Page 1: Power Projects · 2- Power plants increase e fficiency 2.3- Hafez Power Plant Project Location (site) & Images: 16th kilometer of Shiraz-Fasa Rd , Fars Province , Islamic Republic

Power Projects

Page 2: Power Projects · 2- Power plants increase e fficiency 2.3- Hafez Power Plant Project Location (site) & Images: 16th kilometer of Shiraz-Fasa Rd , Fars Province , Islamic Republic

Power plants increase efficiency (Via buyback and repowering method) High efficiency combined cycle power plants development Development of Small Scale DG & CHP Renewable energy

82

Power Industry Projects

Row Name of Project

1 TREC Power transmissions and sub transmission lines and substations 2 3 4 5

SUM

Investment Opportunities in the Utilities Industry

Page 3: Power Projects · 2- Power plants increase e fficiency 2.3- Hafez Power Plant Project Location (site) & Images: 16th kilometer of Shiraz-Fasa Rd , Fars Province , Islamic Republic

Amount (USD Billion)

3.13 9.261

3.8 2

5.78

23.97

Number

396 Substations & 450 KM , High voltage Cable 13356 MW 5936 MW 3000 MW 3000 MW

83 Investment Opportunities in the Utilities Industry

Page 4: Power Projects · 2- Power plants increase e fficiency 2.3- Hafez Power Plant Project Location (site) & Images: 16th kilometer of Shiraz-Fasa Rd , Fars Province , Islamic Republic

Target Regional Power Company Ratio(KV)

1 Azarbaijan(6), Zanjan(2), Gharb(2), Fars(2), Kerman(2), Mazandran(2) 400/230 Tehran(4) 400/230 Tehran(2) 400/230 Azarbayjan(2), Khorasan(10), Khuzestan(12), Fars(2), Kerman(4),

400/132 Hormozgan(2)

2 3

32 * 200

5 Fars(10) 400/66 10 * 200 8 * 200 Tehran(2), Mazandaran(2), Yazd(2),

Bakhtar(2)

Target Regional Power Company Azarbaijan(6), Kerman(2) Fars(14) Fars(2), Sistan& Baluchestan(4), Tehran(2) Tehran(8), Mazandaran(4) Bakhtar(6), Tehran(2), Zanjan(2), Gharb(2), Gilan(2), Hormozgan(14), Yazd(2) Tehran(2), Sistan& Baluchestan(16), Gilan(4) Khuzestan(2)

Ratio(KV) 230/132 230/66 230/20 230/63 230/63

1 2

3 4

230/63 230/33

24 * 125 2 * 50

Set 35 49 85

227 450 KM

Credit (US$ Billion)

1.3

1.4

0.5 ~ 3.13

Quantity

84 Substations

Project name Buying equipment for Transmission Substations (Under the Supervision of the IPDC)

* www.IPDC.ir

84

1- Power Transmission and sub–Transmission substations

Name of Project 400 KV Substations 230 KV Substations 132 KV Substations 63 KV Substations

Tehran City (63 KV cable) Sum

1

1.1- 400 KV Sub-station Projects for Investment

Quantity * Capacity (MVA)

16* 315 4 * 500 2 * 200

4

230 KV Sub-station Projects For Investment

6 400/63

1.2 - 230 KV Sub-station Projects for Investment Quantity * Capacity

(MVA) 8 * 160

14 * 160 6 * 50

2 * 250 12 * 180

5 230/63 30 * 160

6

Investment Opportunities in the Utilities Industry

Page 5: Power Projects · 2- Power plants increase e fficiency 2.3- Hafez Power Plant Project Location (site) & Images: 16th kilometer of Shiraz-Fasa Rd , Fars Province , Islamic Republic

8

Page 6: Power Projects · 2- Power plants increase e fficiency 2.3- Hafez Power Plant Project Location (site) & Images: 16th kilometer of Shiraz-Fasa Rd , Fars Province , Islamic Republic

2

* Tehran Regional Electric Company

1.3- 132 KV Sub-station Projects for Investment

Quantity * Capacity (MVA)

46 * 50

2 3

1.4 -66 & 63 KV Sub-station Projects for Investment

Quantity * Capacity (MVA)

108 * 40

3 63/20 284 * 40

4 63/20 62 * 30

Target Regional Power Company Azarbaijan(20), Kerman(2), Hor- mozgan(4), Yazd (2), Fars (18) Azarbaijan(6), Kerman(4), Kho- rasan(42), Gharb (2) Khuzestan (70)

Ratio(KV)

1 132/20

132/20 132/33

54 * 40 70 * 50

Target Regional Power Company Fars (108) Isfahan (26), Bakhtar(26), Teh- ran[180, including 70 GIS], Semnan (14), Gilan(8), Mazandaran (20), Hormozgan(10), Azarbaijan (8), Zanjan [10, including 4 GIS], Sistan& Baluches- tan(20), Gharb (8), Kerman (12), Gilan(4),

Ratio(KV) 66/20 1

Project name Investment in buying equipment of the Sub Transmission Substations And Sub-transmission Lines (Under the Supervision of the TREC*)

Quantity 312 Substations

450 Km lines

85 Investment Opportunities in the Utilities Industry

Page 7: Power Projects · 2- Power plants increase e fficiency 2.3- Hafez Power Plant Project Location (site) & Images: 16th kilometer of Shiraz-Fasa Rd , Fars Province , Islamic Republic

86

Azarbayjan regional Electrical Company

Azarbayjan

a) 400/230 KV 2*315 MVA Sahand Power Plant Substation b) 400/230 KV 2*315 MVA Haris Power Plant Substation c) 400/230 KV 2*315 MVA Sabalan Power Plant Substation d) 400/132 KV 2*200 MVA Hashtrood Substation

Investment Opportunities in the Utilities Industry

Page 8: Power Projects · 2- Power plants increase e fficiency 2.3- Hafez Power Plant Project Location (site) & Images: 16th kilometer of Shiraz-Fasa Rd , Fars Province , Islamic Republic

Bakhtar regional Electrical Company

Bakhtar

a)400/230 KV 2*315 MVA Khomain Substation

87 Investment Opportunities in the Utilities Industry

Page 9: Power Projects · 2- Power plants increase e fficiency 2.3- Hafez Power Plant Project Location (site) & Images: 16th kilometer of Shiraz-Fasa Rd , Fars Province , Islamic Republic

88

Tehran regional Electrical Company

Tehran

a) 400/230 KV 2*500 MVA Tehranpars Substation b) 400/230 KV 2*500 MVA Dar Abad Substation c) 400/63 KV 2*200 MVA Baghestan Substation

Investment Opportunities in the Utilities Industry

Page 10: Power Projects · 2- Power plants increase e fficiency 2.3- Hafez Power Plant Project Location (site) & Images: 16th kilometer of Shiraz-Fasa Rd , Fars Province , Islamic Republic

Khorasan regional Electrical Company

Khorasan a) 400/132 KV 2*200 MVA Kohsangi Substation b) 400/132 KV 2*200 MVA Bojnord Substation c) 400/132 KV 2*200 MVA Doulat Abad Substation d) 400/132 KV 2*200 MVA Binaloud Substation e) 400/132 KV 2*200 MVA Emam Reza Substation

89 Investment Opportunities in the Utilities Industry

Page 11: Power Projects · 2- Power plants increase e fficiency 2.3- Hafez Power Plant Project Location (site) & Images: 16th kilometer of Shiraz-Fasa Rd , Fars Province , Islamic Republic

90

Khozestan regional Electrical Company

Khuzestan

a) 400/132 KV 2*200 MVA Pirozan Substation b) 400/132 KV 2*200 MVA isar Substation c) 400/132 KV 2*200 MVA parsomash Substation d) 400/132 KV 2*200 MVA Jondi Shapour Substation e) 400/132 KV 2*200 MVA Shahid Baghai Substation f) 400/132 KV 2*200 MVA Monfared Niaki Substation

Investment Opportunities in the Utilities Industry

Page 12: Power Projects · 2- Power plants increase e fficiency 2.3- Hafez Power Plant Project Location (site) & Images: 16th kilometer of Shiraz-Fasa Rd , Fars Province , Islamic Republic

Zanjan regional Electrical Company

Bakhtar a) 400/230 KV 2*315 MVA Takestan Substation

91 Investment Opportunities in the Utilities Industry

Page 13: Power Projects · 2- Power plants increase e fficiency 2.3- Hafez Power Plant Project Location (site) & Images: 16th kilometer of Shiraz-Fasa Rd , Fars Province , Islamic Republic

92

Development of Small Scale DG & CHPGharb regional Electrical Company

Gharb

a) 400/230 KV 2*315 MVA Sanandaj Substation

Investment Opportunities in the Utilities Industry

Page 14: Power Projects · 2- Power plants increase e fficiency 2.3- Hafez Power Plant Project Location (site) & Images: 16th kilometer of Shiraz-Fasa Rd , Fars Province , Islamic Republic

Development of Small Scale DG & CHPFars regional Electrical Company

Fars a) 400/230 KV 2*315 MVA Marv Dasht Substation b) 400/132 KV 2*200 MVA Khormoj Substation c) 400/66 KV 2*200 MVA Marv Dasht Substation d) 400/66 KV 2*200 MVA Sarhad Substation e) 400/66 KV 2*200 MVA Dehbid Substation f) 400/66 KV 2*200 MVA Darab Substation g) 400/66 KV 2*200 MVA Kharameh Substation

93 Investment Opportunities in the Utilities Industry

Page 15: Power Projects · 2- Power plants increase e fficiency 2.3- Hafez Power Plant Project Location (site) & Images: 16th kilometer of Shiraz-Fasa Rd , Fars Province , Islamic Republic

94

Kerman regional Electrical Company

Kerman

a) 400/230 KV 2*315 MVA Kahnooj Substation b) 400/132 KV 2*200 MVA Khaton Abad Substation c) 400/132 KV 2*200 MVA Jiroft Substation

Investment Opportunities in the Utilities Industry

Page 16: Power Projects · 2- Power plants increase e fficiency 2.3- Hafez Power Plant Project Location (site) & Images: 16th kilometer of Shiraz-Fasa Rd , Fars Province , Islamic Republic

Mazandaran regional Electrical Company

Mazandaran a) 400/230 KV 2*315 MVA Markaz Mazandaran Substation b) 400/63 KV 2*200 MVA Gorgan Substation

95 Investment Opportunities in the Utilities Industry

Page 17: Power Projects · 2- Power plants increase e fficiency 2.3- Hafez Power Plant Project Location (site) & Images: 16th kilometer of Shiraz-Fasa Rd , Fars Province , Islamic Republic

96

Hormozgan regional Electrical Company

Hormozgan

a) 400/132 KV 2*200 MVA Haji Abad Substation

Investment Opportunities in the Utilities Industry

Page 18: Power Projects · 2- Power plants increase e fficiency 2.3- Hafez Power Plant Project Location (site) & Images: 16th kilometer of Shiraz-Fasa Rd , Fars Province , Islamic Republic

Yazd regional Electrical Company

Yazd a) 400/63 KV 2*200 MVA Mehriz Substation

97 Investment Opportunities in the Utilities Industry

Page 19: Power Projects · 2- Power plants increase e fficiency 2.3- Hafez Power Plant Project Location (site) & Images: 16th kilometer of Shiraz-Fasa Rd , Fars Province , Islamic Republic

(Via buyback and repowering method)

98

2- Power plants increase efficiency

Outline of a buyback contract

To stimulate private sector investment in the infrastructural water and power plans and projects and to have this sector further engaged in the abovementioned area we need to prepare relevant desirable projects. Therefore the Iranian law permits this opportunity to foreign companies, involvement in projects through Buyback contracts. Ministry of Energy introduces some projects under buyback contract. Iran’s power industry requires investments of USD 24 billion in the short and medium time. Iran would like to interest international power and energy companies in investing in Iran’s power business by offering buyback contracts. Under abuyback contract an international company invests and when production starts, the eld is handed over to the ministry of energy orone of its representatives. According to the Iranian government, the buybackcontract contains suf cient incentives for international companies to invest in Iran.

