POS based Public Distribution System REQUEST FOR PROPOSAL (RFP) Selection of Agency for implementing ePDS with PoS devices for Department of Civil Supplies and Consumer Affairs, Government of Goa. 12 December 2013 Ground Floor, “Shrama Shakti Bhavan”, Patto Plaza, EDC Complex, Panaji-Goa 403 001 Tel:2437220, 2437248. Fax: 2437220. Website: www.goaelectronics.co.in © 2013 Goa Electronics Limited

Upload: truongthu

Post on 13-Feb-2017

219 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: POS based Public Distribution System

POS based Public Distribution System

REQUEST FOR PROPOSAL (RFP)

Selection of Agency for implementing ePDS with PoS devices for Department

of Civil Supplies and Consumer Affairs, Government of Goa.

12 December 2013

Ground Floor, “Shrama Shakti Bhavan”, Patto Plaza, EDC Complex, Panaji-Goa 403 001

Tel:2437220, 2437248. Fax: 2437220. Website: www.goaelectronics.co.in © 2013 Goa Electronics Limited

Page 2: POS based Public Distribution System

Page 1 of 31

TABLE OF CONTENTS

Sr. No Title Page No

1 ACRONYMS AND ABBREVIATION 2

2 RFP NOTICE 3

3 RFP DOCUMENT 4

4 PROJECT BACKGROUND 5

5 SCOPE OF WORK 10

6 TERMS & CONDITIONS 21

7 ANNEXURE A –TECHNICAL BID FORMAT 25

8 ANNEXURE B –FINANCIAL BID FORMAT 26

9 ANNEXURE C –TECHNICAL SPECIFICATIONS OF HAND HELD DEVICES 27

10 ANNEXURE D – REQUIREMENTS & SCHEDULE OF POS TERMINALS 28

11 ANNEXURE E - USE CASES OF POS APPLICATION 30

Page 3: POS based Public Distribution System

Page 2 of 31

1. ACRONYMS AND ABBREVIATION

AAY ANTODAYA ANNA YOJANA

APL ABOVE POVERTY LINE

BOM BILL OF MATERIAL

BPL BELOW POVERTY LINE

CDMA CODE DIVISION MULTIPLE ACCESS

DBA DATABASE ADMINISTRATOR

DEO DATA ENTRY OPERATOR

DFSC DISTRICT FOOD AND SUPPLIES CONTROLLER

DCSCA DEPARTMENT OF CIVIL SUPPLIES AND CONSUMER AFFAIRS

DIT/DOIT DEPARTMENT OF INFORMATION TECHNOLOGY,GOA

FCI FOOD CORPORATION OF INDIA

FPS FAIR PRICE SHOP

GBBN GOA BROADBAND NETWORK

GoG GOVERNMENT OF GOA

GOI GOVERNMENT OF INDIA

GPRS GENERAL PACKET RADIO SERVICE

GEL GOA ELECTRONICS LIMITED

ICT INFORMATION AND COMMUNICATION TECHNOLOGY

LAN LOCAL AREA NETWORK

MIS MANAGEMENT INFORMATION SYSTEM

MSA MASTER SERVICE AGGREEMENT

NeGP NATIONAL e-GOVERNANCE PLAN

NIC NATIONAL INFORMATICS CENTRE

POS POINT OF SALE

RAM RANDOME ACCESS MEMORY

RDBMS RELATIONAL DATABASE MANAGEMENT SYSTEM

SCOSTA SMART CARD OPERATING SYSTEM FOR TRANSPORT APPLICATION STANDARD FOR ANY SMART CARD APPLICATION FROM NIC

SDC STATE DATA CENTRE

SDM SUB-DIVISIONAL MANAGER

SHQ STATE HEAD QUARTERS

SLA SERVICE LEVEL AGREEMENT

SOW SCOPE OF WORK

RFP REQUEST FOR PROPOSAL

VIZ VISUAL INSPECTION ZONE

WAN WIDE AREA NETWORK

GIC GODOWN INCHARGE CARD

FPSIC FAIR PRICE SHOP INCHARGE CARD

SRC SMART RATION CARD

FPT FINGER PRINT TEMPLATE

LOI LETTER OF INTEREST

Page 4: POS based Public Distribution System

Page 3 of 31

2. RFP NOTICE

RFP for the purchase of Point Of Sale (POS) Terminal are hereby invited from the

vendors by Goa Electronics Limited through the e-tendering process using the website

www.etender.goa.gov.in. The RFP documents can be downloaded from GEL Website:

www.goaelectronics.co.in or www.etender.goa.gov.in.

The RFP document containing “Technical bid” and “financial bid”, complete in all

respect should be uploaded on www.etender.goa.gov.in on or before 30 Dec 2013 upto 2.30 PM

which will be opened on the same day in the presence of the vendors or their representatives who

may like to be present at that time. The sale of RFP document will commence on the next date of

publication of this RFP notice and will close on the date specified on the RFP document.

The vendors are required to get registered with www.tenderwizard.com/GOA. The

vendor must have valid digital signature to submit the bid. The interested vendors fulfilling the

terms & conditions should quote their minimum rates along with earnest money deposit(EMD)

as mentioned in the RFP document.

All the vendors should also give a brief resume about their firm/company. Their

turnover and firms/ offices to which they are supplying quoted items, should also be mentioned.

Goa Electronics Limited (GEL) reserves the right to reject all or any of the RFP without

assigning any reason thereof. The RFP which is conditional/ incomplete/ belated/ without earnest

money, processing fees, RFP fees; will not be entertained.

