Post Point Wastewater Treatment Plant Improvements
Project Overview
October 2010
![Page 2: Post Point Wastewater Treatment Plant Improvements](https://reader034.vdocuments.us/reader034/viewer/2022042305/625b16d51400ad00bb7e46f9/html5/thumbnails/2.jpg)
Filename.ppt
Post Point WWTP Project Site
![Page 3: Post Point Wastewater Treatment Plant Improvements](https://reader034.vdocuments.us/reader034/viewer/2022042305/625b16d51400ad00bb7e46f9/html5/thumbnails/3.jpg)
Projected BOD Loading
20,000
25,000
30,000
35,000
40,000
45,000
1998 2003 2008 2013 2018 2023 2028 2033 2038
Plan
t Influen
t BOD Lo
ad (lb/d)
Comp PlanReduced GrowthReduced Growth+Aggressive ReductionHistorical Max 30‐Day Avg
Estimated Phase 1Completion (Year 2014)
Current WWTPCapacity
![Page 4: Post Point Wastewater Treatment Plant Improvements](https://reader034.vdocuments.us/reader034/viewer/2022042305/625b16d51400ad00bb7e46f9/html5/thumbnails/4.jpg)
Average Monthly BOD Loading
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
J M M J S N J M M J S N J M M J S N J M M J S N J M M J S
% of R
ated
Cap
acity
2006 2007 2008 2009 2010
![Page 5: Post Point Wastewater Treatment Plant Improvements](https://reader034.vdocuments.us/reader034/viewer/2022042305/625b16d51400ad00bb7e46f9/html5/thumbnails/5.jpg)
Average Monthly Flow1998-2010
0
2
4
6
8
10
12
14
16
18
20
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Average Mon
thly Plant Flow (m
gd)
![Page 6: Post Point Wastewater Treatment Plant Improvements](https://reader034.vdocuments.us/reader034/viewer/2022042305/625b16d51400ad00bb7e46f9/html5/thumbnails/6.jpg)
Basis of DesignParameter Current NPDES
PermitDesign
Design Year --- 2034
Design FlowAverage AnnualMaximum MonthPeak Hour (plant)Blending allowed for peak flowPeak Hour (secondary)
---20 mgd72 mgd
Yes37 mgd
21.7 mgd34.3 mgd72 mgd
Yes40 mgd
Maximum Month Influent BOD 25,530 lb/d 39,800 lb/d
Maximum Month Influent TSS 47,000 lb/d 47,000 lb/d
Temperature Range --- 12-22.5 oC
Effluent BOD 30 mg/L 30 mg/L
Effluent TSS 30 mg/L 30 mg/L
![Page 7: Post Point Wastewater Treatment Plant Improvements](https://reader034.vdocuments.us/reader034/viewer/2022042305/625b16d51400ad00bb7e46f9/html5/thumbnails/7.jpg)
Filename.ppt
Wetlands
NeighborhoodImpacts
InterpretiveTrail Loop/Public Access
Open Space(passive recreation)
Wildlife Habitat
Poor Soils
BellinghamBay
![Page 8: Post Point Wastewater Treatment Plant Improvements](https://reader034.vdocuments.us/reader034/viewer/2022042305/625b16d51400ad00bb7e46f9/html5/thumbnails/8.jpg)
Filename.ppt
![Page 9: Post Point Wastewater Treatment Plant Improvements](https://reader034.vdocuments.us/reader034/viewer/2022042305/625b16d51400ad00bb7e46f9/html5/thumbnails/9.jpg)
Filename.ppt
CEPT Building
![Page 10: Post Point Wastewater Treatment Plant Improvements](https://reader034.vdocuments.us/reader034/viewer/2022042305/625b16d51400ad00bb7e46f9/html5/thumbnails/10.jpg)
Filename.ppt
Chemically Enhanced Primary Treatment (CEPT) Building
![Page 11: Post Point Wastewater Treatment Plant Improvements](https://reader034.vdocuments.us/reader034/viewer/2022042305/625b16d51400ad00bb7e46f9/html5/thumbnails/11.jpg)
Chemical Storage and Metering
• 2,600 sf Building• PAX, Polymer Storage• Electrical Room
![Page 12: Post Point Wastewater Treatment Plant Improvements](https://reader034.vdocuments.us/reader034/viewer/2022042305/625b16d51400ad00bb7e46f9/html5/thumbnails/12.jpg)
Filename.ppt
PEPSModifications
![Page 13: Post Point Wastewater Treatment Plant Improvements](https://reader034.vdocuments.us/reader034/viewer/2022042305/625b16d51400ad00bb7e46f9/html5/thumbnails/13.jpg)
Modifications to Primary Effluent Pump Station
Structural Addition
