port of vancouver harbour operations manual

89
HARBOUR OPERATIONS MANUAL Vancouver Fraser Port Authority Updated January 2014

Upload: others

Post on 09-Dec-2021

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Port of Vancouver Harbour Operations Manual

HARBOUR

OPERATIONS MANUAL

Vancouver Fraser Port Authority

Updated – January 2014

Page 2: Port of Vancouver Harbour Operations Manual

January 2014 Page 2 of 89

HARBOUR OPERATIONS MANUAL

Table of Contents

Table of Contents ....................................................................................................... 2

Section 1: Introduction ............................................................................................... 8

Section 2: General Information .................................................................................... 8

2.1 General Information .................................................................................... 8

2.2 Interpretation ............................................................................................. 9

2.3 Marine Traffic Contacts .............................................................................. 14

2.3.1 Marine Communications and Traffic Services (MCTS) 14

2.4 Harbour Masters Office .............................................................................. 15

2.4.1 Office Hours 15

2.4.2 Harbour Patrol 15

Section 3: Navigation and Waterway .......................................................................... 15

3.1 First Narrows ............................................................................................ 15

3.1.1 Definition 15

3.1.2 Passing and Overtaking 15

3.1.3 Towing, Tugs and Tows 15

3.1.4 Maneuvering within First Narrows 16

3.1.5 Restrictions– Fishing, Sailing, Personal Watercraft and Deep Draft Vessels

16

3.1.6 Clearing Narrows 16

3.2 Second Narrows Movement Restriction Area Procedures ................................. 17

3.2.1 Introduction 17

3.2.2 Definitions 17

3.2.3 Application 18

3.2.4 Second Narrows Bridges Vertical and Navigation Clearances 18

3.3 Transit Restrictions .................................................................................... 19

3.3.1 Operational Periods 19

3.3.2 Vessel Restrictions 19

3.3.3. Navigation Channel Clearances 19

3.3.4 Transit Speed 20

Page 3: Port of Vancouver Harbour Operations Manual

January 2014 Page 3 of 89

HARBOUR OPERATIONS MANUAL

3.3.5 Clear Narrows 20

3.3.6 Order of Transit 20

3.3.7 Wind Restrictions 20

3.3.8 Visibility 21

3.4 Communications ....................................................................................... 21

3.4.1 Harbour Master 21

3.4.2 MCTS 21

3.4.3 CN Bridge 22

3.5 Vessel Traffic within the MRA ...................................................................... 23

3.6 MRA Vessels Tug Requirements ................................................................... 23

3.6.1 General Requirements 23

3.6.2 Vessels - Tug Matrix 24

3.7 Towing and Barge Traffic ............................................................................ 25

3.7.1 General 25

3.7.2 Tug Requirement for Barges 25

3.7.3 Log Towing 25

3.8 Bridge Transits – Fraser River ..................................................................... 25

3.8.1 General Practices 25

3.8.2 Queensborough Railway Bridge 26

3.8.3 New Westminster Railway Bridge 27

3.8.4 Pitt River Railway Bridge 28

3.8.5 Pitt River Highway Bridge 29

3.8.6 Westham Island/ Canoe Pass Bridge 30

3.8.7 Annacis Swing Bridge 30

3.8.8 Canadian Pacific Railway Bridge - Marpole 31

3.9 Dredging .................................................................................................. 31

3.9.1 Dredging and Construction 31

3.9.2 Mooring of Floating Property 32

3.10 Movement in Fraser River – South Arm ........................................................ 33

3.10.1 General 33

3.10.2 Triple Tows 34

3.10.3 Deep-Sea Towing Gear 34

Page 4: Port of Vancouver Harbour Operations Manual

January 2014 Page 4 of 89

HARBOUR OPERATIONS MANUAL

3.11 Movement of Fraser River – North Arm ........................................................ 34

3.11.1 Movement & Control of Floating Property and Booms 34

3.11.2 Towing 36

3.12 Escorts .................................................................................................... 37

3.12.1 Tankers 37

3.12.2 Cruise Ships 37

3.12.3 Other Vessels 37

3.13 Speed Limits ............................................................................................. 37

Section 4: Vessel Operations ..................................................................................... 38

