power system scada part ii (ems,dms)sasidharan.webs.com/documents/scada part ii.pdf · power system...

75
Power System SCADA – Part II (EMS,DMS) Dr. Sasidharan Sreedharan www.sasidharan.webs.com

Upload: hoangnguyet

Post on 30-Jan-2018

285 views

Category:

Documents


19 download

TRANSCRIPT

Page 1: Power System SCADA Part II (EMS,DMS)sasidharan.webs.com/documents/SCADA Part II.pdf · Power System SCADA – Part II (EMS,DMS) Dr. Sasidharan Sreedharan

Power System SCADA – Part II

(EMS,DMS)

Dr. Sasidharan Sreedharan

www.sasidharan.webs.com

Page 2: Power System SCADA Part II (EMS,DMS)sasidharan.webs.com/documents/SCADA Part II.pdf · Power System SCADA – Part II (EMS,DMS) Dr. Sasidharan Sreedharan

Contents

Energy Management System (EMS)

• AGC

• Energy Pricing (ABT)

Distribution Management System(DMS)

• Distribution Automation

• SS Automation

Case Studies (SCADA With Distribution Automation)

AIT/SCADA - Day 4 2

Page 3: Power System SCADA Part II (EMS,DMS)sasidharan.webs.com/documents/SCADA Part II.pdf · Power System SCADA – Part II (EMS,DMS) Dr. Sasidharan Sreedharan

Syllabus Update

AIT/SCADA - Day 4 3

Page 4: Power System SCADA Part II (EMS,DMS)sasidharan.webs.com/documents/SCADA Part II.pdf · Power System SCADA – Part II (EMS,DMS) Dr. Sasidharan Sreedharan

AIT/SCADA - Day 4 4

Page 5: Power System SCADA Part II (EMS,DMS)sasidharan.webs.com/documents/SCADA Part II.pdf · Power System SCADA – Part II (EMS,DMS) Dr. Sasidharan Sreedharan

AIT/SCADA - Day 4 5

Page 6: Power System SCADA Part II (EMS,DMS)sasidharan.webs.com/documents/SCADA Part II.pdf · Power System SCADA – Part II (EMS,DMS) Dr. Sasidharan Sreedharan

SCADA/EMS Architecture

AIT/SCADA - Day 4 6

Page 7: Power System SCADA Part II (EMS,DMS)sasidharan.webs.com/documents/SCADA Part II.pdf · Power System SCADA – Part II (EMS,DMS) Dr. Sasidharan Sreedharan

SCADA/EMS/DMS Architecture

AIT/SCADA - Day 4 7

Page 8: Power System SCADA Part II (EMS,DMS)sasidharan.webs.com/documents/SCADA Part II.pdf · Power System SCADA – Part II (EMS,DMS) Dr. Sasidharan Sreedharan

EMS/DMS Functions

EMS

• Network Configuration / Topology

Processor

• State Estimation

• Contingency Analysis

• Three Phase Balanced Power Flow

• Optimal Power Flow

DMS

Voltage Reduction

Load Management

Power Factor Control

Two‐Way Distribution Communications

Short‐Term Load Forecasting

Fault Identification / Fault Isolation / Service

Restoration

Interface to Intelligent Electronic Devices (IEDs)

Load Forecast : Every hour for a period of 1-7 days

LFC : Every few seconds

• ED : Every few minutes .

AIT/SCADA - Day 4 8

Page 9: Power System SCADA Part II (EMS,DMS)sasidharan.webs.com/documents/SCADA Part II.pdf · Power System SCADA – Part II (EMS,DMS) Dr. Sasidharan Sreedharan

EMS Detailed Function • System load forecast :

• Unit Commitment : Start up & shut down times for most economic operation of thermal units for each hour.

• Fuel Scheduling : Economic choice, fuel purchase contracts.

• Transaction evaluation : Purchase & sale of energy with neighboring companies.

• Transmission loss minimization : Controller actions for minimization of loss.

• Security constrained dispatch : Ensuring eco dispatch without violating network security.

• Production cost calculation : Actual & economical for each generated unit on hourly basis.

AIT/SCADA - Day 4 9

Page 10: Power System SCADA Part II (EMS,DMS)sasidharan.webs.com/documents/SCADA Part II.pdf · Power System SCADA – Part II (EMS,DMS) Dr. Sasidharan Sreedharan

Power System Action Time Frames

AIT/SCADA - Day 4 10

Page 11: Power System SCADA Part II (EMS,DMS)sasidharan.webs.com/documents/SCADA Part II.pdf · Power System SCADA – Part II (EMS,DMS) Dr. Sasidharan Sreedharan

Grid Management

• Unit commitment – which works on a scale of days

• Scheduling needed on a day upon day basis

• Load following which has a time scale of minutes to hours

• Regulation which happen over seconds to minutes

AIT/SCADA - Day 4 11

Page 12: Power System SCADA Part II (EMS,DMS)sasidharan.webs.com/documents/SCADA Part II.pdf · Power System SCADA – Part II (EMS,DMS) Dr. Sasidharan Sreedharan

Load Dispatch Centre - Functions

Load Generation Balance(LGB) preparation

Demand Forecasting

Scheduling of Central share

Power Purchase

Outage Planning

Preparation of Daily System Statistics

AIT/SCADA - Day 4 12

Page 13: Power System SCADA Part II (EMS,DMS)sasidharan.webs.com/documents/SCADA Part II.pdf · Power System SCADA – Part II (EMS,DMS) Dr. Sasidharan Sreedharan

