 0.2 0.2 0.2 0.2 0.2

Variable cost (existing

capacity) 0.4 0.4 0.4 0.4 0.5

Total Capital cost 7.0 7.3 7.3 5.1 7.9

Investment

cost 6.7 7.0 7.0 4.8 7.5

Rehabilitation

cost 0.3 0.3 0.3 0.3 0.3

Variable cost 0.6 0.6 0.6 1.9 0.7

Total 7.6 8.0 7.9 7.0 8.5

Page 30: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

26

Table A1.35 Investment costs of capacity expansion (M$) – Mozambique

Trade

expansion

Trade

stagnation Low growth

Current access

rate

35% access

rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Generation Investment cost 4,649.7 4,653 4,652 2,949 4,652

Rehabilitation

cost 54 54 54 54 54

T&D Investment cost 379 664 604 464 541

Rehabilitation

cost 162 162 162 162 162

Total 5,244 5,532 5,472 3,628 5,408

Table A1.36 Investment costs of capacity expansion (% of GDP in 2015) – Mozambique

Trade

expansion

Trade

stagnation Low growth

Current access

rate

35% access

rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Generation Investment cost 47.5 % 47.5 % 47.5 % 30.1 % 52.0 %

Rehabilitation

cost 0.5 % 0.5 % 0.5 % 0.5 % 0.6 %

T&D Investment cost 3.9 % 6.8 % 6.2 % 4.7 % 6.0 %

Rehabilitation

cost 1.7 % 1.7 % 1.7 % 1.7 % 1.8 %

Total 53.6 % 56.5 % 55.9 % 37.1 % 60.4 %

Page 31: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

27

Namibia

Table A1.37 Overview: Namibia 2015

Trade expansion Trade

stagnation

Low growth

Current

access rate

35% access

rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Imports (TWh) 4.8 4.8 4.9 1.2 4.4

Exports (TWh) 1.0 1.1 1.1 2.0 1.6

Net Exports (TWh) -3.7 -3.8 -3.8 0.9 -2.8

Generation capacity -

installed (MW)

240 240 240 240 240

Generation capacity -

refurbishment (MW) 120 120 120 120 120

Generation capacity - new

investments (MW) 0 1 2 1 059 2

New cross-border Transmission

(MW) 544 550 556 0 498

Target Access Rate 37 % 45 % 53 % 53 % 53 %

Generation capacity

mix (%):

Hydro

67 % 66 % 66 % 31 % 66 %

Coal 33 % 33 % 33 % 8 % 33 %

Gas 0 % 0 % 0 % 60 % 0 %

Other 0 % 0 % 1 % 0 % 1 %

Table A1.38 Possible Hydropower Expansion: Namibia

Scenario Project* Planned capacity (MW) Lead time (years) Cost estimate (Mill. USD)

Trade expansion No new projects - -

Trade stagnation Popa Falls 23 4 No estimate

Baine* 180 4 320

* Plus mini-hydro in rural node

**Borders to Angola

Page 32: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

28

Table A1.39 Annualized costs of capacity expansion (M$) – Namibia

Trade

expansion

Trade

stagnation

Low

growth

Current

access rate

35% access

rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access

rates, trade

expansion

Generation Investment cost 0.0 0.4 0.7 129.6 0.7

Thermal 0.0 0.0 0.0 82.5 0.0

Hydro 0.0 0.0 0.0 46.4 0.0

Other 0.0 0.4 0.7 0.7 0.7

Rehabilitation cost 6.4 6.4 6.4 6.4 6.4

Thermal 6.4 6.4 6.4 6.4 6.4

Hydro 0.0 0.0 0.0 0.0 0.0

Other 0.0 0.0 0.0 0.0 0.0

Variable cost (fuel, O&M) 13.1 13.1 13.1 213.1 13.1

New capacity 0.0 0.0 0.0 200.1 0.0

Installed

capacity 13.1 13.1 13.1 13.1 13.1

T&D Investment cost 98 103 107 77 71

Cross-border 29 29 30 0 26

Distribution

grid 67 67 67 67 34

Urban

connection 2 3 4 4 4

Rural

connection 0 3 7 7 7

Rehabilitation cost 55 55 55 55 55

Variable cost (existing capacity) 102 102 102 102 102

Total Capital cost 159 164 169 268 133

Investment

Cost 98 103 108 207 72

Rehabilitation

cost 61 61 61 61 61

Variable cost 115 115 115 315 115

Total 274 279 284 583 248

Page 33: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

29

Table A1.40 Annualized costs of capacity expansion (% of GDP in 2015) – Namibia

Trade

expansion

Trade

stagnation

Low

growth

Current

access

rate

35%

access

rate

National

targets for

access

rates

National

targets for

access

rates

National

targets for

access

rates, trade

expansion

Generation Investment cost 0.0 % 0.0 % 0.0 % 1.3 % 0.0 %

Thermal 0.0 % 0.0 % 0.0 % 0.8 % 0.0 %

Hydro 0.0 % 0.0 % 0.0 % 0.5 % 0.0 %

Other 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Rehabilitation cost 0.1 % 0.1 % 0.1 % 0.1 % 0.1 %

Thermal 0.1 % 0.1 % 0.1 % 0.1 % 0.1 %

Hydro 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Other 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Variable cost (fuel, O&M) 0.1 % 0.1 % 0.1 % 2.1 % 0.2 %

New capacity 0.0 % 0.0 % 0.0 % 2.0 % 0.0 %

Existing

capacity 0.1 % 0.1 % 0.1 % 0.1 % 0.2 %

T&D Investment cost 1.0 % 1.0 % 1.1 % 0.8 % 0.8 %

Cross-border 0.3 % 0.3 % 0.3 % 0.0 % 0.3 %

Distribution

grid 0.7 % 0.7 % 0.7 % 0.7 % 0.4 %

Urban

connection 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Rural

connection 0.0 % 0.0 % 0.1 % 0.1 % 0.1 %

Rehabilitation cost 0.5 % 0.5 % 0.5 % 0.5 % 0.6 %

Variable cost (existing

capacity) 1.0 % 1.0 % 1.0 % 1.0 % 1.2 %

Total Capital cost 1.6 % 1.6 % 1.7 % 2.6 % 1.6 %

Investment

cost 1.0 % 1.0 % 1.1 % 2.0 % 0.8 %

Rehabilitation

cost 0.6 % 0.6 % 0.6 % 0.6 % 0.7 %

Variable cost 1.1 % 1.1 % 1.1 % 3.1 % 1.4 %

Total 2.7 % 2.8 % 2.8 % 5.8 % 2.9 %

Page 34: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

30

Table A1.41 Investment costs of capacity expansion (M$) – Namibia

Trade

expansion

Trade

stagnation Low growth

Current access

rate

35% access

rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Generation Investment cost 0.0 3 6 939 6

Rehabilitation cost 36 36 36 36 36

T&D Investment cost 787 826 863 623 571

Rehabilitation cost 440 440 440 440 440

Total 1,263 1,305 1,345 2,038 1,052

Table A1.42 Investment costs of capacity expansion (% of GDP in 2015) – Namibia

Trade

expansion

Trade

stagnation Low growth

Current access

rate

35% access

rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Generation Investment cost 0.0 % 0.0 % 0.1 % 9.3 % 0.1 %

Rehabilitation cost 0.4 % 0.4 % 0.4 % 0.4 % 0.4 %

T&D Investment cost 7.8 % 8.2 % 8.5 % 6.2 % 6.7 %

Rehabilitation cost 4.4 % 4.4 % 4.4 % 4.4 % 5.2 %

Total 12.5 % 12.9 % 13.3 % 20.2 % 12.4 %

Page 35: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

31

Republic of South Africa

Table A1.43 Overview: South Africa 2015

Trade expansion Trade

stagnation

Low growth

Current

access rate

35% access

rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Imports (TWh) 38.8 37.2 37.7 21.8 45.1

Exports (TWh) 0.6 0.8 1.4 7.8 1.2

Net exports (TWh) -38.3 -36.4 -36.4 -14.0 -44.0

Generation capacity -

installed (MW)

13 463 13 463 13 463 13 463 13 463

Generation capacity -

refurbishment (MW) 21 690 21 690 21 690 21 690 21 690

Generation capacity - new

investments (MW)* 18 657 19 082 19 399 20 873 7 239

New cross-border transmission

(MW) 819 528 547 0 1 647

Target access rate 71 % 79 % 100 % 100 % 100 %

Generation capacity

mix (%):

Hydro

8 % 8 % 8 % 8 % 11 %

Coal 82 % 82 % 82 % 83 % 77 %

Gas 0 % 0 % 0 % 0 % 0 %

Other 9 % 9 % 9 % 9 % 12 %

* Mmamabula power plant (2 400 MW) is, for modelling purposes, assumed to be located in South Africa (in order to reflect the short distance between the power plant and the point where the power will be fed into the South African transmission grid). Consequently, the investment volumes and costs of Mmamabula are not included in the tables for Botswana, but in the tables for South Africa.

Table A1.44 Possible Hydropower Expansion: South Africa

Scenario Project*

Planned capacity

(MW)

Lead time

(years)

Cost estimate (Mill.

USD)

Trade

expansion

Bramhoek Pumped

Storage 1,332 5 1,400

Steelport Pumped

Storage 1,000 7 976

Trade

stagnation Same

* Plus mini-hydro in rural node

Page 36: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

32

Table A1.45 Annualized costs of capacity expansion (M$) – South Africa

Trade

expansion

Trade

stagnation

Low

growth

Current

access rate

35% access

rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access

rates, trade

expansion

Generation Investment cost 2,607.3 2,677.2 2,745.3 2,984.0 776.7

Thermal 2,138.8 2,206.7 2,244.9 2,483.6 276.3

Hydro 313.7 313.7 313.7 313.7 313.7

Other 154.8 156.8 186.7 186.7 186.7

Rehabilitation cost 1,045.5 1,045.5 1,045.5 1,045.5 1,045.5

Thermal 1,013.6 1,013.6 1,013.6 1,013.6 1,013.6

Hydro 31.9 31.9 31.9 31.9 31.9

Other 0.0 0.0 0.0 0.0 0.0

Variable cost (fuel, O&M) 5,026.4 5,072.0 5,100.9 5,486.9 3,820.3

New capacity 1,985.6 2,048.6 2,084.1 2,305.7 256.5

Installed

capacity 3,040.8 3,023.3 3,016.8 3,181.3 3,563.8

T&D Investment cost 1,192 1,229 1,324 1,322 608

Cross-border 2 1 1 0 4

Distribution

grid 1,173 1,173 1,173 1,173 455

Urban

connection 18 37 70 70 70

Rural

connection 0 18 80 80 80

Rehabilitation cost 800 800 800 800 800

Variable cost (existing capacity) 2,495 2,495 2,495 2,495 2,495

Total Capital cost 5,645 5,752 5,914 6,152 3,230

Investment

Cost 3,800 3,907 4,069 4,306 1,385

Rehabilitation

cost 1,846 1,846 1,846 1,846 1,846

Variable cost 7,521 7,567 7,596 7,982 6,315

Total 13,167 13,319 13,510 14,134 9,546

Page 37: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

33

Table A1.46 Annualized costs of capacity expansion (% of GDP in 2015) – South Africa

Trade

expansion

Trade

stagnation

Low

growth

Current

access rate

35%

access

rate

National

targets for

access

rates

National

targets for

access

rates

National

targets for

access

rates, trade

expansion

Generation Investment cost 0.7 % 0.8 % 0.8 % 0.9 % 0.3 %

Thermal 0.6 % 0.6 % 0.6 % 0.7 % 0.1 %

Hydro 0.1 % 0.1 % 0.1 % 0.1 % 0.1 %

Other 0.0 % 0.0 % 0.1 % 0.1 % 0.1 %

Rehabilitation cost 0.3 % 0.3 % 0.3 % 0.3 % 0.4 %

Thermal 0.3 % 0.3 % 0.3 % 0.3 % 0.3 %

Hydro 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Other 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Variable cost (fuel, O&M) 1.4 % 1.4 % 1.5 % 1.6 % 1.3 %

New capacity 0.6 % 0.6 % 0.6 % 0.7 % 0.1 %

Existing

capacity 0.9 % 0.9 % 0.9 % 0.9 % 1.2 %

T&D Investment cost 0.3 % 0.4 % 0.4 % 0.4 % 0.2 %

Cross-border 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Distribution

grid 0.3 % 0.3 % 0.3 % 0.3 % 0.2 %

Urban

connection 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Rural

connection 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Rehabilitation cost 0.2 % 0.2 % 0.2 % 0.2 % 0.3 %

Variable cost (existing

capacity) 0.7 % 0.7 % 0.7 % 0.7 % 0.8 %

Total Capital cost 1.6 % 1.6 % 1.7 % 1.8 % 1.1 %

Investment

cost 1.1 % 1.1 % 1.2 % 1.2 % 0.5 %

Rehabilitation

cost 0.5 % 0.5 % 0.5 % 0.5 % 0.6 %

Variable cost 2.1 % 2.2 % 2.2 % 2.3 % 2.1 %

Total 3.8 % 3.8 % 3.9 % 4.0 % 3.2 %

Page 38: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

34

Table A1.47 Investment costs of capacity expansion (M$) – South Africa

Trade

expansion

Trade

stagnation Low growth

Current access

rate

35% access

rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Generation Investment cost 17,929 18,406 18,894 20,515 5,518

Rehabilitation

cost 5,908 5,908 5,908 5,908 5,908

T&D Investment cost 9,605 9,903 10,661 10,651 4,900

Rehabilitation

cost 6,445 6,445 6,445 6,445 6,445

Total 39,887 40,662 41,907 43,518 22,770

Table A1.48 Investment costs of capacity expansion (% of GDP in 2015) – South Africa

Trade

expansion

Trade

stagnation Low growth

Current access

rate

35% access

rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Generation Investment cost 5.1 % 5.3 % 5.4 % 5.9 % 1.9 %

Rehabilitation

cost 1.7 % 1.7 % 1.7 % 1.7 % 2.0 %

T&D Investment cost 2.7 % 2.8 % 3.0 % 3.0 % 1.6 %

Rehabilitation

cost 1.8 % 1.8 % 1.8 % 1.8 % 2.2 %

Total 11.4 % 11.6 % 12.0 % 12.4 % 7.7 %

Page 39: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

35

Zambia

Table A1.49 Overview: Zambia 2015

Trade expansion Trade

stagnation

Low growth

Current

access rate

35% access

rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Imports (TWh) 41.0 41.1 41.1 2.4 41.1

Exports (TWh) 39.4 39.2 39.3 8.4 40.4

Net Exports (TWh) -1.6 -1.8 -1.8 6.0 -0.7

Generation capacity -

installed (MW)

268 268 268 268 268

Generation capacity -

refurbishment (MW) 1 670 1 670 1 670 1 670 1 670

Generation capacity - new

investments (MW) 0 2 3 1 726 3

New cross-border Transmission

(MW) 7 548 7 511 7 526 0 7 694

Target access rate 20 % 29 % 29 % 29 % 29 %

Generation capacity

mix (%):

Hydro

95 % 95 % 95 % 97 % 95 %

Coal 0 % 0 % 0 % 0 % 0 %

Gas 4 % 4 % 4 % 2 % 4 %

Other 1 % 1 % 1 % 1 % 1 %

Table A1.50 Possible Hydropower Expansion: Zambia

Scenario Project* Planned capacity (MW) Lead time (years) Cost estimate (Mill. USD)

Trade expansion No new projects* - - -

Trade stagnation Kafue Gorge Lower 600 6 600

Itezhi Tezi 120 5 142

Kalungwhishi 163 7 210

Batoka**

800 10 1,250

Devils Gorge**

300 7 454

* Plus mini-hydro in rural node

** Borders to Zimbabwe

Page 40: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

36

Table A1.51 Annualized costs of capacity expansion (M$) – Zambia

Trade

expansion

Trade

stagnation

Low

growth

Current

access rate

35% access

rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access

rates, trade

expansion

Generation Investment cost 0 0.6 1.0 302.3 1.0

Thermal 0 0 0 0 0

Hydro 0 0 0 301.4 0

Other 0 0.6 1.0 1.0 1.0

Rehabilitation cost 56.5 56.5 56.5 56.5 56.5

Thermal 0 0 0 0 0

Hydro 56.5 56.5 56.5 56.5 56.5

Other 0 0 0 0 0

Variable cost (fuel, O&M) 0.0 0 0 0 0

New capacity 0 0 0 0 0

Installed

capacity 0 0 0 0 0

T&D Investment cost 193 225 233 92 217

Cross-border 141 142 142 0 141

Distribution

grid 43 43 43 43 27

Urban

connection 8 16 11 11 11

Rural

connection 1 24 38 38 38

Rehabilitation cost 81 81 81 81 81

Variable cost (existing capacity) 99 99 99 99 99

Total Capital cost 330 364 372 532 356

Investment

cost 193 226 234 394 218

Rehabilitation

cost 138 138 138 138 138

Variable cost 99 99 99 99 99

Total 429 463 471 631 455

Page 41: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

37

Table A1.52 Annualized costs of capacity expansion (% of GDP in 2015) – Zambia

Trade

expansion

Trade

stagnation

Low

growth

Current

access

rate

35%

access r

ate

National

targets for

access

rates

National

targets for

access

rates

National

targets for

access

rates, trade

expansion

Generation Investment cost 0.0 % 0.0 % 0.0 % 2.8 % 0.0 %

Thermal 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Hydro 0.0 % 0.0 % 0.0 % 2.8 % 0.0 %

Other 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Rehabilitation cost 0.5 % 0.5 % 0.5 % 0.5 % 0.6 %

Thermal 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Hydro 0.5 % 0.5 % 0.5 % 0.5 % 0.6 %

Other 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Variable cost (fuel, O&M) 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

New capacity 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Existing

capacity 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

T&D Investment cost 1.8 % 2.1 % 2.2 % 0.9 % 2.3 %

Cross-border 1.3 % 1.3 % 1.3 % 0.0 % 1.5 %

Distribution

grid 0.4 % 0.4 % 0.4 % 0.4 % 0.3 %

Urban

connection 0.1 % 0.1 % 0.1 % 0.1 % 0.1 %

Rural

connection 0.0 % 0.2 % 0.4 % 0.4 % 0.4 %

Rehabilitation cost 0.8 % 0.8 % 0.8 % 0.8 % 0.8 %

Variable cost (existing

capacity) 0.9 % 0.9 % 0.9 % 0.9 % 1.0 %

Total Capital cost 3.1 % 3.4 % 3.5 % 5.0 % 3.7 %

Investment

cost 1.8 % 2.1 % 2.2 % 3.7 % 2.3 %

Rehabilitation

cost 1.3 % 1.3 % 1.3 % 1.3 % 1.4 %

Variable cost 0.9 % 0.9 % 0.9 % 0.9 % 1.0 %

Total 4.0 % 4.3 % 4.4 % 5.9 % 4.7 %

Page 42: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

38

Table A1.53 Investment costs of capacity expansion (M$) – Zambia

Trade

expansion

Trade

stagnation Low growth

Current

access rate

35% access

rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Generation Investment cost 0.0 4 7 2,310 7

Rehabilitation cost 319 319 319 319 319

T&D Investment cost 1,551 1,814 1,881 740 1,747

Rehabilitation cost 655 655 655 655 655

Total 2,524 2,793 2,862 4,023 2,729

Table A1.54 Investment costs of capacity expansion (% of GDP in 2015) – Zambia

Trade

expansion

Trade

stagnation Low growth

Current

access rate

35% access

rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Generation Investment cost 0.0 % 0.0 % 0.1 % 21.7 % 0.1 %

Rehabilitation cost 3.0 % 3.0 % 3.0 % 3.0 % 3.3 %

T&D Investment cost 14.6 % 17.0 % 17.7 % 6.9 % 18.1 %

Rehabilitation cost 6.1 % 6.1 % 6.1 % 6.1 % 6.8 %

Total 23.7 % 26.2 % 26.9 % 37.8 % 28.3 %

Page 43: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

39

Zimbabwe

Table A1.55 Overview: Zimbabwe 2015

Trade expansion Trade

stagnation

Low growth

Current

access rate

35% access

rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Imports (TWh) 25.9 24.8 25.5 12.4 28.3

Exports (TWh) 23.1 21.6 22.0 8.8 27.7

Net Exports (TWh) -2.7 -3.2 -3.5 -3.6 -0.6

Generation capacity -

installed (MW)

0 0 0 0 0

Generation capacity -

refurbishment (MW) 1 835 1 835 1 835 1 835 1 835

Generation capacity - new

investments (MW) 2 225 2 228 2 251 2 158 2 251

New cross-border Transmission

(MW) 3 388 2 979 3 072 0 4 371

Target Access Rate 41 % 49 % 67 % 67 % 67 %

Generation capacity

mix (%):

Hydro

74 % 73 % 73 % 47 % 73 %

Coal 26 % 26 % 26 % 52 % 26 %

Gas 0 % 0 % 0 % 0 % 0 %

Other 0 % 0 % 1 % 1 % 1 %

Page 44: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

40

Table A1.56 Possible Hydropower Expansion: Zimbabwe

Scenario Project*

Planned capacity

(MW)

Lead time

(years)

Cost estimate (Mill.

USD)

Trade

expansion

Gairezi 35 2 35

Condo 100 100

Batoka**

800 10 1,250

Devils Gorge**

300 7 454

Mupata Gorge**

300 7 454

Victoria Falls**

390 7 590

Kariba South

Extension

300 3 200

Trade

stagnation

Gairezi 35 2 35

Condo 100 100

Batoka**

800 10 1,250

Devils Gorge**

300 7 454

* Plus mini-hydro in rural node

** Borders to Zambia

Page 45: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

41

Table A1.57 Annualized costs of capacity expansion (M$) – Zimbabwe

Trade

expansion

Trade

stagnation

Low

growth

Current

access rate

35% access

rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access

rates, trade

expansion

Generation Investment cost 402.5 403.7 411.7 375.5 411.7

Thermal 0.0 0.0 0.0 165.2 0.0

Hydro 402.5 402.5 402.5 201.2 402.5

Other 0.0 1.2 9.2 9.2 9.2

Rehabilitation cost 97.4 97.4 97.4 97.4 97.4

Thermal 57.1 57.1 57.1 57.1 57.1

Hydro 40.4 40.4 40.4 40.4 40.4

Other 0.0 0.0 0.0 0.0 0.0

Variable cost (fuel, O&M) 116.9 116.9 116.9 223.0 116.9

New capacity 0.0 0.0 0.0 106.1 0.0

Installed

capacity 116.9 116.9 116.9 116.9 116.9

T&D Investment cost 115 145 238 201 214

Cross-border 41 36 37 0 52

Distribution

grid 75 75 75 75 36

Urban

connection 0 19 20 20 20

Rural

connection 0 15 106 106 106

Rehabilitation cost 160 160 160 160 160

Variable cost (existing capacity) 185 185 185 185 185

Total Capital cost 775 807 907 834 883

Investment

Cost 518 549 650 577 626

Rehabilitation

cost 257 257 257 257 257

Variable cost 302 302 302 408 302

Total 1,077 1,109 1,210 1,243 1,186

Page 46: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

42

Table A1.58 Annualized costs of capacity expansion (% of GDP in 2015) – Zimbabwe

Trade

expansion

Trade

stagnation

Low

growth

Current

access rate

35% access

rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access

rates, trade

expansion

Generation Investment cost 8.5 % 8.6 % 8.7 % 8.0 % 9.9 %

Thermal 0.0 % 0.0 % 0.0 % 3.5 % 0.0 %

Hydro 8.5 % 8.5 % 8.5 % 4.3 % 9.7 %

Other 0.0 % 0.0 % 0.2 % 0.2 % 0.2 %

Rehabilitation cost 2.1 % 2.1 % 2.1 % 2.1 % 2.3 %

Thermal 1.2 % 1.2 % 1.2 % 1.2 % 1.4 %

Hydro 0.9 % 0.9 % 0.9 % 0.9 % 1.0 %

Other 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Variable cost (fuel, O&M) 2.5 % 2.5 % 2.5 % 4.7 % 2.8 %

New capacity 0.0 % 0.0 % 0.0 % 2.3 % 0.0 %

Installed

capacity 2.5 % 2.5 % 2.5 % 2.5 % 2.8 %

T&D Investment cost 2.4 % 3.1 % 5.1 % 4.3 % 5.1 %

Cross-border 0.9 % 0.8 % 0.8 % 0.0 % 1.2 %

Distribution

grid 1.6 % 1.6 % 1.6 % 1.6 % 0.9 %

Urban

connection 0.0 % 0.4 % 0.4 % 0.4 % 0.5 %

Rural

connection 0.0 % 0.3 % 2.3 % 2.3 % 2.5 %

Rehabilitation cost 3.4 % 3.4 % 3.4 % 3.4 % 3.8 %

Variable cost (existing capacity) 3.9 % 3.9 % 3.9 % 3.9 % 4.4 %

Total Capital cost 16.4 % 17.1 % 19.2 % 17.7 % 21.2 %

Investment

Cost 11.0 % 11.7 % 13.8 % 12.2 % 15.0 %

Rehabilitation

cost 5.5 % 5.5 % 5.5 % 5.5 % 6.2 %

Variable cost 6.4 % 6.4 % 6.4 % 8.7 % 7.3 %

Total 22.9 % 23.5 % 25.7 % 26.4 % 28.4 %

Page 47: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

43

Table A1.59 Investment costs of capacity expansion (M$) – Zimbabwe

Trade

expansion

Trade

stagnation Low growth

Current access

rate

35% access

rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Generation Investment cost 3,081.6 3,091 3,152 2,733 3,152

Rehabilitation

cost 551 551 551 551 551

T&D Investment cost 927 1,172 1,919 1,621 1,726

Rehabilitation

cost 1,288 1,288 1,288 1,288 1,288

Total 5,848 6,101 6,909 6,192 6,716

Table A1.60 Investment costs of capacity expansion (% of GDP in 2015) – Zimbabwe

Trade

expansion

Trade

stagnation Low growth

Current access

rate

35% access

rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Generation Investment cost 65.4 % 65.6 % 66.9 % 58.0 % 75.6 %

Rehabilitation

cost 11.7 % 11.7 % 11.7 % 11.7 % 13.2 %

T&D Investment cost 19.7 % 24.9 % 40.7 % 34.4 % 41.4 %

Rehabilitation

cost 27.3 % 27.3 % 27.3 % 27.3 % 30.9 %

Total 124.1 % 129.4 % 146.6 % 131.4 % 161.1 %

Page 48: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

44

Nile Basin – East Africa Power Pool

Burundi

Table A1.61 Overview: Burundi 2015

Trade

expansion

Trade

stagnation

Low growth

Current

access rate

35% access

rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Imports (TWh) 0.3 0.8 0.9 0.0 0.8

Exports (TWh) 0.0 0.1 0.2 0.0 0.2

Net Exports (TWh) -0.3 -0.7 -0.7 0.0 -0.6

Generation capacity -

installed (MW)

13 13 13 13 13

Generation capacity -

refurbishment (MW)

18 18 18 18 18

Generation capacity - new

investments (MW)