Chief Executive Officer

Goa Electronics Limited

Page 5: POS based Public Distribution System

Page 4 of 31

3. RFP DOCUMENT

1. No. GEL/PDS/POS-04 Date: 12/12/2013

2. Name and Address of the party

3. RFP Document for Purchase of Point Of Sale Terminals

4. Earnest money Deposit Rs. 150000 /-

5. Cost of RFP document Rs.12500 /-

6. Cost of RFP processing fee Rs.1500 /-

7. Last date of sale of RFP 30/12/2013 upto 2.00 PM.

8. Last date for submission of RFP. 30/12/2013 upto 2.30 PM.

9. To be opened on 30/12/2013 at 3.00 PM. 10. Last date for submission of written Queries for clarifications 23/12/2013 11. Contact Person for queries Mr. Sagar Jaiwar (Sr. Software Developer) Goa Electronics Limited Mobile No: 8411004910 12. Addressee and Address at which Chief Executive Officer RFP to be submitted Goa Electronics Limited, Mezzanine floor, Block ‘B’, EDC House, Dr.Dada Vaidya Road, Panaji, Goa- 403001

Note: All the Pre Bid Queries would be accepted in written form (and a copy through mail also) only at below address: Chief Executive Officer, Goa Electronics Limited, Mezzanine floor, Block ‘B’, EDC House, Dr. Dada Vaidya Road, Panaji, Goa-403001 Mail: [email protected] & [email protected]

Page 6: POS based Public Distribution System

Page 5 of 31

4. PROJECT BACKGROUND

4.1 INTRODUCTION

India’s social commitment for providing food security for the poor and needy is

answered through the strong network of more than 4.5 Lac FPS across the

country. Our Planning Commission estimates that more than 150 million

families purchase commodities at ration shops every year. The Public

Distribution system in India is however plagued with several malpractices

which prevent the benefits from reaching the intended beneficiaries and also

result in revenue loss for the Government. There is leakage and pilferage of

food grains at each point of the supply chain - from procurement until

distribution. It has also been seen that issuance of multiple ration cards to a

single person prohibits the proper allocation of food grains to deserved

beneficiary. The manual maintenance of records for issuance of food grains at

the Fair Price Shops helps in creating a supportive environment for the FPS

owners to divulge in malpractice. Keeping in mind the above areas, it is crucial

to strengthen the PDS to ensure adequate supplies, reasonable subsidies and

efficient delivery of subsidized food.

4.2 TARGETED PUBLIC DISTRIBUTION SYSTEM

The Government of Goa views the Targeted Public Distribution System (TPDS)

as an important constituent of a strategy for ensuring food security of the

targeted population by ensuring availability of monthly quota of food grains to

them as per entitlement through Fair Price shops. The Government is

committed to implement the TPDS to the best advantage of the beneficiaries

with full transparency, and efficiency of operations and accountability of

authorities implementing it.

Page 7: POS based Public Distribution System

Page 6 of 31

4.3 PROJECT OBJECTIVES

The primary project objective is that the DCSCA, GoG envisages with the

implementation of the Smart Card based Ration Cards are:

(i) Timely and need based allocation.

(ii) Prevention of diversion of essential commodities.

(iii) Containment of arbitrary decision making at all levels.

(iv) Induction of transparency and accountability in operations.

(v) Reduction of redundant workload of department employees.

(vi) Electronic security and control of confidential data.

(vii) Fast disposal of stakeholder grievances.

(viii) Dissemination of information as per public requirements.

(ix) Leveraging the benefit of Goa State Wide Area Network (SWAN) for

easy flow of information among one and all stakeholders.

(x) MIS for monitoring and quick decision making.

(xi) Protecting the interest of all the stakeholders.

(xii) To improve service delivery and create transparency

(xiii) To empower beneficiary

(xiv) To weed out bad FPS and bogus Ration Cards.

4.4 PROJECT IMPLEMENTATION STRATEGY

The project will be executed in two phases:

Phase I: Pilot Rollout

This phase will involve rollout of the project across 78 FPSs of the Bardez

taluka. Time period for the Phase I will be 2 months.

Phase II: Remaining Talukas Rollout

This phase will involve rollout across 423 FPSs throughout the state. This phase

will be taken up only after successful implementation of phase I.

Page 8: POS based Public Distribution System

Page 7 of 31

4.5 FPS AUTOMATION PROCESS:

Strategy to be adopted

In e-PDS, FPSs will be equipped with a POS with GPRS connectivity. Food

grains will be given manually at FPS but authentication and record of

transaction on server is done through this POS. Each Beneficiary is

provided with a Smart Ration Card (SRC).Each FPS owner with a FPS

incharge Card (FPSIC) and each Godown Incharge with a Godown

incharge card (GIC)

Basic infrastructure proposed at (a) Godowns: POS and GIC, (b) FPS: POS

and FPSIC.

1. Issuance of the commodities by Godowns to FPS Incharge

1.1 Online mode

1.1.1 Godown Incharge will insert the FPSIC and the GIC into the

POS.

1.1.2 The POS will read the card details and will fetch the

entitlements for the FPS.

1.1.3 The Godown Incharge will issue the entitled quantity to the

FPS Incharge. The transaction will be updated on the server,

FPSIC and GIC.

1.2 Offline mode

1.2.1 Godown Incharge will insert the FPSIC and the GIC into the POS.

1.2.2 The POS will read the card details and will fetch the

entitlements for the FPS from the GIC.

1.2.3 The Godown Incharge will issue the entitled quantity to the FPS

Incharge and update the FPSIC and GIC. Whenever the connectivity is

available, all the transactions flagged as “offline” will be updated on

the server, FPSIC and GIC.

2. Issuance of the commodities by FPS to the Beneficiaries

2.1 Online mode

2.1.1 FPS sales person inserts FPSIC in POS Device

2.1.2 POS reads the details of the FPS current stock allocation

and stock status.

Page 9: POS based Public Distribution System

Page 8 of 31

2.1.3 FPS sales person inserts the SRC of the beneficiary in POS

device.

2.1.4 POS reads the ration card number and sends it to the

server through GPRS to get beneficiary’s entitlement

balances.

In case the member’s biometric has not been

authenticated yet

STEP I: The Finger print template (FPT) is

captured and sent to UIDAI for authentication

STEP II: If the authentication succeeds, the

captured FPT is stored on the SRC and the

Server

STEP III: If the authentication fails, go to STEP I

with second FPT and repeat

STEP IV: Atleast 4 fingers to be stored per

person and best match to be recorded

In case the member‘s biometric has been already

authenticated with UIDAI i.e The FPT is already

stored on the SRC

STEP I: The Finger print template (FPT) of the

member is matched with the FPT stored on the

SRC

STEP II: If the authentication fails, go to STEP I

with second FP and repeat.

2.1.2 FPS sales person enters the quantities to be issued to

beneficiary and submits to the server.