Load Generation Balance (LGB)

Ensuring availability of generation to meet the ever-changing demand in the most optimal way

• Real time

– The actual demand has to be met with power availability

• Long term (Control period)

– Energy requirement for the control period is to be met

13

• Stable and Secure grid operation

• Effective utilization of available resources

AIT/SCADA - Day 4

Page 14: Power System SCADA Part II (EMS,DMS)sasidharan.webs.com/documents/SCADA Part II.pdf · Power System SCADA – Part II (EMS,DMS) Dr. Sasidharan Sreedharan

Factors affecting LGB

Major loss of generation / Central grid station (CGS)

outage

Transmission line outage

Climatic condition

Price signal from power market

Spill threat

Conservation requirement

AIT/SCADA - Day 4 14

Page 15: Power System SCADA Part II (EMS,DMS)sasidharan.webs.com/documents/SCADA Part II.pdf · Power System SCADA – Part II (EMS,DMS) Dr. Sasidharan Sreedharan

Preparation of LGB

Factors considered

1. Demand forecast

2. Generation schedule

– KSEB

» Hydel

» Thermal

– IPPs

3. Availability of CGS Share

4. Power Purchase AIT/SCADA - Day 4 15

Page 16: Power System SCADA Part II (EMS,DMS)sasidharan.webs.com/documents/SCADA Part II.pdf · Power System SCADA – Part II (EMS,DMS) Dr. Sasidharan Sreedharan

Demand Forecast

Forecast to be made for day ahead demand and

energy requirement.

Demand forecast is divided into segments like

• Night-off peak (22:00hr to 05:00hr)

• Morning peak (05:00hr to 08:00hr)

• Day peak (08:00hr to 18:00hr)

• Evening peak (18:00hr to 22:00hr)

Availability to be ensured for each segments AIT/SCADA - Day 4 16

Page 17: Power System SCADA Part II (EMS,DMS)sasidharan.webs.com/documents/SCADA Part II.pdf · Power System SCADA – Part II (EMS,DMS) Dr. Sasidharan Sreedharan

Factors affecting demand

• Climatic condition

• Festivals

• Major holidays

• Major sports events and Political developments

• Social disturbances and strikes

AIT/SCADA - Day 4 17

Page 18: Power System SCADA Part II (EMS,DMS)sasidharan.webs.com/documents/SCADA Part II.pdf · Power System SCADA – Part II (EMS,DMS) Dr. Sasidharan Sreedharan

Typical Demand Curve

18 AIT/SCADA - Day 4

Page 19: Power System SCADA Part II (EMS,DMS)sasidharan.webs.com/documents/SCADA Part II.pdf · Power System SCADA – Part II (EMS,DMS) Dr. Sasidharan Sreedharan

Power Purchase

Power is purchased from

i. Central Electricity Regulatory Commission

approved Traders and

ii. Power Exchanges

AIT/SCADA - Day 4 19

Page 20: Power System SCADA Part II (EMS,DMS)sasidharan.webs.com/documents/SCADA Part II.pdf · Power System SCADA – Part II (EMS,DMS) Dr. Sasidharan Sreedharan

Availability Based Tariff

• Introduced in Southern Region with effect from 1-1-2003

• Tariff promotes grid discipline with its inherent commercial mechanism

• Consists of three parts: Fixed charge or Capacity charge

Variable charge or Energy charge

UI (Unscheduled Interchange) charge

www.srldc.org

AIT/SCADA - Day 4 20

Page 21: Power System SCADA Part II (EMS,DMS)sasidharan.webs.com/documents/SCADA Part II.pdf · Power System SCADA – Part II (EMS,DMS) Dr. Sasidharan Sreedharan

Tariff Structure

• ABT is a three part tariff

–Capacity charges (Fixed cost)

–Energy charges (Variable cost)

–UI charges

Capacity charges and energy charges are settled monthly as per the Regional energy Account.

UI charges are settled weekly

Energy accounts are prepared and issued by the Southern Regional Power Committee Secretariat

AIT/SCADA - Day 4 21

Page 22: Power System SCADA Part II (EMS,DMS)sasidharan.webs.com/documents/SCADA Part II.pdf · Power System SCADA – Part II (EMS,DMS) Dr. Sasidharan Sreedharan

Major problems existed in grid operation prior to the implementation of ABT

• Low frequency during peak load hours - 48.0-48.5 Hz

• High frequency during off peak hours - 50.5 to 51 Hz

• Rapid and wide changes in frequency – 1 Hz in 5 to 10 minutes.

• Very frequent grid disturbances, causing tripping of generating stations, interruption of supply to large blocks of consumers, and disintegration of the regional grids.

One important reason attributed to the situation was the absence of direct incentives or penalties for the individual

utilities responsible for the problems.

22 AIT/SCADA - Day 4

Page 23: Power System SCADA Part II (EMS,DMS)sasidharan.webs.com/documents/SCADA Part II.pdf · Power System SCADA – Part II (EMS,DMS) Dr. Sasidharan Sreedharan

Beneficiary UI

Actual drawal by beneficiary

Drawal Schedule by RLDC

+UI

-UI

AIT/SCADA - Day 4 23

Page 24: Power System SCADA Part II (EMS,DMS)sasidharan.webs.com/documents/SCADA Part II.pdf · Power System SCADA – Part II (EMS,DMS) Dr. Sasidharan Sreedharan

What is UI?

