Digital access to all sources of information continues to expand at an accelerating rate, and academic libraries are working to transform themselves in response to a generation of students entering the university having embraced online, mobile, anytime, anywhere access to information. In an academic community that increasingly values intellectual collaboration among faculty and students, and learning in and out of the classroom, the twenty-first century academic library must continually recreate itself as a place that fosters curiosity, engagement, collaboration, and lifelong learning. Typical twentieth-century capital investment cycles in academic libraries are characterized by large-scale once-a-generation investments. In the first decade of the twenty first century the drive to transform is greater than ever before, but there is less capital funding available, increasing the pressure on institutions to reduce capital investment cycle times in order to remain responsive to rapid changes in technology, pedagogy, scholarship, and user expectations. The end of any project is the start of evaluation and planning for the next. This presentation explores and discusses efforts in the Emory University Libraries to develop new ways to evaluate library spaces, services, and operations. It highlights initiatives intended to operationalize capital investment, shorten cycle times and provide incremental interventions, within a general framework of planning big and implementing small. Exit counts, occupancy rates, and peer comparisons are used to address user needs, program innovation, and facilities enhancement, with the aim of continually refreshing and renewing library spaces to enhance learning, inspire scholarship, and foster community. Presented at GaCOMO12 (as part of the GLA Academic Papers session) by Charles Forrest.TRANSCRIPT
![Page 1: Post Occupancy Evaluation in an Academic Library: Using Data to Make the Case for Continuous Improvement of Facilities](https://reader034.vdocuments.us/reader034/viewer/2022052523/5562e759d8b42ad26c8b4d63/html5/thumbnails/1.jpg)
Post occupancy evaluation in an academic library
Using data to make the case for continuous improvement of facilities
Charles Forrest Director, Library Facilities
Emory University Atlanta, Georgia
![Page 2: Post Occupancy Evaluation in an Academic Library: Using Data to Make the Case for Continuous Improvement of Facilities](https://reader034.vdocuments.us/reader034/viewer/2022052523/5562e759d8b42ad26c8b4d63/html5/thumbnails/2.jpg)
Welcoming, flexible, & state-of-the-art
• Library users have choices They vote with their feet
• Inputs and outputs support outcomes Investment + activity = experience
• Once a generation capital investment? Responsive libraries require shorter cycle times
• Plan big, implement small Keep them coming with something new!
![Page 3: Post Occupancy Evaluation in an Academic Library: Using Data to Make the Case for Continuous Improvement of Facilities](https://reader034.vdocuments.us/reader034/viewer/2022052523/5562e759d8b42ad26c8b4d63/html5/thumbnails/3.jpg)
Continuous facilities improvement
• Measuring success The customer experience
• Five Phases The capital investment cycle
• The Emory experience Exit count, group study use, hours of operation
• Continuous facilities improvement Choices, investment, outcomes
![Page 4: Post Occupancy Evaluation in an Academic Library: Using Data to Make the Case for Continuous Improvement of Facilities](https://reader034.vdocuments.us/reader034/viewer/2022052523/5562e759d8b42ad26c8b4d63/html5/thumbnails/4.jpg)
Measuring Success
Inputs
Outputs
Outcomes
Budget, staff, volumes, subscriptions Circulation, questions answered, classes taught Student learning, faculty productivity, customer satisfaction
![Page 5: Post Occupancy Evaluation in an Academic Library: Using Data to Make the Case for Continuous Improvement of Facilities](https://reader034.vdocuments.us/reader034/viewer/2022052523/5562e759d8b42ad26c8b4d63/html5/thumbnails/5.jpg)
The Experience Economy
If you focus on the activities you execute, then you’re in the service business;
if you focus on the demonstrated outcome the customer achieves, then and only then are you in the transformation business.
B. Joseph Pine II, James H. Gilmore,
The Experience Economy: Work is Theatre & Every Business a Stage (Boston: Harvard Business School Press, 1999)
![Page 6: Post Occupancy Evaluation in an Academic Library: Using Data to Make the Case for Continuous Improvement of Facilities](https://reader034.vdocuments.us/reader034/viewer/2022052523/5562e759d8b42ad26c8b4d63/html5/thumbnails/6.jpg)
The Customer Experience
CUSTOMER LIBRARY
Measures
Mode Role Mode Role
Transaction Patron Control Gatekeeper Inputs
Service Customer Connect Assistant Outputs
Experience Guest Collaborate Partner Outcomes
Useful
Helpful
Memorable
Investments
Activities
What difference
did it make?
