portfolio
DESCRIPTION
Architectural portfolioTRANSCRIPT
![Page 1: Portfolio](https://reader034.vdocuments.us/reader034/viewer/2022042903/568c4a181a28ab491696c763/html5/thumbnails/1.jpg)
MARCO MUCEDOLAPORTFOLIO
![Page 2: Portfolio](https://reader034.vdocuments.us/reader034/viewer/2022042903/568c4a181a28ab491696c763/html5/thumbnails/2.jpg)
"Every time we discover new techniques often we stick to the old forms stupidly. "
Pier Luigi Nervi
![Page 3: Portfolio](https://reader034.vdocuments.us/reader034/viewer/2022042903/568c4a181a28ab491696c763/html5/thumbnails/3.jpg)
MODELS pag. 19WORKSZetron at CCW 2013 pag. 17Egypt ministery of tourism pag. 18Ligier Microcar pag. 18
INTERIOR DESIGNLoft at Docks Dora in Turin pag. 13
SMALL STRUCTUREBalangero asbestos quarry pag. 11
XXL STRUCTURESesia Tensegrity Bridge pag. 3Oceanic colony (competition) pag. 9
INTERACTION DESIGNEntity pag. 1 Waterlilies pag. 2
![Page 4: Portfolio](https://reader034.vdocuments.us/reader034/viewer/2022042903/568c4a181a28ab491696c763/html5/thumbnails/4.jpg)
![Page 5: Portfolio](https://reader034.vdocuments.us/reader034/viewer/2022042903/568c4a181a28ab491696c763/html5/thumbnails/5.jpg)
![Page 6: Portfolio](https://reader034.vdocuments.us/reader034/viewer/2022042903/568c4a181a28ab491696c763/html5/thumbnails/6.jpg)
![Page 7: Portfolio](https://reader034.vdocuments.us/reader034/viewer/2022042903/568c4a181a28ab491696c763/html5/thumbnails/7.jpg)
![Page 8: Portfolio](https://reader034.vdocuments.us/reader034/viewer/2022042903/568c4a181a28ab491696c763/html5/thumbnails/8.jpg)
05
![Page 9: Portfolio](https://reader034.vdocuments.us/reader034/viewer/2022042903/568c4a181a28ab491696c763/html5/thumbnails/9.jpg)
06
![Page 10: Portfolio](https://reader034.vdocuments.us/reader034/viewer/2022042903/568c4a181a28ab491696c763/html5/thumbnails/10.jpg)
07
![Page 11: Portfolio](https://reader034.vdocuments.us/reader034/viewer/2022042903/568c4a181a28ab491696c763/html5/thumbnails/11.jpg)
08
![Page 12: Portfolio](https://reader034.vdocuments.us/reader034/viewer/2022042903/568c4a181a28ab491696c763/html5/thumbnails/12.jpg)
09
OCEANIC COLONY (COMPETITION)
HumanHuman activities are compro-mising life on Earth. City’s ex-pansion, industrial production and deforestation are modify-ing earth’s balance, exasperat-ing the global warming issue, causing Poles’ice dissolution.Space's photographies marks a reduction of North pole ex-tension of 16% between 1987 and 2007.
As consequnce of all oceans levels grows, day by day, ac-cording to dissolution. In the next future water could cover many coastal city.
The Chara Colony it is de-signed to allow human life in this possible scenario. The tower design aim to maximize passive energy production ex-ploiting: tides, wind guts and Archimede’s push. It is a no emisison building for open
![Page 13: Portfolio](https://reader034.vdocuments.us/reader034/viewer/2022042903/568c4a181a28ab491696c763/html5/thumbnails/13.jpg)
Energy supply chain
The tides movement joined to Archimedes' push, activate the electric generators (a sort of pistons). The energy in part is stored in part it is used to feed some vapour turbines. A piezoe-lectric fabric sail, wraps the whole tower to catch wind on 360°.
FunctionHeight comparedDistribution core
10
![Page 14: Portfolio](https://reader034.vdocuments.us/reader034/viewer/2022042903/568c4a181a28ab491696c763/html5/thumbnails/14.jpg)
11
Giving a cealingDoors openingMixing volume and abstraction
Pure volumesquare based
Negative: Abstraction
Facade reading:Negative
Facade reading:Positive
Site’s existing chapel
BALANGERO ASBESTOS QUARRYThis project aim to requalify the asbestos quarry in Balangero. This pages focus on the laic chapel design, the counter-chapel of the Saint Vittore’s Chapel on quarry’s hill.