4.1 Visits ....................................................................................................... 38

4.2 Overside Discharges .................................................................................. 38

4.2.1 Application 38

4.2.2 Sealing of Overside Discharge Valves 38

4.2.3 Hold Washing Discharge 38

4.2.4 Accidental Discharges 39

4.3 Bunkering Practices and Procedures ............................................................ 39

4.3.1 General 39

4.3.2 Planning Considerations 40

4.3.3 Bunkering Operations 42

4.4 Tanker Operations ..................................................................................... 44

4.4.1 Definition 44

4.4.2 Reporting 44

4.4.3 Combination Carriers – Oil, Bulk, Ore 44

4.4.4 Lightering 45

4.5 Anchorages .............................................................................................. 46

4.5.1 Introduction 46

4.5.2 General 46

4.5.3 Ships at Anchor 47

4.6 Berthing ................................................................................................... 53

4.6.1 General 53

Page 5: Port of Vancouver Harbour Operations Manual

January 2014 Page 5 of 89

HARBOUR OPERATIONS MANUAL

4.6.2 Overhang 53

4.6.3 Shifting Along the Berth 53

4.6.4 Emergency Towing Lines 54

4.6.5 Immobilizing Main Engines or engaging propulsion systems alongside 54

4.6.6 Berthing of Non-Cruise vessel at Canada Place 55

4.6.7 Berthing Large Vessels at Dry-dock Pier 55

4.7 Air Emissions ............................................................................................ 56

4.8 Vessel Service Request .............................................................................. 57

Section 5: Cargo Operations ...................................................................................... 57

5.1 General – Dangerous Goods ....................................................................... 57

5.2 Movement of Dangerous Goods ................................................................... 57

5.3 Containerized Dangerous Goods .................................................................. 58

5.4 Time and Quantity Limitations – IMDG Class 1 & 7 ........................................ 58

5.5 Notification of the Loading or Unloading of Explosives or Ammonium Nitrate ..... 58

5.6 Ship/Shore Safety Check-List ..................................................................... 59

5.6.1 Application 59

5.6.2 General Requirements 60

5.6.3 Definitions 60

5.6.4 The Ship/Shore Check-List 61

Section 6: Non-Deep Sea Traffic 6.1 Commercial Fishing .............................................. 61

6.1.1 General 61

6.1.2 Communications 61

6.1.3 Commercial Navigation Considerations 61

6.1.4 Fishing Vessel Considerations 62

6.2 Log Operations ......................................................................................... 62

6.2.1 Log Loading in the Fraser River 62

6.2.2 North Arm Log Transit and Scow Mooring Grounds 65

6.2.3 Log Procedures in Burrard Inlet 66

6.2.4 Suspension of Log Salvage Operations 67

6.3 Recreational Vessels - Anchoring ................................................................. 67

Page 6: Port of Vancouver Harbour Operations Manual

January 2014 Page 6 of 89

HARBOUR OPERATIONS MANUAL

6.3.1 Derelict, Abandoned, Illegally Moored or Anchored Vessels and Ships

67

6.4 Small Craft ............................................................................................... 69

6.4.1 Small Craft 69

6.4.2 Reporting 69

6.4.3 Harbour Master 70

6.4.4 Personal Watercraft 70

6.4.5 Tugs 71

6.4.6 Aircraft 71

6.4.7 Fueling 71

6.4.8 Speed Limits 71

6.4.9 Restricting Navigation 72

6.4.10 Navigating in Patullo Bridge Area 72

6.4.11 Vessel Constrained by Draught – Fraser River 72

Section 7: Special Events .......................................................................................... 73

7.1 Marine Events ........................................................................................... 73

7.1.1 Holding a Marine Event in the Port 73

7.2 Other Activities ......................................................................................... 74

7.2.1 Diving Operations 74

7.2.2 Military Vessels 75

Section 8: Emergencies ............................................................................................ 75

8.1 General .................................................................................................... 75

8.2 Incidents / Accidents/ Pollution ................................................................... 75

8.3 Fire Protection .......................................................................................... 75

Section 9: Security ................................................................................................... 76

