POST- CLEARANCE ENVIRONMENTAL REPORT (Commercial Colony Project) SECTOR-102, VILLAGE DHANKOT, DISTT. GURGAON, HARYANA Prepared by SHIMI RESEARCH CENTER PVT. LTD. Submitted to MINISTRY OF ENVIRONMENT & FORESTS (New Delhi & Panchkula) SECOND REPORT, JUNE 2015

Upload: phungdung

Post on 25-Aug-2018

212 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: POST- CLEARANCE ENVIRONMENTAL REPORT (Commercial Colony ...nromoef.gov.in/SMPR/01062015/47.pdf · POST- CLEARANCE ENVIRONMENTAL REPORT (Commercial Colony Project) SECTOR ... Time

POST- CLEARANCE ENVIRONMENTAL REPORT

(Commercial Colony Project)

SECTOR-102, VILLAGE DHANKOT, DISTT. GURGAON, HARYANA

Prepared by

SHIMI RESEARCH CENTER PVT. LTD.

Submitted to

MINISTRY OF ENVIRONMENT & FORESTS (New Delhi & Panchkula)

SECOND REPORT, JUNE 2015

Page 2: POST- CLEARANCE ENVIRONMENTAL REPORT (Commercial Colony ...nromoef.gov.in/SMPR/01062015/47.pdf · POST- CLEARANCE ENVIRONMENTAL REPORT (Commercial Colony Project) SECTOR ... Time

Sector 102, Gurgaon, Haryana

2

SALIENT FEATURES OF THE PROPOSED PROJECT

Type of Project : Commercial Colony Project

Name of Company : M/s Clarion Properties Ltd.

Location: Sector-102, Village Dhankot, Distt.

Gurgaon, Haryana

Plot size : 40671 Sqm (10.05 acres)

Project Features :

Total Plot Area 14012.24 Sqm

Total Built up Area 39997.30 Sqm

1 Block

2 Basements + GF + 9 Floors

Max. Height Allowed : 35 Mt

Total water requirement, 242 KLD

Fresh water, 107 KLD from HUDA

Waste water generation, 169 KLD

Proposed STP of 210 KLD

Solid waste generation of 968 kg/day

Power Requirement 3137 KVA from

DHBVN

Parking Space 580 ECS

Proposed green belt development of 30%

Page 3: POST- CLEARANCE ENVIRONMENTAL REPORT (Commercial Colony ...nromoef.gov.in/SMPR/01062015/47.pdf · POST- CLEARANCE ENVIRONMENTAL REPORT (Commercial Colony Project) SECTOR ... Time

Sector 102, Gurgaon, Haryana

3

STATUARY APPROVALS

Environmental : Clearance Received having Ref

Clearance No. SEIAA/HR/2013/392 dated 26/06/2013

Supply of Drinking : Licence 93 of 2012

Water for Labour 2011/15985 dated 31/10/2011

Supply of Water : Approved vide Memo No. 13012

For Construction dated 09/06/2014

Page 4: POST- CLEARANCE ENVIRONMENTAL REPORT (Commercial Colony ...nromoef.gov.in/SMPR/01062015/47.pdf · POST- CLEARANCE ENVIRONMENTAL REPORT (Commercial Colony Project) SECTOR ... Time

Sector 102, Gurgaon, Haryana

4

PROJECT STATUS

The project status is as follows:

1. Land leveling has been done.

2. 100% fencing has been done around the site.

3. Installation of new pillars and fencing at the front side of the site is

under progress

4. The guard room is complete.

5. Site office is setup at the site

6. AAC blocks are used in constructions of site office and sample flat.

7. The water for the construction purpose is provided through HUDA.

8. No bore well water is used for the construction.

9. All DG sets used are with acoustic enclosures.

10. Adequate sanitary and hygienic measures for workers have been

adopted and have been maintained throughout construction phase.

Drinking water facility and toilets at construction site have been

provided for workers. For officers and supervisors, site office with

required facilities has been developed.

Page 5: POST- CLEARANCE ENVIRONMENTAL REPORT (Commercial Colony ...nromoef.gov.in/SMPR/01062015/47.pdf · POST- CLEARANCE ENVIRONMENTAL REPORT (Commercial Colony Project) SECTOR ... Time

Sector 102, Gurgaon, Haryana

5

11. No hazardous material and bituminous material has been

generated from site. Every precaution has been taken to prevent

groundwater from contamination.

12. The continuous fencing around the project site acts as a safety

barrier. No incremental increase in air pollution or noise in nearby

areas has been recorded after construction. The data on air

pollution, water, noise and soil are enclosed with the report.

13. Secured area has been provided for storage of cement bags.

14. Workers are advised to use helmets at construction site.

15. No stagnant water formation is found in the premises.

16. Regular water spray is being used to suppress the dust generated

from haul road inside the construction site.