Investment Opportunities in the Utilities Industry

Page 20: Power Projects · 2- Power plants increase e fficiency 2.3- Hafez Power Plant Project Location (site) & Images: 16th kilometer of Shiraz-Fasa Rd , Fars Province , Islamic Republic

Outline of Repowering Projects

Due to the rapid increase of power consumption in Iran, older power plants cannot be taken of ine. Therefore in addition to building new power plants, repowering older power plants by eliminating the old boiler systems and coupling them with gas turbines or by using heat recovery steam generators, is a suitable course of action. As one of the more important investment areas in Iranian power industry, 19 power plants have been preselected for optimiza- tion using one of the mentioned methods.

General Information

Foreign Investment Promotion and Protection Act (FIPPA): • No restriction on the percentage of foreign shareholding. • The volume of foreign investment in each individual case shall not be subject the any limitation. • (and 4) – repatriation of principal capital and pro ts is permissible. • No restriction of the kind of acceptable investment. • Facilitation of foreign investors entrance and residency. • Coverage of non-commercial risks. • Shortening the admission process and issuance of foreign investment license. • Admittance of foreign governmental companies. • Compensation of losses caused by expropriation and nationalization. • Possibility of investment by Iranian investors using foreign originated capital , instead of foreigners. • Possibility of referring disputes international arbitration. • Foreign investors , (who have already invested in Iran, may bene t from “FIP- PA” coverage for the principal investment already made.

Other facilities

Taxes (duties) exemption oUp the 80% for 4 years. o(In less developed areas) 100% for 10 years. oExporting 100% without limitations .

99 Investment Opportunities in the Utilities Industry

Page 21: Power Projects · 2- Power plants increase e fficiency 2.3- Hafez Power Plant Project Location (site) & Images: 16th kilometer of Shiraz-Fasa Rd , Fars Province , Islamic Republic

(Via buyback and repowering method)

100

2- Power plants increase efficiency

2-1- Chabahar Power Plant

Project Location (site) & Images: 15th kilometer of Chabahar-Iranshahr Rd ,Chabahar , Sistan and Baluchestan Province , Islamic Republic of Iran Type of Contract: Buyback Plant

Project Status

Present Infrastructures (Supply of land, water, electricity & gas): • Preparation of needed land for steam section of power plant • Preparation of needed electricity for construct period which per-

Sistan& Baluchestan

Investment Opportunities in the Utilities Industry

Page 22: Power Projects · 2- Power plants increase e fficiency 2.3- Hafez Power Plant Project Location (site) & Images: 16th kilometer of Shiraz-Fasa Rd , Fars Province , Islamic Republic

formed • Preparation of fuel for operation period which performed (Costs will be paid by government) • The ability of connection to the network through the power plant substation

Project Time Schedule (Period of Preparation, Construction & Operation): • Development period : 6 months to 1 year. • Construction period : 36 to 39 months. • Return of capital period : Up to 2 years. Feasibility Study: • feasibility studies by investor Position of Land Ownership: • Is owned by the private investor . Legal Permissions (License of Constriction, Foreign currency guota, environmental assessment, ect.):

Investment Opportunities in the Utilities Industry 101

Page 23: Power Projects · 2- Power plants increase e fficiency 2.3- Hafez Power Plant Project Location (site) & Images: 16th kilometer of Shiraz-Fasa Rd , Fars Province , Islamic Republic

• Obtain the required environmental permit

Page 24: Power Projects · 2- Power plants increase e fficiency 2.3- Hafez Power Plant Project Location (site) & Images: 16th kilometer of Shiraz-Fasa Rd , Fars Province , Islamic Republic

102

Technical and Economic Specifications

Model of Investment: • Buyback Capacity: • about 160MW consisting of 1 steam unit. Total Capital Investment Forecasting: • more than 176 million Dollar Return of capital period (year):

Up to 2 years Net Present Value (NPV) - million Rials: - • International Rate of Return (IRR) %: 12 percent

Investment Opportunities in the Utilities Industry

Page 25: Power Projects · 2- Power plants increase e fficiency 2.3- Hafez Power Plant Project Location (site) & Images: 16th kilometer of Shiraz-Fasa Rd , Fars Province , Islamic Republic

Investment Opportunities in the Utilities Industry 103

Page 26: Power Projects · 2- Power plants increase e fficiency 2.3- Hafez Power Plant Project Location (site) & Images: 16th kilometer of Shiraz-Fasa Rd , Fars Province , Islamic Republic

104

2- Power plants increase efficiency

2.2- Golestan (Aliabad) Power Plant

Project Location (site) & Images: Near the city of Aliabad-e-Katul , Golestan Province , Islamic Republic of Iran Type of Contract: Buyback

Project Status

Present Infrastructures (Supply of land, water, electricity & gas): • Preparation of needed land for steam section of power plant • Preparation of needed electricity for construct period which per- formed • Preparation of fuel for opera-

Mazandaran

Investment Opportunities in the Utilities Industry

Page 27: Power Projects · 2- Power plants increase e fficiency 2.3- Hafez Power Plant Project Location (site) & Images: 16th kilometer of Shiraz-Fasa Rd , Fars Province , Islamic Republic

tion period which performed (Costs will be paid by government) • The ability of connection to the network through the power plant substation Project Time Schedule (Period of Preparation, Construction & Operation): • Development period : 6 months to 1 year. • Construction period : 36 to 39 months. • Return of capital period : Up to 2 years. Site Preparation: Feasibility Study: • feasibility studies by investor Position of Land Ownership: Is owned by the private investor . Legal Permissions (License of Constriction, Foreign currency guota, environmental assessment, ect.): • Obtain the required environmental permit and permit for water

Investment Opportunities in the Utilities Industry 105

Page 28: Power Projects · 2- Power plants increase e fficiency 2.3- Hafez Power Plant Project Location (site) & Images: 16th kilometer of Shiraz-Fasa Rd , Fars Province , Islamic Republic

106

Technical and Economic Specifications

Model of Investment: Buyback

Capacity: about 480MW consisting of 3 steam units. Total Capital Investment Forecasting: more than 528 million Dollar Return of capital period (year): Up to 2 years Net Present Value (NPV) - million Rials: International Rate of Return (IRR) %: 12 percent

Investment Opportunities in the Utilities Industry

Page 29: Power Projects · 2- Power plants increase e fficiency 2.3- Hafez Power Plant Project Location (site) & Images: 16th kilometer of Shiraz-Fasa Rd , Fars Province , Islamic Republic

Investment Opportunities in the Utilities Industry 107

Page 30: Power Projects · 2- Power plants increase e fficiency 2.3- Hafez Power Plant Project Location (site) & Images: 16th kilometer of Shiraz-Fasa Rd , Fars Province , Islamic Republic

108

2- Power plants increase efficiency

2.3- Hafez Power Plant

Project Location (site) & Images: 16th kilometer of Shiraz-Fasa Rd , Fars Province , Islamic Republic of Iran Type of Contract: Buyback

Project Status

Present Infrastructures (Supply of land, water, electricity & gas): • Preparation of needed land for steam section of power plant • Preparation of needed electricity for con- struct period which performed • Preparation of fuel for operation peri-

Fars

Investment Opportunities in the Utilities Industry

Page 31: Power Projects · 2- Power plants increase e fficiency 2.3- Hafez Power Plant Project Location (site) & Images: 16th kilometer of Shiraz-Fasa Rd , Fars Province , Islamic Republic

od which performed (Costs will be paid by government) • The ability of connection to the network through the power plant substation Project Time Schedule (Period of Preparation, Construction & Operation): • Development period : 6 months to 1 year. • Construction period : 36 to 39 months. • Return of capital period : Up to 2 years. Site Preparation: Feasibility Study: • feasibility studies by IPDC Position of Land Ownership: Is owned by the IPDC. Legal Permissions (License of Constriction, Foreign currency guota, environmental assessment, ect.): • Environmental permit has been ob- tained. • Water permit has been obtained.

Investment Opportunities in the Utilities Industry 109

Page 32: Power Projects · 2- Power plants increase e fficiency 2.3- Hafez Power Plant Project Location (site) & Images: 16th kilometer of Shiraz-Fasa Rd , Fars Province , Islamic Republic

110

Technical and Economic Specifications

Model of Investment: Buyback Capacity: about 480MW consisting of the 3 steam units. Total Capital Investment Forecasting: more than 528 million Dollar Return of capital period (year): Up to 2 years Net Present Value (NPV) - million Rials: - International Rate of Return (IRR) %: 12 percent

Investment Opportunities in the Utilities Industry

Page 33: Power Projects · 2- Power plants increase e fficiency 2.3- Hafez Power Plant Project Location (site) & Images: 16th kilometer of Shiraz-Fasa Rd , Fars Province , Islamic Republic

Investment Opportunities in the Utilities Industry 111

Page 34: Power Projects · 2- Power plants increase e fficiency 2.3- Hafez Power Plant Project Location (site) & Images: 16th kilometer of Shiraz-Fasa Rd , Fars Province , Islamic Republic

112

2- Power plants increase efficiency

2.4- Hormozgan Power Plant

Project Location (site) & Images: 25 km north of Bandar Abbas, Hormozgan Province , Islamic Republic of Iran Type of Contract: Buyback

Project Status

Present Infrastructures (Supply of land, water, electricity & gas): • Preparation of needed land for steam section of power plant • Preparation of needed electricity for construct period which performed • Preparation of fuel for operation

Hormozgan

Investment Opportunities in the Utilities Industry

Page 35: Power Projects · 2- Power plants increase e fficiency 2.3- Hafez Power Plant Project Location (site) & Images: 16th kilometer of Shiraz-Fasa Rd , Fars Province , Islamic Republic

period which performed (Costs will be paid by government) • The ability of connection to the network through the power plant substation Project Time Schedule (Period of Preparation, Construction & Operation): • Development period : 6 months to 1 year. • Construction period : 36 to 39 months. • Return of capital period : Up to 2 years. Site Preparation: Feasibility Study: • feasibility studies by IPDC Position of Land Ownership: Is owned by the IPDC . Legal Permissions (License of Con- striction,Foreign currency guota, environmental assessment, ect.): • Environmental permit has been ob- tained .

