Post combustion capture of CO2
Nick Otter
International Workshop on “Power Generation with CCS in India”
Ashok Hotel, New Delhi, India
22nd January 2008
![Page 2: Post combustion capture of CO 2 Nick Otter International Workshop on “Power Generation with CCS in India” Ashok Hotel, New Delhi, India 22 nd January 2008](https://reader036.vdocuments.us/reader036/viewer/2022081517/5697bf9d1a28abf838c939d6/html5/thumbnails/2.jpg)
© ALSTOM 2007. All rights reserved. Information contained in this document is provided without liability for information purposes only and is subject to change without notice. No representation or warranty is given or to be implied as to the completeness of information or fitness for any particular purpose. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Post combustion CO2 capture OTTER PG & CCS Seminar New Delhi, 22-23 January 2008 : 01/01/2007 P 2
CO2 capture solutionsZero emission technology pathways
Main goal: Cost of CO2 avoided: < 20 €/t CO2
Source: VattenfallSource: Vattenfall Source: Vattenfall
FOCUS OF ALSTOM
Post- combustion(New + retrofit)
Oxy- combustion(New + retrofit)
Pre-combustion(New plants only)
Power Plant with CO2 Capture
Source: Vattenfall
![Page 3: Post combustion capture of CO 2 Nick Otter International Workshop on “Power Generation with CCS in India” Ashok Hotel, New Delhi, India 22 nd January 2008](https://reader036.vdocuments.us/reader036/viewer/2022081517/5697bf9d1a28abf838c939d6/html5/thumbnails/3.jpg)
© ALSTOM 2007. All rights reserved. Information contained in this document is provided without liability for information purposes only and is subject to change without notice. No representation or warranty is given or to be implied as to the completeness of information or fitness for any particular purpose. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Post combustion CO2 capture OTTER PG & CCS Seminar New Delhi, 22-23 January 2008 : 01/01/2007 P 3
Original Equipment Manufacturer (OEM) suppliesin worldwide power plants
……..importance of addressing existing base, especially recently/to be installed
OEM supplied at least the Turbine, the Generator, or the Steam Generator
Source: UDI - ALSTOM
GW
0
200
400
600
800
1000
1200
Alstom GE Siemens MHI
Nuclear Plant
Conventional SteamPlant
Hydro Plant
Gas Turbine Plant (InclST for CC)
Total World end 2005~ 4100 GW
![Page 4: Post combustion capture of CO 2 Nick Otter International Workshop on “Power Generation with CCS in India” Ashok Hotel, New Delhi, India 22 nd January 2008](https://reader036.vdocuments.us/reader036/viewer/2022081517/5697bf9d1a28abf838c939d6/html5/thumbnails/4.jpg)
© ALSTOM 2007. All rights reserved. Information contained in this document is provided without liability for information purposes only and is subject to change without notice. No representation or warranty is given or to be implied as to the completeness of information or fitness for any particular purpose. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Post combustion CO2 capture OTTER PG & CCS Seminar New Delhi, 22-23 January 2008 : 01/01/2007 P 4
CO2 capture solutions :Post-Combustion opportunities and challenges
−Large industrial experience
−Partial capture
−Adaptable to all boilers
−Retrofitable
−Operation flexibility
−Potential in other industries
−Advanced technologies in
pipeline
Opportunities
Innovation
Challenges
CostCost
−Solvent regeneration −Solvent consumption−CO2 compression−Integration
TechnologyTechnology
−Adapt to low pressure−New solvents−Advanced process−Scale-up validation−Corrosion issues−Adaptation to installed base
![Page 5: Post combustion capture of CO 2 Nick Otter International Workshop on “Power Generation with CCS in India” Ashok Hotel, New Delhi, India 22 nd January 2008](https://reader036.vdocuments.us/reader036/viewer/2022081517/5697bf9d1a28abf838c939d6/html5/thumbnails/5.jpg)
© ALSTOM 2007. All rights reserved. Information contained in this document is provided without liability for information purposes only and is subject to change without notice. No representation or warranty is given or to be implied as to the completeness of information or fitness for any particular purpose. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Post combustion CO2 capture OTTER PG & CCS Seminar New Delhi, 22-23 January 2008 : 01/01/2007 P 5
0
500
1000
1500
2000
2500
3000
1990 1995 2000 2005 2010 2015 2020
Hea
t o
f R
eact
ion
(B
TU
/lb
)
