Page 1: Power Transmission Solutions Grid Access

1 04-2009 Power Transmission DivisionE T PS SL/Re

Power Transmission SolutionsGrid Access

1 Power Transmission DivisionE T PS SL/Re04-2009

© Siemens AG 2009Energy Sector

Connecting the 500 MW Greater Gabbard Offshore Wind Farm to the Grid

Dietmar RetzmannAlberto Schultze

Page 2: Power Transmission Solutions Grid Access

2 04-2009 Power Transmission DivisionE T PS SL/Re

Global Trends CO2 Reduction – Green EnergyMegacities – Security of Supply

2 04-2009 Power Transmission DivisionE T PS SL/Re

Page 3: Power Transmission Solutions Grid Access

3 04-2009 Power Transmission DivisionE T PS SL/Re

Electrical Energy is the Backbone of our Society …

… today and in Future

3 Power Transmission DivisionE T PS SL/Re04-2009

Page 4: Power Transmission Solutions Grid Access

4 04-2009 Power Transmission DivisionE T PS SL/Re

Greenland Melt-Down has accelerated –

Sea-Level Rise from Ice-Melting and thermal Expansion: 1961-2003: +18 +/-5 cm per 100 Years 1993-2003: +31 +/-8 cm per 100 Years

Source: Gregory et al., Nature (2004)

Possible Maximum Value as Worst-CaseBusiness-As-Usual Scenario

Source: "An End to Global Warming“, L.O. Williams,Elsevier 2002

Accelerated Greenland Melt-Down North of Germany after Sea-Level Rise by 100 m

Pictures of the Future ?

Page 5: Power Transmission Solutions Grid Access

5 04-2009 Power Transmission DivisionE T PS SL/Re5 Power Transmission DivisionE T PS SL/Re

of Power Supply04-2009

ustainability

Page 6: Power Transmission Solutions Grid Access

6 04-2009 Power Transmission DivisionE T PS SL/Re

Lynn / Inner Dowsing, GB, 200854 x SWT-3.6-107 (194 MW)

Burbo Banks, GB, 200725 x SWT-3.6-107 (90 MW)

Lillgrund, SE, 200748 x SWT-2.3-93 (110 MW)

Middelgrunden, DK, 200020 x SWT-2.0 (40 MW)

Horns Rev II, DK, 200991 x SWT-2.3-93 (209 MW)

Samsø, DK, 200210 x SWT-2.3-82 (23 MW)

Rhyl Flats, GB, 200925 x SWT-3.6-107 (90 MW)

Gunfleet Sands, GB, 200930 x SWT-3.6-107 (108 MW)

Rødsand, DK, 200372 x SWT-2.3-82 (165,6 MW)

Vindeby, DK, 199111 x 450 (4,95 kW)

Offshore Windfarms in Europe – our Projects

Gunfleet Sands II, GB 200918 x SWT-3.6-107 (64,8 MW)

* planned or under Construction

Rødsand II, DK, 201090 x SWT-2.3-93 (207 MW)

Sheringham Shoal,GB, 201188 x SWT-3.6-107 (316,8 MW)

Several DONG Projects in Northern Europe500 x SWT-3.6 (1800 MW) *

Greater Gabbard,GB, 2009/2010140 x SWT-3.6-107 (504 MW)

Page 7: Power Transmission Solutions Grid Access

7 04-2009 Power Transmission DivisionE T PS SL/Re

Solutions for Grid Access

Grid Access, SVC, SVC PLUS, HVDC, HVDC PLUS

MV / HV-SwitchgearCablingwith MV / HV-cables

Potentially:

Gearbox

Wind Power (E R WP)Drive Technologies (I DT) Power Transmission (E T)

Blades Nacelle

Wind Turbine

Turnkey Wind Farms

Generator variable or fixed Speed

Page 8: Power Transmission Solutions Grid Access

8 04-2009 Power Transmission DivisionE T PS SL/Re

Siemens Energy: Turnkey Solutions for Grid Access – from one single Source

Studies

Engineering

Procurement

Construction

Training &Maintenance

Cable and Laying

Civil Works

Road Works

Platform Construction

Project Financing

AIS, HIS, GIS

FACTS, HVDC

MV Switchgear

Transformers

Control, Communication

and Protection

Technology Service Partnership

Wind Turbines

8 04-2009 Power Transmission DivisionE T PS SL/Re

Page 9: Power Transmission Solutions Grid Access

9 04-2009 Power Transmission DivisionE T PS SL/Re

Turnkey Responsibility:First and crucial Steps

Definition of most economic Wind Farm Network and Grid Connection (AC versus DC).

