portfolio - maximilian kiener · my intern project bose corporation 2007/2008. 07 shower unit for...

19
Portfolio Maximilian Kiener 2012 01 Christmas Poster 2010 Two-sided poster for gravity’s clients gravity 2010

Upload: others

Post on 01-Aug-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Portfolio - Maximilian Kiener · My intern project Bose Corporation 2007/2008. 07 Shower Unit for Natural Disasters People queuing in front of the shower unit Diploma Thesis 2009

PortfolioMaximilian Kiener

2012

01 Christmas Poster 2010Two-sided poster for gravity’s clients

gravity2010

Page 2: Portfolio - Maximilian Kiener · My intern project Bose Corporation 2007/2008. 07 Shower Unit for Natural Disasters People queuing in front of the shower unit Diploma Thesis 2009

Audibbva

COCA-COLAOtto group

WacomETC...

The bain of being a design consultant is that you are very restricted in showing your work.

However, I learned a great deal working in these projects with sometimes difficult, sometimes wonderful clients (guess who’s who).I was lucky to work on UX, UI an ID projects with experts from all fields.

02 ConfidentialWork for gravity’s clients

gravity2010 - 2012

Page 3: Portfolio - Maximilian Kiener · My intern project Bose Corporation 2007/2008. 07 Shower Unit for Natural Disasters People queuing in front of the shower unit Diploma Thesis 2009

Our site is only available in German for now but we do ship internationally!

www.tadata.de

03 My first app/small businesswww.tadata.de - check out our site

self-initiated2012

Page 4: Portfolio - Maximilian Kiener · My intern project Bose Corporation 2007/2008. 07 Shower Unit for Natural Disasters People queuing in front of the shower unit Diploma Thesis 2009

I worked here.Bose Advanced Development Industrial Design

04 Industrial Design InternshipBirdseyeview of my badge and my workplace

Bose Corporation2007/2008

Page 5: Portfolio - Maximilian Kiener · My intern project Bose Corporation 2007/2008. 07 Shower Unit for Natural Disasters People queuing in front of the shower unit Diploma Thesis 2009

Bose Advanced Development Industrial Design

Amongst many other projects it was a great pleasure and learning to be part of the conceptual User Experience Team that worked on the remote control for the Bose TV, VideoWave.

I worked here.

05 Industrial Design InternshipVideoWave remote

Bose Corporation2007/2008

Page 6: Portfolio - Maximilian Kiener · My intern project Bose Corporation 2007/2008. 07 Shower Unit for Natural Disasters People queuing in front of the shower unit Diploma Thesis 2009

06

Bose Advanced Development Industrial Design

I was given my own Intern Project, working with a bunch of incredible designers, modelmakers and engineers. This was also my first affair with rapid prototyping and I couldn’t let go ever since.

I learned here.

Industrial Design InternshipMy intern project

Bose Corporation2007/2008

Page 7: Portfolio - Maximilian Kiener · My intern project Bose Corporation 2007/2008. 07 Shower Unit for Natural Disasters People queuing in front of the shower unit Diploma Thesis 2009

07 Shower Unit for Natural DisastersPeople queuing in front of the shower unit

Diploma Thesis2009

Page 8: Portfolio - Maximilian Kiener · My intern project Bose Corporation 2007/2008. 07 Shower Unit for Natural Disasters People queuing in front of the shower unit Diploma Thesis 2009

What a shower can learn from McDonald’s

Where do services have to happen quickly? Looking at everyday facilities like drive-thrus, supermarket regis-tries or hospitals shows the structure behind efficient models. Some can also be applied for the showering process.

Undress

User 1

User 1

User 1

User 2

User 3

User 2 User 3

Shower

Drive Pay Drive Pick UpOrder

Drive Pay Drive Pick UpOrder

Drive Pay Drive Pick UpOrder

User 2

User 3

Dry Dress

Undress Shower Dry Dress

Undress Shower Dry Dress

Undress Shower Dry Dress

Undress Shower Dry Dress Undress Shower Dry Dress

t

08 Shower Unit for Natural DisastersSerial vs. parallel processing of crowds

Diploma Thesis2009

Page 9: Portfolio - Maximilian Kiener · My intern project Bose Corporation 2007/2008. 07 Shower Unit for Natural Disasters People queuing in front of the shower unit Diploma Thesis 2009

Four steps, four stops

If the showering process is divided into four steps and the steps are set up in four different locations, multiple users can use the facility in parallel.“Soft-pulsing” moves the user forward (when the water runs out after three minutes)