9.1 Security Requirement for Vessels Entering the Port ....................................... 76

9.2 Port Security Officer .................................................................................. 76

9.3 Declaration of Security ............................................................................... 76

9.3.1 Declaration of Security Requirements 76

9.3.2 Declaration of Security Completion 77

Page 7: Port of Vancouver Harbour Operations Manual

January 2014 Page 7 of 89

HARBOUR OPERATIONS MANUAL

Section 10: Miscellaneous ......................................................................................... 79

10.1 Bollards ................................................................................................... 79

10.1.1 Centerm 79

10.1.2 Deltaport 79

10.2 Vessel Constrained by their Draught ............................................................ 79

10.3 Automatic Identification System (AIS) ......................................................... 79

10.4 Gangways ................................................................................................ 80

10.4.1 Cruise Gangway Terminal Procedures 80

10.4.2 Other Terminal Gangway Procedures 80

10.4.3 Gangways During Bunkering Operations (Vessel to Vessel) 80

10.5 Ship’s Garbage ......................................................................................... 80

10.6 Procurement of Services ............................................................................ 81

10.7 Lifeboat Exercises and Ferrying ................................................................... 81

10.7.1 Lifeboat Exercises 81

10.7.2 Ferrying 81

Annex A: The Ship/Shore Safety Check-List ................................................................. 82

Page 8: Port of Vancouver Harbour Operations Manual

January 2014 Page 8 of 89

HARBOUR OPERATIONS MANUAL

Section 1: Introduction

Welcome to Vancouver Fraser Port Authority (the “Authority”), Canada’s largest port. The

Authority is committed to facilitating and expanding the movement of cargo and passengers

through the port of Vancouver and the port of the Fraser River (individually or jointly the

“Port”) by providing facilities, services and technologies that are competitive, safe,

commercially viable, dependable and customer oriented.

This document titled, Harbour Operations Manual: Practices and Procedures for the

Vancouver Fraser Port Authority, was created pursuant to Section 56 of the Canada Marine

Act. It contains a set of localized practices and procedures designed to promote safe and

efficient navigation within the waters of the Port and support efforts to protect the marine

environment. The practices and procedures contained in the Manual apply to all vessels in

the Port, including small craft vessels, as well as other users of the Port, including tenants

and may be amended from time to time by the Authority upon thirty days notice.

Further information pertaining to their application may be obtained by contact the Harbour

Master’s office at (604) 665-9086 or via E-mail at

[email protected]

Section 2: General Information

2.1 General Information

1) The Harbour Master is the primary point of contact for the Authority and can be

reached 24 hours a day, 7 days a week and 365 days a year at (604) 665-9086.

2) The owner or person in charge of a ship involved in any accident or collision causing

injury or death to persons or loss or destruction of or damage to property, or

grounding in the Port shall forthwith inform the Authority of such accident, collision

or grounding and shall, within 24 hours of such accident, collision or grounding,

submit to the Authority a written report giving full details of the accident, collision or

grounding including the particulars of any injury or death to persons and the loss,

destruction or damage to property.

3) The owner or person in charge of a ship shall in case of fire, accident, dangerous

situation or disturbance affecting safe and efficient navigation in the Port or

environmental protection of the waters of the Port forthwith notify the Harbour

Master.

4) No ship shall moor or anchor without approval of the Authority and then only at such

places and in such a manner as directed by the Authority.

5) Where the owner or person in charge of a ship in the Port is not available or refuses

or neglects to obey any order to move the ship, the Harbour Master’s office may, at

the expense of the owner of the ship:

Page 9: Port of Vancouver Harbour Operations Manual

January 2014 Page 9 of 89

HARBOUR OPERATIONS MANUAL

a) take possession of and remove the ship;

b) use any means of force reasonably necessary to move the ship;

c) order tugs to move the ship; and

d) Moor or anchor the ship at any place satisfactory to the Authority.

6) No ship, while in the Port, shall move at such a rate of speed as to interfere with safe

and efficient navigation in the waters of the Port including, without limitation,

interference with other ships, or to wharves, structures or works being carried on by

the Authority or others and ships, when passing dredges, pile drivers, works, tugs

and small craft within the limits of the Port, shall reduce speed sufficiently to prevent

danger or injury by bow wave or wash to such craft or works and persons employed

on or in connection with such craft or works.

