portfolio committee presentation 17/10/2006

34
PORTFOLIO COMMITTEE PRESENTATION 17/10/2006 Mhlathuze Water Contribution Towards Rural Development in Water, Sanitation & Forestry! BY: LAWRENCE SITHOLE 17 OCTOBER 2006.

Upload: zoey

Post on 23-Jan-2016

28 views

Category:

Documents


0 download

DESCRIPTION

PORTFOLIO COMMITTEE PRESENTATION 17/10/2006. Mhlathuze Water Contribution Towards Rural Development in Water, Sanitation & Forestry! BY: LAWRENCE SITHOLE 17 OCTOBER 2006. MHLATHUZE WATER [MW] SERVICES FOCUS. To Open MW Services to Serve ALL 4 1 / 2 WSA’s in its area. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: PORTFOLIO COMMITTEE PRESENTATION 17/10/2006

PORTFOLIO COMMITTEE PRESENTATION 17/10/2006

Mhlathuze Water Contribution Towards Rural Development in Water, Sanitation & Forestry!

BY: LAWRENCE SITHOLE17 OCTOBER 2006.

Page 2: PORTFOLIO COMMITTEE PRESENTATION 17/10/2006

MHLATHUZE WATER [MW] SERVICES FOCUS

To Open MW Services to Serve ALL 41/2 WSA’s in its area.

To Provide Business Solutions RATHER Services to WSA’s.

To Promote Economic Growth & Reduce Poverty.

Page 3: PORTFOLIO COMMITTEE PRESENTATION 17/10/2006

MW AS A WATER BOARD NEEDS TO BALANCE:

A Healthy Triple Bottom Line Contribution Towards Government Objectives. Social Responsibility. Fulfilling Developmental Mandates.

As Such MW Does Not Look At Water Service Provisioning In Isolation!

Page 4: PORTFOLIO COMMITTEE PRESENTATION 17/10/2006

HOW IS MHLATHUZE WATER CONTRIBUTING TOWARDS RURAL DEVELOPMENT?

The Three (3) Water Utilities in KZN:Thukela Water, Umgeni Water & Mhlathuze

Water:In Answering This Fundamental Question Have

Come Up With:

““KZN Bulk Regional Water Concept” KZN Bulk Regional Water Concept” [KZN BRWS][KZN BRWS]

Page 5: PORTFOLIO COMMITTEE PRESENTATION 17/10/2006

Coming Out The KZN Water Summit!

The KZN Bulk Regional Water Concept was formally adopted at the KZN Water Summit in September 2005.

The 3 Water Utilities [WU] were tasked with the responsibility to ensure the concept receives the buy-in of and is owned by the WSA’s.

Page 6: PORTFOLIO COMMITTEE PRESENTATION 17/10/2006

THE KEY OBJECTIVES OF THE KZN BRWS ARE:

Integrated Solutions On A Regional Scale For Sustainability & Affordability.

Integrating Water Services With Water Resources For Optimal Water Resource Utilisation.

Gearing Private Sector Funds For Augmentation of Central Allocations.

Page 7: PORTFOLIO COMMITTEE PRESENTATION 17/10/2006

THE KEY OBJECTIVES OF THE KZN BRWS ARE (Cont.):

Rationalisation of Fragmented Systems For: Economies Of Scale Cost Effectiveness & Affordability Efficiency

Addressing Backlogs As Augmented Product.

Promote Economic Development – Water to Lead Development.

Page 8: PORTFOLIO COMMITTEE PRESENTATION 17/10/2006

HOW MHLATHUZE WATER CAN ADD VALUE TO WATER SERVICE AUTHORITIES?

Planning Across Municipal Boundaries. Providing Comprehensive Solutions and

Total Package [Bulk, Reticulation, Financing, Operating Model, Appropriate Institutional Arrangements, Unlocking Development Potentials etc.]

Page 9: PORTFOLIO COMMITTEE PRESENTATION 17/10/2006

PROGRESS TO DATE!

Following The Portfolio Committee Visit (July/August 2005), The KZN Water Summit (Sept. 2005) and Presidential Imbizo At Ilembe (Dec 2005) –

We can report the following progress:

Page 10: PORTFOLIO COMMITTEE PRESENTATION 17/10/2006

ILEMBE DISTRICT MUNICIPALITY!

Bulk Regional Scheme Pre-feasibility concluded and Proposal Presented to the Ilembe on 31st May 2006.

Council approval/decision is awaited The Proposal is By a Partnership

Between DBSA, Bigen Africa and Mhlathuze Water.

Page 11: PORTFOLIO COMMITTEE PRESENTATION 17/10/2006

ILEMBE DISTRICT MUNICIPALITY!