Investment Opportunities in the Utilities Industry 113

Page 36: Power Projects · 2- Power plants increase e fficiency 2.3- Hafez Power Plant Project Location (site) & Images: 16th kilometer of Shiraz-Fasa Rd , Fars Province , Islamic Republic

• water supply contract was signed in the gas section , but there is not enough water .

Page 37: Power Projects · 2- Power plants increase e fficiency 2.3- Hafez Power Plant Project Location (site) & Images: 16th kilometer of Shiraz-Fasa Rd , Fars Province , Islamic Republic

114

Technical and Economic Specifications

Model of Investment: Buyback

Capacity: about 320MW consisting of 2 steam units. Total Capital Investment Forecasting: more than 352 million Euro Return of capital period (year): Up to 2 years Net Present Value (NPV) - million Rials: International Rate of Return (IRR) %: 12 percent

Investment Opportunities in the Utilities Industry

Page 38: Power Projects · 2- Power plants increase e fficiency 2.3- Hafez Power Plant Project Location (site) & Images: 16th kilometer of Shiraz-Fasa Rd , Fars Province , Islamic Republic

Investment Opportunities in the Utilities Industry 115

Page 39: Power Projects · 2- Power plants increase e fficiency 2.3- Hafez Power Plant Project Location (site) & Images: 16th kilometer of Shiraz-Fasa Rd , Fars Province , Islamic Republic

116

2- Power plants increase efficiency

2.5- Iranshahr Power Plant

Project Location (site) & Images: 5th kilometer of Iranshahr-Bampour Rd , Sistan and Baluchestan Province , Islamic Republic of Iran Type of Contract: Buyback

Project Status

Present Infrastructures (Supply of land, water, electricity & gas): • Preparation of needed land for steam section of power plant • Preparation of needed electricity for con- struct period which performed • Preparation of fuel for operation peri-

Investment Opportunities in the Utilities Industry

Sistan& Baluchestan

Page 40: Power Projects · 2- Power plants increase e fficiency 2.3- Hafez Power Plant Project Location (site) & Images: 16th kilometer of Shiraz-Fasa Rd , Fars Province , Islamic Republic

od which performed (Costs will be paid by government) • The ability of connection to the network through the power plant substation Project Time Schedule (Period of Preparation, Construction & Operation): • Development period : 6 months to 1 year. • Construction period : 36 to 39 months. • Return of capital period : Up to 2 years. Site Preparation: • Land ready for delivery Feasibility Study: • feasibility studies by IPDC Position of Land Ownership: Is owned by the IPDC. Legal Permissions (License of Constriction, Foreign currency guota, environmental assessment, ect.): • correspondence necessary to permit the water supply is done.

Investment Opportunities in the Utilities Industry 117

Page 41: Power Projects · 2- Power plants increase e fficiency 2.3- Hafez Power Plant Project Location (site) & Images: 16th kilometer of Shiraz-Fasa Rd , Fars Province , Islamic Republic

118

Technical and Economic Specifications

Model of Investment: Buyback Capacity: about 160MW consisting of 1 steam unit. Total Capital Investment Forecasting: more than 176 million Dollar Return of capital period (year): Up to 2 years Net Present Value (NPV) - million Rials: International Rate of Return (IRR) %: 12 percent

Investment Opportunities in the Utilities Industry

Page 42: Power Projects · 2- Power plants increase e fficiency 2.3- Hafez Power Plant Project Location (site) & Images: 16th kilometer of Shiraz-Fasa Rd , Fars Province , Islamic Republic

Investment Opportunities in the Utilities Industry 119

Page 43: Power Projects · 2- Power plants increase e fficiency 2.3- Hafez Power Plant Project Location (site) & Images: 16th kilometer of Shiraz-Fasa Rd , Fars Province , Islamic Republic

120

2- Power plants increase efficiency

2.6- Kashan Power Plant

Project Location (site) & Images: 20th kilometer of Kashan-Ardestan Rd , Isfahan Province , Islamic Republic of Iran Type of Contract: Buyback

Project Status

Present Infrastructures (Supply of land, water, electricity & gas): • Preparation of needed land for steam section of power plant • Preparation of needed electricity for construct period which performed • Preparation of fuel for operation

Esfahan

Investment Opportunities in the Utilities Industry

Page 44: Power Projects · 2- Power plants increase e fficiency 2.3- Hafez Power Plant Project Location (site) & Images: 16th kilometer of Shiraz-Fasa Rd , Fars Province , Islamic Republic

period which performed (Costs will be paid by gov- ernment) • The ability of connection to the network through the power plant substation Project Time Schedule (Period of Preparation, Con- struction & Operation): • Development period : 6 months to 1 year. • Construction period : 36 to 39 months. • Return of capital period : Up to 2 years. Site Preparation: Feasibility Study: • feasibility studies by investor Position of Land Ownership: Is owned by the private investor .

Investment Opportunities in the Utilities Industry 121

Page 45: Power Projects · 2- Power plants increase e fficiency 2.3- Hafez Power Plant Project Location (site) & Images: 16th kilometer of Shiraz-Fasa Rd , Fars Province , Islamic Republic

122

Technical and Economic Specifications

Model of Investment: Buyback Capacity: about 160MW consisting of 1 steam unit. Total Capital Investment Forecasting: more than 176 million Dollar Return of capital period (year): Up to 2 years Net Present Value (NPV) - million Rials: International Rate of Return (IRR) %: 12 percent

Investment Opportunities in the Utilities Industry

Page 46: Power Projects · 2- Power plants increase e fficiency 2.3- Hafez Power Plant Project Location (site) & Images: 16th kilometer of Shiraz-Fasa Rd , Fars Province , Islamic Republic

Investment Opportunities in the Utilities Industry 123

Page 47: Power Projects · 2- Power plants increase e fficiency 2.3- Hafez Power Plant Project Location (site) & Images: 16th kilometer of Shiraz-Fasa Rd , Fars Province , Islamic Republic

124

2- Power plants increase efficiency

2.7- Khaleej Fars Power Plant

Project Location (site) & Images: At distance of 45 km northeast of Bandar Abbas and 11 km of Sarkhoon gas eld, Hormozgan Province , Islamic Republic of Iran

Type of Contract: Buyback

Project Status

Present Infrastructures (Supply of land, water, electricity & gas): • Preparation of needed land for steam section of power plant • Preparation of needed electricity for construct period which performed • Preparation of fuel for operation

Hormozgan

Investment Opportunities in the Utilities Industry

Page 48: Power Projects · 2- Power plants increase e fficiency 2.3- Hafez Power Plant Project Location (site) & Images: 16th kilometer of Shiraz-Fasa Rd , Fars Province , Islamic Republic

period which performed (Costs will be paid by government) • The ability of connection to the network through the power plant substation Project Time Schedule (Period of Preparation, Construction & Operation): • Development period : 6 months to 1 year. • Construction period : 36 to 39 months. • Return of capital period : Up to 2 years. Site Preparation: Feasibility Study: • feasibility studies by IPDC Position of Land Ownership: Is owned by the IPDC. Legal Permissions (License of Constriction, Foreign currency guota, environmental assessment, ect.): • Regional Water agrees to sell water and declared under tariff

Investment Opportunities in the Utilities Industry 125

Page 49: Power Projects · 2- Power plants increase e fficiency 2.3- Hafez Power Plant Project Location (site) & Images: 16th kilometer of Shiraz-Fasa Rd , Fars Province , Islamic Republic

126

Technical and Economic Specifications

Model of Investment: Buyback

Capacity: about 480MW consisting of 3 steam units. Total Capital Investment Forecasting: more than 528 million Euro Return of capital period (year): Up to 2 years Net Present Value (NPV) - million Rials: International Rate of Return (IRR) %: 12 percent

Investment Opportunities in the Utilities Industry

Page 50: Power Projects · 2- Power plants increase e fficiency 2.3- Hafez Power Plant Project Location (site) & Images: 16th kilometer of Shiraz-Fasa Rd , Fars Province , Islamic Republic

Investment Opportunities in the Utilities Industry 127

Page 51: Power Projects · 2- Power plants increase e fficiency 2.3- Hafez Power Plant Project Location (site) & Images: 16th kilometer of Shiraz-Fasa Rd , Fars Province , Islamic Republic

• Preparation of needed land for steam section of power plant • Preparation of needed electricity for con- struct period which performed • Preparation of fuel for operation period

128

2- Power plants increase efficiency

2.8- Mahshahr Power Plant

Project Location (site) & Images: 9th kilometer of Petrochemical-Chamran Rd, Mahshahr , Khuzestan Province , Islamic Republic of Iran Type of Contract: Buyback

Project Status

Present Infrastructures (Supply of land, water, electricity & gas):

Khuzestan

Investment Opportunities in the Utilities Industry

Page 52: Power Projects · 2- Power plants increase e fficiency 2.3- Hafez Power Plant Project Location (site) & Images: 16th kilometer of Shiraz-Fasa Rd , Fars Province , Islamic Republic

which performed (Costs will be paid by government) • The ability of connection to the network through the power plant substation Project Time Schedule (Period of Preparation, Construction & Operation): • Development period : 6 months to 1 year. • Construction period : 36 to 39 months. • Return of capital period : Up to 2 years. Site Preparation: Feasibility Study: • feasibility studies by IPDC Position of Land Ownership: Is owned by the IPDC . Legal Permissions (License of Constriction, Foreign currency guota, environmental assessment, ect.): • Environmental permit has been ob- tained .

Investment Opportunities in the Utilities Industry 129

Page 53: Power Projects · 2- Power plants increase e fficiency 2.3- Hafez Power Plant Project Location (site) & Images: 16th kilometer of Shiraz-Fasa Rd , Fars Province , Islamic Republic

• required water is supplied by the gas section.

