Potential AWWU Land Acquisition. Presentation by Anchorage Water and Wastewater Utility 1/13/2011 Brian Baus, Planning and Development Services Manager Paul Hatcher, Real Estate Coordinator. Today’s intent is to engage stakeholders concerning a potential AWWU land acquisition. - PowerPoint PPT Presentation

TRANSCRIPT

  • Potential AWWU Land AcquisitionPresentation byAnchorage Water and Wastewater Utility1/13/2011

    Brian Baus, Planning and Development Services ManagerPaul Hatcher, Real Estate Coordinator

  • Todays intent is to engage stakeholders concerning a potential AWWU land acquisition

    Tract B, Legacy Pointe SubdivisionPortion of site (~2 to 3 acres)Potential future reservoir site

    Presentation ContentSpecifics of Tract BAWWU interest in Tract BCurrent status of acquisitionPath forwardDiscussion

  • Tract B is located in South Anchorage

    ~1.5 miles South of the Rabbit Creek/Golden View Intersection

    Moen Park

    Moen Trail

    Proposed Legacy Pointe Development

  • Regulatory oversight of Tract B is consistent with the Hillside Hillside District Plan

    Regulatory Commission of Alaska service areas

    Political DistrictsAssembly Seats J and K (Jennifer Johnston & Chris Birch)Senate District P (Cathy Giessel)House District 32 (Mike Hawker)

    Rabbit Creek Community Council

  • Planning has identified a need for future water storage on the hillside2005 Anchorage Water Master Plan~ 2 Million Gallons (MG) by 2014920 HGLBased on projected population growth Shortages experienced prior to 2010 2009 Goldenview Reservoir Design Study Report (GRDSR)Did not find the perfect siteIdentified a portion of Tract B as a desirable siteRecommended phased approach to increase water storage

  • AWWU has implemented recommendations of the GRDSR

    Constructed 1MG ReservoirSouth Anchorage Middle School (SAMS) Reservoir Site Minimized present hillside water shortages

    Plan for Future reservoirRequire site (920HGL)~1 MGD Future project based on area specific need

  • MOA-HLB owns Tract B of the Legacy Pointe subdivision

    HLB Acquisition in 2005Previous Owner Forrest Heights LLCPossible Elementary School Site

    HLB interests in Tract B have changedNo longer potential ASD sitePossible property disposal

  • AWWU and MOA-HLB are currently discussing a land transfer

    Future reservoir site

    Precursors to discussionGRDSR identification of portion Tract BChange in HLB perceived land use

    Acquisition is yet to be determined

  • AWWU is currently investigating the viability of a land transfer

    Established acquisition project

    Received appraisal

    Started site investigation

    Seeking input from stakeholders

  • A number of steps still exists if Tract B is to be transferred

    Continued stakeholder inputFinish site investigationReceive new appraisalAWWU/HLB negotiationsReceive regulatory approvalDevelop/execute sales agreementRe-plat property

  • AWWU development of Tract B is undefinedNo project exist in Capital Improvement Program (CIP)

    Precursors to AWWU developmentEstablishment of demandConstruction of additional infrastructure

    Development will be through future projectStudy Design Construction

    Potential to relinquishment land exists

  • Stakeholder input is important to AWWU

    Site specific information

    Area specific information

    Public opinion

  • Discussion?