Post-combustion capture for retrofit applications Jon Gibbins Director, UK CCS Research Centre Professor of CCS, University of Sheffield www.ukccsrc.ac.uk Email: [email protected] Capture Session 17 April 2019, Cardiff University

Upload: others

Post on 09-Apr-2020

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Post-combustion capture for retrofit applications...International post-combustion capture retrofit workshop held in Sheffield, 9-12 April 2019 CCUS specialists from the UK CCS Research

Post-combustion capture for retrofit applications

Jon GibbinsDirector UK CCS Research CentreProfessor of CCS University of SheffieldwwwukccsrcacukEmail jgibbinssheffieldacuk

Capture Session17 April 2019 Cardiff University

International Test Center Network httpsitcn-globalorg

PACT Pilot-Scale Advanced Capture TechnologyA facility managed by the University of Sheffield

httpspactgroupshefacuk

PACT is coordinating the ITCN for 2 years

International post-combustion capture retrofit workshop held in Sheffield 9-12 April 2019CCUS specialists from the UK CCS Research Centre and the University of Sheffieldrsquos PACT facilities together with Bechtel (US) TNO (NL) Test Centre Mongstad (Norway) and the Universities of Edinburgh and Leeds held an international workshop on post-combustion capture (PCC) retrofit Together with application experts from China Ireland South Africa and Thailand the workshop examined past open-access PCC studies and potential future practical applications from across the world

httpwwwieaorgweo2017

International Energy Agency (2017) World Energy Outlook 2017 OECDIEA Paris

The IEA Sustainable Development Scenario only keeps within carbon budgets by reducing CO2 emissions rate significantly by 2040 and carrying on rapidly to net zero or net negative after that

Large scale CCS including negative emissions technologies (BECCS and DACS) is obviously essential

12

8

4

0

CCS has a smaller role than renewables to 2040 but still a very significant increase from almost zero CCS now

GtCO2yr

2040 storage of ~ 2 GtCO2yrwould need perhaps 200large sources or clusters eachtaking 5-10 years to developeven in China

httpwwwglobalccsinstitutecomnewsinstitute-updatesparis-climate-change-targets-cannot-be-met-without-ccs-cop23 + httpswwwieaorgpublicationsfreepublicationspublication20-years-of-carbon-capture-and-storagehtml

International Energy Agency (2017) World Energy Outlook 2017 OECDIEA Paris

Where we can get to by 2030 is critical new initiatives are needed to build the core of an industry that can be expanded rapidly in the 2030s (and 2040s and 2050s)

Annual Electricity generation by source

SDS power CCS is lsquoonlyrsquo 6 of global electricity generation but this is a major increase

Installed capacity in 204013100 GW

Boundary Dam 3 120MW Petra Nova 240MW

Installed capacity in 204013100 GW

+ httpswwwieaorgpublicationsinsightsinsightpublicationsThePotentialforEquippingChinasExistingCoalFleetwithCarbonCaptureandStoragepdf

International Energy Agency (2017) World Energy Outlook 2017 OECDIEA Paris2040 power CCS capacity is x1000 - 375GW vs 360MW now

(plus capture from industry)bull 210 GW of coal power capacity with CCS globallybull 150 GW of this is in China (~15 of current Chinese power plant capacity)+

bull 165 GW of gas power capacity with CCS globallybull Most of the coal CCS likely to be post-combustion and retrofits to existing plantsbull This is still only ~500 generating units but most will have to be built in the 2030s

PCC

UK cost estimates for a range of fuels and technologiesStudy for BEIS by Wood formerly Amec-FW httpswwwgovukguidancefunding-for-low-carbon-industry

GasGTCC

Gas+PCC

Gas+H2

Coal+PCC

Coal+Oxy

CoalIGCC

Gas SCO2

Gas MCFC

Bio

+PCCBio

+OxyBio

IGCC

bull Post-combustion capture appears competitive ndash also allows retrofit

bull Urgent to accelerate learning by doing for all technologies to reduce costs

LCOE does not include any negative emissions credit

From Bruce Adderley Jeremy Carey Jon Gibbins Mathieu Lucquiaud and Richard Smith ldquoPost-Combustion Carbon Dioxide Capture Cost Reduction to 2030 and beyondrdquo Faraday Discussion on CCS July 2016 httppubsrscorgenContentArticleLanding2016FDc6fd00046kdivAbstract

Government funded RampD and private innovators can help to evolve PCC technologies provided that there can be good knowledge transfer between operating large scale plants and research and developer and innovation communities

Commercial Readiness Index (CRI) for PCC needs to be increased by driving sub-systems through the TRLs based on learning by doing

Bankable Asset Class

Market competitiondriving widespread development

Multiple Commercial Applications

Commercial Scale Up

Commercial Trial Small Scale

Hypothetical Commercial Proposition

System test launch and operation

Systemsubsystem development

Technology demonstration

Technology development

Research to prove feasibility

Basic technology research

TRL

CRI

9

8

7

6

5

4

3

2

1

6

5

4

3

2

1

CO2CRC Study Retrofitting an Australian Brown Coal Power Station With Post-Combustion Capture

Map httpworldweatherwmoint185c00434mhtm credited Courtesy Department of Peacekeeping Operations Cartographic Section United Nations Reference Map No 4170 Rev4 January 2004

httpwwwco2crccomaupublication-categoryreports

From Loy Yang B visitor booklet

Post-Combustion Capture (PCC) Process Flow Diagram

Example coming later is fairly conventional but special features are

(a) SOx removal in FGD (b) Continuous reclaimer (c) Stack gas heater at top of absorber

Brown Coal Retrofit Study PCC Capture System

bull Two PCC modules per 568 MW

unit

bull 24 MtCO2yr capacity per

module

bull DCC in the base of the absorber

tower

bull Absorber - 15m diameter x 15m

packed height

bull 190 MW reduction in

net unit output BUT

can be rapidly

restored

bull Estimated AUD 935

million CAPEX per

module

bull AUD 24 to 60 million per year

OPEX excluding energy

bull 40 ww MEA with continuous

batch reclaiming ndash so open-access

Layout for

PCC

retrofit on

all four

reference

units

bull Open stack

bull Connections

at stack base

need major

attention

bull Treated flue

gas vented at

top of

absorbers

Site visit photo 2 Nov 2017 Loy Yang A Unit 3

Shand Brown Coal Petra Nova

Tonnes CO2 per day per PCC unit 6540 6588 4776

CO2 vv dry 13 157

EOP kWhtCO2 2706 3466

CAPEX $9864M AUD935M

~USD700M

Capex ($M) 9864 700 635

$ktCO2 per day 151 106 133

MtCO2yr based on 85 LF 203 204 148

$MMtCO2yr 486 342 429

No owners costs

Petra Nova httpswwwostigovbiblio1344080Shand httpsccsknowledgecomresources2nd-generationBrown Coal httpwwwco2crccomaupublication-categoryreports

376414

353 350 362 351 360

MEA30ww

Alstom BASF Fluor HTC MHI Cansolv

World BankPre-Feasibility Study for Establishing a Carbon Capture Pilot Plant in Mexico - Full-Scale Poza

Rica NGCC PCC Retrofit Incremental Electricity Cost ($MWh) for 85 CO2 Capture

Open-technology open-access is a key enabler for international partnerships especially for full-scale PCC projects as well as lab- and pilot-scale work

bull Why is CCUS different ndash only a few (5-10) big PCC projects globally over the next decade and then a huge increase in deployment mainly via retrofits to meet climate targets

bull So need to build a next phase of post-combustion (PCC) full-scale projects as open-technology (multiple solvents) with open-access (generic solvent) at least for an initial period

bull Open-access enables international knowledge exchange and strong commercial competition to reduce costs at all stages ndash feasibility FEED EPC commissioning and initial operation

bull Gets much better value for government expenditure on deployment and RampD

bull Greatly increases the rate at which the field of PCC technologies will improve

bull Open-technology open-access PCC hardware is a fast track to deploy multipleinnovations including through in-service upgrading

bull Can try out new solvents etc without building a new plant for every one

bull Plus critical information exchange in both directions with Mission Innovation and pilot testing eg ITCN ACT - Accelerating CCS Technologies

bull Relative costs for an open-technology open-access PCC from a study undertaken for the World Bank+ show overall incremental electricity costs for a range of proprietary PCC technology vendors similar and only marginally better than a first generation open-access solvent 30 ww MEA

wwwact-ccseu + httpswwwgobmxsenerendocumentospre-feasibility-study-for-establishing-a-carbon-capture-pilot-plant-in-mexicoidiom=en

Conclusions

bull PCC now getting deployed often for retrofit ndashnumber of waste incinerator projects in NL most recently

bull Cement and incinerator in Norway

bull Coal power retrofits globally

bull Biomass and gas power in UK

bull Research scope expanding to include solvent management and factors affecting capital cost

bull Bottom line is overall cost of ownership and investability

httpswwwnetldoegovFile20LibraryEvents2016c0220cap20review1-MondayH-Lu-Nexant-NGCC-Applications-in-Mexicopdf + full details in final Mexico World Bank project report httpswwwgobmxcmsuploadsattachmentfile107318CCPP_Final_Reportpdf

Study for World Bank found first generation generic solvent gave only slightly higher electricity costs than proprietary solvents for natural gas PCC retrofit

30 ww

httpswwwnetldoegovFile20LibraryEvents2016c0220cap20review1-MondayH-Lu-Nexant-NGCC-Applications-in-Mexicopdf + full details in final Mexico World Bank project report httpswwwgobmxcmsuploadsattachmentfile107318CCPP_Final_Reportpdf

CO2CRCBechtel Australia

Brown coal retrofit ndash 4 x

520MW

httpwwwco2crccomauwp-

contentuploads201810Retrofitting_Australian_Power_Station_with_PCCpdf

ETI NGCC project Download final project report from this link httpswwweticoukprogrammescarbon-

capture-storagethermal-power-with-ccssize=10ampfrom=0amp_type=eti-

documentamppublicOnly=falseampquery=final+project+reportampprogrammeName5B05D=Carbon

+Capture+and+StorageampprojectName5B05D=Thermal+Power+with+CCS

Karsto NGCC project httppublikasjonernvenoreport2007report2007_02pdf

Full FEED on UKCCSRC web site

httpsukccsrcacuksitesdefaultfilesdocumentsnewsKarsto-FEED-Study-Report-Redacted-

Updated-comppdfIreland NGCC project Under development ndash see httpwwwerviaiebusiness-developmentcarbon-capture-storage

IEAGHG PH433 ndash a conceptual study on natural gas and coal but quite detailed including for the

capture plant httpsieaghgorgdocsGeneral_DocsReportsPH4-

3320post20combustionpdf

Canada CCS Knowledge Centre Shand retrofit

httpsccsknowledgecomresources2nd-generation

Mexico Posa Rica Nexant study

httpswwwnetldoegovFile20LibraryEvents2016c0220cap20review1-MondayH-Lu-

Nexant-NGCC-Applications-in-Mexicopdf + full details in final Mexico World Bank project

report httpswwwgobmxcmsuploadsattachmentfile107318CCPP_Final_Reportpdf

Netherlands ROAD Maasvlakte

httpsccsnetworkeuprojectsroad-project-rotterdam

DTIDECCBEIS FEED studies httpswwwgovukgovernmentcollectionscarbon-capture-and-storage-knowledge-sharing

Some PCC retrofit studies

Page 2: Post-combustion capture for retrofit applications...International post-combustion capture retrofit workshop held in Sheffield, 9-12 April 2019 CCUS specialists from the UK CCS Research

International Test Center Network httpsitcn-globalorg

PACT Pilot-Scale Advanced Capture TechnologyA facility managed by the University of Sheffield

httpspactgroupshefacuk

PACT is coordinating the ITCN for 2 years

International post-combustion capture retrofit workshop held in Sheffield 9-12 April 2019CCUS specialists from the UK CCS Research Centre and the University of Sheffieldrsquos PACT facilities together with Bechtel (US) TNO (NL) Test Centre Mongstad (Norway) and the Universities of Edinburgh and Leeds held an international workshop on post-combustion capture (PCC) retrofit Together with application experts from China Ireland South Africa and Thailand the workshop examined past open-access PCC studies and potential future practical applications from across the world

httpwwwieaorgweo2017

International Energy Agency (2017) World Energy Outlook 2017 OECDIEA Paris

The IEA Sustainable Development Scenario only keeps within carbon budgets by reducing CO2 emissions rate significantly by 2040 and carrying on rapidly to net zero or net negative after that

Large scale CCS including negative emissions technologies (BECCS and DACS) is obviously essential

12

8

4

0

CCS has a smaller role than renewables to 2040 but still a very significant increase from almost zero CCS now

GtCO2yr

2040 storage of ~ 2 GtCO2yrwould need perhaps 200large sources or clusters eachtaking 5-10 years to developeven in China

httpwwwglobalccsinstitutecomnewsinstitute-updatesparis-climate-change-targets-cannot-be-met-without-ccs-cop23 + httpswwwieaorgpublicationsfreepublicationspublication20-years-of-carbon-capture-and-storagehtml

International Energy Agency (2017) World Energy Outlook 2017 OECDIEA Paris

Where we can get to by 2030 is critical new initiatives are needed to build the core of an industry that can be expanded rapidly in the 2030s (and 2040s and 2050s)

Annual Electricity generation by source

SDS power CCS is lsquoonlyrsquo 6 of global electricity generation but this is a major increase

Installed capacity in 204013100 GW

Boundary Dam 3 120MW Petra Nova 240MW

Installed capacity in 204013100 GW

+ httpswwwieaorgpublicationsinsightsinsightpublicationsThePotentialforEquippingChinasExistingCoalFleetwithCarbonCaptureandStoragepdf

International Energy Agency (2017) World Energy Outlook 2017 OECDIEA Paris2040 power CCS capacity is x1000 - 375GW vs 360MW now

(plus capture from industry)bull 210 GW of coal power capacity with CCS globallybull 150 GW of this is in China (~15 of current Chinese power plant capacity)+

bull 165 GW of gas power capacity with CCS globallybull Most of the coal CCS likely to be post-combustion and retrofits to existing plantsbull This is still only ~500 generating units but most will have to be built in the 2030s

PCC

UK cost estimates for a range of fuels and technologiesStudy for BEIS by Wood formerly Amec-FW httpswwwgovukguidancefunding-for-low-carbon-industry

GasGTCC

Gas+PCC

Gas+H2

Coal+PCC

Coal+Oxy

CoalIGCC

Gas SCO2

Gas MCFC

Bio

+PCCBio

+OxyBio

IGCC

bull Post-combustion capture appears competitive ndash also allows retrofit

bull Urgent to accelerate learning by doing for all technologies to reduce costs

LCOE does not include any negative emissions credit

From Bruce Adderley Jeremy Carey Jon Gibbins Mathieu Lucquiaud and Richard Smith ldquoPost-Combustion Carbon Dioxide Capture Cost Reduction to 2030 and beyondrdquo Faraday Discussion on CCS July 2016 httppubsrscorgenContentArticleLanding2016FDc6fd00046kdivAbstract

Government funded RampD and private innovators can help to evolve PCC technologies provided that there can be good knowledge transfer between operating large scale plants and research and developer and innovation communities

Commercial Readiness Index (CRI) for PCC needs to be increased by driving sub-systems through the TRLs based on learning by doing

Bankable Asset Class

Market competitiondriving widespread development

Multiple Commercial Applications

Commercial Scale Up

Commercial Trial Small Scale

Hypothetical Commercial Proposition

System test launch and operation

Systemsubsystem development

Technology demonstration

Technology development

Research to prove feasibility

Basic technology research

TRL

CRI

9

8

7

6

5

4

3

2

1

6

5

4

3

2

1

CO2CRC Study Retrofitting an Australian Brown Coal Power Station With Post-Combustion Capture

Map httpworldweatherwmoint185c00434mhtm credited Courtesy Department of Peacekeeping Operations Cartographic Section United Nations Reference Map No 4170 Rev4 January 2004

httpwwwco2crccomaupublication-categoryreports

From Loy Yang B visitor booklet

Post-Combustion Capture (PCC) Process Flow Diagram

Example coming later is fairly conventional but special features are

(a) SOx removal in FGD (b) Continuous reclaimer (c) Stack gas heater at top of absorber