UI – Unscheduled interchange Demand of the grid is not constant Frequency of the grid is not constant Depending on various conditions, the tie line flow

varies from instant to instant Thus UI is unavoidable in an integrated network UI can be harnessed effectively to the advantage

of the constituents if system permits The UI is the difference between the schedule

and the actual draw up / generation. Rate depends on frequency CERC finalizes Inter state UI rate

24 AIT/SCADA - Day 4

Page 25: Power System SCADA Part II (EMS,DMS)sasidharan.webs.com/documents/SCADA Part II.pdf · Power System SCADA – Part II (EMS,DMS) Dr. Sasidharan Sreedharan

25

UI Rate

0

50

100

150

200

250

300

350

400

450

48.50 49.00 49.50 50.00 50.50

Frequency (Hz)

UI R

ate

(P

ais

e/U

nit

)

AIT/SCADA - Day 4

Page 26: Power System SCADA Part II (EMS,DMS)sasidharan.webs.com/documents/SCADA Part II.pdf · Power System SCADA – Part II (EMS,DMS) Dr. Sasidharan Sreedharan

VAR Rates

26

VAR injection at Voltages above 103% of rated voltage VAR drawal at Voltages below 97% of rated voltage

VAR drawal at Voltages above 103% of rated voltage VAR injection at Voltages below 97% of rated voltage

Payable @10 ps/KVARH For

.

.

Receivable @10 ps/KVARH For

.

.

AIT/SCADA - Day 4

Page 27: Power System SCADA Part II (EMS,DMS)sasidharan.webs.com/documents/SCADA Part II.pdf · Power System SCADA – Part II (EMS,DMS) Dr. Sasidharan Sreedharan

ADVANTAGE ABT.

• MAXIMISATION OF GENERATION AVAILABILITY – MEET MORE CONSUMER DEMAND

• ECONOMY IN OPERATION – REDUCE COSTS

• RESULT :- – IMPROVED QUALITY OF SUPPLY.

– UNUTILISED CAPACITY HARNESSED.

– MERIT ORDER IN GENERATION.

– GRID DISCIPLINE

AIT/SCADA - Day 4 27

Page 28: Power System SCADA Part II (EMS,DMS)sasidharan.webs.com/documents/SCADA Part II.pdf · Power System SCADA – Part II (EMS,DMS) Dr. Sasidharan Sreedharan

28 AIT/SCADA - Day 4

Page 29: Power System SCADA Part II (EMS,DMS)sasidharan.webs.com/documents/SCADA Part II.pdf · Power System SCADA – Part II (EMS,DMS) Dr. Sasidharan Sreedharan

29 AIT/SCADA - Day 4

Page 30: Power System SCADA Part II (EMS,DMS)sasidharan.webs.com/documents/SCADA Part II.pdf · Power System SCADA – Part II (EMS,DMS) Dr. Sasidharan Sreedharan

AIT/SCADA - Day 4 30

Page 31: Power System SCADA Part II (EMS,DMS)sasidharan.webs.com/documents/SCADA Part II.pdf · Power System SCADA – Part II (EMS,DMS) Dr. Sasidharan Sreedharan

31 AIT/SCADA - Day 4

Page 32: Power System SCADA Part II (EMS,DMS)sasidharan.webs.com/documents/SCADA Part II.pdf · Power System SCADA – Part II (EMS,DMS) Dr. Sasidharan Sreedharan

SUB STATION AUTOMATION Why Needed?

Why Now? DEREGULATION & COMPETITION Deregulation driving actions of most utilities Major driving forces: • Improved power quality and service reliability • New energy related services and business areas • Lower cost of service • Information needed for improved decision making

SA: A proactive response to these forces

32 AIT/SCADA - Day 4

Page 33: Power System SCADA Part II (EMS,DMS)sasidharan.webs.com/documents/SCADA Part II.pdf · Power System SCADA – Part II (EMS,DMS) Dr. Sasidharan Sreedharan

Why Needed? Why Now?

DEVELOPMENT OF IEDs Rapid development and deployment of Intelligent Electronic Devices (IEDs) • Protective relays • Meters • Equipment condition monitors IEDs have become an integral part of Substation Automation systems Technological developments have made SA systems less expensive and more powerful

33 AIT/SCADA - Day 4

Page 34: Power System SCADA Part II (EMS,DMS)sasidharan.webs.com/documents/SCADA Part II.pdf · Power System SCADA – Part II (EMS,DMS) Dr. Sasidharan Sreedharan

Automatic Load Restoration: “Intelligent” Bus Failover

• Nature of Problem – When a transformer failure occurs, “simple” bus

failover scheme transfers load to healthy transformer

– “Simple” failover scheme may overload healthy transformer, especially during peak load

– Some schemes have been disabled because of this.

– Substation firm capacity limited by amount of load that can be carried if a transformer fault occurs.