![Page 7: Post Occupancy Evaluation in an Academic Library: Using Data to Make the Case for Continuous Improvement of Facilities](https://reader034.vdocuments.us/reader034/viewer/2022052523/5562e759d8b42ad26c8b4d63/html5/thumbnails/7.jpg)
University outcome: Recruiting
Important facilities to see during my visit
1. Facilities in my major
2. Residence halls
3. Library
4. Classrooms
5. Technology facilities
Extremely or very important facilities in the selection decision
1. Facilities in my major
2. Library
3. Sophisticated technology
4. Classrooms
5. Residence halls
APPA Center for Facilities Research 2006
![Page 8: Post Occupancy Evaluation in an Academic Library: Using Data to Make the Case for Continuous Improvement of Facilities](https://reader034.vdocuments.us/reader034/viewer/2022052523/5562e759d8b42ad26c8b4d63/html5/thumbnails/8.jpg)
Continuous facilities improvement
• Measuring success The customer experience
• Five Phases The capital investment cycle
• The Emory experience Exit count, group study use, hours of operation
• Continuous facilities improvement Choices, investment, outcomes
![Page 9: Post Occupancy Evaluation in an Academic Library: Using Data to Make the Case for Continuous Improvement of Facilities](https://reader034.vdocuments.us/reader034/viewer/2022052523/5562e759d8b42ad26c8b4d63/html5/thumbnails/9.jpg)
Continuous facilities improvement
• Measuring success The customer experience
• Five Phases The capital investment cycle
• The Emory experience Exit count, group study use, hours of operation
• Continuous facilities improvement Choices, investment, outcomes
![Page 10: Post Occupancy Evaluation in an Academic Library: Using Data to Make the Case for Continuous Improvement of Facilities](https://reader034.vdocuments.us/reader034/viewer/2022052523/5562e759d8b42ad26c8b4d63/html5/thumbnails/10.jpg)
Five Phases
1. Vision Concept, idea, problem
2. Plan Assess needs, develop program, assess feasibility
3. Design Schematic, Development, Construction Documents
4. Implement Construct, renovate
5. Occupy Move in, celebrate, evaluate (Post Occupancy)
![Page 11: Post Occupancy Evaluation in an Academic Library: Using Data to Make the Case for Continuous Improvement of Facilities](https://reader034.vdocuments.us/reader034/viewer/2022052523/5562e759d8b42ad26c8b4d63/html5/thumbnails/11.jpg)
Post Occupancy Evaluation (POE)
Post Occupancy Evaluation (POE) involves systematic evaluation of opinion about buildings in use, from the perspective of the people who use them.
POE assesses how well buildings match users' needs, and identifies ways to improve building design, performance and fitness for purpose.
http://www.postoccupancyevaluation.com/default.shtml
![Page 12: Post Occupancy Evaluation in an Academic Library: Using Data to Make the Case for Continuous Improvement of Facilities](https://reader034.vdocuments.us/reader034/viewer/2022052523/5562e759d8b42ad26c8b4d63/html5/thumbnails/12.jpg)
Post Occupancy Evaluation (POE)
POE can be used for many purposes, including fine tuning new buildings, developing new facilities and managing 'problem' buildings. Organizations also find POE valuable when establishing maintenance, replacement, purchasing or supply policies; preparing for refurbishment; or selecting accommodation for purchase or rent.
http://www.postoccupancyevaluation.com/default.shtml
![Page 13: Post Occupancy Evaluation in an Academic Library: Using Data to Make the Case for Continuous Improvement of Facilities](https://reader034.vdocuments.us/reader034/viewer/2022052523/5562e759d8b42ad26c8b4d63/html5/thumbnails/13.jpg)
Post Occupancy Evaluation (POE)
POE differs significantly from conventional surveys and market research. POE uses the direct, unmediated experiences of building users as the basis for evaluating how a building works for its intended use.