2.1.3 Server updates the transaction and gives the success

report. Detailed transactions are updated on the FPS IC

and the SRC

Page 10: POS based Public Distribution System

Page 9 of 31

2.1.4 A receipt is printed and the commodities are issued to

beneficiaries.

2.1.5 For the next transaction the beneficiary can choose to go

to another FPS as his/her food account balances are

maintained on the server and on her smart card.

2.2 Offline mode*

2.2.1 FPS sales person inserts his FPSIC in POS Device

2.2.2 POS reads the details of the FPS current stock

allocation and stock status.

2.2.3 FPS sales person inserts the SRC of the beneficiary in

POS device.

2.2.4 POS reads the ration card number and gets

beneficiary’s entitlement balances from the FPS card

In case the biometric is stored on the SRC

STEP I: The FPT is matched with the FPT on the

SRC against the member

STEP II: If the authentication fails, go to STEP I

with second FPT and repeat.

In case the biometric is not stored on the card, issuance

will be done and the transactions will be recorded

[‘N’**attempts to be allowed]

2.2.5 FPS sales person enters the quantities to be issued to

beneficiary and stores the transactions on the FPSIC and

SRC.

2.2.6 A receipt is printed and the commodities are issued

to beneficiaries.

2.2.7 Whenever the connectivity is available, inserting

either FPSIC/SRC into the POS, all the offline

transactions stored on the cards shall be updated on

the server.

* The POS application will have facility to restrict issuance if biometrics of member

collecting the commodity is not stored on the SRC on ‘Nth’** attempt.

**N – To be decided by DCSCA.

Page 11: POS based Public Distribution System

Page 10 of 31

5. SCOPE OF WORK

I) Geographical Scope of project:

The project roll-out will be across the state at the following locations:

Location No. of Locations

FCS Godowns 10

FPS 501

Total 511

II) Development of Software for POS terminals.

Development and Testing of POS application

The selected vendor will depute two programmers at NIC Delhi for

development of the POS software application in close coordination with NIC

Delhi team. The software will have to be certified by NIC Delhi before

operationalizing the same.

Licensed product and Services

The selected vendor would be required to obtain license/authorization for any

software or hardware or services to fulfill its performance obligations under

this contract. In case of any infringement on this by vendor, GEL will not be

responsible for the same.

Functional Scope of the Software for POS

The Software for POS should handle the following functionalities.

1. Issuance of the commodities by Godowns to FPS Incharge

1.1 Online mode

1.1.1 Once the Godown Incharge inserts the FPS incharge Card (FPSIC)

into the POS, POS Application will read the card details and will fetch

the entitlements for the FPS from NIC server.

1.1.2 On issuance of commodities to the FPS Incharge, POS

application will update the transaction to the server data as well as

the FPSIC and Godown Incharge Card (GIC).

Page 12: POS based Public Distribution System

Page 11 of 31

1.2 Offline mode(Mandatory that after issuance all the transactions

on the FPSIC has to be updated on the server)

1.2.1 Once the Godown Incharge inserts the FPS incharge Card

(FPSIC) into the POS, POS Application will read the card

details and will fetch the entitlements for the FPS from NIC

server.

1.2.2 On issuance of commodities to the FPS Incharge, the POS

application will display a success message and save the

transactions on the FPSIC and GIC, flagged as ‘offline’.

1.2.3 Whenever the connectivity is available, all the transactions

flagged as “offline” will be updated on the server, FPSIC and GIC.

2. Issuance of the commodities by FPS to the Beneficiaries

2.1. Online mode

2.1.1 Once the FPS incharge inserts FPSIC in POS Device, the application

will check if any transactions in the FPSIC are flagged as ‘Offline’ and if

so update them onto the server. Incase there are any transactions

onto the server which are not updated on the SRC, the POS application

should write those transactions onto the SRC. Then the POS

application will fetch the details of the FPS current stock allocation and

stock status from the server.

2.1.2 Next, on inserting the SRC of the beneficiary in POS device, the POS

application will read the ration card number and send it to the server

through GPRS to get beneficiary’s entitlement balances.

2.1.3 Biometric authentication of the beneficiary will be facilitated by the

software

In case the member’s biometric has not been authenticated yet

STEP I: The application will capture the Finger Print Template (FPT)

and send to UIDAI for authentication.

STEP II: If the authentication succeeds, the application will save the

captured FPT on the SRC and the Server.

Page 13: POS based Public Distribution System

Page 12 of 31

STEP III: If the authentication fails, the application will display a

message about the failure and an option for authentication of FPT

with second finger. (Repeat form Step I)

STEP IV: The application will store atleast 4 FPT and the best match

will be recorded.

In case the member‘s biometric has been already authenticated with

UIDAI i.e The FPT is already stored on the SRC

STEP I: The POS application will match the FPT with the FPT stored on

the SRC against the member.

STEP II: If the authentication fails, the application will display a

message about the failure and an option for authentication of FPT

with second finger. (Repeat from Step I)

2.1.4 In case last transaction of issuance to the beneficiary was offline

STEP I: The application will update all the transactions from the SRC

which are flagged ‘offline’ onto the server.

2.1.5 Then the POS application will display a screen to select the

commodities and enter the quantities to be issued. Once entered,

the application will submit all the details to the server.

2.1.6 POS application will update the transaction and gives the success

report and will also update the FPSIC and SRC after every

successful transaction.

2.1.7 Next, the application will print a receipt about the transaction

carried out and the FPS incharge will issue the commodities to the

beneficiary with the receipt.

2.1.8 Since the POS application updates the food account balances on

the server, SRC and the FPSIC; for the next transaction, the

beneficiary can choose to go to another FPS.

Page 14: POS based Public Distribution System

Page 13 of 31

2.2 Offline mode *

2.2.1 Once the FPS sales person inserts his FPSIC in POS Device, the POS

application should read the details of the FPS’s current stock

allocation and stock status from the FPSIC.

2.2.2 Next, the FPS incharge inserts the SRC of the beneficiary in POS

device.

2.2.3 POS application will read the ration card number and get

beneficiary’s entitlement balances from the FPSIC.

In case the biometric is stored on the SRC

STEP I: The POS application will match the FPT with the FPT

stored on the SRC against the member.