Page 54: Power Projects · 2- Power plants increase e fficiency 2.3- Hafez Power Plant Project Location (site) & Images: 16th kilometer of Shiraz-Fasa Rd , Fars Province , Islamic Republic

130

Technical and Economic Specifications

Model of Investment: Buyback Capacity: about 320MW consisting of 2 steam units. Total Capital Investment Forecasting: more than 352 million Dollar Return of capital period (year): Up to 2 years Net Present Value (NPV) - million Rials: - International Rate of Return (IRR) %: 12 percent

Investment Opportunities in the Utilities Industry

Page 55: Power Projects · 2- Power plants increase e fficiency 2.3- Hafez Power Plant Project Location (site) & Images: 16th kilometer of Shiraz-Fasa Rd , Fars Province , Islamic Republic

Investment Opportunities in the Utilities Industry 131

Page 56: Power Projects · 2- Power plants increase e fficiency 2.3- Hafez Power Plant Project Location (site) & Images: 16th kilometer of Shiraz-Fasa Rd , Fars Province , Islamic Republic

132

2- Power plants increase efficiency

2.9- Parand Power Plant

Project Location (site) & Images: 30th kilometer of Tehran-Saveh Highway , Tehran Province , Islamic Republic of Iran Type of Contract: Buyback

Project Status

Present Infrastructures (Supply of land, water, electricity & gas): • Preparation of needed land for steam section of power plant • Preparation of needed electricity for con- struct period which performed • Preparation of fuel for operation period

Tehran

Investment Opportunities in the Utilities Industry

Page 57: Power Projects · 2- Power plants increase e fficiency 2.3- Hafez Power Plant Project Location (site) & Images: 16th kilometer of Shiraz-Fasa Rd , Fars Province , Islamic Republic

which performed (Costs will be paid by government) • The ability of connection to the network through the power plant substation Project Time Schedule (Period of Preparation, Construction & Operation): • Development period : 6 months to 1 year. • Construction period : 36 to 39 months. • Return of capital period : Up to 2 years. Site Preparation: • 11% Feasibility Study: • feasibility studies by investor Position of Land Ownership: Is owned by the private investor . Legal Permissions (License of Constriction, Foreign currency guota, environmental assessment, ect.): • Obtain the required environmental permit and permit for water

Investment Opportunities in the Utilities Industry 133

Page 58: Power Projects · 2- Power plants increase e fficiency 2.3- Hafez Power Plant Project Location (site) & Images: 16th kilometer of Shiraz-Fasa Rd , Fars Province , Islamic Republic

134

Technical and Economic Specifications

Model of Investment: Buyback Capacity: about 480MW consisting of 3 steam units. Total Capital Investment Forecasting: more than 528 million Dollar Return of capital period (year): Up to 2 years Net Present Value (NPV) - million Rials: - International Rate of Return (IRR) %: 12 percent

Investment Opportunities in the Utilities Industry

Page 59: Power Projects · 2- Power plants increase e fficiency 2.3- Hafez Power Plant Project Location (site) & Images: 16th kilometer of Shiraz-Fasa Rd , Fars Province , Islamic Republic

Investment Opportunities in the Utilities Industry 135

Page 60: Power Projects · 2- Power plants increase e fficiency 2.3- Hafez Power Plant Project Location (site) & Images: 16th kilometer of Shiraz-Fasa Rd , Fars Province , Islamic Republic

136

2- Power plants increase efficiency

2.10- Rudeshur Power Plant

Project Location (site) & Images: 44th kilometer of Tehran-Saveh Fwy , Markazi Province, Islamic Republic of Iran Type of Contract: Buyback

Project Status

Present Infrastructures (Supply of land, water, electricity & gas): • Preparation of needed land for steam section of power plant • Preparation of needed electricity for con- struct period which performed • Preparation of fuel for operation period

Bakhtar

Investment Opportunities in the Utilities Industry

Page 61: Power Projects · 2- Power plants increase e fficiency 2.3- Hafez Power Plant Project Location (site) & Images: 16th kilometer of Shiraz-Fasa Rd , Fars Province , Islamic Republic

which performed (Costs will be paid by government) • The ability of connection to the network through the power plant substation Project Time Schedule (Period of Preparation, Construction & Operation): • Development period : 6 months to 1 year. • Construction period : 36 to 39 months. • Return of capital period : Up to 2 years. Site Preparation: • 3% Feasibility Study: • feasibility studies by investor Position of Land Ownership: Is owned by the private investor . Legal Permissions (License of Constriction, Foreign currency guota, environmental assessment, ect.): • Obtain the required environmental permit and permit for water

Investment Opportunities in the Utilities Industry 137

Page 62: Power Projects · 2- Power plants increase e fficiency 2.3- Hafez Power Plant Project Location (site) & Images: 16th kilometer of Shiraz-Fasa Rd , Fars Province , Islamic Republic

138

Technical and Economic Specifications

Model of Investment: Buyback Capacity: about 340MW consisting of 1 steam unit. Total Capital Investment Forecasting:

more than 374 million Dollar Return of capital period (year): Up to 2 years Net Present Value (NPV) - million Rials: - International Rate of Return (IRR) %: 12 percent

Investment Opportunities in the Utilities Industry

Page 63: Power Projects · 2- Power plants increase e fficiency 2.3- Hafez Power Plant Project Location (site) & Images: 16th kilometer of Shiraz-Fasa Rd , Fars Province , Islamic Republic

Investment Opportunities in the Utilities Industry 139

Page 64: Power Projects · 2- Power plants increase e fficiency 2.3- Hafez Power Plant Project Location (site) & Images: 16th kilometer of Shiraz-Fasa Rd , Fars Province , Islamic Republic

140

2- Power plants increase efficiency

2.11- Sabalan Power Plant

Project Location (site) & Images: 30th kilometer of Ardabil- Meshgin shahr Rd , Ardabil Province , Islamic Republic of Iran Type of Contract: Buyback

Project Status

Present Infrastructures (Supply of land, water, electricity & gas): • Preparation of needed land for steam section of power plant • Preparation of needed electricity for con- struct period which performed • Preparation of fuel for operation period

Azarbayjan

Investment Opportunities in the Utilities Industry

Page 65: Power Projects · 2- Power plants increase e fficiency 2.3- Hafez Power Plant Project Location (site) & Images: 16th kilometer of Shiraz-Fasa Rd , Fars Province , Islamic Republic

which performed (Costs will be paid by government) • The ability of connection to the network through the power plant substation Project Time Schedule (Period of Preparation, Construction & Operation): • Development period : 6 months to 1 year. • Construction period : 36 to 39 months. • Return of capital period : Up to 2 years. Site Preparation: • 2% Feasibility Study: • feasibility studies by investor Position of Land Ownership: Is owned by the private investor .

Investment Opportunities in the Utilities Industry 141

Page 66: Power Projects · 2- Power plants increase e fficiency 2.3- Hafez Power Plant Project Location (site) & Images: 16th kilometer of Shiraz-Fasa Rd , Fars Province , Islamic Republic

142

Technical and Economic Specifications

Model of Investment: Buyback Capacity: about 480MW consisting of 3 steam units. Total Capital Investment Forecasting: more than 528 million Dollar Return of capital period (year): Up to 2 years Net Present Value (NPV) - million Rials: International Rate of Return (IRR) %: 12 percent

Investment Opportunities in the Utilities Industry

Page 67: Power Projects · 2- Power plants increase e fficiency 2.3- Hafez Power Plant Project Location (site) & Images: 16th kilometer of Shiraz-Fasa Rd , Fars Province , Islamic Republic

Investment Opportunities in the Utilities Industry 143

Page 68: Power Projects · 2- Power plants increase e fficiency 2.3- Hafez Power Plant Project Location (site) & Images: 16th kilometer of Shiraz-Fasa Rd , Fars Province , Islamic Republic

144

2- Power plants increase efficiency

2.12- Shahid Kaveh Power Plant

Project Location (site) & Images: 4th kilometer of Ghayen-Mashhad Rd , South Khorasan Province , Islamic Republic of Iran Type of Contract: Buyback

Project Status

Present Infrastructures (Supply of land, water, electricity & gas): • Preparation of needed land for steam section of power plant • Preparation of needed electricity for con- struct period which performed • Preparation of fuel for operation period

Khorasan

Investment Opportunities in the Utilities Industry

Page 69: Power Projects · 2- Power plants increase e fficiency 2.3- Hafez Power Plant Project Location (site) & Images: 16th kilometer of Shiraz-Fasa Rd , Fars Province , Islamic Republic

which performed (Costs will be paid by government) • The ability of connection to the network through the power plant substation Project Time Schedule (Period of Preparation, Construction & Operation): • Development period : 6 months to 1 year. • Construction period : 36 to 39 months. • Return of capital period : Up to 2 years. Site Preparation: • land ready for delivery Feasibility Study: • feasibility studies by IPDC Position of Land Ownership: Is owned by the IPDC . Legal Permissions (License of Constriction, Foreign currency guota, environmental assessment, ect.):

Investment Opportunities in the Utilities Industry 145

Page 70: Power Projects · 2- Power plants increase e fficiency 2.3- Hafez Power Plant Project Location (site) & Images: 16th kilometer of Shiraz-Fasa Rd , Fars Province , Islamic Republic

• Correspondence for obtaining envi- ronmental permit and water permit was conducted

Page 71: Power Projects · 2- Power plants increase e fficiency 2.3- Hafez Power Plant Project Location (site) & Images: 16th kilometer of Shiraz-Fasa Rd , Fars Province , Islamic Republic

146

Technical and Economic Specifications

Model of Investment: Buyback

Capacity: about 320MW consisting of 2 steam units. Total Capital Investment Forecasting: more than 352 million Dollar Return of capital period (year): Up to 2 years Net Present Value (NPV) - million Rials: - International Rate of Return (IRR) %: 12 percent

Investment Opportunities in the Utilities Industry

Page 72: Power Projects · 2- Power plants increase e fficiency 2.3- Hafez Power Plant Project Location (site) & Images: 16th kilometer of Shiraz-Fasa Rd , Fars Province , Islamic Republic

Investment Opportunities in the Utilities Industry 147

Page 73: Power Projects · 2- Power plants increase e fficiency 2.3- Hafez Power Plant Project Location (site) & Images: 16th kilometer of Shiraz-Fasa Rd , Fars Province , Islamic Republic

148

2- Power plants increase efficiency

2.13- Shahrud Power Plant

Project Location (site) & Images: 15th kilometer of Shahrud-Damghan Rd ,Semnan Province , Islamic Republic of Iran Type of Contract: Buyback

Project Status

Present Infrastructures (Supply of land, water, electricity & gas): • Preparation of needed land for steam section of power plant • Preparation of needed electricity for con- struct period which performed • Preparation of fuel for operation period

Semnan

Investment Opportunities in the Utilities Industry

Page 74: Power Projects · 2- Power plants increase e fficiency 2.3- Hafez Power Plant Project Location (site) & Images: 16th kilometer of Shiraz-Fasa Rd , Fars Province , Islamic Republic

which performed (Costs will be paid by government) • The ability of connection to the network through the power plant substation Project Time Schedule (Period of Preparation, Construction & Operation): • Development period : 6 months to 1 year. • Construction period : 36 to 39 months. • Return of capital period : Up to 2 years. Site Preparation: • land ready for delivery Feasibility Study: • feasibility studies by IPDC Position of Land Ownership: Is owned by the private IPDC . Legal Permissions (License of Constriction, Foreign currency guota, environmental assessment, ect.):

Investment Opportunities in the Utilities Industry 149

Page 75: Power Projects · 2- Power plants increase e fficiency 2.3- Hafez Power Plant Project Location (site) & Images: 16th kilometer of Shiraz-Fasa Rd , Fars Province , Islamic Republic

• Regional Water has declared its read- iness to grant a water permit. •Environmental permits have been obtained .