The System Covers: Rural CommunitiesRural Communities [Maphumulo, Mathonsi &

Macambini] Industrial NodesIndustrial Nodes [Isithebe, Sappi mills, Tongaat

Hullett, Gledhow] Urban AreasUrban Areas [KwaDukuza, Mandini , Darnall] Coastal DevelopmentsCoastal Developments [Thukela Mouth, Zinkwazi

Beach, Prince’s Grant, New Guelderland etc]

Integration of 8 WTP into 1 AND 7 Sewerage Plants Integration of 8 WTP into 1 AND 7 Sewerage Plants into 3.into 3.

Page 12: PORTFOLIO COMMITTEE PRESENTATION 17/10/2006
Page 13: PORTFOLIO COMMITTEE PRESENTATION 17/10/2006

Project development assistance cont…Project development assistance cont…

Tugela / Mvoti initiative

Page 14: PORTFOLIO COMMITTEE PRESENTATION 17/10/2006

ILEMBE DISTRICT MUNICIPALITY!

The System is Intended: Unlocking coastal development potential Address the backlog (rural) Support housing initiatives Support Industrial/Commercial growth Tax / Income base for the Municipality.

Page 15: PORTFOLIO COMMITTEE PRESENTATION 17/10/2006

ILEMBE DISTRICT MUNICIPALITY: Institutional & Financial Arrangements

Capital Injection: R502 Million. Private Funding: Government Funding:

Effective Bulk Tariff: R2.54 kl Ownership & Control by Ilembe DM Operated by Mhlathuze Water.

R322 Million

R180 Million

Page 16: PORTFOLIO COMMITTEE PRESENTATION 17/10/2006

UMKHANYAKUDE DISTRICT MUNICIPALITY!

Regional Master Plan has been Concluded. Projects Have Been Identified. Quantification Still to be Finalised. Submission Due to be Made to Council.

Page 17: PORTFOLIO COMMITTEE PRESENTATION 17/10/2006

UMKHANYAKUDE DM CONTEXT:

Unemployment figures of 60% - 70%. Has Water Backlogs of 68%. Is a Presidential Node. Has got the 1/3 largest dam in SA. Economic drivers are Agriculture & Tourism

No water service solutions will be affordable No water service solutions will be affordable and sustainable anywhere unless there is and sustainable anywhere unless there is local capacity to afford and sustain them!local capacity to afford and sustain them!

Page 18: PORTFOLIO COMMITTEE PRESENTATION 17/10/2006

WATER SERVICE PROVISIONING CONSTRAINTS

Mkhanyakude Water Services cannot be Addressed in Isolation from Area’s Economic Capacity.

The development in Mkhanyakude Region is held back by non-availability of water!

MW PHILOSOPHY:

“Water should never be constraints to Water should never be constraints to development BUT a catalyst!development BUT a catalyst!”

Page 19: PORTFOLIO COMMITTEE PRESENTATION 17/10/2006

INTEGRATED APPROACH TO WATER SERVICES!

For sustainability & Effectiveness.For bankability & Affordability.Local Capacity to afford services.Facilitate Capital Investment. [ASGISA]

Page 20: PORTFOLIO COMMITTEE PRESENTATION 17/10/2006

PONGOLAPOORT DAM POTENTIAL!

Mhlathuze Water Re-Opening Pongolapoort Dam Argument!

The Dam was completed in 1970. [Never Filled till 1984]

Main Objective = 30 000ha of Sugar Cane under Irrigation.

It has NOT Achieved this!It has NOT benefited Communities in this

Region!

Page 21: PORTFOLIO COMMITTEE PRESENTATION 17/10/2006

MKHANYAKUDE ECONOMY?

Agriculture [Led By Sugar Industry].Tourism & Associated SMALL

Industries.

MAJOR CONSTRAINT:

Lack of Water for Irrigation.

Page 22: PORTFOLIO COMMITTEE PRESENTATION 17/10/2006

PERCEIVED LACK OF WATER!

System Capacity: 847847 Mil.m3 p.a.

Less: Allocations 785785 Mil.m3 p.a. Reserve 172 . Irrigation 294 . Flood Releases 250 . Afforestration etc 69 .

Water Available 62 62 Mil.m3 p.a.

Page 23: PORTFOLIO COMMITTEE PRESENTATION 17/10/2006

MHLATHUZE WATER RECOMMENDATIONS MADE

TO DWAF!

Make MORE Water Available for irrigation & economy [50%50% allocated to environment (422 {172 + 250} of the 847)]

Because of drought Flood releases have been +150 Mil.m3 p.a. {Allocate 150 instead of 250}

Earnest Requests to DWAF!