Going down the experience curve : Post Combustion CO2 Capture
1995 2000 2005 2010 2015
Parsons-
Study (Fluor)
ABB Lummu
s
ProcessOptimisation
AdvancedAmines
ProcessInnovations
Chillled Ammoni
a Process
Data of current project
s
1,350 BTU/lb3150 kJ/kg
6000
5000
4000
3000
2000
1000
0
Hea
t o
f R
eact
ion
[kJ
/kg
]
Process Optimisation
CO2 €/T 45-35 35-25 25-15 (not including transport and storage)
Advanced Amines
![Page 6: Post combustion capture of CO 2 Nick Otter International Workshop on “Power Generation with CCS in India” Ashok Hotel, New Delhi, India 22 nd January 2008](https://reader036.vdocuments.us/reader036/viewer/2022081517/5697bf9d1a28abf838c939d6/html5/thumbnails/6.jpg)
© ALSTOM 2007. All rights reserved. Information contained in this document is provided without liability for information purposes only and is subject to change without notice. No representation or warranty is given or to be implied as to the completeness of information or fitness for any particular purpose. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Post combustion CO2 capture OTTER PG & CCS Seminar New Delhi, 22-23 January 2008 : 01/01/2007 P 6
Development Plan of Chilled Ammonia Process
2006 2007 2008 2009 2010 2011
Main Steps
Laboratory Scale
• First technical hypotheses
Large Bench Scale (0,25 MWt)
• Optimize absorber design
• Establish absorber removal rate
• Demonstrate limited ammonia emissions
Field Pilot Scale (5 MWt)
• Validate key performance parameters
1
3
Demonstration Scale (30-40 MWt)
• System reliability4
2 for coal and gas fired power plants
demonstration in North America and Europe
Utility Scale (+200 MWt)
• Integration5
![Page 7: Post combustion capture of CO 2 Nick Otter International Workshop on “Power Generation with CCS in India” Ashok Hotel, New Delhi, India 22 nd January 2008](https://reader036.vdocuments.us/reader036/viewer/2022081517/5697bf9d1a28abf838c939d6/html5/thumbnails/7.jpg)
© ALSTOM 2007. All rights reserved. Information contained in this document is provided without liability for information purposes only and is subject to change without notice. No representation or warranty is given or to be implied as to the completeness of information or fitness for any particular purpose. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Post combustion CO2 capture OTTER PG & CCS Seminar New Delhi, 22-23 January 2008 : 01/01/2007 P 7
Chilled ammonia process
A promising technology for post combustion carbon capture
Principle
• Ammonia (NH3) reacts with CO2 and water. It forms ammonia carbonate or bicarbonate
• Moderately raising the temperatures reverses the above reactions – releasing CO2
![Page 8: Post combustion capture of CO 2 Nick Otter International Workshop on “Power Generation with CCS in India” Ashok Hotel, New Delhi, India 22 nd January 2008](https://reader036.vdocuments.us/reader036/viewer/2022081517/5697bf9d1a28abf838c939d6/html5/thumbnails/8.jpg)
© ALSTOM 2007. All rights reserved. Information contained in this document is provided without liability for information purposes only and is subject to change without notice. No representation or warranty is given or to be implied as to the completeness of information or fitness for any particular purpose. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Post combustion CO2 capture OTTER PG & CCS Seminar New Delhi, 22-23 January 2008 : 01/01/2007 P 8
Chilled ammonia technology validated at large bench scale
Results
• 90% Capture demonstrated
• On CO2 concentrations as low as 3-4%
• Bicarbonate solids are easy to handle
• Low NH3 emissions obtained
• Regeneration validated
• Results used to design field pilot systems at We Energies and E.ON
0.25 MW Large Bench scale
![Page 9: Post combustion capture of CO 2 Nick Otter International Workshop on “Power Generation with CCS in India” Ashok Hotel, New Delhi, India 22 nd January 2008](https://reader036.vdocuments.us/reader036/viewer/2022081517/5697bf9d1a28abf838c939d6/html5/thumbnails/9.jpg)
© ALSTOM 2007. All rights reserved. Information contained in this document is provided without liability for information purposes only and is subject to change without notice. No representation or warranty is given or to be implied as to the completeness of information or fitness for any particular purpose. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Post combustion CO2 capture OTTER PG & CCS Seminar New Delhi, 22-23 January 2008 : 01/01/2007 P 9
5 MWt Pilot Plant (USA)