http://www.postoccupancyevaluation.com/default.shtml
![Page 14: Post Occupancy Evaluation in an Academic Library: Using Data to Make the Case for Continuous Improvement of Facilities](https://reader034.vdocuments.us/reader034/viewer/2022052523/5562e759d8b42ad26c8b4d63/html5/thumbnails/14.jpg)
Post Occupancy Evaluation (POE)
'Building users' are all people with an interest in a building:
– Staff – Managers – Customers or clients – Visitors – Owners – Design and maintenance teams, – Particular interest groups such as the disabled
http://www.postoccupancyevaluation.com/default.shtml
![Page 15: Post Occupancy Evaluation in an Academic Library: Using Data to Make the Case for Continuous Improvement of Facilities](https://reader034.vdocuments.us/reader034/viewer/2022052523/5562e759d8b42ad26c8b4d63/html5/thumbnails/15.jpg)
Five Phases
1. Vision 2 – 3 years
2. Plan 2 – 3 years
3. Design 1 – 2 years
4. Implement 1 – 2 years
5. Occupy 1 year (warranty, budget close)
![Page 16: Post Occupancy Evaluation in an Academic Library: Using Data to Make the Case for Continuous Improvement of Facilities](https://reader034.vdocuments.us/reader034/viewer/2022052523/5562e759d8b42ad26c8b4d63/html5/thumbnails/16.jpg)
0 5 10
1. Vision
2. Plan
3. Design
4. Implement
Five phases can take ten years
5. Occupy
![Page 17: Post Occupancy Evaluation in an Academic Library: Using Data to Make the Case for Continuous Improvement of Facilities](https://reader034.vdocuments.us/reader034/viewer/2022052523/5562e759d8b42ad26c8b4d63/html5/thumbnails/17.jpg)
1. Vision
2. Plan
3. Design
4. Implement
Implement = 20% Occupy = 80%
5. Occupy 5. Occupy
0 5 10
![Page 18: Post Occupancy Evaluation in an Academic Library: Using Data to Make the Case for Continuous Improvement of Facilities](https://reader034.vdocuments.us/reader034/viewer/2022052523/5562e759d8b42ad26c8b4d63/html5/thumbnails/18.jpg)
Do something!
Major capital investment once every thirty years
Satisfactory Unsatisfactory
0 10 30
5. Occupy
20
![Page 19: Post Occupancy Evaluation in an Academic Library: Using Data to Make the Case for Continuous Improvement of Facilities](https://reader034.vdocuments.us/reader034/viewer/2022052523/5562e759d8b42ad26c8b4d63/html5/thumbnails/19.jpg)
1. Vision
2. Plan
3. Design
4. Implement
Satisfactory Unsatisfactory
5. Occupy 5. Occupy
0 10 30 20
Major capital investment once every thirty years
![Page 20: Post Occupancy Evaluation in an Academic Library: Using Data to Make the Case for Continuous Improvement of Facilities](https://reader034.vdocuments.us/reader034/viewer/2022052523/5562e759d8b42ad26c8b4d63/html5/thumbnails/20.jpg)
1. Vision
2. Plan
3. Design
4. Implement
Implement = 7% Occupy = 93%
Satisfactory Unsatisfactory
5. Occupy
0 10 30 20
5. Occupy
![Page 21: Post Occupancy Evaluation in an Academic Library: Using Data to Make the Case for Continuous Improvement of Facilities](https://reader034.vdocuments.us/reader034/viewer/2022052523/5562e759d8b42ad26c8b4d63/html5/thumbnails/21.jpg)
Implement Vision
Plan Design
Occupy
Evaluate
Measure
Learn
Occupancy is evaluation
![Page 22: Post Occupancy Evaluation in an Academic Library: Using Data to Make the Case for Continuous Improvement of Facilities](https://reader034.vdocuments.us/reader034/viewer/2022052523/5562e759d8b42ad26c8b4d63/html5/thumbnails/22.jpg)
Continuous facilities improvement
• Measuring success The customer experience
• Five Phases The capital investment cycle
• The Emory experience Exit count, group study use, hours of operation
• Continuous facilities improvement Choices, investment, outcomes
![Page 23: Post Occupancy Evaluation in an Academic Library: Using Data to Make the Case for Continuous Improvement of Facilities](https://reader034.vdocuments.us/reader034/viewer/2022052523/5562e759d8b42ad26c8b4d63/html5/thumbnails/23.jpg)
Continuous facilities improvement
• Measuring success The customer experience
• Five Phases The capital investment cycle
• The Emory experience Exit count, group study use, hours of operation
• Continuous facilities improvement Choices, investment, outcomes
![Page 24: Post Occupancy Evaluation in an Academic Library: Using Data to Make the Case for Continuous Improvement of Facilities](https://reader034.vdocuments.us/reader034/viewer/2022052523/5562e759d8b42ad26c8b4d63/html5/thumbnails/24.jpg)
• Established 1836 • Private university • Enrollment 14,000
– 7,500 Undergraduate – 6,500 Graduate and Professional