Brown Coal Retrofit Study PCC Capture System

bull Two PCC modules per 568 MW

unit

bull 24 MtCO2yr capacity per

module

bull DCC in the base of the absorber

tower

bull Absorber - 15m diameter x 15m

packed height

bull 190 MW reduction in

net unit output BUT

can be rapidly

restored

bull Estimated AUD 935

million CAPEX per

module

bull AUD 24 to 60 million per year

OPEX excluding energy

bull 40 ww MEA with continuous

batch reclaiming ndash so open-access

Layout for

PCC

retrofit on

all four

reference

units

bull Open stack

bull Connections

at stack base

need major

attention

bull Treated flue

gas vented at

top of

absorbers

Site visit photo 2 Nov 2017 Loy Yang A Unit 3

Shand Brown Coal Petra Nova

Tonnes CO2 per day per PCC unit 6540 6588 4776

CO2 vv dry 13 157

EOP kWhtCO2 2706 3466

CAPEX $9864M AUD935M

~USD700M

Capex ($M) 9864 700 635

$ktCO2 per day 151 106 133

MtCO2yr based on 85 LF 203 204 148

$MMtCO2yr 486 342 429

No owners costs

Petra Nova httpswwwostigovbiblio1344080Shand httpsccsknowledgecomresources2nd-generationBrown Coal httpwwwco2crccomaupublication-categoryreports

376414

353 350 362 351 360

MEA30ww

Alstom BASF Fluor HTC MHI Cansolv

World BankPre-Feasibility Study for Establishing a Carbon Capture Pilot Plant in Mexico - Full-Scale Poza

Rica NGCC PCC Retrofit Incremental Electricity Cost ($MWh) for 85 CO2 Capture

Open-technology open-access is a key enabler for international partnerships especially for full-scale PCC projects as well as lab- and pilot-scale work

bull Why is CCUS different ndash only a few (5-10) big PCC projects globally over the next decade and then a huge increase in deployment mainly via retrofits to meet climate targets

bull So need to build a next phase of post-combustion (PCC) full-scale projects as open-technology (multiple solvents) with open-access (generic solvent) at least for an initial period

bull Open-access enables international knowledge exchange and strong commercial competition to reduce costs at all stages ndash feasibility FEED EPC commissioning and initial operation

bull Gets much better value for government expenditure on deployment and RampD

bull Greatly increases the rate at which the field of PCC technologies will improve

bull Open-technology open-access PCC hardware is a fast track to deploy multipleinnovations including through in-service upgrading

bull Can try out new solvents etc without building a new plant for every one

bull Plus critical information exchange in both directions with Mission Innovation and pilot testing eg ITCN ACT - Accelerating CCS Technologies

bull Relative costs for an open-technology open-access PCC from a study undertaken for the World Bank+ show overall incremental electricity costs for a range of proprietary PCC technology vendors similar and only marginally better than a first generation open-access solvent 30 ww MEA

wwwact-ccseu + httpswwwgobmxsenerendocumentospre-feasibility-study-for-establishing-a-carbon-capture-pilot-plant-in-mexicoidiom=en

Conclusions

bull PCC now getting deployed often for retrofit ndashnumber of waste incinerator projects in NL most recently

bull Cement and incinerator in Norway

bull Coal power retrofits globally

bull Biomass and gas power in UK

bull Research scope expanding to include solvent management and factors affecting capital cost

bull Bottom line is overall cost of ownership and investability

httpswwwnetldoegovFile20LibraryEvents2016c0220cap20review1-MondayH-Lu-Nexant-NGCC-Applications-in-Mexicopdf + full details in final Mexico World Bank project report httpswwwgobmxcmsuploadsattachmentfile107318CCPP_Final_Reportpdf

Study for World Bank found first generation generic solvent gave only slightly higher electricity costs than proprietary solvents for natural gas PCC retrofit

30 ww

httpswwwnetldoegovFile20LibraryEvents2016c0220cap20review1-MondayH-Lu-Nexant-NGCC-Applications-in-Mexicopdf + full details in final Mexico World Bank project report httpswwwgobmxcmsuploadsattachmentfile107318CCPP_Final_Reportpdf

CO2CRCBechtel Australia

Brown coal retrofit ndash 4 x

520MW

httpwwwco2crccomauwp-

contentuploads201810Retrofitting_Australian_Power_Station_with_PCCpdf

ETI NGCC project Download final project report from this link httpswwweticoukprogrammescarbon-

capture-storagethermal-power-with-ccssize=10ampfrom=0amp_type=eti-

documentamppublicOnly=falseampquery=final+project+reportampprogrammeName5B05D=Carbon

+Capture+and+StorageampprojectName5B05D=Thermal+Power+with+CCS

Karsto NGCC project httppublikasjonernvenoreport2007report2007_02pdf

Full FEED on UKCCSRC web site

httpsukccsrcacuksitesdefaultfilesdocumentsnewsKarsto-FEED-Study-Report-Redacted-

Updated-comppdfIreland NGCC project Under development ndash see httpwwwerviaiebusiness-developmentcarbon-capture-storage

IEAGHG PH433 ndash a conceptual study on natural gas and coal but quite detailed including for the

capture plant httpsieaghgorgdocsGeneral_DocsReportsPH4-

3320post20combustionpdf

Canada CCS Knowledge Centre Shand retrofit

httpsccsknowledgecomresources2nd-generation

Mexico Posa Rica Nexant study

httpswwwnetldoegovFile20LibraryEvents2016c0220cap20review1-MondayH-Lu-

Nexant-NGCC-Applications-in-Mexicopdf + full details in final Mexico World Bank project

report httpswwwgobmxcmsuploadsattachmentfile107318CCPP_Final_Reportpdf

Netherlands ROAD Maasvlakte

httpsccsnetworkeuprojectsroad-project-rotterdam

DTIDECCBEIS FEED studies httpswwwgovukgovernmentcollectionscarbon-capture-and-storage-knowledge-sharing

Some PCC retrofit studies

Page 3: Post-combustion capture for retrofit applications...International post-combustion capture retrofit workshop held in Sheffield, 9-12 April 2019 CCUS specialists from the UK CCS Research

International post-combustion capture retrofit workshop held in Sheffield 9-12 April 2019CCUS specialists from the UK CCS Research Centre and the University of Sheffieldrsquos PACT facilities together with Bechtel (US) TNO (NL) Test Centre Mongstad (Norway) and the Universities of Edinburgh and Leeds held an international workshop on post-combustion capture (PCC) retrofit Together with application experts from China Ireland South Africa and Thailand the workshop examined past open-access PCC studies and potential future practical applications from across the world

httpwwwieaorgweo2017

International Energy Agency (2017) World Energy Outlook 2017 OECDIEA Paris

The IEA Sustainable Development Scenario only keeps within carbon budgets by reducing CO2 emissions rate significantly by 2040 and carrying on rapidly to net zero or net negative after that

Large scale CCS including negative emissions technologies (BECCS and DACS) is obviously essential

12

8

4

0

CCS has a smaller role than renewables to 2040 but still a very significant increase from almost zero CCS now

GtCO2yr

2040 storage of ~ 2 GtCO2yrwould need perhaps 200large sources or clusters eachtaking 5-10 years to developeven in China

httpwwwglobalccsinstitutecomnewsinstitute-updatesparis-climate-change-targets-cannot-be-met-without-ccs-cop23 + httpswwwieaorgpublicationsfreepublicationspublication20-years-of-carbon-capture-and-storagehtml

International Energy Agency (2017) World Energy Outlook 2017 OECDIEA Paris

Where we can get to by 2030 is critical new initiatives are needed to build the core of an industry that can be expanded rapidly in the 2030s (and 2040s and 2050s)

Annual Electricity generation by source

SDS power CCS is lsquoonlyrsquo 6 of global electricity generation but this is a major increase

Installed capacity in 204013100 GW

Boundary Dam 3 120MW Petra Nova 240MW

Installed capacity in 204013100 GW

+ httpswwwieaorgpublicationsinsightsinsightpublicationsThePotentialforEquippingChinasExistingCoalFleetwithCarbonCaptureandStoragepdf

International Energy Agency (2017) World Energy Outlook 2017 OECDIEA Paris2040 power CCS capacity is x1000 - 375GW vs 360MW now

(plus capture from industry)bull 210 GW of coal power capacity with CCS globallybull 150 GW of this is in China (~15 of current Chinese power plant capacity)+

bull 165 GW of gas power capacity with CCS globallybull Most of the coal CCS likely to be post-combustion and retrofits to existing plantsbull This is still only ~500 generating units but most will have to be built in the 2030s

PCC

UK cost estimates for a range of fuels and technologiesStudy for BEIS by Wood formerly Amec-FW httpswwwgovukguidancefunding-for-low-carbon-industry

GasGTCC

Gas+PCC

Gas+H2

Coal+PCC

Coal+Oxy

CoalIGCC

Gas SCO2

Gas MCFC

Bio

+PCCBio

+OxyBio

IGCC

bull Post-combustion capture appears competitive ndash also allows retrofit

bull Urgent to accelerate learning by doing for all technologies to reduce costs

LCOE does not include any negative emissions credit

From Bruce Adderley Jeremy Carey Jon Gibbins Mathieu Lucquiaud and Richard Smith ldquoPost-Combustion Carbon Dioxide Capture Cost Reduction to 2030 and beyondrdquo Faraday Discussion on CCS July 2016 httppubsrscorgenContentArticleLanding2016FDc6fd00046kdivAbstract

Government funded RampD and private innovators can help to evolve PCC technologies provided that there can be good knowledge transfer between operating large scale plants and research and developer and innovation communities

Commercial Readiness Index (CRI) for PCC needs to be increased by driving sub-systems through the TRLs based on learning by doing

Bankable Asset Class

Market competitiondriving widespread development

Multiple Commercial Applications

Commercial Scale Up

Commercial Trial Small Scale

Hypothetical Commercial Proposition

System test launch and operation

Systemsubsystem development

Technology demonstration

Technology development

Research to prove feasibility

Basic technology research

TRL

CRI

9

8

7

6

5

4

3

2

1

6

5

4

3

2

1

CO2CRC Study Retrofitting an Australian Brown Coal Power Station With Post-Combustion Capture

Map httpworldweatherwmoint185c00434mhtm credited Courtesy Department of Peacekeeping Operations Cartographic Section United Nations Reference Map No 4170 Rev4 January 2004

httpwwwco2crccomaupublication-categoryreports

From Loy Yang B visitor booklet

Post-Combustion Capture (PCC) Process Flow Diagram

Example coming later is fairly conventional but special features are

(a) SOx removal in FGD (b) Continuous reclaimer (c) Stack gas heater at top of absorber

Brown Coal Retrofit Study PCC Capture System

bull Two PCC modules per 568 MW

unit

bull 24 MtCO2yr capacity per

module

bull DCC in the base of the absorber

tower

bull Absorber - 15m diameter x 15m

packed height

bull 190 MW reduction in

net unit output BUT

can be rapidly

restored

bull Estimated AUD 935

million CAPEX per

module

bull AUD 24 to 60 million per year

OPEX excluding energy

bull 40 ww MEA with continuous

batch reclaiming ndash so open-access

Layout for

PCC

retrofit on

all four

reference

units

bull Open stack

bull Connections

at stack base

need major

attention

bull Treated flue

gas vented at

top of

absorbers

Site visit photo 2 Nov 2017 Loy Yang A Unit 3

Shand Brown Coal Petra Nova

Tonnes CO2 per day per PCC unit 6540 6588 4776

CO2 vv dry 13 157

EOP kWhtCO2 2706 3466

CAPEX $9864M AUD935M

~USD700M

Capex ($M) 9864 700 635

$ktCO2 per day 151 106 133

MtCO2yr based on 85 LF 203 204 148

$MMtCO2yr 486 342 429

No owners costs

Petra Nova httpswwwostigovbiblio1344080Shand httpsccsknowledgecomresources2nd-generationBrown Coal httpwwwco2crccomaupublication-categoryreports

376414

353 350 362 351 360

MEA30ww

Alstom BASF Fluor HTC MHI Cansolv

World BankPre-Feasibility Study for Establishing a Carbon Capture Pilot Plant in Mexico - Full-Scale Poza

Rica NGCC PCC Retrofit Incremental Electricity Cost ($MWh) for 85 CO2 Capture

Open-technology open-access is a key enabler for international partnerships especially for full-scale PCC projects as well as lab- and pilot-scale work

bull Why is CCUS different ndash only a few (5-10) big PCC projects globally over the next decade and then a huge increase in deployment mainly via retrofits to meet climate targets

bull So need to build a next phase of post-combustion (PCC) full-scale projects as open-technology (multiple solvents) with open-access (generic solvent) at least for an initial period

bull Open-access enables international knowledge exchange and strong commercial competition to reduce costs at all stages ndash feasibility FEED EPC commissioning and initial operation

bull Gets much better value for government expenditure on deployment and RampD

bull Greatly increases the rate at which the field of PCC technologies will improve

bull Open-technology open-access PCC hardware is a fast track to deploy multipleinnovations including through in-service upgrading

bull Can try out new solvents etc without building a new plant for every one

bull Plus critical information exchange in both directions with Mission Innovation and pilot testing eg ITCN ACT - Accelerating CCS Technologies

bull Relative costs for an open-technology open-access PCC from a study undertaken for the World Bank+ show overall incremental electricity costs for a range of proprietary PCC technology vendors similar and only marginally better than a first generation open-access solvent 30 ww MEA

wwwact-ccseu + httpswwwgobmxsenerendocumentospre-feasibility-study-for-establishing-a-carbon-capture-pilot-plant-in-mexicoidiom=en

Conclusions

bull PCC now getting deployed often for retrofit ndashnumber of waste incinerator projects in NL most recently

bull Cement and incinerator in Norway

bull Coal power retrofits globally

bull Biomass and gas power in UK

bull Research scope expanding to include solvent management and factors affecting capital cost

bull Bottom line is overall cost of ownership and investability

httpswwwnetldoegovFile20LibraryEvents2016c0220cap20review1-MondayH-Lu-Nexant-NGCC-Applications-in-Mexicopdf + full details in final Mexico World Bank project report httpswwwgobmxcmsuploadsattachmentfile107318CCPP_Final_Reportpdf

Study for World Bank found first generation generic solvent gave only slightly higher electricity costs than proprietary solvents for natural gas PCC retrofit

30 ww

httpswwwnetldoegovFile20LibraryEvents2016c0220cap20review1-MondayH-Lu-Nexant-NGCC-Applications-in-Mexicopdf + full details in final Mexico World Bank project report httpswwwgobmxcmsuploadsattachmentfile107318CCPP_Final_Reportpdf

CO2CRCBechtel Australia

Brown coal retrofit ndash 4 x

520MW

httpwwwco2crccomauwp-

contentuploads201810Retrofitting_Australian_Power_Station_with_PCCpdf

ETI NGCC project Download final project report from this link httpswwweticoukprogrammescarbon-

capture-storagethermal-power-with-ccssize=10ampfrom=0amp_type=eti-

documentamppublicOnly=falseampquery=final+project+reportampprogrammeName5B05D=Carbon

+Capture+and+StorageampprojectName5B05D=Thermal+Power+with+CCS

Karsto NGCC project httppublikasjonernvenoreport2007report2007_02pdf

Full FEED on UKCCSRC web site

httpsukccsrcacuksitesdefaultfilesdocumentsnewsKarsto-FEED-Study-Report-Redacted-

Updated-comppdfIreland NGCC project Under development ndash see httpwwwerviaiebusiness-developmentcarbon-capture-storage

IEAGHG PH433 ndash a conceptual study on natural gas and coal but quite detailed including for the

capture plant httpsieaghgorgdocsGeneral_DocsReportsPH4-

3320post20combustionpdf

Canada CCS Knowledge Centre Shand retrofit

httpsccsknowledgecomresources2nd-generation

Mexico Posa Rica Nexant study

httpswwwnetldoegovFile20LibraryEvents2016c0220cap20review1-MondayH-Lu-

Nexant-NGCC-Applications-in-Mexicopdf + full details in final Mexico World Bank project

report httpswwwgobmxcmsuploadsattachmentfile107318CCPP_Final_Reportpdf

Netherlands ROAD Maasvlakte

httpsccsnetworkeuprojectsroad-project-rotterdam

DTIDECCBEIS FEED studies httpswwwgovukgovernmentcollectionscarbon-capture-and-storage-knowledge-sharing

Some PCC retrofit studies

Page 4: Post-combustion capture for retrofit applications...International post-combustion capture retrofit workshop held in Sheffield, 9-12 April 2019 CCUS specialists from the UK CCS Research

httpwwwieaorgweo2017

International Energy Agency (2017) World Energy Outlook 2017 OECDIEA Paris

The IEA Sustainable Development Scenario only keeps within carbon budgets by reducing CO2 emissions rate significantly by 2040 and carrying on rapidly to net zero or net negative after that

Large scale CCS including negative emissions technologies (BECCS and DACS) is obviously essential

12

8

4

0

CCS has a smaller role than renewables to 2040 but still a very significant increase from almost zero CCS now

