portfoliofinalweb
TRANSCRIPT
A P O R T F O L I O S A M P L E :
M O D E R N E S C A P E | T H E C H R I S T I E L O D G E
O A S I S | T H E S H E L T E R H U T
B E S O S S U R F A C E | S U R F A C E T E N S I O N
I N T E R A C T I V I T Y | M U S K O K A N B O A T H O U S E
T H I S C O L L E C T I O N D E M O N S T R A T E S S E L E C T E D P R O J E C T S T H A T W E R E
C O N C E P T U A L I Z E D D R A F T E D A N D M A T E R I A L I Z E D T H R O U G H O U T M Y U N -
D E R G R A D U A T E E D U C A T I O N . I T A I M S T O D E S C R I B E W H O I A M A S A D E -
S I G N E R , A T H I N K E R , A T R A V E L E R , A N D A S T U D E N T . I A M D R I V E N B Y
S O C I A L P R O B L E M S , S O C I A L R E S P O N S I B I L I T Y , E N G A G E M E N T A N D S O -
L U T I O N S . A R C H I T E C T U R E I S T H E M E D I U M B Y W H I C H I D E S I R E T O
P O S I T I V E L Y I M P A C T B U I L T S O C I A L A N D N A T U R A L E N V I R O N M E N T S .
2.
2.
2.
2.
2.
2.
2.
2.
2.
2.
2.
2.
2.
2.
2.
2.
2.
2.
2.
2.
2.
2.
2.
2.
2.
2.
2.
2.
2.
4.
4.
4.
4.
4.
4.
2.
2.
2.
2.
2.
3.
3.
2.
2.
2.
2.
2.
2.
2.
2.
2.
2.
2.
2.
2.
2.
2.
2.
2.
2.
2.
2.
2.
2.
2.
2.
2.4.
4.
4.
4.
4.
4.
4.
4.
4.
4.
4.
2.
2.
2.
C H R I S T I E L O D G E | A V O N , C O | F A L L 2014
THE CHRISTIE LODGE IS LOCATED IN THE MECCA FOR OUTDOOR EXPLORATION AND ACTIVI-TIES. THE GOAL OF THIS REDESIGN PROJECT WAS TO ELUCIDATE THE RELATIONSHIP THAT EX-ISTS BETWEEN THE BUILT NATURAL ENVIRONMENTS BY ENHANCING THE FUNCTION OF THE BUILD-ING STRUCTURE AND INTERIOR SPACES. THROUGH A SERIES OF NATURAL AND HUMAN INFLICTING PARAMETERS WE BEGAN TO MANIPULATE FORM, CREATING THE BUILDING FOOTPRINT UPON THE LAND-SCAPE STRIATIONS ON BOTH THE GROUND AND ROOF LEVELS, STITCHING THE HOTEL INTO ITS ENVIRONMENT.
M O D E R N E S C A P E
PHYSICAL MODELS SAMPLE FLOOR PLANS
DIVIDE
PUSH / PULL
CARVE
SKIN
ANGLE
1. PUBLIC CIRCULATION
2. STANDARD ROOMS
3. ELEVATORS
4. DELUXE ROOMS
5. MAINTENANCE
6. ROOFTOP GARDEN
1. PUBLIC CIRCULATION
2. MAIN ENTRY
3. GLASS CONFERENCE RM
4. ELEVATORS
5. STAFF ROOMS
6. COFFEE SHOP
THIS MODULAR DESIGNED HOTEL SUITE IS 450 SQ FT AND CAN ACCOMMODATE UP TO 10 GUESTS WHEN TWO ROOMS ARE COMBINED. THE INTERIOR SPACES WERE BASED OFF THE HOTELS EXISTING SQUARE FOOTAGE AND REDESIGNED INTO MODULAR EFFICENT FLOOR PLANS. THE FINISHES ARE MEANT TO PLEASE THE HOTEL WANTS AND GUESTS NEEDS.