Pump Replacement and Electrical Modifications
![Page 14: Post Point Wastewater Treatment Plant Improvements](https://reader034.vdocuments.us/reader034/viewer/2022042305/625b16d51400ad00bb7e46f9/html5/thumbnails/14.jpg)
Filename.ppt
BlowerBuilding
Selector/ AS Basin
Modificationsto Existing ABs
![Page 15: Post Point Wastewater Treatment Plant Improvements](https://reader034.vdocuments.us/reader034/viewer/2022042305/625b16d51400ad00bb7e46f9/html5/thumbnails/15.jpg)
Filename.ppt
Selector/Activated Sludge Basin 1
Aluminum Covers
Sluice Gates
![Page 16: Post Point Wastewater Treatment Plant Improvements](https://reader034.vdocuments.us/reader034/viewer/2022042305/625b16d51400ad00bb7e46f9/html5/thumbnails/16.jpg)
Filename.ppt
Blower Building
![Page 17: Post Point Wastewater Treatment Plant Improvements](https://reader034.vdocuments.us/reader034/viewer/2022042305/625b16d51400ad00bb7e46f9/html5/thumbnails/17.jpg)
Filename.ppt
Oxygen Supply and Standby Power
• 5,800 sf Building• Blower Room• Generator Room• Controls Room• Electrical Room
![Page 18: Post Point Wastewater Treatment Plant Improvements](https://reader034.vdocuments.us/reader034/viewer/2022042305/625b16d51400ad00bb7e46f9/html5/thumbnails/18.jpg)
Modifications to Existing Activated Sludge Basins
Remove SurfaceMixers
Aeration Piping
Reroute Large ML Process Piping
![Page 19: Post Point Wastewater Treatment Plant Improvements](https://reader034.vdocuments.us/reader034/viewer/2022042305/625b16d51400ad00bb7e46f9/html5/thumbnails/19.jpg)
Filename.ppt
Flow Splitter Box
Secondary Clarifier
![Page 20: Post Point Wastewater Treatment Plant Improvements](https://reader034.vdocuments.us/reader034/viewer/2022042305/625b16d51400ad00bb7e46f9/html5/thumbnails/20.jpg)
Secondary Clarifier Improvements
Pile Supports
Piping Connections
Addition to Splitter Box
RAS System Modifications
![Page 21: Post Point Wastewater Treatment Plant Improvements](https://reader034.vdocuments.us/reader034/viewer/2022042305/625b16d51400ad00bb7e46f9/html5/thumbnails/21.jpg)
Filename.ppt
Additional Basin(future)
![Page 22: Post Point Wastewater Treatment Plant Improvements](https://reader034.vdocuments.us/reader034/viewer/2022042305/625b16d51400ad00bb7e46f9/html5/thumbnails/22.jpg)
Additional Activated Sludge Basin(Likely Future Phase)
Flow Junction Box
0.84 MgalAeration Basin
![Page 23: Post Point Wastewater Treatment Plant Improvements](https://reader034.vdocuments.us/reader034/viewer/2022042305/625b16d51400ad00bb7e46f9/html5/thumbnails/23.jpg)
Filename.ppt
Secondary Clarifier
Selector/ AS Basin
BlowerBuilding
CEPT Building
PEPSModifications
Flow Splitter Box
Additional Basin(future)
![Page 24: Post Point Wastewater Treatment Plant Improvements](https://reader034.vdocuments.us/reader034/viewer/2022042305/625b16d51400ad00bb7e46f9/html5/thumbnails/24.jpg)
Filename.ppt
Yard Piping Layout
![Page 25: Post Point Wastewater Treatment Plant Improvements](https://reader034.vdocuments.us/reader034/viewer/2022042305/625b16d51400ad00bb7e46f9/html5/thumbnails/25.jpg)
Filename.ppt
Piping Between PEPS and Selector/AS Basin 1
![Page 26: Post Point Wastewater Treatment Plant Improvements](https://reader034.vdocuments.us/reader034/viewer/2022042305/625b16d51400ad00bb7e46f9/html5/thumbnails/26.jpg)
Filename.ppt
Secondary Clarifier Piping
![Page 27: Post Point Wastewater Treatment Plant Improvements](https://reader034.vdocuments.us/reader034/viewer/2022042305/625b16d51400ad00bb7e46f9/html5/thumbnails/27.jpg)
. 2008 2009 2010 2011 2012 2013 2014
PlanningPreliminary Design Detailed DesignConstructionStartup
Complete construction
Project Schedule
Notification of Selected GC/CM
Complete MACC Negotiations
Begin Pre-Construction
Phase
Begin Construction