34 AIT/SCADA - Day 4

Page 35: Power System SCADA Part II (EMS,DMS)sasidharan.webs.com/documents/SCADA Part II.pdf · Power System SCADA – Part II (EMS,DMS) Dr. Sasidharan Sreedharan

Automatic Load Restoration: “Intelligent” Bus Failover

• Objectives – Transfer as much load as possible to 2nd

substation transformer

– If necessary, transfer portion of load to alternate substation

– Shed portion of load if necessary

35 AIT/SCADA - Day 4

Page 36: Power System SCADA Part II (EMS,DMS)sasidharan.webs.com/documents/SCADA Part II.pdf · Power System SCADA – Part II (EMS,DMS) Dr. Sasidharan Sreedharan

36

“Intelligent” Bus Failover:

How It Works

AIT/SCADA - Day 4

Page 37: Power System SCADA Part II (EMS,DMS)sasidharan.webs.com/documents/SCADA Part II.pdf · Power System SCADA – Part II (EMS,DMS) Dr. Sasidharan Sreedharan

37

Transformer

Fault

Occurs

“Intelligent” Bus Failover:

How It Works

AIT/SCADA - Day 4

Page 38: Power System SCADA Part II (EMS,DMS)sasidharan.webs.com/documents/SCADA Part II.pdf · Power System SCADA – Part II (EMS,DMS) Dr. Sasidharan Sreedharan

38

Trf

Protection

Operates

“Intelligent” Bus Failover:

How It Works

AIT/SCADA - Day 4

Page 39: Power System SCADA Part II (EMS,DMS)sasidharan.webs.com/documents/SCADA Part II.pdf · Power System SCADA – Part II (EMS,DMS) Dr. Sasidharan Sreedharan

39

Bus Transfer

Scheme

Operates

“Intelligent” Bus Failover:

How It Works

AIT/SCADA - Day 4

Page 40: Power System SCADA Part II (EMS,DMS)sasidharan.webs.com/documents/SCADA Part II.pdf · Power System SCADA – Part II (EMS,DMS) Dr. Sasidharan Sreedharan

40

Shed Load

If Necessary

To Adjacent

Substation

“Intelligent” Bus Failover:

How It Works

AIT/SCADA - Day 4

Page 41: Power System SCADA Part II (EMS,DMS)sasidharan.webs.com/documents/SCADA Part II.pdf · Power System SCADA – Part II (EMS,DMS) Dr. Sasidharan Sreedharan

41

Restore Load

Using Feeder

Automation

To Adjacent

Substation

“Intelligent” Bus Failover:

How It Works

AIT/SCADA - Day 4

Page 42: Power System SCADA Part II (EMS,DMS)sasidharan.webs.com/documents/SCADA Part II.pdf · Power System SCADA – Part II (EMS,DMS) Dr. Sasidharan Sreedharan

Supply Line Sectionalizing

42

SA

System

AIT/SCADA - Day 4

Page 43: Power System SCADA Part II (EMS,DMS)sasidharan.webs.com/documents/SCADA Part II.pdf · Power System SCADA – Part II (EMS,DMS) Dr. Sasidharan Sreedharan

Supply Line Sectionalizing

43

Permanent

Fault Occurs

SA

System

AIT/SCADA - Day 4

Page 44: Power System SCADA Part II (EMS,DMS)sasidharan.webs.com/documents/SCADA Part II.pdf · Power System SCADA – Part II (EMS,DMS) Dr. Sasidharan Sreedharan

Supply Line Sectionalizing

44

Line

Protection

Operates

SA

System

AIT/SCADA - Day 4

Page 45: Power System SCADA Part II (EMS,DMS)sasidharan.webs.com/documents/SCADA Part II.pdf · Power System SCADA – Part II (EMS,DMS) Dr. Sasidharan Sreedharan

Supply Line Sectionalizing

45

Line Protection

Reports Fault

Location

SA

System

AIT/SCADA - Day 4

Page 46: Power System SCADA Part II (EMS,DMS)sasidharan.webs.com/documents/SCADA Part II.pdf · Power System SCADA – Part II (EMS,DMS) Dr. Sasidharan Sreedharan

Supply Line Sectionalizing

46

SA System Opens

Appropriate device

SA

System

AIT/SCADA - Day 4

Page 47: Power System SCADA Part II (EMS,DMS)sasidharan.webs.com/documents/SCADA Part II.pdf · Power System SCADA – Part II (EMS,DMS) Dr. Sasidharan Sreedharan

Supply Line Sectionalizing

47

SA System Sends

Reclose Signal

SA

System

AIT/SCADA - Day 4

Page 48: Power System SCADA Part II (EMS,DMS)sasidharan.webs.com/documents/SCADA Part II.pdf · Power System SCADA – Part II (EMS,DMS) Dr. Sasidharan Sreedharan

Equipment Condition Monitoring • Continuous On-line Diagnosis

of SS Equipment (HV breakers, Transformers)

• Main objectives

– Find/fix problems earlier – Avoid forced (unscheduled) outages – Reduce maintenance costs

• Role of SA

– Monitor specialized sensors – Perform “expert system” analysis – Inform engineers or dispatchers of

possible problems

48 AIT/SCADA - Day 4

• Dissolved Gas in Oil

Monitors/Samples

• Moisture Detectors

• Load Tap Changer Monitors

• Partial Discharge/Acoustic Monitors

• Bushing Monitors

• Circuit Breaker Monitors (GIS and

OCB)

• Battery Monitors

• Expert System Analyzers

Monitoring

Devices

Page 49: Power System SCADA Part II (EMS,DMS)sasidharan.webs.com/documents/SCADA Part II.pdf · Power System SCADA – Part II (EMS,DMS) Dr. Sasidharan Sreedharan

Adaptive Relaying

• Process of automatically altering settings on protective relay IEDs based on system conditions

• Special Protection Schemes – SA system can play a role in implementing bulk power Special Protection

Schemes (SPS)

– Example: tripping of critical generating unit requires new settings on a line that may become very heavily loaded under this condition.