DOUBLE SUITE
THE LANDSCAPE WAS MANIPULATED BY EXISTING FACTORS THAT PRESENT CHAL-LENGES ON THE SITE, INCLUDING WIND, WALKABILITY, AND NOISE POLLUTION. THE DATA COLLECTED WAS THEN ORGANIZED WITHIN A 5 FT WIDE STRIATION PATTERN THAT MOVES THROUGH THE LANDSCAPE, INTO THE BUILDING, AND TO THE ROOFTOP.ROOF PLAN
SINGLE SUITE
STRUCTURAL PROCESS
STRUCTURAL MORPHOLOGY
WAVES TO CURVES SOLID SURFACE SECTION SCRIPT EXPAND + ELIMINATE POST STRUCTURE
USING SITE PARAMETERS AND A GEOGRAPHIC INFORMATION SYSTEM, A HUT WAS CREATED SPECIFI-CALLY FOR THIS LOCATION. THIS SEMI CLOSED STRUCTURE WAS MATERIALIZED THROUGH THE IDEA OF PRIVACY IN A PUBLIC AREA. THE IDEA WAS TO CREATE LIGHTWEIGHT STRUCTURES SPECIFIC TO THEIR LO-CATIONS THAT COULD BE ASSEMBLED BY LOCALS AS PLACES THAT YIELD PRIVACY WHILE ALSO OFFER-ING INCLUSION. AN EXAMPLE IS THE MEDITATION YOGA SPACE SHOWN, WHICH IS SHIELDED FROM THE PUBLIC WALKWAYS AND DIRECT SUNLIGHT BUT OPEN TO THE VIEWS OF THE OCEAN AND THE BREEZE.
S H E L T E R H U T | M A U I , H I | S P R I N G 2015
O A S I S
LOCATION | CONTEXT | PLAN
U R B A N C O N N E C T I O N | B A R C E L O N A | S P R I N G 2014
B E S O S S U R F A C ETHE BESOS NEIGHBORHOOD IN BARCELONA, SPAIN IS SURROUNDED BY DENSE, DEVELOPED URBAN DEVELOPMENT AND THE MEDITERRANEAN SEA; THERE IS OPPORTUNITY IN THIS CURRENTLY DETERIORATING PUBLIC SPACE. OUR FOCUS WAS THE DISCONNECT BETWEEN THE RIVER BELOW THE TRANSIT CORRIDOR. WITH NO CURRENT VERTICAL ACCESS TO THE WATER, WE PROPOSED A CONNECTIVE SYSTEM OF PEDESTRIAN BRIDGES, ARCHITECTURE AND A SURFACE TENSION CORRIDOR SUSPENDED OVER THE RIVER TO REACTIVATE THE SPACE FOR THE COMMUNITY.
LIB
RA
RY
N. ELEVATION ZOOM - COMMUNITY CENTER / SURFACE TENSION BRIDGE THE SECTION ABOVE ILLUSTRATES HOW THE TRANSIT AND CONNECTION PROBLEM ON SITE CAN BE SOLVED. WHILE ALL CURRENT PATHS ARE ABOVE WATER LEVEL, THE PROPOSED SURFACE TENSION CORRIDOR WILL RUN THROUGH THE WATER AND CON-NECT TO THE NEW ARCHITECTURE, ALLOWING FOR A TANGIBLE, NATURAL EXPERIENCE.
SITE FOCUS
A V E R A G E P E R H O U R 2 35 74 15 6 0
2 F R E I G H T T R A I N S
4 L I G H T R A I L C A R S
35 P E D E S T R I A N S
7 D O G S
15 B I K E R S
60+ V E H I C L E S
P A S S I N G T H R O U G H
CO
MM
UN
ITY C
EN
TE
R
BIK
E P
AT
H
BE
SO
S R
IVE
R
BR
IDG
E C
SU
SP
EN
DE
D G
YM
TR
AIN
ST
OP
BR
IDG
E B
SU
RF
AC
E T
EN
SIO
N C
OR
RI-
LIG
HT
RA
IL
4 LA
NE
RO
AD
BR
IDG
E A
TO
ME
DIT
ER
RA
NE
AN
MATERIALITY
THE SURFACE TENSION PROTOTYPE ABOVE SHOWS THE EXPERIENCE ONE COULD HAVE WITH THE BESOS RIVER. USING ARDUINO SOFTWARE WE TESTED HUMAN INTERACTION WITH NATURAL SYSTEMS. THE CORRIDOR WILL RESPOND TO THE PARAMETERS SET FOR SAFE INTERACTION.