STEP II: If the authentication fails, the application will display a

message about the failure and an option for authentication of

FPT with second finger. (Repeat from Step I)

In case the biometric is not stored on the card, issuance will be

done and the transactions will be recorded with a flag that

”goods are issued without authentication” [‘N’**attempts to be

allowed]

2.2.4 Then the POS application will display a screen to select the

commodities and enter the quantities to be issued. Once

issued, the POS application will display a success message and

save the transactions on the FPSIC and SRC, flagged as ‘offline’.

2.2.5 Next, the application will print a receipt about the transaction

carried out and the FPS incharge issues the commodities to the

beneficiary.

2.2.6 Whenever the connectivity is available, inserting either FPSIC

and SRC into the POS, all the offline transactions stored on the

FPSIC and the SRC will be updated on the server by the POS

application.

Page 15: POS based Public Distribution System

Page 14 of 31

* The POS application will have facility to restrict issuance if biometrics of member

collecting the commodity is not stored on the SRC on ‘Nth’** attempt.

* Synchronization of all the transactions on the server, FPSIC and GIC has to be

accurately handled on connectivity by the POS application i.e. POS application will

synchronize the transactions pertaining to the beneficiary SRC onto the server, FPSIC

and the SRC as needed. In case the SRC holds the latest transactions, the server and

the FPSIC will be updated. If the server holds the latest transactions, the SRC and the

FPSIC will be updated.

**N – To be decided by DCSCA.

Use Cases of POS Application (Refer Annexure E)

General Requirements and scope of Software

The Bidder shall ensure the following requirements in respect of the Software for

POS:

Assist in defining the processes required to support the operation of the software.

Manage high volume batches of data input easily. Provide a comprehensive, modular, streamlined, flexible and scalable solution. Provide a configurable batch data export facility. Enforce data entity workflow rules (e.g. a person is not “registered” until they

have been “verified”). Create and/or capture a unique identifier that should be able to cross

reference any physical material (e.g. paper forms, photographs) relating to a record.

Ensure provision for acting on data in "mass" for functions such as organization updates, approval/denial, category assignment, privilege maintenance and printing.

Provide access to reporting via NIC’s FEAST Application. Satisfy the functional requirements generally identified in this Scope of Works. Focus on error reduction, and making cost savings through process

improvement. Develop and document to allow other suitably knowledgeable people to

support or further develop it. Ensure the solution and supporting technology has scalable capacity and

processing power necessary to exceed anticipated demands. Ensure accuracy so that all information is maintained correctly and is real time.

Provide failover capabilities to a redundant service.

Page 16: POS based Public Distribution System

Page 15 of 31

Security Requirement of the Software:

Provide data security via user log-on profiles. Implement a robust security model to ensure access control to the system and

content. Maintain audit trails of data changes and related user IDs. Manage user groups and security, including creating new users and resetting

passwords.

III) SCOPE DURING IMPLEMENTATION OF THE SOFTWARE

1. Installation of software on all POS devices

The developed application module shall be pre-installed in all the POS devices by

the vendor before their delivery.

2. Project planning and management

This project is a geographically spread initiative involving multiple stakeholders.

Its implementation is complex and though its ultimate success depends on all the

stakeholders; the role of bidder is key and hence bidder is required to design and

implement a comprehensive and effective project management methodology

together with efficient & reliable tools. To have an effective project management

system in place, it is necessary for the bidder to use a Project Management

Information System (PMIS). The bidder has to ensure that the supply and roll-out

is completed as per the timelines.

The bidder shall address at the minimum the following:

Create an organized set of activities for the project

Establish and measure resource assignments and responsibilities

Construct a project plan schedule including milestones

Measure project deadlines and performance objectives

Communicate the project plan to stakeholders with meaningful reports

Provide facility for detecting problems and inconsistencies in the plan

During the project implementation the bidder shall report to GEL, on following

items:

Results accomplished during the period

Cumulative deviations to date from schedule of progress on milestones as

specified in this RFP read with the agreed and finalized Project Plan

Page 17: POS based Public Distribution System

Page 16 of 31

Corrective actions to be taken to return to planned schedule of progress

Proposed revision to planned schedule provided such revision is

necessitated by reasons beyond the control of the bidder

Other issues and outstanding problems, and actions proposed to be taken

Progress reports on a weekly/fortnightly/monthly basis

Interventions which the bidder expects to be made by GEL and/or actions

to be taken by GEL before the next reporting period;

Project quality assurance reports

As part of the project management activities, the bidder shall also undertake:

Issue Management to identify and track the issues that need attention and

resolution from GEL.

Scope Management to manage the scope and changes through a formal

management and approval process

Risk Management to identify and manage the risks that can hinder the

project progress

3. Requirements traceability matrix

The bidder would ensure that developed software is fully compliant with the

requirements and specifications provided in the RFP such as functional, non-

functional and technical requirements. For ensuring this, the bidder shall prepare

a Requirements Traceability Matrix on the basis of Functional Requirements

Specifications (FRS), Non Functional Requirements Specification, and Technical

Requirements provided by GEL (updated, expanded and fine-tuned by the bidder

as necessary) and the System Requirements Specifications (SRS) prepared by the

bidder This matrix would keep track of the requirements and trace their

compliance through different stages of the project including software design,

coding, unit testing and acceptance testing. The Requirements Traceability Matrix

would be a live document throughout the project, with the bidder team updating

the matrix at every stage to reflect the meeting of each specification at every

stage. Through the duration of the project, GEL will periodically review the

Traceability Matrix. GEL would provide the final approval once they are satisfied

that all requirements are met.

Page 18: POS based Public Distribution System

Page 17 of 31

4. Project documentation

The bidder shall create and maintain all project documents that would be passed

on to GEL as deliverables as per the agreed project timelines. The documents

created by the bidder will be reviewed and approved by GEL. GEL would also

approve any changes required to these documents during the course of the

project. Project documents include but are not limited to the following:

Detailed Project Plan

Updated/vetted FRS

SRS document

Technical specifications of POS devices.

Any third party tools/software needed by the bidder

All Test Plans

Test Specifications (Functional / Performance / Stress / Load test cases)

Document

Reports summarizing the Functional /Performance/Load Test Reports

carried in Lab environment.