Undress

User 1

User 1

User

User 2 User 3

Shower

Drive Pay Drive Pick UpOrder

Drive Pay Drive Pick UpOrder

Drive Pay Drive Pick UpOrder

User 2

User 3

Dry Dress

Undress Shower Dry Dress

Undress Shower Dry Dress Undress Shower Dry Dress

t

09 Shower Unit for Natural DisastersDesignated cabins for seperated steps

Diploma Thesis2009

Page 10: Portfolio - Maximilian Kiener · My intern project Bose Corporation 2007/2008. 07 Shower Unit for Natural Disasters People queuing in front of the shower unit Diploma Thesis 2009

7l = 3minWater-indicator in the shower.

10 Shower Unit for Natural DisastersWater-indicator

Diploma Thesis2009

Page 11: Portfolio - Maximilian Kiener · My intern project Bose Corporation 2007/2008. 07 Shower Unit for Natural Disasters People queuing in front of the shower unit Diploma Thesis 2009

In cases of emergency – be pragmatic.

11 Shower Unit for Natural DisastersIndividual parts fitting into a shipping container

Diploma Thesis2009

Page 12: Portfolio - Maximilian Kiener · My intern project Bose Corporation 2007/2008. 07 Shower Unit for Natural Disasters People queuing in front of the shower unit Diploma Thesis 2009

12 KTM/FH Joanneum2008

KTM SuperbrandConsumer touchpoint

Page 13: Portfolio - Maximilian Kiener · My intern project Bose Corporation 2007/2008. 07 Shower Unit for Natural Disasters People queuing in front of the shower unit Diploma Thesis 2009

1 Solar panels. 2 Tools.

3 Personal locker. 4 Bike stand.

5 Battery compartment. 6 Spare part vending machine.

7 Laptime tracker.

Provide the tools

If you lower the entry-cost for the sport you become more attractive for newcomers.

Provide the seeds

Enable competitive features such as lap time tracking. A vending machine for spare parts is convenient for users & creates a new stream of revenue.

Launch new products

Once you have your infrastructure in place it is easier to launch new products, such as zero-emission bikes by adding battery-swap compartments as an extra feature.

1

2

3

4 5

6

7

13 KTM SuperbrandMx Rock features

KTM/FH Joanneum2008

Page 14: Portfolio - Maximilian Kiener · My intern project Bose Corporation 2007/2008. 07 Shower Unit for Natural Disasters People queuing in front of the shower unit Diploma Thesis 2009

Setup

3. The locker will be unlocked via an RFID tag in the user’s glove.

7. The glove also is used for keeping track of lap time-statistics which can be seen and compared at the Rock.

3 7

14 KTM SuperbrandMx Rock details

KTM/FH Joanneum2008

Page 15: Portfolio - Maximilian Kiener · My intern project Bose Corporation 2007/2008. 07 Shower Unit for Natural Disasters People queuing in front of the shower unit Diploma Thesis 2009

1. Reseach2. Synthesis/Brainstorms3. Ideation4. “Cardboard-sketching”5. Pre-final model6.CMF

Reasearch: Interviews & observations

Ideation sketches Cardboard concepts, architectures CMF: Experimenting with new finishes

Reasearch: Do it yourself Synthesis and brainstorms

15 KTM SuperbrandProcess

KTM/FH Joanneum2008

Page 16: Portfolio - Maximilian Kiener · My intern project Bose Corporation 2007/2008. 07 Shower Unit for Natural Disasters People queuing in front of the shower unit Diploma Thesis 2009

16 Automated Golf TrolleyPresentation render

Audi/FH Joanneum2008

Page 17: Portfolio - Maximilian Kiener · My intern project Bose Corporation 2007/2008. 07 Shower Unit for Natural Disasters People queuing in front of the shower unit Diploma Thesis 2009

17 Automated Golf TrolleyFolding mechanism

Audi/FH Joanneum2008

Page 18: Portfolio - Maximilian Kiener · My intern project Bose Corporation 2007/2008. 07 Shower Unit for Natural Disasters People queuing in front of the shower unit Diploma Thesis 2009

18 Automated Golf TrolleyProcess

Audi/FH Joanneum2008

Page 19: Portfolio - Maximilian Kiener · My intern project Bose Corporation 2007/2008. 07 Shower Unit for Natural Disasters People queuing in front of the shower unit Diploma Thesis 2009

Also, please check out my digital projects at:

Thank You!