• Benefit – Avoid need to implement custom hardwired logic to

accomplish this functionality 49

Critical

generating

unit trips

EMS

detects

unit trip

EMS

informs

SA system

of the

event

SA System

switches line

relay to new

settings

AIT/SCADA - Day 4

Page 50: Power System SCADA Part II (EMS,DMS)sasidharan.webs.com/documents/SCADA Part II.pdf · Power System SCADA – Part II (EMS,DMS) Dr. Sasidharan Sreedharan

Intelligent Alarm Processing

– Prioritize alarm information

– Eliminate duplicate & nuisance alarms

– Route alarm info to appropriate party

– “Expert” alarm processing

• provides more informative and useful alarm messages

50 AIT/SCADA - Day 4

Page 51: Power System SCADA Part II (EMS,DMS)sasidharan.webs.com/documents/SCADA Part II.pdf · Power System SCADA – Part II (EMS,DMS) Dr. Sasidharan Sreedharan

Power Quality Monitoring

– SA System and IEDs able to detect power quality events and report the following information:

• Harmonic content of the voltage waveform

• Total harmonic distortion

• Oscillographic data (waveforms)

51 AIT/SCADA - Day 4

Page 52: Power System SCADA Part II (EMS,DMS)sasidharan.webs.com/documents/SCADA Part II.pdf · Power System SCADA – Part II (EMS,DMS) Dr. Sasidharan Sreedharan

Real-Time Equipment Rating

– Base equipment ratings on actual conditions rather than conservative assumptions

– Squeeze more capacity out of existing equipment

– Example: Transformer “Hot Spot” Monitoring

• Monitor the true winding hot spot temperature

• Derive loadability from the results

• 10% average additional loading can be achieved

52 AIT/SCADA - Day 4

Page 53: Power System SCADA Part II (EMS,DMS)sasidharan.webs.com/documents/SCADA Part II.pdf · Power System SCADA – Part II (EMS,DMS) Dr. Sasidharan Sreedharan

Support for Feeder Automation

SA is an “Enabling Technology” for Feeder Automation functions Integrated volt VAR control

Feeder reconfiguration

Requirements for Feeder Automation: Monitoring of 3 phase quantities at substation end of

feeder

Load Tap Changer set point control

53 AIT/SCADA - Day 4

Page 54: Power System SCADA Part II (EMS,DMS)sasidharan.webs.com/documents/SCADA Part II.pdf · Power System SCADA – Part II (EMS,DMS) Dr. Sasidharan Sreedharan

Monitoring of Switched Feeder Capacitor Banks

– Switched feeder cap banks forced out due to blown fuses, mechanical control failure, etc.

• 20% failure at one utility

– Banks out of service months before

being discovered

– VAR flow monitoring quickly detects

failed cap banks

54 AIT/SCADA - Day 4

Page 55: Power System SCADA Part II (EMS,DMS)sasidharan.webs.com/documents/SCADA Part II.pdf · Power System SCADA – Part II (EMS,DMS) Dr. Sasidharan Sreedharan

Integrated Protection Functions

• Objective:

Incorporate protection functions in the SA System – Basic protection units (IEDs) exchange current/voltage

data via high speed LAN

– Relay trip signals exchanged over LAN

• Examples: – Automatic reclosing

– Breaker failure

– Bus differential

• Benefit: – Avoid cost of separate protective relays

– Potential for improved performance and reliability

55 AIT/SCADA - Day 4

Page 56: Power System SCADA Part II (EMS,DMS)sasidharan.webs.com/documents/SCADA Part II.pdf · Power System SCADA – Part II (EMS,DMS) Dr. Sasidharan Sreedharan

Hyderabad Integrated SCADA Project

AIT/SCADA - Day 4 56

Page 57: Power System SCADA Part II (EMS,DMS)sasidharan.webs.com/documents/SCADA Part II.pdf · Power System SCADA – Part II (EMS,DMS) Dr. Sasidharan Sreedharan

• The Hyderabad SCADA project involves networking of all the

substations in and around Hyderabad city for.,

Data collection from all substation equipment to the central

Computer system for analysis .,

Control and monitoring of the distribution system by

issuing commands to the remote stations

• The Electricity Distribution system for Hyderabad city spans over

an area of 1555 sq km.

• Over one million consumers are served by APCPDCL

• The system covers 13 nos.132 / 33 kV stations and

93 nos. 33/11 kV stations

Project Synopsis

AIT/SCADA - Day 4 57

APCPDCL: Andhra Pradesh Central Power Distribution Company Ltd http://www.apcentralpower.com/

Page 58: Power System SCADA Part II (EMS,DMS)sasidharan.webs.com/documents/SCADA Part II.pdf · Power System SCADA – Part II (EMS,DMS) Dr. Sasidharan Sreedharan

• Aim of the Project - Effective Load Management of

Distribution system in Hyderabad to improve the reliability

of the electricity supplies

• SCADA (Supervisory Control & Data Acquisition System) is

integrated with Distribution Automation Functionalities for better

utilization

• Load Control

• Automatic Meter Reading

• Emergency Load Shedding

• Integrated Volt/Var Control

• Feeder SCADA-Fault Localization

• Trouble Call Management

• Facilities Management

AIT/SCADA - Day 4 58

Page 59: Power System SCADA Part II (EMS,DMS)sasidharan.webs.com/documents/SCADA Part II.pdf · Power System SCADA – Part II (EMS,DMS) Dr. Sasidharan Sreedharan