7) No ship shall conduct or participate in a marine event, or in any other activity that is

liable to interfere with safe and efficient navigation in the waters of the Port, except

with the written permission of the Authority, which permission may be either general

or specific as to place or time.

8) Persons wishing to hold a marine event in the Port shall apply for and complete an

application at www.pacificgatewayportal.com

9) An applicant for permission to hold a marine event in the Port shall obtain approval

in writing from the Authority prior to the event and if such approval is given, shall

abide by any requirements listed on the approved application and in all cases the

Authority will require that the applicant obtain comprehensive general liability

insurance in an amount acceptable to the Authority. The Authority is to be named as

a co-insured.

10) Any person using a net to fish in the Port shall, upon being notified by 4 long whistle

blasts from an approaching ship, haul in the net to allow passage of the approaching

ship.

11) Prior to the transfer of any fuel or oil, a Fuel Safety Transfer Checklist shall be

completed and all conditions implemented. A copy of the Fuel Safety Transfer

Checklist shall be faxed or emailed to the Authority on completion of the activity

12) When dangerous or hazardous goods are to be loaded or unloaded or are to remain

on board a vessel in the Port, they are to be handled in compliance with all

applicable laws and regulations.

2.2 Interpretation

Act means the Canada Marine Act, as amended from time to time;

Authority means the Vancouver Fraser Port Authority established under Part 5.1 of the Port

Authorities Management Regulations issued pursuant to the Act;

Page 10: Port of Vancouver Harbour Operations Manual

January 2014 Page 10 of 89

HARBOUR OPERATIONS MANUAL

Boom section means a boom measuring 66 feet in length by 66 feet in width enclosed by

boom sticks.

Bridge means any of:

the Middle Arm Highway Bridge that spans Morey Channel from Lulu Island to Sea

Island in Richmond;

the Canadian Pacific Railway Bridge-Marpole that spans the North Arm, Fraser River,

at Marpole from Vancouver to Richmond; or

the Canadian National Railway Bridge that spans the North Arm, Fraser River, from

Burnaby to Richmond in the area commonly known as the “Big Bend”;

Cargo, in respect of a ship, means any goods towed by or loaded aboard a ship or aboard a

ship under tow;

Cargo Transfer means the transfer of cargo liquid and/or vapour to or from the ship;

Clearance means an authorization from MCTS for a vessel to enter, move within or depart

from the MRA subject to any conditions specified in these Orders;

Clear Narrows means the transit of a vessel through the MRA, unimpeded and not met,

overtaken, or crossed ahead by any other vessel;

Contamination means any:

waste or hazardous waste, as those terms are defined in the Environmental

Management Act (British Columbia) and the Hazardous Waste Regulation (British

Columbia), respectively;

substance, as that term is defined in the Canadian Environmental Protection Act

(Canada) including substances specified in the List of Toxic Substances in Schedule 1

thereto;

deleterious substance as that term is defined in the Fisheries Act (Canada); or

matter which is not waste, hazardous waste, a substance, or a deleterious

substance, as those terms are defined in this paragraph, but which presents a risk of

significant harm to the environment or to human health;

Dangerous goods means a product, substance or organism included by its nature or by

the regulations in any of the classes listed in the TDG schedule

Deep sea vessel means:

Page 11: Port of Vancouver Harbour Operations Manual

January 2014 Page 11 of 89

HARBOUR OPERATIONS MANUAL

any vessel requiring a pilot;

barges with a displacement of 6,500 tonnes and greater, whether or not self-

propelled;

Duty Harbour Master is the person who acts on behalf of the Harbour Master, when the

Harbour Master is unavailable.