GtCO2yr

2040 storage of ~ 2 GtCO2yrwould need perhaps 200large sources or clusters eachtaking 5-10 years to developeven in China

httpwwwglobalccsinstitutecomnewsinstitute-updatesparis-climate-change-targets-cannot-be-met-without-ccs-cop23 + httpswwwieaorgpublicationsfreepublicationspublication20-years-of-carbon-capture-and-storagehtml

International Energy Agency (2017) World Energy Outlook 2017 OECDIEA Paris

Where we can get to by 2030 is critical new initiatives are needed to build the core of an industry that can be expanded rapidly in the 2030s (and 2040s and 2050s)

Annual Electricity generation by source

SDS power CCS is lsquoonlyrsquo 6 of global electricity generation but this is a major increase

Installed capacity in 204013100 GW

Boundary Dam 3 120MW Petra Nova 240MW

Installed capacity in 204013100 GW

+ httpswwwieaorgpublicationsinsightsinsightpublicationsThePotentialforEquippingChinasExistingCoalFleetwithCarbonCaptureandStoragepdf

International Energy Agency (2017) World Energy Outlook 2017 OECDIEA Paris2040 power CCS capacity is x1000 - 375GW vs 360MW now

(plus capture from industry)bull 210 GW of coal power capacity with CCS globallybull 150 GW of this is in China (~15 of current Chinese power plant capacity)+

bull 165 GW of gas power capacity with CCS globallybull Most of the coal CCS likely to be post-combustion and retrofits to existing plantsbull This is still only ~500 generating units but most will have to be built in the 2030s

PCC

UK cost estimates for a range of fuels and technologiesStudy for BEIS by Wood formerly Amec-FW httpswwwgovukguidancefunding-for-low-carbon-industry

GasGTCC

Gas+PCC

Gas+H2

Coal+PCC

Coal+Oxy

CoalIGCC

Gas SCO2

Gas MCFC

Bio

+PCCBio

+OxyBio

IGCC

bull Post-combustion capture appears competitive ndash also allows retrofit

bull Urgent to accelerate learning by doing for all technologies to reduce costs

LCOE does not include any negative emissions credit

From Bruce Adderley Jeremy Carey Jon Gibbins Mathieu Lucquiaud and Richard Smith ldquoPost-Combustion Carbon Dioxide Capture Cost Reduction to 2030 and beyondrdquo Faraday Discussion on CCS July 2016 httppubsrscorgenContentArticleLanding2016FDc6fd00046kdivAbstract

Government funded RampD and private innovators can help to evolve PCC technologies provided that there can be good knowledge transfer between operating large scale plants and research and developer and innovation communities

Commercial Readiness Index (CRI) for PCC needs to be increased by driving sub-systems through the TRLs based on learning by doing

Bankable Asset Class

Market competitiondriving widespread development

Multiple Commercial Applications

Commercial Scale Up

Commercial Trial Small Scale

Hypothetical Commercial Proposition

System test launch and operation

Systemsubsystem development

Technology demonstration

Technology development

Research to prove feasibility

Basic technology research

TRL

CRI

9

8

7

6

5

4

3

2

1

6

5

4

3

2

1

CO2CRC Study Retrofitting an Australian Brown Coal Power Station With Post-Combustion Capture

Map httpworldweatherwmoint185c00434mhtm credited Courtesy Department of Peacekeeping Operations Cartographic Section United Nations Reference Map No 4170 Rev4 January 2004

httpwwwco2crccomaupublication-categoryreports

From Loy Yang B visitor booklet

Post-Combustion Capture (PCC) Process Flow Diagram

Example coming later is fairly conventional but special features are

(a) SOx removal in FGD (b) Continuous reclaimer (c) Stack gas heater at top of absorber

Brown Coal Retrofit Study PCC Capture System

bull Two PCC modules per 568 MW

unit

bull 24 MtCO2yr capacity per

module

bull DCC in the base of the absorber

tower

bull Absorber - 15m diameter x 15m

packed height

bull 190 MW reduction in

net unit output BUT

can be rapidly

restored

bull Estimated AUD 935

million CAPEX per

module

bull AUD 24 to 60 million per year

OPEX excluding energy

bull 40 ww MEA with continuous

batch reclaiming ndash so open-access

Layout for

PCC

retrofit on

all four

reference

units

bull Open stack

bull Connections

at stack base

need major

attention

bull Treated flue

gas vented at

top of

absorbers

Site visit photo 2 Nov 2017 Loy Yang A Unit 3

Shand Brown Coal Petra Nova

Tonnes CO2 per day per PCC unit 6540 6588 4776

CO2 vv dry 13 157

EOP kWhtCO2 2706 3466

CAPEX $9864M AUD935M

~USD700M

Capex ($M) 9864 700 635

$ktCO2 per day 151 106 133

MtCO2yr based on 85 LF 203 204 148

$MMtCO2yr 486 342 429

No owners costs

Petra Nova httpswwwostigovbiblio1344080Shand httpsccsknowledgecomresources2nd-generationBrown Coal httpwwwco2crccomaupublication-categoryreports

376414

353 350 362 351 360

MEA30ww

Alstom BASF Fluor HTC MHI Cansolv

World BankPre-Feasibility Study for Establishing a Carbon Capture Pilot Plant in Mexico - Full-Scale Poza

Rica NGCC PCC Retrofit Incremental Electricity Cost ($MWh) for 85 CO2 Capture

Open-technology open-access is a key enabler for international partnerships especially for full-scale PCC projects as well as lab- and pilot-scale work

bull Why is CCUS different ndash only a few (5-10) big PCC projects globally over the next decade and then a huge increase in deployment mainly via retrofits to meet climate targets

bull So need to build a next phase of post-combustion (PCC) full-scale projects as open-technology (multiple solvents) with open-access (generic solvent) at least for an initial period

bull Open-access enables international knowledge exchange and strong commercial competition to reduce costs at all stages ndash feasibility FEED EPC commissioning and initial operation

bull Gets much better value for government expenditure on deployment and RampD

bull Greatly increases the rate at which the field of PCC technologies will improve

bull Open-technology open-access PCC hardware is a fast track to deploy multipleinnovations including through in-service upgrading

bull Can try out new solvents etc without building a new plant for every one

bull Plus critical information exchange in both directions with Mission Innovation and pilot testing eg ITCN ACT - Accelerating CCS Technologies

bull Relative costs for an open-technology open-access PCC from a study undertaken for the World Bank+ show overall incremental electricity costs for a range of proprietary PCC technology vendors similar and only marginally better than a first generation open-access solvent 30 ww MEA

wwwact-ccseu + httpswwwgobmxsenerendocumentospre-feasibility-study-for-establishing-a-carbon-capture-pilot-plant-in-mexicoidiom=en

Conclusions

bull PCC now getting deployed often for retrofit ndashnumber of waste incinerator projects in NL most recently

bull Cement and incinerator in Norway

bull Coal power retrofits globally

bull Biomass and gas power in UK

bull Research scope expanding to include solvent management and factors affecting capital cost

bull Bottom line is overall cost of ownership and investability

httpswwwnetldoegovFile20LibraryEvents2016c0220cap20review1-MondayH-Lu-Nexant-NGCC-Applications-in-Mexicopdf + full details in final Mexico World Bank project report httpswwwgobmxcmsuploadsattachmentfile107318CCPP_Final_Reportpdf

Study for World Bank found first generation generic solvent gave only slightly higher electricity costs than proprietary solvents for natural gas PCC retrofit

30 ww

httpswwwnetldoegovFile20LibraryEvents2016c0220cap20review1-MondayH-Lu-Nexant-NGCC-Applications-in-Mexicopdf + full details in final Mexico World Bank project report httpswwwgobmxcmsuploadsattachmentfile107318CCPP_Final_Reportpdf

CO2CRCBechtel Australia

Brown coal retrofit ndash 4 x

520MW

httpwwwco2crccomauwp-

contentuploads201810Retrofitting_Australian_Power_Station_with_PCCpdf

ETI NGCC project Download final project report from this link httpswwweticoukprogrammescarbon-

capture-storagethermal-power-with-ccssize=10ampfrom=0amp_type=eti-

documentamppublicOnly=falseampquery=final+project+reportampprogrammeName5B05D=Carbon

+Capture+and+StorageampprojectName5B05D=Thermal+Power+with+CCS

Karsto NGCC project httppublikasjonernvenoreport2007report2007_02pdf

Full FEED on UKCCSRC web site

httpsukccsrcacuksitesdefaultfilesdocumentsnewsKarsto-FEED-Study-Report-Redacted-

Updated-comppdfIreland NGCC project Under development ndash see httpwwwerviaiebusiness-developmentcarbon-capture-storage

IEAGHG PH433 ndash a conceptual study on natural gas and coal but quite detailed including for the

capture plant httpsieaghgorgdocsGeneral_DocsReportsPH4-

3320post20combustionpdf

Canada CCS Knowledge Centre Shand retrofit

httpsccsknowledgecomresources2nd-generation

Mexico Posa Rica Nexant study

httpswwwnetldoegovFile20LibraryEvents2016c0220cap20review1-MondayH-Lu-

Nexant-NGCC-Applications-in-Mexicopdf + full details in final Mexico World Bank project

report httpswwwgobmxcmsuploadsattachmentfile107318CCPP_Final_Reportpdf

Netherlands ROAD Maasvlakte

httpsccsnetworkeuprojectsroad-project-rotterdam

DTIDECCBEIS FEED studies httpswwwgovukgovernmentcollectionscarbon-capture-and-storage-knowledge-sharing

Some PCC retrofit studies

Page 5: Post-combustion capture for retrofit applications...International post-combustion capture retrofit workshop held in Sheffield, 9-12 April 2019 CCUS specialists from the UK CCS Research

12

8

4

0

CCS has a smaller role than renewables to 2040 but still a very significant increase from almost zero CCS now

GtCO2yr

2040 storage of ~ 2 GtCO2yrwould need perhaps 200large sources or clusters eachtaking 5-10 years to developeven in China

httpwwwglobalccsinstitutecomnewsinstitute-updatesparis-climate-change-targets-cannot-be-met-without-ccs-cop23 + httpswwwieaorgpublicationsfreepublicationspublication20-years-of-carbon-capture-and-storagehtml

International Energy Agency (2017) World Energy Outlook 2017 OECDIEA Paris

Where we can get to by 2030 is critical new initiatives are needed to build the core of an industry that can be expanded rapidly in the 2030s (and 2040s and 2050s)

Annual Electricity generation by source

SDS power CCS is lsquoonlyrsquo 6 of global electricity generation but this is a major increase

Installed capacity in 204013100 GW

Boundary Dam 3 120MW Petra Nova 240MW

Installed capacity in 204013100 GW

+ httpswwwieaorgpublicationsinsightsinsightpublicationsThePotentialforEquippingChinasExistingCoalFleetwithCarbonCaptureandStoragepdf

International Energy Agency (2017) World Energy Outlook 2017 OECDIEA Paris2040 power CCS capacity is x1000 - 375GW vs 360MW now

(plus capture from industry)bull 210 GW of coal power capacity with CCS globallybull 150 GW of this is in China (~15 of current Chinese power plant capacity)+

bull 165 GW of gas power capacity with CCS globallybull Most of the coal CCS likely to be post-combustion and retrofits to existing plantsbull This is still only ~500 generating units but most will have to be built in the 2030s

PCC

UK cost estimates for a range of fuels and technologiesStudy for BEIS by Wood formerly Amec-FW httpswwwgovukguidancefunding-for-low-carbon-industry

GasGTCC

Gas+PCC

Gas+H2

Coal+PCC

Coal+Oxy

CoalIGCC

Gas SCO2

Gas MCFC

Bio

+PCCBio

+OxyBio

IGCC

bull Post-combustion capture appears competitive ndash also allows retrofit

bull Urgent to accelerate learning by doing for all technologies to reduce costs

LCOE does not include any negative emissions credit

From Bruce Adderley Jeremy Carey Jon Gibbins Mathieu Lucquiaud and Richard Smith ldquoPost-Combustion Carbon Dioxide Capture Cost Reduction to 2030 and beyondrdquo Faraday Discussion on CCS July 2016 httppubsrscorgenContentArticleLanding2016FDc6fd00046kdivAbstract

Government funded RampD and private innovators can help to evolve PCC technologies provided that there can be good knowledge transfer between operating large scale plants and research and developer and innovation communities

Commercial Readiness Index (CRI) for PCC needs to be increased by driving sub-systems through the TRLs based on learning by doing

Bankable Asset Class

Market competitiondriving widespread development

Multiple Commercial Applications

Commercial Scale Up

Commercial Trial Small Scale

Hypothetical Commercial Proposition

System test launch and operation

Systemsubsystem development

Technology demonstration

Technology development

Research to prove feasibility

Basic technology research

TRL

CRI

9

8

7

6

5

4

3

2

1

6

5

4

3

2

1

CO2CRC Study Retrofitting an Australian Brown Coal Power Station With Post-Combustion Capture

Map httpworldweatherwmoint185c00434mhtm credited Courtesy Department of Peacekeeping Operations Cartographic Section United Nations Reference Map No 4170 Rev4 January 2004

httpwwwco2crccomaupublication-categoryreports

From Loy Yang B visitor booklet

Post-Combustion Capture (PCC) Process Flow Diagram

Example coming later is fairly conventional but special features are

(a) SOx removal in FGD (b) Continuous reclaimer (c) Stack gas heater at top of absorber

Brown Coal Retrofit Study PCC Capture System

bull Two PCC modules per 568 MW

unit

bull 24 MtCO2yr capacity per

module

bull DCC in the base of the absorber

tower

bull Absorber - 15m diameter x 15m

packed height

bull 190 MW reduction in

net unit output BUT

can be rapidly

restored

bull Estimated AUD 935

million CAPEX per

module

bull AUD 24 to 60 million per year

OPEX excluding energy

bull 40 ww MEA with continuous

batch reclaiming ndash so open-access

Layout for

PCC

retrofit on

all four

reference

units

bull Open stack

bull Connections

at stack base

need major

attention

bull Treated flue

gas vented at

top of

absorbers

Site visit photo 2 Nov 2017 Loy Yang A Unit 3

Shand Brown Coal Petra Nova

Tonnes CO2 per day per PCC unit 6540 6588 4776

CO2 vv dry 13 157

EOP kWhtCO2 2706 3466

CAPEX $9864M AUD935M

~USD700M

Capex ($M) 9864 700 635

$ktCO2 per day 151 106 133

MtCO2yr based on 85 LF 203 204 148

$MMtCO2yr 486 342 429

No owners costs

Petra Nova httpswwwostigovbiblio1344080Shand httpsccsknowledgecomresources2nd-generationBrown Coal httpwwwco2crccomaupublication-categoryreports

376414

353 350 362 351 360

MEA30ww

Alstom BASF Fluor HTC MHI Cansolv

World BankPre-Feasibility Study for Establishing a Carbon Capture Pilot Plant in Mexico - Full-Scale Poza

Rica NGCC PCC Retrofit Incremental Electricity Cost ($MWh) for 85 CO2 Capture

Open-technology open-access is a key enabler for international partnerships especially for full-scale PCC projects as well as lab- and pilot-scale work

bull Why is CCUS different ndash only a few (5-10) big PCC projects globally over the next decade and then a huge increase in deployment mainly via retrofits to meet climate targets

bull So need to build a next phase of post-combustion (PCC) full-scale projects as open-technology (multiple solvents) with open-access (generic solvent) at least for an initial period

bull Open-access enables international knowledge exchange and strong commercial competition to reduce costs at all stages ndash feasibility FEED EPC commissioning and initial operation

bull Gets much better value for government expenditure on deployment and RampD

bull Greatly increases the rate at which the field of PCC technologies will improve

bull Open-technology open-access PCC hardware is a fast track to deploy multipleinnovations including through in-service upgrading

bull Can try out new solvents etc without building a new plant for every one

bull Plus critical information exchange in both directions with Mission Innovation and pilot testing eg ITCN ACT - Accelerating CCS Technologies

bull Relative costs for an open-technology open-access PCC from a study undertaken for the World Bank+ show overall incremental electricity costs for a range of proprietary PCC technology vendors similar and only marginally better than a first generation open-access solvent 30 ww MEA

wwwact-ccseu + httpswwwgobmxsenerendocumentospre-feasibility-study-for-establishing-a-carbon-capture-pilot-plant-in-mexicoidiom=en