Requirements Traceability Matrix

Change Management and Capacity Building Plans

SLA and Performance Monitoring Plan

Call Log/Emails/Resolution Reports for Help Desk

Performance Monitoring Reports for Operations and Support

Technical, Operation, Administration and Maintenance Manuals, Standard

Operation Procedures (Manuals covering installation,

configuration/setting up of POS device, Standard Operating Procedures

and Maintenance procedures.)

Updated System Design Document, Source Code, Manuals, Change Logs

Project Status Report

Issue Logs

The bidder shall submit a list of deliverables that they would submit based on the

methodology they propose. The bidder shall prepare the formats/templates for

each of the deliverables front based upon industry standards and the same will be

approved by GEL prior to its use for deliverables. All project documents are to be

Page 19: POS based Public Distribution System

Page 18 of 31

kept up-to-date during the course of the project. The Bidder shall maintain a log

of the internal review of all the deliverables submitted. The logs shall be

submitted to GEL on request. All project documentation shall conform to the

highest standards of software engineering documentation.

5. System study, customization, deployment and integration

The bidder is required to study the Supply Chain Management in detail in

association with GEL and come out with System requirement Document for the

software to be developed/customized for POS devices, for the approval of the

stakeholders.

Customization, deployment and integration (if any) in the application should be

done bug free.

6. Creating test cases

Once the SRS is approved and design is started, the bidder would prepare all

necessary Test Plans (including test cases), i.e., plans for Unit Testing, Integration

and System Testing and User Acceptance Testing. Test cases for UAT would be

developed in collaboration with domain experts identified by GEL. The Test Plans

also include planning for the testing any integration with 3rd party software. The

Test Plans should also specify any assistance required from GEL. The bidder

should have the Test Plans reviewed and approved by GEL.

7. Handholding support

Bidder has to provide requisite Technical Support Engineers to meet turnaround

time at clause 28 in the Terms and Conditions of the RFP.

8. Requirements to adherence to standards

Software for POS must be designed following open standards, to the extent

feasible and in line with overall system requirements set out in this RFP, in order

to provide for good inter-operability with multiple platforms and avoid any

technology or technology provider lock-in.

9. Industry standard compliance

In addition to above, the POS Software has to be based on and compliant with

industry standards (their latest versions as on date) wherever applicable. This will

apply to all the aspects of solution including but not limited to design,

Page 20: POS based Public Distribution System

Page 19 of 31

customization, deployment, security, installation, and testing. There are many

standards that are indicated throughout this volume as well as summarized

below. However the list below is just for reference and is not to be treated as

exhaustive. Particulars Required Standards to be adhered to

Application development W3C specifications Information access/transfer protocols SOAP, HTTP/HTTPS

Interoperability Web Services, Open standards Photograph JPEG (minimum resolution of 640 x

480 pixels) Scanned documents TIFF (Resolution of 600 X 600 dpi) Biometric framework As per UIDAI standards

Finger print scanning As per UIDAI standards Digital signature As per UIDAI signing Technique Document encryption As per UIDAI communication

standards

IV) MAINTENANCE OF POS TERMINALS WITH SOFTWARE:

The vendor will provide 3 years onsite comprehensive warranty for POS

Terminals and the Software

The vendor shall maintain minimum 5% of the devices with his authorized

office for maintenance located in Goa for replacement of faulty devices

without losing any data and time.

The faulty device is required to be repaired or replaced as per the penalty

clause 28 in the Terms and Conditions in the RFP

The scope of hardware support services will include preventive and corrective

comprehensive maintenance and cover installation, on-site diagnosis and

resolution of hardware faults in response to the reported problems. Vendor

will also resolve all the hardware problems detected during routine operational

support activities and will ensure that the problems are resolved by repair or

appropriate replacement as and when required.

Page 21: POS based Public Distribution System

Page 20 of 31

V) Training and Capacity Building

Office No of Offices Approx No of Trainees Total*

Phase -I] Pilot Rollout for Bardez DCSCA 24 4 96

GEL 1 50 50

FPS 78 2 156

Phase-II] Remaining Talukas Rollout FPS 423 2 846

The Bidder would conduct a detail training program for all the FPS Incharges,

DCSCA & GEL Staff members.

The bidder shall organize refresher trainings as and when required by GEL.

*Mentioned figures are estimated and the actual number may vary.

Page 22: POS based Public Distribution System

Page 21 of 31

TERMS AND CONDITIONS

1 The vendors are required to get registered with www.tenderwizard.com/GOA. The vendor must have valid digital signature to submit the bid.

2 RFP documents should be downloaded from website www.goaelectronics.co.in or http://www.etender.goa.gov.in as per the dates mentioned in the RFP.

3 The vendor should use the electronic mode of tendering using the website www.etender.goa.gov.in to submit his best possible quotes for the items given therein. 4 Late submission will not be entertained and will not be permitted by the e-Tendering System.

5 Last minute submission should be avoided. As such GEL will not be responsible for any failures in submission of bids.

6 Incomplete or conditional bids will be summarily rejected.

7 The vendor shall bear all costs associated with the preparation and submission of its Proposal and GEL will in no case be responsible or liable for those costs, regardless of the conduct or outcome of the proposal process. 8 Tender shall be uploaded separately through the e-Tendering System under Two Bid System viz Technical bid & Financial bid, as per the prescribed formats only. Failure to comply with these requirements may result in the bid being rejected.

9 The tender fees shall not be refunded even if the bid is not submitted.

10 The Technical Bid and the Financial bid as per Annexure –“A” and Annexure-“B” to be strictly uploaded to the e-tendering website mentioned. Additionally, a hard copy of the Technical Bid along with the Three DD’s mentioned in the Technical Bid Format (Annexure-“A”) needs to be submitted to the address of the CEO - Goa Electronics Limited, as mentioned in the RFP. The hardcopy of the technical bid along with the DD’s shall be placed in single envelope superscripted as “Technical Bid and DD’s towards Tender No GEL/PDS/POS -04 for Purchase of Point of Sale terminals” and the due date of opening of the bid mentioned to be deposited at the O/o Goa Electronics Limited, Panjim on or before the tender submission date. Hard copy of the Financial Bid is not to be submitted. Financial bid to be only uploaded to the website mentioned.