• Efficient Distribution Management

• Fault analysis easier and quicker due to availability of real time

information

• Prompt and quicker restoration of supply in case of outages

• Malfunctioning equipment can be identified and action can be taken for

rectifying the same early

• Historical data up to a period of 2 years can be stored for future analysis

• Stations can be operated as unmanned substation

• Close monitoring of supply status for essential services and VIP functions

• Load shedding can be programmed in a systematic manner during

shortages or exigencies

AIT/SCADA - Day 4 59

Project Benefits

Page 60: Power System SCADA Part II (EMS,DMS)sasidharan.webs.com/documents/SCADA Part II.pdf · Power System SCADA – Part II (EMS,DMS) Dr. Sasidharan Sreedharan

Project Finance

• Project is financed by DFID under AP Energy Efficiency

Project (APEEP)

• DFID has so far released Rs 32 crores ( 4.8 million

UKP ) for this project

AIT/SCADA - Day 4 60

Department For International Development (DFID)

Page 61: Power System SCADA Part II (EMS,DMS)sasidharan.webs.com/documents/SCADA Part II.pdf · Power System SCADA – Part II (EMS,DMS) Dr. Sasidharan Sreedharan

System Details

The Hyderabad SCADA system comprises of the following

subsystems

• Control Center Equipment (Computer System )

• Application Software - SCADA

• Distribution Management Functions Software

• Microwave Communication system

• Field data Acquisition system (Remote Terminal Unit)

• UPS, Power Supplies, Towers etc.,

AIT/SCADA - Day 4 61

Page 62: Power System SCADA Part II (EMS,DMS)sasidharan.webs.com/documents/SCADA Part II.pdf · Power System SCADA – Part II (EMS,DMS) Dr. Sasidharan Sreedharan

AIT/SCADA - Day 4 62

Page 63: Power System SCADA Part II (EMS,DMS)sasidharan.webs.com/documents/SCADA Part II.pdf · Power System SCADA – Part II (EMS,DMS) Dr. Sasidharan Sreedharan

MAR Network

MAR Remote station

R C Puram 132kV

Gachibowli 220kV

TDMA Freq 1

(2.385/2.479 GHz)

TDMA Freq 2

(2.371/2.463 GHz)

Gummadidala 132kV

Medchal 132kV

Bolarum132kV

Jubilee Hills 132kV

Erragadda DCC

Shapurnagar 220kV

Vidyut Soudha

Gunrock132kV

Asifnagar 132kV

Sivaramapalli 132kV

Imlibum 132kV Bandlaguda 132kV

Moulali 220kV

H. sagar 132kv

Chilakalaguda 132kV

Legend:

TDMA Freq.3

2.343 / 2.437

TDMA Central Station

TDMA Repeater

Station

TDMA Outstation

Communication Network

Chandrayangutta 220kV

AIT/SCADA - Day 4 63

Page 64: Power System SCADA Part II (EMS,DMS)sasidharan.webs.com/documents/SCADA Part II.pdf · Power System SCADA – Part II (EMS,DMS) Dr. Sasidharan Sreedharan

Communication Towers

AIT/SCADA - Day 4 64

Page 65: Power System SCADA Part II (EMS,DMS)sasidharan.webs.com/documents/SCADA Part II.pdf · Power System SCADA – Part II (EMS,DMS) Dr. Sasidharan Sreedharan

AIT/SCADA - Day 4 65

Page 66: Power System SCADA Part II (EMS,DMS)sasidharan.webs.com/documents/SCADA Part II.pdf · Power System SCADA – Part II (EMS,DMS) Dr. Sasidharan Sreedharan

AIT/SCADA - Day 4 66

Page 67: Power System SCADA Part II (EMS,DMS)sasidharan.webs.com/documents/SCADA Part II.pdf · Power System SCADA – Part II (EMS,DMS) Dr. Sasidharan Sreedharan

AIT/SCADA - Day 4 67

Page 68: Power System SCADA Part II (EMS,DMS)sasidharan.webs.com/documents/SCADA Part II.pdf · Power System SCADA – Part II (EMS,DMS) Dr. Sasidharan Sreedharan

AIT/SCADA - Day 4 68

Page 69: Power System SCADA Part II (EMS,DMS)sasidharan.webs.com/documents/SCADA Part II.pdf · Power System SCADA – Part II (EMS,DMS) Dr. Sasidharan Sreedharan

AIT/SCADA - Day 4 69

Page 70: Power System SCADA Part II (EMS,DMS)sasidharan.webs.com/documents/SCADA Part II.pdf · Power System SCADA – Part II (EMS,DMS) Dr. Sasidharan Sreedharan

Historical Data Processing

Long term archiving

Archiving features: - Cyclic or time of day

- Data with quality codes

- Successive mean value calculation

- Backup value

Future

Past Real time

data

Avanti DBMS

Archiving Time

tagge

d

data

AIT/SCADA - Day 4 70

Page 71: Power System SCADA Part II (EMS,DMS)sasidharan.webs.com/documents/SCADA Part II.pdf · Power System SCADA – Part II (EMS,DMS) Dr. Sasidharan Sreedharan

Historical Data Presentation

. . . . Value A

123.4

121.8

123.6

122.9

Value B

47.4

46.8

48.2

47.4

Value C

186.0

185.2

186.3

185.9

Value X

356.8

353.8

358.2

356.4

Actual

Minimum

Maximum

Average

Time: 01.00

Time: 02.00

Time: 03.00

Time: 04.00

Time: 05.00

Time: 06.00

. . . .

. . . .

. . . .

. . . .