Page 24: PORTFOLIO COMMITTEE PRESENTATION 17/10/2006

ECONOMIC OPPORTUNITIES

1. Sugar Industry: 18 000 Tons p.a.: R1.2 Billion investment: 6 000 to 10 000 Jobs.: R600 Million Annual T/O: 1 000 Houses

2. Holiday Resort & Golf Estate: 1 000 Jobs: R3.2 Billion Investment.: 600 High Cost Housing.: Hotels & Holiday Accommodation.

Page 25: PORTFOLIO COMMITTEE PRESENTATION 17/10/2006

ECONOMIC OPPORTUNITIES

3. Other Agricultural Activities: Cassawa: Starch Project [500 Jobs : R60 Annual T/O]

Citrus Project: No Details!

4. Hydro-Power: No Water Consumption: Will generate much needed ENERGY & CASH for the Region.

Page 26: PORTFOLIO COMMITTEE PRESENTATION 17/10/2006

OUTCOMES OF EXTENDED CABINET LEKGOTLA

July 06; Provinces were challenged: To identify concrete interventions to gear (ratchet) up

economic growth towards 6%. To identify measures to stimulate the economy while

inspiring & unifying all our people behind a vision of shared growth. [Asgi-SA]

To identify and recommend strategic economic infrastructure projects in their PGDS with a “massification” effect.

Page 27: PORTFOLIO COMMITTEE PRESENTATION 17/10/2006

OUTCOMES OF EXTENDED CABINET

LEKGOTLA

For KZN Makhathini Flats was mentioned For KZN Makhathini Flats was mentioned as the possible project for KZN!as the possible project for KZN!

ALL Provinces mentioned the following as ALL Provinces mentioned the following as one of their frustrations:one of their frustrations:

That:That:““Provided DWAF Co-operates!”Provided DWAF Co-operates!”

Very serious statement for the SECTOR!

Page 28: PORTFOLIO COMMITTEE PRESENTATION 17/10/2006

MINISTER’S FRUSTRATION!

At the Annual Women in Water Sanitation and Forestry Awards [11 August 2006] the Minister stated that:

“One of her pressing frustrations was the fact that she does NOT have water to allocate to the poor and for economic developments”

Again A Serious Political Statement!Again A Serious Political Statement!

Page 29: PORTFOLIO COMMITTEE PRESENTATION 17/10/2006

UNLOCKING PONGOLAPOORT DAM

POTENTIAL!

Unlocking These Opportunities will make providing Water Services at Mkhanyakude much more Achievable, Affordable & Sustainable!

ANDAND

MW is Striving to Contribute towards Improving the Lives of the People of the Region in a integrated, empowering and sustainable manner.

Page 30: PORTFOLIO COMMITTEE PRESENTATION 17/10/2006

WATER SERVICES REGIONAL OPTION

Primary raw water sources Pongola Poort dam Umfolozi River [Unreliable] Hluhluwe dam [Unreliable] Lake Sibaya [Environmentally

Irresponsible]

LEAVES ONE OPTION!LEAVES ONE OPTION!

COMBINATION!COMBINATION!

Page 31: PORTFOLIO COMMITTEE PRESENTATION 17/10/2006

KEY FEATURE OF THE OPTION MHLATHUZE IS

LOOKING AT!

Key Features– Distribution infrastructure development – A total solution –

No gaps: Upgrade dysfunctional internal networks New distribution networks Implementation to be concurrent to bulk supply

Old treatment infrastructure will be decommissioned progressively

The existing Shemula water treatment works to be phased out

Appropriate Operation & Maintenance strategies to be developed

Page 32: PORTFOLIO COMMITTEE PRESENTATION 17/10/2006
Page 33: PORTFOLIO COMMITTEE PRESENTATION 17/10/2006

UTHUNGULU & ZULULAND DISTRICT MUNICIPALITIES

Except for Mandlakazi Scheme integration with Mkhanyakude System – Little has been done in Zululand DM.

Uthungulu DM Concept is due for concluding soon: The Southern part: Gingindlovu, Matigulu, Nyoni etc = Ilembe

System. The Northern part: South of Mfolozi = Mkhanyakude System. Central-Eastern part: Mbonambi, Ntambanani = Mhlathuze City

Systems.

Separate Solution is Needed for Nkandla, Eshowe & Separate Solution is Needed for Nkandla, Eshowe & Mthonjaneni!Mthonjaneni!

Page 34: PORTFOLIO COMMITTEE PRESENTATION 17/10/2006

CONCLUSION

It is believed that these initiatives will contribute towards Rural Developments through:

Integrated Service Provisioning Facilitating Economic Developments Gearing in Private Resources Providing Affordable, Sustainable & Real

Solutions.

THANK YOU!THANK YOU!