Floating property means any shed, shanty, boathouse or other structure that is located on

the waters of the Port and which is designed, used or capable of being used solely or partly

for marine navigation;

Foreshore means that part of the Port between the low water mark at low tide and the

upper limit of wave wash at high tide otherwise known as the high water mark;

Harbour Master means the person appointed by the Authority as harbour master of the

Port and includes any person who is authorized by the Authority from time to time to

discharge the function of the harbour master;

Hodder’s Tug Boat Dock means 1,250 metres (1.25 kilometres) upstream from the

bottom of Mitchell Island;

Holding areas means designated areas within the MRA, on the north and south shores

each side of the Second Narrows Bridges, in which tugs and tows can hold themselves in

readiness until conditions are such that a transit of the Second Narrows Bridges can be

made. These designated areas are:

North East - Canexus Chemicals;

North West - Lynnterm;

South East - Stanovan;

South West - Cascadia

Inner (Easterly) Light means Light No. 385 as set forth in the “List of Lights, Buoys and

Fog Signals Pacific Coast including Rivers and Lakes of British Columbia 1992”, as published

by the Canadian Coast Guard, Marine Navigation Services;

ISGOTT means the International Safety Guide for Oil Tankers and Terminals, latest edition;

Log means any bolt, pole, pile, boom stick, swifter, rider, tree or other un-manufactured

wood product;

Page 12: Port of Vancouver Harbour Operations Manual

January 2014 Page 12 of 89

HARBOUR OPERATIONS MANUAL

Log salvage means securing, pursuing or searching for drift timber or for drift timber that

has been secured and possession of the timber, until it has been returned to its owner or it

is delivered to a receiving station;

Log transit grounds means the area of the Port on the north shore of the North Arm Jetty

commencing at a point 780 metres easterly of the Second Light and extending upstream to

a point approximately 250 metres beyond the Inner (Easterly) Light and from the dolphins

seaward in a northerly direction for the distance prescribed in Section 9.2 (a) (b) or (c) in

which the Authority has installed mooring dolphins numbers 1 to 88;

Marine event includes, but is not limited to the following:

yacht and boat races;

hang gliding and paracending;

sail meets and swim races;

sails - past;

media productions; and

aquatic sports;

MCTS means the Vancouver Marine Communications and Traffic Services Centre at the Port

of Vancouver, B.C.

Middle Arm (Morey Channel) means the area in the Port from the northeast corner of

Sea Island to the upper reach of Duck Island to Terra Nova;

Mitchell Slough means the water area between the south shore of Vancouver and the

north shore of Mitchell Island;

MRA means the Second Narrows Movement Restriction Area and comprises that area

enclosed within lines drawn 000 degrees True north from the fixed light on the north-

eastern end of Terminal Dock to the North Vancouver Shoreline at Neptune Terminals and a

line drawn 000 degrees True north from Berry Point Light (approximately 1.5 miles east of

the CN Bridge on the South Shore of Vancouver Harbour) to the North Shore on the

opposite side of the channel;

North Arm Breakwater means the rock wall on the north side of the entrance to the North

Arm of the Fraser River;

North Arm Jetty means the area in the Port from the Inner Light to the White Light to the

point of Point Grey;

Page 13: Port of Vancouver Harbour Operations Manual

January 2014 Page 13 of 89

HARBOUR OPERATIONS MANUAL

Outer (Westerly) Light means Light No. 381 as set forth in the “List of Lights, Buoys and

Fog Signals Pacific Coast including Rivers and Lakes of British Columbia 1992”, as published

by the Canadian Coast Guard, Marine Navigation Services;

Point Grey Log Storage Grounds means the area of the Port that is made up of the entire

Point Grey Flats which includes log storage lease Areas #1 through #4 and the access

channels immediately east and west of each said log storage area.

Port means the navigable waters described in Schedule “A” and includes the Federal Real

Property described in Schedule “B”, and the real property other than Federal Real Property

described in Schedule “C” of the Authority’s “Letters Patent”;

Richmond Island means the island located on the north side one (1) mile below the CP

Rail Bridge;

Responsible Officer (or Person) means the person appointed by the Company or the

Master of the ship and empowered to take all decisions relating to a specific task, and

having the necessary knowledge and experience for that purpose;

Scow mooring grounds means:

the area of the Port that fronts the north bank of the North Arm of the Fraser River,

is upstream of the North Arm Breakwater and in which the Authority has installed

mooring berths numbers 1 to 7; and

the area of the Port that fronts the north shore of Sea Island and is upstream of

“Woods Island” in which the Authority has installed mooring berths numbers 1 to 4;

Sea Island (Sheeting) means the wooden and sheet piling walls located across from

Richmond Island;