• Business, Law, Medicine, Nursing, Public Health, Theology • Emory Healthcare Hospital and Clinic • Staff 23,000
– 12,000 University faculty and staff – 11,000 Emory Healthcare
Emory University
![Page 25: Post Occupancy Evaluation in an Academic Library: Using Data to Make the Case for Continuous Improvement of Facilities](https://reader034.vdocuments.us/reader034/viewer/2022052523/5562e759d8b42ad26c8b4d63/html5/thumbnails/25.jpg)
• 3.7M volumes – Business – Chemistry – Health and Life Sciences – Law – Math and Science – Music and Media – Theology
• Main Library – 1926 Candler Library – 1955 Candler renovated – 1969 Woodruff Library – 1998 Woodruff renovated
![Page 26: Post Occupancy Evaluation in an Academic Library: Using Data to Make the Case for Continuous Improvement of Facilities](https://reader034.vdocuments.us/reader034/viewer/2022052523/5562e759d8b42ad26c8b4d63/html5/thumbnails/26.jpg)
1915 Emory University
chartered in Atlanta
1926 Asa G. Candler Library first main library open
1955 Asa G. Candler Library
renovated
2003 Asa G. Candler Library
renovated
1997 Robert W. Woodruff Library
addition and renovation
Emory Main Library in the 20th century
1900 1950 2000
1969 Robert W. Woodruff Library
new main Library open
![Page 27: Post Occupancy Evaluation in an Academic Library: Using Data to Make the Case for Continuous Improvement of Facilities](https://reader034.vdocuments.us/reader034/viewer/2022052523/5562e759d8b42ad26c8b4d63/html5/thumbnails/27.jpg)
1915 Emory University
chartered in Atlanta
1926 Asa G. Candler Library first main library open
1955 Asa G. Candler Library
renovated
2003 Asa G. Candler Library
renovated
1997 Robert W. Woodruff Library
addition and renovation
Emory Main Library in the 20th century
1900 1950 2000
1969 Robert W. Woodruff Library
new main Library open
![Page 28: Post Occupancy Evaluation in an Academic Library: Using Data to Make the Case for Continuous Improvement of Facilities](https://reader034.vdocuments.us/reader034/viewer/2022052523/5562e759d8b42ad26c8b4d63/html5/thumbnails/28.jpg)
Facility use: What does the data tell us?
• Facilities improvements – Exit count – Group study use
• Facilities operations – Library schedule
![Page 29: Post Occupancy Evaluation in an Academic Library: Using Data to Make the Case for Continuous Improvement of Facilities](https://reader034.vdocuments.us/reader034/viewer/2022052523/5562e759d8b42ad26c8b4d63/html5/thumbnails/29.jpg)
Exit Count Woodruff Library
0
100,000
200,000
300,000
400,000
500,000
600,000
700,000
800,000
900,000
1,000,000
89 90 91 92 93 94 95 96 97 98 99 00 01 02 03 04 05 06 07 08 09 10 11
![Page 30: Post Occupancy Evaluation in an Academic Library: Using Data to Make the Case for Continuous Improvement of Facilities](https://reader034.vdocuments.us/reader034/viewer/2022052523/5562e759d8b42ad26c8b4d63/html5/thumbnails/30.jpg)
Woodruff Library exit count has increased in response to facilities improvements over the last 20+ years
0
100,000
200,000
300,000
400,000
500,000
600,000
700,000
800,000
900,000
1,000,000
89 90 91 92 93 94 95 96 97 98 99 00 01 02 03 04 05 06 07 08 09 10 11
![Page 31: Post Occupancy Evaluation in an Academic Library: Using Data to Make the Case for Continuous Improvement of Facilities](https://reader034.vdocuments.us/reader034/viewer/2022052523/5562e759d8b42ad26c8b4d63/html5/thumbnails/31.jpg)
Woodruff Library 1969 opened
0
100,000
200,000
300,000
400,000
500,000
600,000
700,000
800,000
900,000
1,000,000
89 90 91 92 93 94 95 96 97 98 99 00 01 02 03 04 05 06 07 08 09 10 11
1926 1955
1969
![Page 32: Post Occupancy Evaluation in an Academic Library: Using Data to Make the Case for Continuous Improvement of Facilities](https://reader034.vdocuments.us/reader034/viewer/2022052523/5562e759d8b42ad26c8b4d63/html5/thumbnails/32.jpg)
Center for Library and Information Resources 1997 opened (80% increase)
0
100,000
200,000
300,000
400,000
500,000
600,000
700,000
800,000
900,000
1,000,000
89 90 91 92 93 94 95 96 97 98 99 00 01 02 03 04 05 06 07 08 09 10 11
1926 1955
1969 1997
![Page 33: Post Occupancy Evaluation in an Academic Library: Using Data to Make the Case for Continuous Improvement of Facilities](https://reader034.vdocuments.us/reader034/viewer/2022052523/5562e759d8b42ad26c8b4d63/html5/thumbnails/33.jpg)
Candler Library renovation Renovated 2003 (exit count began to decline)
0
100,000
200,000
300,000
400,000
500,000
600,000
700,000
800,000
900,000
1,000,000