Page 76: Power Projects · 2- Power plants increase e fficiency 2.3- Hafez Power Plant Project Location (site) & Images: 16th kilometer of Shiraz-Fasa Rd , Fars Province , Islamic Republic

150

Technical and Economic Specifications

Model of Investment: Buyback Capacity: about 160MW consisting of 1 steam unit. Total Capital Investment Forecasting: more than 176 million Dollar Return of capital period (year): Up to 2 years Net Present Value (NPV) - million Rials: International Rate of Return (IRR) %: 12 percent

Investment Opportunities in the Utilities Industry

Page 77: Power Projects · 2- Power plants increase e fficiency 2.3- Hafez Power Plant Project Location (site) & Images: 16th kilometer of Shiraz-Fasa Rd , Fars Province , Islamic Republic

Investment Opportunities in the Utilities Industry 151

Page 78: Power Projects · 2- Power plants increase e fficiency 2.3- Hafez Power Plant Project Location (site) & Images: 16th kilometer of Shiraz-Fasa Rd , Fars Province , Islamic Republic

152

2- Power plants increase efficiency

2.14- Soltanieh Power Plant

Project Location (site) & Images: Sorkhe Dizaj Village, 25th kilometer of Qazvin-Zanjan Highway , Zanjan Province , Islamic Republic of Iran Type of Contract: Buyback

Project Status

Present Infrastructures (Supply of land, water, electricity & gas): • Preparation of needed land for steam section of power plant • Preparation of needed electricity for con- struct period which performed • Preparation of fuel for operation period

Zanjan

Investment Opportunities in the Utilities Industry

Page 79: Power Projects · 2- Power plants increase e fficiency 2.3- Hafez Power Plant Project Location (site) & Images: 16th kilometer of Shiraz-Fasa Rd , Fars Province , Islamic Republic

which performed (Costs will be paid by government) • The ability of connection to the network through the power plant substation Project Time Schedule (Period of Preparation, Construction & Operation): • Development period : 6 months to 1 year. • Construction period : 36 to 39 months. • Return of capital period : Up to 2 years. Site Preparation: Feasibility Study: • feasibility studies by investor Position of Land Ownership: Land Own- ership is on track Legal Permissions (License of Constriction, Foreign currency guota, environmental assessment, ect.): • Obtain the required environmental permit

Investment Opportunities in the Utilities Industry 153

Page 80: Power Projects · 2- Power plants increase e fficiency 2.3- Hafez Power Plant Project Location (site) & Images: 16th kilometer of Shiraz-Fasa Rd , Fars Province , Islamic Republic

154

Technical and Economic Specifications

Model of Investment: Buyback Capacity: about 320MW consisting of 2 steam units. Total Capital Investment Forecasting: more than 352 million Dollar Return of capital period (year): Up to 2 years Net Present Value (NPV) - million Rials: International Rate of Return (IRR) %: 12 percent

Investment Opportunities in the Utilities Industry

Page 81: Power Projects · 2- Power plants increase e fficiency 2.3- Hafez Power Plant Project Location (site) & Images: 16th kilometer of Shiraz-Fasa Rd , Fars Province , Islamic Republic

Investment Opportunities in the Utilities Industry 155

Page 82: Power Projects · 2- Power plants increase e fficiency 2.3- Hafez Power Plant Project Location (site) & Images: 16th kilometer of Shiraz-Fasa Rd , Fars Province , Islamic Republic

156

2- Power plants increase efficiency

2.15- South Isfahan Power Plant

Project Location (site) & Images: 75 kilometers to the southwest Isfahan near the Mobarakeh Steel Complex, Isfahan Province , Islamic Republic of Iran Type of Contract: Buyback

Project Status

Present Infrastructures (Supply of land, water, electricity & gas): • Preparation of needed land for steam section of power plant • Preparation of needed electricity for con- struct period which performed • Preparation of fuel for operation period

Esfahan

Investment Opportunities in the Utilities Industry

Page 83: Power Projects · 2- Power plants increase e fficiency 2.3- Hafez Power Plant Project Location (site) & Images: 16th kilometer of Shiraz-Fasa Rd , Fars Province , Islamic Republic

which performed (Costs will be paid by government) • The ability of connection to the network through the power plant substation Project Time Schedule (Period of Preparation, Construction & Operation): • Development period : 6 months to 1 year. • Construction period : 36 to 39 months. • Return of capital period : Up to 2 years. Site Preparation: Feasibility Study: • feasibility studies by IPDC Position of Land Ownership: Is owned by the IPDC . Legal Permissions (License of Constriction, Foreign currency guota, environmental assessment, ect.): • Environmental permit has been ob- tained . • Water permit has been obtained (25 liters/sec) and in case of the subscription payment, up to 40 liters can be increased.

Investment Opportunities in the Utilities Industry 157

Page 84: Power Projects · 2- Power plants increase e fficiency 2.3- Hafez Power Plant Project Location (site) & Images: 16th kilometer of Shiraz-Fasa Rd , Fars Province , Islamic Republic

158

Technical and Economic Specifications

Model of Investment: Buyback Capacity: about 480MW consisting of 3 steam units. Total Capital Investment Forecasting: more than 528 million Dollar Return of capital period (year): Up to 2 years Net Present Value (NPV) - million Rials: International Rate of Return (IRR) %: 12 percent

Investment Opportunities in the Utilities Industry

Page 85: Power Projects · 2- Power plants increase e fficiency 2.3- Hafez Power Plant Project Location (site) & Images: 16th kilometer of Shiraz-Fasa Rd , Fars Province , Islamic Republic

Investment Opportunities in the Utilities Industry 159

Page 86: Power Projects · 2- Power plants increase e fficiency 2.3- Hafez Power Plant Project Location (site) & Images: 16th kilometer of Shiraz-Fasa Rd , Fars Province , Islamic Republic

160

2- Power plants increase efficiency

2.16- Urmia Power Plant

Project Location (site) & Images: 30th kilometer of Urmia-Mahabad Road , West Azerbaijan Province, Islamic Republic of Iran Type of Contract: Buyback

Project Status

Present Infrastructures (Supply of land, water, electricity & gas): • Preparation of needed land for steam section of power plant • Preparation of needed electricity for con- struct period which performed • Preparation of fuel for operation period

Azarbayjan

Investment Opportunities in the Utilities Industry

Page 87: Power Projects · 2- Power plants increase e fficiency 2.3- Hafez Power Plant Project Location (site) & Images: 16th kilometer of Shiraz-Fasa Rd , Fars Province , Islamic Republic

which performed (Costs will be paid by government) • The ability of connection to the network through the power plant substation Project Time Schedule (Period of Preparation, Construction & Oper- ation): • Development period : 6 months to 1 year. • Construction period : 36 to 39 months. • Return of capital period : Up to 2 years. Site Preparation: Feasibility Study: • feasibility studies by investor Position of Land Ownership: Is owned by the private investor .

Investment Opportunities in the Utilities Industry 161

Page 88: Power Projects · 2- Power plants increase e fficiency 2.3- Hafez Power Plant Project Location (site) & Images: 16th kilometer of Shiraz-Fasa Rd , Fars Province , Islamic Republic

162

Technical and Economic Specifications

Model of Investment: Buyback Capacity: about 480MW consisting of 3 steam units. Total Capital Investment Forecasting: more than 528 million Dollar Return of capital period (year): Up to 2 years Net Present Value (NPV) - million Rials: International Rate of Return (IRR) %: 12 percent

Investment Opportunities in the Utilities Industry

Page 89: Power Projects · 2- Power plants increase e fficiency 2.3- Hafez Power Plant Project Location (site) & Images: 16th kilometer of Shiraz-Fasa Rd , Fars Province , Islamic Republic

Investment Opportunities in the Utilities Industry 163

Page 90: Power Projects · 2- Power plants increase e fficiency 2.3- Hafez Power Plant Project Location (site) & Images: 16th kilometer of Shiraz-Fasa Rd , Fars Province , Islamic Republic

164

2- Power plants increase efficiency

2.17- Zagros Power Plant

Project Location (site) & Images: Kermanshah Province , Islamic Republic of Iran Type of Contract: Buyback

Project Status

Present Infrastructures (Supply of land, water, electricity & gas): • Preparation of needed land for steam section of power plant • Preparation of needed electricity for con- struct period which performed • Preparation of fuel for operation period

Gharb

Investment Opportunities in the Utilities Industry

Page 91: Power Projects · 2- Power plants increase e fficiency 2.3- Hafez Power Plant Project Location (site) & Images: 16th kilometer of Shiraz-Fasa Rd , Fars Province , Islamic Republic

which performed (Costs will be paid by government) • The ability of connection to the net- work through the power plant substa- tion Project Time Schedule (Period of Preparation, Construction & Opera- tion): • Development period : 6 months to 1 year. • Construction period : 36 to 39 months. • Return of capital period : Up to 2 years. Site Preparation: Feasibility Study: • feasibility studies by investor Position of Land Ownership: Transfer of land yet to be nalized

Investment Opportunities in the Utilities Industry 165

Page 92: Power Projects · 2- Power plants increase e fficiency 2.3- Hafez Power Plant Project Location (site) & Images: 16th kilometer of Shiraz-Fasa Rd , Fars Province , Islamic Republic

166

Technical and Economic Specifications

Model of Investment: Buyback Capacity: about 320MW consisting of 2 steam units. Total Capital Investment Forecasting: more than 352 million Euro Return of capital period (year): Up to 2 years Net Present Value (NPV) - million Rials: International Rate of Return (IRR) %: 12 percent

Investment Opportunities in the Utilities Industry

Page 93: Power Projects · 2- Power plants increase e fficiency 2.3- Hafez Power Plant Project Location (site) & Images: 16th kilometer of Shiraz-Fasa Rd , Fars Province , Islamic Republic

Investment Opportunities in the Utilities Industry 167

Page 94: Power Projects · 2- Power plants increase e fficiency 2.3- Hafez Power Plant Project Location (site) & Images: 16th kilometer of Shiraz-Fasa Rd , Fars Province , Islamic Republic
Page 95: Power Projects · 2- Power plants increase e fficiency 2.3- Hafez Power Plant Project Location (site) & Images: 16th kilometer of Shiraz-Fasa Rd , Fars Province , Islamic Republic