32’
8’ 5”
SURFACE TENSION CORRIDOR
INFRASTRUCTURE ABOVE
PERSPECTIVE
PLAN
PHYSICAL MODEL PROTOTYPE
A SECTION OF THE PROPOSED NEW CIVIC AREA WAS MODELED AND DISPLAYED IN THE IAAC BARCELONA FAB LAB. THE MODEL WAS BUILT USING LASER BEDS, A MILL MACHINE AND HAND ASSEMBLY. THE SURFACE TENSION CONNECTIONS ARE SUSPENDED FROM THE LIBRARY AND COMMUNITY CENTER, SHOWN ABOVE.
1.6.
8.
4.5.
14.
16.
15.
17.13.
9.
11.
12.
10.3.
2.
2.
1.
2.
2.
5.
18.
20.
21.
22.
127’
127’
165’
127’
M U S K O K A B O A T H O U S E | C A N A D A | S P R I N G 2015
MUSKOKA IS A DYNAMIC REGIONAL MUNICIPALITY LOCATED IN CENTRAL ONTARIO, CANADA. THE TASK AT HAND WAS TO DEVELOP A NEW MARINA AND ANTIQUE BOAT MUSEUM. BASED ON CONTEX-TUAL AND PROJECT ISSUES WE DETERMINED THAT THIS PROJECT NEEDED TO HOUSE BOTH TOUR-IST AMENITIES AND MAINTAIN FUNCTIONALITY YEAR ROUND FOR LOCALS. THIS PROPOSAL WAS NAMED INTERACTIVITY FOR ITS INSTINCTIVE VERNACULAR QUALITY AND RELATION TO THE WATER. THE TRA-DITIONAL MUSKOKAN LAKE HOUSE STYLE WAS INCORPORATED WHILE PROVIDING MODERN AMENI-TIES AND PROGRAMMATIC NECESSITIES TO FOSTER COMMUNITY AND BRING LIFE TO THE WATERFRONT.
I N T E R A C T I V I T YTHE SITE PRESENTED A STEEP CHALLENGE, LITERALLY. WITH OVER A 20 FT ELEVATION CHANGE ACROSS THE SITE, THE PLAN NEEDED TO TRANSPORT PEDESTRIANS FROM THE LAND ENTRANCE DOWN AND THE WATER ENTRANCE UP, TO PROVIDE MAXIMUM USABILITY.
INTERIOR PACKAGE 1 ENTRY 2 CLASSROOMS 3 CONFERENCE 4 RESTORATION 5 DRY EXHIBIT 6 CAFE 7 OFFICES 8 TICKETING 9 MARINE SUPPLY10 RENTALS11 STORAGE12 RETAIL13 REPAIRS14 PARTS + SERVICES15 MACHINE SHOP16 MECHANICAL ROOM17 CUSTODIAL18 STAFF19 RESTAURANT20 MICRO BREWERY21 KITCHEN22 BAR
79.493 W
0.5
MI
45
.07
1 N
0.2
5 M
I
ONTAR IO, CANADA MUSKOKA REGION
SUMME R CONDI T I ONS
POPUL AT I ON : 2 .1 M I L
SUN ZE NI T H : 6 8 ’
R A I NFAL L : 8 1 CM/ Y R
WI NT E R CONDIT IONS
POPUL AT I ON : 53 ,000
SUN ZE NI T H : 28 ’
R A I NFAL L : 3 34 CM/Y R
“COTTAGE COUNTRY”
BUILDING ABOVE TWO
STORIES IS NOW RESTR ICTED
TONDE R N I S LAND
ENTRYRESTORATIONEXHIBITIONCROWN WHARF
PATIO / BAR-
SERVICEBOAT SERVICING
N O R T H E L E V A T I O N
W E S T S E C T I O N
I N T E R A C T I V I T Y