89 90 91 92 93 94 95 96 97 98 99 00 01 02 03 04 05 06 07 08 09 10 11
1926 1955 2003
1969 1997 2001
![Page 34: Post Occupancy Evaluation in an Academic Library: Using Data to Make the Case for Continuous Improvement of Facilities](https://reader034.vdocuments.us/reader034/viewer/2022052523/5562e759d8b42ad26c8b4d63/html5/thumbnails/34.jpg)
Jazzman’s on Level 1 2005 opened (exit count increased)
0
100,000
200,000
300,000
400,000
500,000
600,000
700,000
800,000
900,000
1,000,000
89 90 91 92 93 94 95 96 97 98 99 00 01 02 03 04 05 06 07 08 09 10 11
![Page 35: Post Occupancy Evaluation in an Academic Library: Using Data to Make the Case for Continuous Improvement of Facilities](https://reader034.vdocuments.us/reader034/viewer/2022052523/5562e759d8b42ad26c8b4d63/html5/thumbnails/35.jpg)
Beginning of Stack Tower floor-by-floor renovation Level 4 (2004), Level 5 (2007)
0
100,000
200,000
300,000
400,000
500,000
600,000
700,000
800,000
900,000
1,000,000
89 90 91 92 93 94 95 96 97 98 99 00 01 02 03 04 05 06 07 08 09 10 11
![Page 36: Post Occupancy Evaluation in an Academic Library: Using Data to Make the Case for Continuous Improvement of Facilities](https://reader034.vdocuments.us/reader034/viewer/2022052523/5562e759d8b42ad26c8b4d63/html5/thumbnails/36.jpg)
Beginning of Stack Tower floor-by-floor renovation Level 4 (2004), Level 5 (2007)
0
100,000
200,000
300,000
400,000
500,000
600,000
700,000
800,000
900,000
1,000,000
89 90 91 92 93 94 95 96 97 98 99 00 01 02 03 04 05 06 07 08 09 10 11
![Page 37: Post Occupancy Evaluation in an Academic Library: Using Data to Make the Case for Continuous Improvement of Facilities](https://reader034.vdocuments.us/reader034/viewer/2022052523/5562e759d8b42ad26c8b4d63/html5/thumbnails/37.jpg)
Group studies added to Stack Tower renovation Level 6 (2008)
0
100,000
200,000
300,000
400,000
500,000
600,000
700,000
800,000
900,000
1,000,000
89 90 91 92 93 94 95 96 97 98 99 00 01 02 03 04 05 06 07 08 09 10 11
![Page 38: Post Occupancy Evaluation in an Academic Library: Using Data to Make the Case for Continuous Improvement of Facilities](https://reader034.vdocuments.us/reader034/viewer/2022052523/5562e759d8b42ad26c8b4d63/html5/thumbnails/38.jpg)
Group studies added to Stack Tower renovation Level 7 (2009)
0
100,000
200,000
300,000
400,000
500,000
600,000
700,000
800,000
900,000
1,000,000
89 90 91 92 93 94 95 96 97 98 99 00 01 02 03 04 05 06 07 08 09 10 11
![Page 39: Post Occupancy Evaluation in an Academic Library: Using Data to Make the Case for Continuous Improvement of Facilities](https://reader034.vdocuments.us/reader034/viewer/2022052523/5562e759d8b42ad26c8b4d63/html5/thumbnails/39.jpg)
Library Service Desk on Level 2 Opens 2010
0
100,000
200,000
300,000
400,000
500,000
600,000
700,000
800,000
900,000
1,000,000
89 90 91 92 93 94 95 96 97 98 99 00 01 02 03 04 05 06 07 08 09 10 11
![Page 40: Post Occupancy Evaluation in an Academic Library: Using Data to Make the Case for Continuous Improvement of Facilities](https://reader034.vdocuments.us/reader034/viewer/2022052523/5562e759d8b42ad26c8b4d63/html5/thumbnails/40.jpg)
Business Library renovation, Research Commons opens 2011
0
100,000
200,000
300,000
400,000
500,000
600,000
700,000
800,000
900,000
1,000,000
89 90 91 92 93 94 95 96 97 98 99 00 01 02 03 04 05 06 07 08 09 10 11
![Page 41: Post Occupancy Evaluation in an Academic Library: Using Data to Make the Case for Continuous Improvement of Facilities](https://reader034.vdocuments.us/reader034/viewer/2022052523/5562e759d8b42ad26c8b4d63/html5/thumbnails/41.jpg)
Business Library renovation, Research Commons opens 2011
0
100,000
200,000
300,000
400,000
500,000
600,000
700,000
800,000
900,000
1,000,000
89 90 91 92 93 94 95 96 97 98 99 00 01 02 03 04 05 06 07 08 09 10 11
![Page 42: Post Occupancy Evaluation in an Academic Library: Using Data to Make the Case for Continuous Improvement of Facilities](https://reader034.vdocuments.us/reader034/viewer/2022052523/5562e759d8b42ad26c8b4d63/html5/thumbnails/42.jpg)
Exit Count Woodruff Library
0
100,000
200,000
300,000
400,000
500,000
600,000
700,000
800,000
900,000
1,000,000
89 90 91 92 93 94 95 96 97 98 99 00 01 02 03 04 05 06 07 08 09 10 11
![Page 43: Post Occupancy Evaluation in an Academic Library: Using Data to Make the Case for Continuous Improvement of Facilities](https://reader034.vdocuments.us/reader034/viewer/2022052523/5562e759d8b42ad26c8b4d63/html5/thumbnails/43.jpg)
Facility use: What does the data tell us?