0 15 30 173 30

New cross-border Transmission

(MW)

39 86 78 0 66

Target Access Rate 6 % 25 % 31 % 31 % 31 %

Generation capacity

mix (%):

Hydro 84 % 56 % 43 % 60 % 43 %

Coal 0 % 0 % 0 % 0 % 0 %

Gas 0 % 0 % 0 % 0 % 0 %

Other 16 % 44 % 57 % 40 % 57 %

Page 49: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

45

Table A1.62 Possible Hydropower Expansion: Burundi

Scenario Project* Planned capacity (MW) Lead time (years) Cost estimate (Mill. USD)

Trade expansion No new projects* - - -

Trade stagnation Ruzizi III ** 27 4 32

Rusumo Falls *** 21 5 38

Kabu 16 20 5 44

Kaganuzi Complex 39 5 162

* Plus mini-hydro in rural node

** Borders to DRC and Rwanda

*** Borders to Tanzania and Rwanda

Page 50: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

46

Table A1.63 Annualized costs of capacity expansion (M$) – Burundi

Trade

expansion

Trade

stagnation

Low

growth

Current

access

rate

35% access

rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access

rates, trade

expansion

Generation Investment cost 0.0 5.9 11.4 71.7 11.4

Thermal 0.0 0.0 0.0 0.0 0.0

Hydro 0.0 0.0 0.0 41.8 0.0

Other 0.0 5.9 11.4 29.9 11.4

Rehabilitation cost 1.0 1.0 1.0 1.0 1.0

Thermal 0.0 0.0 0.0 0.0 0.0

Hydro 1.0 1.0 1.0 1.0 1.0

Other 0.0 0.0 0.0 0.0 0.0

Variable cost (fuel, O&M) 0.4 0.4 0.5 2.0 0.5

New capacity 0.0 0.0 0.0 1.2 0.0

Installed

capacity 0.4 0.4 0.4 0.9 0.4

T&D Investment cost 7 47 69 68 68

Cross-border

grid 0 1 1 0 0

Distribution

grid 3 3 3 3 2

Urban

connection 4 14 8 8 8

Rural

connection 0 29 57 57 57

Rehabilitation cost 1 1 1 1 1

Variable cost (existing capacity) 4 4 4 4 4

Total Capital cost 10 55 82 142 82

Investment

Cost 7 53 80 140 80

Rehabilitation

cost 2 2 2 2 2

Variable cost 4 4 4 6 4

Total 14 59 87 148 86

Page 51: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

47

Table A1.64 Annualized costs of capacity expansion (% of GDP in 2015) – Burundi

Trade

expansion

Trade

stagnation

Low

growth

Current

access rate

35%

access rate

National

targets for

access

rates

National

targets for

access

rates

National

targets for

access

rates, trade

expansion

Generation Investment cost 0.0 % 0.5 % 0.9 % 5.7 % 1.0 %

Thermal 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Hydro 0.0 % 0.0 % 0.0 % 3.3 % 0.0 %

Other 0.0 % 0.5 % 0.9 % 2.4 % 1.0 %

Rehabilitation cost 0.1 % 0.1 % 0.1 % 0.1 % 0.1 %

Thermal 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Hydro 0.1 % 0.1 % 0.1 % 0.1 % 0.1 %

Other 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Variable cost (fuel, O&M) 0.0 % 0.0 % 0.0 % 0.2 % 0.0 %

New capacity 0.0 % 0.0 % 0.0 % 0.1 % 0.0 %

Existing

capacity 0.0 % 0.0 % 0.0 % 0.1 % 0.0 %

T&D Investment cost 0.6 % 3.7 % 5.5 % 5.5 % 5.8 %

Cross-border

grid 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Distribution

grid 0.2 % 0.2 % 0.2 % 0.2 % 0.2 %

Urban

connection 0.3 % 1.1 % 0.7 % 0.7 % 0.7 %

Rural

connection 0.0 % 2.3 % 4.6 % 4.6 % 4.9 %

Rehabilitation cost 0.1 % 0.1 % 0.1 % 0.1 % 0.1 %

Variable cost

(existing capacity) 0.3 % 0.3 % 0.3 % 0.3 % 0.3 %

Total Capital cost 0.8 % 4.4 % 6.6 % 11.4 % 7.0 %

Investment

cost 0.6 % 4.2 % 6.4 % 11.2 % 6.8 %

Rehabilitation

cost 0.2 % 0.2 % 0.2 % 0.2 % 0.2 %

Variable cost 0.3 % 0.3 % 0.3 % 0.5 % 0.4 %

Total 1.1 % 4.7 % 6.9 % 11.8 % 7.4 %

Page 52: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

48

Table A1.65 Investment costs of capacity expansion (M$) – Burundi

Trade

expansion

Trade

stagnation Low growth

Current

access

rate

35% access

rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Generation Investment cost 0.3 43 83 558 83

Rehabilitation

cost 5 5 5 5 5

T&D Investment cost 59 385 571 567 567

Rehabilitation

cost 9 9 9 9 9

Total 75 443 669 1,140 665

Table A1.66 Investment costs of capacity expansion (% of GDP in 2015) – Burundi

Trade

expansion

Trade

stagnation Low growth

Current

access

rate

35% access

rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Generation Investment cost 0.0 % 3.4 % 6.7 % 44.6 % 7.1 %

Rehabilitation

cost 0.4 % 0.4 % 0.4 % 0.4 % 0.5 %

T&D Investment cost 4.8 % 30.8 % 45.6 % 45.3 % 48.3 %

Rehabilitation

cost 0.8 % 0.8 % 0.8 % 0.8 % 0.8 %

Total 6.0 % 35.4 % 53.5 % 91.1 % 56.7 %

Page 53: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

49

Djibouti

Table A1.67 Overview: Djibouti 2015

Trade expansion Trade

stagnation

Low growth

Current

access rate

35% access

rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Imports (TWh) 0.0 0.0 0.0 0.0 0.0

Exports (TWh) 0.0 0.0 0.0 0.0 0.0

Net Exports (TWh) 0.0 0.0 0.0 0.0 0.0

Generation capacity -

installed (MW)

85 85 85 85 85

Generation capacity -

refurbishment (MW)

0 0 0 0 0

Generation capacity - new

investments (MW)

45 53 54 54 60

New cross-border Transmission

(MW)

0 0 0 0 0

Target Access Rate 31 % 50 % 53 % 53 % 53 %

Generation capacity

mix (%):

Hydro 0 % 0 % 0 % 0 % 0 %

Coal 0 % 0 % 0 % 0 % 0 %

Gas 0 % 0 % 0 % 0 % 0 %

Other 100 % 100 % 100 % 100 % 100 %

Table A1.68 Possible Hydropower Expansion: Djibouti

Scenario Project* Planned capacity (MW) Lead time (years) Cost estimate (Mill. USD)

Trade expansion No new projects - - -

Trade stagnation No new projects - - -

* Only mini-hydro in rural node

Page 54: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

50

Table A1.69 Annualized costs of capacity expansion (M$) – Djibouti

Trade

expansion

Trade

stagnation

Low

growth

Current

access rate

35%

access

rate

National

targets for

access

rates

National

targets for

access

rates

National

targets for

access

rates, trade

expansion

Generation Investment cost 18.8 22.1 22.5 22.5 24.8

Thermal 0.0 0.0 0.0 0.0 0.0

Hydro 0.0 0.0 0.0 0.0 0.0

Other 18.8 22.1 22.5 22.5 24.8

Rehabilitation cost 0.0 0.0 0.0 0.0 0.0

Thermal 0.0 0.0 0.0 0.0 0.0

Hydro 0.0 0.0 0.0 0.0 0.0

Other 0.0 0.0 0.0 0.0 0.0

Variable cost (fuel, O&M) 0.6 0.7 0.7 0.7 0.8

New capacity 0.6 0.7 0.7 0.7 0.8

Installed

capacity 0.0 0.0 0.0 0.0 0.0

T&D Investment cost 1 3 4 4 4

Cross-border 0 0 0 0 0

Distribution

grid 0 0 0 0 0

Urban

connection 1 3 3 3 3

Rural

connection 0 0 1 1 1

Rehabilitation cost 0 0 0 0 0

Variable cost (existing capacity) 1 1 1 1 1

Total Capital cost 20 26 27 27 29

Investment

cost 20 25 27 27 29

Rehabilitation

cost 0 0 0 0 0

Variable cost 2 2 2 2 2

Total 22 27 29 29 31

Page 55: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

51

Table A1.70 Annualized costs of capacity expansion (% of GDP in 2015) – Djibouti

Trade

expansion

Trade

stagnation

Low

growth

Current

access

rate

35%

access

rate

National

targets for

access

rates

National

targets for

access

rates

National

targets for

access

rates, trade

expansion

Generation Investment cost 1.9 % 2.2 % 2.3 % 2.3 % 2.7 %

Thermal 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Hydro 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Other 1.9 % 2.2 % 2.3 % 2.3 % 2.7 %

Rehabilitation cost 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Thermal 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Hydro 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Other 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Variable cost (fuel, O&M) 0.1 % 0.1 % 0.1 % 0.1 % 0.1 %

New capacity 0.1 % 0.1 % 0.1 % 0.1 % 0.1 %

Existing

capacity 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

T&D Investment cost 0.1 % 0.3 % 0.4 % 0.4 % 0.4 %

Cross-border 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Distribution

grid 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Urban

connection 0.1 % 0.3 % 0.3 % 0.3 % 0.3 %

Rural

connection 0.0 % 0.0 % 0.1 % 0.1 % 0.1 %

Rehabilitation cost 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Variable cost (existing

capacity) 0.1 % 0.1 % 0.1 % 0.1 % 0.1 %

Total Capital cost 2.0 % 2.6 % 2.7 % 2.7 % 3.2 %

Investment

cost 2.0 % 2.6 % 2.7 % 2.7 % 3.1 %

Rehabilitation

cost 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Variable cost 0.2 % 0.2 % 0.2 % 0.2 % 0.2 %

Total 2.2 % 2.8 % 2.9 % 2.9 % 3.4 %

Page 56: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

52

Table A1.71 Investment costs of capacity expansion (M$) – Djibouti

Trade

expansion

Trade

stagnation Low growth

Current

access rate

35% access

rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Generation Investment cost 136 160 163 163 179

Rehabilitation cost 0 0 0 0 0

T&D Investment cost 9 27 34 34 33

Rehabilitation cost 2 2 2 2 2

Total 146 189 199 199 215

Table A1.72 Investment costs of capacity expansion (% of GDP in 2015) – Djibouti

Trade

expansion

Trade

stagnation Low growth

Current

access rate

35% access

rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Generation Investment cost 13.8 % 16.2 % 16.5 % 16.5 % 19.5 %

Rehabilitation cost 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

T&D Investment cost 0.9 % 2.8 % 3.5 % 3.5 % 3.6 %

Rehabilitation cost 0.2 % 0.2 % 0.2 % 0.2 % 0.2 %

Total 14.9 % 19.2 % 20.2 % 20.2 % 23.3 %

Page 57: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

53

Egypt

Table A1.73 Overview: Egypt 2015

Trade expansion Trade

stagnation

Low growth

Current

access rate

35% access

rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Imports (TWh) 55.2 46.5 43.2 1.0 44.6

Exports (TWh) 0.4 1.0 1.0 1.0 1.0

Net Exports (TWh) -54.8 -45.5 -42.2 0.0 -43.7

Generation capacity - installed

(MW)

17 103 17 103 17 103 17 103 17 103

Generation capacity -

refurbishment (MW)

113 113 113 113 113

Generation capacity - new

investments (MW)

6 988 8 163 8 529 11 439 6 609

New cross-border Transmission

(MW)

10 000 10 000 10 000 0 10 000

Target Access Rate 93 % 100 % 100 % 100 % 100 %

Generation capacity

mix (%):

Hydro 12 % 12 % 11 % 10 % 12 %

Coal 0 % 0 % 0 % 0 % 0 %

Gas 87 % 88 % 88 % 89 % 87 %

Other 1 % 1 % 1 % 1 % 1 %

Table A1.74 Possible Hydropower Expansion: Egypt

Scenario Project* Planned capacity (MW) Lead time (years) Cost estimate (Mill. USD)

Trade expansion No new projects* - - -

Trade stagnation No new projects* - - -

*Only mini-hydro in rural node

Page 58: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

54

Table A1.75 Annualized costs of capacity expansion (M$) – Egypt

Trade

expansion

Trade

stagnation

Low

growth

Current

access

rate

35% access

rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access

rates, trade

expansion

Generation Investment cost 692 827 862 1 143 677

Thermal 669 775 810 1 091 625

Hydro 0 0 0 0 0

Other 23 52 52 52 52

Rehabilitation cost 3 3 3 3 3

Thermal 3 3 3 3 3

Hydro 0 0 0 0 0

Other 0 0 0 0 0

Variable cost (fuel, O&M) 4 552 5 188 5 399 8 429 4 296

New capacity 3 979 4 616 4 826 6 496 3 724

Installed

capacity 573 573 573 1 933 573

T&D Investment cost 287 367 367 367 315

Cross-border 0 0 0 0 0

Distribution

grid 130 130 130 130 78

Urban

connection 92 92 92 92 92

Rural

connection 65 145 145 145 145

Rehabilitation cost 172 172 172 172 172

Variable cost (existing

capacity) 310 310 310 310 310

Total Capital cost 1,155 1,369 1,405 1,686 1,167

Investment

cost 979 1,194 1,229 1,510 991

Rehabilitation

cost 175 175 175 175 175

Variable cost 4,862 5,498 5,708 8,739 4,606

Total 6,016 6,867 7,113 10,424 5,773

Page 59: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

55

Table A1.76 Annualized costs of capacity expansion (% of GDP in 2015 – Egypt

Trade

expansion

Trade

stagnation

Low

growth

Current

access rate

35%

access

rate

National

targets for

access

rates

National

targets for

access

rates

National

targets for

access

rates, trade

expansion

Generation Investment cost 0.5 % 0.6 % 0.6 % 0.9 % 0.6 %

Thermal 0.5 % 0.6 % 0.6 % 0.8 % 0.5 %

Hydro 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Other 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Rehabilitation cost 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Thermal 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Hydro 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Other 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Variable cost (fuel, O&M) 3.4 % 3.9 % 4.0 % 6.3 % 3.6 %

New capacity 3.0 % 3.4 % 3.6 % 4.8 % 3.1 %

Existing

capacity 0.4 % 0.4 % 0.4 % 1.4 % 0.5 %

T&D Investment cost 0.2 % 0.3 % 0.3 % 0.3 % 0.3 %

Cross-border 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Distribution

grid 0.1 % 0.1 % 0.1 % 0.1 % 0.1 %

Urban

connection 0.1 % 0.1 % 0.1 % 0.1 % 0.1 %

Rural

connection 0.0 % 0.1 % 0.1 % 0.1 % 0.1 %

Rehabilitation cost 0.1 % 0.1 % 0.1 % 0.1 % 0.1 %

Variable cost (existing

capacity) 0.2 % 0.2 % 0.2 % 0.2 % 0.3 %

Total Capital cost 0.9 % 1.0 % 1.0 % 1.3 % 1.0 %

Investment

cost 0.7 % 0.9 % 0.9 % 1.1 % 0.8 %

Rehabilitation

cost 0.1 % 0.1 % 0.1 % 0.1 % 0.1 %

Variable cost 3.6 % 4.1 % 4.3 % 6.5 % 3.8 %

Total 4.5 % 5.1 % 5.3 % 7.8 % 4.8 %

Page 60: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

56

Table A1.77 Investment costs of capacity expansion (M$) – Egypt

Trade

expansion

Trade

stagnation Low growth

Current access

rate

35% access

rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Generation Investment cost 4,795.6 5,721 5,966 7,916 4,679

Rehabilitation

cost 19 19 19 19 19

T&D Investment cost 2,349 3,035 3,035 3,035 2,612

Rehabilitation

cost 1,386 1,386 1,386 1,386 1,386

Total 8,549 10,160 10,406 12,356 8,696

Table A1.78 Investment costs of capacity expansion (% of GDP in 2015) – Egypt

Trade

expansion

Trade

stagnation Low growth

Current access

rate

35% access

rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Generation Investment cost 3.6 % 4.3 % 4.4 % 5.9 % 3.9 %

Rehabilitation

cost 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

T&D Investment cost 1.8 % 2.3 % 2.3 % 2.3 % 2.2 %

Rehabilitation

cost 1.0 % 1.0 % 1.0 % 1.0 % 1.1 %

Total 6.4 % 7.6 % 7.8 % 9.2 % 7.2 %

Page 61: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

57

Ethiopia

Table A1.79 Overview: Ethiopia 2015

Trade expansion Trade

stagnation

Low growth

Current

access rate

35% access

rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Imports (TWh) 0.0 1.0 3.4 3.4 3.4

Exports (TWh) 30.9 29.6 29.6 3.3 30.0

Net Exports (TWh) 30.9 28.5 26.2 -0.1 26.6

Generation capacity - installed

(MW)

831 831 831 831 831

Generation capacity -

refurbishment (MW)

335 335 335 335 335

Generation capacity - new

investments (MW)

8 157 8 323 8 699 1 933 8 699

New cross-border Transmission

(MW)

3 527 3 258 2 997 0 3 048

Target Access Rate 15 % 32 % 60 % 60 % 60 %

Generation capacity

mix (%):

Hydro 100 % 98 % 94 % 81 % 94 %

Coal 0 % 0 % 0 % 0 % 0 %

Gas 0 % 0 % 0 % 0 % 0 %

Other 0 % 2 % 6 % 19 % 6 %

Page 62: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

58

Table A1.80 Possible Hydropower Expansion: Ethiopia

Scenario Project*

Planned capacity

(MW)

Lead time

(years)

Cost estimate (Mill.

USD)

Trade

expansion

Mandaya 2,000 8 247

Baro 2 + Genji 700 7 502

Geba (1 & 2) 372 6 361

Halele Wrabesa (1 &

2)

422 5 474

Karadobi 1,600 8 2,040

Genale III 258 5 304

Border 1,200 6 1,626

Beles 220 4 294

Chemoga Yeda (1&2) 281 4 403

Neshe 43 3 69

Genale IV 256 4 383

Alethu West 265 6 561

Alethu East I 186 6 438

Gojeb 153 5 287

Baro 1 200 5 505

Trade

stagnation

Mandaya 2,000 8 247

* Plus mini-hydro in rural node

Page 63: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

59

Table A1.81 Annualized costs of capacity expansion (M$) – Ethiopia

Trade

expansion

Trade

stagnation

Low

growth

Current

access rate

35% access

rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access

rates, trade

expansion

Generation Investment cost 1,135.5 1,199.8 1,344.9 403.1 1,344.9

Thermal 0.0 0.0 0.0 0.0 0.0

Hydro 1,135.3 1,135.3 1,135.3 193.5 1,135.3

Other 0.2 64.5 209.6 209.6 209.6

Rehabilitation cost 17.8 17.8 17.8 17.8 17.8

Thermal 0.0 0.0 0.0 0.0 0.0

Hydro 17.8 17.8 17.8 17.8 17.8

Other 0.0 0.0 0.0 0.0 0.0

Variable cost (fuel, O&M) 133.2 141.3 159.5 62.4 159.5

New capacity 97.0 123.1 141.4 28.6 123.3

Installed

capacity 36.3 18.2 18.2 33.8 36.3

T&D Investment cost 206 687 1,658 1,598 1,636

Cross-border 71 66 61 0 62

Distribution

grid 69 69 69 69 46

Urban

connection 64 120 120 120 120

Rural

connection 2 431 1,408 1,408 1,408

Rehabilitation cost 84 84 84 84 84

Variable cost (existing

capacity) 116 116 116 116 116

Total Capital cost 1,444 1,989 3,105 2,103 3,083

Investment

Cost 1,342 1,887 3,003 2,001 2,981

Rehabilitation

cost 102 102 102 102 102

Variable cost 249 257 276 178 276

Total 1,693 2,246 3,381 2,281 3,359

Page 64: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

60

Table A1.82 Annualized costs of capacity expansion (% of GDP in 2015) – Ethiopia

Trade

expansion

Trade

stagnation

Low

growth

Current

access rate

35%

access

rate

National

targets for

access

rates

National

targets for

access

rates

National

targets for

access

rates, trade

expansion

Generation Investment cost 6.2 % 6.5 % 7.3 % 2.2 % 8.2 %

Thermal 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Hydro 6.2 % 6.2 % 6.2 % 1.1 % 7.0 %

Other 0.0 % 0.4 % 1.1 % 1.1 % 1.3 %

Rehabilitation cost 0.1 % 0.1 % 0.1 % 0.1 % 0.1 %

Thermal 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Hydro 0.1 % 0.1 % 0.1 % 0.1 % 0.1 %

Other 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Variable cost (fuel, O&M) 0.7 % 0.8 % 0.9 % 0.3 % 1.0 %

New capacity 0.5 % 0.7 % 0.8 % 0.2 % 0.8 %

Existing

capacity 0.2 % 0.1 % 0.1 % 0.2 % 0.2 %

T&D Investment cost 1.1 % 3.7 % 9.0 % 8.7 % 10.0 %

Cross-border 0.4 % 0.4 % 0.3 % 0.0 % 0.4 %

Distribution

grid 0.4 % 0.4 % 0.4 % 0.4 % 0.3 %

Urban

connection 0.3 % 0.7 % 0.7 % 0.7 % 0.7 %

Rural

connection 0.0 % 2.3 % 7.7 % 7.7 % 8.6 %

Rehabilitation cost 0.5 % 0.5 % 0.5 % 0.5 % 0.5 %

Variable cost (existing

capacity) 0.6 % 0.6 % 0.6 % 0.6 % 0.7 %

Total Capital cost 7.9 % 10.8 % 16.9 % 11.4 % 18.9 %

Investment

cost 7.3 % 10.3 % 16.3 % 10.9 % 18.3 %

Rehabilitation

cost 0.6 % 0.6 % 0.6 % 0.6 % 0.6 %

Variable cost 1.4 % 1.4 % 1.5 % 1.0 % 1.7 %

Total 9.2 % 12.2 % 18.4 % 12.4 % 20.6 %

Page 65: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

61

Table A1.83 Investment costs of capacity expansion (M$) – Ethiopia

Trade

expansion

Trade

stagnation Low growth

Current

access

rate

35% access

rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Generation Investment cost 8,500.1 8,972 10,037 2,987 10,037

Rehabilitation

cost 101 101 101 101 101

T&D Investment cost 1,660 5,623 13,649 13,161 13,471

Rehabilitation

cost 679 679 679 679 679

Total 10,940 15,375 24,466 16,928 24,288

Table A1.84 Investment costs of capacity expansion (% of GDP in 2015) – Ethiopia

Trade

expansion

Trade

stagnation Low growth

Current

access

rate

35% access

rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Generation Investment cost 46.3 % 48.8 % 54.6 % 16.3 % 61.5 %

Rehabilitation

cost 0.5 % 0.5 % 0.5 % 0.5 % 0.6 %

T&D Investment cost 9.0 % 30.6 % 74.3 % 71.6 % 82.5 %

Rehabilitation

cost 3.7 % 3.7 % 3.7 % 3.7 % 4.2 %

Total 59.6 % 83.7 % 133.2 % 92.2 % 148.8 %

Page 66: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

62

Kenya

Table A1.85 Overview: Kenya 2015

Trade expansion Trade

stagnation

Low growth

Current

access rate

35% access

rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Imports (TWh) 2.0 0.5 3.3 1.0 2.7

Exports (TWh) 3.3 0.1 0.5 0.5 0.5

Net Exports (TWh) 1.3 -0.4 -2.8 -0.5 -2.2

Generation capacity - installed

(MW)

695 695 695 695 695

Generation capacity -

refurbishment (MW)

383 389 389 395 389

Generation capacity - new

investments (MW)

901 913 987 1 237 987

New cross-border Transmission

(MW)

600 0 266 0 201

Target Access Rate 27 % 42 % 67 % 67 % 67 %

Generation capacity

mix (%):

Hydro 44 % 44 % 42 % 36 % 42 %

Coal 34 % 34 % 32 % 28 % 32 %

Gas 7 % 7 % 7 % 20 % 7 %

Other 14 % 15 % 19 % 17 % 19 %

Table A1.86 Possible Hydropower Expansion: Kenya

Scenario Project* Planned capacity (MW) Lead time (years) Cost estimate (Mill. USD)

Trade expansion No new projects* - - -

Trade stagnation No new projects* - - -

*Only mini-hydro in rural node

Page 67: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

63

Table A1.87 Annualized costs of capacity expansion (M$) – Kenya

Trade

expansion

Trade

stagnation

Low

growth

Current

access rate

35% access

rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access

rates, trade

expansion

Generation Investment cost 231 235 264 288 264

Thermal 81 81 81 105 81

Hydro 0 0 0 0 0

Other 150 155 183 183 183

Rehabilitation cost 20 21 21 21 21

Thermal 0 0 0 0 0

Hydro 20 20 20 20 20

Other 0 0 0 0 0

Variable cost (fuel, O&M) 144 144 144 298 144

New capacity 131 131 131 282 131

Installed

capacity 13 13 13 16 13

T&D Investment cost 132 214 412 409 397

Cross-border 15 0 3 0 2

Distribution

grid 65 65 65 65 50

Urban

connection 51 120 200 200 200

Rural

connection 1 29 144 144 144

Rehabilitation cost 48 48 48 48 48

Variable cost (existing

capacity) 130 130 130 130 130

Total Capital cost 431 518 745 766 730

Investment

Cost 362 450 676 697 661

Rehabilitation

cost 68 69 69 69 69

Variable cost 274 274 274 428 274

Total 705 792 1,019 1,194 1,004

Page 68: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

64

Table A1.88 Annualized costs of capacity expansion (% of GDP in 2015) – Kenya

Trade

expansion

Trade

stagnation

Low

growth

Current

access

rate

35%

access

rate

National

targets for

access

rates

National

targets for

access

rates

National

targets for

access

rates,

trade

expansion

Generation Investment cost 0.8 % 0.8 % 0.9 % 1.0 % 1.0 %

Thermal 0.3 % 0.3 % 0.3 % 0.4 % 0.3 %

Hydro 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Other 0.5 % 0.5 % 0.6 % 0.6 % 0.7 %

Rehabilitation cost 0.1 % 0.1 % 0.1 % 0.1 % 0.1 %

Thermal 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Hydro 0.1 % 0.1 % 0.1 % 0.1 % 0.1 %

Other 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Variable cost (fuel, O&M) 0.5 % 0.5 % 0.5 % 1.0 % 0.5 %

