  • POST CLOSURE DEVELOPMENT CLOSED SITES WITH MULTIPLE OWNERSAN LEA PERSPECTIVE

  • Sierra Point Landfill

    41-AA-0003

    • Operated 1965-1972

    • Waste 2.6 million CYDS

    • Site Closure 1982 Under Water Board Authority

    • Site Development Mid 1980s through early 2000s

    • 16 Individual Owners

    Oyster Point Landfill

    41-AA-0065

    • Operated 1956-1970

    • Waste 2.5 million CYDS

    • Site Closure 1981 Under Water Board Authority

    • Site Development Mid 1980s Redevelopment 2017-Present

    • 2 Individual Owners w/ Potential up to 6

  • Sierra Point Landfill

    Sierra Point Environmental Management Association

    • Covenants, Conditions and Restrictions (CC&R) for Environmental Compliance for Sierra Point.

    • The CC&R only for compliance to the Water Board WDR

    • The CC&R specifies each individual owner is responsible for compliance with other agency (CalRecycle) regulations

  • LEA

    2000 Shoreline CT

    5000Sierra PT PWY

    5000Shoreline CT

    6000Shoreline CT

    1000Marina

    5000Marina

    7000 Marina Under Construction

    2000 Sierra PT PWY

    8000Marina

    9000Marina Undeveloped Parcel

    800, 1000 ,1200Sierra PT PWY3 Parcels Under Construction

    New Owner

    NewOwner

  • The Approach

    The Local Jurisdiction

    Single Point of Contact

    Responsibility Matrix

  • The ApproachUse Tools Available to the LEA

    Closure/Post Closure Maintenance Plan (CPCMP)

    Record the CPCMP to the property(CCR 27 Section 21170)

    Owner Affidavit(CCR 27 Section 21200 (2))

  • LEA

    2000 Shoreline CT

    5000Sierra PT PWY

    5000Shoreline CT

    6000Shoreline CT

    1000Marina

    5000Marina

    7000 Marina Under Construction

    2000 Sierra PT PWY

    8000Marina

    9000Marina Undeveloped Parcel

    800, 1000 ,1200Sierra PT PWY3 Parcels Under Construction

    New Owner

    NewOwner

  • The ApproachOyster Point Landfill

    Environmental Compliance ManagerCity Of SSF Public Works Director

    OwnershipResponsibility Matrix

  • Sierra Point Landfill

  • The Approach

    Sierra Point Landfill

    • The Local Jurisdiction

    • Require “CCR Title 27 Compliance Document” (CCR27CD)

    • Record the CCR27CD to the property

    (CCR 27 Section 21170)

    • Owner Affidavit

    (CCR 27 Section 21200 (2))

  • Summary• The Local Jurisdiction

    • Use the tool available

    CPCMP, CCR27 Compliance Document

    Single Pont of Contact (for multiple owner sites)

    Responsibility Matrix

    • Record the CPCMP, CCR27CD etc. to the property (CCR 27 Section 21170)

    • Owner Affidavit (CCR 27 Section 21200 (2))

  • Questions?

    (650)-465-1700 T

    (650)-627-8244 F

    (650)-372-6200 Main

    [email protected]

    www.smchealth.org

    Greg P. Schirle, REHSCounty of San MateoSolid Waste Program Specialist2000 Alameda de las Pulgas Suite 100San Mateo, CA 94403