• Facilities improvements – Exit count – Group study use
• Facilities operations – Library schedule
![Page 44: Post Occupancy Evaluation in an Academic Library: Using Data to Make the Case for Continuous Improvement of Facilities](https://reader034.vdocuments.us/reader034/viewer/2022052523/5562e759d8b42ad26c8b4d63/html5/thumbnails/44.jpg)
Facility use: What does the data tell us?
• Facilities improvements – Exit count – Group study use
• Facilities operations – Library schedule
![Page 45: Post Occupancy Evaluation in an Academic Library: Using Data to Make the Case for Continuous Improvement of Facilities](https://reader034.vdocuments.us/reader034/viewer/2022052523/5562e759d8b42ad26c8b4d63/html5/thumbnails/45.jpg)
Group studies
![Page 46: Post Occupancy Evaluation in an Academic Library: Using Data to Make the Case for Continuous Improvement of Facilities](https://reader034.vdocuments.us/reader034/viewer/2022052523/5562e759d8b42ad26c8b4d63/html5/thumbnails/46.jpg)
0 100 200 300 400
215
656
756
765
664
764
665
213
Room 656 offered a low-height table with cushions Inspired by the University’s Cox Hall Computing Center
![Page 47: Post Occupancy Evaluation in an Academic Library: Using Data to Make the Case for Continuous Improvement of Facilities](https://reader034.vdocuments.us/reader034/viewer/2022052523/5562e759d8b42ad26c8b4d63/html5/thumbnails/47.jpg)
0 100 200 300 400
215
656
756
765
664
764
665
213
The unconventional furnishings were replaced with a standard table and chairs
![Page 48: Post Occupancy Evaluation in an Academic Library: Using Data to Make the Case for Continuous Improvement of Facilities](https://reader034.vdocuments.us/reader034/viewer/2022052523/5562e759d8b42ad26c8b4d63/html5/thumbnails/48.jpg)
0 100 200 300 400
215
656
756
765
664
764
665
213
Use of the rooms increased from spring 2011 to fall 2011
![Page 49: Post Occupancy Evaluation in an Academic Library: Using Data to Make the Case for Continuous Improvement of Facilities](https://reader034.vdocuments.us/reader034/viewer/2022052523/5562e759d8b42ad26c8b4d63/html5/thumbnails/49.jpg)
(100)
(80)
(60)
(40)
(20)
0
20
40
60
80
656 756 664 215 773 874 665 765 764 213
But there was a surprising decrease in 764 and especially 213
![Page 50: Post Occupancy Evaluation in an Academic Library: Using Data to Make the Case for Continuous Improvement of Facilities](https://reader034.vdocuments.us/reader034/viewer/2022052523/5562e759d8b42ad26c8b4d63/html5/thumbnails/50.jpg)
0 100 200 300 400
215
656
756
765
664
764
665
213
Remember that 213 was the most heavily used room; 764 was tied for second place
![Page 51: Post Occupancy Evaluation in an Academic Library: Using Data to Make the Case for Continuous Improvement of Facilities](https://reader034.vdocuments.us/reader034/viewer/2022052523/5562e759d8b42ad26c8b4d63/html5/thumbnails/51.jpg)
0 100 200 300 400
215
656
756
765
664
764
665
213
Use shifted away from these rooms Why?