New capacity 0.5 % 0.5 % 0.5 % 1.0 % 0.5 %

Existing

capacity 0.0 % 0.0 % 0.0 % 0.1 % 0.0 %

T&D Investment cost 0.5 % 0.7 % 1.4 % 1.4 % 1.5 %

Cross-border 0.1 % 0.0 % 0.0 % 0.0 % 0.0 %

Distribution

grid 0.2 % 0.2 % 0.2 % 0.2 % 0.2 %

Urban

connection 0.2 % 0.4 % 0.7 % 0.7 % 0.7 %

Rural

connection 0.0 % 0.1 % 0.5 % 0.5 % 0.5 %

Rehabilitation cost 0.2 % 0.2 % 0.2 % 0.2 % 0.2 %

Variable cost (existing

capacity) 0.5 % 0.5 % 0.5 % 0.5 % 0.5 %

Total Capital cost 1.5 % 1.8 % 2.6 % 2.7 % 2.7 %

Investment

cost 1.3 % 1.6 % 2.3 % 2.4 % 2.5 %

Rehabilitation

cost 0.2 % 0.2 % 0.2 % 0.2 % 0.3 %

Variable cost 1.0 % 1.0 % 1.0 % 1.5 % 1.0 %

Total 2.4 % 2.8 % 3.5 % 4.2 % 3.7 %

Page 69: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

65

Table A1.89 Investment costs of capacity expansion (M$) – Kenya

Trade

expansion

Trade

stagnation Low growth

Current access

rate

35% access

rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Generation Investment cost 1,628.9 1,664 1,875 2,042 1,875

Rehabilitation

cost 115 118 118 119 118

T&D Investment cost 1,062 1,732 3,353 3,329 3,231

Rehabilitation

cost 387 387 387 387 387

Total 3,193 3,901 5,733 5,878 5,611

Table A1.90 Investment costs of capacity expansion (% of GDP in 2015) – Kenya

Trade

expansion

Trade

stagnation Low growth

Current access

rate

35% access

rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Generation Investment cost 5.7 % 5.8 % 6.5 % 7.1 % 7.0 %

Rehabilitation

cost 0.4 % 0.4 % 0.4 % 0.4 % 0.4 %

T&D Investment cost 3.7 % 6.0 % 11.7 % 11.6 % 12.0 %

Rehabilitation

cost 1.3 % 1.3 % 1.3 % 1.3 % 1.4 %

Total 11.1 % 13.6 % 19.9 % 20.4 % 20.9 %

Page 70: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

66

Rwanda

Table A1.91 Overview: Rwanda 2015

Trade expansion Trade

stagnation

Low growth

Current

access rate

35% access

rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Imports (TWh) 0.0 0.1 0.0 0.0 0.0

Exports (TWh) 1.1 0.7 1.1 0.0 1.1

Net Exports (TWh) 1.1 0.7 1.0 0.0 1.1

Generation capacity - installed

(MW)

25 25 25 25 25

Generation capacity -

refurbishment (MW)

24 24 24 24 24

Generation capacity - new

investments (MW)

327 330 330 94 330

New cross-border Transmission

(MW)

120 90 120 0 124

Target Access Rate 16 % 29 % 18 % 18 % 18 %

Generation capacity

mix (%):

Hydro 95 % 95 % 95 % 86 % 95 %

Coal 0 % 0 % 0 % 0 % 0 %

Gas 0 % 0 % 0 % 0 % 0 %

Other 5 % 5 % 5 % 14 % 5 %

Table A1.92 Possible Hydropower Expansion: Rwanda

Scenario Project* Planned capacity (MW) Lead time (years) Cost estimate (Mill. USD)

Trade expansion Ruzizi III**

27 4 32

Ruzizi Div.***

135 6 160

Rusumo Falls**

31 5 57

Sici 3***

87 3 203

Nyabarongo 28 4 111

Panzi***

19 4 69

Trade stagnation Ruzizi III**

27 4 32

Ruzizi Div.**

135 6 160

* Plus mini-hydro in rural node

** Borders to DRC and Burundi

*** Borders to DRC

**** Borders to Tanzania and Burundi

Page 71: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

67

Table A1.93 Annualized costs of capacity expansion (M$) – Rwanda

Trade

expansion

Trade

stagnation

Low

growth

Current

access rate

35% access

rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access

rates, trade

expansion

Generation Investment cost 80.8 81.7 81.8 23.6 81.8

Thermal 0.0 0.0 0.0 0.0 0.0

Hydro 80.8 80.8 80.8 22.6 80.8

Other 0.0 0.9 1.0 1.0 1.0

Rehabilitation cost 1.3 1.3 1.3 1.3 1.3

Thermal 0.0 0.0 0.0 0.0 0.0

Hydro 1.3 1.3 1.3 1.3 1.3

Other 0.0 0.0 0.0 0.0 0.0

Variable cost (fuel, O&M) 5.8 5.8 5.8 2.0 5.8

New capacity 4.8 4.8 4.8 1.0 4.8

Installed

capacity 1.0 1.0 1.0 1.0 1.0

T&D Investment cost 16 36 21 20 19

Cross-border 1 1 1 0 1

Distribution

grid 3 3 3 3 1

Urban

connection 13 28 13 13 13

Rural

connection 0 4 5 5 5

Rehabilitation cost 2 2 2 2 2

Variable cost (existing

capacity) 5 5 5 5 5

Total Capital cost 100 121 106 47 104

Investment

Cost 97 117 103 44 101

Rehabilitation

cost 3 3 3 3 3

Variable cost 11 11 11 7 11

Total 111 131 116 53 115

Page 72: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

68

Table A1.94 Annualized costs of capacity expansion (% of GDP in 2015) – Rwanda

Trade

expansion

Trade

stagnation

Low

growth

Current

access

rate

35%

access

rate

National

targets for

access

rates

National

targets for

access

rates

National

targets for

access

rates, trade

expansion

Generation Investment cost 2.3 % 2.3 % 2.3 % 0.7 % 2.6 %

Thermal 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Hydro 2.3 % 2.3 % 2.3 % 0.6 % 2.6 %

Other 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Rehabilitation cost 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Thermal 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Hydro 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Other 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Variable cost (fuel, O&M) 0.2 % 0.2 % 0.2 % 0.1 % 0.2 %

New capacity 0.1 % 0.1 % 0.1 % 0.0 % 0.2 %

Existing

capacity 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

T&D Investment cost 0.5 % 1.0 % 0.6 % 0.6 % 0.6 %

Cross-border 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Distribution

grid 0.1 % 0.1 % 0.1 % 0.1 % 0.0 %

Urban

connection 0.4 % 0.8 % 0.4 % 0.4 % 0.4 %

Rural

connection 0.0 % 0.1 % 0.1 % 0.1 % 0.1 %

Rehabilitation cost 0.1 % 0.1 % 0.1 % 0.1 % 0.1 %

Variable cost (existing

capacity) 0.1 % 0.1 % 0.1 % 0.1 % 0.2 %

Total Capital cost 2.9 % 3.4 % 3.0 % 1.3 % 3.4 %

Investment

cost 2.8 % 3.3 % 2.9 % 1.2 % 3.3 %

Rehabilitation

cost 0.1 % 0.1 % 0.1 % 0.1 % 0.1 %

Variable cost 0.3 % 0.3 % 0.3 % 0.2 % 0.3 %

Total 3.2 % 3.7 % 3.3 % 1.5 % 3.7 %

Page 73: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

69

Table A1.95 Investment costs of capacity expansion (M$) – Rwanda

Trade

expansion

Trade

stagnation Low growth

Current access

rate

35% access

rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Generation Investment cost 631.4 638 639 184 639

Rehabilitation

cost 7 7 7 7 7

T&D Investment cost 132 288 169 162 157

Rehabilitation

cost 16 16 16 16 16

Total 786 949 831 368 818

Table A1.96 Investment costs of capacity expansion (% of GDP in 2015)– Rwanda

Trade

expansion

Trade

stagnation Low growth

Current access

rate

35% access

rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Generation Investment cost 18.0 % 18.2 % 18.2 % 5.2 % 20.7 %

Rehabilitation

cost 0.2 % 0.2 % 0.2 % 0.2 % 0.2 %

T&D Investment cost 3.8 % 8.2 % 4.8 % 4.6 % 5.1 %

Rehabilitation

cost 0.4 % 0.4 % 0.4 % 0.4 % 0.5 %

Total 22.4 % 27.1 % 23.7 % 10.5 % 26.5 %

Page 74: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

70

Sudan

Table A1.97 Overview: Sudan 2015

Trade expansion Trade

stagnation

Low growth

Current

access rate

35% access

rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Imports (TWh) 39.0 31.2 29.2 0.2 30.0

Exports (TWh) 54.8 45.7 42.4 0.2 43.8

Net Exports (TWh) 15.8 14.5 13.1 0.0 13.9

Generation capacity - installed

(MW)

2 554 2 554 2 554 2 554 2 554

Generation capacity -

refurbishment (MW)

0 0 0 0 0

Generation capacity - new

investments (MW)

3 676 3 709 3 704 568 3 704

New cross-border Transmission

(MW)

14 567 13 675 13 491 0 13 397

Target Access Rate 34 % 50 % 60 % 60 % 60 %

Generation capacity

mix (%):

Hydro 87 % 87 % 87 % 73 % 87 %

Coal 0 % 0 % 0 % 0 % 0 %

Gas 6 % 6 % 6 % 13 % 6 %

Other 6 % 7 % 7 % 14 % 7 %

Page 75: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

71

Table A1.98 Possible Hydropower Expansion: Sudan

Scenario Project*

Planned capacity

(MW)

Lead time

(years)

Cost estimate (Mill.

USD)

Trade expansion Shirri 400 8 549

Shukoli 210 8 420

Lakki 210 8 429

Bedden 400 8 880

Fula I 720 8 1,319

Morgat 240 4 595

Roseires ext. +

Dinder 135 4 173

Dal Low 340 6 1,096

Dagash 285 6 1,048

Sabaloka 120 3 396

Shereiq 315 6 1,190

Kabjar 300 7 1,125

Trade

stagnation Shirri 400 8 549

Shukoli 210 8 420

* Plus mini-hydro in rural node

Page 76: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

72

Table A1.99 Annualized costs of capacity expansion (M$) – Sudan

Trade

expansion

Trade

stagnation

Low

growth

Current

access rate

35% access

rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access

rates, trade

expansion

Generation Investment cost 1,166 1,179 1,177 182 1,177

Thermal 0 0 0 0 0

Hydro 1,166 1,166 1,166 171 1,166

Other 0 13 11 11 11

Rehabilitation cost 0 13 11 11 11

Thermal 0 0 0 0 0

Hydro 0 0 0 0 0

Other 0 0 0 0 0

Variable cost (fuel, O&M) 88 90 90 37 90

New capacity 51 53 52 1 50

Installed

capacity 37 37 37 36 40

T&D Investment cost 161 297 340 303 318

Cross-border 50 39 37 0 37

Distribution

grid 59 59 59 59 37

Urban

connection 48 104 166 166 166

Rural

connection 4 94 78 78 78

Rehabilitation cost 43 43 43 43 43

Variable cost (existing

capacity) 97 97 97 97 97

Total Capital cost 1,370 1,519 1,560 529 1,538

Investment

cost 1,327 1,476 1,517 485 1,495

Rehabilitation

cost 43 43 43 43 43

Variable cost 186 187 187 135 187

Total 1,556 1,707 1,748 663 1,725

Page 77: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

73

Table A1.100 Annualized costs of capacity expansion (% of GDP in 2015) – Sudan

Trade

expansion

Trade

stagnation

Low

growth

Current

access rate

35%

access rate

National

targets for

access

rates

National

targets for

access

rates

National

targets for

access

rates, trade

expansion

Generation Investment cost 2.6 % 2.6 % 2.6 % 0.4 % 3.0 %

Thermal 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Hydro 2.6 % 2.6 % 2.6 % 0.4 % 3.0 %

Other 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Rehabilitation cost 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Thermal 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Hydro 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Other 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Variable cost (fuel, O&M) 0.2 % 0.2 % 0.2 % 0.1 % 0.2 %

New capacity 0.1 % 0.1 % 0.1 % 0.0 % 0.1 %

Existing

capacity 0.1 % 0.1 % 0.1 % 0.1 % 0.1 %

T&D Investment cost 0.4 % 0.7 % 0.8 % 0.7 % 0.8 %

Cross-border 0.1 % 0.1 % 0.1 % 0.0 % 0.1 %

Distribution

grid 0.1 % 0.1 % 0.1 % 0.1 % 0.1 %

Urban

connection 0.1 % 0.2 % 0.4 % 0.4 % 0.4 %

Rural

connection 0.0 % 0.2 % 0.2 % 0.2 % 0.2 %

Rehabilitation cost 0.1 % 0.1 % 0.1 % 0.1 % 0.1 %

Variable cost (existing

capacity) 0.2 % 0.2 % 0.2 % 0.2 % 0.2 %

Total Capital cost 3.1 % 3.4 % 3.5 % 1.2 % 3.9 %

Investment

cost 3.0 % 3.3 % 3.4 % 1.1 % 3.8 %

Rehabilitation

cost 0.1 % 0.1 % 0.1 % 0.1 % 0.1 %

Variable cost 0.4 % 0.4 % 0.4 % 0.3 % 0.5 %

Total 3.5 % 3.8 % 3.9 % 1.5 % 4.4 %

Page 78: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

74

Table A1.101 Investment costs of capacity expansion (M$) – Sudan

Trade

expansion

Trade

stagnation Low growth

Current access

rate

35% access

rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Generation Investment cost 9,223.7 9,318 9,304 1,434 9,304

Rehabilitation

cost 0 0 0 0 0

T&D Investment cost 1,299 2,410 2,754 2,457 2,576

Rehabilitation

cost 348 348 348 348 348

Total 10,870 12,076 12,406 4,239 12,228

Table A1.102 Investment costs of capacity expansion (% of GDP in 2015) – Sudan

Trade

expansion

Trade

stagnation Low growth

Current access

rate

35% access

rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Generation Investment cost 20.6 % 20.8 % 20.7 % 3.2 % 23.6 %

Rehabilitation

cost 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

T&D Investment cost 2.9 % 5.4 % 6.1 % 5.5 % 6.5 %

Rehabilitation

cost 0.8 % 0.8 % 0.8 % 0.8 % 0.9 %

Total 24.2 % 26.9 % 27.7 % 9.5 % 31.1 %

Page 79: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

75

Tanzania

Table A1.103 Overview: Tanzania 2015

Trade expansion Trade

stagnation

Low growth

Current

access rate

35% access

rate

National

targets for

access rates

National

targets

for access

rates

National

targets for

access rates,

trade

expansion

Imports (TWh) 0.0 0.1 0.5 0.5 0.5

Exports (TWh) 2.1 0.1 2.9 0.5 2.3

Net Exports (TWh) 2.0 0.0 2.4 0.0 1.8

Generation capacity - installed

(MW)

468 468 468 468 468

Generation capacity -

refurbishment (MW)

305 305 305 305 305

Generation capacity - new

investments (MW)

1 753 1 862 2 046 1 767 1 864

New cross-border Transmission

(MW)

224 0 266 0 201

Target Access Rate 13 % 30 % 29 % 29 % 29 %

Generation capacity

mix (%):

Hydro 68 % 65 % 61 % 67 % 65 %

Coal 24 % 23 % 21 % 20 % 23 %

Gas 9 % 12 % 14 % 9 % 9 %

Other 0 % 0 % 4 % 4 % 4 %

Table A1.104 Possible Hydropower Expansion: Tanzania

Scenario Project* Planned capacity (MW) Lead time (years) Cost estimate (Mill. USD)

Trade expansion Ruzumo**

62 5

Songwe***

330 7

Mpanga 144 8 191

Masigira 118 7 157

Rumakali 222 10 351

Ruhudji 358 8 611

Trade stagnation Same - - -

* Plus mini-hydro in rural node

** Borders to Rwanda and Burundi

*** Borders to Malawi

Page 80: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

76

Table A1.105 Annualized costs of capacity expansion (M$) – Tanzania

Trade

expansion

Trade

stagnation

Low

growth

Current

access rate

35% access

rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access

rates, trade

expansion

Generation Investment cost 243.2 254.9 302.5 269.6 285.0

Thermal 97.1 107.3 115.2 82.3 97.7

Hydro 146.1 146.1 146.1 146.1 146.1

Other 0.0 1.5 41.2 41.2 41.2

Rehabilitation cost 16.2 16.2 16.2 16.2 16.2

Thermal 0.0 0.0 0.0 0.0 0.0

Hydro 16.2 16.2 16.2 16.2 16.2

Other 0.0 0.0 0.0 0.0 0.0

Variable cost (fuel, O&M) 131.6 180.9 219.5 115.4 134.3

New capacity 113.7 171.9 201.6 97.4 125.3

Installed

capacity 17.9 9.0 17.9 17.9 9.0

T&D Investment cost 63 156 276 265 263

Cross-border 10 0 12 0 9

Distribution

grid 29 29 29 29 18

Urban

connection 24 118 51 51 51

Rural

connection 0 9 184 184 184

Rehabilitation cost 36 36 36 36 36

Variable cost (existing

capacity) 60 60 60 60 60

Total Capital cost 358 463 631 586 600

Investment

cost 306 411 579 534 548

Rehabilitation

cost 52 52 52 52 52

Variable cost 192 241 280 176 195

Total 550 704 911 762 794

Page 81: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

77

Table A1.106 Annualized costs of capacity expansion (% of GDP in 2015) – Tanzania

Trade

expansion

Trade

stagnation

Low

growth

Current

access rate

35%

access

rate

National

targets for

access

rates

National

targets for

access

rates

National

targets for

access

rates, trade

expansion

Generation Investment cost 1.3 % 1.4 % 1.6 % 1.4 % 1.7 %

Thermal 0.5 % 0.6 % 0.6 % 0.4 % 0.6 %

Hydro 0.8 % 0.8 % 0.8 % 0.8 % 0.9 %

Other 0.0 % 0.0 % 0.2 % 0.2 % 0.2 %

Rehabilitation cost 0.1 % 0.1 % 0.1 % 0.1 % 0.1 %

Thermal 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Hydro 0.1 % 0.1 % 0.1 % 0.1 % 0.1 %

Other 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Variable cost (fuel, O&M) 0.7 % 1.0 % 1.2 % 0.6 % 0.8 %

New capacity 0.6 % 0.9 % 1.1 % 0.5 % 0.7 %

Existing

capacity 0.1 % 0.0 % 0.1 % 0.1 % 0.1 %

T&D Investment cost 0.3 % 0.8 % 1.5 % 1.4 % 1.6 %

Cross-border 0.1 % 0.0 % 0.1 % 0.0 % 0.1 %

Distribution

grid 0.2 % 0.2 % 0.2 % 0.2 % 0.1 %

Urban

connection 0.1 % 0.6 % 0.3 % 0.3 % 0.3 %

Rural

connection 0.0 % 0.0 % 1.0 % 1.0 % 1.1 %

Rehabilitation cost 0.2 % 0.2 % 0.2 % 0.2 % 0.2 %

Variable cost (existing

capacity) 0.3 % 0.3 % 0.3 % 0.3 % 0.4 %

Total Capital cost 1.9 % 2.5 % 3.4 % 3.1 % 3.5 %

Investment

cost 1.6 % 2.2 % 3.1 % 2.8 % 3.2 %

Rehabilitation

cost 0.3 % 0.3 % 0.3 % 0.3 % 0.3 %

Variable cost 1.0 % 1.3 % 1.5 % 0.9 % 1.2 %

Total 2.9 % 3.7 % 4.8 % 4.0 % 4.7 %

Page 82: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

78

Table A1.107 Investment costs of capacity expansion (M$) – Tanzania

Trade

expansion

Trade

stagnation Low growth

Current access

rate

35% access

rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Generation Investment cost 1,742.4 1,824 2,174 1,948 2,052

Rehabilitation

cost 92 92 92 92 92

T&D Investment cost 507 1,257 2,294 2,199 2,184

Rehabilitation

cost 289 289 289 289 289

Total 2,630 3,461 4,849 4,527 4,617

Table A1.108 Investment costs of capacity expansion (% of GDP in 2015) – Tanzania

Trade

expansion

Trade

stagnation Low growth

Current access

rate

35% access

rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Generation Investment cost 9.3 % 9.7 % 11.5 % 10.3 % 12.1 %

Rehabilitation

cost 0.5 % 0.5 % 0.5 % 0.5 % 0.5 %

T&D Investment cost 2.7 % 6.7 % 12.2 % 11.7 % 12.9 %

Rehabilitation

cost 1.5 % 1.5 % 1.5 % 1.5 % 1.7 %

Total 14.0 % 18.4 % 25.7 % 24.0 % 27.3 %

Page 83: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

79

Uganda

Table A1.109 Overview: Uganda 2015

Trade expansion Trade

stagnation

Low growth

Current

access rate

35% access

rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Imports (TWh) 0.8 0.5 0.8 0.4 1.0

Exports (TWh) 4.9 3.2 3.6 0.8 3.9

Net Exports (TWh) 4.1 2.7 2.8 0.4 2.9

Generation capacity - installed

(MW) 358 358 358 358 358

Generation capacity -

refurbishment (MW) 191 191 191 191 191

Generation capacity - new

investments (MW) 1 198 1 271 1 258 707 1 258

New cross-border Transmission

(MW) 745 421 537 0 407

Target Access Rate 8 % 27 % 25 % 25 % 25 %

Generation capacity

mix (%):

Hydro

94 % 90 % 91 % 87 % 91 %

Coal 0 % 0 % 0 % 0 % 0 %

Gas 0 % 0 % 0 % 0 % 0 %

Other 6 % 10 % 9 % 13 % 9 %

Table A1.110 Possible Hydropower Expansion: Uganda

Scenario Project* Planned capacity (MW) Lead time (years) Cost estimate (Mill. USD)

Trade expansion Bujagali # 5 50 4 31

Kalagala tot 450 8 512

Murchison Base 2 222 10 397

Ayago North 304 8 730

Bygoe 13 3 25

Bujagali 200 4 526

Trade stagnation Bujagali # 5 50 4 31

Kalagala tot 450 8 512

Murchison Base 2 222 10 397

* Plus mini-hydro in rural node

Page 84: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

80

Table A1.111 Annualized costs of capacity expansion (M$) – Uganda

Trade

expansion

Trade

stagnation

Low

growth

Current

access

rate

35% access

rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access

rates, trade

expansion

Generation Investment cost 289 317 312 179 312

Thermal 0 0 0 0 0

Hydro 289 289 289 156 289

Other 0 29 24 24 24

Rehabilitation cost 10 10 10 10 10

Thermal 0 0 0 0 0

Hydro 10 10 10 10 10

Other 0 0 0 0 0

Variable cost (fuel, O&M) 27 27 27 18 27

New capacity 12 12 19 3 19

Installed

capacity 14 14 7 14 7

T&D Investment cost 58 203 186 174 179

Cross-border

grid 16 10 12 0 9

Distribution

grid 23 23 23 23 19

Urban

connection 13 54 54 54 54

Rural

connection 6 116 96 96 96

Rehabilitation cost 28 28 28 28 28

Variable cost (existing

capacity) 39 39 39 39 39

Total Capital cost 385 559 536 391 529

Investment

Cost 347 520 498 353 491

Rehabilitation

cost 38 38 38 38 38

Variable cost 65 65 65 56 65

Total 451 624 601 448 594

Page 85: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

81

Table A1.112 Annualized costs of capacity expansion (% of GDP in 2015) – Uganda

Trade

expansion

Trade

stagnation

Low

growth

Current

access

rate

35%

access

rate

National

targets for

access

rates

National

targets for

access

rates

National

targets for

access

rates,

trade

expansion

Generation Investment cost 2.0 % 2.2 % 2.2 % 1.2 % 2.3 %

Thermal 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Hydro 2.0 % 2.0 % 2.0 % 1.1 % 2.1 %

Other 0.0 % 0.2 % 0.2 % 0.2 % 0.2 %

Rehabilitation cost 0.1 % 0.1 % 0.1 % 0.1 % 0.1 %

Thermal 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Hydro 0.1 % 0.1 % 0.1 % 0.1 % 0.1 %

Other 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Variable cost (fuel, O&M) 0.2 % 0.2 % 0.2 % 0.1 % 0.2 %

New capacity 0.1 % 0.1 % 0.1 % 0.0 % 0.1 %

Existing

capacity 0.1 % 0.1 % 0.0 % 0.1 % 0.1 %

T&D Investment cost 0.4 % 1.4 % 1.3 % 1.2 % 1.3 %

Cross-border

grid 0.1 % 0.1 % 0.1 % 0.0 % 0.1 %

Distribution

grid 0.2 % 0.2 % 0.2 % 0.2 % 0.1 %

Urban

connection 0.1 % 0.4 % 0.4 % 0.4 % 0.4 %

Rural

connection 0.0 % 0.8 % 0.7 % 0.7 % 0.7 %

Rehabilitation cost 0.2 % 0.2 % 0.2 % 0.2 % 0.2 %

Variable cost (existing

capacity) 0.3 % 0.3 % 0.3 % 0.3 % 0.3 %

Total Capital cost 2.7 % 3.9 % 3.7 % 2.7 % 3.9 %

Investment

cost 2.4 % 3.6 % 3.5 % 2.5 % 3.6 %

Rehabilitation

cost 0.3 % 0.3 % 0.3 % 0.3 % 0.3 %

Variable cost 0.5 % 0.5 % 0.5 % 0.4 % 0.5 %

Total 3.1 % 4.3 % 4.2 % 3.1 % 4.4 %

Page 86: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

82

Table A1.113 Investment costs of capacity expansion (M$) – Uganda

Tradeexpansion

Trade

stagnation Low growth

Current access

rate

35% access

rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Generation Investment cost 2,255.0 2,463 2,426 1,389 2,426

Rehabilitation

cost 57 57 57 57 57

T&D Investment cost 472 1,672 1,525 1,429 1,470

Rehabilitation

cost 226 226 226 226 226

Total 3,010 4,419 4,234 3,101 4,180

Table A1.114 Investment costs of capacity expansion (% of GDP in 2015) – Uganda

Trade

expansion

Trade

stagnation Low growth

Current access

rate

35% access

rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Generation Investment cost 15.7 % 17.1 % 16.9 % 9.7 % 17.9 %

Rehabilitation

cost 0.4 % 0.4 % 0.4 % 0.4 % 0.4 %

T&D Investment cost 3.3 % 11.6 % 10.6 % 9.9 % 10.9 %

Rehabilitation

cost 1.6 % 1.6 % 1.6 % 1.6 % 1.7 %

Total 21.0 % 30.8 % 29.5 % 21.6 % 30.9 %

Page 87: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

83

Western Africa Power Pool

Benin

Table A1.115 Overview: Benin 2015

Trade expansion

Trade

stagnation Low growth

Current

access rate

53%

regional

average

access rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Imports (TWh) 0.8 0.5 1.0 0.4 0.9

Exports (TWh) 0.6 0.0 0.0 0.0 0.0

Net exports (TWh) -0.2 -0.5 -0.9 -0.4 -0.8

Generation capacity - installed

(MW) 75 75 75 75 75

Generation capacity -

refurbishment (MW) 112 112 112 112 112

Generation capacity - new

investments (MW) 0 3 4 76 4

New cross-border

transmission (MW) 162 81 160 0 92

Target Access Rate 25 % 35 % 50 % 50 % 50 %

Generation capacity

mix (%): Hydro 17 % 16 % 16 % 12 % 16 %

Coal 0 % 0 % 0 % 0 % 0 %

Gas 0 % 0 % 0 % 28 % 0 %

Other 83 % 84 % 84 % 61 % 84 %

Table A1.116 Possible Hydropower Expansion: Benin

Scenario Project

Planned capacity

(MW)