![Page 15: Portfolio](https://reader034.vdocuments.us/reader034/viewer/2022042903/568c4a181a28ab491696c763/html5/thumbnails/15.jpg)
Texture
12
![Page 16: Portfolio](https://reader034.vdocuments.us/reader034/viewer/2022042903/568c4a181a28ab491696c763/html5/thumbnails/16.jpg)
Interventio Building Complex Hall Porch Building Inner State Machine’s room
TO (AFTER TRANSFORMATION)
Flat
Office
Laboratory
Factory space
Factory space
Factory space
FROM (BEFOR TRANSFORMATION)
Rock
Garden Laboratory
Office Rock garden
Kitchen Living BedBath
1 - ASSIGNED BLOCK 2 - CHOOSING 3 - OPENING 4 - STARTING DESIGNLOFT AT THE DOCKS DORA
The Project aim to provide a proposal to qualify the old Docks of Turin.The building it is protected by superin-tendences.The superintendences has divided the building in 150 blocks, each one it is be assigned to an architect. The transfor-mation bounds are:- each unit has to have an own entrance- allowed function are house, office or both.Blocks are very long, narrow and light-less; for these in my proposal, the roof it is been opened.Opening allow light and air to come in, generating a direct linking between inner and outer space.The project forecast that house it is di-vided in at at the 1st oor, office at the ground oor and laboratory in the un-dergrouund. At office level, it is placed a white rock garden . The rocks reect light increas-ing the average of office light level.
13
![Page 17: Portfolio](https://reader034.vdocuments.us/reader034/viewer/2022042903/568c4a181a28ab491696c763/html5/thumbnails/17.jpg)
0 0,15 0,7 1,4 2,8 5,6m First Floor
Kitchen Living area
Reading area Bed room
Bathroom
Office
Rock gardenA
A
A
A
Ground Floor
14
![Page 18: Portfolio](https://reader034.vdocuments.us/reader034/viewer/2022042903/568c4a181a28ab491696c763/html5/thumbnails/18.jpg)
15
![Page 19: Portfolio](https://reader034.vdocuments.us/reader034/viewer/2022042903/568c4a181a28ab491696c763/html5/thumbnails/19.jpg)
16
![Page 20: Portfolio](https://reader034.vdocuments.us/reader034/viewer/2022042903/568c4a181a28ab491696c763/html5/thumbnails/20.jpg)
Plan
Section4 - Voronoi3 - Dots dene the grid
2 - Dots lay on plane1 - Plane
17
ZETRON BOOTH FOR CCW 2013
TThis project smartly use all the available triangular shapes of booth area. The top part it is used for people receipts, the middle and larged for event and presenta-tion while the bottomo part it is used for bar and a private meeting area.Zetron it is a company that develop soft-ware and tools for emergencies handling.To achieve their goal, the zetron tools ge-olocalize the emergency point.Voronoi’s lacunar ceiling is to Zetron as Zetron’s work is to point’s localization. Indeed a Voronoi grid it is dened by posi-tion of some points in space. Different points dene different grids.Beneath the Voronoi a dome for video event, recalls people for the Zetron event.
![Page 21: Portfolio](https://reader034.vdocuments.us/reader034/viewer/2022042903/568c4a181a28ab491696c763/html5/thumbnails/21.jpg)
18
INSPIRATION
Section Scale 1:80Plan Scale 1:100
LIGIER - MICROCAR ITINIREANT BOOTH
Ligier and Microcar Italia, were planning an itinerant test drive along the whole country.UponUpon request It is been de-signed a booth simply to mount, easily to move and cut-ting edge
EGYPTIAN MINISTRY OF TOURISM BOOTH
This project aim to represent the desert like a chest that pre-serve all the egyptian land-scape and culture.As the desert enclose the treas-ure, the booth keep in handy the whole Egyptian heritage.
![Page 22: Portfolio](https://reader034.vdocuments.us/reader034/viewer/2022042903/568c4a181a28ab491696c763/html5/thumbnails/22.jpg)
19
MODELS
![Page 23: Portfolio](https://reader034.vdocuments.us/reader034/viewer/2022042903/568c4a181a28ab491696c763/html5/thumbnails/23.jpg)
![Page 24: Portfolio](https://reader034.vdocuments.us/reader034/viewer/2022042903/568c4a181a28ab491696c763/html5/thumbnails/24.jpg)
21
![Page 25: Portfolio](https://reader034.vdocuments.us/reader034/viewer/2022042903/568c4a181a28ab491696c763/html5/thumbnails/25.jpg)
22
![Page 26: Portfolio](https://reader034.vdocuments.us/reader034/viewer/2022042903/568c4a181a28ab491696c763/html5/thumbnails/26.jpg)