Define Layout and specify Components of the entire Grid Connection.

Load-Flow Studies and Short-Circuit Calculations of the whole System.

Define the System Grounding Concept and perform Insulation Coordination for the entire Grid Connection.

Verification the static and dynamic Performance and Design of Reactive Power Compensation and / or DC System.

Evaluation of System Resonance Behavior driven by the Cables, Transformers, Reactors and Wind Generators.

Prove the Conformity with the GRID CODE.

Design of Protection, Control (SCADA) and Communication System.

System Efficiency: Evaluation of overall Losses for various Scenarios.

Evaluation of Electro-Magnetic Interferences for the Grid Connection.

Optimization of System Reliability and Availability.

Page 10: Power Transmission Solutions Grid Access

10 04-2009 Power Transmission DivisionE T PS SL/Re

Turnkey: Responsibility –from Studies to Commercial Operation

Procurement, Transport, Erection,Commissioning

Commercial Operation

System and Design Studies

538 m538 m

538 m538 m

538 m538 m

538 m538 m

538 m

73 A219 A

8010 m

219 A219 A

219 A438 A

438 A

657 A

Page 11: Power Transmission Solutions Grid Access

11 04-2009 Power Transmission DivisionE T PS SL/Re

Examples of Studies – Verification of Grid Code

Source: EWIS Interim Report June-2008

Page 12: Power Transmission Solutions Grid Access

12 04-2009 Power Transmission DivisionE T PS SL/Re

System and Design Studies:Detailed Modeling of a Number of Wind Farms

Page 13: Power Transmission Solutions Grid Access

13 04-2009 Power Transmission DivisionE T PS SL/Re

Example of System and Design Studies:Single Line Diagram of a complex System – Example with DC Link

Page 14: Power Transmission Solutions Grid Access

14 04-2009 Power Transmission DivisionE T PS SL/Re

SVC PLUSThe Advanced STATCOMInnovation Meets Experience

Single Units:

+/- 25 MVAr+/- 35 MVAr+/- 50 MVAr

Up to 4parallel Units:

+/- 200 MVAr

Siemens uses MMC Technology(Modular Multilevel Converter)

14 Power Transmission DivisionE T PS SL/Re04-2009

Page 15: Power Transmission Solutions Grid Access

15 04-2009 Power Transmission DivisionE T PS SL/Re

SVC PLUS – A View of the Technology

Cooling System Converter Control & Protection

Page 16: Power Transmission Solutions Grid Access

16 04-2009 Power Transmission DivisionE T PS SL/Re

Layout SVC PLUS: Example of +/- 50 MVAr

16 Power Transmission DivisionE T PS SL/Re04-2009

21 m

25 m

Page 17: Power Transmission Solutions Grid Access

17 04-2009 Power Transmission DivisionE T PS SL/Re

SVC PLUS: Example of Factory Acceptance Tests – Nuremberg, Germany

17 Power Transmission Division04-2009 E T PS SL/Re

Page 18: Power Transmission Solutions Grid Access

18 04-2009 Power Transmission DivisionE T PS SL/Re

Greater Gabbard: World’s largest Offshore Wind Farm – Overview

Project Owner:

Airtricity

Project Development:

Airtricity & Fluor

Balance of Plant Contractor:

Fluor

Solution for Grid Access:

Siemens

Wind Turbines:

Siemens

Page 19: Power Transmission Solutions Grid Access

19 04-2009 Power Transmission DivisionE T PS SL/Re

Greater Gabbard Offshore Wind Farm

132 kV Export Cable Lengths:

Gabbard to Onshore approx. 46 km –Three Circuits

Galloper to Gabbard approx. 16 km –One Circuit

Inner Gabbard:

100 Wind Turbines

Galopper:

40 Wind Turbines

Inter-Array Cables: 33 kV

Page 20: Power Transmission Solutions Grid Access

20 04-2009 Power Transmission DivisionE T PS SL/Re

Landing Point for the Sea Cables

Sizewell A Nuclear Power StationSizewell B Nuclear Power Station

132 kV Cables

Page 21: Power Transmission Solutions Grid Access

21 04-2009 Power Transmission DivisionE T PS SL/Re

Greater Gabbard Main Platform

2 Decks, Topside approx. 2000 t:16 incoming 33 kV Cables from Wind Turbine Array 3 GIS 33 kV Switchboards3 x 33/132 kV Transformers,3 Winding 90/90/180 MVAAuxiliary/Earthing Transformers4 GIS 132 kV Circuit Breakers132 kV Cable Connections to TransformersGenerator, Refuge, Fire Suppression, Metering, etc.Helipad

Page 22: Power Transmission Solutions Grid Access

22 04-2009 Power Transmission DivisionE T PS SL/Re

Galloper Platform

2 Decks, Topside approx. 2000 t6 incoming 33 kV Cables from Wind Turbine Array GIS 33 kV Switchboard2 x 33/132 kV Transformers,2 Winding 90 MVA Auxiliary/Earthing Transformers2 x 33 kV 30 MVAr ReactorsGIS 132 kV Circuit Breaker132 kV Cable Connections to TransformersGenerator, Refuge, Fire Suppression, Metering, etc.Helipad

Page 23: Power Transmission Solutions Grid Access

23 04-2009 Power Transmission DivisionE T PS SL/Re

Gabbard Offshore Substation

23 04-2009 Power Transmission DivisionE T PS SL/Re

Page 24: Power Transmission Solutions Grid Access

24 04-2009 Power Transmission DivisionE T PS SL/Re

October 2008 – Supports ready for Deck Assembly

24 04-2009 Power Transmission DivisionE T PS SL/Re

Page 25: Power Transmission Solutions Grid Access

25 04-2009 Power Transmission DivisionE T PS SL/Re

November 2008 – Deck Assembly

25 04-2009 Power Transmission DivisionE T PS SL/Re

Page 26: Power Transmission Solutions Grid Access

26 04-2009 Power Transmission DivisionE T PS SL/Re

December 2008 – Structure appears

26 04-2009 Power Transmission DivisionE T PS SL/Re

Page 27: Power Transmission Solutions Grid Access

27 04-2009 Power Transmission DivisionE T PS SL/Re

March 2009 – Onshore Civil Works …

27 04-2009 Power Transmission DivisionE T PS SL/Re

come out of the Ground

Page 28: Power Transmission Solutions Grid Access

28 04-2009 Power Transmission DivisionE T PS SL/Re

April 2009 – Internal Structure & Helipad

Page 29: Power Transmission Solutions Grid Access

29 04-2009 Power Transmission DivisionE T PS SL/Re

May 2009 – Platform GIS Switchboard

29 04-2009 Power Transmission DivisionE T PS SL/Re

Page 30: Power Transmission Solutions Grid Access

30 04-2009 Power Transmission DivisionE T PS SL/Re

May 2009 – Final Tuning

30 04-2009 Power Transmission DivisionE T PS SL/Re

Page 31: Power Transmission Solutions Grid Access

31 04-2009 Power Transmission DivisionE T PS SL/Re

May 2009 – Ready for Roll out

31 04-2009 Power Transmission DivisionE T PS SL/Re

Page 32: Power Transmission Solutions Grid Access

32 04-2009 Power Transmission DivisionE T PS SL/Re

Roll out 6th June 2009

32 04-2009 Power Transmission DivisionE T PS SL/Re

Page 33: Power Transmission Solutions Grid Access

33 04-2009 Power Transmission DivisionE T PS SL/Re

Roll out 6th June 2009

33 04-2009 Power Transmission DivisionE T PS SL/Re

Page 34: Power Transmission Solutions Grid Access

34 04-2009 Power Transmission DivisionE T PS SL/Re

Roll out 6th June 2009

34 04-2009 Power Transmission DivisionE T PS SL/Re

Page 35: Power Transmission Solutions Grid Access

35 04-2009 Power Transmission DivisionE T PS SL/Re

The Future ? – Global Link for Green Energywith HVDC and FACTS

6-7 GW DCs in China

Thank You for Your Attention !