Lead time

(years)

Cost estimate

(Mill. USD)

Trade

expansion

No new

projects* - - -

Trade

stagnation

No new

projects* - - -

* Only mini-hydro in rural node

Page 88: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

84

Table A1.117 Annualized costs of capacity expansion (M$) – Benin

Trade

expansion

Trade

stagnation Low growth

Current

access rate

53%

regional

average

access rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Generation

Investment

cost

0 1 1 8 1

Thermal 0 0 0 7 0

Hydro 0 0 0 0 0

Other 0 1 1 1 1

Rehabilitation

cost

4 4 4 4 4

Thermal 0 0 0 0 0

Hydro 2 2 2 2 2

Other 2 2 2 2 2

Variable cost (fuel, O&M) 57 57 57 94 57

New capacity 0 0 0 37 0

Installed

capacity

57 57 57 57 57

T&D

Investment

cost

28 45 66 65 61

Cross-border

grid

0 0 0 0 0

Distribution

grid

18 18 18 18 13

Urban

connection

8 18 35 35 35

Rural

connection

2 9 12 12 12

Rehabilitation

cost

15 15 15 15 15

Variable cost (existing

capacity)

36 36 36 36 36

Total Capital cost 47 65 86 93 81

Investment

Cost

28 46 67 74 62

Rehabilitation

cost

19 19 19 19 19

Variable cost 93 93 93 130 93

TOTAL 140 158 179 223 174

Page 89: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

85

Table A1.118 Annualized costs of capacity expansion (% of GDP in 2015) – Benin

Trade

expansion

Trade

stagnation Low growth

Current

access rate

53%

regional

average

access rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Generation Investment cost 0.0 % 0.0 % 0.0 % 0.1 % 0.0 %

Thermal 0.0 % 0.0 % 0.0 % 0.1 % 0.0 %

Hydro 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Other 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Rehabilitation cost 0.1 % 0.1 % 0.1 % 0.1 % 0.1 %

Thermal 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Hydro 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Other 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Variable cost (fuel,

O&M) 0.9 % 0.9 % 0.9 % 1.4 % 0.9 %

New capacity 0.0 % 0.0 % 0.0 % 0.6 % 0.0 %

Existing

capacity 0.9 % 0.9 % 0.9 % 0.9 % 0.9 %

T&D Investment cost 0.4 % 0.7 % 1.0 % 1.0 % 1.0 %

Cross-border

grid 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Distribution

grid 0.3 % 0.3 % 0.3 % 0.3 % 0.2 %

Urban

connection 0.1 % 0.3 % 0.5 % 0.5 % 0.6 %

Rural

connection 0.0 % 0.1 % 0.2 % 0.2 % 0.2 %

Rehabilitation cost 0.2 % 0.2 % 0.2 % 0.2 % 0.2 %

Variable cost

(existing capacity) 0.5 % 0.5 % 0.5 % 0.5 % 0.6 %

Total Capital cost 0.7 % 1.0 % 1.3 % 1.4 % 1.3 %

Investment

cost 0.4 % 0.7 % 1.0 % 1.1 % 1.0 %

Rehabilitation

cost 0.3 % 0.3 % 0.3 % 0.3 % 0.3 %

Variable cost 1.4 % 1.4 % 1.4 % 2.0 % 1.5 %

Total 2.1 % 2.4 % 2.7 % 3.4 % 2.9 %

Page 90: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

86

Table A1.119 Investment costs of capacity expansion (M$) – Benin

Trade

expansion

Trade

stagnation Low growth

Current access

rate

53% regional

average access

rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Generation

Investment

cost 1.2 8 10 59 10

Rehabilitation

cost 23 23 23 23 23

T&D

Investment

cost 227 363 528 527 489

Rehabilitation

cost 120 120 120 120 120

Total 371 514 681 729 642

Table A1.120 Investment costs of capacity expansion (% of GDP in 2015) – Benin

Trade

expansion

Trade

stagnation Low growth

Current access

rate

53% regional

average access

rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Generation

Investment

cost 0.0 % 0.1 % 0.2 % 0.9 % 0.2 %

Rehabilitation

cost 0.3 % 0.3 % 0.3 % 0.3 % 0.4 %

T&D

Investment

cost 3.5 % 5.5 % 8.0 % 8.0 % 8.1 %

Rehabilitation

cost 1.8 % 1.8 % 1.8 % 1.8 % 2.0 %

Total 5.7 % 7.8 % 10.4 % 11.1 % 10.6 %

Page 91: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

87

Burkina Faso

Table A1.121 Overview: Burkina Faso 2015

Trade expansion

Trade

stagnation Low growth

Current

access rate

53%

regional

average

access rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Imports (TWh) 1.5 1.3 1.0 1.0 1.0

Exports (TWh) 1.0 0.5 0.0 0.0 0.0

Net exports (TWh) -0.5 -0.8 -1.0 -1.0 -1.0

Generation capacity - installed

(MW)

66 66 66 66 66

Generation capacity -

refurbishment (MW)

95 95 95 95 95

Generation capacity - new

investments (MW)

0 1 0 0 0

New cross-border

transmission (MW)

117 50 0 0 0

Target Access Rate 9 % 20 % 23 % 23 % 23 %

Generation capacity

mix (%): Hydro

39 % 39 % 39 % 39 % 39 %

Coal 0 % 0 % 0 % 0 % 0 %

Gas 0 % 0 % 0 % 0 % 0 %

Other 61 % 61 % 61 % 61 % 61 %

Table A1.122 Possible Hydropower Expansion: Burkina Faso

Scenario Project

Planned capacity

(MW)

Lead time

(years)

Cost estimate

(Mill. USD)

Trade

expansion

No new

projects* - - -

Trade

stagnation

No new

projects* - - -

* Only mini-hydro in rural node

Page 92: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

88

Table A1.123 Annualized costs of capacity expansion (M$) – Burkina Faso

Trade

expansion

Trade

stagnation Low growth

Current

access rate

53%

regional

average

access rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Generation

Investment

cost

0 0 0 0 0

Thermal 0 0 0 0 0

Hydro 0 0 0 0 0

Other 0 0 0 0 0

Rehabilitation

cost

4 4 4 4 4

Thermal 0 0 0 0 0

Hydro 3 3 3 3 3

Other 1 1 1 1 1

Variable cost (fuel, O&M) 24 39 39 39 39

New capacity 0 0 0 0 0

Installed

capacity

24 39 39 39 39

T&D

Investment

cost

21 44 50 50 49

Cross-border

grid

3 1 0 0 0

Distribution

grid

10 10 10 10 9

Urban

connection

8 31 39 39 39

Rural

connection

0 2 1 1 1

Rehabilitation

cost

17 17 17 17 17

Variable cost (existing

capacity)

32 32 32 32 32

Total Capital cost 42 65 71 71 71

Investment

Cost

21 44 50 50 50

Rehabilitation

cost

21 21 21 21 21

Variable cost 57 71 71 71 71

TOTAL 99 136 142 142 142

Page 93: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

89

Table A1.124 Annualized costs of capacity expansion (% of GDP in 2015) – Burkina Faso

Trade

expansion

Trade

stagnation Low growth

Current

access rate

53%

regional

average

access rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Generation Investment cost 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Thermal 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Hydro 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Other 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Rehabilitation cost 0.1 % 0.1 % 0.1 % 0.1 % 0.1 %

Thermal 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Hydro 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Other 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Variable cost (fuel,

O&M) 0.3 % 0.5 % 0.5 % 0.5 % 0.5 %

New capacity 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Existing

capacity 0.3 % 0.5 % 0.5 % 0.5 % 0.5 %

T&D Investment cost 0.3 % 0.6 % 0.7 % 0.7 % 0.7 %

Cross-border

grid 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Distribution

grid 0.1 % 0.1 % 0.1 % 0.1 % 0.1 %

Urban

connection 0.1 % 0.4 % 0.5 % 0.5 % 0.5 %

Rural

connection 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Rehabilitation cost 0.2 % 0.2 % 0.2 % 0.2 % 0.2 %

Variable cost

(existing capacity) 0.4 % 0.4 % 0.4 % 0.4 % 0.4 %

Total Capital cost 0.6 % 0.9 % 0.9 % 0.9 % 0.9 %

Investment

cost 0.3 % 0.6 % 0.7 % 0.7 % 0.7 %

Rehabilitation

cost 0.3 % 0.3 % 0.3 % 0.3 % 0.3 %

Variable cost 0.7 % 0.9 % 0.9 % 0.9 % 1.0 %

Total 1.3 % 1.8 % 1.9 % 1.9 % 1.9 %

Page 94: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

90

Table A1.125 Investment costs of capacity expansion (M$) – Burkina Faso

Trade

expansion

Trade

stagnation Low growth

Current access

rate

53% regional

average access

rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Generation

Investment

cost 0.2 1 1 1 1

Rehabilitation

cost 24 24 24 24 24

T&D

Investment

cost 170 355 405 405 398

Rehabilitation

cost 136 136 136 136 136

Total 330 517 566 566 559

Table A1.126 Investment costs of capacity expansion (% of GDP in 2015) – Burkina Faso

Trade

expansion

Trade

stagnation Low growth

Current access

rate

53% regional

average access

rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Generation

Investment

cost 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Rehabilitation

cost 0.3 % 0.3 % 0.3 % 0.3 % 0.3 %

T&D

Investment

cost 2.2 % 4.7 % 5.3 % 5.3 % 5.3 %

Rehabilitation

cost 1.8 % 1.8 % 1.8 % 1.8 % 1.8 %

Total 4.3 % 6.8 % 7.5 % 7.5 % 7.5 %

Page 95: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

91

Côte d’Ivoire

Table A1.127 Overview: Côte d’Ivoire 2015

Trade expansion

Trade

stagnation Low growth

Current

access rate

53%

regional

average

access rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Imports (TWh) 15.2 13.9 11.1 0.2 11.9

Exports (TWh) 11.5 10.6 12.0 3.7 9.5

Net exports (TWh) -3.7 -3.3 0.9 3.5 -2.5

Generation capacity - installed

(MW)

498 498 498 498 498

Generation capacity -

refurbishment (MW)

601 601 601 601 601

Generation capacity - new

investments (MW)

136 345 1,368 1,562 552

New cross-border

transmission (MW)

2,596 2,340 2,226 0 2,006

Target Access Rate 54 % 63 % 73 % 73 % 73 %

Generation capacity

mix (%): Hydro

59 % 64 % 77 % 79 % 66 %

Coal 0 % 0 % 0 % 0 % 0 %

Gas 40 % 34 % 20 % 19 % 30 %

Other 0 % 1 % 2 % 2 % 3 %

Page 96: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

92

Table A1.128 Possible Hydropower Expansion: Côte d’Ivoire

Scenario Project*

Planned capacity

(MW)

Lead time

(years)

Cost estimate

(Mill. USD)

Trade

expansion

Soubre 316 6 471

Singrobo 80 3 184

Louga 280 5 678

Malamasso 90 3 245

Daboite 91 3 269

Ndieliesso 90 3 315

Missouli 21 2 not available

Kokumbo 78 3 not available

Abisso-Come 90 3 not available

Gibo-Popoli 112 4 not available

Boloubre 156 4 not available

Tayaboui 100 4 not available

Trade

stagnation Same

* Plus mini-hydro in rural node

Page 97: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

93

Table A1.129 Annualized costs of capacity expansion (M$) – Côte d’Ivoire

Trade

expansion

Trade

stagnation Low growth

Current

access rate

53%

regional

average

access rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Generation

Investment

cost

40 102 402 458 166

Thermal 0 0 0 0 0

Hydro 39 94 380 436 143

Other 1 8 22 22 22

Rehabilitation

cost

32 32 32 32 32

Thermal 0 0 0 0 0

Hydro 32 32 32 32 32

Other 0 0 0 0 0

Variable cost (fuel, O&M) 12 15 31 140 18

New capacity 1 4 13 17 6

Installed

capacity

11 12 18 123 12

T&D

Investment

cost

106 147 212 185 202

Cross-border

grid

32 28 27 0 24

Distribution

grid

38 38 38 38 30

Urban

connection

28 41 46 46 46

Rural

connection

8 39 101 101 101

Rehabilitation

cost

49 49 49 49 49

Variable cost (existing

capacity)

99 99 99 99 99

Total Capital cost 227 330 695 725 449

Investment

Cost

146 249 614 644 368

Rehabilitation

cost

81 81 81 81 81

Variable cost 111 114 131 239 117

TOTAL 338 445 826 964 566

Page 98: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

94

Table A1.130 Annualized costs of capacity expansion (% of GDP in 2015) – Côte d’Ivoire

Trade

expansion

Trade

stagnation Low growth

Current

access rate

53%

regional

average

access rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Generation Investment cost 0.2 % 0.5 % 1.8 % 2.1 % 0.8 %

Thermal 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Hydro 0.2 % 0.4 % 1.7 % 2.0 % 0.7 %

Other 0.0 % 0.0 % 0.1 % 0.1 % 0.1 %

Rehabilitation cost 0.1 % 0.1 % 0.1 % 0.1 % 0.2 %

Thermal 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Hydro 0.1 % 0.1 % 0.1 % 0.1 % 0.2 %

Other 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Variable cost (fuel,

O&M) 0.1 % 0.1 % 0.1 % 0.6 % 0.1 %

New capacity 0.0 % 0.0 % 0.1 % 0.1 % 0.0 %

Existing

capacity 0.1 % 0.1 % 0.1 % 0.6 % 0.1 %

T&D Investment cost 0.5 % 0.7 % 1.0 % 0.9 % 1.0 %

Cross-border

grid 0.1 % 0.1 % 0.1 % 0.0 % 0.1 %

Distribution

grid 0.2 % 0.2 % 0.2 % 0.2 % 0.1 %

Urban

connection 0.1 % 0.2 % 0.2 % 0.2 % 0.2 %

Rural

connection 0.0 % 0.2 % 0.5 % 0.5 % 0.5 %

Rehabilitation cost 0.2 % 0.2 % 0.2 % 0.2 % 0.2 %

Variable cost

(existing capacity) 0.5 % 0.5 % 0.5 % 0.5 % 0.5 %

Total Capital cost 1.0 % 1.5 % 3.2 % 3.3 % 2.2 %

Investment

cost 0.7 % 1.1 % 2.8 % 3.0 % 1.8 %

Rehabilitation

cost 0.4 % 0.4 % 0.4 % 0.4 % 0.4 %

Variable cost 0.5 % 0.5 % 0.6 % 1.1 % 0.6 %

Total 1.5 % 2.0 % 3.8 % 4.4 % 2.7 %

Page 99: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

95

Table A1.131 Investment costs of capacity expansion (M$) – Côte d’Ivoire

Trade

expansion

Trade

stagnation Low growth

Current access

rate

53% regional

average access

rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Generation

Investment

cost 312 802 3,159 3,600 1,295

Rehabilitation

cost 180 180 180 180 180

T&D

Investment

cost 852 1,184 1,708 1,494 1,629

Rehabilitation

cost 396 396 396 396 396

Total 1,741 2,563 5,444 5,671 3,500

Table A1.132 Investment costs of capacity expansion (% of GDP in 2015) – Côte d’Ivoire

Trade

expansion

Trade

stagnation Low growth

Current access

rate

53% regional

average access

rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Generation

Investment

cost 1.4 % 3.7 % 14.5 % 16.5 % 6.2 %

Rehabilitation

cost 0.8 % 0.8 % 0.8 % 0.8 % 0.9 %

T&D

Investment

cost 3.9 % 5.4 % 7.8 % 6.8 % 7.8 %

Rehabilitation

cost 1.8 % 1.8 % 1.8 % 1.8 % 1.9 %

Total 8.0 % 11.7 % 24.9 % 26.0 % 16.8 %

Page 100: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

96

Gambia

Table A1.133 Overview: Gambia 2015

Trade expansion

Trade

stagnation Low growth

Current

access rate

53%

regional

average

access rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Imports (TWh) 0.0 0.0 0.0 0.0 0.0

Exports (TWh) 0.1 0.2 0.1 0.0 0.2

Net exports (TWh) 0.1 0.2 0.1 0.0 0.1

Generation capacity - installed

(MW)

22 22 22 22 22

Generation capacity -

refurbishment (MW)

74 74 74 66 74

Generation capacity – new

investments (MW)

0 2 4 4 4

New cross-border

transmission (MW)

24 20 19 0 20

Target Access Rate 59 % 66 % 79 % 79 % 79 %

Generation capacity

mix (%): Hydro

0 % 0 % 0 % 0 % 0 %

Coal 0 % 0 % 0 % 0 % 0 %

Gas 0 % 0 % 0 % 0 % 0 %

Other 100 % 100 % 100 % 100 % 100 %

Table A1.134 Possible Hydropower Expansion: Gambia

Scenario Project

Planned capacity

(MW)

Lead time

(years)

Cost estimate

(Mill. USD)

Trade

expansion

No new

projects* - - -

Trade

stagnation

No new

projects* - - -

* Only mini-hydro in rural node

Page 101: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

97

Table A1.135 Annualized costs of capacity expansion (M$) – Gambia

Trade

expansion

Trade

stagnation Low growth

Current

access rate

53%

regional

average

access rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Generation

Investment

cost

0 1 2 2 2

Thermal 0 0 0 0 0

Hydro 0 0 0 0 0

Other 0 1 2 2 2

Rehabilitation

cost

2 2 2 2 2

Thermal 0 0 0 0 0

Hydro 0 0 0 0 0

Other 2 2 2 2 2

Variable cost (fuel, O&M) 30 36 37 30 37

New capacity 0 0 0 0 0

Installed

capacity

30 36 37 30 37

T&D

Investment

cost

6 9 15 15 15

Cross-border

grid

0 0 0 0 0

Distribution

grid

1 1 1 1 1

Urban

connection

4 5 7 7 7

Rural

connection

0 3 7 7 7

Rehabilitation

cost

1 1 1 1 1

Variable cost (existing

capacity)

1 1 1 1 1

Total Capital cost 8 13 20 19 20

Investment

Cost

6 10 17 17 17

Rehabilitation

cost

3 3 3 3 3

Variable cost 31 37 38 31 38

TOTAL 40 50 58 51 57

Page 102: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

98

Table A1.136 Annualized costs of capacity expansion (% of GDP in 2015) – Gambia

Trade

expansion

Trade

stagnation Low growth

Current

access rate

53%

regional

average

access rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Generation Investment cost 0.0 % 0.1 % 0.2 % 0.2 % 0.3 %

Thermal 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Hydro 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Other 0.0 % 0.1 % 0.2 % 0.2 % 0.3 %

Rehabilitation cost 0.3 % 0.3 % 0.3 % 0.3 % 0.3 %

Thermal 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Hydro 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Other 0.3 % 0.3 % 0.3 % 0.3 % 0.3 %

Variable cost (fuel,

O&M) 4.5 % 5.2 % 5.4 % 4.5 % 5.7 %

New capacity 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Existing

capacity 4.5 % 5.2 % 5.4 % 4.5 % 5.7 %

T&D Investment cost 0.8 % 1.4 % 2.2 % 2.2 % 2.4 %

Cross-border

grid 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Distribution

grid 0.1 % 0.1 % 0.1 % 0.1 % 0.1 %

Urban

connection 0.6 % 0.8 % 1.1 % 1.1 % 1.1 %

Rural

connection 0.1 % 0.5 % 1.1 % 1.1 % 1.1 %

Rehabilitation cost 0.1 % 0.1 % 0.1 % 0.1 % 0.1 %

Variable cost

(existing capacity) 0.2 % 0.2 % 0.2 % 0.2 % 0.2 %

Total Capital cost 1.2 % 1.9 % 2.9 % 2.9 % 3.1 %

Investment

cost 0.8 % 1.5 % 2.5 % 2.5 % 2.6 %

Rehabilitation

cost 0.4 % 0.4 % 0.4 % 0.4 % 0.4 %

Variable cost 4.6 % 5.4 % 5.6 % 4.6 % 5.9 %

Total 5.9 % 7.3 % 8.4 % 7.5 % 9.0 %

Page 103: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

99

Table A1.137 Investment costs of capacity expansion (M$) – Gambia

Trade

expansion

Trade

stagnation Low growth

Current access

rate

53% regional

average access

rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Generation

Investment

cost 0.3 5 12 12 12

Rehabilitation

cost 12 12 12 11 12

T&D

Investment

cost 45 76 123 123 122

Rehabilitation

cost 6 6 6 6 6

Total 63 99 153 152 152

Table A1.138 Investment costs of capacity expansion (% of GDP in 2015) – Gambia

Trade

expansion

Trade

stagnation Low growth

Current access

rate

53% regional

average access

rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Generation

Investment

cost 0.0 % 0.8 % 1.8 % 1.8 % 1.9 %

Rehabilitation

cost 1.8 % 1.8 % 1.8 % 1.6 % 1.9 %

T&D

Investment

cost 6.6 % 11.2 % 18.1 % 18.0 % 19.0 %

Rehabilitation

cost 0.8 % 0.8 % 0.8 % 0.8 % 0.9 %

Total 9.2 % 14.6 % 22.5 % 22.3 % 23.7 %

Page 104: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

100

Ghana

Table A1.139 Overview: Ghana 2015

Trade expansion

Trade

stagnation Low growth

Current

access rate

53%

regional

average

access rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Imports (TWh) 10.0 9.3 11.0 2.8 8.5

Exports (TWh) 1.7 0.6 1.4 0.3 1.6

Net exports (TWh) -8.3 -8.7 -9.6 -2.6 -6.9

Generation capacity - installed

(MW)

1,713 1,713 1,713 1,713 1,713

Generation capacity -

refurbishment (MW)

160 160 160 160 160

Generation capacity - new

investments (MW)

980 1,005 1,048 1,400 1,048

New cross-border

transmission (MW)

922 770 979 0 659

Target Access Rate 55 % 62 % 76 % 76 % 76 %

Generation capacity

mix (%): Hydro

76 % 76 % 75 % 67 % 75 %

Coal 0 % 0 % 0 % 0 % 0 %

Gas 19 % 19 % 19 % 28 % 19 %

Other 4 % 5 % 7 % 6 % 7 %

Table A1.140 Possible Hydropower Expansion: Ghana

Scenario Project*

Planned capacity

(MW) Lead time (years)

Cost estimate (Mill.

USD)

Trade expansion Awisam 88 3 174

Abatumesu 63 3 162

Juale 193 4 528

Bui 400 7 622

Asouso 51 3 150

Nounibiel**

(20%) 12 2 57

Sedukrom 26 not available

Jomuro 26 not available

Tanoso 30 not available

Kojokrom 36 not available

Hemang 54 not available

Trade stagnation Same

* Plus mini-hydro in rural node

** Shared with Burkina Faso

Page 105: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

101

Table A1.141 Annualized costs of capacity expansion (M$) – Ghana

Trade

expansion

Trade

stagnation Low growth

Current

access rate

53%

regional

average

access rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Generation

Investment

cost

262 272 288 322 288

Thermal 0 0 0 34 0

Hydro 262 262 262 262 262

Other 1 10 27 27 27

Rehabilitation

cost

9 9 9 9 9

Thermal 0 0 0 0 0

Hydro 9 9 9 9 9

Other 0 0 0 0 0

Variable cost (fuel, O&M) 32 32 32 530 32

New capacity 9 9 9 219 8

Installed

capacity

23 23 23 311 24

T&D

Investment

cost

128 180 271 266 243

Cross-border

grid

5 4 5 0 4

Distribution

grid

79 79 79 79 52

Urban

connection

42 53 73 73 73

Rural

connection

3 44 114 114 114

Rehabilitation

cost

34 34 34 34 34

Variable cost (existing

capacity)

94 94 94 94 94

Total Capital cost 433 494 602 630 573

Investment

Cost

391 452 560 588 531

Rehabilitation

cost

42 42 42 42 42

Variable cost 126 126 126 624 126

TOTAL 559 620 728 1,255 699

Page 106: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

102

Table A1.142 Annualized costs of capacity expansion (% of GDP in 2015) – Ghana

Trade

expansion

Trade

stagnation Low growth

Current

access rate

53%

regional

average

access rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Generation Investment cost 1.5 % 1.5 % 1.6 % 1.8 % 1.9 %

Thermal 0.0 % 0.0 % 0.0 % 0.2 % 0.0 %

Hydro 1.5 % 1.5 % 1.5 % 1.5 % 1.7 %

Other 0.0 % 0.1 % 0.2 % 0.2 % 0.2 %

Rehabilitation cost 0.0 % 0.0 % 0.0 % 0.0 % 0.1 %

Thermal 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Hydro 0.0 % 0.0 % 0.0 % 0.0 % 0.1 %

Other 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Variable cost (fuel,

O&M) 0.2 % 0.2 % 0.2 % 3.0 % 0.2 %

New capacity 0.1 % 0.1 % 0.1 % 1.2 % 0.1 %

Existing

capacity 0.1 % 0.1 % 0.1 % 1.8 % 0.2 %

T&D Investment cost 0.7 % 1.0 % 1.5 % 1.5 % 1.6 %

Cross-border

grid 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Distribution

grid 0.4 % 0.4 % 0.4 % 0.4 % 0.3 %

Urban

connection 0.2 % 0.3 % 0.4 % 0.4 % 0.5 %

Rural

connection 0.0 % 0.2 % 0.6 % 0.6 % 0.7 %

Rehabilitation cost 0.2 % 0.2 % 0.2 % 0.2 % 0.2 %

Variable cost

(existing capacity) 0.5 % 0.5 % 0.5 % 0.5 % 0.6 %

Total Capital cost 2.4 % 2.8 % 3.4 % 3.6 % 3.7 %

Investment

cost 2.2 % 2.6 % 3.2 % 3.3 % 3.5 %

Rehabilitation

cost 0.2 % 0.2 % 0.2 % 0.2 % 0.3 %

Variable cost 0.7 % 0.7 % 0.7 % 3.5 % 0.8 %

Total 3.2 % 3.5 % 4.1 % 7.1 % 4.6 %

Page 107: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

103

Table A1.143 Investment costs of capacity expansion (M$) – Ghana

Trade

expansion

Trade

stagnation Low growth

Current access

rate

53% regional

average access

rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Generation

Investment

cost 2,058 2,129 2,253 2,489 2,253

Rehabilitation

cost 48 48 48 48 48

T&D

Investment

cost 1,034 1,450 2,184 2,142 1,954

Rehabilitation

cost 270 270 270 270 270

Total 3,410 3,896 4,755 4,949 4,525

Table A1.144 Investment costs of capacity expansion (% of GDP in 2015) – Ghana

Trade

expansion

Trade

stagnation Low growth

Current access

rate

53% regional

average access

rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Generation

Investment

cost 11.6 % 12.0 % 12.7 % 14.1 % 14.7 %

Rehabilitation

cost 0.3 % 0.3 % 0.3 % 0.3 % 0.3 %

T&D

Investment

cost 5.8 % 8.2 % 12.3 % 12.1 % 12.8 %

Rehabilitation

cost 1.5 % 1.5 % 1.5 % 1.5 % 1.8 %

Total 19.3 % 22.0 % 26.9 % 27.9 % 29.6 %

Page 108: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

104

Guinea

Table A1.145 Overview: Guinea 2015

Trade expansion

Trade

stagnation Low growth

Current

access rate

53%

regional

average

access rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Imports (TWh) 0.0 0.0 0.0 0.0 0.0