Green Belt Development The site is under the initial phase of construction and so far no green belt development has been done at site. S. No. Year Area

Covered No. of Plants Planted

Species of Plants Planted

Expenditure Incurred

1 June 2015

Nil Nil N/A Nil

Page 6: POST- CLEARANCE ENVIRONMENTAL REPORT (Commercial Colony ...nromoef.gov.in/SMPR/01062015/47.pdf · POST- CLEARANCE ENVIRONMENTAL REPORT (Commercial Colony Project) SECTOR ... Time

Sector 102, Gurgaon, Haryana

6

SAFETY MEASURES The other safety measures to be followed during the construction period

by Project Manager/Deputy Project Manager

That no staff should go to the project site without wearing helmets

and safety shoes

Wearing helmets need to be mandatory for visitors

Safety net should be used at risky areas

That access to and from site should clear

That proper signboards should be available about safety and safe

exit points

All water tanks at site should be properly covered for further use.

TESTING Ambient Air Quality The ambient air quality monitoring was conducted in April 2015.

Monitoring was carried out at two stations for 7 days. The guidelines for

selections of ambient air monitoring stations as given in IS – 5182 part

14, were followed. These guidelines state that, “when the objective of air

sampling is to identify the contribution from specific sources of pollution,

the sampling locations should be located in upwind and the downwind of

Page 7: POST- CLEARANCE ENVIRONMENTAL REPORT (Commercial Colony ...nromoef.gov.in/SMPR/01062015/47.pdf · POST- CLEARANCE ENVIRONMENTAL REPORT (Commercial Colony Project) SECTOR ... Time

Sector 102, Gurgaon, Haryana

7

such sources”. The location of air quality monitoring stations should

satisfy the following conditions:

1. The site should be representative of the area selected;

2. The station should be set up and operated so as to yield data that

can be compared with those from stations within the network

Sampling Stations:

Station A-1: Near the entry gate

Station A-2: At the center of site

Duration of Sampling

Duration : 7 days during April 2015

Period : Sampling was done 24 hourly continuous of

SPM/RSPM and 8 hourly for gaseous parameters.

Sampling Procedure

Time averaged insitu sampling was adopted by passing a known volume

of air through a trap, and a collecting medium (filter paper and bubbler).

Repairable Dust Sampler was used for the purpose.

This procedure was adopted because there are no short-term variations

and low concentration of gaseous pollutants was expected.

Page 8: POST- CLEARANCE ENVIRONMENTAL REPORT (Commercial Colony ...nromoef.gov.in/SMPR/01062015/47.pdf · POST- CLEARANCE ENVIRONMENTAL REPORT (Commercial Colony Project) SECTOR ... Time

Sector 102, Gurgaon, Haryana

8

Analytical methods followed for ambient air quality monitoring

(i) Suspended Particular Matter (SPM):

The samples for SPM were collected on GF/A Filter paper by Respirable

Dust Sampler (RDS), operated at maximum rate of 1.5 cu.m./min. and

concentration were determined gravimetrically on 24 hrs basis.

(ii) Sulphur dioxide (SO2):

Sulphur dioxide collection was done by aspirating a measured volume of

air through a dilute acidified solution of hydrogen peroxide. For analysis,

TCM method was followed (Ref. Chapter 700, Standard Method of Air

Sampling and Analysis, 2nd edition, APHA, 1977).

(iii) Nitrogen Oxides (IS: 5182; Part – VI – 1975 ):

Nitrogen oxides were estimated by bubbling air through 0.1 N Sodium

hydroxide solution and measured as nitrate through spectrophotometer

at 540 nm.

Results

Air quality is a complex and dynamic characteristic of any area. Most of

the areas in Gurgaon and adjoining locations reel under air pollution and

construction activity is the major contributor of pollutants. The climatic

conditions and high rise buildings aid and abet their dispersion in the

adjoining areas. The ambient air quality results are summarized in

following tables:

Page 9: POST- CLEARANCE ENVIRONMENTAL REPORT (Commercial Colony ...nromoef.gov.in/SMPR/01062015/47.pdf · POST- CLEARANCE ENVIRONMENTAL REPORT (Commercial Colony Project) SECTOR ... Time

Sector 102, Gurgaon, Haryana

9

SPM µg/m3

DATE A-1 A-2 Max Min Mean Max Min Mean 22-04-15 378 178 152 367 210 102 23-04-15 351 215 232 368 235 156 24-04-15 375 212 223 391 190 109 25-04-15 397 183 217 386 241 126 26-04-15 362 204 237 363 210 129 27-04-15 370 165 192 340 203 108 28-04-15 408 189 228 361 197 132

