portfolio

26

Upload: marco-m

Post on 25-Mar-2016

213 views

Category:

Documents


0 download

DESCRIPTION

Architectural portfolio

TRANSCRIPT

Page 1: Portfolio

MARCO MUCEDOLAPORTFOLIO

Page 2: Portfolio

"Every time we discover new techniques often we stick to the old forms stupidly. "

Pier Luigi Nervi

Page 3: Portfolio

MODELS pag. 19WORKSZetron at CCW 2013 pag. 17Egypt ministery of tourism pag. 18Ligier Microcar pag. 18

INTERIOR DESIGNLoft at Docks Dora in Turin pag. 13

SMALL STRUCTUREBalangero asbestos quarry pag. 11

XXL STRUCTURESesia Tensegrity Bridge pag. 3Oceanic colony (competition) pag. 9

INTERACTION DESIGNEntity pag. 1 Waterlilies pag. 2

Page 4: Portfolio
Page 5: Portfolio
Page 6: Portfolio
Page 7: Portfolio
Page 8: Portfolio

05

Page 9: Portfolio

06

Page 10: Portfolio

07

Page 11: Portfolio

08

Page 12: Portfolio

09

OCEANIC COLONY (COMPETITION)

HumanHuman activities are compro-mising life on Earth. City’s ex-pansion, industrial production and deforestation are modify-ing earth’s balance, exasperat-ing the global warming issue, causing Poles’ice dissolution.Space's photographies marks a reduction of North pole ex-tension of 16% between 1987 and 2007.

As consequnce of all oceans levels grows, day by day, ac-cording to dissolution. In the next future water could cover many coastal city.

The Chara Colony it is de-signed to allow human life in this possible scenario. The tower design aim to maximize passive energy production ex-ploiting: tides, wind guts and Archimede’s push. It is a no emisison building for open

Page 13: Portfolio

Energy supply chain

The tides movement joined to Archimedes' push, activate the electric generators (a sort of pistons). The energy in part is stored in part it is used to feed some vapour turbines. A piezoe-lectric fabric sail, wraps the whole tower to catch wind on 360°.

FunctionHeight comparedDistribution core

10

Page 14: Portfolio

11

Giving a cealingDoors openingMixing volume and abstraction

Pure volumesquare based

Negative: Abstraction

Facade reading:Negative

Facade reading:Positive

Site’s existing chapel

BALANGERO ASBESTOS QUARRYThis project aim to requalify the asbestos quarry in Balangero. This pages focus on the laic chapel design, the counter-chapel of the Saint Vittore’s Chapel on quarry’s hill.

Page 15: Portfolio

Texture

12

Page 16: Portfolio

Interventio Building Complex Hall Porch Building Inner State Machine’s room

TO (AFTER TRANSFORMATION)

Flat

Office

Laboratory

Factory space

Factory space

Factory space

FROM (BEFOR TRANSFORMATION)

Rock

Garden Laboratory

Office Rock garden

Kitchen Living BedBath

1 - ASSIGNED BLOCK 2 - CHOOSING 3 - OPENING 4 - STARTING DESIGNLOFT AT THE DOCKS DORA

The Project aim to provide a proposal to qualify the old Docks of Turin.The building it is protected by superin-tendences.The superintendences has divided the building in 150 blocks, each one it is be assigned to an architect. The transfor-mation bounds are:- each unit has to have an own entrance- allowed function are house, office or both.Blocks are very long, narrow and light-less; for these in my proposal, the roof it is been opened.Opening allow light and air to come in, generating a direct linking between inner and outer space.The project forecast that house it is di-vided in at at the 1st oor, office at the ground oor and laboratory in the un-dergrouund. At office level, it is placed a white rock garden . The rocks reect light increas-ing the average of office light level.

13

Page 17: Portfolio

0 0,15 0,7 1,4 2,8 5,6m First Floor

Kitchen Living area

Reading area Bed room

Bathroom

Office

Rock gardenA

A

A

A

Ground Floor

14

Page 18: Portfolio

15

Page 19: Portfolio

16

Page 20: Portfolio

Plan

Section4 - Voronoi3 - Dots dene the grid

2 - Dots lay on plane1 - Plane

17

ZETRON BOOTH FOR CCW 2013

TThis project smartly use all the available triangular shapes of booth area. The top part it is used for people receipts, the middle and larged for event and presenta-tion while the bottomo part it is used for bar and a private meeting area.Zetron it is a company that develop soft-ware and tools for emergencies handling.To achieve their goal, the zetron tools ge-olocalize the emergency point.Voronoi’s lacunar ceiling is to Zetron as Zetron’s work is to point’s localization. Indeed a Voronoi grid it is dened by posi-tion of some points in space. Different points dene different grids.Beneath the Voronoi a dome for video event, recalls people for the Zetron event.

Page 21: Portfolio

18

INSPIRATION

Section Scale 1:80Plan Scale 1:100

LIGIER - MICROCAR ITINIREANT BOOTH

Ligier and Microcar Italia, were planning an itinerant test drive along the whole country.UponUpon request It is been de-signed a booth simply to mount, easily to move and cut-ting edge

EGYPTIAN MINISTRY OF TOURISM BOOTH

This project aim to represent the desert like a chest that pre-serve all the egyptian land-scape and culture.As the desert enclose the treas-ure, the booth keep in handy the whole Egyptian heritage.

Page 22: Portfolio

19

MODELS

Page 23: Portfolio
Page 24: Portfolio

21

Page 25: Portfolio

22

Page 26: Portfolio