Exports (TWh) 18.2 17.8 17.4 0.0 17.5

Net exports (TWh) 18.2 17.8 17.4 0.0 17.5

Generation capacity - installed

(MW)

119 119 119 119 119

Generation capacity -

refurbishment (MW)

28 28 28 28 28

Generation capacity – new

investments (MW)

4,287 4,288 4,288 568 4,288

New cross-border

transmission (MW)

2,204 2,225 2,283 0 2,271

Target Access Rate 21 % 31 % 40 % 40 % 40 %

Generation capacity

mix (%): Hydro

99 % 99 % 99 % 94 % 99 %

Coal 0 % 0 % 0 % 0 % 0 %

Gas 0 % 0 % 0 % 0 % 0 %

Other 1 % 1 % 1 % 6 % 1 %

Page 109: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

105

Table A1.146 Possible Hydropower Expansion: Guinea

Scenario Project*

Planned

capacity (MW) Expected online

Cost estimate

(Mill. USD)

Trade

expansion

Kaléta I 105 2008 143

Sambangalou**

60 2009 139

Kaléta II 210 209

Kassa 118 93

Souapiti II 500 605

Amaria I 300 309

Amaria II 665 835

Souapiti II 750 1008

Balassa 181 171

Gozoguezia 48 110

Morisanako 100 246

Tiopo 120 296

Koukoutamba 281 440

Bouréa 161 373

Diaoya 149 332

Téné 76 122

Fello Sounga 82 263

Fomi 90 300

Grand Kikon 291 637

Trade

stagnation

Kaléta I 105 2008 143

Sambangalou**

60 2009 139

Kaléta II 210 209

Kassa 118 93

* Plus mini-hydro in rural node

** Shared with Senegal

Page 110: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

106

Table A1.147 Annualized costs of capacity expansion (M$) – Guinea

Trade

expansion

Trade

stagnation Low growth

Current

access rate

53%

regional

average

access rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Generation

Investment

cost

860 860 860 114 860

Thermal 0 0 0 0 0

Hydro 860 860 860 114 860

Other 0 0 0 0 0

Rehabilitation

cost

1 1 1 1 1

Thermal 0 0 0 0 0

Hydro 1 1 1 1 1

Other 0 0 0 0 0

Variable cost (fuel, O&M) 91 91 91 11 91

New capacity 71 71 71 8 71

Installed

capacity

20 20 20 3 20

T&D

Investment

cost

61 77 87 47 87

Cross-border

grid

44 43 40 0 41

Distribution

grid

6 6 6 6 5

Urban

connection

10 24 37 37 37

Rural

connection

1 4 4 4 4

Rehabilitation

cost

2 2 2 2 2

Variable cost (existing

capacity)

7 7 7 7 7

Total Capital cost 924 940 951 165 951

Investment

Cost

920 936 947 161 947

Rehabilitation

cost

3 3 3 3 3

Variable cost 98 98 98 18 98

TOTAL 1,022 1,038 1,049 183 1,049

Page 111: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

107

Table A1.148 Annualized costs of capacity expansion (% of GDP in 2015) – Guinea

Trade

expansion

Trade

stagnation Low growth

Current

access rate

53%

regional

average

access rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Generation Investment cost 17.3 % 17.3 % 17.3 % 2.3 % 18.7 %

Thermal 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Hydro 17.3 % 17.3 % 17.3 % 2.3 % 18.7 %

Other 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Rehabilitation cost 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Thermal 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Hydro 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Other 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Variable cost (fuel,

O&M) 1.8 % 1.8 % 1.8 % 0.2 % 2.0 %

New capacity 1.4 % 1.4 % 1.4 % 0.2 % 1.5 %

Existing

capacity 0.4 % 0.4 % 0.4 % 0.1 % 0.4 %

T&D Investment cost 1.2 % 1.5 % 1.8 % 1.0 % 1.9 %

Cross-border

grid 0.9 % 0.9 % 0.8 % 0.0 % 0.9 %

Distribution

grid 0.1 % 0.1 % 0.1 % 0.1 % 0.1 %

Urban

connection 0.2 % 0.5 % 0.7 % 0.7 % 0.8 %

Rural

connection 0.0 % 0.1 % 0.1 % 0.1 % 0.1 %

Rehabilitation cost 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Variable cost

(existing capacity) 0.1 % 0.1 % 0.1 % 0.1 % 0.1 %

Total Capital cost 18.6 % 18.9 % 19.2 % 3.3 % 20.7 %

Investment

cost 18.6 % 18.9 % 19.1 % 3.3 % 20.6 %

Rehabilitation

cost 0.1 % 0.1 % 0.1 % 0.1 % 0.1 %

Variable cost 2.0 % 2.0 % 2.0 % 0.4 % 2.1 %

Total 20.6 % 20.9 % 21.1 % 3.7 % 22.8 %

Page 112: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

108

Table A1.149 Investment costs of capacity expansion (M$) – Guinea

Trade

expansion

Trade

stagnation Low growth

Current access

rate

53% regional

average access

rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Generation

Investment

cost 6,632 6,635 6,635 880 6,635

Rehabilitation

cost 8 8 8 8 8

T&D

Investment

cost 490 617 703 381 702

Rehabilitation

cost 15 15 15 15 15

Total 7,145 7,275 7,362 1,284 7,361

Table A1.150 Investment costs of capacity expansion (% of GDP in 2015) – Guinea

Trade

expansion

Trade

stagnation Low growth

Current access

rate

53% regional

average access

rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Generation

Investment

cost 133.7 % 133.8 % 133.8 % 17.7 % 144.5 %

Rehabilitation

cost 0.2 % 0.2 % 0.2 % 0.2 % 0.2 %

T&D

Investment

cost 9.9 % 12.4 % 14.2 % 7.7 % 15.3 %

Rehabilitation

cost 0.3 % 0.3 % 0.3 % 0.3 % 0.3 %

Total 144.1 % 146.7 % 148.4 % 25.9 % 160.3 %

Page 113: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

109

Guinea Bissau

Table A1.151 Overview: Guinea Bissau 2015

Trade expansion

Trade

stagnation Low growth

Current

access rate

53%

regional

average

access rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Imports (TWh) 0.6 1.2 2.1 0.0 1.5

Exports (TWh) 0.6 1.1 1.9 0.0 1.3

Net exports (TWh) 0.0 -0.1 -0.2 0.0 -0.2

Generation capacity - installed

(MW)

0 0 0 0 0

Generation capacity -

refurbishment (MW)

22 22 22 22 22

Generation capacity - new

investments (MW)

0 0 0 24 0

New cross-border

transmission (MW)

266 538 818 0 646

Target Access Rate 14 % 25 % 33 % 33 % 33 %

Generation capacity

mix (%): Hydro

0 % 0 % 0 % 44 % 0 %

Coal 0 % 0 % 0 % 0 % 0 %

Gas 0 % 0 % 0 % 0 % 0 %

Other 100 % 100 % 100 % 56 % 100 %

Table A1.152 Possible Hydropower Expansion: Guinea Bissau

Scenario Project

Planned capacity

(MW)

Lead time

(years)

Cost estimate

(Mill. USD)

Trade

expansion

No new

projects* - - -

Trade

stagnation

No new

projects* - - -

* Only mini-hydro in rural node

Page 114: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

110

Table A1.153 Annualized costs of capacity expansion (M$) – Guinea Bissau

Trade

expansion

Trade

stagnation Low growth

Current

access rate

53%

regional

average

access rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Generation

Investment

cost

0 0 0 11 0

Thermal 0 0 0 0 0

Hydro 0 0 0 10 0

Other 0 0 0 1 0

Rehabilitation

cost

1 1 1 1 1

Thermal 0 0 0 0 0

Hydro 0 0 0 0 0

Other 1 1 1 1 1

Variable cost (fuel, O&M) 8 8 8 11 8

New capacity 0 0 0 2 0

Installed

capacity

8 8 8 8 8

T&D

Investment

cost

3 7 10 5 9

Cross-border

grid

2 3 5 0 4

Distribution

grid

0 0 0 0 0

Urban

connection

1 3 5 5 5

Rural

connection

0 1 1 1 1

Rehabilitation

cost

0 0 0 0 0

Variable cost (existing

capacity)

1 1 1 1 1

Total Capital cost 3 8 11 18 10

Investment

Cost

3 7 11 17 9

Rehabilitation

cost

1 1 1 1 1

Variable cost 8 9 9 11 9

TOTAL 12 17 20 29 19

Page 115: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

111

Table A1.154 Annualized costs of capacity expansion (% of GDP in 2015) – Guinea Bissau

Trade

expansion

Trade

stagnation Low growth

Current

access rate

53%

regional

average

access rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Generation Investment cost 0.0 % 0.0 % 0.0 % 3.0 % 0.0 %

Thermal 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Hydro 0.0 % 0.0 % 0.0 % 2.7 % 0.0 %

Other 0.0 % 0.0 % 0.0 % 0.3 % 0.0 %

Rehabilitation cost 0.2 % 0.2 % 0.2 % 0.2 % 0.2 %

Thermal 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Hydro 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Other 0.2 % 0.2 % 0.2 % 0.2 % 0.2 %

Variable cost (fuel,

O&M) 2.0 % 2.3 % 2.3 % 2.9 % 2.3 %

New capacity 0.0 % 0.0 % 0.0 % 0.6 % 0.0 %

Existing

capacity 2.0 % 2.3 % 2.3 % 2.3 % 2.3 %

T&D Investment cost 0.7 % 1.9 % 2.8 % 1.5 % 2.5 %

Cross-border

grid 0.4 % 0.9 % 1.3 % 0.0 % 1.1 %

Distribution

grid 0.1 % 0.1 % 0.1 % 0.1 % 0.1 %

Urban

connection 0.2 % 0.8 % 1.2 % 1.2 % 1.2 %

Rural

connection 0.0 % 0.2 % 0.2 % 0.2 % 0.2 %

Rehabilitation cost 0.1 % 0.1 % 0.1 % 0.1 % 0.1 %

Variable cost

(existing capacity) 0.1 % 0.1 % 0.1 % 0.1 % 0.1 %

Total Capital cost 0.9 % 2.1 % 3.0 % 4.7 % 2.8 %

Investment

cost 0.7 % 1.9 % 2.8 % 4.5 % 2.5 %

Rehabilitation

cost 0.2 % 0.2 % 0.2 % 0.2 % 0.3 %

Variable cost 2.2 % 2.4 % 2.4 % 3.0 % 2.4 %

Total 3.1 % 4.5 % 5.4 % 7.7 % 5.2 %

Page 116: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

112

Table A1.155 Investment costs of capacity expansion (M$) – Guinea Bissau

Trade

expansion

Trade

stagnation Low growth

Current access

rate

53% regional

average access

rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Generation

Investment

cost 0 1 0 84 0

Rehabilitation

cost 4 4 4 4 4

T&D

Investment

cost 20 57 84 44 76

Rehabilitation

cost 3 3 3 3 3

Total 27 64 91 135 82

Table A1.156 Investment costs of capacity expansion (% of GDP in 2015) – Guinea Bissau

Trade

expansion

Trade

stagnation Low growth

Current access

rate

53% regional

average access

rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Generation

Investment

cost 0.0 % 0.1 % 0.1 % 22.4 % 0.1 %

Rehabilitation

cost 1.0 % 1.0 % 1.0 % 1.0 % 1.0 %

T&D

Investment

cost 5.4 % 15.2 % 22.4 % 11.7 % 20.4 %

Rehabilitation

cost 0.7 % 0.7 % 0.7 % 0.7 % 0.7 %

Total 7.1 % 16.9 % 24.1 % 35.8 % 22.2 %

Page 117: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

113

Liberia

Table A1.157 Overview: Liberia 2015

Trade expansion

Trade

stagnation Low growth

Current

access rate

53%

regional

average

access rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Imports (TWh) 0.6 0.7 1.7 0.0 1.6

Exports (TWh) 0.0 0.0 0.0 0.0 0.0

Net exports (TWh) -0.6 -0.7 -1.7 0.0 -1.6

Generation capacity - installed

(MW)

0 0 0 0 0

Generation capacity -

refurbishment (MW)

64 64 64 73 64

Generation capacity - new

investments (MW)

0 9 0 369 0

New cross-border

transmission (MW)

91 99 258 0 246

Target Access Rate 1 % 13 % 66 % 66 % 66 %

Generation capacity

mix (%): Hydro

100 % 88 % 100 % 98 % 100 %

Coal 0 % 0 % 0 % 0 % 0 %

Gas 0 % 0 % 0 % 0 % 0 %

Other 0 % 12 % 0 % 2 % 0 %

Table A1.158 Possible Hydropower Expansion: Liberia

Scenario Project*

Planned capacity

(MW)

Lead time

(years)

Cost estimate

(Mill. USD)

Trade

expansion

No new projects

Trade

stagnation

Manu River 45

Mount Coffee

expansion

60 not available

Mano 1 180 605

SP-B1 120 437

* Only mini-hydro in rural node

Page 118: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

114

Table A1.159 Annualized costs of capacity expansion (M$) – Liberia

Trade

expansion

Trade

stagnation Low growth

Current

access rate

53%

regional

average

access rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Generation

Investment

cost

0 4 0 191 0

Thermal 0 0 0 0 0

Hydro 0 0 0 191 0

Other 0 4 0 0 0

Rehabilitation

cost

3 3 3 4 3

Thermal 0 0 0 0 0

Hydro 3 3 3 3 3

Other 0 0 0 0 0

Variable cost (fuel, O&M) 1 1 1 14 1

New capacity 0 0 0 5 0

Installed

capacity

1 1 1 9 1

T&D

Investment

cost

5 23 39 37 36

Cross-border

grid

1 1 2 0 2

Distribution

grid

5 5 5 5 2

Urban

connection

0 0 32 32 32

Rural

connection

0 17 1 1 1

Rehabilitation

cost

0 0 0 0 0

Variable cost (existing

capacity)

4 4 4 4 4

Total Capital cost 9 29 42 232 40

Investment

Cost

5 26 39 228 36

Rehabilitation

cost

3 3 3 4 3

Variable cost 5 5 5 18 5

TOTAL 14 35 48 250 45

Page 119: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

115

Table A1.160 Annualized costs of capacity expansion (% of GDP in 2015) – Liberia

Trade

expansion

Trade

stagnation Low growth

Current

access rate

53%

regional

average

access rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Generation Investment cost 0.0 % 0.4 % 0.0 % 22.7 % 0.0 %

Thermal 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Hydro 0.0 % 0.0 % 0.0 % 22.7 % 0.0 %

Other 0.0 % 0.4 % 0.0 % 0.0 % 0.0 %

Rehabilitation cost 0.4 % 0.4 % 0.4 % 0.5 % 0.4 %

Thermal 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Hydro 0.4 % 0.4 % 0.4 % 0.4 % 0.4 %

Other 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Variable cost (fuel,

O&M) 0.1 % 0.1 % 0.1 % 1.6 % 0.1 %

New capacity 0.0 % 0.0 % 0.0 % 0.6 % 0.0 %

Existing

capacity 0.1 % 0.1 % 0.1 % 1.1 % 0.1 %

T&D Investment cost 0.7 % 2.7 % 4.6 % 4.4 % 4.7 %

Cross-border

grid 0.1 % 0.1 % 0.2 % 0.0 % 0.2 %

Distribution

grid 0.6 % 0.6 % 0.6 % 0.6 % 0.3 %

Urban

connection 0.0 % 0.0 % 3.7 % 3.7 % 4.0 %

Rural

connection 0.0 % 2.0 % 0.1 % 0.1 % 0.1 %

Rehabilitation cost 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Variable cost

(existing capacity) 0.5 % 0.5 % 0.5 % 0.5 % 0.6 %

Total Capital cost 1.1 % 3.5 % 5.0 % 27.6 % 5.1 %

Investment

cost 0.7 % 3.1 % 4.6 % 27.1 % 4.7 %

Rehabilitation

cost 0.4 % 0.4 % 0.4 % 0.5 % 0.4 %

Variable cost 0.6 % 0.6 % 0.6 % 2.1 % 0.7 %

Total 1.7 % 4.2 % 5.7 % 29.7 % 5.8 %

Page 120: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

116

Table A1.161 Investment costs of capacity expansion (M$) – Liberia

Trade

expansion

Trade

stagnation Low growth

Current access

rate

53% regional

average access

rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Generation

Investment

cost 0 26 1 1,533 1

Rehabilitation

cost 19 19 19 20 19

T&D

Investment

cost 44 182 313 299 293

Rehabilitation

cost 0 0 0 0 0

Total 63 227 333 1,852 313

Table A1.162 Investment costs of capacity expansion (% of GDP in 2015) – Liberia

Trade

expansion

Trade

stagnation Low growth

Current access

rate

53% regional

average access

rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Generation

Investment

cost 0.0 % 3.1 % 0.1 % 182.4 % 0.1 %

Rehabilitation

cost 2.3 % 2.3 % 2.3 % 2.3 % 2.5 %

T&D

Investment

cost 5.2 % 21.6 % 37.3 % 35.6 % 37.6 %

Rehabilitation

cost 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Total 7.5 % 27.0 % 39.6 % 220.3 % 40.2 %

Page 121: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

117

Mali

Table A1.163 Overview: Mali 2015

Trade expansion

Trade

stagnation Low growth

Current

access rate

53%

regional

average

access rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Imports (TWh) 16.2 15.2 12.7 0.1 13.6

Exports (TWh) 15.4 14.0 10.9 0.4 11.7

Net exports (TWh) -0.8 -1.2 -1.9 0.3 -1.8

Generation capacity - installed

(MW)

288 288 288 288 288

Generation capacity -

refurbishment (MW)

46 46 46 66 46

Generation capacity - new

investments (MW)

0 5 3 284 3

New cross-border

transmission (MW)

3,571 3,298 2,703 0 2,890

Target Access Rate 15 % 25 % 39 % 39 % 39 %

Generation capacity

mix (%): Hydro

74 % 73 % 73 % 82 % 73 %

Coal 0 % 0 % 0 % 0 % 0 %

Gas 6 % 6 % 6 % 3 % 6 %

Other 20 % 21 % 21 % 14 % 21 %

Table A1.164 Possible Hydropower Expansion: Mali

Scenario Project*

Planned capacity

(MW)

Lead time

(years)

Cost estimate

(Mill. USD)

Trade

expansion

No new projects

Trade

stagnation

Feloue 62 2 83.7

Gouina 95 2 160

Kenie 56 3 100

Gaoulgo 300 814

* Plus mini-hydro in rural node

Page 122: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

118

Table A1.165 Annualized costs of capacity expansion (M$) – Mali

Trade

expansion

Trade

stagnation Low growth

Current

access rate

53%

regional

average

access rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Generation

Investment

cost

0 2 1 115 1

Thermal 0 0 0 0 0

Hydro 0 0 0 113 0

Other 0 2 1 2 1

Rehabilitation

cost

2 2 2 3 2

Thermal 0 0 0 0 0

Hydro 2 2 2 2 2

Other 0 0 0 1 0

Variable cost (fuel, O&M) 4 4 4 40 4

New capacity 0 0 0 4 0

Installed

capacity

4 4 4 35 4

T&D

Investment

cost

70 92 111 85 106

Cross-border

grid

35 32 26 0 28

Distribution

grid

24 24 24 24 18

Urban

connection

9 25 52 52 52

Rural

connection

1 10 8 8 8

Rehabilitation

cost

18 18 18 18 18

Variable cost (existing

capacity)

43 43 43 43 43

Total Capital cost 91 114 132 220 128

Investment

Cost

70 94 112 199 107

Rehabilitation

cost

20 20 20 21 20

Variable cost 47 47 47 82 47

TOTAL 137 161 179 303 175

Page 123: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

119

Table A1.166 Annualized costs of capacity expansion (% of GDP in 2015) – Mali

Trade

expansion

Trade

stagnation Low growth

Current

access rate

53%

regional

average

access rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Generation Investment cost 0.0 % 0.0 % 0.0 % 1.3 % 0.0 %

Thermal 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Hydro 0.0 % 0.0 % 0.0 % 1.3 % 0.0 %

Other 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Rehabilitation cost 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Thermal 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Hydro 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Other 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Variable cost (fuel,

O&M) 0.0 % 0.0 % 0.0 % 0.5 % 0.1 %

New capacity 0.0 % 0.0 % 0.0 % 0.1 % 0.0 %

Existing

capacity 0.0 % 0.0 % 0.0 % 0.4 % 0.1 %

T&D Investment cost 0.8 % 1.1 % 1.3 % 1.0 % 1.4 %

Cross-border

grid 0.4 % 0.4 % 0.3 % 0.0 % 0.4 %

Distribution

grid 0.3 % 0.3 % 0.3 % 0.3 % 0.2 %

Urban

connection 0.1 % 0.3 % 0.6 % 0.6 % 0.7 %

Rural

connection 0.0 % 0.1 % 0.1 % 0.1 % 0.1 %

Rehabilitation cost 0.2 % 0.2 % 0.2 % 0.2 % 0.2 %

Variable cost

(existing capacity) 0.5 % 0.5 % 0.5 % 0.5 % 0.6 %

Total Capital cost 1.1 % 1.3 % 1.6 % 2.6 % 1.6 %

Investment

cost 0.8 % 1.1 % 1.3 % 2.3 % 1.4 %

Rehabilitation

cost 0.2 % 0.2 % 0.2 % 0.2 % 0.3 %

Variable cost 0.5 % 0.5 % 0.5 % 1.0 % 0.6 %

Total 1.6 % 1.9 % 2.1 % 3.6 % 2.2 %

Page 124: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

120

Table A1.167 Investment costs of capacity expansion (M$) – Mali

Trade

expansion

Trade

stagnation Low growth

Current access

rate

53% regional

average access

rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Generation

Investment

cost 1 13 7 916 7

Rehabilitation

cost 14 14 14 17 14

T&D

Investment

cost 565 739 893 681 857

Rehabilitation

cost 144 144 144 144 144

Total 724 910 1,058 1,759 1,023

Table A1.168 Investment costs of capacity expansion (% of GDP in 2015) – Mali

Trade

expansion

Trade

stagnation Low growth

Current access

rate

53% regional

average access

rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Generation

Investment

cost 0.0 % 0.2 % 0.1 % 10.8 % 0.1 %

Rehabilitation

cost 0.2 % 0.2 % 0.2 % 0.2 % 0.2 %

T&D

Investment

cost 6.6 % 8.7 % 10.5 % 8.0 % 11.0 %

Rehabilitation

cost 1.7 % 1.7 % 1.7 % 1.7 % 1.9 %

Total 8.5 % 10.7 % 12.4 % 20.7 % 13.2 %

Page 125: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

121

Mauritania

Table A1.169 Overview: Mauritania 2015

Trade expansion

Trade

stagnation Low growth

Current

access rate

53%

regional

average

access rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Imports (TWh) 0.3 0.4 0.6 0.0 0.5

Exports (TWh) 0.0 0.0 0.0 0.3 0.0

Net exports (TWh) -0.3 -0.4 -0.6 0.3 -0.5

Generation capacity - installed

(MW)

37 37 37 37 37

Generation capacity -

refurbishment (MW)

63 63 63 63 63

Generation capacity - new

investments (MW)

0 0 1 136 1

New cross-border

transmission (MW)

21 48 79 0 54

Target Access Rate 23% 34 % 46 % 46 % 46 %

Generation capacity

mix (%): Hydro

0 % 0 % 0 % 0 % 0 %

Coal 0 % 0 % 0 % 0 % 0 %

Gas 0 % 0 % 0 % 58 % 0 %

Other 100 % 100 % 100 % 42 % 100 %

Table A1.170 Possible Hydropower Expansion: Mauritania

Scenario Project

Planned capacity

(MW)

Lead time

(years)

Cost estimate

(Mill. USD)

Trade

expansion

No new

projects* - - -

Trade

stagnation

No new

projects* - - -

* Only mini-hydro in rural node

Page 126: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

122

Table A1.171 Annualized costs of capacity expansion (M$) – Mauritania

Trade

expansion

Trade

stagnation Low growth

Current

access rate

53%

regional

average

access rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Generation

Investment

cost

0 0 0 13 0

Thermal 0 0 0 13 0

Hydro 0 0 0 0 0

Other 0 0 0 0 0

Rehabilitation

cost

2 2 2 2 2

Thermal 0 0 0 0 0

Hydro 0 0 0 0 0

Other 2 2 2 2 2

Variable cost (fuel, O&M) 29 29 29 87 29

New capacity 0 0 0 58 0

Installed

capacity

29 29 29 29 29

T&D

Investment

cost

15 22 28 27 24

Cross-border

grid

0 1 1 0 1

Distribution

grid

11 11 11 11 7

Urban

connection

3 8 14 14 14

Rural

connection

0 2 2 2 2

Rehabilitation

cost

5 5 5 5 5

Variable cost (existing

capacity)

11 11 11 11 11

Total Capital cost 22 29 35 48 31

Investment

Cost

15 22 29 41 24

Rehabilitation

cost

7 7 7 7 7

Variable cost 39 39 39 97 39

TOTAL 61 68 74 145 70

Page 127: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

123

Table A1.172 Annualized costs of capacity expansion (% of GDP in 2015) – Mauritania

Trade

expansion

Trade

stagnation Low growth

Current

access rate

53%

regional

average

access rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Generation Investment cost 0.0 % 0.0 % 0.0 % 0.3 % 0.0 %

Thermal 0.0 % 0.0 % 0.0 % 0.3 % 0.0 %

Hydro 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Other 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Rehabilitation cost 0.0 % 0.0 % 0.0 % 0.0 % 0.1 %

Thermal 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Hydro 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Other 0.0 % 0.0 % 0.0 % 0.0 % 0.1 %

Variable cost (fuel,

O&M) 0.7 % 0.7 % 0.7 % 2.2 % 0.9 %

New capacity 0.0 % 0.0 % 0.0 % 1.5 % 0.0 %

Existing

capacity 0.7 % 0.7 % 0.7 % 0.7 % 0.9 %

T&D Investment cost 0.4 % 0.6 % 0.7 % 0.7 % 0.7 %

Cross-border

grid 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Distribution

grid 0.3 % 0.3 % 0.3 % 0.3 % 0.2 %

Urban

connection 0.1 % 0.2 % 0.4 % 0.4 % 0.4 %

Rural

connection 0.0 % 0.0 % 0.1 % 0.1 % 0.1 %

Rehabilitation cost 0.1 % 0.1 % 0.1 % 0.1 % 0.2 %

Variable cost

(existing capacity) 0.3 % 0.3 % 0.3 % 0.3 % 0.3 %

Total Capital cost 0.6 % 0.7 % 0.9 % 1.2 % 1.0 %

Investment

cost 0.4 % 0.6 % 0.7 % 1.0 % 0.8 %

Rehabilitation

cost 0.2 % 0.2 % 0.2 % 0.2 % 0.2 %

Variable cost 1.0 % 1.0 % 1.0 % 2.5 % 1.2 %

Total 1.5 % 1.7 % 1.9 % 3.7 % 2.2 %

Page 128: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

124

Table A1.173 Investment costs of capacity expansion (M$) – Mauritania

Trade

expansion

Trade

stagnation Low growth

Current access

rate

53% regional

average access

rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Generation

Investment

cost 0 1 1 93 1

Rehabilitation

cost 10 10 10 10 10

T&D

Investment

cost 121 175 228 221 191

Rehabilitation

cost 41 41 41 41 41

Total 172 227 281 365 244

Table A1.174 Investment costs of capacity expansion (% of GDP in 2015) – Mauritania