Second Light means Light No. 383 as set forth in the “List of Lights, Buoys and Fog Signals

Pacific Coast including Rivers and Lakes of British Columbia 1992”, as published by the

Canadian Coast Guard, Marine Navigation Services (discontinued);

Second Narrows Bridges means the Canadian National Railways (“CN”) Bridge and the

Second Narrows Vehicular Bridge;

Ship has the meaning ascribed to such word in Section 2(1) of the Act;

Small craft means any vessel that is not a deep sea vessel;

Tank cleaning means the process of removing hydrocarbon vapours, liquid or residue from

tanks;

Page 14: Port of Vancouver Harbour Operations Manual

January 2014 Page 14 of 89

HARBOUR OPERATIONS MANUAL

Tanker means a ship designed to carry liquid cargo in bulk, including a combination carrier

when being used for this purpose;

Terminal means a place where tankers are berthed or moored for the purpose of loading or

discharging liquid cargoes;

Terminal Representative means a person designated by the terminal to take

responsibility for an operation or duty;

Tonne means a metric tonne of 1000 kilograms (2205 lbs.);

Transit speed means the speed of the vessel through the water within the MRA;

Vessel means a vessel as defined in the COLREG; and

White Light means the light marking the entrance to the North Arm of the Fraser River.

2.3 Marine Traffic Contacts

2.3.1 Marine Communications and Traffic Services (MCTS)

Marine Communications and Traffic Services (MCTS) can communicate with, and monitor

the movement of vessels in the Port.

All vessels transiting the Port with VHF radio capability, and not just those required to by

the Marine Communications and Vessel Traffic Services Zone Regulations, should monitor

the VHF channel used for MCTS communications in the respective area.

In the Vancouver harbour restrictions MCTS uses VHF channel 12 for communications.

In the southern Vancouver harbour limits (Iona to the international boundary not including

the Fraser River) MCTS uses VHF channel 11 for communications.

In the Fraser River restrictions MCTS uses VHF channel 74 for communications.

Be aware that log loading operations at Timberland Basin must be on stand-by and monitor

VHF channel 08.

Periodic notices of actions required of vessels in Port waters will be distributed by MCTS as

Notices to Shipping or on the continuous marine broadcast.

Page 15: Port of Vancouver Harbour Operations Manual

January 2014 Page 15 of 89

HARBOUR OPERATIONS MANUAL

2.4 Harbour Masters Office

2.4.1 Office Hours

The Harbour Masters Office is open 24 hours per day and 7 days a week, 365 days per year.

The office can be contacted by calling (604) 665-9086 or by email at

[email protected].

2.4.2 Harbour Patrol

Harbour Patrol vessels are in operation 7 days a week. Staff on board these vessels

represent the Harbour Masters Office. Patrol vessels may be contacted by calling MCTS or

by radio directly.

Section 3: Navigation and Waterway

3.1 First Narrows

3.1.1 Definition

First Narrows is defined as those waters in Vancouver harbour bounded to the east by a line

drawn from Brockton Point to Burnaby Shoal, then 000 degrees True north; bounded to the

west by a line drawn from Navvy Jack Point to Ferguson Point.

3.1.2 Passing and Overtaking

Deep sea and large coastal vessels are not permitted to meet or overtake each other

between Calamity Shoal Buoy and Capilano Light Beacon (First Narrows Light).

Deep sea and large coastal vessels are not permitted to overtake other vessels transporting

dangerous goods between Brockton Point and Capilano Light Beacon.

3.1.3 Towing, Tugs and Tows

1) The maximum allowable dimensions of log rafts are as follows:

forty sections total content

twenty sections overall length

two sections overall width.

Page 16: Port of Vancouver Harbour Operations Manual

January 2014 Page 16 of 89

HARBOUR OPERATIONS MANUAL

2) Log rafts over 10 sections in length require an assist tug. Unless cleared by the

MCTS Centre, eastbound tugs with tows bound for Seaspan and the Navy Buoy area

shall cross the channel east of Burnaby Shoal.

3) The maximum length of tow line to be used between Capilano light and the Second

Narrow MRA is 55M (180 ft.)