1252 123 123 123 123 123 123 123 123 123

123

123

123

123

123

123

123

123 93-04-21 09:36 kjdfjdfsjdfskjdfjdfsjdfj lkfgfdg lkdfnglkjdffjgkdfklgjlkfjglklfdlkdf lkdf lkdgfk

93-04-21 09:36 kjdfjdfsjdfskjdfjdfsjdfj lkfgfdg lkdfnglkjdffjgkdfklgjlkfjglklfdlkdf lkdf lkdgfk

93-04-21 09:36 kjdfjdfsjdfskjdfjdfsjdfj lkfgfdg lkdfnglkjdffjgkdfklgjlkfjglklfdlkdf lkdf lkdgfk

93-04-21 09:36 kjdfjdfsjdfskjdfjdfsjdfj lkfgfdg lkdfnglkjdffjgkdfklgjlkfjglklfdlkdf lkdf lkdgfk

93-04-21 09:36 kjdfjdfsjdfskjdfjdfsjdfj lkfgfdg lkdfnglkjdffjgkdfklgjlkfjglklfdlkdf lkdf lkdgfk

93-04-21 09:36 kjdfjdfsjdfskjdfjdfsjdfj lkfgfdg lkdfnglkjdffjgkdfklgjlkfjglklfdlkdf lkdf lkdgfk

93-04-21 09:36 kjdfjdfsjdfskjdfjdfsjdfj lkfgfdg lkdfnglkjdffjgkdfklgjlkfjglklfdlkdf lkdf lkdgfk

93-04-21 09:36 kjdfjdfsjdfskjdfjdfsjdfj lkfgfdg lkdfnglkjdffjgkdfklgjlkfjglklfdlkdf lkdf lkdgfk

93-04-21 09:36 kjdfjdfsjdfskjdfjdfsjdfj lkfgfdg lkdfnglkjdffjgkdfklgjlkfjglklfdlkdf lkdf lkdgfk

93-04-21 09:36 kjdfjdfsjdfskjdfjdfsjdfj lkfgfdg lkdfnglkjdffjgkdfklgjlkfjglklfdlkdf lkdf lkdgfk

93-04-21 09:36 kjdfjdfsjdfskjdfjdfsjdfj lkfgfdg lkdfnglkjdffjgkdfklgjlkfjglklfdlkdf lkdf lkdgfk

93-04-21 09:36 kjdfjdfsjdfskjdfjdfsjdfjlkfgfdg lkdfnglkjdffjgkdfklgjlkfjglklfdlkdf lkdf lkdgfk

93-04-21 09:36 kjdfjdfsjdfskjdfjdfsjdfj lkfgfdg lkdfnglkjdffjgkdfklgjlkfjglklfdlkdf lkdf lkdgfk

93-04-21 09:36 kjdfjdfsjdfskjdfjdfsjdfj lkfgfdg lkdfnglkjdffjgkdfklgjlkfjglklfdlkdf lkdf lkdgfk

93-04-21 09:36 kjdfjdfsjdfskjdfjdfsjdfj lkfgfdg lkdfnglkjdffjgkdfklgjlkfjglklfdlkdf lkdf lkdgfk

93-04-21 09:36 kjdfjdfsjdfskjdfjdfsjdfj lkfgfdg lkdfnglkjdffjgkdfklgjlkfjglklfdlkdf lkdf lkdgfk

93-04-21 09:36 kjdfjdfsjdfskjdfjdfsjdfj lkfgfdg lkdfnglkjdffjgkdfklgjlkfjglklfdlkdf lkdf lkdgfk

93-04-21 09:36 kjdfjdfsjdfskjdfjdfsjdfj lkfgfdg lkdfnglkjdffjgkdfklgjlkfjglklfdlkdf lkdf lkdgfk

93-04-21 09:36 kjdfjdfsjdfskjdfjdfsjdfj lkfgfdg lkdfnglkjdffjgkdfklgjlkfjglklfdlkdf lkdf lkdgfk

93-04-21 09:36 kjdfjdfsjdfskjdfjdfsjdfj lkfgfdg lkdfnglkjdffjgkdfklgjlkfjglklfdlkdf lkdf lkdgfk

Station A

B8 B9

C1 T1 T2

B1 B2

B3 B4 B5 B6 C7

C2

B7

Time tagged data

p min

p max

kW

p

0 6 12 18 h To=24

Duration curves

Curves

Single line diagram

Plans

Reports

10.25.32

AIT/SCADA - Day 4 71

Page 72: Power System SCADA Part II (EMS,DMS)sasidharan.webs.com/documents/SCADA Part II.pdf · Power System SCADA – Part II (EMS,DMS) Dr. Sasidharan Sreedharan

Spread sheet integration

Future

Past Real

time

data

Avanti DBMS

Time

tagge

d

data

93-04-21 09:36 kjdfjdfsjdfskjdfjdfsjdfjlkfgfdg lkdfnglkjdffjgkdfklgjlkfjglklfdlkdflkdflkdgfklklkldg