11 If any vendor does not qualify in technical evaluation as per Annexure –“A”, the Commercial Proposal

shall not be opened.

12 The price should not be mentioned in the Technical bid in any form or manner. In case the prices are mentioned in the technical bid, the offer will be liable for rejection. 13 The technical bid and financial bid will be opened on two different dates. The technical bid will be opened on due date as mentioned in the RFP document.

14 At any time prior to the deadline for submission of Proposal, GEL may amend the RFP documents by issuing suitable corrigendum. Any corrigendum issued in this regard shall be uploaded on websites www.goaelectronics.co.in or www.etender.goa.gov.in and will be communicated through email to those companies who have already purchased the RFP document.

Page 23: POS based Public Distribution System

Page 22 of 31

15 Performance Bank Guarantee(PBG) Phase –I: Pilot Rollout for Bardez The vendor shall submit performance bank guarantee equal to 10% of the total cost of Phase I/Pilot project. On successful completion of Phase I: Phase-II: Remaining Talukas Rollout The vendor shall submit performance bank guarantee equal to 10% of the total cost of Phase II. GEL shall be at liberty to enforce such bank guarantee in case the vendor fails to provide the warranty of supplied devices and the services as per the scope mentioned in RFP. 16 The EMD of successful vendor will be converted into security till the complete supply is made and all the services are provided as per the scope mentioned in RFP and will be refunded without any interest. The EMD of unsuccessful vendors will be returned after completion of tender process.

17 The vendors are expected to examine all instructions, forms, terms and other information in the RFP. Failure to furnish all information required as mentioned in the RFP or submission of a proposal not substantially responsive to the RFP in every respect will be at the vendor’s risk and may result in rejection of the proposal and forfeiture of the bid. 18 If the tenders opening day happens to be holiday, the same will be accepted and opened on the next working day.

19 The person signing the tender form (or any other document forming part of the contract) on behalf of another, shall be deemed to warranty that he has the authority to sign such documents and if, on inquiry it appears that the person so signing had no authority to do so, GEL, may without prejudice to other civil and criminal remedies against the contract, hold the signatory liable for all costs and damages and forfeiture of the earnest money.

20 The attempt on the part of the vendor, to negotiate directly or indirectly, with the authority to whom the tender is being submitted or with the tender accepting authority, before the finalization of tenders, will make vendor liable for exclusion from the consideration of his/her tender.

21 GEL reserves the right to reject all or any tender without assigning any reason. GEL also reserves the

right to cancel the bid process at any time prior to signing the contract and GEL will have no liability for

above mentioned actions.

22 The approximate quantity to be purchased along with specifications required have been mentioned

at Annexure “C” and Annexure “D” respectively. However, GEL reserves the right to modify the

quantity as per requirements. 23 The Bids shall be valid for a period of minimum “ONE YEAR” from the date of submission of the bid. On

completion of the validity period (1 Year), in case required, GEL, may solicit the vendor’s consent to an

extension of the period of validity. The request and the responses thereto shall be made in writing by

post or email.

24 The successful vendor on submission of PBG will be issued an order towards Phase I-Rollout in Bardez

Taluka.Only on successful completion of pilot talukathe order of Phase II- Rollout in remaining Taluka

will be placed with the vendor. 25 The proposal submitted by the Bidder shall comprise the following documents:

1) All documents as per the Technical Bid Format (Annexure “A”) of RFP and along with all

attachments/schedules duly completed and duly signed by the authorized signatory of the

bidder/consortium.

2) The bidders Financial proposal as per the Financial Bid Format(Annexure “B”)of the RFP duly signed

by the authorized signatory of the bidder/consortium.

All sections in the bid should be adequately flagged and numbered.

Page 24: POS based Public Distribution System

Page 23 of 31

26 In the event of the bidder engaging in any corrupt or fraudulent practices during the bidding process, by

the judgment of GEL the bid will be rejected. For the purpose of this clause:

“Corrupt Practice” means the offering, giving, receiving or soliciting of anything of value to influence the

action of a GEL official in the selection process. It also includes bringing undue influence through any

quarter or interfering directly or indirectly in the selection process to affect its outcome. “Fraudulent

Practice” means a misrepresentation of facts in order to influence selection process to the detriment of

GEL.

27 The vendor shall not perform any kind of promotion, publicity or advertising etc. at DCSCA, its field

offices and FPSs through any kinds of hoardings, banners or any other media. 28 Penalty.

Delay in Implementation: A penalty of 5% of the relevant phase shall be levied on the contractor for every delay of one week in execution of the project.

Uptime in Implementation An uptime of 99.99% is expected from the bidder. User may make a complaint about the POS devices and other peripherals / accessory and software /service through letter, fax, email, phone, SMS or any other means as the user thinks fit or convenient to the service center of vendor. Vendor shall provide contact numbers/ e-mail IDs clearly on stickers to be displayed on the POS Devices. On receiving complaint about the non functionality of the POS due to software or hardware problems the Vendor shall respond/ repair/ resolve or provide required services within the period as stated below.

Location Response Period

Resolution period

Penalty for Downtime

Anywhere in Goa

30 mins 1hr @0.25% of the relevant phase for delay of every 2 hrs subsequent to the permitted Resolution period

Penalty shall be applicable if the call is not responded within 30 mins. If any parts need to be replaced, then the same shall be done within 1 hour including data transfer and completion of complaints in totality.

29 If the successful bidder fails to execute the project as per the schedule (Annexure “C”) and Terms & Conditions of the agreement executed, a penalty at the rate of maximum 10% of total contract value shall be levied on the contractor, which shall be recovered from the security deposit or from the payment to be made to the contractor and the contract may be terminated at the risk and cost of the contractor. However, the decision regarding the quantum of penalty shall vest with GEL.

30 The bidder has to ensure that all workforce provided is insured as per the company’s rules/guidelines. It is the responsibility of the bidder to ensure all safety precautions are taken for their staff during the installations. In no case GEL will be responsible for any mishappenings.