3.1.4 Maneuvering within First Narrows

The following applies to vessels maneuvering in First Narrows:

1) All vessels are to keep to starboard of mid channel unless otherwise authorized by

the MCTS Centre.

2) Vessels entering First Narrows are to be in receipt of a Traffic Advisory issued by the

MCTS Centre not later than Burnaby shoal westbound or Dundarave eastbound

3.1.5 Restrictions– Fishing, Sailing, Personal Watercraft and

Deep Draft Vessels

Fishing is prohibited between Capilano Light Beacon and Brockton Point.

Sailing or proceeding without mechanical power (rowing and paddling) is prohibited in First

Narrows. One sail sheeted home is allowed for stability purposes when under power in the

Narrows – otherwise sails are to be lowered.

The use of personal watercraft in First Narrows is prohibited.

All vessels with a draft greater than 15 metres require a “Clear Narrows” authorization as

set out in 3.1.6.

3.1.6 Clearing Narrows

The term “Clear Narrows” is defined as the transit of a vessel through either First or Second

Narrows, unimpeded and not met, overtaken or crossed ahead of by any other vessel.

The MCTS Centre will issue a “Clear Narrows” clearance upon request by the master of a

vessel that requires a clear passage through either First or Second Narrows, provided that

traffic conditions allow.

The MCTS Centre will issue a “Clear Narrows” clearance on VHF Channel 16 followed by a

broadcast on VHF Channel 12.

Light tugs and other highly maneuverable small vessels may be granted a compliance

exemption from the MCTS Centre.

Page 17: Port of Vancouver Harbour Operations Manual

January 2014 Page 17 of 89

HARBOUR OPERATIONS MANUAL

3.2 Second Narrows Movement Restriction Area Procedures

3.2.1 Introduction

The Second Narrows forms a natural bottleneck of water in Burrard Inlet, between the main

port area of Vancouver harbour to the west and the Central Portion of Vancouver harbour to

the east. The Vancouver Fraser Port Authority (VFPA) has established the Second Narrows

Movement Restriction Area (MRA) and has developed the Second Narrows MRA Procedures,

hereinafter the “MRA Procedures”, in consultation with pilots and marine industry. The

purpose of the MRA Procedures is to facilitate the safe navigation and efficient operation of

vessels in this area of Vancouver Harbour and they are part of the VFPA’s Harbour Practices

and Procedures.

3.2.2 Definitions

Barge means a vessel designed with no means of self-propulsion.

Bollard Pull means the sustained useful pulling capability of the towing vessel.

Clear Narrows means the unimpeded transit of a vessel through the MRA, including not

met, overtaken, or crossed ahead by any other vessel.

Clearance means an authorization from MCTS for a vessel to enter, move within or depart

from the MRA subject to any conditions specified in the MRA Procedures.

Dangerous Goods means polluting and dangerous cargoes in liquid bulk, explosives and

highly toxic cargoes, as identified by applicable Canadian and International standards.

Daytime means the hours between dawn and dusk as defined by the morning and evening

civil twilight, respectively.

Harbour Master’s Office means the VFPA department that governs port practices and

procedures and has responsibilities related to the safety of navigation and marine

operations in the port jurisdiction.

Holding Area means a designated area in which vessels can hold themselves in readiness

until conditions are such that a transit of the Second Narrows Bridges can be made.

Master means person in charge of a ship.

MRA means the Second Narrows Movement Restriction Area and comprises the area

enclosed within lines drawn 000o from the fixed light on the north-eastern end of Terminal

Dock to the North Vancouver Shoreline at Neptune Terminals and a line drawn 000o from

Berry Point Light (approximately 1.5 miles east of the CN Bridge on the South Shore of

Vancouver Harbour) to the North Shore on the opposite side of the channel

MRA Vessel means a vessel restricted by these regulations during its transit of the Second

Narrows Bridges.

Non MRA Vessel means a vessel that at the time of its transit through the Second Narrows

Bridges is not restricted by these regulations.

Page 18: Port of Vancouver Harbour Operations Manual

January 2014 Page 18 of 89

HARBOUR OPERATIONS MANUAL

Piloted Vessel means a vessel that is under the conduct of a pilot in accordance with the

Pacific Pilotage Regulations.