93-04-21 09:36 kjdfjdfsjdfskjdfjdfsjdfjlkfgfdg lkdfnglkjdffjgkdfklgjlkfjglklfdlkdflkdflkdgfklklkldg 93-04-21 09:36 kjdfjdfsjdfskjdfjdfsjdfjlkfgfdg lkdfnglkjdffjgkdfklgjlkfjglklfdlkdflkdflkdgfklklkldg 93-04-21 09:36 kjdfjdfsjdfskjdfjdfsjdfjlkfgfdg lkdfnglkjdffjgkdfklgjlkfjglklfdlkdflkdflkdgfklklkldg 93-04-21 09:36 kjdfjdfsjdfskjdfjdfsjdfjlkfgfdg lkdfnglkjdffjgkdfklgjlkfjglklfdlkdflkdflkdgfklklkldg 93-04-21 09:36 kjdfjdfsjdfskjdfjdfsjdfjlkfgfdg lkdfnglkjdffjgkdfklgjlkfjglklfdlkdflkdflkdgfklklkldg 93-04-21 09:36 kjdfjdfsjdfskjdfjdfsjdfjlkfgfdg lkdfnglkjdffjgkdfklgjlkfjglklfdlkdflkdflkdgfklklkldg 93-04-21 09:36 kjdfjdfsjdfskjdfjdfsjdfjlkfgfdg lkdfnglkjdffjgkdfklgjlkfjglklfdlkdflkdflkdgfklklkldg 93-04-21 09:36 kjdfjdfsjdfskjdfjdfsjdfjlkfgfdg lkdfnglkjdffjgkdfklgjlkfjglklfdlkdflkdflkdgfklklkldg 93-04-21 09:36 kjdfjdfsjdfskjdfjdfsjdfjlkfgfdg lkdfnglkjdffjgkdfklgjlkfjglklfdlkdflkdflkdgfklklkldg 93-04-21 09:36 kjdfjdfsjdfskjdfjdfsjdfjlkfgfdg lkdfnglkjdffjgkdfklgjlkfjglklfdlkdflkdflkdgfklklkldg 93-04-21 09:36 kjdfjdfsjdfskjdfjdfsjdfjlkfgfdg lkdfnglkjdffjgkdfklgjlkfjglklfdlkdflkdflkdgfklklkldg 93-04-21 09:36 kjdfjdfsjdfskjdfjdfsjdfjlkfgfdg lkdfnglkjdffjgkdfklgjlkfjglklfdlkdflkdflkdgfklklkldg 93-04-21 09:36 kjdfjdfsjdfskjdfjdfsjdfjlkfgfdg lkdfnglkjdffjgkdfklgjlkfjglklfdlkdflkdflkdgfklklkldgg 93-04-21 09:36 kjdfjdfsjdfskjdfjdfsjdfjlkfgfdg lkdfnglkjdffjgkdfklgjlkfjglklfdlkdflkdflkdgfklklkldg 93-04-21 09:36 kjdfjdfsjdfskjdfjdfsjdfjlkfgfdg lkdfnglkjdffjgkdfklgjlkfjglklfdlkdflkdflkdgfklklkldg

93-04-21 09:36 kjdfjdfsjdfskjdfjdfsjdfjlkfgfdg lkdfnglkjdffjgkdfklgjlkfjglklfdlkdflkdflkdgfklklkldg 93-04-21 09:36 kjdfjdfsjdfskjdfjdfsjdfjlkfgfdg lkdfnglkjdffjgkdfklgjlkfjglklfdlkdflkdflkdgfklklkldg 93-04-21 09:36 kjdfjdfsjdfskjdfjdfsjdfjlkfgfdg lkdfnglkjdffjgkdfklgjlkfjglklfdlkdflkdflkdgfklklkl 93-04-21 09:36 kjdfjdfsjdfskjdfjdfsjdfjlkfgfdg lkdfnglkjdffjgkdfklgjlkfjglklfdlkdflkdflkdgfklklkldg

Quality code

inheritance

Commercial

spread sheet

• Tables

• Histograms

• Pie charts

• Three dimensional

diagrams

Spread

sheet

interaction

AIT/SCADA - Day 4 72

Page 73: Power System SCADA Part II (EMS,DMS)sasidharan.webs.com/documents/SCADA Part II.pdf · Power System SCADA – Part II (EMS,DMS) Dr. Sasidharan Sreedharan

Disturbance Data Archiving - Post Mortem Review

14:23.00

14.23.10

14.23.30

14.23.40

14.23.50

123.4

123.5

123.6

123.9

122.0

121.8

.

47.4

47.4

47.7

47.9

47.0

46.8

.

186.0

186.0

186.0

185.7

185.7

185.2

.

14.23.20

Value A Value B Value C

1252 123 123 123 123 123 123 123 123 123 123 123 123 123 123

123

123

123

123

123

123

123

123

123

123

123

123

RTU

Storing

Storing

Archive

Master Station

Presentation

Triggering

AIT/SCADA - Day 4 73

Page 74: Power System SCADA Part II (EMS,DMS)sasidharan.webs.com/documents/SCADA Part II.pdf · Power System SCADA – Part II (EMS,DMS) Dr. Sasidharan Sreedharan

New Customer

Accounting Billing

Revenue

Collection

LT Billing HT Billing

e-Seva

ERO-Offices

Web enabled

Collections

(Online Collections)

Common Billing System

e-Seva

Citi Bank

Online

e-Collection

on Box

Credit

Cards

Electronic

Clearing

System aponline

ATMs of

Banks

KIOSKS

of Banks

Payment Through

Telephone

(IVRS) AIT/SCADA - Day 4 74

Page 75: Power System SCADA Part II (EMS,DMS)sasidharan.webs.com/documents/SCADA Part II.pdf · Power System SCADA – Part II (EMS,DMS) Dr. Sasidharan Sreedharan

Dr. Sasidharan Sreedharan

YBL Systems and Solutions

(Electrical Power System Research Consultants)

www.sasidharan.webs.com

Regards,

75 AIT/SCADA - Day 4