2.18- Repowering Projects

Page 96: Power Projects · 2- Power plants increase e fficiency 2.3- Hafez Power Plant Project Location (site) & Images: 16th kilometer of Shiraz-Fasa Rd , Fars Province , Islamic Republic

170

Recent condition

246 804 162 804 648 582

Recent condition

Loshan 2 Bandar abbas 2

Tabriz 1 Montazeri 4

Montazer ghaem 1 Total

Isfahan 1 120 767 Hamedan 2 500 3197

Besat 1 75 480 Rajaee 2 500 3197

Tos 2 300 1918 Bistoon 1 320 2046

34 2 123 37.5 4 201 31 1 162

37.5 4 201 36.7 4 162 39 2 291

2 240 1535 2 640 3479 1 350 2238 4 800 5116 1 150 959 19 3995 24933

34 4 35 4 38 2

123 291 291 201 162

-

492 1164 582 1608 324 7416

5116 35.6 8 36 2 - 37

2.18- Repowering Projects Investment Opportunities in the Utilities Industry

Page 97: Power Projects · 2- Power plants increase e fficiency 2.3- Hafez Power Plant Project Location (site) & Images: 16th kilometer of Shiraz-Fasa Rd , Fars Province , Islamic Republic

1755 6254 1137 6254 4547 4326

48.2 516 364 152 133 342 51.4 1668 1217 451 437 1015 49.8 367 228 138 88 311 51.4 1668 1217 451 432 1015 49.8 1239 913 326 352 733 54.6 1109 792 317 316 713

3668 48.2 1079 761 318 267 715 9397 54.6 2685 1721 964 633 2168 4470 54.6 1176 819 358 316 805 11549 51.4 3244 2247 997 874 2244 2273 49.8 631 456 175 176 394 55630 51.8 15382 10735 4647 4034 10455

After Recovery

After Recovery

Investment Opportunities in the Utilities Industry 171

Page 98: Power Projects · 2- Power plants increase e fficiency 2.3- Hafez Power Plant Project Location (site) & Images: 16th kilometer of Shiraz-Fasa Rd , Fars Province , Islamic Republic

172

3- High efficiency combined cycle power plants development

General Information

Foreign Investment Promotion and Protection Act (FIPPA): Foreign Investment Promotion and Protection Act (FIPPA): • No restriction on the percentage of foreign shareholding. • The volume of foreign investment in each individual case shall not be subject the any limitation. • (and 4) – repatriation of principal capital and pro ts is permissible. • No restriction of the kind of acceptable investment. • Facilitation of foreign investors entrance and residency. • Coverage of non-commercial risks. • Shortening the admission process and issuance of foreign investment license. • Admittance of foreign governmental companies. • Compensation of losses caused by expropriation and nationalization. • Possibility of investment by Iranian investors using foreign originated capital

Investment Opportunities in the Utilities Industry

Page 99: Power Projects · 2- Power plants increase e fficiency 2.3- Hafez Power Plant Project Location (site) & Images: 16th kilometer of Shiraz-Fasa Rd , Fars Province , Islamic Republic

, instead of foreigners. • Possibility of referring disputes international arbitration. • Foreign investors , (who have already invested in Iran, may bene t from “FIPPA” coverage for the principal investment already made.

Other facilities •Taxes (duties) exemption .

o Up the 80% for 4 years. o (In less developed areas) 100% for 10 years. o Exporting 100% without limitations .

Investment Opportunities in the Utilities Industry 173

Page 100: Power Projects · 2- Power plants increase e fficiency 2.3- Hafez Power Plant Project Location (site) & Images: 16th kilometer of Shiraz-Fasa Rd , Fars Province , Islamic Republic

174

3- High efficiency combined cycle power plants development

3.1- Maragheh 848 MW CCPP

Project Location (site) & Images: Maragheh, East Azarbayjan Province , Islamic Republic of Iran Type of Contract: BOT Pre - Conditions of the Contract (Productivity, Equipment, etc.): • Usage of gas Turbines Class “F” or higher models from the point ef ciency in combined cycle power plants. • Ef ciency of combined cycle power plant should be 58 percent or more.

Project Status

Present Infrastructures (Supply of land, water, electricity & gas): • Preparation of needed power plant land which performed (Costs should be paid by investor) • Preparation of water for construction

Azarbayjan

Investment Opportunities in the Utilities Industry

Page 101: Power Projects · 2- Power plants increase e fficiency 2.3- Hafez Power Plant Project Location (site) & Images: 16th kilometer of Shiraz-Fasa Rd , Fars Province , Islamic Republic

and operation periods which performed (Costs should be paid by investor) • Preparation of needed electricity for construct period which performed (Costs will be paid by government) • Preparation of gas for operation period which performed (Costs will be paid by government) Project Time Schedule (Period of Preparation, Construction & Operation): • Development period : 6 months to 1 year. • Construction period : 36 to 39 months. • Operation period : 20 years. Site Preparation: Nothing done Feasibility Study: Nothing done Position of Land Ownership: East Azarbayjan Natural Resources Of ce Legal Permissions (License of Constriction, Foreign currency guota, environmental assessment, ect.): Nothing done

Investment Opportunities in the Utilities Industry 175

Page 102: Power Projects · 2- Power plants increase e fficiency 2.3- Hafez Power Plant Project Location (site) & Images: 16th kilometer of Shiraz-Fasa Rd , Fars Province , Islamic Republic

176

Technical and Economic Specifications

Model of Investment: BOT

Capacity: about 848MW consisting of the class “F” gas unit and the relative steam unit. Total Capital Investment Forecasting: 678.4 million dollar Operational Period (year): 20 years Net Present Value (NPV) - million Rials: International Rate of Return (IRR) %: 12 percent

Investment Opportunities in the Utilities Industry

Page 103: Power Projects · 2- Power plants increase e fficiency 2.3- Hafez Power Plant Project Location (site) & Images: 16th kilometer of Shiraz-Fasa Rd , Fars Province , Islamic Republic

Investment Opportunities in the Utilities Industry 177

Page 104: Power Projects · 2- Power plants increase e fficiency 2.3- Hafez Power Plant Project Location (site) & Images: 16th kilometer of Shiraz-Fasa Rd , Fars Province , Islamic Republic

178

3- High efficiency combined cycle power plants development

3.2- Miyaneh 848 MW CCPP

Project Location (site) & Images: Miyaneh, East Azarbayjan Province , Islamic Republic of Iran Type of Contract: BOT Pre - Conditions of the Contract (Productivity, Equipment, etc.): • Usage of gas Turbines Class “F” or higher models from the point ef ciency in combined cycle power plants. • Ef ciency of combined cycle power plant should be 58 percent or more.

Project Status

Present Infrastructures (Supply of land, water, electricity & gas): • Preparation of needed power plant land which performed (Costs should be paid by investor)

Azarbayjan

Investment Opportunities in the Utilities Industry

Page 105: Power Projects · 2- Power plants increase e fficiency 2.3- Hafez Power Plant Project Location (site) & Images: 16th kilometer of Shiraz-Fasa Rd , Fars Province , Islamic Republic

• Preparation of water for construction and operation periods which per- formed (Costs should be paid by investor) • Preparation of needed electricity for construct period which performed (Costs will be paid by government) • Preparation of gas for operation period which performed (Costs will be paid by government) Project Time Schedule (Period of Preparation, Construction & Operation): • Development period : 6 months to 1 year. • Construction period : 36 to 39 months. • Operation period : 20 years. Site Preparation: Nothing done Feasibility Study: Nothing done Position of Land Ownership: East Azarbayjan Natural Resources Of ce Legal Permissions (License of Constriction, Foreign currency guota, environmental assessment, ect.): Nothing done

Investment Opportunities in the Utilities Industry 179

Page 106: Power Projects · 2- Power plants increase e fficiency 2.3- Hafez Power Plant Project Location (site) & Images: 16th kilometer of Shiraz-Fasa Rd , Fars Province , Islamic Republic

180

Technical and Economic Specifications

Model of Investment: BOT Capacity: about 848MW consisting of the class “F” gas unit and the relative steam unit. Total Capital Investment Forecasting: 678.4 million dollar Operational Period (year): 20 years Net Present Value (NPV) - million Rials: International Rate of Return (IRR) %: 12 percent

Investment Opportunities in the Utilities Industry

Page 107: Power Projects · 2- Power plants increase e fficiency 2.3- Hafez Power Plant Project Location (site) & Images: 16th kilometer of Shiraz-Fasa Rd , Fars Province , Islamic Republic

Investment Opportunities in the Utilities Industry 181

Page 108: Power Projects · 2- Power plants increase e fficiency 2.3- Hafez Power Plant Project Location (site) & Images: 16th kilometer of Shiraz-Fasa Rd , Fars Province , Islamic Republic

182

3- High efficiency combined cycle power plants development

3.3- Omidiyeh 848 MW CCPP

Project Location (site) & Images: Omidiyeh-Mahshahr Road, khuzestan Province , Islamic Republic of Iran Type of Contract: BOT Pre - Conditions of the Contract (Productivity, Equipment, etc.): • Usage of gas Turbines Class “F” or higher models from the point ef ciency in combined cycle power plants. • Ef ciency of combined cycle power plant should be 58 percent or more.

Project Status

Present Infrastructures (Supply of land, water, electricity & gas): • Preparation of needed power plant land which performed (Costs should be paid by investor) • Preparation of water for construction

Bakhtar

Investment Opportunities in the Utilities Industry

Page 109: Power Projects · 2- Power plants increase e fficiency 2.3- Hafez Power Plant Project Location (site) & Images: 16th kilometer of Shiraz-Fasa Rd , Fars Province , Islamic Republic

and operation periods which performed (Costs should be paid by investor) • Preparation of needed electricity for construct period which performed (Costs will be paid by government) • Preparation of gas for operation period which performed (Costs will be paid by government) Project Time Schedule (Period of Preparation, Construction & Operation): • Development period : 6 months to 1 year. • Construction period : 36 to 39 months. • Operation period : 20 years. Site Preparation: Nothing done Feasibility Study: Carry out feasibility and network studies Position of Land Ownership: Khouzestan regional electric company Legal Permissions (License of Constriction, Foreign currency guota, environmental assessment, ect.): • Obtain the required environmental permit, well permit for water, electricity permit and gas permit.

Investment Opportunities in the Utilities Industry 183

Page 110: Power Projects · 2- Power plants increase e fficiency 2.3- Hafez Power Plant Project Location (site) & Images: 16th kilometer of Shiraz-Fasa Rd , Fars Province , Islamic Republic

184

Technical and Economic Specifications

Model of Investment: BOT

Capacity: about 848MW consisting of the class “F” gas unit and the relative steam unit.