Trade

expansion

Trade

stagnation Low growth

Current access

rate

53% regional

average access

rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Generation

Investment

cost 0.0 % 0.0 % 0.0 % 2.4 % 0.0 %

Rehabilitation

cost 0.3 % 0.3 % 0.3 % 0.3 % 0.3 %

T&D

Investment

cost 3.1 % 4.4 % 5.8 % 5.6 % 6.0 %

Rehabilitation

cost 1.0 % 1.0 % 1.0 % 1.0 % 1.3 %

Total 4.4 % 5.8 % 7.1 % 9.3 % 7.6 %

Page 129: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

125

Niger

Table A1.175 Overview: Niger 2015

Trade expansion

Trade

stagnation Low growth

Current

access rate

53%

regional

average

access rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Imports (TWh) 1.0 1.4 1.5 0.4 1.5

Exports (TWh) 0.3 0.0 0.0 0.0 0.0

Net exports (TWh) -0.7 -1.4 -1.5 -0.4 -1.5

Generation capacity - installed

(MW)

0 0 0 0 0

Generation capacity -

refurbishment (MW)

38 38 38 73 38

Generation capacity - new

investments (MW)

0 1 0 202 0

New cross-border

transmission (MW)

117 193 206 0 204

Target Access Rate 7 % 18 % 20 % 20 % 20 %

Generation capacity

mix (%): Hydro

0 % 0 % 0 % 73 % 0 %

Coal 100 % 99 % 99 % 14 % 99 %

Gas 0 % 0 % 0 % 0 % 0 %

Other 0 % 1 % 1 % 13 % 1 %

Table A1.176 Possible Hydropower Expansion: Niger

Scenario Project*

Planned capacity

(MW)

Lead time

(years)

Cost estimate

(Mill. USD)

Trade

expansion No new projects - - -

Trade

stagnation

Kandadji 125 4 359

Dyondyonga 26 2 69

Gambou I 50 3 not available

* Plus mini-hydro in rural node

Page 130: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

126

Table A1.177 Annualized costs of capacity expansion (M$) – Niger

Trade

expansion

Trade

stagnation Low growth

Current

access rate

53%

regional

average

access rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Generation

Investment

cost

0 0 0 72 0

Thermal 0 0 0 0 0

Hydro 0 0 0 72 0

Other 0 0 0 0 0

Rehabilitation

cost

2 2 2 4 2

Thermal 2 2 2 2 2

Hydro 0 0 0 0 0

Other 0 0 0 2 0

Variable cost (fuel, O&M) 10 10 10 44 10

New capacity 0 0 0 3 0

Installed

capacity

10 10 10 41 10

T&D

Investment

cost

10 33 34 34 34

Cross-border

grid

1 1 0 0 0

Distribution

grid

4 4 4 4 4

Urban

connection

5 27 29 29 29

Rural

connection

0 2 1 1 1

Rehabilitation

cost

16 16 16 16 16

Variable cost (existing

capacity)

14 14 14 14 14

Total Capital cost 28 52 53 126 52

Investment

Cost

10 33 34 106 34

Rehabilitation

cost

18 18 18 20 18

Variable cost 24 24 24 59 24

TOTAL 52 75 76 185 76

Page 131: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

127

Table A1.178 Annualized costs of capacity expansion (% of GDP in 2015) – Niger

Trade

expansion

Trade

stagnation Low growth

Current

access rate

53%

regional

average

access rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Generation Investment cost 0.0 % 0.0 % 0.0 % 1.6 % 0.0 %

Thermal 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Hydro 0.0 % 0.0 % 0.0 % 1.6 % 0.0 %

Other 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Rehabilitation cost 0.0 % 0.0 % 0.0 % 0.1 % 0.0 %

Thermal 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Hydro 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Other 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Variable cost (fuel,

O&M) 0.2 % 0.2 % 0.2 % 1.0 % 0.2 %

New capacity 0.0 % 0.0 % 0.0 % 0.1 % 0.0 %

Existing

capacity 0.2 % 0.2 % 0.2 % 0.9 % 0.2 %

T&D Investment cost 0.2 % 0.7 % 0.8 % 0.8 % 0.8 %

Cross-border

grid 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Distribution

grid 0.1 % 0.1 % 0.1 % 0.1 % 0.1 %

Urban

connection 0.1 % 0.6 % 0.6 % 0.6 % 0.7 %

Rural

connection 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Rehabilitation cost 0.4 % 0.4 % 0.4 % 0.4 % 0.4 %

Variable cost

(existing capacity) 0.3 % 0.3 % 0.3 % 0.3 % 0.3 %

Total Capital cost 0.6 % 1.1 % 1.2 % 2.8 % 1.2 %

Investment

cost 0.2 % 0.7 % 0.8 % 2.3 % 0.8 %

Rehabilitation

cost 0.4 % 0.4 % 0.4 % 0.4 % 0.4 %

Variable cost 0.5 % 0.5 % 0.5 % 1.3 % 0.5 %

Total 1.1 % 1.7 % 1.7 % 4.1 % 1.7 %

Page 132: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

128

Table A1.179 Investment costs of capacity expansion (M$) – Niger

Trade

expansion

Trade

stagnation Low growth

Current access

rate

53% regional

average access

rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Generation

Investment

cost 0 1 1 571 1

Rehabilitation

cost 11 11 11 13 11

T&D

Investment

cost 80 268 277 276 275

Rehabilitation

cost 129 129 129 129 129

Total 221 410 418 990 416

Table A1.180 Investment costs of capacity expansion (% of GDP in 2015) – Niger

Trade

expansion

Trade

stagnation Low growth

Current access

rate

53% regional

average access

rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Generation

Investment

cost 0.0 % 0.0 % 0.0 % 12.5 % 0.0 %

Rehabilitation

cost 0.2 % 0.2 % 0.2 % 0.3 % 0.3 %

T&D

Investment

cost 1.8 % 5.9 % 6.1 % 6.1 % 6.1 %

Rehabilitation

cost 2.8 % 2.8 % 2.8 % 2.8 % 2.9 %

Total 4.8 % 9.0 % 9.2 % 21.7 % 9.3 %

Page 133: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

129

Nigeria

Table A1.181 Overview: Nigeria 2015

Trade expansion

Trade

stagnation Low growth

Current

access rate

53%

regional

average

access rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Imports (TWh) 1.0 0.9 2.1 2.1 2.1

Exports (TWh) 0.2 2.2 4.2 2.4 3.9

Net exports (TWh) -0.8 1.3 2.1 0.3 1.8

Generation capacity - installed

(MW)

1,011 1,011 1,011 1,011 1,011

Generation capacity -

refurbishment (MW)

4,057 4,644 5,454 5,208 4,017

Generation capacity - new

investments (MW)

10,323 10,522 10,828 10,828 10,828

New cross-border

transmission (MW)

161 224 366 0 296

Target Access Rate 59 % 67 % 82 % 82 % 82 %

Generation capacity

mix (%): Hydro

85 % 81 % 76 % 77 % 83 %

Coal 0 % 0 % 0 % 0 % 0 %

Gas 14 % 17 % 21 % 20 % 14 %

Other 0 % 1 % 3 % 3 % 3 %

Table A1.182 Possible Hydropower Expansion: Nigeria

Scenario Project*

Planned capacity

(MW)

Lead time

(years)

Cost estimate

(Mill. USD)

Trade

expansion

Mambila 3900 2000

Makurdi 1062 7 1983

Lakoja 1950 9 4463

Zungeru 950 not available

Onitsha 1050 not available

Ikom 736 not available

Guara 300 not available

Dadin Kova 34 not available

Katsina Ali 310 not available

Trade

stagnation

Same

*Plus mini-hydro in rural node

Page 134: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

130

Table A1.183 Annualized costs of capacity expansion (M$) – Nigeria

Trade

expansion

Trade

stagnation Low growth

Current

access rate

53%

regional

average

access rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Generation

Investment

cost

1,671 1,748 1,867 1,867 1,867

Thermal 0 0 0 0 0

Hydro 1,658 1,658 1,658 1,658 1,658

Other 13 90 210 210 210

Rehabilitation

cost

169 177 189 186 168

Thermal 17 26 38 34 17

Hydro 151 151 151 151 151

Other 0 0 0 0 0

Variable cost (fuel, O&M) 1,452 1,779 2,232 2,095 1,429

New capacity 121 121 121 128 121

Installed

capacity

1,331 1,659 2,111 1,966 1,308

T&D

Investment

cost

1,375 1,749 2,379 2,377 1,708

Cross-border

grid

1 1 2 0 1

Distribution

grid

1,013 1,013 1,013 1,013 343

Urban

connection

306 355 484 484 484

Rural

connection

55 380 880 880 880

Rehabilitation

cost

473 473 473 473 473

Variable cost (existing

capacity)

596 596 596 596 596

Total Capital cost 3,688 4,148 4,908 4,903 4,217

Investment

Cost

3,046 3,497 4,246 4,244 3,576

Rehabilitation

cost

642 651 662 659 641

Variable cost 2,048 2,376 2,828 2,691 2,026

TOTAL 5,736 6,523 7,736 7,594 6,243

Page 135: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

131

Table A1.184 Annualized costs of capacity expansion (% of GDP in 2015) – Nigeria

Trade

expansion

Trade

stagnation Low growth

Current

access rate

53%

regional

average

access rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Generation Investment cost 0.9 % 0.9 % 1.0 % 1.0 % 1.1 %

Thermal 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Hydro 0.8 % 0.8 % 0.8 % 0.8 % 1.0 %

Other 0.0 % 0.0 % 0.1 % 0.1 % 0.1 %

Rehabilitation cost 0.1 % 0.1 % 0.1 % 0.1 % 0.1 %

Thermal 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Hydro 0.1 % 0.1 % 0.1 % 0.1 % 0.1 %

Other 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Variable cost (fuel,

O&M) 0.7 % 0.9 % 1.1 % 1.1 % 0.8 %

New capacity 0.1 % 0.1 % 0.1 % 0.1 % 0.1 %

Existing

capacity 0.7 % 0.8 % 1.1 % 1.0 % 0.8 %

T&D Investment cost 0.7 % 0.9 % 1.2 % 1.2 % 1.0 %

Cross-border

grid 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Distribution

grid 0.5 % 0.5 % 0.5 % 0.5 % 0.2 %

Urban

connection 0.2 % 0.2 % 0.2 % 0.2 % 0.3 %

Rural

connection 0.0 % 0.2 % 0.4 % 0.4 % 0.5 %

Rehabilitation cost 0.2 % 0.2 % 0.2 % 0.2 % 0.3 %

Variable cost

(existing capacity) 0.3 % 0.3 % 0.3 % 0.3 % 0.4 %

Total Capital cost 1.9 % 2.1 % 2.5 % 2.5 % 2.5 %

Investment

cost 1.6 % 1.8 % 2.2 % 2.2 % 2.1 %

Rehabilitation

cost 0.3 % 0.3 % 0.3 % 0.3 % 0.4 %

Variable cost 1.0 % 1.2 % 1.4 % 1.4 % 1.2 %

Total 2.9 % 3.3 % 3.9 % 3.9 % 3.7 %

Page 136: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

132

Table A1.185 Investment costs of capacity expansion (M$) – Nigeria

Trade

expansion

Trade

stagnation Low growth

Current access

rate

53% regional

average access

rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Generation

Investment

cost 12,669 13,246 14,133 14,133 14,133

Rehabilitation

cost 976 1,035 1,117 1,092 972

T&D

Investment

cost 11,080 14,091 19,162 19,149 13,762

Rehabilitation

cost 3,812 3,812 3,812 3,812 3,812

Total 28,537 32,184 38,224 38,186 32,679

Table A1.186 Investment costs of capacity expansion (% of GDP in 2015) – Nigeria

Trade

expansion

Trade

stagnation Low growth

Current access

rate

53% regional

average access

rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Generation

Investment

cost 6.5 % 6.8 % 7.2 % 7.2 % 8.4 %

Rehabilitation

cost 0.5 % 0.5 % 0.6 % 0.6 % 0.6 %

T&D

Investment

cost 5.7 % 7.2 % 9.8 % 9.8 % 8.1 %

Rehabilitation

cost 1.9 % 1.9 % 1.9 % 1.9 % 2.3 %

Total 14.6 % 16.4 % 19.5 % 19.5 % 19.3 %

Page 137: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

133

Senegal

Table A1.187 Overview: Senegal 2015

Trade expansion

Trade

stagnation Low growth

Current

access rate

53%

regional

average

access rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Imports (TWh) 0.9 1.5 2.0 0.7 1.5

Exports (TWh) 0.4 0.5 0.7 0.1 0.5

Net exports (TWh) -0.5 -1.0 -1.4 -0.6 -1.0

Generation capacity - installed

(MW)

205 205 205 205 205

Generation capacity -

refurbishment (MW)

139 139 139 139 139

Generation capacity - new

investments (MW)

251 254 258 320 258

New cross-border

transmission (MW)

175 324 487 0 380

Target Access Rate 34 % 44 % 51 % 51 % 51 %

Generation capacity

mix (%): Hydro

0 % 0 % 0 % 9 % 0 %

Coal 42 % 42 % 42 % 38 % 42 %

Gas 0 % 0 % 0 % 0 % 0 %

Other 58 % 58 % 58 % 53 % 58 %

Table A1.188 Possible Hydropower Expansion: Senegal

Scenario Project*

Planned capacity

(MW)

Lead time

(years)

Cost estimate

(Mill. USD)

Trade

expansion

No new

projects* - - -

Trade

stagnation

Sambangalou**

60 2009 139

* Only mini-hydro in rural node

** Shared with Guinea

Page 138: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

134

Table A1.189 Annualized costs of capacity expansion (M$) – Senegal

Trade

expansion

Trade

stagnation Low growth

Current

access rate

53%

regional

average

access rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Generation

Investment

cost

41 42 44 62 44

Thermal 40 40 40 40 40

Hydro 0 0 0 18 0

Other 1 2 3 4 3

Rehabilitation

cost

4 4 4 4 4

Thermal 0 0 0 0 0

Hydro 0 0 0 0 0

Other 4 4 4 4 4

Variable cost (fuel, O&M) 131 131 131 185 131

New capacity 58 58 58 59 58

Installed

capacity

73 73 73 126 73

T&D

Investment

cost

281 307 326 323 238

Cross-border

grid

1 2 3 0 2

Distribution

grid

261 261 261 261 174

Urban

connection

16 32 42 42 42

Rural

connection

3 12 20 20 20

Rehabilitation

cost

118 118 118 118 118

Variable cost (existing

capacity)

370 370 370 370 370

Total Capital cost 444 471 491 507 403

Investment

Cost

322 349 369 385 281

Rehabilitation

cost

122 122 122 122 122

Variable cost 501 501 501 555 501

TOTAL 946 972 993 1,062 904

Page 139: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

135

Table A1.190 Annualized costs of capacity expansion (% of GDP in 2015) – Senegal

Trade

expansion

Trade

stagnation Low growth

Current

access rate

53%

regional

average

access rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Generation Investment cost 0.3 % 0.3 % 0.3 % 0.5 % 0.4 %

Thermal 0.3 % 0.3 % 0.3 % 0.3 % 0.3 %

Hydro 0.0 % 0.0 % 0.0 % 0.1 % 0.0 %

Other 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Rehabilitation cost 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Thermal 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Hydro 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Other 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Variable cost (fuel,

O&M) 1.0 % 1.0 % 1.0 % 1.4 % 1.1 %

New capacity 0.4 % 0.4 % 0.4 % 0.4 % 0.5 %

Existing

capacity 0.5 % 0.5 % 0.5 % 0.9 % 0.6 %

T&D Investment cost 2.1 % 2.3 % 2.4 % 2.4 % 1.9 %

Cross-border

grid 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Distribution

grid 1.9 % 1.9 % 1.9 % 1.9 % 1.4 %

Urban

connection 0.1 % 0.2 % 0.3 % 0.3 % 0.3 %

Rural

connection 0.0 % 0.1 % 0.1 % 0.1 % 0.2 %

Rehabilitation cost 0.9 % 0.9 % 0.9 % 0.9 % 1.0 %

Variable cost

(existing capacity) 2.7 % 2.7 % 2.7 % 2.7 % 3.0 %

Total Capital cost 3.3 % 3.5 % 3.6 % 3.7 % 3.3 %

Investment

cost 2.4 % 2.6 % 2.7 % 2.8 % 2.3 %

Rehabilitation

cost 0.9 % 0.9 % 0.9 % 0.9 % 1.0 %

Variable cost 3.7 % 3.7 % 3.7 % 4.1 % 4.1 %

Total 7.0 % 7.2 % 7.3 % 7.8 % 7.3 %

Page 140: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

136

Table A1.191 Investment costs of capacity expansion (M$) – Senegal

Trade

expansion

Trade

stagnation Low growth

Current access

rate

53% regional

average access

rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Generation

Investment

cost 279 287 299 443 299

Rehabilitation

cost 23 23 23 23 23

T&D

Investment

cost 2,266 2,473 2,623 2,601 1,913

Rehabilitation

cost 951 951 951 951 951

Total 3,519 3,734 3,895 4,018 3,186

Table A1.192 Investment costs of capacity expansion (% of GDP in 2015) – Senegal

Trade

expansion

Trade

stagnation Low growth

Current access

rate

53% regional

average access

rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Generation

Investment

cost 2.1 % 2.1 % 2.2 % 3.3 % 2.4 %

Rehabilitation

cost 0.2 % 0.2 % 0.2 % 0.2 % 0.2 %

T&D

Investment

cost 16.7 % 18.2 % 19.3 % 19.1 % 15.5 %

Rehabilitation

cost 7.0 % 7.0 % 7.0 % 7.0 % 7.7 %

Total 25.9 % 27.5 % 28.6 % 29.6 % 25.8 %

Page 141: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

137

Sierra Leone

Table A1.193 Overview: Sierra Leone 2015

Trade expansion

Trade

stagnation Low growth

Current

access rate

53%

regional

average

access rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Imports (TWh) 1.6 1.4 2.6 0.0 2.5

Exports (TWh) 0.6 0.7 1.7 0.0 1.6

Net exports (TWh) -0.9 -0.7 -0.9 0.0 -0.9

Generation capacity - installed

(MW)

62 62 62 62 62

Generation capacity -

refurbishment (MW)

0 46 46 46 46

Generation capacity - new

investments (MW)

0 0 1 145 1

New cross-border

transmission (MW)

323 314 661 0 633

Target Access Rate 41 % 46 % 51 % 51 % 51 %

Generation capacity

mix (%): Hydro

81 % 46 % 46 % 77 % 46 %

Coal 0 % 0 % 0 % 0 % 0 %

Gas 0 % 0 % 0 % 0 % 0 %

Other 19 % 54 % 54 % 23 % 54 %

Table A1.194 Possible Hydropower Expansion: Sierra Leone

Scenario Project*

Planned capacity

(MW)

Lead time

(years)

Cost estimate

(Mill. USD)

Trade

expansion

No new

projects* - - -

Trade

stagnation

Benkongor I-III 200 511

* Plus mini-hydro in rural node

Page 142: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

138

Table A1.195 Annualized costs of capacity expansion (M$) – Sierra Leone

Trade

expansion

Trade

stagnation Low growth

Current

access rate

53%

regional

average

access rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Generation

Investment

cost

0 0 0 56 0

Thermal 0 0 0 0 0

Hydro 0 0 0 56 0

Other 0 0 0 0 0

Rehabilitation

cost

0 1 1 1 1

Thermal 0 0 0 0 0

Hydro 0 0 0 0 0

Other 0 1 1 1 1

Variable cost (fuel, O&M) 6 23 23 26 23

New capacity 0 0 0 2 0

Installed

capacity

6 23 23 24 23

T&D

Investment

cost

21 26 35 29 31

Cross-border

grid

3 3 7 0 6

Distribution

grid

5 5 5 5 1

Urban

connection

13 17 21 21 21

Rural

connection

0 1 2 2 2

Rehabilitation

cost

1 1 1 1 1

Variable cost (existing

capacity)

5 5 5 5 5

Total Capital cost 23 29 38 88 34

Investment

Cost

21 27 36 85 31

Rehabilitation

cost

1 3 3 3 3

Variable cost 10 28 28 31 28

TOTAL 33 57 66 118 61

Page 143: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

139

Table A1.196 Annualized costs of capacity expansion (% of GDP in 2015) – Sierra Leone

Trade

expansion

Trade

stagnation Low growth

Current

access rate

53%

regional

average

access rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Generation Investment cost 0.0 % 0.0 % 0.0 % 3.5 % 0.0 %

Thermal 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Hydro 0.0 % 0.0 % 0.0 % 3.5 % 0.0 %

Other 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Rehabilitation cost 0.0 % 0.1 % 0.1 % 0.1 % 0.1 %

Thermal 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Hydro 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Other 0.0 % 0.1 % 0.1 % 0.1 % 0.1 %

Variable cost (fuel,

O&M) 0.3 % 1.4 % 1.4 % 1.6 % 1.5 %

New capacity 0.0 % 0.0 % 0.0 % 0.2 % 0.0 %

Existing

capacity 0.3 % 1.4 % 1.4 % 1.5 % 1.5 %

T&D Investment cost 1.3 % 1.6 % 2.2 % 1.8 % 2.0 %

Cross-border

grid 0.2 % 0.2 % 0.4 % 0.0 % 0.4 %

Distribution

grid 0.3 % 0.3 % 0.3 % 0.3 % 0.1 %

Urban

connection 0.8 % 1.0 % 1.3 % 1.3 % 1.3 %

Rural

connection 0.0 % 0.1 % 0.2 % 0.2 % 0.2 %

Rehabilitation cost 0.1 % 0.1 % 0.1 % 0.1 % 0.1 %

Variable cost

(existing capacity) 0.3 % 0.3 % 0.3 % 0.3 % 0.3 %

Total Capital cost 1.4 % 1.8 % 2.4 % 5.5 % 2.2 %

Investment

cost 1.3 % 1.7 % 2.2 % 5.3 % 2.0 %

Rehabilitation

cost 0.1 % 0.2 % 0.2 % 0.2 % 0.2 %

Variable cost 0.6 % 1.7 % 1.7 % 1.9 % 1.8 %

Total 2.0 % 3.5 % 4.1 % 7.4 % 3.9 %

Page 144: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

140

Table A1.197 Investment costs of capacity expansion (M$) – Sierra Leone

Trade

expansion

Trade

stagnation Low growth

Current access

rate

53% regional

average access

rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Generation

Investment

cost 0 1 3 449 3

Rehabilitation

cost 0 8 8 8 8

T&D

Investment

cost 171 213 283 230 249

Rehabilitation

cost 11 11 11 11 11

Total 182 233 305 697 270

Table A1.198 Investment costs of capacity expansion (% of GDP in 2015) – Sierra Leone

Trade

expansion

Trade

stagnation Low growth

Current access

rate

53% regional

average access

rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Generation

Investment

cost 0.0 % 0.1 % 0.2 % 28.0 % 0.2 %

Rehabilitation

cost 0.0 % 0.5 % 0.5 % 0.5 % 0.5 %

T&D

Investment

cost 10.6 % 13.3 % 17.6 % 14.3 % 15.9 %

Rehabilitation

cost 0.7 % 0.7 % 0.7 % 0.7 % 0.7 %

Total 11.3 % 14.5 % 19.0 % 43.4 % 17.3 %

Page 145: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

141

Togo

Table A1.199 Overview: Togo 2015

Trade expansion

Trade

stagnation Low growth

Current

access rate

53%

regional

average

access rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Imports (TWh) 1.7 0.5 1.1 0.0 1.3

Exports (TWh) 0.7 0.1 0.2 0.5 0.4

Net exports (TWh) -1.1 -0.4 -0.9 0.5 -0.9

Generation capacity - installed

(MW)

0 0 0 0 0

Generation capacity -

refurbishment (MW)

31 31 31 91 31

Generation capacity - new

investments (MW)

0 199 200 321 200

New cross-border

transmission (MW)

61 0 5 0 0

Target Access Rate 21 % 30 % 50 % 50 % 50 %

Generation capacity

mix (%): Hydro

100 % 99 % 99 % 56 % 99 %

Coal 0 % 0 % 0 % 0 % 0 %

Gas 0 % 0 % 0 % 44 % 0 %

Other 0 % 1 % 1 % 0 % 1 %

Table A1.200 Possible Hydropower Expansion: Togo

Scenario Project*

Planned capacity

(MW)

Lead time

(years)

Cost estimate

(Mill. USD)

Trade

expansion

Adjaralla**

(50%)

49

Adjaralla ext.**

(50%)

38.5 2 76.5

Tchala 90 146

Tetetou 20 132

Trade

stagnation

Same

* Only mini-hydro in rural node

** Shared with Benin

Page 146: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

142

Table A1.201 Annualized costs of capacity expansion (M$) – Togo

Trade

expansion

Trade

stagnation Low growth

Current

access rate

53%

regional

average

access rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Generation

Investment

cost

0 60 60 72 60

Thermal 0 0 0 12 0

Hydro 0 60 60 60 60

Other 0 1 1 1 1

Rehabilitation

cost

2 2 2 3 2

Thermal 0 0 0 1 0

Hydro 2 2 2 2 2

Other 0 0 0 0 0

Variable cost (fuel, O&M) 0 4 4 97 4

New capacity 0 3 3 76 3

Installed

capacity

0 0 1 21 1

T&D

Investment

cost

10 19 37 37 37

Cross-border

grid

0 0 0 0 0

Distribution

grid

3 3 3 3 3

Urban

connection

6 13 30 30 30

Rural

connection

0 3 4 4 4

Rehabilitation

cost

3 3 3 3 3

Variable cost (existing

capacity)

7 7 7 7 7

Total Capital cost 14 84 102 115 102

Investment

Cost

10 80 97 109 97

Rehabilitation

cost

5 5 5 5 5

Variable cost 8 11 11 105 11

TOTAL 22 95 113 219 113

Page 147: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

143

Table A1.202 Annualized costs of capacity expansion (% of GDP in 2015) – Togo

Trade

expansion

Trade

stagnation Low growth

Current

access rate

53%

regional

average

access rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Generation Investment cost 0.0 % 2.1 % 2.1 % 2.5 % 2.1 %

Thermal 0.0 % 0.0 % 0.0 % 0.4 % 0.0 %

Hydro 0.0 % 2.1 % 2.1 % 2.1 % 2.1 %

Other 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Rehabilitation cost 0.1 % 0.1 % 0.1 % 0.1 % 0.1 %