31 The POS Software will have to be certified by NIC Delhi before operationalizing the same.

Page 25: POS based Public Distribution System

Page 24 of 31

32 CONSORTIUM CRITERIA The following are the requirements for a Consortium: • The number of members in a consortium shall not be more than three (3) .However, the prime

bidder shall individually qualify the Pre-qualification criteria and be solely responsible for all

implementation of the entire scope of the project;

• The bid should contain details of all the members of the consortium including their legal status and

specify their roles and responsibilities in the project;

• In case of a consortium, applicant consortia shall have a valid Memorandum of Understanding

(MoU)/ agreement among all the members signed by the Chief Executives/ Authorised Signatories

of the companies dated prior to the submission of the bid. The MoU/ agreement shall clearly specify

the stake of each member and outline the roles and responsibilities of each member. The MoU/

agreement shall be exclusively for this project and shall be responsible in case of failure by any

member.;

All Consortium partner(s) should be registered in India and must have company registration certificate, registration under Labour Laws Contract Act, valid sales tax registration certificate and valid service tax registration certificate

Consortium partners participating in the bid along with one prime bidder should not be a consortium partner to any other prime bidder or should not participate as a prime bidder against this RFP. If found so, all bids of these bidders will be liable to be rejected

The consortium shall be evaluated based on the lead bidder’s strength as defined in this bid document. Once short listed in pre-qualification, change of consortium shall not be allowed. MSA will be signed with lead bidder only, in case of consortium

33 Period of Project The selected Agency will make available all the POS devices in working condition along with the required software after installation/commissioning and testing at the respective locations 2 days prior to the date of commencement of the Project as per the schedule at Annexure –“C” for necessary trial runs. Total period of the project will be 3 Years.

34 Payment Schedule: The Bidder shall raise bills of Supply at the end of every month. Payment would be

made within 30 days of raising the invoice. All payments would be made after deductions calculated

based on any penalties if applicable.

35 The make / brand of the quoted POS devices must be mentioned and must comply to the specifications

and standards mentioned in this RFP. 36 Any dispute, arising out of this contract will be under the jurisdiction of Goa Court.

37 Cost towards repairs of any damages to the equipment during transportation or installation by the bidder will have to be borne by the bidder.

38 The bidder is fully responsible for handling of the equipments and making sure that all POS equipments are kept safely. If any equipments get damaged that will be rectified by the bidder at his own cost.

39 A detailed contract will be signed with the successful bidder within 15 days of issue of work order.

40 GEL would in no way be responsible for any issues, litigations, or legal implications arising if at all due to

use of any pirated software by the vendor. The complete onus and responsibility of any such

consequences would be on the vendor.

Page 26: POS based Public Distribution System

Page 25 of 31

ANNEXURE “A” (TECHNICAL BID FORMAT)

The Bidder/ Prime Bidder (in case of consortium) needs to fulfill all the prequalification criteria

mentioned below to technically qualify for the bid. The technical bid should contain the

following documents:-

Sr No

The Bidder / Prime Bidder (In case of consortium) shall satisfy all of the criteria below

Supporting Document Required

1 Bidder/ Prime Bidder (in case of consortium), should submit the RFP payments in the form of Demand Draft from any Nationalized/scheduled bank, payable at Panaji, which must be scanned and uploaded to the e-tendering website within the period of tender application submission and the originals to be deposited in the office of Goa Electronics Limited, Panaji on or before the RFP submission date.

a) A Demand draft of Rs. 150000/- (Rupees One Lac Fifty Thousand only) drawn on any Nationalized / Scheduled Bank in favour of Goa Electronics Limited payable at Panaji , Goa towards Earnest Money Deposit (EMD) b) A Demand Draft of Rs. 12500/- (Rupees Twelve thousand five hundred only)drawn on any Nationalized / Scheduled Bank in favour of Goa Electronics Limited payable at

Panaji , Goa towards Cost of RFP document. c) A Demand Draft for Rs. 1500/- (Rupees One Thousand Five Hundred only) drawn on any Nationalized / Scheduled Bank in favour of Infotech Corporation of Goa Ltd. payable at Panaji – Goa towards Cost of RFP processing fee.

2 Bidder/ Prime Bidder (in case of consortium), should have executed atleast 1 similar Project** in PDS in India supplying minimum 500 POS terminals and should be running successfully for the last 6 months.

Purchase Order and Certificate from the client specifying no. of POS, Period of successful implementation, Department and State.

3 The Bidder / Prime Bidder (in case of consortium) should be a registered company with an office for operations. The company should be operational for at least the last three financial years as on 31st March 2013. The Bidder / Prime Bidder (in case of consortium) has to be a single legal entity.

Certificate of Incorporation/ Registration and proof of Income Tax ,Sales Tax, Service Tax and VAT Registration number(As applicable)

4 The Bidder / Prime Bidder (in case of consortium) must have an office in Goa or should furnish an undertaking that the same would be established within two weeks of signing the contract.

Undertaking to be provided /Agreement /Electricity bill

5 The Bidder / Prime Bidder (in case of consortium), must have an annual turnover of not less than Rs. 10 crores in each of the last three financial years not before 2009-10.

Audited/Certified Annual Financial Statements in the form of balance sheet and P & L account. Annual Report for the three financial years

6 Bidder/ Prime Bidder (in case of the consortium) and all of the consortium partners, should not have any of their contracts terminated/blacklisted in the Last Three years by any State or Central Government/PSU/BFSI/Private Sector.

Affidavit Duly notarized to be submitted for the bidder and all the consortium partners

**Similar Project: supply, installation including maintenance of POS Devices with required

software for POS

Page 27: POS based Public Distribution System

Page 26 of 31

ANNEXURE-“B”- (FINANCIAL BID FORMAT)

Total amount in words (Rs):___________________________________________________

Financial Bid Terms and Conditions:-

1. Rates mentioned should be inclusive of all taxes, insurance, packaging,

transportation to all locations, installation /un-installation and all charges towards

execution of all activities as per mentioned scope of work.

2. Rates mentioned should include cost of technical support, manpower resources and

any buffer POSs required for uptime.

3. The mentioned approximate quantity of POS Devices may vary. All payments would

be made only towards actual number of POS devices purchased.

4. The bidders must use only the format provided in the e-tender website (Annexure-B)

for submitting the financials. Any other formats/ forms will not be accepted and

such tenders will be rejected.

5. The bidder must provide the Commercial Proposal in e-tender mode only.

Hardcopies of the Commercial proposals are not entertained.