Total Capital Investment Forecasting: 678.4 million dollar Operational Period (year): 20 years Net Present Value (NPV) - million Rials: International Rate of Return (IRR) %: 12 percent

Investment Opportunities in the Utilities Industry

Page 111: Power Projects · 2- Power plants increase e fficiency 2.3- Hafez Power Plant Project Location (site) & Images: 16th kilometer of Shiraz-Fasa Rd , Fars Province , Islamic Republic

Investment Opportunities in the Utilities Industry 185

Page 112: Power Projects · 2- Power plants increase e fficiency 2.3- Hafez Power Plant Project Location (site) & Images: 16th kilometer of Shiraz-Fasa Rd , Fars Province , Islamic Republic

186

3- High efficiency combined cycle power plants development

3.4- Fars North 848 MW CCPP

Name of Project: Combined Cycle Power Plant Project Location (site) & Images: MarvDasht-Arsanjan Road, Fars Province , Islamic Republic of Iran Type of Contract: BOT Pre - Conditions of the Contract (Productivity, Equipment, etc.): • Usage of gas Turbines Class “F” or higher models from the point ef ciency in combined cycle power plants. • Ef ciency of combined cycle power plant should be 58 percent or more.

Project Status

Present Infrastructures (Supply of land, water, electricity & gas): • Preparation of needed power plant land

Fars

Investment Opportunities in the Utilities Industry

Page 113: Power Projects · 2- Power plants increase e fficiency 2.3- Hafez Power Plant Project Location (site) & Images: 16th kilometer of Shiraz-Fasa Rd , Fars Province , Islamic Republic

which performed (Costs should be paid by investor) • Preparation of water for construction and operation periods which performed (Costs should be paid by investor) • Preparation of needed electricity for construct period which performed (Costs will be paid by government) • Preparation of gas for operation period which performed (Costs will be paid by govern- ment) Project Time Schedule (Period of Preparation, Construction & Operation): • Development period : 6 months to 1 year. • Construction period : 36 to 39 months. • Operation period : 20 years. Site Preparation: Nothing done Feasibility Study: Nothing done Position of Land Ownership: Fars Natural Resources Of ce Legal Permissions (License of Constriction, Foreign currency guota, environmental assessment, ect.): Nothing done

Investment Opportunities in the Utilities Industry 187

Page 114: Power Projects · 2- Power plants increase e fficiency 2.3- Hafez Power Plant Project Location (site) & Images: 16th kilometer of Shiraz-Fasa Rd , Fars Province , Islamic Republic

188

Technical and Economic Specifications

Model of Investment: BOT Capacity: about 848MW consisting of the class “F” gas unit and the relative steam unit. Total Capital Investment Forecasting: 678.4 million dollar Operational Period (year): 20 years Net Present Value (NPV) - million Rials: International Rate of Return (IRR) %: 12 percent

Investment Opportunities in the Utilities Industry

Page 115: Power Projects · 2- Power plants increase e fficiency 2.3- Hafez Power Plant Project Location (site) & Images: 16th kilometer of Shiraz-Fasa Rd , Fars Province , Islamic Republic

Investment Opportunities in the Utilities Industry 189

Page 116: Power Projects · 2- Power plants increase e fficiency 2.3- Hafez Power Plant Project Location (site) & Images: 16th kilometer of Shiraz-Fasa Rd , Fars Province , Islamic Republic

• Ef ciency of combined cycle power plant should be 58 percent or more.

190

3- High efficiency combined cycle power plants development

3.5- Tabriz 848 MW CCPP

Name of Project: Combined Cycle Power Plant Project Location (site) & Images: Tabriz, East Azarbayjan Province , Islamic Republic of Iran Type of Contract:BOT Pre - Conditions of the Contract (Productivity, Equipment, etc.): • Usage of gas Turbines Class “F” or higher models from the point ef ciency in combined cycle power plants.

Azarbayjan

Project Status

Present Infrastructures (Supply of land, water, electricity & gas): • Preparation of needed power plant land

Investment Opportunities in the Utilities Industry

Page 117: Power Projects · 2- Power plants increase e fficiency 2.3- Hafez Power Plant Project Location (site) & Images: 16th kilometer of Shiraz-Fasa Rd , Fars Province , Islamic Republic

which performed (Costs should be paid by investor) • Preparation of water for construction and operation periods which performed (Costs should be paid by investor) • Preparation of needed electricity for construct period which performed (Costs will be paid by government) • Preparation of gas for operation period which performed (Costs will be paid by government) Project Time Schedule (Period of Preparation, Construction & Operation): • Development period : 6 months to 1 year. • Construction period : 36 to 39 months. • Operation period : 20 years. Site Preparation: Nothing done Feasibility Study: Nothing done Position of Land Ownership: East Azarbayjan Natural Resources Of ce Legal Permissions (License of Constriction, Foreign currency guota, environmental assessment, ect.): Nothing done

Investment Opportunities in the Utilities Industry 191

Page 118: Power Projects · 2- Power plants increase e fficiency 2.3- Hafez Power Plant Project Location (site) & Images: 16th kilometer of Shiraz-Fasa Rd , Fars Province , Islamic Republic

192

Technical and Economic Specifications

Model of Investment: BOT Capacity: about 848MW consisting of the class “F” gas unit and the relative steam unit. Total Capital Investment Forecasting: 678.4 million dollar Operational Period (year): 20 years

Net Present Value (NPV) - million Rials: International Rate of Return (IRR) %: 12 percent

Investment Opportunities in the Utilities Industry

Page 119: Power Projects · 2- Power plants increase e fficiency 2.3- Hafez Power Plant Project Location (site) & Images: 16th kilometer of Shiraz-Fasa Rd , Fars Province , Islamic Republic

Investment Opportunities in the Utilities Industry 193

Page 120: Power Projects · 2- Power plants increase e fficiency 2.3- Hafez Power Plant Project Location (site) & Images: 16th kilometer of Shiraz-Fasa Rd , Fars Province , Islamic Republic

194

3- High efficiency combined cycle power plants development

3.6- Zahedan 848 MW CCPP

Project Location (site) & Images: Zahedan-Zabol Road, Sistan and Balouchestsn Province , Islamic Republic of Iran Type of Contract: BOT Pre - Conditions of the Contract (Productivity, Equipment, etc.): • Usage of gas Turbines Class “F” or higher models from the point ef ciency in combined cycle power plants. • Ef ciency of combined cycle power plant should be 58 percent or more.

Project Status

Present Infrastructures (Supply of land, water, electricity & gas): • Preparation of needed power plant land which performed (Costs should be paid by investor)

Sistan& Baluchestan

Investment Opportunities in the Utilities Industry

Page 121: Power Projects · 2- Power plants increase e fficiency 2.3- Hafez Power Plant Project Location (site) & Images: 16th kilometer of Shiraz-Fasa Rd , Fars Province , Islamic Republic

• Preparation of water for construction and operation periods which performed (Costs should be paid by investor) • Preparation of needed electricity for construct period which performed (Costs will be paid by government) • Preparation of gas for operation period which performed (Costs will be paid by government) Project Time Schedule (Period of Preparation, Construction & Operation): • Development period : 6 months to 1 year. • Construction period : 36 to 39 months. • Operation period : 20 years. Site Preparation: Nothing done Feasibility Study: Nothing done Position of Land Ownership: Sistan Natural Resources Of ce Legal Permissions (License of Constriction, Foreign currency guota, environmental assessment, ect.): Nothing done

Investment Opportunities in the Utilities Industry 195

Page 122: Power Projects · 2- Power plants increase e fficiency 2.3- Hafez Power Plant Project Location (site) & Images: 16th kilometer of Shiraz-Fasa Rd , Fars Province , Islamic Republic

196

Technical and Economic Specifications

Model of Investment: BOT Capacity: about 848MW consisting of the class “F” gas unit and the relative steam unit. Total Capital Investment Forecasting: 678.4 million dollar Operational Period (year): 20 years Net Present Value (NPV) - million Rials: International Rate of Return (IRR) %: 12 percent

Investment Opportunities in the Utilities Industry

Page 123: Power Projects · 2- Power plants increase e fficiency 2.3- Hafez Power Plant Project Location (site) & Images: 16th kilometer of Shiraz-Fasa Rd , Fars Province , Islamic Republic

Investment Opportunities in the Utilities Industry 197

Page 124: Power Projects · 2- Power plants increase e fficiency 2.3- Hafez Power Plant Project Location (site) & Images: 16th kilometer of Shiraz-Fasa Rd , Fars Province , Islamic Republic

198

3- High efficiency combined cycle power plants development

3.7- Zanjan 500 MW CCPP

Project Location (site) & Images: Sorkhe Dizaj Village, 25th kilometer of Qazvin-Zanjan Highway , Zanjan Prov- ince , Islamic Republic of Iran Type of Contract: BOT Pre - Conditions of the Contract (Productivity, Equipment, etc.): • Usage of gas Turbines Class “F” or higher models from the point ef ciency in combined cycle power plants. • Ef ciency of combined cycle power plant should be 58 percent or more.

Project Status

Present Infrastructures (Supply of land, water, electricity & gas): • Preparation of needed power

plant land which performed (Costs should be paid by investor)

Sistan& Baluchestan

Investment Opportunities in the Utilities Industry

Page 125: Power Projects · 2- Power plants increase e fficiency 2.3- Hafez Power Plant Project Location (site) & Images: 16th kilometer of Shiraz-Fasa Rd , Fars Province , Islamic Republic

• Preparation of water for construction and operation periods which per- formed (Costs should be paid by investor) • Preparation of needed electricity for construct period which performed (Costs will be paid by government) • Preparation of gas for operation period which performed (Costs will be paid by government) • The distance (intervals) from the 400KW electricity transmission line, 3 kilo- meters. • The distance (intervals) from the 230KW electricity transmission line, 2 kilo- meters. Project Time Schedule (Period of Preparation, Construction & Operation): • Development period : 6 months to 1 year. • Construction period : 36 to 39 months. • Operation period : 20 years. Site Preparation: • Prepare topographic maps of the site and carry out studies related to the access road to ghazwin _zanjan freeway. • Construction of site perimeter wall and provide necessary power supply for the construction phase of the power plant. • Complete well digging and install relating equipments. • Construct necessary levee and access road. Feasibility Study: • Carry out environmental, geotechnical and hydrological studies • Prepare and approve sight plan and SLD Position of Land Ownership: Zanjan regional electric company Legal Permissions (License of Constriction, Foreign currency guota, environmental assessment, ect.): • Obtain necessary permit for digging a deep water well with a depth of 130 m and maximum output of 28.5 litr/s • Obtain the required environmental permit, well permit for water, electricity permit and gas permit.