![Page 52: Post Occupancy Evaluation in an Academic Library: Using Data to Make the Case for Continuous Improvement of Facilities](https://reader034.vdocuments.us/reader034/viewer/2022052523/5562e759d8b42ad26c8b4d63/html5/thumbnails/52.jpg)
0 100 200 300 400
215
656
756
765
664
764
665
213
Installed new technology, table and chairs in 213
![Page 53: Post Occupancy Evaluation in an Academic Library: Using Data to Make the Case for Continuous Improvement of Facilities](https://reader034.vdocuments.us/reader034/viewer/2022052523/5562e759d8b42ad26c8b4d63/html5/thumbnails/53.jpg)
0 100 200 300 400
215
656
756
765
664
764
665
213
Installed tables and chairs in 764
![Page 54: Post Occupancy Evaluation in an Academic Library: Using Data to Make the Case for Continuous Improvement of Facilities](https://reader034.vdocuments.us/reader034/viewer/2022052523/5562e759d8b42ad26c8b4d63/html5/thumbnails/54.jpg)
Group study 656
![Page 55: Post Occupancy Evaluation in an Academic Library: Using Data to Make the Case for Continuous Improvement of Facilities](https://reader034.vdocuments.us/reader034/viewer/2022052523/5562e759d8b42ad26c8b4d63/html5/thumbnails/55.jpg)
Group study 756
![Page 56: Post Occupancy Evaluation in an Academic Library: Using Data to Make the Case for Continuous Improvement of Facilities](https://reader034.vdocuments.us/reader034/viewer/2022052523/5562e759d8b42ad26c8b4d63/html5/thumbnails/56.jpg)
Group study 764
![Page 57: Post Occupancy Evaluation in an Academic Library: Using Data to Make the Case for Continuous Improvement of Facilities](https://reader034.vdocuments.us/reader034/viewer/2022052523/5562e759d8b42ad26c8b4d63/html5/thumbnails/57.jpg)
Facility use: What does the data tell us?
• Facilities improvements – Exit count – Group study use
• Facilities operations – Library schedule
![Page 58: Post Occupancy Evaluation in an Academic Library: Using Data to Make the Case for Continuous Improvement of Facilities](https://reader034.vdocuments.us/reader034/viewer/2022052523/5562e759d8b42ad26c8b4d63/html5/thumbnails/58.jpg)
Facility use: What does the data tell us?
• Facilities improvements – Exit count – Group study use
• Facilities operations – Library schedule
![Page 59: Post Occupancy Evaluation in an Academic Library: Using Data to Make the Case for Continuous Improvement of Facilities](https://reader034.vdocuments.us/reader034/viewer/2022052523/5562e759d8b42ad26c8b4d63/html5/thumbnails/59.jpg)
Library schedule
![Page 60: Post Occupancy Evaluation in an Academic Library: Using Data to Make the Case for Continuous Improvement of Facilities](https://reader034.vdocuments.us/reader034/viewer/2022052523/5562e759d8b42ad26c8b4d63/html5/thumbnails/60.jpg)
Student Government Association and College Council
• Spring 2011: Please extend hours of operation • SGA/CC: “Emory is the only top twenty library in
the country that doesn’t offer twenty-four hour access seven days a week.”
• Emory Library: “Demand has never justified extending the library’s hours of operation.”
![Page 61: Post Occupancy Evaluation in an Academic Library: Using Data to Make the Case for Continuous Improvement of Facilities](https://reader034.vdocuments.us/reader034/viewer/2022052523/5562e759d8b42ad26c8b4d63/html5/thumbnails/61.jpg)
0.0 24.0 48.0 72.0 96.0 120.0 144.0 168.0
MIT
Yale
Princeton
Northwestern
U Notre Dame
Duke
EMORY
Cornell
Harvard
Rice
Vanderbilt
U of Chicago
U of Penn
Columbia
Cal Tech
Stanford
Dartmouth
Johns Hopkins
Wash U St Louis
Brown
Only one third of the top twenty US academic libraries offer 24 X 7 service somewhere in their library system
![Page 62: Post Occupancy Evaluation in an Academic Library: Using Data to Make the Case for Continuous Improvement of Facilities](https://reader034.vdocuments.us/reader034/viewer/2022052523/5562e759d8b42ad26c8b4d63/html5/thumbnails/62.jpg)
Student Government Association and College Council
• Spring 2011: Please extend hours of operation • SGA/CC: “Emory is the only top twenty library in
the country that doesn’t offer twenty-four hour access seven days a week.”
• Emory Library: “Demand has never justified extending the library’s hours of operation.”
