Board of Directors Item 11 | May 10, 2019 1 Interstate 5 Auxiliary Lane Improvement Project Board of Directors Item 11 | May 10, 2019 2 Portfolio of Projects N Gilman Dr. Bridge Project Voigt Dr. Widening Project Genesee Ave. Interchange Project MidCoast Trolley Project Genesee Southbound Auxiliary Lane Bridge Structure

Upload: others

Post on 08-Aug-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Portfolio Projects...Portfolio of Projects Gilman Dr. Bridge Project Voigt Dr. Widening Project Genesee Ave. Interchange Project Mid ‐Coast Trolley Project Genesee Southbound Auxiliary

Board of Directors Item 11 | May 10, 2019 1

Interstate 5 Auxiliary Lane Improvement ProjectBoard of Directors Item 11 |May 10, 2019

2

Portfolio of Projects

N

Gilman Dr. Bridge Project

Voigt Dr. Widening Project

Genesee Ave. Interchange Project

Mid‐Coast Trolley Project

Genesee Southbound Auxiliary Lane

Bridge Structure

Page 2: Portfolio Projects...Portfolio of Projects Gilman Dr. Bridge Project Voigt Dr. Widening Project Genesee Ave. Interchange Project Mid ‐Coast Trolley Project Genesee Southbound Auxiliary

Board of Directors Item 11 | May 10, 2019 2

Portfolio of Projects

Gilman Dr. Bridge Project

Voigt Dr. Widening Project

Genesee Ave. Interchange Project

Mid‐Coast Trolley Project

Genesee Southbound Auxiliary Lane

Bridge Structure

3

CORRIDOR CONSTRUCTION – CM/GC

Supplement 1 ‐Wet Utilities/CP Rose

Supplement 2 ‐ San Diego River Bridge (LOSSAN)

Supplement 6 ‐ Voigt Drive Improvements

Supplement 4 ‐Mid‐Coast Trolley

Supplement 7 ‐ Rose Creek Bikeway

Supplement 5 ‐ Elvira to Morena Double Track 

Supplement 3 ‐ Gilman Drive Bridge

CM/GC Construction Services Agreement 

Supplement 8 ‐ Genesee Avenue Auxiliary Lane

4

Page 3: Portfolio Projects...Portfolio of Projects Gilman Dr. Bridge Project Voigt Dr. Widening Project Genesee Ave. Interchange Project Mid ‐Coast Trolley Project Genesee Southbound Auxiliary

Board of Directors Item 11 | May 10, 2019 3

Recommendation

The Transportation Committee recommends that the Board of Directors: (1) approve the Guaranteed Maximum Price (GMP) negotiated

between Mid‐Coast Transit Constructors and SANDAG forSupplement 8 to the Construction Manager/GeneralContractor Construction Services Agreement for theInterstate 5/Genesee Avenue Auxiliary Lane Project in theamount of $4.941 million;

(2) authorize the Executive Director to execute Supplement 8;and

(3) approve an amendment to the FY 2019 Program Budget toaccept $200,000 from the State Highway Operation andProtection Program to fully fund the project (CapitalImprovement Program Project No. 1200512).

5

Page 4: Portfolio Projects...Portfolio of Projects Gilman Dr. Bridge Project Voigt Dr. Widening Project Genesee Ave. Interchange Project Mid ‐Coast Trolley Project Genesee Southbound Auxiliary

Board of Directors Item 12 |  May 10, 2019 1

Regional Housing Needs Assessment Update

Board of Directors Item 12 | May 10, 2019

RHNA Subcommittee

Provide input and guidance on potentialpolicy and technical options for developing theRHNA methodology

2

Members

Catherine Blakespear, ChairMayor, City of Encinitas

Mary SalasMayor, City of Chula Vista

Monica MontgomeryCouncilmember, City of San Diego

Jim DesmondSupervisor, County of San Diego

Kristine AlessioCouncilmember, City of La Mesa

Rebecca JonesMayor, City of San Marcos

Richard BaileyMayor, City of Coronado

Page 5: Portfolio Projects...Portfolio of Projects Gilman Dr. Bridge Project Voigt Dr. Widening Project Genesee Ave. Interchange Project Mid ‐Coast Trolley Project Genesee Southbound Auxiliary

Board of Directors Item 12 |  May 10, 2019 2

Regional Housing Needs Assessment (RHNA) Process

3

RHNA Determination(HCD/SANDAG)

RHNA Plan(SANDAG/local jurisdictions)

Housing Element(Local jurisdictions/HCD)

Income Categories

HCD Regional Housing Need Determination

4

Income Category Housing Unit Need Percent

Very Low 42,332                          24.7%

Low 26,627                          15.5%

Moderate 29,734                          17.3%

Above Moderate 72,992                          42.5%

Total Housing Units 171,685                       100%

Page 6: Portfolio Projects...Portfolio of Projects Gilman Dr. Bridge Project Voigt Dr. Widening Project Genesee Ave. Interchange Project Mid ‐Coast Trolley Project Genesee Southbound Auxiliary

Board of Directors Item 12 |  May 10, 2019 3

RHNA Plan Objectives

5

Promote infill development/protect resources

Increase housing supply/mix of

housing types

Improve jobs/housing relationship

Allocate housing in an equitable manner

Further fair housing

5

Draft Methodology Framework

6

171,685 units

Transit – XX%

Rail & Rapid

High-Frequency

Transit

Jobs –XX%

Equity Adjustment

Page 7: Portfolio Projects...Portfolio of Projects Gilman Dr. Bridge Project Voigt Dr. Widening Project Genesee Ave. Interchange Project Mid ‐Coast Trolley Project Genesee Southbound Auxiliary

Board of Directors Item 12 |  May 10, 2019 4

Transit

• Rail & Rapid

• High Frequency Transit

7

Jobs

• Definition:

A job is a position for which an individual receives earnings from a firm(who would then be considered their “employer”) in a given time frame.

8

Page 8: Portfolio Projects...Portfolio of Projects Gilman Dr. Bridge Project Voigt Dr. Widening Project Genesee Ave. Interchange Project Mid ‐Coast Trolley Project Genesee Southbound Auxiliary

Board of Directors Item 12 |  May 10, 2019 5

Equity Adjustment

The regional housing needs allocation plan shall further all of the following objectives:

Allocating a lower proportion of housing need to an income category when a jurisdiction already has a disproportionately high share of households in that income category.

Affirmatively furthering fair housing.

9

Low Income HouseholdsPercent of low and very low income households

10

Source: 2015 American Community Survey

18%

26%

28%

28%

29%

29%

32%

39%

40%

40%

44%

44%

46%

47%

50%

51%

55%

55%

61%

0% 10% 20% 30% 40% 50% 60% 70%

Del Mar

Poway

Solana Beach

Encinitas

Carlsbad

Coronado

Santee

San Diego County

San Diego

Chula Vista

Oceanside

San Marcos

La Mesa

Lemon Grove

Escondido

Vista

El Cajon

Imperial Beach

National City

Regional Average 40%

Page 9: Portfolio Projects...Portfolio of Projects Gilman Dr. Bridge Project Voigt Dr. Widening Project Genesee Ave. Interchange Project Mid ‐Coast Trolley Project Genesee Southbound Auxiliary

Board of Directors Item 12 |  May 10, 2019 6

Next Steps

• May 2019 – Analyze RHNA Subcommittee inputfor alignment with state law

• June 2019 – RHNA Subcommittee Recommendation

• June 2019 – Board of Directors releases draft allocation for public review.

• October 2019 – Adopt RHNA Plan and Allocation

11