RSPM µg/m3

DATE A-1 A-2 Max Min Mean Max Min Mean

22-04-15 255 98 146 150 62 106 23-04-15 279 118 235 201 66 131 24-04-15 317 150 214 161 82 127 25-04-15 323 127 212 178 136 105 26-04-15 277 143 228 181 74 117 27-04-15 288 127 206 189 75 115 28-04-15 289 114 235 202 85 122

            SPM Levels at Project Site                     

     

     

     

mg/m3

       

     

          

               Dates               

Page 10: POST- CLEARANCE ENVIRONMENTAL REPORT (Commercial Colony ...nromoef.gov.in/SMPR/01062015/47.pdf · POST- CLEARANCE ENVIRONMENTAL REPORT (Commercial Colony Project) SECTOR ... Time

Sector 102, Gurgaon, Haryana

10

When assessed air quality is compared to the prescribed standards, it

was observed that SPM and RSPM values were very near to the

standards. The higher values of SPM & RSPM are not solely contributed

by the construction activities at this particular site but also by the nearby

construction activities. The results confirm that the particulate load

generated by traffic and construction activities remain as aerosol for

longer period of time. The smaller the particulate, larger is the time it

stays in suspension (RSPM). The detailed results indicate that night-time

ambient air was usually better than that of morning and afternoon due to

lesser traffic density and least construction activity.

Noise Level

Noise Measurement Locations: The locations selected for the noise

monitoring were as follows:

Station A-1: Near the entry gate

Station A-2: At the center of site

Methodology:

At each station noise level was monitored by noise meter for 24-hours

simultaneously. For each measurement, dB (A) readings were taken for

every 15 minutes to get Ld, Ln and Ldn.

Page 11: POST- CLEARANCE ENVIRONMENTAL REPORT (Commercial Colony ...nromoef.gov.in/SMPR/01062015/47.pdf · POST- CLEARANCE ENVIRONMENTAL REPORT (Commercial Colony Project) SECTOR ... Time

Sector 102, Gurgaon, Haryana

11

Results

Results are summarized in following table. The ambient noise level at the

center of the site is relatively lower than the location near entry gate. The

higher noise level is due to continuous movement of vehicle. During the

day time, noise level at the gate and the center of site were 57.12 dB(A)

and 50.92 dB(A) respectively. The standards for commercial areas is ~

65 dB (A). During night noise level at the same locations were 40.64

dB(A) and 35.26 dB(A) respectively which are lower than the night-time

noise standards of 55 dB(A).

NOISE LEVEL Day Night

Standard in dB(A) 55 45 Residential

65 55 Commercial Site Land use Ld Ln Ldn

N1 Near the entry gate 57.12 40.64 43.28 N2 At center of the site 50.92 35.26 40.10

      Noise Level at Construction Site         

 

                 

Ldn in

 dBA

       

            Locations         

Page 12: POST- CLEARANCE ENVIRONMENTAL REPORT (Commercial Colony ...nromoef.gov.in/SMPR/01062015/47.pdf · POST- CLEARANCE ENVIRONMENTAL REPORT (Commercial Colony Project) SECTOR ... Time

Sector 102, Gurgaon, Haryana

12

DIFFERENT PRESPECTIVES OF SITE

Page 13: POST- CLEARANCE ENVIRONMENTAL REPORT (Commercial Colony ...nromoef.gov.in/SMPR/01062015/47.pdf · POST- CLEARANCE ENVIRONMENTAL REPORT (Commercial Colony Project) SECTOR ... Time

Sector 102, Gurgaon, Haryana

13

DIFFERENT PRESPECTIVES OF SITE

Page 14: POST- CLEARANCE ENVIRONMENTAL REPORT (Commercial Colony ...nromoef.gov.in/SMPR/01062015/47.pdf · POST- CLEARANCE ENVIRONMENTAL REPORT (Commercial Colony Project) SECTOR ... Time

Sector 102, Gurgaon, Haryana

14

DIFFERENT PRESPECTIVES OF SITE

Page 15: POST- CLEARANCE ENVIRONMENTAL REPORT (Commercial Colony ...nromoef.gov.in/SMPR/01062015/47.pdf · POST- CLEARANCE ENVIRONMENTAL REPORT (Commercial Colony Project) SECTOR ... Time

Sector 102, Gurgaon, Haryana

15

DIFFERENT PRESPECTIVES OF SITE

Page 16: POST- CLEARANCE ENVIRONMENTAL REPORT (Commercial Colony ...nromoef.gov.in/SMPR/01062015/47.pdf · POST- CLEARANCE ENVIRONMENTAL REPORT (Commercial Colony Project) SECTOR ... Time

Sector 102, Gurgaon, Haryana

16

DIFFERENT PRESPECTIVES OF SITE