Conclusions

bull PCC now getting deployed often for retrofit ndashnumber of waste incinerator projects in NL most recently

bull Cement and incinerator in Norway

bull Coal power retrofits globally

bull Biomass and gas power in UK

bull Research scope expanding to include solvent management and factors affecting capital cost

bull Bottom line is overall cost of ownership and investability

httpswwwnetldoegovFile20LibraryEvents2016c0220cap20review1-MondayH-Lu-Nexant-NGCC-Applications-in-Mexicopdf + full details in final Mexico World Bank project report httpswwwgobmxcmsuploadsattachmentfile107318CCPP_Final_Reportpdf

Study for World Bank found first generation generic solvent gave only slightly higher electricity costs than proprietary solvents for natural gas PCC retrofit

30 ww

httpswwwnetldoegovFile20LibraryEvents2016c0220cap20review1-MondayH-Lu-Nexant-NGCC-Applications-in-Mexicopdf + full details in final Mexico World Bank project report httpswwwgobmxcmsuploadsattachmentfile107318CCPP_Final_Reportpdf

CO2CRCBechtel Australia

Brown coal retrofit ndash 4 x

520MW

httpwwwco2crccomauwp-

contentuploads201810Retrofitting_Australian_Power_Station_with_PCCpdf

ETI NGCC project Download final project report from this link httpswwweticoukprogrammescarbon-

capture-storagethermal-power-with-ccssize=10ampfrom=0amp_type=eti-

documentamppublicOnly=falseampquery=final+project+reportampprogrammeName5B05D=Carbon

+Capture+and+StorageampprojectName5B05D=Thermal+Power+with+CCS

Karsto NGCC project httppublikasjonernvenoreport2007report2007_02pdf

Full FEED on UKCCSRC web site

httpsukccsrcacuksitesdefaultfilesdocumentsnewsKarsto-FEED-Study-Report-Redacted-

Updated-comppdfIreland NGCC project Under development ndash see httpwwwerviaiebusiness-developmentcarbon-capture-storage

IEAGHG PH433 ndash a conceptual study on natural gas and coal but quite detailed including for the

capture plant httpsieaghgorgdocsGeneral_DocsReportsPH4-

3320post20combustionpdf

Canada CCS Knowledge Centre Shand retrofit

httpsccsknowledgecomresources2nd-generation

Mexico Posa Rica Nexant study

httpswwwnetldoegovFile20LibraryEvents2016c0220cap20review1-MondayH-Lu-

Nexant-NGCC-Applications-in-Mexicopdf + full details in final Mexico World Bank project

report httpswwwgobmxcmsuploadsattachmentfile107318CCPP_Final_Reportpdf

Netherlands ROAD Maasvlakte

httpsccsnetworkeuprojectsroad-project-rotterdam

DTIDECCBEIS FEED studies httpswwwgovukgovernmentcollectionscarbon-capture-and-storage-knowledge-sharing

Some PCC retrofit studies

Page 6: Post-combustion capture for retrofit applications...International post-combustion capture retrofit workshop held in Sheffield, 9-12 April 2019 CCUS specialists from the UK CCS Research

Annual Electricity generation by source

SDS power CCS is lsquoonlyrsquo 6 of global electricity generation but this is a major increase

Installed capacity in 204013100 GW

Boundary Dam 3 120MW Petra Nova 240MW

Installed capacity in 204013100 GW

+ httpswwwieaorgpublicationsinsightsinsightpublicationsThePotentialforEquippingChinasExistingCoalFleetwithCarbonCaptureandStoragepdf

International Energy Agency (2017) World Energy Outlook 2017 OECDIEA Paris2040 power CCS capacity is x1000 - 375GW vs 360MW now

(plus capture from industry)bull 210 GW of coal power capacity with CCS globallybull 150 GW of this is in China (~15 of current Chinese power plant capacity)+

bull 165 GW of gas power capacity with CCS globallybull Most of the coal CCS likely to be post-combustion and retrofits to existing plantsbull This is still only ~500 generating units but most will have to be built in the 2030s

PCC

UK cost estimates for a range of fuels and technologiesStudy for BEIS by Wood formerly Amec-FW httpswwwgovukguidancefunding-for-low-carbon-industry

GasGTCC

Gas+PCC

Gas+H2

Coal+PCC

Coal+Oxy

CoalIGCC

Gas SCO2

Gas MCFC

Bio

+PCCBio

+OxyBio

IGCC

bull Post-combustion capture appears competitive ndash also allows retrofit

bull Urgent to accelerate learning by doing for all technologies to reduce costs

LCOE does not include any negative emissions credit

From Bruce Adderley Jeremy Carey Jon Gibbins Mathieu Lucquiaud and Richard Smith ldquoPost-Combustion Carbon Dioxide Capture Cost Reduction to 2030 and beyondrdquo Faraday Discussion on CCS July 2016 httppubsrscorgenContentArticleLanding2016FDc6fd00046kdivAbstract

Government funded RampD and private innovators can help to evolve PCC technologies provided that there can be good knowledge transfer between operating large scale plants and research and developer and innovation communities

Commercial Readiness Index (CRI) for PCC needs to be increased by driving sub-systems through the TRLs based on learning by doing

Bankable Asset Class

Market competitiondriving widespread development

Multiple Commercial Applications

Commercial Scale Up

Commercial Trial Small Scale

Hypothetical Commercial Proposition

System test launch and operation

Systemsubsystem development

Technology demonstration

Technology development

Research to prove feasibility

Basic technology research

TRL

CRI

9

8

7

6

5

4

3

2

1

6

5

4

3

2

1

CO2CRC Study Retrofitting an Australian Brown Coal Power Station With Post-Combustion Capture

Map httpworldweatherwmoint185c00434mhtm credited Courtesy Department of Peacekeeping Operations Cartographic Section United Nations Reference Map No 4170 Rev4 January 2004

httpwwwco2crccomaupublication-categoryreports

From Loy Yang B visitor booklet

Post-Combustion Capture (PCC) Process Flow Diagram

Example coming later is fairly conventional but special features are

(a) SOx removal in FGD (b) Continuous reclaimer (c) Stack gas heater at top of absorber

Brown Coal Retrofit Study PCC Capture System

bull Two PCC modules per 568 MW

unit

bull 24 MtCO2yr capacity per

module

bull DCC in the base of the absorber

tower

bull Absorber - 15m diameter x 15m

packed height

bull 190 MW reduction in

net unit output BUT

can be rapidly

restored

bull Estimated AUD 935

million CAPEX per

module

bull AUD 24 to 60 million per year

OPEX excluding energy

bull 40 ww MEA with continuous

batch reclaiming ndash so open-access

Layout for

PCC

retrofit on

all four

reference

units

bull Open stack

bull Connections

at stack base

need major

attention

bull Treated flue

gas vented at

top of

absorbers

Site visit photo 2 Nov 2017 Loy Yang A Unit 3

Shand Brown Coal Petra Nova

Tonnes CO2 per day per PCC unit 6540 6588 4776

CO2 vv dry 13 157

EOP kWhtCO2 2706 3466

CAPEX $9864M AUD935M

~USD700M

Capex ($M) 9864 700 635

$ktCO2 per day 151 106 133

MtCO2yr based on 85 LF 203 204 148

$MMtCO2yr 486 342 429

No owners costs

Petra Nova httpswwwostigovbiblio1344080Shand httpsccsknowledgecomresources2nd-generationBrown Coal httpwwwco2crccomaupublication-categoryreports

376414

353 350 362 351 360

MEA30ww

Alstom BASF Fluor HTC MHI Cansolv

World BankPre-Feasibility Study for Establishing a Carbon Capture Pilot Plant in Mexico - Full-Scale Poza

Rica NGCC PCC Retrofit Incremental Electricity Cost ($MWh) for 85 CO2 Capture

Open-technology open-access is a key enabler for international partnerships especially for full-scale PCC projects as well as lab- and pilot-scale work

bull Why is CCUS different ndash only a few (5-10) big PCC projects globally over the next decade and then a huge increase in deployment mainly via retrofits to meet climate targets

bull So need to build a next phase of post-combustion (PCC) full-scale projects as open-technology (multiple solvents) with open-access (generic solvent) at least for an initial period

bull Open-access enables international knowledge exchange and strong commercial competition to reduce costs at all stages ndash feasibility FEED EPC commissioning and initial operation

bull Gets much better value for government expenditure on deployment and RampD

bull Greatly increases the rate at which the field of PCC technologies will improve

bull Open-technology open-access PCC hardware is a fast track to deploy multipleinnovations including through in-service upgrading

bull Can try out new solvents etc without building a new plant for every one

bull Plus critical information exchange in both directions with Mission Innovation and pilot testing eg ITCN ACT - Accelerating CCS Technologies

bull Relative costs for an open-technology open-access PCC from a study undertaken for the World Bank+ show overall incremental electricity costs for a range of proprietary PCC technology vendors similar and only marginally better than a first generation open-access solvent 30 ww MEA

wwwact-ccseu + httpswwwgobmxsenerendocumentospre-feasibility-study-for-establishing-a-carbon-capture-pilot-plant-in-mexicoidiom=en

Conclusions

bull PCC now getting deployed often for retrofit ndashnumber of waste incinerator projects in NL most recently

bull Cement and incinerator in Norway

bull Coal power retrofits globally

bull Biomass and gas power in UK

bull Research scope expanding to include solvent management and factors affecting capital cost

bull Bottom line is overall cost of ownership and investability

httpswwwnetldoegovFile20LibraryEvents2016c0220cap20review1-MondayH-Lu-Nexant-NGCC-Applications-in-Mexicopdf + full details in final Mexico World Bank project report httpswwwgobmxcmsuploadsattachmentfile107318CCPP_Final_Reportpdf

Study for World Bank found first generation generic solvent gave only slightly higher electricity costs than proprietary solvents for natural gas PCC retrofit

30 ww

httpswwwnetldoegovFile20LibraryEvents2016c0220cap20review1-MondayH-Lu-Nexant-NGCC-Applications-in-Mexicopdf + full details in final Mexico World Bank project report httpswwwgobmxcmsuploadsattachmentfile107318CCPP_Final_Reportpdf

CO2CRCBechtel Australia

Brown coal retrofit ndash 4 x

520MW

httpwwwco2crccomauwp-

contentuploads201810Retrofitting_Australian_Power_Station_with_PCCpdf

ETI NGCC project Download final project report from this link httpswwweticoukprogrammescarbon-

capture-storagethermal-power-with-ccssize=10ampfrom=0amp_type=eti-

documentamppublicOnly=falseampquery=final+project+reportampprogrammeName5B05D=Carbon

+Capture+and+StorageampprojectName5B05D=Thermal+Power+with+CCS

Karsto NGCC project httppublikasjonernvenoreport2007report2007_02pdf

Full FEED on UKCCSRC web site

httpsukccsrcacuksitesdefaultfilesdocumentsnewsKarsto-FEED-Study-Report-Redacted-

Updated-comppdfIreland NGCC project Under development ndash see httpwwwerviaiebusiness-developmentcarbon-capture-storage

IEAGHG PH433 ndash a conceptual study on natural gas and coal but quite detailed including for the

capture plant httpsieaghgorgdocsGeneral_DocsReportsPH4-

3320post20combustionpdf

Canada CCS Knowledge Centre Shand retrofit

httpsccsknowledgecomresources2nd-generation

Mexico Posa Rica Nexant study

httpswwwnetldoegovFile20LibraryEvents2016c0220cap20review1-MondayH-Lu-

Nexant-NGCC-Applications-in-Mexicopdf + full details in final Mexico World Bank project

report httpswwwgobmxcmsuploadsattachmentfile107318CCPP_Final_Reportpdf

Netherlands ROAD Maasvlakte

httpsccsnetworkeuprojectsroad-project-rotterdam

DTIDECCBEIS FEED studies httpswwwgovukgovernmentcollectionscarbon-capture-and-storage-knowledge-sharing

Some PCC retrofit studies

Page 7: Post-combustion capture for retrofit applications...International post-combustion capture retrofit workshop held in Sheffield, 9-12 April 2019 CCUS specialists from the UK CCS Research

PCC

UK cost estimates for a range of fuels and technologiesStudy for BEIS by Wood formerly Amec-FW httpswwwgovukguidancefunding-for-low-carbon-industry

GasGTCC

Gas+PCC

Gas+H2

Coal+PCC

Coal+Oxy

CoalIGCC

Gas SCO2

Gas MCFC

Bio

+PCCBio

+OxyBio

IGCC

bull Post-combustion capture appears competitive ndash also allows retrofit

bull Urgent to accelerate learning by doing for all technologies to reduce costs

LCOE does not include any negative emissions credit

From Bruce Adderley Jeremy Carey Jon Gibbins Mathieu Lucquiaud and Richard Smith ldquoPost-Combustion Carbon Dioxide Capture Cost Reduction to 2030 and beyondrdquo Faraday Discussion on CCS July 2016 httppubsrscorgenContentArticleLanding2016FDc6fd00046kdivAbstract

Government funded RampD and private innovators can help to evolve PCC technologies provided that there can be good knowledge transfer between operating large scale plants and research and developer and innovation communities

Commercial Readiness Index (CRI) for PCC needs to be increased by driving sub-systems through the TRLs based on learning by doing

Bankable Asset Class

Market competitiondriving widespread development

Multiple Commercial Applications

Commercial Scale Up

Commercial Trial Small Scale

Hypothetical Commercial Proposition

System test launch and operation

Systemsubsystem development

Technology demonstration

Technology development

Research to prove feasibility

Basic technology research

TRL

CRI

9

8

7

6

5

4

3

2

1

6

5

4

3

2

1

CO2CRC Study Retrofitting an Australian Brown Coal Power Station With Post-Combustion Capture

Map httpworldweatherwmoint185c00434mhtm credited Courtesy Department of Peacekeeping Operations Cartographic Section United Nations Reference Map No 4170 Rev4 January 2004

httpwwwco2crccomaupublication-categoryreports

From Loy Yang B visitor booklet

Post-Combustion Capture (PCC) Process Flow Diagram

Example coming later is fairly conventional but special features are

(a) SOx removal in FGD (b) Continuous reclaimer (c) Stack gas heater at top of absorber

Brown Coal Retrofit Study PCC Capture System

bull Two PCC modules per 568 MW

unit

bull 24 MtCO2yr capacity per

module

bull DCC in the base of the absorber

tower

bull Absorber - 15m diameter x 15m

packed height

bull 190 MW reduction in

net unit output BUT

can be rapidly

restored

bull Estimated AUD 935

million CAPEX per

module

bull AUD 24 to 60 million per year

OPEX excluding energy

bull 40 ww MEA with continuous

batch reclaiming ndash so open-access

Layout for

PCC

retrofit on

all four

reference

units

bull Open stack

bull Connections

at stack base

need major

attention

bull Treated flue

gas vented at

top of

absorbers

Site visit photo 2 Nov 2017 Loy Yang A Unit 3

Shand Brown Coal Petra Nova

Tonnes CO2 per day per PCC unit 6540 6588 4776

CO2 vv dry 13 157

EOP kWhtCO2 2706 3466

CAPEX $9864M AUD935M

~USD700M

Capex ($M) 9864 700 635

$ktCO2 per day 151 106 133

MtCO2yr based on 85 LF 203 204 148

$MMtCO2yr 486 342 429

No owners costs

Petra Nova httpswwwostigovbiblio1344080Shand httpsccsknowledgecomresources2nd-generationBrown Coal httpwwwco2crccomaupublication-categoryreports

376414

353 350 362 351 360

MEA30ww

Alstom BASF Fluor HTC MHI Cansolv

World BankPre-Feasibility Study for Establishing a Carbon Capture Pilot Plant in Mexico - Full-Scale Poza

Rica NGCC PCC Retrofit Incremental Electricity Cost ($MWh) for 85 CO2 Capture

Open-technology open-access is a key enabler for international partnerships especially for full-scale PCC projects as well as lab- and pilot-scale work

bull Why is CCUS different ndash only a few (5-10) big PCC projects globally over the next decade and then a huge increase in deployment mainly via retrofits to meet climate targets

bull So need to build a next phase of post-combustion (PCC) full-scale projects as open-technology (multiple solvents) with open-access (generic solvent) at least for an initial period

bull Open-access enables international knowledge exchange and strong commercial competition to reduce costs at all stages ndash feasibility FEED EPC commissioning and initial operation

bull Gets much better value for government expenditure on deployment and RampD

bull Greatly increases the rate at which the field of PCC technologies will improve

bull Open-technology open-access PCC hardware is a fast track to deploy multipleinnovations including through in-service upgrading

bull Can try out new solvents etc without building a new plant for every one

bull Plus critical information exchange in both directions with Mission Innovation and pilot testing eg ITCN ACT - Accelerating CCS Technologies

bull Relative costs for an open-technology open-access PCC from a study undertaken for the World Bank+ show overall incremental electricity costs for a range of proprietary PCC technology vendors similar and only marginally better than a first generation open-access solvent 30 ww MEA

wwwact-ccseu + httpswwwgobmxsenerendocumentospre-feasibility-study-for-establishing-a-carbon-capture-pilot-plant-in-mexicoidiom=en