Investment Opportunities in the Utilities Industry 199

Page 126: Power Projects · 2- Power plants increase e fficiency 2.3- Hafez Power Plant Project Location (site) & Images: 16th kilometer of Shiraz-Fasa Rd , Fars Province , Islamic Republic

200

Technical and Economic Specifications

Model of Investment: BOT Capacity: about 500MW consisting of the class “F” gas unit and the relative steam unit. Total Capital Investment Forecasting:

more than 250 million Euro Operational Period (year): 20 years Net Present Value (NPV) - million Rials: International Rate of Return (IRR) %: 12 percent

Investment Opportunities in the Utilities Industry

Page 127: Power Projects · 2- Power plants increase e fficiency 2.3- Hafez Power Plant Project Location (site) & Images: 16th kilometer of Shiraz-Fasa Rd , Fars Province , Islamic Republic

Investment Opportunities in the Utilities Industry 201

Page 128: Power Projects · 2- Power plants increase e fficiency 2.3- Hafez Power Plant Project Location (site) & Images: 16th kilometer of Shiraz-Fasa Rd , Fars Province , Islamic Republic

202

4. Development of Small Scale DG & CHP

PROVINCE

EAST & WEST AZARBAHJAN,ARDABIL

ISFAHAN-CHMAHARBAKHTIARI

LORESTAN-HAMADAN-CENTER

TAHRAN-ALBURZ0QOM

NORTH,SOUTH&RAZAVI KHORASAN

KHOOZESTAN-KOHGULIYEH&BOYER AHMAD

ZANJAN-GAZVIN

SEMNAN

SISTAN - BALUCHESTAN

KERMANSHAH-KORDESTAN-ILAM

FARS-BOOSHEHR

KERMAN

GILAN

MAZANDARAN-GOLESTAN

HORMOZGAN

YAZD

ROW REGIONAL STATION

1 AZARBAIJAN

2 ISFAHAN

3 BAKHTAR

4 TEHRAN

5 KHORASAN

6 KHOZESTAN

7 ZANJAN

8 SEMNAN

9 SISTAN-BALUCHESTAN

10 WEST

11 FARS

12 KERMAN

13 GILAN

14 MAZANDARAN

15 HORMOZGAN

16 YAZD

SUM

Investment Opportunities in the Utilities Industry

Page 129: Power Projects · 2- Power plants increase e fficiency 2.3- Hafez Power Plant Project Location (site) & Images: 16th kilometer of Shiraz-Fasa Rd , Fars Province , Islamic Republic

NO & TOTAL AMOUNT( $ MILLION)CAPACITY TOTAL CAPACITY(MW)

8*25 200 132

8*25 200 132

8*25 200 132

12*25 300 198

6*25 150 99

6*25 150 99

8*25 200 132

4*25 100 66

4*25 100 66

8*25 200 132

8*25 200 132

8*25 200 132

6*25 150 99

10*25 250 165

8*25 200 132

8*25 200 132

120*25 3000 1980

Investment Opportunities in the Utilities Industry 203

Page 130: Power Projects · 2- Power plants increase e fficiency 2.3- Hafez Power Plant Project Location (site) & Images: 16th kilometer of Shiraz-Fasa Rd , Fars Province , Islamic Republic

204

5. Renewable power plants Projects

ROW RENEWABLE PROVINCE/AREA

YAZD ISFAHAN

FARS KERMAN

1 SISTAN-BALUCHESTAN

QOM-CENTER

SEMNAN KHORASAN

TOTAL/SOLAR PROJECTS

RAZAVI KHORASAN-KHAF

WIND SISTAN-BALUCHESTAN

QAZVIN-TAKESTAN EAST AZERBAILAN

TOTAL/WIND PROJECTS

3 GEOTHERMAL PROJECTS ARDABIL-MESHKIN SHAHR

4 BIOMASS PROJECTS

5

SUM

PHOTOVOLTAIC

2

SMALL HYDROPOWER PROJECTS SOUTH & NORTH

Investment Opportunities in the Utilities Industry

Page 131: Power Projects · 2- Power plants increase e fficiency 2.3- Hafez Power Plant Project Location (site) & Images: 16th kilometer of Shiraz-Fasa Rd , Fars Province , Islamic Republic

CAPACITY(MW) LAND/HEC REQUIRES AMOUNT (USD MILLION)

50 100 100

750 6000 1300

650 5200 1150

ACCORDING TO REQUEST

50 175

-- - 125

3000 5775

100 200 200 100 200 200 100 200 200 100 200 200

50 100 100 50 100 100 50 100 100 600 1200

500 4000 875 250 2000 450 2150 17500

100 500

Investment Opportunities in the Utilities Industry 205

Page 132: Power Projects · 2- Power plants increase e fficiency 2.3- Hafez Power Plant Project Location (site) & Images: 16th kilometer of Shiraz-Fasa Rd , Fars Province , Islamic Republic

206

5.1- Solar photovoltaic power projects

Project Pro le for foreign Investment

Name of Project

Project Location (site)& images

Introduction to Project

project Status

Technical and Economic Speci - cations

General Information

Type of Contract

Pre - Conditions of the Contract ( Productivity; (Equipment; etc

present infrastructures (Supply of land; water; elec- (tricity& gas

project Time Schedule ( period of Preparation ; (Construction & Operation

Site Preparation

Feasibility Study

position of Land ownership

Legal Permissions (License of constriction; foreign .(currency quota; environmental assessment ;etc

Model of Investment

Capacity

Total Capital investment Forecasting

(Operational Period (year

(million Rails- Net present Value (NPV

%(International Rate of Return (IRR

Foreign Investment Promotion and Protection Act ((FIPPA

Other facilities

Site Map

Name of Company ( Address; Tel & Fax ; Email ; (website

Investment Opportunities in the Utilities Industry

Page 133: Power Projects · 2- Power plants increase e fficiency 2.3- Hafez Power Plant Project Location (site) & Images: 16th kilometer of Shiraz-Fasa Rd , Fars Province , Islamic Republic

is available for some projects

private sector - using foreign nance

about 400 MW

$ total investment about 800 million

years 20

-

-

will be obtained

-

is available in our brochure

private companies which names are attached to our brochure

(Solar Photovoltaic Power Plants (including 34 Power Plants

Yazd - South & Razavi Khorasan - Fars - Isfehan - Qom- Alborz- Sistan & Balouches- .tan- Tehran- Semnan- Hormozgan

Guaranteed Electricity Purchase

Obtaining Environmental, Grid connection and Land Licenses

PPA period is 20 years ( including 18 months for Development and Construction peri- (od

most of the projects are in process of obtaining licenses

has been done in some of the projects

has been done in some of the projects

in some projects, all legal licenses have been obtained

Investment Opportunities in the Utilities Industry 207

Page 134: Power Projects · 2- Power plants increase e fficiency 2.3- Hafez Power Plant Project Location (site) & Images: 16th kilometer of Shiraz-Fasa Rd , Fars Province , Islamic Republic

208

5.2- Wind Power Projects

Project Pro le for foreign Investment

Name of Project Project Location (site)& images

Type of Contract

(Pre - Conditions of the Contract ( Productivity; Equipment; etc

(present infrastructures (Supply of land; water; electricity& gas

project Status

Technical and Economic Speci cations

General Information

Introduction to Project

(project Time Schedule ( period of Preparation ; Construction & Operation

Site Preparation

Feasibility Study

position of Land ownership

Legal Permissions (License of constriction; foreign currency quota; environ- .(mental assessment ;etc

Model of Investment

Capacity

Total Capital investment Forecasting

(Operational Period (year

(million Rails- Net present Value (NPV

%(International Rate of Return (IRR

(Foreign Investment Promotion and Protection Act (FIPPA

Other facilities

Site Map

(Name of Company ( Address; Tel & Fax ; Email ; website

Investment Opportunities in the Utilities Industry

Page 135: Power Projects · 2- Power plants increase e fficiency 2.3- Hafez Power Plant Project Location (site) & Images: 16th kilometer of Shiraz-Fasa Rd , Fars Province , Islamic Republic

(Wind Power Plants (including 32 Power Plants

Khaaf - Qazvin - Zabol - Ahar - Manjil & Binaloud areas

Guaranteed Electricity Purchase

Obtaining Environmental, Grid connection and Land Licenses

is available for some projects

(PPA period is 20 years ( including 18 months for Development and Construction period

most of the projects are in process of obtaining licenses

has been done in some of the projects

has been done in some of the projects

in some projects, all legal licenses have been obtained

private sector - using foreign nance

about 2514 MW

$ about 4500 million

years 20

-

-

will be obtained

-

is available in our brochure

private companies which names are attached to our brochure

Investment Opportunities in the Utilities Industry 209

Page 136: Power Projects · 2- Power plants increase e fficiency 2.3- Hafez Power Plant Project Location (site) & Images: 16th kilometer of Shiraz-Fasa Rd , Fars Province , Islamic Republic

210

5.3- Bio-mass power Plants Projects

Project Pro le for foreign Investment

Name of Project Project Location (site)& images

Introduction to Project

project Status

Technical and Economic Speci -

cations

General Informa- tion

Type of Contract

Pre - Conditions of the Contract ( Productivity; Equipment; etc)

present infrastructures (Supply of land; water; electricity& gas)

project Time Schedule ( period of Preparation ; Construction & Opera- tion)

Site Preparation

Feasibility Study

position of Land ownership

Legal Permissions (License of constriction; foreign currency quota; environmental assessment ;etc).

Model of Investment

Capacity

Total Capital investment Forecasting

Operational Period (year)

million Rails- Net present Value (NPV)

International Rate of Return (IRR)% Foreign Investment Promotion and Protection Act (FIPPA)

Other facilities

Site Map

Name of Company ( Address; Tel & Fax ; Email ; website)

Investment Opportunities in the Utilities Industry

Page 137: Power Projects · 2- Power plants increase e fficiency 2.3- Hafez Power Plant Project Location (site) & Images: 16th kilometer of Shiraz-Fasa Rd , Fars Province , Islamic Republic

most of the projects are in process of obtaining licenses

has been done in some of the projects

has been done in some of the projects

in some projects, all legal licenses have been obtained

private sector - using foreign nance

about 75 MW

total investment about 265 million $

20 years

-

- will be obtained

-

is available in our brochure

private companies which names are attached to our brochure

Bio-mass Power Plants (including 19 Power Plants) Golestan- East & West Azerbaijan- Semnan- Gilan- Isfahan- Fars- Tehran-

Kordestan- Kermanshah- Khuzestan- Sistan & Balouchestan- Markazi- Ardabil- Qom- Qazvin. Guaranteed Electricity Purchase

Obtaining Environmental, Grid connection and Land Licenses

is available for some projects

PPA period is 20 years ( including 18 months for Development and Construction period)

Investment Opportunities in the Utilities Industry 211