Start-up end 2007
Advantages
• High efficiency capture of CO2 and low heat of reaction
• Low cost reagent
• No degradation during absorption-regeneration
• Tolerance to oxygen and contaminations in flue gas
Chilled ammonia technology being addressed at field pilot scale : coal
![Page 10: Post combustion capture of CO 2 Nick Otter International Workshop on “Power Generation with CCS in India” Ashok Hotel, New Delhi, India 22 nd January 2008](https://reader036.vdocuments.us/reader036/viewer/2022081517/5697bf9d1a28abf838c939d6/html5/thumbnails/10.jpg)
© ALSTOM 2007. All rights reserved. Information contained in this document is provided without liability for information purposes only and is subject to change without notice. No representation or warranty is given or to be implied as to the completeness of information or fitness for any particular purpose. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Post combustion CO2 capture OTTER PG & CCS Seminar New Delhi, 22-23 January 2008 : 01/01/2007 P 10
Mongstad 40 MWth
Start-up 2010 – 100 kt/yr CO2 shipped to Snøvit in North Sea
Chilled ammonia technology being addressed at demonstration scale : gas
![Page 11: Post combustion capture of CO 2 Nick Otter International Workshop on “Power Generation with CCS in India” Ashok Hotel, New Delhi, India 22 nd January 2008](https://reader036.vdocuments.us/reader036/viewer/2022081517/5697bf9d1a28abf838c939d6/html5/thumbnails/11.jpg)
© ALSTOM 2007. All rights reserved. Information contained in this document is provided without liability for information purposes only and is subject to change without notice. No representation or warranty is given or to be implied as to the completeness of information or fitness for any particular purpose. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Post combustion CO2 capture OTTER PG & CCS Seminar New Delhi, 22-23 January 2008 : 01/01/2007 P 11
CO2 capture solutions :Oxy-combustion opportunities and challenges
−Lowest technological risk option
−Same power gen size possible
−Repowering and Retrofit
−All boiler technologies adaptable
−Potential boiler size reduction
−Fuel flexibility
−Rupture technology in pipeline
−Gasification
Opportunities
Innovation
Challenges
CostCost
−Cryogenic oxygen −CO2 compression−Heat flow optimisation−Integration
TimeTime
−On time Development
TechnologyTechnology
−Scale-up validation−Adaptation to installed base−Innovation
![Page 12: Post combustion capture of CO 2 Nick Otter International Workshop on “Power Generation with CCS in India” Ashok Hotel, New Delhi, India 22 nd January 2008](https://reader036.vdocuments.us/reader036/viewer/2022081517/5697bf9d1a28abf838c939d6/html5/thumbnails/12.jpg)
© ALSTOM 2007. All rights reserved. Information contained in this document is provided without liability for information purposes only and is subject to change without notice. No representation or warranty is given or to be implied as to the completeness of information or fitness for any particular purpose. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Post combustion CO2 capture OTTER PG & CCS Seminar New Delhi, 22-23 January 2008 : 01/01/2007 P 12
• Hea
t o
f R
eac
tio
n (
BT
U/lb
)
Going down the experience curve : Oxy Combustion CO2 Capture
2000 2010 2020 2030
Process Optimisation
Integration & Process Improvt
Process Innovation
400
375
300
250
200
150
En
erg
y re
qu
irem
ents
[K
Wh
/ T
CO
2]
LargeDemos
Large ASU
Chemical looping
ENCAP studies
Scale economy
Non cryo O2 production
CO2 €/T 40-25 30-15 25-10 (not including transport and storage)
![Page 13: Post combustion capture of CO 2 Nick Otter International Workshop on “Power Generation with CCS in India” Ashok Hotel, New Delhi, India 22 nd January 2008](https://reader036.vdocuments.us/reader036/viewer/2022081517/5697bf9d1a28abf838c939d6/html5/thumbnails/13.jpg)
© ALSTOM 2007. All rights reserved. Information contained in this document is provided without liability for information purposes only and is subject to change without notice. No representation or warranty is given or to be implied as to the completeness of information or fitness for any particular purpose. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Post combustion CO2 capture OTTER PG & CCS Seminar New Delhi, 22-23 January 2008 : 01/01/2007 P 13
Oxy-combustion: 30 MWth oxyfuel demonstration
Test of CO2 capture at Vattenfall Site „Schwarze Pumpe“
Source: Vattenfall
Main parameters