Thermal 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Hydro 0.1 % 0.1 % 0.1 % 0.1 % 0.1 %

Other 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Variable cost (fuel,

O&M) 0.0 % 0.1 % 0.1 % 3.4 % 0.1 %

New capacity 0.0 % 0.1 % 0.1 % 2.6 % 0.1 %

Existing

capacity 0.0 % 0.0 % 0.0 % 0.7 % 0.0 %

T&D Investment cost 0.3 % 0.7 % 1.3 % 1.3 % 1.3 %

Cross-border

grid 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Distribution

grid 0.1 % 0.1 % 0.1 % 0.1 % 0.1 %

Urban

connection 0.2 % 0.5 % 1.1 % 1.1 % 1.1 %

Rural

connection 0.0 % 0.1 % 0.1 % 0.1 % 0.1 %

Rehabilitation cost 0.1 % 0.1 % 0.1 % 0.1 % 0.1 %

Variable cost

(existing capacity) 0.3 % 0.3 % 0.3 % 0.3 % 0.3 %

Total Capital cost 0.5 % 2.9 % 3.5 % 4.0 % 3.6 %

Investment

cost 0.3 % 2.8 % 3.4 % 3.8 % 3.4 %

Rehabilitation

cost 0.2 % 0.2 % 0.2 % 0.2 % 0.2 %

Variable cost 0.3 % 0.4 % 0.4 % 3.6 % 0.4 %

Total 0.8 % 3.3 % 3.9 % 7.6 % 4.0 %

Page 148: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

144

Table A1.203 Investment costs of capacity expansion (M$) – Togo

Trade

expansion

Trade

stagnation Low growth

Current access

rate

53% regional

average access

rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Generation

Investment

cost 0 477 477 559 477

Rehabilitation

cost 9 9 9 15 9

T&D

Investment

cost 77 156 298 298 297

Rehabilitation

cost 24 24 24 24 24

Total 110 666 808 896 807

Table A1.204 Investment costs of capacity expansion (% of GDP in 2015) – Togo

Trade

expansion

Trade

stagnation Low growth

Current access

rate

53% regional

average access

rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Generation

Investment

cost 0.0 % 16.6 % 16.6 % 19.4 % 16.8 %

Rehabilitation

cost 0.3 % 0.3 % 0.3 % 0.5 % 0.3 %

T&D

Investment

cost 2.7 % 5.4 % 10.3 % 10.3 % 10.4 %

Rehabilitation

cost 0.8 % 0.8 % 0.8 % 0.8 % 0.8 %

Total 3.8 % 23.1 % 28.1 % 31.1 % 28.3 %

Page 149: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

145

Central Africa Power Pool

Cameroon

Table A1.205 Overview: Cameroon 2015

Trade expansion

Trade

stagnation Low growth

Current

access rate

44%

regional

average

access rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Imports (TWh) 0.0 0.1 0.2 0.2 0.2

Exports (TWh) 6.9 6.7 6.9 0.2 7.6

Net exports (TWh) 6.9 6.6 6.7 0.0 7.4

Generation capacity - installed

(MW)

249 249 249 249 249

Generation capacity -

refurbishment (MW)

596 596 596 596 596

Generation capacity - new

investments (MW)

2,430 2,443 2,471 1,015 2,471

New cross-border

transmission (MW)

796 789 831 0 905

Target Access Rate 61 % 68 % 71 % 71 % 71 %

Generation capacity

mix (%): Hydro

96 % 96 % 95 % 91 % 95 %

Coal 0 % 0 % 0 % 0 % 0 %

Gas 0 % 0 % 0 % 0 % 0 %

Other 4 % 4 % 5 % 9 % 5 %

Page 150: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

146

Table A1.206 Possible Hydropower Expansion: Cameroon

Scenario Project*

Planned capacity

(MW)

Lead time

(years)

Cost estimate

(Mill. USD)

Trade

expansion

Memve'Ele 202 6 160

Nachtigal 267 7 318

Njock 150 371

Lom Pangar 56 3 115

Bini a Warak 75 4 not available

Song Ndong 280 not available

Kikot 500 not available

Sonmbengue 900 not available

Trade

stagnation

Memve'Ele 202 6 160

Nachtigal 267 7 318

Njock 150 371

Lom Pangar 56 3 115

Bini a Warak 75 4 not available

Song Ndong 280 not available

* Plus mini-hydro in rural node

Page 151: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

147

Table A1.207 Annualized costs of capacity expansion (M$) – Cameroon

Trade

expansion

Trade

stagnation Low growth

Current

access rate

44%

regional

average

access rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Generation

Investment

cost

410 415 426 180 426

Thermal 0 0 0 0 0

Hydro 410 410 410 164 410

Other 0 5 16 16 16

Rehabilitation

cost

32 32 32 32 32

Thermal 0 0 0 0 0

Hydro 32 32 32 32 32

Other 0 0 0 0 0

Variable cost (fuel, O&M) 54 54 54 29 54

New capacity 30 31 31 9 31

Installed

capacity

23 23 23 21 23

T&D

Investment

cost

86 124 169 147 165

Cross-border

grid

22 21 21 0 24

Distribution

grid

22 22 22 22 15

Urban

connection

42 50 41 41 41

Rural

connection

1 31 85 85 85

Rehabilitation

cost

21 21 21 21 21

Variable cost (existing

capacity)

43 43 43 43 43

Total Capital cost 549 592 647 380 643

Investment

Cost

497 539 595 328 591

Rehabilitation

cost

52 52 52 52 52

Variable cost 97 97 97 72 97

TOTAL 646 688 744 452 740

Page 152: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

148

Table A1.208 Annualized costs of capacity expansion (% of GDP in 2015) – Cameroon

Trade

expansion

Trade

stagnation Low growth

Current

access rate

44%

regional

average

access rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Generation Investment cost 1.6 % 1.7 % 1.7 % 0.7 % 1.9 %

Thermal 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Hydro 1.6 % 1.6 % 1.6 % 0.7 % 1.8 %

Other 0.0 % 0.0 % 0.1 % 0.1 % 0.1 %

Rehabilitation cost 0.1 % 0.1 % 0.1 % 0.1 % 0.1 %

Thermal 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Hydro 0.1 % 0.1 % 0.1 % 0.1 % 0.1 %

Other 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Variable cost (fuel,

O&M) 0.2 % 0.2 % 0.2 % 0.1 % 0.2 %

New capacity 0.1 % 0.1 % 0.1 % 0.0 % 0.1 %

Existing

capacity 0.1 % 0.1 % 0.1 % 0.1 % 0.1 %

T&D Investment cost 0.3 % 0.5 % 0.7 % 0.6 % 0.7 %

Cross-border

grid 0.1 % 0.1 % 0.1 % 0.0 % 0.1 %

Distribution

grid 0.1 % 0.1 % 0.1 % 0.1 % 0.1 %

Urban

connection 0.2 % 0.2 % 0.2 % 0.2 % 0.2 %

Rural

connection 0.0 % 0.1 % 0.3 % 0.3 % 0.4 %

Rehabilitation cost 0.1 % 0.1 % 0.1 % 0.1 % 0.1 %

Variable cost

(existing capacity) 0.2 % 0.2 % 0.2 % 0.2 % 0.2 %

Total Capital cost 2.2 % 2.4 % 2.6 % 1.5 % 2.8 %

Investment

cost 2.0 % 2.1 % 2.4 % 1.3 % 2.6 %

Rehabilitation

cost 0.2 % 0.2 % 0.2 % 0.2 % 0.2 %

Variable cost 0.4 % 0.4 % 0.4 % 0.3 % 0.4 %

Total 2.6 % 2.7 % 3.0 % 1.8 % 3.2 %

Page 153: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

149

Table A1.209 Investment costs of capacity expansion (M$) – Cameroon

Trade

expansion

Trade

stagnation Low growth

Current access

rate

44% regional

average access

rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Generation

Investment

cost 3,126 3,163 3,242 1,370 3,242

Rehabilitation

cost 179 179 179 179 179

T&D

Investment

cost 696 998 1,359 1,187 1,327

Rehabilitation

cost 167 167 167 167 167

Total 4,167 4,507 4,947 2,903 4,914

Table A1.210 Investment costs of capacity expansion (% of GDP in 2015) – Cameroon

Trade

expansion

Trade

stagnation Low growth

Current access

rate

44% regional

average access

rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Generation

Investment

cost 12.5 % 12.6 % 12.9 % 5.5 % 14.2 %

Rehabilitation

cost 0.7 % 0.7 % 0.7 % 0.7 % 0.8 %

T&D

Investment

cost 2.8 % 4.0 % 5.4 % 4.7 % 5.8 %

Rehabilitation

cost 0.7 % 0.7 % 0.7 % 0.7 % 0.7 %

Total 16.6 % 18.0 % 19.7 % 11.6 % 21.5 %

Page 154: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

150

Central African Republic

Table A1.211 Overview: Central African Republic 2015

Trade expansion

Trade

stagnation Low growth

Current

access rate

44%

regional

average

access rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Imports (TWh) 0.0 0.0 0.0 0.0 0.0

Exports (TWh) 0.0 0.0 0.0 0.0 0.0

Net exports (TWh) 0.0 0.0 0.0 0.0 0.0

Generation capacity - installed

(MW)

0 0 0 0 0

Generation capacity -

refurbishment (MW)

18 18 18 18 18

Generation capacity - new

investments (MW)

24 68 143 143 139

New cross-border

transmission (MW)

0 0 0 0 0

Target Access Rate 3 % 15 % 34 % 34 % 34 %

Generation capacity

mix (%): Hydro

100 % 100 % 100 % 100 % 100 %

Coal 0 % 0 % 0 % 0 % 0 %

Gas 0 % 0 % 0 % 0 % 0 %

Other 0 % 0 % 0 % 0 % 0 %

Table A1.212 Possible Hydropower Expansion: Central African Republic

Scenario Project*

Planned capacity

(MW)

Lead time

(years)

Cost estimate

(Mill. USD)

Trade

expansion

Boali III 10 not available

Palambo 300 450

Trade

stagnation

Same

* Plus mini-hydro in rural node

Page 155: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

151

Table A1.213 Annualized costs of capacity expansion (M$) – Central African Republic

Trade

expansion

Trade

stagnation Low growth

Current

access rate

44%

regional

average

access rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Generation

Investment

cost

5 13 28 28 27

Thermal 0 0 0 0 0

Hydro 5 13 28 28 27

Other 0 0 0 0 0

Rehabilitation

cost

1 1 1 1 1

Thermal 0 0 0 0 0

Hydro 1 1 1 1 1

Other 0 0 0 0 0

Variable cost (fuel, O&M) 1 1 3 3 3

New capacity 0 1 2 2 2

Installed

capacity

1 1 1 1 0

T&D

Investment

cost

1 9 20 20 20

Cross-border

grid

0 0 0 0 0

Distribution

grid

1 1 1 1 1

Urban

connection

0 7 19 19 19

Rural

connection

0 1 0 0 0

Rehabilitation

cost

1 1 1 1 1

Variable cost (existing

capacity)

2 2 2 2 2

Total Capital cost 9 25 51 51 50

Investment

Cost

6 23 48 48 47

Rehabilitation

cost

2 2 2 2 2

Variable cost 3 4 5 5 5

TOTAL 12 29 56 56 55

Page 156: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

152

Table A1.214 Annualized costs of capacity expansion (% of GDP in 2015) – Central African Republic

Trade

expansion

Trade

stagnation Low growth

Current

access rate

44%

regional

average

access rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Generation Investment cost 0.3 % 0.7 % 1.5 % 1.5 % 1.6 %

Thermal 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Hydro 0.3 % 0.7 % 1.5 % 1.5 % 1.6 %

Other 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Rehabilitation cost 0.1 % 0.1 % 0.1 % 0.1 % 0.1 %

Thermal 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Hydro 0.1 % 0.1 % 0.1 % 0.1 % 0.1 %

Other 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Variable cost (fuel,

O&M) 0.0 % 0.1 % 0.1 % 0.1 % 0.2 %

New capacity 0.0 % 0.0 % 0.1 % 0.1 % 0.1 %

Existing

capacity 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

T&D Investment cost 0.1 % 0.5 % 1.1 % 1.1 % 1.2 %

Cross-border

grid 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Distribution

grid 0.1 % 0.1 % 0.1 % 0.1 % 0.0 %

Urban

connection 0.0 % 0.4 % 1.0 % 1.0 % 1.1 %

Rural

connection 0.0 % 0.1 % 0.0 % 0.0 % 0.0 %

Rehabilitation cost 0.1 % 0.1 % 0.1 % 0.1 % 0.1 %

Variable cost

(existing capacity) 0.1 % 0.1 % 0.1 % 0.1 % 0.1 %

Total Capital cost 0.5 % 1.4 % 2.8 % 2.8 % 2.9 %

Investment

cost 0.3 % 1.3 % 2.7 % 2.7 % 2.8 %

Rehabilitation

cost 0.1 % 0.1 % 0.1 % 0.1 % 0.1 %

Variable cost 0.2 % 0.2 % 0.3 % 0.3 % 0.3 %

Total 0.6 % 1.6 % 3.1 % 3.1 % 3.2 %

Page 157: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

153

Table A1.215 Investment costs of capacity expansion (M$) – Central African Republic

Trade

expansion

Trade

stagnation Low growth

Current access

rate

44% regional

average access

rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Generation

Investment

cost 36 103 214 214 209

Rehabilitation

cost 5 5 5 5 5

T&D

Investment

cost 11 76 164 164 162

Rehabilitation

cost 12 12 12 12 12

Total 65 197 396 396 388

Table A1.216 Investment costs of capacity expansion (% of GDP in 2015) – Central African Republic

Trade

expansion

Trade

stagnation Low growth

Current access

rate

44% regional

average access

rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Generation

Investment

cost 2.0 % 5.7 % 11.8 % 11.8 % 12.4 %

Rehabilitation

cost 0.3 % 0.3 % 0.3 % 0.3 % 0.3 %

T&D

Investment

cost 0.6 % 4.2 % 9.0 % 9.0 % 9.6 %

Rehabilitation

cost 0.7 % 0.7 % 0.7 % 0.7 % 0.7 %

Total 3.6 % 10.8 % 21.8 % 21.8 % 23.0 %

Page 158: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

154

Chad

Table A1.217 Overview: Chad 2015

Trade expansion

Trade

stagnation Low growth

Current

access rate

44%

regional

average

access rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Imports (TWh) 0.2 0.8 1.3 0.0 1.3

Exports (TWh) 0.0 0.0 0.0 0.0 0.0

Net exports (TWh) -0.2 -0.8 -1.3 0.0 -1.3

Generation capacity - installed

(MW)

0 0 0 0 0

Generation capacity -

refurbishment (MW)

0 0 0 22 0

Generation capacity - new

investments (MW)

0 0 0 174 0

New cross-border

transmission (MW)

35 118 202 0 201

Target Access Rate 3 % 15 % 26 % 26 % 26 %

Generation capacity

mix (%): Hydro

0 % 0 % 0 % 0 % 0 %

Coal 0 % 0 % 0 % 0 % 0 %

Gas 0 % 0 % 0 % 0 % 0 %

Other 100 % 100 % 100 % 100 % 100 %

Table A1.218 Possible Hydropower Expansion: Chad

Scenario Project*

Planned capacity

(MW)

Lead time

(years)

Cost estimate

(Mill. USD)

Trade

expansion

No new

projects* - - -

Trade

stagnation

No new

projects* - - -

* Only mini-hydro in rural node

Page 159: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

155

Table A1.219 Annualized costs of capacity expansion (M$) – Chad

Trade

expansion

Trade

stagnation Low growth

Current

access rate

44%

regional

average

access rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Generation

Investment

cost

0 0 0 33 0

Thermal 0 0 0 0 0

Hydro 0 0 0 0 0

Other 0 0 0 33 0

Rehabilitation

cost

0 0 0 1 0

Thermal 0 0 0 0 0

Hydro 0 0 0 0 0

Other 0 0 0 1 0

Variable cost (fuel, O&M) 0 0 0 84 0

New capacity 0 0 0 77 0

Installed

capacity

0 0 0 7 0

T&D

Investment

cost

2 22 39 39 39

Cross-border

grid

0 0 0 0 0

Distribution

grid

0 0 0 0 0

Urban

connection

2 20 38 38 38

Rural

connection

0 2 0 0 0

Rehabilitation

cost

0 0 0 0 0

Variable cost (existing

capacity)

1 1 1 1 1

Total Capital cost 3 23 39 73 39

Investment

Cost

2 22 39 72 39

Rehabilitation

cost

0 0 0 1 0

Variable cost 1 1 1 85 1

TOTAL 4 23 40 157 40

Page 160: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

156

Table A1.220 Annualized costs of capacity expansion (% of GDP in 2015) – Chad

Trade

expansion

Trade

stagnation Low growth

Current

access rate

44%

regional

average

access rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Generation Investment cost 0.0 % 0.0 % 0.0 % 0.4 % 0.0 %

Thermal 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Hydro 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Other 0.0 % 0.0 % 0.0 % 0.4 % 0.0 %

Rehabilitation cost 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Thermal 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Hydro 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Other 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Variable cost (fuel,

O&M) 0.0 % 0.0 % 0.0 % 1.0 % 0.0 %

New capacity 0.0 % 0.0 % 0.0 % 0.9 % 0.0 %

Existing

capacity 0.0 % 0.0 % 0.0 % 0.1 % 0.0 %

T&D Investment cost 0.0 % 0.3 % 0.5 % 0.5 % 0.5 %

Cross-border

grid 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Distribution

grid 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Urban

connection 0.0 % 0.2 % 0.4 % 0.4 % 0.5 %

Rural

connection 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Rehabilitation cost 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Variable cost

(existing capacity) 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Total Capital cost 0.0 % 0.3 % 0.5 % 0.9 % 0.5 %

Investment

cost 0.0 % 0.3 % 0.5 % 0.8 % 0.5 %

Rehabilitation

cost 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Variable cost 0.0 % 0.0 % 0.0 % 1.0 % 0.0 %

Total 0.0 % 0.3 % 0.5 % 1.9 % 0.5 %

Page 161: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

157

Table A1.221 Investment costs of capacity expansion (M$) – Chad

Trade

expansion

Trade

stagnation Low growth

Current access

rate

44% regional

average access

rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Generation

Investment

cost 0 1 0 191 0

Rehabilitation

cost 0 0 0 4 0

T&D

Investment

cost 18 177 314 314 313

Rehabilitation

cost 3 3 3 3 3

Total 21 182 317 512 317

Table A1.222 Investment costs of capacity expansion (% of GDP in 2015) – Chad

Trade

expansion

Trade

stagnation Low growth

Current access

rate

44% regional

average access

rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Generation

Investment

cost 0.0 % 0.0 % 0.0 % 2.3 % 0.0 %

Rehabilitation

cost 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

T&D

Investment

cost 0.2 % 2.1 % 3.7 % 3.7 % 3.8 %

Rehabilitation

cost 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Total 0.3 % 2.1 % 3.7 % 6.0 % 3.9 %

Page 162: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

158

Republic of Congo (Br.)

Table A1.223 Overview: Congo (Br.) 2015

Trade expansion

Trade

stagnation Low growth

Current

access rate

44%

regional

average

access rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Imports (TWh) 5.6 4.7 4.4 0.0 5.2

Exports (TWh) 0.0 0.0 0.0 0.0 0.0

Net exports (TWh) -5.6 -4.7 -4.4 0.0 -5.2

Generation capacity - installed

(MW)

0 0 0 0 0

Generation capacity -

refurbishment (MW)

129 129 129 148 129

Generation capacity - new

investments (MW)

1,318 1,540 1,689 2,381 1,220

New cross-border

transmission (MW)

639 539 498 0 593

Target Access Rate 22 % 33 % 53 % 53 % 53 %

Generation capacity

mix (%): Hydro

100 % 100 % 100 % 85 % 100 %

Coal 0 % 0 % 0 % 0 % 0 %

Gas 0 % 0 % 0 % 0 % 0 %

Other 0 % 0 % 0 % 15 % 0 %

Table A1.224 Possible Hydropower Expansion: Congo (Br.)

Scenario Project*

Planned capacity

(MW)

Lead time

(years)

Cost estimate

(Mill. USD)

Trade

expansion

Imboulou 100 200

Sounda II 160 230

Dijoue ext. 15 58

Gamomba 14 not available

Mpe 20 not available

Nambili 28 not available

Kouembali 150 not available

Kouli 180 not available

Chollet 600 not available

Sounda III 750 not available

Trade

stagnation Same

* Plus mini-hydro in rural node

Page 163: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

159

Table A1.225 Annualized costs of capacity expansion (M$) – Congo (Br.)

Trade

expansion

Trade

stagnation Low growth

Current

access rate

44%

regional

average

access rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Generation

Investment

cost

301 351 385 528 278

Thermal 0 0 0 0 0

Hydro 301 351 385 460 278

Other 0 0 0 68 0

Rehabilitation

cost

7 7 7 7 7

Thermal 0 0 0 0 0

Hydro 7 7 7 7 7

Other 0 0 0 1 0

Variable cost (fuel, O&M) 24 28 31 175 23

New capacity 20 24 29 171 19

Installed

capacity

4 4 2 4 4

T&D

Investment

cost

32 35 46 31 47

Cross-border

grid

20 17 15 0 18

Distribution

grid

9 9 9 9 6

Urban

connection

4 10 22 22 22

Rural

connection

0 0 0 0 0

Rehabilitation

cost

0 0 0 0 0

Variable cost (existing

capacity)

13 13 13 13 13

Total Capital cost 339 394 438 566 332

Investment

Cost

332 387 431 559 325

Rehabilitation

cost

7 7 7 7 7

Variable cost 37 41 43 188 36

TOTAL 376 434 482 754 367

Page 164: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

160

Table A1.226 Annualized costs of capacity expansion (% of GDP in 2015) – Congo (Br.)

Trade

expansion

Trade

stagnation Low growth

Current

access rate

44%

regional

average

access rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Generation Investment cost 3.0 % 3.5 % 3.9 % 5.3 % 3.1 %

Thermal 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Hydro 3.0 % 3.5 % 3.9 % 4.6 % 3.1 %

Other 0.0 % 0.0 % 0.0 % 0.7 % 0.0 %

Rehabilitation cost 0.1 % 0.1 % 0.1 % 0.1 % 0.1 %

Thermal 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Hydro 0.1 % 0.1 % 0.1 % 0.1 % 0.1 %

Other 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Variable cost (fuel,

O&M) 0.2 % 0.3 % 0.3 % 1.8 % 0.3 %

New capacity 0.2 % 0.2 % 0.3 % 1.7 % 0.2 %

Existing

capacity 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

T&D Investment cost 0.3 % 0.4 % 0.5 % 0.3 % 0.5 %

Cross-border

grid 0.2 % 0.2 % 0.2 % 0.0 % 0.2 %

Distribution

grid 0.1 % 0.1 % 0.1 % 0.1 % 0.1 %

Urban

connection 0.0 % 0.1 % 0.2 % 0.2 % 0.2 %

Rural

connection 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Rehabilitation cost 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Variable cost

(existing capacity) 0.1 % 0.1 % 0.1 % 0.1 % 0.1 %

Total Capital cost 3.4 % 3.9 % 4.4 % 5.7 % 3.7 %

Investment

cost 3.3 % 3.9 % 4.3 % 5.6 % 3.6 %

Rehabilitation

cost 0.1 % 0.1 % 0.1 % 0.1 % 0.1 %

Variable cost 0.4 % 0.4 % 0.4 % 1.9 % 0.4 %

Total 3.8 % 4.4 % 4.8 % 7.6 % 4.1 %

Page 165: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

161

Table A1.227 Investment costs of capacity expansion (M$) – Congo (Br.)

Trade

expansion

Trade

stagnation Low growth

Current access

rate

44% regional

average access

rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Generation

Investment

cost 2,339 2,734 2,998 3,980 2,166

Rehabilitation

cost 39 39 39 42 39

T&D

Investment

cost 256 285 370 247 376

Rehabilitation

cost 0 0 0 0 0

Total 2,634 3,057 3,407 4,269 2,581

Table A1.228 Investment costs of capacity expansion (% of GDP in 2015) – Congo (Br.)

