portland district commanders panel & regional … › wp-content › uploads ›...
TRANSCRIPT
217217217
200200200
255255255
000
163163163
131132122
2396553
110135120
1129256
62102130
1025648
130120111
237237237
8011927
252174.59
8336
118
“The views, opinions and findings contained in this report are those of the authors(s) and should not be construed as an official Department of the Army position, policy or decision, unless so designated by other official documentation.”
1
COLONEL JOSE L. AGUILARDistrict CommanderPresented to2016 PNWA Annual Convention12 October 2016
PORTLAND DISTRICT COMMANDERS PANEL & REGIONAL UPDATES
2016 STATUS ACTIVITIES
• Dredging maintenance update
• MCR jetties update
• Navlock update
27 September 2016
COLUMBIA RIVER CHANNEL STATUS
Astoria
Longview
Kalama
Portland & Vancouver
7 or more feet above project depth5 or 6 feet above project depth3 or 4 feet above project depth1 or 2 feet above project depthAt or 1 foot below project depth2 or 3 feet below project depth4 feet or more below project depth
Comparison of Draft Restrictions
Year Days Percent of Time
2016 0 02015 94 262014 39 112013 67 182012 121 332011 258 71
MCR 59 60 55
MCR 46
MCR 53 53 50
MCR 46
Lower Desdemona 47 48 50 51
Upper Desdemona 43 44 43 41
Flavel 41 44 45 35
Upper Sands 40 42 45 42
Upper Sands 41 44 43 38
Tongue Point 41 45 44 44
Tongue Point 42 44 43 38
Miller Sands 39 43 44 39
Miller Sands 41 44 43 28
Miller Sands 39 44 44 40
Pillar Rock 42 42 42 39
Pillar Rock 36 43 42 42
Brookfield-Welch 42 45 44 44
Brookfield-Welch 47 47 43 33
Skamokawa 37 43 44 40
Skamokawa 44 44 44 42
Puget 54 56 53 48
Puget 43 44 44 41
Wauna 40 44 45 45
Wauna 42 45 45 44
Westport 40 45 44 43
Westport 43 45 44 43
Eureka 42 45 45 44
Eureka 45 45 47 43
Eureka 43 45 46 41
Gull Island 43 45 42 41
Gull Island 45 46 44 41
Stella-Fisher 47 48 47 41
Stella-Fisher 42 43 44 39
Walker Island 44 47 47 44
Walker Island 44 44 46 43
Walker Island 47 48 45 42
Slaughters 42 43 45 43
Slaughters 43 42 43 40
Lower Dobelbower 42 45 43 40
Lower Dobelbower 46 47 45 40
Upper Dobelbower 45 45 44 40
Upper Dobelbower 43 44 44 43
Kalama 44 57 59 57
Kalama 44 44 43 34
Kalama 40 44 44 41
Lower Martin 43 45 45 45
Lower Martin 44 45 45 41
Lower Martin 44 44 45 41
Upper Martin 48 46 44 42
Upper Martin 42 45 45 43
Upper Martin 43 44 45 41
St. Helens 44 46 44 42
St. Helens 44 46 46 43
Warrior Rock 50 51 48 45
Warrior Rock 41 42 43 41
Warrior Rock 40 42 44 42
Henrici 41 43 45 42
Henrici 44 44 44 41
Willow 41 45 44 42
Willow 42 44 43 42
Morgan 43 44 46 45
Morgan 41 46 49 50
Morgan 45 46 47 43
Lower Vancourver 46 48 46
Lower Vancourver 44 44 44 39
Lower Vancourver 45 45 43 42
KEY CONTRACTS FOR FY2016
OregonCoastClamshell
DepotSloughClamshell
DredgeOregonPipeline
WestCoastHopper
ESSAYONS AND YAQUINA
MCR Major Rehabilitation (CG) 2016 New Start• Ensures reliable entrance for the $24B
Columbia-Snake System “Highway”
• Columbia navigation system:o No. 1 export gateway for the
Nation’s wheat and barley exports
o No. 1 export gateway for west coast wood and mineral bulk exports
o No. 1 one for automobile imports
o More than 40,000 jobs are dependent on these trades
o Over $1B in new infrastructure investment along the river since the main channel was deepened in 2010
MCR Major Rehabilitation Report
®
®
• Approved by NWD in 2012 - $257.2M Rehab over 7 Years ($281.8M Indexed)
• Includes ~$3.6M for Mitigation
• Annual Monitoring is Key to Adaptively Managing for Efficient Rehab
• Priority: Jetty A North Jetty South Jetty
MCR Jetty A – 2016/2017
• $19.46M Contract Award
• Mobilization – May 2016
• Jetty stone delivery by barge (82,000 Tons)
• Anticipated stone placement completion June 2017
• 100% of Jetty stone delivered and approximately 35% placed as of 30 Sep 2016
MCR Jetty A – 2016/2017
Barge offloading activities at Jetty A – July 2016
Scope–Upgrade controls (both hardware and software)–Perform inspections and preventative maintenance
actions
Outage limited to first eight weeks–Dec. 12, 2016 - Feb. 9, 2017
Current Status (Fall 2016)–All work being completed by in-house staff–Hardware on-site–Continue performing prework – routing cables,
installing electrical panels–Draft software program complete – being reviewed
BONNEVILLE FY17 EXTENDED LOCK OUTAGE
THE DALLES 2017 EXTENDED LOCK OUTAGE
2017 Scope– Replace downstream gate gudgeon hardware– Replace upstream gate– Upgrade controls and power distribution system
Current Status (Fall 2016)– Upstream gate and downstream gate gudgeon
fabrication progressing on schedule– Power distribution hardware fabrication nearly
complete– On-site work has begun
• US gate crane setup• Electrical equipment installation
The Corps provides safe, reliable, efficient, and environmentally sustainable waterborne
transportation systems (channels, harbors, and waterways) for movement of commerce,
national security needs, and recreation.