Conclusions

bull PCC now getting deployed often for retrofit ndashnumber of waste incinerator projects in NL most recently

bull Cement and incinerator in Norway

bull Coal power retrofits globally

bull Biomass and gas power in UK

bull Research scope expanding to include solvent management and factors affecting capital cost

bull Bottom line is overall cost of ownership and investability

httpswwwnetldoegovFile20LibraryEvents2016c0220cap20review1-MondayH-Lu-Nexant-NGCC-Applications-in-Mexicopdf + full details in final Mexico World Bank project report httpswwwgobmxcmsuploadsattachmentfile107318CCPP_Final_Reportpdf

Study for World Bank found first generation generic solvent gave only slightly higher electricity costs than proprietary solvents for natural gas PCC retrofit

30 ww

httpswwwnetldoegovFile20LibraryEvents2016c0220cap20review1-MondayH-Lu-Nexant-NGCC-Applications-in-Mexicopdf + full details in final Mexico World Bank project report httpswwwgobmxcmsuploadsattachmentfile107318CCPP_Final_Reportpdf

CO2CRCBechtel Australia

Brown coal retrofit ndash 4 x

520MW

httpwwwco2crccomauwp-

contentuploads201810Retrofitting_Australian_Power_Station_with_PCCpdf

ETI NGCC project Download final project report from this link httpswwweticoukprogrammescarbon-

capture-storagethermal-power-with-ccssize=10ampfrom=0amp_type=eti-

documentamppublicOnly=falseampquery=final+project+reportampprogrammeName5B05D=Carbon

+Capture+and+StorageampprojectName5B05D=Thermal+Power+with+CCS

Karsto NGCC project httppublikasjonernvenoreport2007report2007_02pdf

Full FEED on UKCCSRC web site

httpsukccsrcacuksitesdefaultfilesdocumentsnewsKarsto-FEED-Study-Report-Redacted-

Updated-comppdfIreland NGCC project Under development ndash see httpwwwerviaiebusiness-developmentcarbon-capture-storage

IEAGHG PH433 ndash a conceptual study on natural gas and coal but quite detailed including for the

capture plant httpsieaghgorgdocsGeneral_DocsReportsPH4-

3320post20combustionpdf

Canada CCS Knowledge Centre Shand retrofit

httpsccsknowledgecomresources2nd-generation

Mexico Posa Rica Nexant study

httpswwwnetldoegovFile20LibraryEvents2016c0220cap20review1-MondayH-Lu-

Nexant-NGCC-Applications-in-Mexicopdf + full details in final Mexico World Bank project

report httpswwwgobmxcmsuploadsattachmentfile107318CCPP_Final_Reportpdf

Netherlands ROAD Maasvlakte

httpsccsnetworkeuprojectsroad-project-rotterdam

DTIDECCBEIS FEED studies httpswwwgovukgovernmentcollectionscarbon-capture-and-storage-knowledge-sharing

Some PCC retrofit studies

Page 8: Post-combustion capture for retrofit applications...International post-combustion capture retrofit workshop held in Sheffield, 9-12 April 2019 CCUS specialists from the UK CCS Research

From Bruce Adderley Jeremy Carey Jon Gibbins Mathieu Lucquiaud and Richard Smith ldquoPost-Combustion Carbon Dioxide Capture Cost Reduction to 2030 and beyondrdquo Faraday Discussion on CCS July 2016 httppubsrscorgenContentArticleLanding2016FDc6fd00046kdivAbstract

Government funded RampD and private innovators can help to evolve PCC technologies provided that there can be good knowledge transfer between operating large scale plants and research and developer and innovation communities

Commercial Readiness Index (CRI) for PCC needs to be increased by driving sub-systems through the TRLs based on learning by doing

Bankable Asset Class

Market competitiondriving widespread development

Multiple Commercial Applications

Commercial Scale Up

Commercial Trial Small Scale

Hypothetical Commercial Proposition

System test launch and operation

Systemsubsystem development

Technology demonstration

Technology development

Research to prove feasibility

Basic technology research

TRL

CRI

9

8

7

6

5

4

3

2

1

6

5

4

3

2

1

CO2CRC Study Retrofitting an Australian Brown Coal Power Station With Post-Combustion Capture

Map httpworldweatherwmoint185c00434mhtm credited Courtesy Department of Peacekeeping Operations Cartographic Section United Nations Reference Map No 4170 Rev4 January 2004

httpwwwco2crccomaupublication-categoryreports

From Loy Yang B visitor booklet

Post-Combustion Capture (PCC) Process Flow Diagram

Example coming later is fairly conventional but special features are

(a) SOx removal in FGD (b) Continuous reclaimer (c) Stack gas heater at top of absorber

Brown Coal Retrofit Study PCC Capture System

bull Two PCC modules per 568 MW

unit

bull 24 MtCO2yr capacity per

module

bull DCC in the base of the absorber

tower

bull Absorber - 15m diameter x 15m

packed height

bull 190 MW reduction in

net unit output BUT

can be rapidly

restored

bull Estimated AUD 935

million CAPEX per

module

bull AUD 24 to 60 million per year

OPEX excluding energy

bull 40 ww MEA with continuous

batch reclaiming ndash so open-access

Layout for

PCC

retrofit on

all four

reference

units

bull Open stack

bull Connections

at stack base

need major

attention

bull Treated flue

gas vented at

top of

absorbers

Site visit photo 2 Nov 2017 Loy Yang A Unit 3

Shand Brown Coal Petra Nova

Tonnes CO2 per day per PCC unit 6540 6588 4776

CO2 vv dry 13 157

EOP kWhtCO2 2706 3466

CAPEX $9864M AUD935M

~USD700M

Capex ($M) 9864 700 635

$ktCO2 per day 151 106 133

MtCO2yr based on 85 LF 203 204 148

$MMtCO2yr 486 342 429

No owners costs

Petra Nova httpswwwostigovbiblio1344080Shand httpsccsknowledgecomresources2nd-generationBrown Coal httpwwwco2crccomaupublication-categoryreports

376414

353 350 362 351 360

MEA30ww

Alstom BASF Fluor HTC MHI Cansolv

World BankPre-Feasibility Study for Establishing a Carbon Capture Pilot Plant in Mexico - Full-Scale Poza

Rica NGCC PCC Retrofit Incremental Electricity Cost ($MWh) for 85 CO2 Capture

Open-technology open-access is a key enabler for international partnerships especially for full-scale PCC projects as well as lab- and pilot-scale work

bull Why is CCUS different ndash only a few (5-10) big PCC projects globally over the next decade and then a huge increase in deployment mainly via retrofits to meet climate targets

bull So need to build a next phase of post-combustion (PCC) full-scale projects as open-technology (multiple solvents) with open-access (generic solvent) at least for an initial period

bull Open-access enables international knowledge exchange and strong commercial competition to reduce costs at all stages ndash feasibility FEED EPC commissioning and initial operation

bull Gets much better value for government expenditure on deployment and RampD

bull Greatly increases the rate at which the field of PCC technologies will improve

bull Open-technology open-access PCC hardware is a fast track to deploy multipleinnovations including through in-service upgrading

bull Can try out new solvents etc without building a new plant for every one

bull Plus critical information exchange in both directions with Mission Innovation and pilot testing eg ITCN ACT - Accelerating CCS Technologies

bull Relative costs for an open-technology open-access PCC from a study undertaken for the World Bank+ show overall incremental electricity costs for a range of proprietary PCC technology vendors similar and only marginally better than a first generation open-access solvent 30 ww MEA

wwwact-ccseu + httpswwwgobmxsenerendocumentospre-feasibility-study-for-establishing-a-carbon-capture-pilot-plant-in-mexicoidiom=en

Conclusions

bull PCC now getting deployed often for retrofit ndashnumber of waste incinerator projects in NL most recently

bull Cement and incinerator in Norway

bull Coal power retrofits globally

bull Biomass and gas power in UK

bull Research scope expanding to include solvent management and factors affecting capital cost

bull Bottom line is overall cost of ownership and investability

httpswwwnetldoegovFile20LibraryEvents2016c0220cap20review1-MondayH-Lu-Nexant-NGCC-Applications-in-Mexicopdf + full details in final Mexico World Bank project report httpswwwgobmxcmsuploadsattachmentfile107318CCPP_Final_Reportpdf

Study for World Bank found first generation generic solvent gave only slightly higher electricity costs than proprietary solvents for natural gas PCC retrofit

30 ww

httpswwwnetldoegovFile20LibraryEvents2016c0220cap20review1-MondayH-Lu-Nexant-NGCC-Applications-in-Mexicopdf + full details in final Mexico World Bank project report httpswwwgobmxcmsuploadsattachmentfile107318CCPP_Final_Reportpdf

CO2CRCBechtel Australia

Brown coal retrofit ndash 4 x

520MW

httpwwwco2crccomauwp-

contentuploads201810Retrofitting_Australian_Power_Station_with_PCCpdf

ETI NGCC project Download final project report from this link httpswwweticoukprogrammescarbon-

capture-storagethermal-power-with-ccssize=10ampfrom=0amp_type=eti-

documentamppublicOnly=falseampquery=final+project+reportampprogrammeName5B05D=Carbon

+Capture+and+StorageampprojectName5B05D=Thermal+Power+with+CCS

Karsto NGCC project httppublikasjonernvenoreport2007report2007_02pdf

Full FEED on UKCCSRC web site

httpsukccsrcacuksitesdefaultfilesdocumentsnewsKarsto-FEED-Study-Report-Redacted-

Updated-comppdfIreland NGCC project Under development ndash see httpwwwerviaiebusiness-developmentcarbon-capture-storage

IEAGHG PH433 ndash a conceptual study on natural gas and coal but quite detailed including for the

capture plant httpsieaghgorgdocsGeneral_DocsReportsPH4-

3320post20combustionpdf

Canada CCS Knowledge Centre Shand retrofit

httpsccsknowledgecomresources2nd-generation

Mexico Posa Rica Nexant study

httpswwwnetldoegovFile20LibraryEvents2016c0220cap20review1-MondayH-Lu-

Nexant-NGCC-Applications-in-Mexicopdf + full details in final Mexico World Bank project

report httpswwwgobmxcmsuploadsattachmentfile107318CCPP_Final_Reportpdf

Netherlands ROAD Maasvlakte

httpsccsnetworkeuprojectsroad-project-rotterdam

DTIDECCBEIS FEED studies httpswwwgovukgovernmentcollectionscarbon-capture-and-storage-knowledge-sharing

Some PCC retrofit studies

Page 9: Post-combustion capture for retrofit applications...International post-combustion capture retrofit workshop held in Sheffield, 9-12 April 2019 CCUS specialists from the UK CCS Research

CO2CRC Study Retrofitting an Australian Brown Coal Power Station With Post-Combustion Capture

Map httpworldweatherwmoint185c00434mhtm credited Courtesy Department of Peacekeeping Operations Cartographic Section United Nations Reference Map No 4170 Rev4 January 2004

httpwwwco2crccomaupublication-categoryreports

From Loy Yang B visitor booklet

Post-Combustion Capture (PCC) Process Flow Diagram

Example coming later is fairly conventional but special features are

(a) SOx removal in FGD (b) Continuous reclaimer (c) Stack gas heater at top of absorber

Brown Coal Retrofit Study PCC Capture System

bull Two PCC modules per 568 MW

unit

bull 24 MtCO2yr capacity per

module

bull DCC in the base of the absorber

tower

bull Absorber - 15m diameter x 15m

packed height

bull 190 MW reduction in

net unit output BUT

can be rapidly

restored

bull Estimated AUD 935

million CAPEX per

module

bull AUD 24 to 60 million per year

OPEX excluding energy

bull 40 ww MEA with continuous

batch reclaiming ndash so open-access

Layout for

PCC

retrofit on

all four

reference

units

bull Open stack

bull Connections

at stack base

need major

attention

bull Treated flue

gas vented at

top of

absorbers

Site visit photo 2 Nov 2017 Loy Yang A Unit 3

Shand Brown Coal Petra Nova

Tonnes CO2 per day per PCC unit 6540 6588 4776

CO2 vv dry 13 157

EOP kWhtCO2 2706 3466

CAPEX $9864M AUD935M

~USD700M

Capex ($M) 9864 700 635

$ktCO2 per day 151 106 133

MtCO2yr based on 85 LF 203 204 148

$MMtCO2yr 486 342 429

No owners costs

Petra Nova httpswwwostigovbiblio1344080Shand httpsccsknowledgecomresources2nd-generationBrown Coal httpwwwco2crccomaupublication-categoryreports

376414

353 350 362 351 360

MEA30ww

Alstom BASF Fluor HTC MHI Cansolv

World BankPre-Feasibility Study for Establishing a Carbon Capture Pilot Plant in Mexico - Full-Scale Poza

Rica NGCC PCC Retrofit Incremental Electricity Cost ($MWh) for 85 CO2 Capture

Open-technology open-access is a key enabler for international partnerships especially for full-scale PCC projects as well as lab- and pilot-scale work

bull Why is CCUS different ndash only a few (5-10) big PCC projects globally over the next decade and then a huge increase in deployment mainly via retrofits to meet climate targets

bull So need to build a next phase of post-combustion (PCC) full-scale projects as open-technology (multiple solvents) with open-access (generic solvent) at least for an initial period

bull Open-access enables international knowledge exchange and strong commercial competition to reduce costs at all stages ndash feasibility FEED EPC commissioning and initial operation

bull Gets much better value for government expenditure on deployment and RampD

bull Greatly increases the rate at which the field of PCC technologies will improve

bull Open-technology open-access PCC hardware is a fast track to deploy multipleinnovations including through in-service upgrading

bull Can try out new solvents etc without building a new plant for every one

bull Plus critical information exchange in both directions with Mission Innovation and pilot testing eg ITCN ACT - Accelerating CCS Technologies

bull Relative costs for an open-technology open-access PCC from a study undertaken for the World Bank+ show overall incremental electricity costs for a range of proprietary PCC technology vendors similar and only marginally better than a first generation open-access solvent 30 ww MEA

wwwact-ccseu + httpswwwgobmxsenerendocumentospre-feasibility-study-for-establishing-a-carbon-capture-pilot-plant-in-mexicoidiom=en

Conclusions

bull PCC now getting deployed often for retrofit ndashnumber of waste incinerator projects in NL most recently

bull Cement and incinerator in Norway

bull Coal power retrofits globally

bull Biomass and gas power in UK

bull Research scope expanding to include solvent management and factors affecting capital cost

bull Bottom line is overall cost of ownership and investability

httpswwwnetldoegovFile20LibraryEvents2016c0220cap20review1-MondayH-Lu-Nexant-NGCC-Applications-in-Mexicopdf + full details in final Mexico World Bank project report httpswwwgobmxcmsuploadsattachmentfile107318CCPP_Final_Reportpdf

Study for World Bank found first generation generic solvent gave only slightly higher electricity costs than proprietary solvents for natural gas PCC retrofit

30 ww

httpswwwnetldoegovFile20LibraryEvents2016c0220cap20review1-MondayH-Lu-Nexant-NGCC-Applications-in-Mexicopdf + full details in final Mexico World Bank project report httpswwwgobmxcmsuploadsattachmentfile107318CCPP_Final_Reportpdf

CO2CRCBechtel Australia

Brown coal retrofit ndash 4 x

520MW

httpwwwco2crccomauwp-

contentuploads201810Retrofitting_Australian_Power_Station_with_PCCpdf

ETI NGCC project Download final project report from this link httpswwweticoukprogrammescarbon-

capture-storagethermal-power-with-ccssize=10ampfrom=0amp_type=eti-

documentamppublicOnly=falseampquery=final+project+reportampprogrammeName5B05D=Carbon

+Capture+and+StorageampprojectName5B05D=Thermal+Power+with+CCS

Karsto NGCC project httppublikasjonernvenoreport2007report2007_02pdf

Full FEED on UKCCSRC web site

httpsukccsrcacuksitesdefaultfilesdocumentsnewsKarsto-FEED-Study-Report-Redacted-

Updated-comppdfIreland NGCC project Under development ndash see httpwwwerviaiebusiness-developmentcarbon-capture-storage