Trade

expansion

Trade

stagnation Low growth

Current access

rate

44% regional

average access

rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Generation

Investment

cost 23.5 % 27.4 % 30.1 % 39.9 % 24.1 %

Rehabilitation

cost 0.4 % 0.4 % 0.4 % 0.4 % 0.4 %

T&D

Investment

cost 2.6 % 2.9 % 3.7 % 2.5 % 4.2 %

Rehabilitation

cost 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Total 26.4 % 30.7 % 34.2 % 42.8 % 28.7 %

Page 166: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

162

Equatorial Guinea

Table A1.229 Overview: Equatorial Guinea 2015

Trade expansion

Trade

stagnation Low growth

Current

access rate

44%

regional

average

access rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Imports (TWh) 0.1 0.1 0.1 0.0 0.1

Exports (TWh) 0.0 0.0 0.0 0.0 0.0

Net exports (TWh) -0.1 -0.1 -0.1 0.0 -0.1

Generation capacity - installed

(MW)

10 10 10 10 10

Generation capacity -

refurbishment (MW)

0 0 0 0 0

Generation capacity - new

investments (MW)

0 0 0 28 0

New cross-border

transmission (MW)

12 16 20 0 19

Target Access Rate 11 % 22 % 35 % 35 % 35 %

Generation capacity

mix (%): Hydro

0 % 0 % 0 % 73 % 0 %

Coal 0 % 0 % 0 % 0 % 0 %

Gas 100 % 100 % 100 % 27 % 100 %

Other 0 % 0 % 0 % 0 % 0 %

Table A1.230 Possible Hydropower Expansion: Equatorial Guinea

Scenario Project*

Planned capacity

(MW)

Lead time

(years)

Cost estimate

(Mill. USD)

Trade

expansion No new projects - - -

Trade

stagnation

Name unknown 120 275

* Plus mini-hydro in rural node

Page 167: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

163

Table A1.231 Annualized costs of capacity expansion (M$) – Equatorial Guinea

Trade

expansion

Trade

stagnation Low growth

Current

access rate

44%

regional

average

access rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Generation

Investment

cost

0 0 0 8 0

Thermal 0 0 0 0 0

Hydro 0 0 0 8 0

Other 0 0 0 0 0

Rehabilitation

cost

0 0 0 0 0

Thermal 0 0 0 0 0

Hydro 0 0 0 0 0

Other 0 0 0 0 0

Variable cost (fuel, O&M) 0 0 0 0 0

New capacity 0 0 0 0 0

Installed

capacity

0 0 0 0 0

T&D

Investment

cost

1 2 3 2 2

Cross-border

grid

0 0 0 0 0

Distribution

grid

0 0 0 0 0

Urban

connection

0 1 2 2 2

Rural

connection

0 0 0 0 0

Rehabilitation

cost

0 0 0 0 0

Variable cost (existing

capacity)

0 0 0 0 0

Total Capital cost 1 2 3 11 3

Investment

Cost

1 2 3 11 2

Rehabilitation

cost

0 0 0 0 0

Variable cost 0 0 0 1 0

TOTAL 1 2 3 12 3

Page 168: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

164

Table A1.232 Annualized costs of capacity expansion (% of GDP in 2015) – Equatorial Guinea

Trade

expansion

Trade

stagnation Low growth

Current

access rate

44%

regional

average

access rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Generation Investment cost 0.0 % 0.0 % 0.0 % 0.1 % 0.0 %

Thermal 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Hydro 0.0 % 0.0 % 0.0 % 0.1 % 0.0 %

Other 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Rehabilitation cost 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Thermal 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Hydro 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Other 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Variable cost (fuel,

O&M) 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

New capacity 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Existing

capacity 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

T&D Investment cost 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Cross-border

grid 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Distribution

grid 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Urban

connection 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Rural

connection 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Rehabilitation cost 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Variable cost

(existing capacity) 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Total Capital cost 0.0 % 0.0 % 0.0 % 0.1 % 0.0 %

Investment

cost 0.0 % 0.0 % 0.0 % 0.1 % 0.0 %

Rehabilitation

cost 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Variable cost 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Total 0.0 % 0.0 % 0.0 % 0.1 % 0.0 %

Page 169: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

165

Table A1.233 Investment costs of capacity expansion (M$) – Equatorial Guinea

Trade

expansion

Trade

stagnation Low growth

Current access

rate

44% regional

average access

rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Generation

Investment

cost 0 0 0 65 0

Rehabilitation

cost 0 0 0 0 0

T&D

Investment

cost 5 12 20 20 19

Rehabilitation

cost 2 2 2 2 2

Total 7 14 23 86 22

Table A1.234 Investment costs of capacity expansion (% of GDP in 2015) – Equatorial Guinea

Trade

expansion

Trade

stagnation Low growth

Current access

rate

44% regional

average access

rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Generation

Investment

cost 0.0 % 0.0 % 0.0 % 0.5 % 0.0 %

Rehabilitation

cost 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

T&D

Investment

cost 0.0 % 0.1 % 0.2 % 0.2 % 0.2 %

Rehabilitation

cost 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Total 0.1 % 0.1 % 0.2 % 0.7 % 0.2 %

Page 170: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

166

Gabon

Table A1.235 Overview: Gabon 2015

Trade expansion

Trade

stagnation Low growth

Current

access rate

44%

regional

average

access rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Imports (TWh) 1.0 1.0 1.0 0.0 0.9

Exports (TWh) 0.0 0.0 0.0 0.0 0.0

Net exports (TWh) -1.0 -1.0 -1.0 0.0 -0.9

Generation capacity - installed

(MW)

0 0 0 0 0

Generation capacity -

refurbishment (MW)

163 163 163 297 163

Generation capacity - new

investments (MW)

84 90 92 92 85

New cross-border

transmission (MW)

117 115 111 0 103

Target Access Rate 82 % 92 % 91 % 91 % 91 %

Generation capacity

mix (%): Hydro

100 % 100 % 99 % 65 % 99 %

Coal 0 % 0 % 0 % 0 % 0 %

Gas 0 % 0 % 0 % 0 % 0 %

Other 0 % 0 % 1 % 35 % 1 %

Table A1.236 Possible Hydropower Expansion: Gabon

Scenario Project*

Planned capacity

(MW)

Lead time

(years)

Cost estimate

(Mill. USD)

Trade

expansion

Two projects (names

unknown)

90 not available

Trade

stagnation

Same

* Plus mini-hydro in rural node

Page 171: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

167

Table A1.237 Annualized costs of capacity expansion (M$) – Gabon

Trade

expansion

Trade

stagnation Low growth

Current

access rate

44%

regional

average

access rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Generation

Investment

cost

19 20 21 21 19

Thermal 0 0 0 0 0

Hydro 19 20 20 20 18

Other 0 0 1 1 1

Rehabilitation

cost

9 9 9 12 9

Thermal 0 0 0 0 0

Hydro 9 9 9 9 9

Other 0 0 0 4 0

Variable cost (fuel, O&M) 5 5 5 56 5

New capacity 0 0 0 0 0

Installed

capacity

5 5 5 56 5

T&D

Investment

cost

9 12 15 13 14

Cross-border

grid

2 2 2 0 2

Distribution

grid

3 3 3 3 2

Urban

connection

3 5 3 3 3

Rural

connection

0 2 6 6 6

Rehabilitation

cost

5 5 5 5 5

Variable cost (existing

capacity)

8 8 8 8 8

Total Capital cost 41 46 49 51 47

Investment

Cost

27 32 36 34 33

Rehabilitation

cost

13 13 13 17 13

Variable cost 13 13 13 64 13

TOTAL 54 59 62 115 59

Page 172: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

168

Table A1.238 Annualized costs of capacity expansion (% of GDP in 2015) – Gabon

Trade

expansion

Trade

stagnation Low growth

Current

access rate

44%

regional

average

access rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Generation Investment cost 0.2 % 0.2 % 0.2 % 0.2 % 0.2 %

Thermal 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Hydro 0.2 % 0.2 % 0.2 % 0.2 % 0.2 %

Other 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Rehabilitation cost 0.1 % 0.1 % 0.1 % 0.1 % 0.1 %

Thermal 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Hydro 0.1 % 0.1 % 0.1 % 0.1 % 0.1 %

Other 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Variable cost (fuel,

O&M) 0.0 % 0.0 % 0.0 % 0.5 % 0.0 %

New capacity 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Existing

capacity 0.0 % 0.0 % 0.0 % 0.5 % 0.0 %

T&D Investment cost 0.1 % 0.1 % 0.1 % 0.1 % 0.1 %

Cross-border

grid 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Distribution

grid 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Urban

connection 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Rural

connection 0.0 % 0.0 % 0.1 % 0.1 % 0.1 %

Rehabilitation cost 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Variable cost

(existing capacity) 0.1 % 0.1 % 0.1 % 0.1 % 0.1 %

Total Capital cost 0.3 % 0.4 % 0.4 % 0.4 % 0.4 %

Investment

cost 0.2 % 0.3 % 0.3 % 0.3 % 0.3 %

Rehabilitation

cost 0.1 % 0.1 % 0.1 % 0.1 % 0.1 %

Variable cost 0.1 % 0.1 % 0.1 % 0.5 % 0.1 %

Total 0.4 % 0.5 % 0.5 % 1.0 % 0.5 %

Page 173: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

169

Table A1.239 Investment costs of capacity expansion (M$) – Gabon

Trade

expansion

Trade

stagnation Low growth

Current access

rate

44% regional

average access

rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Generation

Investment

cost 144 155 161 161 149

Rehabilitation

cost 49 49 49 71 49

T&D

Investment

cost 72 99 121 103 113

Rehabilitation

cost 38 38 38 38 38

Total 303 341 368 373 349

Table A1.240 Investment costs of capacity expansion (% of GDP in 2015) – Gabon

Trade

expansion

Trade

stagnation Low growth

Current access

rate

44% regional

average access

rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Generation

Investment

cost 1.2 % 1.3 % 1.3 % 1.3 % 1.3 %

Rehabilitation

cost 0.4 % 0.4 % 0.4 % 0.6 % 0.4 %

T&D

Investment

cost 0.6 % 0.8 % 1.0 % 0.9 % 1.0 %

Rehabilitation

cost 0.3 % 0.3 % 0.3 % 0.3 % 0.3 %

Total 2.5 % 2.9 % 3.1 % 3.1 % 3.1 %

Page 174: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

170

Islands States

Cape Verde

Table A1.241 Overview: Cape Verde 2015

Trade expansion

Trade

stagnation Low growth

Current

access rate

35% access

rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Imports (TWh) 0 0 0 0 0

Exports (TWh) 0 0 0 0 0

Net exports (TWh) 0 0 0 0 0

Generation capacity - installed

(MW)

0 0 0 0 0

Generation capacity -

refurbishment (MW)

1 1 1 1 1

Generation capacity - new

investments (MW)

14 15 18 18 15

New cross-border

transmission (MW)

0 0 0 0 0

Target Access Rate 55 % 62 % 84 % 84 % 84 %

Generation capacity

mix (%): Hydro

0 % 0 % 0 % 0 % 0 %

Coal 5 % 5 % 4 % 4 % 5 %

Gas 0 % 0 % 0 % 0 % 0 %

Other 95 % 95 % 96 % 96 % 95 %

Table A1.242 Possible Hydropower Expansion: Cape Verde

Scenario Project*

Planned capacity

(MW)

Lead time

(years)

Cost estimate

(Mill. USD)

Trade

expansion

No new

projects* - - -

Trade

stagnation

No new

projects* - - -

* Only mini-hydro in rural node

Page 175: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

171

Table A1.243 Annualized costs of capacity expansion (M$) – Cape Verde

Trade

expansion

Trade

stagnation Low growth

Current

access rate

35% access

rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Generation

Investment

cost

3 3 4 4 3

Thermal 0 0 0 0 0

Hydro 0 0 0 0 0

Other 3 3 4 4 3

Rehabilitation

cost

0 0 0 0 0

Thermal 0 0 0 0 0

Hydro 0 0 0 0 0

Other 0 0 0 0 0

Variable cost (fuel, O&M) 10 11 13 13 11

New capacity 10 11 13 13 11

Installed

capacity

0 0 0 0 0

T&D

Investment

cost

1 2 5 5 5

Cross-border

grid

0 0 0 0 0

Distribution

grid

1 1 1 1 1

Urban

connection

0 1 1 1 1

Rural

connection

0 1 3 3 3

Rehabilitation

cost

1 1 1 1 1

Variable cost (existing

capacity)

1 1 1 1 1

Total Capital cost 5 6 9 9 8

Investment

Cost

4 5 9 9 8

Rehabilitation

cost

1 1 1 1 1

Variable cost 11 12 15 15 12

TOTAL 16 18 24 24 21

Page 176: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

172

Table A1.244 Annualized costs of capacity expansion (% of GDP in 2015) – Cape Verde

Trade

expansion

Trade

stagnation Low growth

Current

access rate

35% access

rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Generation Investment cost 0.2 % 0.2 % 0.2 % 0.2 % 0.2 %

Thermal 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Hydro 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Other 0.2 % 0.2 % 0.2 % 0.2 % 0.2 %

Rehabilitation cost 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Thermal 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Hydro 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Other 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Variable cost (fuel,

O&M) 0.6 % 0.7 % 0.8 % 0.8 % 0.8 %

New capacity 0.6 % 0.6 % 0.8 % 0.8 % 0.8 %

Existing

capacity 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

T&D Investment cost 0.1 % 0.1 % 0.3 % 0.3 % 0.3 %

Cross-border

grid 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Distribution

grid 0.1 % 0.1 % 0.1 % 0.1 % 0.0 %

Urban

connection 0.0 % 0.0 % 0.1 % 0.1 % 0.1 %

Rural

connection 0.0 % 0.0 % 0.2 % 0.2 % 0.2 %

Rehabilitation cost 0.0 % 0.0 % 0.0 % 0.0 % 0.1 %

Variable cost

(existing capacity) 0.1 % 0.1 % 0.1 % 0.1 % 0.1 %

Total Capital cost 0.3 % 0.4 % 0.6 % 0.6 % 0.6 %

Investment

cost 0.2 % 0.3 % 0.5 % 0.5 % 0.6 %

Rehabilitation

cost 0.0 % 0.0 % 0.0 % 0.0 % 0.1 %

Variable cost 0.7 % 0.7 % 0.9 % 0.9 % 0.9 %

Total 1.0 % 1.1 % 1.4 % 1.4 % 1.5 %

Page 177: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

173

Table A1.245 Investment costs of capacity expansion (M$) – Cape Verde

Trade

expansion

Trade

stagnation Low growth

Current access

rate

35% access

rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Generation

Investment

cost 15 17 21 21 18

Rehabilitation

cost 0 0 0 0 0

T&D

Investment

cost 11 19 42 42 38

Rehabilitation

cost 6 6 6 6 6

Total 32 41 69 69 61

Table A1.246 Investment costs of capacity expansion (% of GDP in 2015) – Cape Verde

Trade

expansion

Trade

stagnation Low growth

Current access

rate

35% access

rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Generation

Investment

cost 0.9 % 1.0 % 1.3 % 1.3 % 1.3 %

Rehabilitation

cost 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

T&D

Investment

cost 0.7 % 1.1 % 2.5 % 2.5 % 2.8 %

Rehabilitation

cost 0.3 % 0.3 % 0.3 % 0.3 % 0.4 %

Total 1.9 % 2.5 % 4.1 % 4.1 % 4.5 %

Page 178: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

174

Madagascar

Table A1.247 Overview: Madagascar 2015

Trade expansion

Trade

stagnation Low growth

Current

access rate

35% access

rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Imports (TWh) 0 0 0 0 0

Exports (TWh) 0 0 0 0 0

Net exports (TWh) 0 0 0 0 0

Generation capacity - installed

(MW)

87 87 87 87 87

Generation capacity -

refurbishment (MW)

82 82 82 82 82

Generation capacity - new

investments (MW)

175 354 349 349 338

New cross-border

transmission (MW)

0 0 0 0 0

Target Access Rate 18 % 36 % 36 % 36 % 36 %

Generation capacity

mix (%): Hydro

24 % 16 % 16 % 16 % 16 %

Coal 0 % 0 % 0 % 0 % 0 %

Gas 0 % 0 % 0 % 0 % 0 %

Other 76 % 84 % 84 % 84 % 84 %

Table A1.248 Possible Hydropower Expansion: Madagascar

Scenario Project*

Planned capacity

(MW)

Lead time

(years)

Cost estimate

(Mill. USD)

Trade

expansion

No new

projects* - - -

Trade

stagnation

No new

projects* - - -

* Only mini-hydro in rural node

Page 179: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

175

Table A1.249 Annualized costs of capacity expansion (M$) – Madagascar

Trade

expansion

Trade

stagnation Low growth

Current

access rate

35% access

rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Generation

Investment

cost

33 70 70 70 68

Thermal 0 0 0 0 0

Hydro 0 0 0 0 0

Other 33 70 70 70 68

Rehabilitation

cost

4 4 4 4 4

Thermal 0 0 0 0 0

Hydro 4 4 4 4 4

Other 0 0 0 0 0

Variable cost (fuel, O&M) 142 266 261 261 253

New capacity 141 265 260 260 251

Installed

capacity

1 1 1 1 1

T&D

Investment

cost

25 129 135 135 134

Cross-border

grid

0 0 0 0 0

Distribution

grid

2 2 2 2 2

Urban

connection

14 53 51 51 51

Rural

connection

9 74 82 82 82

Rehabilitation

cost

2 2 2 2 2

Variable cost (existing

capacity)

6 6 6 6 6

Total Capital cost 64 206 211 211 208

Investment

Cost

58 200 205 205 202

Rehabilitation

cost

6 6 6 6 6

Variable cost 148 272 267 267 258

TOTAL 212 477 478 478 466

Page 180: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

176

Table A1.250 Annualized costs of capacity expansion (% of GDP in 2015) – Madagascar

Trade

expansion

Trade

stagnation Low growth

Current

access rate

35% access

rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Generation Investment cost 0.5 % 1.0 % 1.0 % 1.0 % 1.0 %

Thermal 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Hydro 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Other 0.5 % 1.0 % 1.0 % 1.0 % 1.0 %

Rehabilitation cost 0.1 % 0.1 % 0.1 % 0.1 % 0.1 %

Thermal 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Hydro 0.1 % 0.1 % 0.1 % 0.1 % 0.1 %

Other 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Variable cost (fuel,

O&M) 2.0 % 3.7 % 3.6 % 3.6 % 3.7 %

New capacity 1.9 % 3.7 % 3.6 % 3.6 % 3.7 %

Existing

capacity 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

T&D Investment cost 0.3 % 1.8 % 1.9 % 1.9 % 2.0 %

Cross-border

grid 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Distribution

grid 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Urban

connection 0.2 % 0.7 % 0.7 % 0.7 % 0.7 %

Rural

connection 0.1 % 1.0 % 1.1 % 1.1 % 1.2 %

Rehabilitation cost 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Variable cost

(existing capacity) 0.1 % 0.1 % 0.1 % 0.1 % 0.1 %

Total Capital cost 0.9 % 2.8 % 2.9 % 2.9 % 3.0 %

Investment

cost 0.8 % 2.8 % 2.8 % 2.8 % 3.0 %

Rehabilitation

cost 0.1 % 0.1 % 0.1 % 0.1 % 0.1 %

Variable cost 2.0 % 3.8 % 3.7 % 3.7 % 3.8 %

Total 2.9 % 6.6 % 6.6 % 6.6 % 6.8 %

Page 181: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

177

Table A1.251 Investment costs of capacity expansion (M$) – Madagascar

Trade

expansion

Trade

stagnation Low growth

Current access

rate

35% access

rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Generation

Investment

cost 197 424 423 423 410

Rehabilitation

cost 25 25 25 25 25

T&D

Investment

cost 198 1,041 1,086 1,086 1,082

Rehabilitation

cost 13 13 13 13 13

Total 432 1,503 1,546 1,546 1,530

Table A1.252 Investment costs of capacity expansion (% of GDP in 2015) – Madagascar

Trade

expansion

Trade

stagnation Low growth

Current access

rate

35% access

rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Generation

Investment

cost 2.7 % 5.9 % 5.8 % 5.8 % 6.0 %

Rehabilitation

cost 0.3 % 0.3 % 0.3 % 0.3 % 0.4 %

T&D

Investment

cost 2.7 % 14.4 % 15.0 % 15.0 % 15.8 %

Rehabilitation

cost 0.2 % 0.2 % 0.2 % 0.2 % 0.2 %

Total 6.0 % 20.8 % 21.4 % 21.4 % 22.3 %

Page 182: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

178

Mauritius

Table A1.253 Overview: Mauritius 2015

Trade expansion

Trade

stagnation Low growth

Current

access rate

35% access

rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Imports (TWh) 0 0 0 0 0

Exports (TWh) 0 0 0 0 0

Net exports (TWh) 0 0 0 0 0

Generation capacity - installed

(MW)

195 195 195 195 195

Generation capacity -

refurbishment (MW)

0 0 0 0 0

Generation capacity - new

investments (MW)

0 0 0 0 0

New cross-border

transmission (MW)

0 0 0 0 0

Target Access Rate 100 % 100 % 100 % 100 % 100 %

Generation capacity

mix (%): Hydro

30 % 30 % 30 % 30 % 30 %

Coal 60 % 60 % 60 % 60 % 60 %

Gas 0 % 0 % 0 % 0 % 0 %

Other 9 % 9 % 9 % 9 % 9 %

Table A1.254 Possible Hydropower Expansion: Mauritius

Scenario Project*

Planned capacity

(MW)

Lead time

(years)

Cost estimate

(Mill. USD)

Trade

expansion

No new

projects* - - -

Trade

stagnation

No new

projects* - - -

* Only mini-hydro in rural node

Page 183: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

179

Table A1.255 Annualized costs of capacity expansion (M$) – Mauritius

Trade

expansion

Trade

stagnation Low growth

Current

access rate

35% access

rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Generation

Investment

cost

0 0 0 0 0

Thermal 0 0 0 0 0

Hydro 0 0 0 0 0

Other 0 0 0 0 0

Rehabilitation

cost

0 0 0 0 0

Thermal 0 0 0 0 0

Hydro 0 0 0 0 0

Other 0 0 0 0 0

Variable cost (fuel, O&M) 8 8 8 8 6

New capacity 0 0 0 0 0

Installed

capacity

8 8 8 8 6

T&D

Investment

cost

16 16 16 16 11

Cross-border

grid

0 0 0 0 0

Distribution

grid

13 13 13 13 8

Urban

connection

1 1 1 1 1

Rural

connection

2 2 2 2 2

Rehabilitation

cost

9 9 9 9 9

Variable cost (existing

capacity)

21 21 21 21 21

Total Capital cost 25 25 25 25 19

Investment

Cost

16 16 16 16 11

Rehabilitation

cost

9 9 9 9 9

Variable cost 29 29 29 29 28

TOTAL 54 54 54 54 47

Page 184: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

180

Table A1.256 Annualized costs of capacity expansion (% of GDP in 2015) – Mauritius

Trade

expansion

Trade

stagnation Low growth

Current

access rate

35% access

rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Generation Investment cost 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Thermal 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Hydro 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Other 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Rehabilitation cost 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Thermal 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Hydro 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Other 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Variable cost (fuel,

O&M) 0.1 % 0.1 % 0.1 % 0.1 % 0.1 %

New capacity 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Existing

capacity 0.1 % 0.1 % 0.1 % 0.1 % 0.1 %

T&D Investment cost 0.2 % 0.2 % 0.2 % 0.2 % 0.1 %

Cross-border

grid 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Distribution

grid 0.1 % 0.1 % 0.1 % 0.1 % 0.1 %

Urban

connection 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Rural

connection 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Rehabilitation cost 0.1 % 0.1 % 0.1 % 0.1 % 0.1 %

Variable cost

(existing capacity) 0.2 % 0.2 % 0.2 % 0.2 % 0.3 %

Total Capital cost 0.3 % 0.3 % 0.3 % 0.3 % 0.2 %

Investment

cost 0.2 % 0.2 % 0.2 % 0.2 % 0.1 %

Rehabilitation

cost 0.1 % 0.1 % 0.1 % 0.1 % 0.1 %

Variable cost 0.3 % 0.3 % 0.3 % 0.3 % 0.3 %

Total 0.6 % 0.6 % 0.6 % 0.6 % 0.6 %

Page 185: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

181

Table A1.257 Investment costs of capacity expansion (M$) – Mauritius

Trade

expansion

Trade

stagnation Low growth

Current access

rate

35% access

rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Generation

Investment

cost 1 1 1 1 1

Rehabilitation

cost 0 0 0 0 0

T&D

Investment

cost 128 128 128 128 85

Rehabilitation

cost 69 69 69 69 69

Total 198 198 198 198 154

Table A1.258 Investment costs of capacity expansion (% of GDP in 2015) – Mauritius

Trade

expansion

Trade

stagnation Low growth

Current access

rate

35% access

rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Generation

Investment

cost 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Rehabilitation

cost 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

T&D

Investment

cost 1.4 % 1.4 % 1.4 % 1.4 % 1.1 %

Rehabilitation

cost 0.8 % 0.8 % 0.8 % 0.8 % 0.9 %

Total 2.2 % 2.2 % 2.2 % 2.2 % 1.9 %

Page 186: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

182

Regional totals for the island states

Table A1.259 Investment needs and generation mix in the island states after ten years (2005-2015)

Trade expansion

Trade

stagnation Low growth

Current

access rate

35% access

rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Generation capacity (in

MW)

- Installed 282 282 282 282 282

- Refurbishment 83 83 83 83 83

- New investments 189 369 368 368 353

Generation capacity

mix (%):

- Hydro 25 % 19 % 19 % 19 % 20 %

- Coal 21 % 16 % 16 % 16 % 16 %

- Gas 0 % 0 % 0 % 0 % 0 %

- Other 53 % 65 % 65 % 65 % 64 %

Page 187: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

183

Table A1.260 Overnight investment costs in the island states over the next ten years (M$)

Trade

expansion

Trade

stagnation Low growth

Current access

rate

35% access

rate

National

targets for

access rates

National

targets for

access rates

National

targets for

access rates,

trade

expansion

Generation Investment cost 213 442 445 445 428

Rehabilitation

cost 25 25 25 25 25

T&D Investment cost 337 1,188 1,256 1,256 1,205

- Cross-border 0 0 0 0 0

- Distribution

grid

130 130 130 130 79

- Urban

connection

119 440 428 428 428

- Rural

connection

88 618 697 697 697

Refurbishement

cost 87 87 87 87 87

Total 762 2,463 2,599 2,599 2,497

Page 188: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

184

Table A1.261 Annualized investment costs of system expansion in the island states (M$)

Trade expansion Trade stagnation Low growth

Current access

rate 35% access rate

National targets

for access rates

National targets

for access rates

National targets

for access rates,

trade expansion

Generation

Investment cost 36 73 74 74 71

Refurbishment cost 4 4 4 4 4

Variable cost (fuel,

O&M)

160 285 283 283 270

- New capacity 151 276 273 273 262

- Existing capacity 9 9 9 9 8

T&D and connection

Investment cost 42 148 156 156 150

- Cross-border 0 0 0 0 0

- Distribution grid 16 16 16 16 10

- Urban connection 15 55 53 53 53

- Rural connection 11 77 87 87 87

Refurbishment cost 11 11 11 11 11

Variable cost (existing

capacity)

28 28 28 28 28

Total

Capital cost 93 236 245 245 236

- Investment cost 78 221 230 230 220

- Refurbishment cost 15 15 15 15 15

Variable cost 188 313 311 311 298

TOTAL 282 549 556 556 534

Page 189: Powering Up: Costing Power Infrastructure Spending Needs … · Powering Up: Costing Power Infrastructure Spending Needs in Sub-Saharan Africa COUNTRY ANNEX Orvika Rosnes and Haakon

COSTING POWER INFRASTRUCTURE INVESTMENT NEEDS IN SUB-SAHARAN AFRICA—ANNEX 1

185

Table A1.262 Annualized costs as a share of GDP in 2015 in the island states

Trade expansion Trade stagnation Low growth

Current access

rate 35% access rate

National targets

for access rates

National targets

for access rates

National targets

for access rates,

trade expansion

Generation

Investment cost 0.2 % 0.4 % 0.4 % 0.4 % 0.4 %

Refurbishment cost 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

Variable cost (fuel,

O&M)

0.9 % 1.6 % 1.6 % 1.6 % 1.7 %

- New capacity 0.8 % 1.5 % 1.5 % 1.5 % 1.6 %

- Existing capacity 0.1 % 0.1 % 0.1 % 0.1 % 0.0 %

T&D and connection

Investment cost 0.2 % 0.8 % 0.9 % 0.9 % 0.9 %

- Cross-border 0.0 % 0.0 % 0.0 % 0.0 % 0.0 %

- Distribution grid 0.1 % 0.1 % 0.1 % 0.1 % 0.1 %

- Urban connection 0.1 % 0.3 % 0.3 % 0.3 % 0.3 %

- Rural connection 0.1 % 0.4 % 0.5 % 0.5 % 0.5 %

Refurbishment cost 0.1 % 0.1 % 0.1 % 0.1 % 0.1 %

Variable cost (existing

capacity)

0.2 % 0.2 % 0.2 % 0.2 % 0.2 %

Total

Capital cost 0.5 % 1.3 % 1.4 % 1.4 % 1.5 %

- Investment cost 0.4 % 1.2 % 1.3 % 1.3 % 1.4 %

- Refurbishment cost 0.1 % 0.1 % 0.1 % 0.1 % 0.1 %

Variable cost 1.0 % 1.7 % 1.7 % 1.7 % 1.8 %

TOTAL 1.6 % 3.1 % 3.1 % 3.1 % 3.3 %

Table A1.263 Long-run marginal costs in the island states ($ per MWh)

Cost of generation

Cost of domestic

transmission and

distribution

Total long-run

marginal costs

Cape Verde 141 50 191

Madagascar 141 1 142

Mauritius 25 153 178

Average 139 126 265

Note: Average is weighted by annualized cost.