![Page 63: Post Occupancy Evaluation in an Academic Library: Using Data to Make the Case for Continuous Improvement of Facilities](https://reader034.vdocuments.us/reader034/viewer/2022052523/5562e759d8b42ad26c8b4d63/html5/thumbnails/63.jpg)
Head count is steady until midnight then falls off by 02:00 am
0
100
200
300
400
500
600
700
17:00 18:00 19:00 20:00 21:00 22:00 23:00 0:00 1:00 2:00 3:00 4:00 5:00 6:00 7:00
Head
cou
nt
1-Apr-11
2-Apr-11
8-Apr-11
9-Apr-11
15-Apr-11
16-Apr-11
22-Apr-11
23-Apr-11
29-Apr-11
30-Apr-11
Midnight
02:00 am
20:00 pm
![Page 64: Post Occupancy Evaluation in an Academic Library: Using Data to Make the Case for Continuous Improvement of Facilities](https://reader034.vdocuments.us/reader034/viewer/2022052523/5562e759d8b42ad26c8b4d63/html5/thumbnails/64.jpg)
0.0 24.0 48.0 72.0 96.0 120.0 144.0 168.0
MIT
Yale
Princeton
Northwestern
U Notre Dame
Duke
EMORY
Cornell
Harvard
Rice
Vanderbilt
U of Chicago
U of Penn
Columbia
Cal Tech
Stanford
Dartmouth
Johns Hopkins
Wash U St Louis
Brown
Library agreed to change Friday and Saturday closing time from 20:00 hours (8:00pm) to midnight
![Page 65: Post Occupancy Evaluation in an Academic Library: Using Data to Make the Case for Continuous Improvement of Facilities](https://reader034.vdocuments.us/reader034/viewer/2022052523/5562e759d8b42ad26c8b4d63/html5/thumbnails/65.jpg)
By adding 8 additional hours per week Emory moved up higher in the second tier
0.0 24.0 48.0 72.0 96.0 120.0 144.0 168.0
MIT
Yale
Princeton
Northwestern
U Notre Dame
Duke
Cornell
Harvard
Rice
Vanderbilt
EMORY
U of Chicago
U of Penn
Columbia
Cal Tech
Stanford
Dartmouth
Johns Hopkins
Wash U St Louis
Brown
![Page 66: Post Occupancy Evaluation in an Academic Library: Using Data to Make the Case for Continuous Improvement of Facilities](https://reader034.vdocuments.us/reader034/viewer/2022052523/5562e759d8b42ad26c8b4d63/html5/thumbnails/66.jpg)
Student Government Association and College Council
• Spring 2011: Please extend hours of operation • SGA/CC: “Emory is the only top twenty library in
the country that doesn’t offer twenty-four hour access seven days a week.”
• Emory Library: “Demand has never justified extending the library’s hours of operation.”
• Test all assumptions—especially your own!
![Page 67: Post Occupancy Evaluation in an Academic Library: Using Data to Make the Case for Continuous Improvement of Facilities](https://reader034.vdocuments.us/reader034/viewer/2022052523/5562e759d8b42ad26c8b4d63/html5/thumbnails/67.jpg)
Continuous facilities improvement
• Measuring success The customer experience
• Five Phases The capital investment cycle
• The Emory experience Exit count, group study use, hours of operation
• Continuous facilities improvement Choices, investment, outcomes
![Page 68: Post Occupancy Evaluation in an Academic Library: Using Data to Make the Case for Continuous Improvement of Facilities](https://reader034.vdocuments.us/reader034/viewer/2022052523/5562e759d8b42ad26c8b4d63/html5/thumbnails/68.jpg)
Continuous facilities improvement
• Measuring success The customer experience
• Five Phases The capital investment cycle
• The Emory experience Exit count, group study use, hours of operation
• Continuous facilities improvement Choices, investment, outcomes
![Page 69: Post Occupancy Evaluation in an Academic Library: Using Data to Make the Case for Continuous Improvement of Facilities](https://reader034.vdocuments.us/reader034/viewer/2022052523/5562e759d8b42ad26c8b4d63/html5/thumbnails/69.jpg)
Welcoming, flexible, state-of-the-art
• Library users have choices They vote with their feet
• Inputs and outputs support outcomes Investment + activity = experience
• Once a generation capital investment? Responsive libraries require shorter cycle times
• Plan big, implement small Keep them coming with something new!
![Page 70: Post Occupancy Evaluation in an Academic Library: Using Data to Make the Case for Continuous Improvement of Facilities](https://reader034.vdocuments.us/reader034/viewer/2022052523/5562e759d8b42ad26c8b4d63/html5/thumbnails/70.jpg)
Post occupancy evaluation in an academic library
Using data to make the case for continuous improvement of facilities
Charles Forrest Director, Library Facilities
Emory University Atlanta, Georgia
![Page 71: Post Occupancy Evaluation in an Academic Library: Using Data to Make the Case for Continuous Improvement of Facilities](https://reader034.vdocuments.us/reader034/viewer/2022052523/5562e759d8b42ad26c8b4d63/html5/thumbnails/71.jpg)
Post occupancy evaluation in an academic library
Using data to make the case for continuous improvement of facilities
Charles Forrest Director, Library Facilities
Emory University Atlanta, Georgia