IEAGHG PH433 ndash a conceptual study on natural gas and coal but quite detailed including for the

capture plant httpsieaghgorgdocsGeneral_DocsReportsPH4-

3320post20combustionpdf

Canada CCS Knowledge Centre Shand retrofit

httpsccsknowledgecomresources2nd-generation

Mexico Posa Rica Nexant study

httpswwwnetldoegovFile20LibraryEvents2016c0220cap20review1-MondayH-Lu-

Nexant-NGCC-Applications-in-Mexicopdf + full details in final Mexico World Bank project

report httpswwwgobmxcmsuploadsattachmentfile107318CCPP_Final_Reportpdf

Netherlands ROAD Maasvlakte

httpsccsnetworkeuprojectsroad-project-rotterdam

DTIDECCBEIS FEED studies httpswwwgovukgovernmentcollectionscarbon-capture-and-storage-knowledge-sharing

Some PCC retrofit studies

Page 10: Post-combustion capture for retrofit applications...International post-combustion capture retrofit workshop held in Sheffield, 9-12 April 2019 CCUS specialists from the UK CCS Research

From Loy Yang B visitor booklet

Post-Combustion Capture (PCC) Process Flow Diagram

Example coming later is fairly conventional but special features are

(a) SOx removal in FGD (b) Continuous reclaimer (c) Stack gas heater at top of absorber

Brown Coal Retrofit Study PCC Capture System

bull Two PCC modules per 568 MW

unit

bull 24 MtCO2yr capacity per

module

bull DCC in the base of the absorber

tower

bull Absorber - 15m diameter x 15m

packed height

bull 190 MW reduction in

net unit output BUT

can be rapidly

restored

bull Estimated AUD 935

million CAPEX per

module

bull AUD 24 to 60 million per year

OPEX excluding energy

bull 40 ww MEA with continuous

batch reclaiming ndash so open-access

Layout for

PCC

retrofit on

all four

reference

units

bull Open stack

bull Connections

at stack base

need major

attention

bull Treated flue

gas vented at

top of

absorbers

Site visit photo 2 Nov 2017 Loy Yang A Unit 3

Shand Brown Coal Petra Nova

Tonnes CO2 per day per PCC unit 6540 6588 4776

CO2 vv dry 13 157

EOP kWhtCO2 2706 3466

CAPEX $9864M AUD935M

~USD700M

Capex ($M) 9864 700 635

$ktCO2 per day 151 106 133

MtCO2yr based on 85 LF 203 204 148

$MMtCO2yr 486 342 429

No owners costs

Petra Nova httpswwwostigovbiblio1344080Shand httpsccsknowledgecomresources2nd-generationBrown Coal httpwwwco2crccomaupublication-categoryreports

376414

353 350 362 351 360

MEA30ww

Alstom BASF Fluor HTC MHI Cansolv

World BankPre-Feasibility Study for Establishing a Carbon Capture Pilot Plant in Mexico - Full-Scale Poza

Rica NGCC PCC Retrofit Incremental Electricity Cost ($MWh) for 85 CO2 Capture

Open-technology open-access is a key enabler for international partnerships especially for full-scale PCC projects as well as lab- and pilot-scale work

bull Why is CCUS different ndash only a few (5-10) big PCC projects globally over the next decade and then a huge increase in deployment mainly via retrofits to meet climate targets

bull So need to build a next phase of post-combustion (PCC) full-scale projects as open-technology (multiple solvents) with open-access (generic solvent) at least for an initial period

bull Open-access enables international knowledge exchange and strong commercial competition to reduce costs at all stages ndash feasibility FEED EPC commissioning and initial operation

bull Gets much better value for government expenditure on deployment and RampD

bull Greatly increases the rate at which the field of PCC technologies will improve

bull Open-technology open-access PCC hardware is a fast track to deploy multipleinnovations including through in-service upgrading

bull Can try out new solvents etc without building a new plant for every one

bull Plus critical information exchange in both directions with Mission Innovation and pilot testing eg ITCN ACT - Accelerating CCS Technologies

bull Relative costs for an open-technology open-access PCC from a study undertaken for the World Bank+ show overall incremental electricity costs for a range of proprietary PCC technology vendors similar and only marginally better than a first generation open-access solvent 30 ww MEA

wwwact-ccseu + httpswwwgobmxsenerendocumentospre-feasibility-study-for-establishing-a-carbon-capture-pilot-plant-in-mexicoidiom=en

Conclusions

bull PCC now getting deployed often for retrofit ndashnumber of waste incinerator projects in NL most recently

bull Cement and incinerator in Norway

bull Coal power retrofits globally

bull Biomass and gas power in UK

bull Research scope expanding to include solvent management and factors affecting capital cost

bull Bottom line is overall cost of ownership and investability

httpswwwnetldoegovFile20LibraryEvents2016c0220cap20review1-MondayH-Lu-Nexant-NGCC-Applications-in-Mexicopdf + full details in final Mexico World Bank project report httpswwwgobmxcmsuploadsattachmentfile107318CCPP_Final_Reportpdf

Study for World Bank found first generation generic solvent gave only slightly higher electricity costs than proprietary solvents for natural gas PCC retrofit

30 ww

httpswwwnetldoegovFile20LibraryEvents2016c0220cap20review1-MondayH-Lu-Nexant-NGCC-Applications-in-Mexicopdf + full details in final Mexico World Bank project report httpswwwgobmxcmsuploadsattachmentfile107318CCPP_Final_Reportpdf

CO2CRCBechtel Australia

Brown coal retrofit ndash 4 x

520MW

httpwwwco2crccomauwp-

contentuploads201810Retrofitting_Australian_Power_Station_with_PCCpdf

ETI NGCC project Download final project report from this link httpswwweticoukprogrammescarbon-

capture-storagethermal-power-with-ccssize=10ampfrom=0amp_type=eti-

documentamppublicOnly=falseampquery=final+project+reportampprogrammeName5B05D=Carbon

+Capture+and+StorageampprojectName5B05D=Thermal+Power+with+CCS

Karsto NGCC project httppublikasjonernvenoreport2007report2007_02pdf

Full FEED on UKCCSRC web site

httpsukccsrcacuksitesdefaultfilesdocumentsnewsKarsto-FEED-Study-Report-Redacted-

Updated-comppdfIreland NGCC project Under development ndash see httpwwwerviaiebusiness-developmentcarbon-capture-storage

IEAGHG PH433 ndash a conceptual study on natural gas and coal but quite detailed including for the

capture plant httpsieaghgorgdocsGeneral_DocsReportsPH4-

3320post20combustionpdf

Canada CCS Knowledge Centre Shand retrofit

httpsccsknowledgecomresources2nd-generation

Mexico Posa Rica Nexant study

httpswwwnetldoegovFile20LibraryEvents2016c0220cap20review1-MondayH-Lu-

Nexant-NGCC-Applications-in-Mexicopdf + full details in final Mexico World Bank project

report httpswwwgobmxcmsuploadsattachmentfile107318CCPP_Final_Reportpdf

Netherlands ROAD Maasvlakte

httpsccsnetworkeuprojectsroad-project-rotterdam

DTIDECCBEIS FEED studies httpswwwgovukgovernmentcollectionscarbon-capture-and-storage-knowledge-sharing

Some PCC retrofit studies

Page 11: Post-combustion capture for retrofit applications...International post-combustion capture retrofit workshop held in Sheffield, 9-12 April 2019 CCUS specialists from the UK CCS Research

Post-Combustion Capture (PCC) Process Flow Diagram

Example coming later is fairly conventional but special features are

(a) SOx removal in FGD (b) Continuous reclaimer (c) Stack gas heater at top of absorber

Brown Coal Retrofit Study PCC Capture System

bull Two PCC modules per 568 MW

unit

bull 24 MtCO2yr capacity per

module

bull DCC in the base of the absorber

tower

bull Absorber - 15m diameter x 15m

packed height

bull 190 MW reduction in

net unit output BUT

can be rapidly

restored

bull Estimated AUD 935

million CAPEX per

module

bull AUD 24 to 60 million per year

OPEX excluding energy

bull 40 ww MEA with continuous

batch reclaiming ndash so open-access

Layout for

PCC

retrofit on

all four

reference

units

bull Open stack

bull Connections

at stack base

need major

attention

bull Treated flue

gas vented at

top of

absorbers

Site visit photo 2 Nov 2017 Loy Yang A Unit 3

Shand Brown Coal Petra Nova

Tonnes CO2 per day per PCC unit 6540 6588 4776

CO2 vv dry 13 157

EOP kWhtCO2 2706 3466

CAPEX $9864M AUD935M

~USD700M

Capex ($M) 9864 700 635

$ktCO2 per day 151 106 133

MtCO2yr based on 85 LF 203 204 148

$MMtCO2yr 486 342 429

No owners costs

Petra Nova httpswwwostigovbiblio1344080Shand httpsccsknowledgecomresources2nd-generationBrown Coal httpwwwco2crccomaupublication-categoryreports

376414

353 350 362 351 360

MEA30ww

Alstom BASF Fluor HTC MHI Cansolv

World BankPre-Feasibility Study for Establishing a Carbon Capture Pilot Plant in Mexico - Full-Scale Poza

Rica NGCC PCC Retrofit Incremental Electricity Cost ($MWh) for 85 CO2 Capture

Open-technology open-access is a key enabler for international partnerships especially for full-scale PCC projects as well as lab- and pilot-scale work

bull Why is CCUS different ndash only a few (5-10) big PCC projects globally over the next decade and then a huge increase in deployment mainly via retrofits to meet climate targets

bull So need to build a next phase of post-combustion (PCC) full-scale projects as open-technology (multiple solvents) with open-access (generic solvent) at least for an initial period

bull Open-access enables international knowledge exchange and strong commercial competition to reduce costs at all stages ndash feasibility FEED EPC commissioning and initial operation

bull Gets much better value for government expenditure on deployment and RampD

bull Greatly increases the rate at which the field of PCC technologies will improve

bull Open-technology open-access PCC hardware is a fast track to deploy multipleinnovations including through in-service upgrading

bull Can try out new solvents etc without building a new plant for every one

bull Plus critical information exchange in both directions with Mission Innovation and pilot testing eg ITCN ACT - Accelerating CCS Technologies

bull Relative costs for an open-technology open-access PCC from a study undertaken for the World Bank+ show overall incremental electricity costs for a range of proprietary PCC technology vendors similar and only marginally better than a first generation open-access solvent 30 ww MEA

wwwact-ccseu + httpswwwgobmxsenerendocumentospre-feasibility-study-for-establishing-a-carbon-capture-pilot-plant-in-mexicoidiom=en

Conclusions

bull PCC now getting deployed often for retrofit ndashnumber of waste incinerator projects in NL most recently

bull Cement and incinerator in Norway

bull Coal power retrofits globally

bull Biomass and gas power in UK

bull Research scope expanding to include solvent management and factors affecting capital cost

bull Bottom line is overall cost of ownership and investability

httpswwwnetldoegovFile20LibraryEvents2016c0220cap20review1-MondayH-Lu-Nexant-NGCC-Applications-in-Mexicopdf + full details in final Mexico World Bank project report httpswwwgobmxcmsuploadsattachmentfile107318CCPP_Final_Reportpdf

Study for World Bank found first generation generic solvent gave only slightly higher electricity costs than proprietary solvents for natural gas PCC retrofit

30 ww

httpswwwnetldoegovFile20LibraryEvents2016c0220cap20review1-MondayH-Lu-Nexant-NGCC-Applications-in-Mexicopdf + full details in final Mexico World Bank project report httpswwwgobmxcmsuploadsattachmentfile107318CCPP_Final_Reportpdf

CO2CRCBechtel Australia

Brown coal retrofit ndash 4 x

520MW

httpwwwco2crccomauwp-

contentuploads201810Retrofitting_Australian_Power_Station_with_PCCpdf

ETI NGCC project Download final project report from this link httpswwweticoukprogrammescarbon-

capture-storagethermal-power-with-ccssize=10ampfrom=0amp_type=eti-

documentamppublicOnly=falseampquery=final+project+reportampprogrammeName5B05D=Carbon

+Capture+and+StorageampprojectName5B05D=Thermal+Power+with+CCS

Karsto NGCC project httppublikasjonernvenoreport2007report2007_02pdf

Full FEED on UKCCSRC web site

httpsukccsrcacuksitesdefaultfilesdocumentsnewsKarsto-FEED-Study-Report-Redacted-

Updated-comppdfIreland NGCC project Under development ndash see httpwwwerviaiebusiness-developmentcarbon-capture-storage

IEAGHG PH433 ndash a conceptual study on natural gas and coal but quite detailed including for the

capture plant httpsieaghgorgdocsGeneral_DocsReportsPH4-

3320post20combustionpdf

Canada CCS Knowledge Centre Shand retrofit

httpsccsknowledgecomresources2nd-generation

Mexico Posa Rica Nexant study

httpswwwnetldoegovFile20LibraryEvents2016c0220cap20review1-MondayH-Lu-

Nexant-NGCC-Applications-in-Mexicopdf + full details in final Mexico World Bank project

report httpswwwgobmxcmsuploadsattachmentfile107318CCPP_Final_Reportpdf

Netherlands ROAD Maasvlakte

httpsccsnetworkeuprojectsroad-project-rotterdam

DTIDECCBEIS FEED studies httpswwwgovukgovernmentcollectionscarbon-capture-and-storage-knowledge-sharing

Some PCC retrofit studies

Page 12: Post-combustion capture for retrofit applications...International post-combustion capture retrofit workshop held in Sheffield, 9-12 April 2019 CCUS specialists from the UK CCS Research

Brown Coal Retrofit Study PCC Capture System

bull Two PCC modules per 568 MW

unit

bull 24 MtCO2yr capacity per

module

bull DCC in the base of the absorber

tower

bull Absorber - 15m diameter x 15m

packed height

bull 190 MW reduction in

net unit output BUT

can be rapidly

restored

bull Estimated AUD 935

million CAPEX per

module

bull AUD 24 to 60 million per year

OPEX excluding energy

bull 40 ww MEA with continuous

batch reclaiming ndash so open-access

Layout for

PCC

retrofit on

all four

reference

units

bull Open stack

bull Connections

at stack base

need major

attention

bull Treated flue

gas vented at

top of

absorbers

Site visit photo 2 Nov 2017 Loy Yang A Unit 3

Shand Brown Coal Petra Nova

Tonnes CO2 per day per PCC unit 6540 6588 4776

CO2 vv dry 13 157

EOP kWhtCO2 2706 3466

CAPEX $9864M AUD935M

~USD700M

Capex ($M) 9864 700 635

$ktCO2 per day 151 106 133

MtCO2yr based on 85 LF 203 204 148

$MMtCO2yr 486 342 429

No owners costs

Petra Nova httpswwwostigovbiblio1344080Shand httpsccsknowledgecomresources2nd-generationBrown Coal httpwwwco2crccomaupublication-categoryreports

376414

353 350 362 351 360

MEA30ww

Alstom BASF Fluor HTC MHI Cansolv

World BankPre-Feasibility Study for Establishing a Carbon Capture Pilot Plant in Mexico - Full-Scale Poza

Rica NGCC PCC Retrofit Incremental Electricity Cost ($MWh) for 85 CO2 Capture

Open-technology open-access is a key enabler for international partnerships especially for full-scale PCC projects as well as lab- and pilot-scale work

bull Why is CCUS different ndash only a few (5-10) big PCC projects globally over the next decade and then a huge increase in deployment mainly via retrofits to meet climate targets

bull So need to build a next phase of post-combustion (PCC) full-scale projects as open-technology (multiple solvents) with open-access (generic solvent) at least for an initial period

bull Open-access enables international knowledge exchange and strong commercial competition to reduce costs at all stages ndash feasibility FEED EPC commissioning and initial operation

bull Gets much better value for government expenditure on deployment and RampD

bull Greatly increases the rate at which the field of PCC technologies will improve

bull Open-technology open-access PCC hardware is a fast track to deploy multipleinnovations including through in-service upgrading

bull Can try out new solvents etc without building a new plant for every one

bull Plus critical information exchange in both directions with Mission Innovation and pilot testing eg ITCN ACT - Accelerating CCS Technologies

bull Relative costs for an open-technology open-access PCC from a study undertaken for the World Bank+ show overall incremental electricity costs for a range of proprietary PCC technology vendors similar and only marginally better than a first generation open-access solvent 30 ww MEA

wwwact-ccseu + httpswwwgobmxsenerendocumentospre-feasibility-study-for-establishing-a-carbon-capture-pilot-plant-in-mexicoidiom=en

Conclusions

bull PCC now getting deployed often for retrofit ndashnumber of waste incinerator projects in NL most recently

bull Cement and incinerator in Norway

bull Coal power retrofits globally

bull Biomass and gas power in UK

bull Research scope expanding to include solvent management and factors affecting capital cost

bull Bottom line is overall cost of ownership and investability

httpswwwnetldoegovFile20LibraryEvents2016c0220cap20review1-MondayH-Lu-Nexant-NGCC-Applications-in-Mexicopdf + full details in final Mexico World Bank project report httpswwwgobmxcmsuploadsattachmentfile107318CCPP_Final_Reportpdf