6. The rates should be quoted in figures as well as in words, on the form attached at

Annexure-‘B’ and duly signed and stamped by the authorized person.

7. The tender should be valid for a minimum period of one year.

8. All rates/amounts to be strictly mentioned in INR only.

9. Prices quoted must be firm and final and shall not be subject to any upward

modifications, on any account whatsoever.

Sr No

Item No of POS

required

Rates per unit inclusive of all taxes

Amount

1 Point Of Sale Terminals with Software and manpower for implementation and all services as per the scope of work mentioned in the RFP.

501

Total amount (Rs):

Page 28: POS based Public Distribution System

Page 27 of 31

ANNEXURE “C”- REQUIREMENTS & SCHEDULE OF POS TERMINALS

Block No of FPS No of POS Date of

Commencement

Date of

Completion

Phase –I: Pilot Rollout for Bardez

Bardez 78 78 T* T+2 months

Phase-II: Remaining Talukas Rollout

Remaining

Talukas

423 423 T+2 months T+4 months

Total 501 501

* T is 30 days after the LOI is issued

Page 29: POS based Public Distribution System

Page 28 of 31

ANNEXURE “D“- TECHNICAL SPECIFICATIONS OF POS DEVICES

S. No Parameters Specification

1 Processor High Speed Arm Cortex A9 Processor with 600 Mhz or higher

2 Operating System Preferably Linux Operating system(Latest Stable

Kernel)/Android 4.0 or higher/Windows 8 Device operating

system should support HTML5 based web browser and CSS 3

3 Memory 256 MB RAM or Higher / 1GB flash memory

4 Expansion slot Micro SD slot, Supporting upto 8 GB

5 Communication GSM/ GPRS/Ethernet/PSTN

6 Interface RS -232, USB 2.0(full speed) Host and client

7 Display 3.5 inch color QVGA(320 X 240) 260 K Colors, TFT display,

Touch screen

8 Touch Panel Resistance

9 Key Pad QWERTY keypad

10 Battery Rechargeable 7.4V,2600mAH, Li-ion(8 hrs battery backup)

11 SIM and SAM Slot Single SIM, Dual SIM is optional, 2 SAM slots

12 Printer 3” thermal printer / 2” thermal printer (Supports all regional

language printing & bar code printing)

13 Audio Speaker, support of all regional language announcements

14 Camera 3 Mega pixel auto focus color camera

15 Finger Print

Scanner

STQC Certified scanner / Non STQC Certified scanner suitable

for Aadhar authentication

16 RFID Reader

(Contactless)

Integrated RFID, ISO1443 A/B(MIFAIR, SCOSTA)

17 Smart

Cards(Contact

Type)

2 Nos of smart card Reader & Writer (SCOSTA complaint)

18 Operating Temp 0 to 50 C

19 Storage Temp 0 to 70 C

20 Humidity 5 to 95% RH non condensing

21 Dimensions 242 m x108mm x 32/64 mm

22 Bluetooth(optional) Integrated Blue tooth Version 2

Page 30: POS based Public Distribution System

Page 29 of 31

23 Magnetic card

Reader (Optional)

Integrated MSR (Bi-directional, track 1,2,3, ISO 7810, ISO

7811, ISO 7813)

24 Barcode

Reader(Optional)

Integrated 1D/2D reader or External 1D/2D Bar Code Reader

25 GPS (Optional) Integrated GPS

26 Status Indication Status indicators provides ease of use, indicators for

connectivity(Presence or absence), signal strength, battery

status etc.

Page 31: POS based Public Distribution System

Page 30 of 31

ANNEXURE “E” - Use Cases of POS Application

Use Case I – Entitlement Withdrawal by Beneficiary at FPS

The smart card of beneficiary

is inserted in the POS

Details (Ration Card no, Name) are displayed on the screen.

Member Names including name of the head are listed for selecting

one member name. The name shall be in Unicode Hindi.

User selects one name who is

taking the entitlements and

puts the finger on the finger

print camera. Presses the

SUBMIT button

Ration Card Number, Member Name, Finger print template, Bio

authentication takes place. POS ID, FPS Smart card number, FPS ID

shall be sent to the central server through GPRS. Ration card

number, Member Name, finger print template, date, POS ID, FPS ID

are stored in a transaction table. Ration Card Number is searched in

the food account table and balance entitlements are read and

displayed on POS device screen. Text boxes are displayed against

each commodity to enter commodities to be withdrawn as shown

in the screen

User enters the commodities

to be

withdrawn and presses

SUBMIT button

FPS ID, POS ID, Commodities to be withdrawn, Ration Card number,

Smart Card Number are sent to server through GPRS. FPS ID,

transaction ID. Ration Card number, Commodities withdrawn are

saved in the transaction table. Food balances are reduced with the

quantities withdrawn. Success report is displayed on the POS

screen.

User prints the receipt.

Handovers the commodities

to the beneficiary,

Page 32: POS based Public Distribution System

Page 31 of 31

Case II – Offline issue when there is no connectivity

It is expected that there may be problems in the connectivity sometimes and online

authentication and check for balance PDS commodities is not possible. In those situations,

beneficiary should not be denied issuance of PDS commodities but should be issue offline.

User selects ‘Offline Issue Button’ System checks for GPRS connectivity and if

there is no connectivity instructs to insert

Beneficiary Card and FPS card.

Cards will be inserted. Card is read and name and member details

are displayed on the screen.

Member is selected and Member puts the

finger on the screen

Bio authentication will be done.

A screen appears asking for entry of PDS

Commodities to be issued.

User enters the quantities to be issued and

Presses enter.

Receipt is generated after storing the

Quantity details with some flag in the

smart card of the beneficiary as well as on

the FPS card with some unique transaction

id.

When beneficiary card flagged to indicate offline

issue, is inserted in any POS , the details are to be

updated on the central server, if the transaction has

not yet been updated from FPSIC. Beneficiary card

offline issue flag will be updated

When FPSIC flagged to indicate offline issue is

inserted in any POS with connectivity all the offline

transactions stored in the card will be updated in the

server. If any transaction has already been updated

from beneficiary card it will not again be updated.

Off line issue flag will be updated accordingly.