• 5,2 t/h Solid Fuel, 10 t/h Oxygen
• 40 t/h Steam,9 t/h Carbon Dioxide
• Goal: validation and improvement of oxyfuel process starting 2008
Alstom supplies the oxy-boiler (as well as steam generator and electrostatic precipitator)
![Page 14: Post combustion capture of CO 2 Nick Otter International Workshop on “Power Generation with CCS in India” Ashok Hotel, New Delhi, India 22 nd January 2008](https://reader036.vdocuments.us/reader036/viewer/2022081517/5697bf9d1a28abf838c939d6/html5/thumbnails/14.jpg)
© ALSTOM 2007. All rights reserved. Information contained in this document is provided without liability for information purposes only and is subject to change without notice. No representation or warranty is given or to be implied as to the completeness of information or fitness for any particular purpose. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Post combustion CO2 capture OTTER PG & CCS Seminar New Delhi, 22-23 January 2008 : 01/01/2007 P 14
Chemical Looping Gasification
Advanced Capture Processes
• Oxygen Fired CFB
• Chemical Looping
Combustion
Gasification
Chemical Looping Combustion
OxidizerReducer
CaS
CaSO4
CO2 & H2O
Coal,Limestone Air
Depleted Air, Ash,
CaSO4
OxidizerReducer
CaS
CaSO4
CO2 & H2O
Coal,Limestone Air
Depleted Air, Ash,
CaSO4
OxidizerReducer
Calciner
Cold Solids
CaCO3 CaO
CaS
CaSO4
Coal,Steam
CO2
Air
CaCO3
Depleted Air, Ash,CaSO4
Hot Solids
H2
CONDENSATE
GASRECIRCULATION
FAN
FLUIDIZINGGAS
BLOWER
COMBUSTOR
Cyc
lon
e
BA
CK
PA
SS
HE
AT
E
XC
HA
NG
ER
S
CFB Steam Generator Unit
ASHCOOLER
ExternalHeat
Exchanger
NITROGENAIR
INDUCED DRAFTFAN
AIRSEPARATION
UNIT
GasCooler
PARTICULATEREMOVALSYSTEM
OX
YG
EN
HE
AT
ER
PFWH
CO2-RICH PRODUCT
TO GAS PROCESSINGSYSTEM
LIMESTONE
COAL
OXYGEN
AIRINFILTRATION
O2 fired CFB
![Page 15: Post combustion capture of CO 2 Nick Otter International Workshop on “Power Generation with CCS in India” Ashok Hotel, New Delhi, India 22 nd January 2008](https://reader036.vdocuments.us/reader036/viewer/2022081517/5697bf9d1a28abf838c939d6/html5/thumbnails/15.jpg)
© ALSTOM 2007. All rights reserved. Information contained in this document is provided without liability for information purposes only and is subject to change without notice. No representation or warranty is given or to be implied as to the completeness of information or fitness for any particular purpose. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Post combustion CO2 capture OTTER PG & CCS Seminar New Delhi, 22-23 January 2008 : 01/01/2007 P 15
Oxy-fired PC, Oxy-fired CFB andChemical Looping
2010 2016 - 202004 2005 2006 2007 2008 2009 2011 2012 2013 2014 2015
Commercialization
Oxy-fired PC
Lab scale tests (500kWt)
Demonstration scale tests (30MWt)
Utility scale tests (250MWe)
Oxy-fired CFB
Chemical Looping
1
2
3
4
Pilot scale (3MWt)
Demonstration Scale tests (10-40MWe)
Utility scale tests (>150MWe)
Commercialization4
2
3
1
1 Bench tests (10-100 kWt)
Pilot scale (1-3 MWt)
Demonstration scale tests 10-20 MWe
2
3
Com5
Source : ALSTOM analysis
Utility scale 50-100MWe4
![Page 16: Post combustion capture of CO 2 Nick Otter International Workshop on “Power Generation with CCS in India” Ashok Hotel, New Delhi, India 22 nd January 2008](https://reader036.vdocuments.us/reader036/viewer/2022081517/5697bf9d1a28abf838c939d6/html5/thumbnails/16.jpg)
© ALSTOM 2007. All rights reserved. Information contained in this document is provided without liability for information purposes only and is subject to change without notice. No representation or warranty is given or to be implied as to the completeness of information or fitness for any particular purpose. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Post combustion CO2 capture OTTER PG & CCS Seminar New Delhi, 22-23 January 2008 : 01/01/2007 P 16
30
40
50
60
70
80
90
1 2 3 4 5 6 7 8 9 10 11 12 13 14
CoE
($
/ M
Wh
net)
IGCC with Capture
SCPC with Ammonia Capture
Oxy PC SCPC without Capture
IGCC without Capture
SCPC with Advanced Amine
Capture
Oxy CFB
Cost discovery zone
Carbon capture technology comparison
A portfolio of technologies must be validated at large scale
** Based on a 400 MWnet design, versus 650 Mwnet for other technologies
![Page 17: Post combustion capture of CO 2 Nick Otter International Workshop on “Power Generation with CCS in India” Ashok Hotel, New Delhi, India 22 nd January 2008](https://reader036.vdocuments.us/reader036/viewer/2022081517/5697bf9d1a28abf838c939d6/html5/thumbnails/17.jpg)