Study for World Bank found first generation generic solvent gave only slightly higher electricity costs than proprietary solvents for natural gas PCC retrofit

30 ww

httpswwwnetldoegovFile20LibraryEvents2016c0220cap20review1-MondayH-Lu-Nexant-NGCC-Applications-in-Mexicopdf + full details in final Mexico World Bank project report httpswwwgobmxcmsuploadsattachmentfile107318CCPP_Final_Reportpdf

CO2CRCBechtel Australia

Brown coal retrofit ndash 4 x

520MW

httpwwwco2crccomauwp-

contentuploads201810Retrofitting_Australian_Power_Station_with_PCCpdf

ETI NGCC project Download final project report from this link httpswwweticoukprogrammescarbon-

capture-storagethermal-power-with-ccssize=10ampfrom=0amp_type=eti-

documentamppublicOnly=falseampquery=final+project+reportampprogrammeName5B05D=Carbon

+Capture+and+StorageampprojectName5B05D=Thermal+Power+with+CCS

Karsto NGCC project httppublikasjonernvenoreport2007report2007_02pdf

Full FEED on UKCCSRC web site

httpsukccsrcacuksitesdefaultfilesdocumentsnewsKarsto-FEED-Study-Report-Redacted-

Updated-comppdfIreland NGCC project Under development ndash see httpwwwerviaiebusiness-developmentcarbon-capture-storage

IEAGHG PH433 ndash a conceptual study on natural gas and coal but quite detailed including for the

capture plant httpsieaghgorgdocsGeneral_DocsReportsPH4-

3320post20combustionpdf

Canada CCS Knowledge Centre Shand retrofit

httpsccsknowledgecomresources2nd-generation

Mexico Posa Rica Nexant study

httpswwwnetldoegovFile20LibraryEvents2016c0220cap20review1-MondayH-Lu-

Nexant-NGCC-Applications-in-Mexicopdf + full details in final Mexico World Bank project

report httpswwwgobmxcmsuploadsattachmentfile107318CCPP_Final_Reportpdf

Netherlands ROAD Maasvlakte

httpsccsnetworkeuprojectsroad-project-rotterdam

DTIDECCBEIS FEED studies httpswwwgovukgovernmentcollectionscarbon-capture-and-storage-knowledge-sharing

Some PCC retrofit studies

Page 13: Post-combustion capture for retrofit applications...International post-combustion capture retrofit workshop held in Sheffield, 9-12 April 2019 CCUS specialists from the UK CCS Research

Layout for

PCC

retrofit on

all four

reference

units

bull Open stack

bull Connections

at stack base

need major

attention

bull Treated flue

gas vented at

top of

absorbers

Site visit photo 2 Nov 2017 Loy Yang A Unit 3

Shand Brown Coal Petra Nova

Tonnes CO2 per day per PCC unit 6540 6588 4776

CO2 vv dry 13 157

EOP kWhtCO2 2706 3466

CAPEX $9864M AUD935M

~USD700M

Capex ($M) 9864 700 635

$ktCO2 per day 151 106 133

MtCO2yr based on 85 LF 203 204 148

$MMtCO2yr 486 342 429

No owners costs

Petra Nova httpswwwostigovbiblio1344080Shand httpsccsknowledgecomresources2nd-generationBrown Coal httpwwwco2crccomaupublication-categoryreports

376414

353 350 362 351 360

MEA30ww

Alstom BASF Fluor HTC MHI Cansolv

World BankPre-Feasibility Study for Establishing a Carbon Capture Pilot Plant in Mexico - Full-Scale Poza

Rica NGCC PCC Retrofit Incremental Electricity Cost ($MWh) for 85 CO2 Capture

Open-technology open-access is a key enabler for international partnerships especially for full-scale PCC projects as well as lab- and pilot-scale work

bull Why is CCUS different ndash only a few (5-10) big PCC projects globally over the next decade and then a huge increase in deployment mainly via retrofits to meet climate targets

bull So need to build a next phase of post-combustion (PCC) full-scale projects as open-technology (multiple solvents) with open-access (generic solvent) at least for an initial period

bull Open-access enables international knowledge exchange and strong commercial competition to reduce costs at all stages ndash feasibility FEED EPC commissioning and initial operation

bull Gets much better value for government expenditure on deployment and RampD

bull Greatly increases the rate at which the field of PCC technologies will improve

bull Open-technology open-access PCC hardware is a fast track to deploy multipleinnovations including through in-service upgrading

bull Can try out new solvents etc without building a new plant for every one

bull Plus critical information exchange in both directions with Mission Innovation and pilot testing eg ITCN ACT - Accelerating CCS Technologies

bull Relative costs for an open-technology open-access PCC from a study undertaken for the World Bank+ show overall incremental electricity costs for a range of proprietary PCC technology vendors similar and only marginally better than a first generation open-access solvent 30 ww MEA

wwwact-ccseu + httpswwwgobmxsenerendocumentospre-feasibility-study-for-establishing-a-carbon-capture-pilot-plant-in-mexicoidiom=en

Conclusions

bull PCC now getting deployed often for retrofit ndashnumber of waste incinerator projects in NL most recently

bull Cement and incinerator in Norway

bull Coal power retrofits globally

bull Biomass and gas power in UK

bull Research scope expanding to include solvent management and factors affecting capital cost

bull Bottom line is overall cost of ownership and investability

httpswwwnetldoegovFile20LibraryEvents2016c0220cap20review1-MondayH-Lu-Nexant-NGCC-Applications-in-Mexicopdf + full details in final Mexico World Bank project report httpswwwgobmxcmsuploadsattachmentfile107318CCPP_Final_Reportpdf

Study for World Bank found first generation generic solvent gave only slightly higher electricity costs than proprietary solvents for natural gas PCC retrofit

30 ww

httpswwwnetldoegovFile20LibraryEvents2016c0220cap20review1-MondayH-Lu-Nexant-NGCC-Applications-in-Mexicopdf + full details in final Mexico World Bank project report httpswwwgobmxcmsuploadsattachmentfile107318CCPP_Final_Reportpdf

CO2CRCBechtel Australia

Brown coal retrofit ndash 4 x

520MW

httpwwwco2crccomauwp-

contentuploads201810Retrofitting_Australian_Power_Station_with_PCCpdf

ETI NGCC project Download final project report from this link httpswwweticoukprogrammescarbon-

capture-storagethermal-power-with-ccssize=10ampfrom=0amp_type=eti-

documentamppublicOnly=falseampquery=final+project+reportampprogrammeName5B05D=Carbon

+Capture+and+StorageampprojectName5B05D=Thermal+Power+with+CCS

Karsto NGCC project httppublikasjonernvenoreport2007report2007_02pdf

Full FEED on UKCCSRC web site

httpsukccsrcacuksitesdefaultfilesdocumentsnewsKarsto-FEED-Study-Report-Redacted-

Updated-comppdfIreland NGCC project Under development ndash see httpwwwerviaiebusiness-developmentcarbon-capture-storage

IEAGHG PH433 ndash a conceptual study on natural gas and coal but quite detailed including for the

capture plant httpsieaghgorgdocsGeneral_DocsReportsPH4-

3320post20combustionpdf

Canada CCS Knowledge Centre Shand retrofit

httpsccsknowledgecomresources2nd-generation

Mexico Posa Rica Nexant study

httpswwwnetldoegovFile20LibraryEvents2016c0220cap20review1-MondayH-Lu-

Nexant-NGCC-Applications-in-Mexicopdf + full details in final Mexico World Bank project

report httpswwwgobmxcmsuploadsattachmentfile107318CCPP_Final_Reportpdf

Netherlands ROAD Maasvlakte

httpsccsnetworkeuprojectsroad-project-rotterdam

DTIDECCBEIS FEED studies httpswwwgovukgovernmentcollectionscarbon-capture-and-storage-knowledge-sharing

Some PCC retrofit studies

Page 14: Post-combustion capture for retrofit applications...International post-combustion capture retrofit workshop held in Sheffield, 9-12 April 2019 CCUS specialists from the UK CCS Research

Site visit photo 2 Nov 2017 Loy Yang A Unit 3

Shand Brown Coal Petra Nova

Tonnes CO2 per day per PCC unit 6540 6588 4776

CO2 vv dry 13 157

EOP kWhtCO2 2706 3466

CAPEX $9864M AUD935M

~USD700M

Capex ($M) 9864 700 635

$ktCO2 per day 151 106 133

MtCO2yr based on 85 LF 203 204 148

$MMtCO2yr 486 342 429

No owners costs

Petra Nova httpswwwostigovbiblio1344080Shand httpsccsknowledgecomresources2nd-generationBrown Coal httpwwwco2crccomaupublication-categoryreports

376414

353 350 362 351 360

MEA30ww

Alstom BASF Fluor HTC MHI Cansolv

World BankPre-Feasibility Study for Establishing a Carbon Capture Pilot Plant in Mexico - Full-Scale Poza

Rica NGCC PCC Retrofit Incremental Electricity Cost ($MWh) for 85 CO2 Capture

Open-technology open-access is a key enabler for international partnerships especially for full-scale PCC projects as well as lab- and pilot-scale work

bull Why is CCUS different ndash only a few (5-10) big PCC projects globally over the next decade and then a huge increase in deployment mainly via retrofits to meet climate targets

bull So need to build a next phase of post-combustion (PCC) full-scale projects as open-technology (multiple solvents) with open-access (generic solvent) at least for an initial period

bull Open-access enables international knowledge exchange and strong commercial competition to reduce costs at all stages ndash feasibility FEED EPC commissioning and initial operation

bull Gets much better value for government expenditure on deployment and RampD

bull Greatly increases the rate at which the field of PCC technologies will improve

bull Open-technology open-access PCC hardware is a fast track to deploy multipleinnovations including through in-service upgrading

bull Can try out new solvents etc without building a new plant for every one

bull Plus critical information exchange in both directions with Mission Innovation and pilot testing eg ITCN ACT - Accelerating CCS Technologies

bull Relative costs for an open-technology open-access PCC from a study undertaken for the World Bank+ show overall incremental electricity costs for a range of proprietary PCC technology vendors similar and only marginally better than a first generation open-access solvent 30 ww MEA

wwwact-ccseu + httpswwwgobmxsenerendocumentospre-feasibility-study-for-establishing-a-carbon-capture-pilot-plant-in-mexicoidiom=en

Conclusions

bull PCC now getting deployed often for retrofit ndashnumber of waste incinerator projects in NL most recently

bull Cement and incinerator in Norway

bull Coal power retrofits globally

bull Biomass and gas power in UK

bull Research scope expanding to include solvent management and factors affecting capital cost

bull Bottom line is overall cost of ownership and investability

httpswwwnetldoegovFile20LibraryEvents2016c0220cap20review1-MondayH-Lu-Nexant-NGCC-Applications-in-Mexicopdf + full details in final Mexico World Bank project report httpswwwgobmxcmsuploadsattachmentfile107318CCPP_Final_Reportpdf

Study for World Bank found first generation generic solvent gave only slightly higher electricity costs than proprietary solvents for natural gas PCC retrofit

30 ww

httpswwwnetldoegovFile20LibraryEvents2016c0220cap20review1-MondayH-Lu-Nexant-NGCC-Applications-in-Mexicopdf + full details in final Mexico World Bank project report httpswwwgobmxcmsuploadsattachmentfile107318CCPP_Final_Reportpdf

CO2CRCBechtel Australia

Brown coal retrofit ndash 4 x

520MW

httpwwwco2crccomauwp-

contentuploads201810Retrofitting_Australian_Power_Station_with_PCCpdf

ETI NGCC project Download final project report from this link httpswwweticoukprogrammescarbon-

capture-storagethermal-power-with-ccssize=10ampfrom=0amp_type=eti-

documentamppublicOnly=falseampquery=final+project+reportampprogrammeName5B05D=Carbon

+Capture+and+StorageampprojectName5B05D=Thermal+Power+with+CCS

Karsto NGCC project httppublikasjonernvenoreport2007report2007_02pdf

Full FEED on UKCCSRC web site

httpsukccsrcacuksitesdefaultfilesdocumentsnewsKarsto-FEED-Study-Report-Redacted-

Updated-comppdfIreland NGCC project Under development ndash see httpwwwerviaiebusiness-developmentcarbon-capture-storage

IEAGHG PH433 ndash a conceptual study on natural gas and coal but quite detailed including for the

capture plant httpsieaghgorgdocsGeneral_DocsReportsPH4-

3320post20combustionpdf

Canada CCS Knowledge Centre Shand retrofit

httpsccsknowledgecomresources2nd-generation

Mexico Posa Rica Nexant study

httpswwwnetldoegovFile20LibraryEvents2016c0220cap20review1-MondayH-Lu-

Nexant-NGCC-Applications-in-Mexicopdf + full details in final Mexico World Bank project

report httpswwwgobmxcmsuploadsattachmentfile107318CCPP_Final_Reportpdf

Netherlands ROAD Maasvlakte

httpsccsnetworkeuprojectsroad-project-rotterdam

DTIDECCBEIS FEED studies httpswwwgovukgovernmentcollectionscarbon-capture-and-storage-knowledge-sharing

Some PCC retrofit studies

Page 15: Post-combustion capture for retrofit applications...International post-combustion capture retrofit workshop held in Sheffield, 9-12 April 2019 CCUS specialists from the UK CCS Research

Shand Brown Coal Petra Nova

Tonnes CO2 per day per PCC unit 6540 6588 4776

CO2 vv dry 13 157

EOP kWhtCO2 2706 3466

CAPEX $9864M AUD935M

~USD700M

Capex ($M) 9864 700 635

$ktCO2 per day 151 106 133

MtCO2yr based on 85 LF 203 204 148

$MMtCO2yr 486 342 429

No owners costs

Petra Nova httpswwwostigovbiblio1344080Shand httpsccsknowledgecomresources2nd-generationBrown Coal httpwwwco2crccomaupublication-categoryreports

376414

353 350 362 351 360

MEA30ww

Alstom BASF Fluor HTC MHI Cansolv

World BankPre-Feasibility Study for Establishing a Carbon Capture Pilot Plant in Mexico - Full-Scale Poza

Rica NGCC PCC Retrofit Incremental Electricity Cost ($MWh) for 85 CO2 Capture

Open-technology open-access is a key enabler for international partnerships especially for full-scale PCC projects as well as lab- and pilot-scale work

bull Why is CCUS different ndash only a few (5-10) big PCC projects globally over the next decade and then a huge increase in deployment mainly via retrofits to meet climate targets

bull So need to build a next phase of post-combustion (PCC) full-scale projects as open-technology (multiple solvents) with open-access (generic solvent) at least for an initial period

bull Open-access enables international knowledge exchange and strong commercial competition to reduce costs at all stages ndash feasibility FEED EPC commissioning and initial operation

bull Gets much better value for government expenditure on deployment and RampD

bull Greatly increases the rate at which the field of PCC technologies will improve

bull Open-technology open-access PCC hardware is a fast track to deploy multipleinnovations including through in-service upgrading

bull Can try out new solvents etc without building a new plant for every one

bull Plus critical information exchange in both directions with Mission Innovation and pilot testing eg ITCN ACT - Accelerating CCS Technologies

bull Relative costs for an open-technology open-access PCC from a study undertaken for the World Bank+ show overall incremental electricity costs for a range of proprietary PCC technology vendors similar and only marginally better than a first generation open-access solvent 30 ww MEA

wwwact-ccseu + httpswwwgobmxsenerendocumentospre-feasibility-study-for-establishing-a-carbon-capture-pilot-plant-in-mexicoidiom=en

Conclusions

bull PCC now getting deployed often for retrofit ndashnumber of waste incinerator projects in NL most recently

bull Cement and incinerator in Norway

bull Coal power retrofits globally

bull Biomass and gas power in UK

bull Research scope expanding to include solvent management and factors affecting capital cost

bull Bottom line is overall cost of ownership and investability

httpswwwnetldoegovFile20LibraryEvents2016c0220cap20review1-MondayH-Lu-Nexant-NGCC-Applications-in-Mexicopdf + full details in final Mexico World Bank project report httpswwwgobmxcmsuploadsattachmentfile107318CCPP_Final_Reportpdf

Study for World Bank found first generation generic solvent gave only slightly higher electricity costs than proprietary solvents for natural gas PCC retrofit

30 ww

httpswwwnetldoegovFile20LibraryEvents2016c0220cap20review1-MondayH-Lu-Nexant-NGCC-Applications-in-Mexicopdf + full details in final Mexico World Bank project report httpswwwgobmxcmsuploadsattachmentfile107318CCPP_Final_Reportpdf

CO2CRCBechtel Australia

Brown coal retrofit ndash 4 x

520MW

httpwwwco2crccomauwp-

contentuploads201810Retrofitting_Australian_Power_Station_with_PCCpdf

ETI NGCC project Download final project report from this link httpswwweticoukprogrammescarbon-

capture-storagethermal-power-with-ccssize=10ampfrom=0amp_type=eti-

documentamppublicOnly=falseampquery=final+project+reportampprogrammeName5B05D=Carbon

+Capture+and+StorageampprojectName5B05D=Thermal+Power+with+CCS

Karsto NGCC project httppublikasjonernvenoreport2007report2007_02pdf

Full FEED on UKCCSRC web site

httpsukccsrcacuksitesdefaultfilesdocumentsnewsKarsto-FEED-Study-Report-Redacted-

Updated-comppdfIreland NGCC project Under development ndash see httpwwwerviaiebusiness-developmentcarbon-capture-storage

IEAGHG PH433 ndash a conceptual study on natural gas and coal but quite detailed including for the

capture plant httpsieaghgorgdocsGeneral_DocsReportsPH4-

3320post20combustionpdf

Canada CCS Knowledge Centre Shand retrofit

httpsccsknowledgecomresources2nd-generation

Mexico Posa Rica Nexant study

httpswwwnetldoegovFile20LibraryEvents2016c0220cap20review1-MondayH-Lu-

Nexant-NGCC-Applications-in-Mexicopdf + full details in final Mexico World Bank project

report httpswwwgobmxcmsuploadsattachmentfile107318CCPP_Final_Reportpdf

Netherlands ROAD Maasvlakte

httpsccsnetworkeuprojectsroad-project-rotterdam

DTIDECCBEIS FEED studies httpswwwgovukgovernmentcollectionscarbon-capture-and-storage-knowledge-sharing

Some PCC retrofit studies

Page 16: Post-combustion capture for retrofit applications...International post-combustion capture retrofit workshop held in Sheffield, 9-12 April 2019 CCUS specialists from the UK CCS Research

376414

353 350 362 351 360

MEA30ww

Alstom BASF Fluor HTC MHI Cansolv

World BankPre-Feasibility Study for Establishing a Carbon Capture Pilot Plant in Mexico - Full-Scale Poza

Rica NGCC PCC Retrofit Incremental Electricity Cost ($MWh) for 85 CO2 Capture

Open-technology open-access is a key enabler for international partnerships especially for full-scale PCC projects as well as lab- and pilot-scale work

bull Why is CCUS different ndash only a few (5-10) big PCC projects globally over the next decade and then a huge increase in deployment mainly via retrofits to meet climate targets

bull So need to build a next phase of post-combustion (PCC) full-scale projects as open-technology (multiple solvents) with open-access (generic solvent) at least for an initial period

bull Open-access enables international knowledge exchange and strong commercial competition to reduce costs at all stages ndash feasibility FEED EPC commissioning and initial operation

bull Gets much better value for government expenditure on deployment and RampD

bull Greatly increases the rate at which the field of PCC technologies will improve

bull Open-technology open-access PCC hardware is a fast track to deploy multipleinnovations including through in-service upgrading

bull Can try out new solvents etc without building a new plant for every one

bull Plus critical information exchange in both directions with Mission Innovation and pilot testing eg ITCN ACT - Accelerating CCS Technologies

bull Relative costs for an open-technology open-access PCC from a study undertaken for the World Bank+ show overall incremental electricity costs for a range of proprietary PCC technology vendors similar and only marginally better than a first generation open-access solvent 30 ww MEA

wwwact-ccseu + httpswwwgobmxsenerendocumentospre-feasibility-study-for-establishing-a-carbon-capture-pilot-plant-in-mexicoidiom=en

Conclusions

bull PCC now getting deployed often for retrofit ndashnumber of waste incinerator projects in NL most recently

bull Cement and incinerator in Norway

bull Coal power retrofits globally

bull Biomass and gas power in UK

bull Research scope expanding to include solvent management and factors affecting capital cost

bull Bottom line is overall cost of ownership and investability

httpswwwnetldoegovFile20LibraryEvents2016c0220cap20review1-MondayH-Lu-Nexant-NGCC-Applications-in-Mexicopdf + full details in final Mexico World Bank project report httpswwwgobmxcmsuploadsattachmentfile107318CCPP_Final_Reportpdf

Study for World Bank found first generation generic solvent gave only slightly higher electricity costs than proprietary solvents for natural gas PCC retrofit

30 ww

httpswwwnetldoegovFile20LibraryEvents2016c0220cap20review1-MondayH-Lu-Nexant-NGCC-Applications-in-Mexicopdf + full details in final Mexico World Bank project report httpswwwgobmxcmsuploadsattachmentfile107318CCPP_Final_Reportpdf

CO2CRCBechtel Australia

Brown coal retrofit ndash 4 x

520MW

httpwwwco2crccomauwp-

contentuploads201810Retrofitting_Australian_Power_Station_with_PCCpdf

ETI NGCC project Download final project report from this link httpswwweticoukprogrammescarbon-

capture-storagethermal-power-with-ccssize=10ampfrom=0amp_type=eti-

documentamppublicOnly=falseampquery=final+project+reportampprogrammeName5B05D=Carbon

+Capture+and+StorageampprojectName5B05D=Thermal+Power+with+CCS

Karsto NGCC project httppublikasjonernvenoreport2007report2007_02pdf

Full FEED on UKCCSRC web site

httpsukccsrcacuksitesdefaultfilesdocumentsnewsKarsto-FEED-Study-Report-Redacted-

Updated-comppdfIreland NGCC project Under development ndash see httpwwwerviaiebusiness-developmentcarbon-capture-storage

IEAGHG PH433 ndash a conceptual study on natural gas and coal but quite detailed including for the

capture plant httpsieaghgorgdocsGeneral_DocsReportsPH4-

3320post20combustionpdf

Canada CCS Knowledge Centre Shand retrofit

httpsccsknowledgecomresources2nd-generation

Mexico Posa Rica Nexant study

httpswwwnetldoegovFile20LibraryEvents2016c0220cap20review1-MondayH-Lu-

Nexant-NGCC-Applications-in-Mexicopdf + full details in final Mexico World Bank project

report httpswwwgobmxcmsuploadsattachmentfile107318CCPP_Final_Reportpdf

Netherlands ROAD Maasvlakte

httpsccsnetworkeuprojectsroad-project-rotterdam

DTIDECCBEIS FEED studies httpswwwgovukgovernmentcollectionscarbon-capture-and-storage-knowledge-sharing

Some PCC retrofit studies

Page 17: Post-combustion capture for retrofit applications...International post-combustion capture retrofit workshop held in Sheffield, 9-12 April 2019 CCUS specialists from the UK CCS Research

Conclusions

bull PCC now getting deployed often for retrofit ndashnumber of waste incinerator projects in NL most recently

bull Cement and incinerator in Norway

bull Coal power retrofits globally

bull Biomass and gas power in UK

bull Research scope expanding to include solvent management and factors affecting capital cost

bull Bottom line is overall cost of ownership and investability

httpswwwnetldoegovFile20LibraryEvents2016c0220cap20review1-MondayH-Lu-Nexant-NGCC-Applications-in-Mexicopdf + full details in final Mexico World Bank project report httpswwwgobmxcmsuploadsattachmentfile107318CCPP_Final_Reportpdf

Study for World Bank found first generation generic solvent gave only slightly higher electricity costs than proprietary solvents for natural gas PCC retrofit

30 ww

httpswwwnetldoegovFile20LibraryEvents2016c0220cap20review1-MondayH-Lu-Nexant-NGCC-Applications-in-Mexicopdf + full details in final Mexico World Bank project report httpswwwgobmxcmsuploadsattachmentfile107318CCPP_Final_Reportpdf

CO2CRCBechtel Australia

Brown coal retrofit ndash 4 x

520MW

httpwwwco2crccomauwp-

contentuploads201810Retrofitting_Australian_Power_Station_with_PCCpdf

ETI NGCC project Download final project report from this link httpswwweticoukprogrammescarbon-

capture-storagethermal-power-with-ccssize=10ampfrom=0amp_type=eti-

documentamppublicOnly=falseampquery=final+project+reportampprogrammeName5B05D=Carbon

+Capture+and+StorageampprojectName5B05D=Thermal+Power+with+CCS

Karsto NGCC project httppublikasjonernvenoreport2007report2007_02pdf

Full FEED on UKCCSRC web site

httpsukccsrcacuksitesdefaultfilesdocumentsnewsKarsto-FEED-Study-Report-Redacted-

Updated-comppdfIreland NGCC project Under development ndash see httpwwwerviaiebusiness-developmentcarbon-capture-storage

IEAGHG PH433 ndash a conceptual study on natural gas and coal but quite detailed including for the

capture plant httpsieaghgorgdocsGeneral_DocsReportsPH4-

3320post20combustionpdf

Canada CCS Knowledge Centre Shand retrofit

httpsccsknowledgecomresources2nd-generation

Mexico Posa Rica Nexant study

httpswwwnetldoegovFile20LibraryEvents2016c0220cap20review1-MondayH-Lu-

Nexant-NGCC-Applications-in-Mexicopdf + full details in final Mexico World Bank project

report httpswwwgobmxcmsuploadsattachmentfile107318CCPP_Final_Reportpdf

Netherlands ROAD Maasvlakte

httpsccsnetworkeuprojectsroad-project-rotterdam

DTIDECCBEIS FEED studies httpswwwgovukgovernmentcollectionscarbon-capture-and-storage-knowledge-sharing

Some PCC retrofit studies

Page 18: Post-combustion capture for retrofit applications...International post-combustion capture retrofit workshop held in Sheffield, 9-12 April 2019 CCUS specialists from the UK CCS Research

httpswwwnetldoegovFile20LibraryEvents2016c0220cap20review1-MondayH-Lu-Nexant-NGCC-Applications-in-Mexicopdf + full details in final Mexico World Bank project report httpswwwgobmxcmsuploadsattachmentfile107318CCPP_Final_Reportpdf

Study for World Bank found first generation generic solvent gave only slightly higher electricity costs than proprietary solvents for natural gas PCC retrofit

30 ww

httpswwwnetldoegovFile20LibraryEvents2016c0220cap20review1-MondayH-Lu-Nexant-NGCC-Applications-in-Mexicopdf + full details in final Mexico World Bank project report httpswwwgobmxcmsuploadsattachmentfile107318CCPP_Final_Reportpdf

CO2CRCBechtel Australia

Brown coal retrofit ndash 4 x

520MW

httpwwwco2crccomauwp-

contentuploads201810Retrofitting_Australian_Power_Station_with_PCCpdf

ETI NGCC project Download final project report from this link httpswwweticoukprogrammescarbon-

capture-storagethermal-power-with-ccssize=10ampfrom=0amp_type=eti-

documentamppublicOnly=falseampquery=final+project+reportampprogrammeName5B05D=Carbon

+Capture+and+StorageampprojectName5B05D=Thermal+Power+with+CCS

Karsto NGCC project httppublikasjonernvenoreport2007report2007_02pdf

Full FEED on UKCCSRC web site

httpsukccsrcacuksitesdefaultfilesdocumentsnewsKarsto-FEED-Study-Report-Redacted-

Updated-comppdfIreland NGCC project Under development ndash see httpwwwerviaiebusiness-developmentcarbon-capture-storage

IEAGHG PH433 ndash a conceptual study on natural gas and coal but quite detailed including for the

capture plant httpsieaghgorgdocsGeneral_DocsReportsPH4-

3320post20combustionpdf

Canada CCS Knowledge Centre Shand retrofit

httpsccsknowledgecomresources2nd-generation

Mexico Posa Rica Nexant study

httpswwwnetldoegovFile20LibraryEvents2016c0220cap20review1-MondayH-Lu-

Nexant-NGCC-Applications-in-Mexicopdf + full details in final Mexico World Bank project

report httpswwwgobmxcmsuploadsattachmentfile107318CCPP_Final_Reportpdf

Netherlands ROAD Maasvlakte

httpsccsnetworkeuprojectsroad-project-rotterdam

DTIDECCBEIS FEED studies httpswwwgovukgovernmentcollectionscarbon-capture-and-storage-knowledge-sharing

Some PCC retrofit studies

Page 19: Post-combustion capture for retrofit applications...International post-combustion capture retrofit workshop held in Sheffield, 9-12 April 2019 CCUS specialists from the UK CCS Research

httpswwwnetldoegovFile20LibraryEvents2016c0220cap20review1-MondayH-Lu-Nexant-NGCC-Applications-in-Mexicopdf + full details in final Mexico World Bank project report httpswwwgobmxcmsuploadsattachmentfile107318CCPP_Final_Reportpdf

CO2CRCBechtel Australia

Brown coal retrofit ndash 4 x

520MW

httpwwwco2crccomauwp-

contentuploads201810Retrofitting_Australian_Power_Station_with_PCCpdf

ETI NGCC project Download final project report from this link httpswwweticoukprogrammescarbon-

capture-storagethermal-power-with-ccssize=10ampfrom=0amp_type=eti-

documentamppublicOnly=falseampquery=final+project+reportampprogrammeName5B05D=Carbon

+Capture+and+StorageampprojectName5B05D=Thermal+Power+with+CCS

Karsto NGCC project httppublikasjonernvenoreport2007report2007_02pdf

Full FEED on UKCCSRC web site

httpsukccsrcacuksitesdefaultfilesdocumentsnewsKarsto-FEED-Study-Report-Redacted-

Updated-comppdfIreland NGCC project Under development ndash see httpwwwerviaiebusiness-developmentcarbon-capture-storage

IEAGHG PH433 ndash a conceptual study on natural gas and coal but quite detailed including for the

capture plant httpsieaghgorgdocsGeneral_DocsReportsPH4-

3320post20combustionpdf

Canada CCS Knowledge Centre Shand retrofit

httpsccsknowledgecomresources2nd-generation

Mexico Posa Rica Nexant study

httpswwwnetldoegovFile20LibraryEvents2016c0220cap20review1-MondayH-Lu-

Nexant-NGCC-Applications-in-Mexicopdf + full details in final Mexico World Bank project

report httpswwwgobmxcmsuploadsattachmentfile107318CCPP_Final_Reportpdf

Netherlands ROAD Maasvlakte

httpsccsnetworkeuprojectsroad-project-rotterdam

DTIDECCBEIS FEED studies httpswwwgovukgovernmentcollectionscarbon-capture-and-storage-knowledge-sharing

Some PCC retrofit studies

Page 20: Post-combustion capture for retrofit applications...International post-combustion capture retrofit workshop held in Sheffield, 9-12 April 2019 CCUS specialists from the UK CCS Research

CO2CRCBechtel Australia

Brown coal retrofit ndash 4 x

520MW

httpwwwco2crccomauwp-

contentuploads201810Retrofitting_Australian_Power_Station_with_PCCpdf

ETI NGCC project Download final project report from this link httpswwweticoukprogrammescarbon-

capture-storagethermal-power-with-ccssize=10ampfrom=0amp_type=eti-

documentamppublicOnly=falseampquery=final+project+reportampprogrammeName5B05D=Carbon

+Capture+and+StorageampprojectName5B05D=Thermal+Power+with+CCS

Karsto NGCC project httppublikasjonernvenoreport2007report2007_02pdf

Full FEED on UKCCSRC web site

httpsukccsrcacuksitesdefaultfilesdocumentsnewsKarsto-FEED-Study-Report-Redacted-

Updated-comppdfIreland NGCC project Under development ndash see httpwwwerviaiebusiness-developmentcarbon-capture-storage

IEAGHG PH433 ndash a conceptual study on natural gas and coal but quite detailed including for the

capture plant httpsieaghgorgdocsGeneral_DocsReportsPH4-

3320post20combustionpdf

Canada CCS Knowledge Centre Shand retrofit

httpsccsknowledgecomresources2nd-generation

Mexico Posa Rica Nexant study

httpswwwnetldoegovFile20LibraryEvents2016c0220cap20review1-MondayH-Lu-

Nexant-NGCC-Applications-in-Mexicopdf + full details in final Mexico World Bank project

report httpswwwgobmxcmsuploadsattachmentfile107318CCPP_Final_Reportpdf

Netherlands ROAD Maasvlakte

httpsccsnetworkeuprojectsroad-project-rotterdam

DTIDECCBEIS FEED studies httpswwwgovukgovernmentcollectionscarbon-capture-and-storage-knowledge-sharing

Some PCC retrofit studies