Recreational Vessel means a non-MRA vessel that has the primary role of recreation (i.e.

not intended for commercial use or hire).

Second Narrows Bridges means the Canadian National Railways Bridge (CN Bridge) and

the Ironworkers Memorial Second Narrows Bridge (Ironworkers Bridge).

Slack Water means tidal currents generally not greater than ½ knot.

Tractor tug means a tug capable of creating forces in multiple directions (generally

equipped with cycloid or 360˚ azimuth drive propulsion)

Under Keel Clearance (UKC) means the depth of water between a vessel's keel and the

waterway bottom.

Vancouver MCTS means the Canadian Coast Guard’s Marine Communications and Traffic

Services Centre in Vancouver.

3.2.3 Application

1) The MRA Procedures apply to all marine traffic in the MRA, except vessels that are

engaged in law enforcement, security, or search and rescue.

2) Non-MRA vessels shall transit or move within the MRA only when safe to do so and

must take into account all factors influencing safe of navigation including tidal

current, weather conditions and their knowledge of the MRA.

3) The MRA Procedures do not relieve the Master from compliance with the Canada

Shipping Act Collision Regulations or other regulations, requirements or standards in

respect of vessels operating in Canadian ports.

4) Further, these Procedures do not lessen in any way, the responsibility of the Master

for the safe navigation, prudent maneuvering of the vessel and preparation for

unforeseen circumstances affecting the normal operation of the CN Bridge.

5) These MRA procedures may be further operationalised with Standard Operating

Procedures developed by the pilotage company in conjunction with the Pacific

Pilotage Authority.

6) These procedures may be varied by the Harbour Master in the event of an

emergency, which causes (or is likely to cause) loss of life, personal injury, serious

environmental pollution or contributes to unsafe navigation in the harbour.

3.2.4 Second Narrows Bridges Vertical and Navigation

Clearances

Vertical clearances are given as distances measured from the Higher High Water, Large Tide

datum to the lowest member of the bridge structure, in way of navigation channel.

1) The limiting height factor for a complete transit of the Second Narrows Bridges is 44

metres which is the vertical clearance at the central fixed span of the Ironworkers

Bridge.

2) The vertical span clearances of the CN Bridge are:

Page 19: Port of Vancouver Harbour Operations Manual

January 2014 Page 19 of 89

HARBOUR OPERATIONS MANUAL

a) Main lift span fully raised (open position) 46 metres

b) Main lift span at lowest level (closed position) 10.8 metres, and

c) First fixed span immediately south of the south tower, 10.8 metres.

3) The central portion of the Ironworkers Bridge shipping channel where the maximum

vertical clearance is available is 110 metres wide.

4) The vertical lift section of the Second Narrows Railway Bridge provides 137 meters

clear navigation width between rubbing fenders.

3.3 Transit Restrictions

3.3.1 Operational Periods

1) Operational Periods are established on either side of high and low water slack tides

and are based on slack water or stemming 1 and 2 knot limiting current.

2) When available, real time tide and current information should be used in conjunction

with predicted Operational Periods to improve the safety and efficiency of operations

in the MRA.

3.3.2 Vessel Restrictions

1) The following vessels are subject to observing the Operational Periods during their

transit of the Second Narrows Bridges:

a) Vessels carrying over 6,000 tonnes of cargo and,

b) All piloted vessels, regardless of tonnage

2) Tug and barge combinations specifically designed for pushing and tractor tugs towing

alongside, may transit with a barge carrying 6,000 to 10,000 tonnes of cargo,

regardless of current direction, when not employing a pilot.

3) Vessels with Length Overall plus Breadth (LOA + B) greater than 265 meters require

two pilots and are subject to daylight passage of the MRA.

4) Tanker vessels greater than 185 meters are restricted to daylight transit through the

MRA when in product.

5) Vessels with LOA+B greater than 295 meters are restricted from transiting 2nd

Narrows without prior approval of the Harbour master.

6) Tankers loaded to 12.5 m or greater shall be trimmed 15 cm by the stern.

7) Vessels found by the pilots to have unacceptable maneuvering characteristics may be

refused permission to transit or subjected to special restrictions.

3.3.3. Navigation Channel Clearances

1) The following guidelines apply to the transit of vessels through the Second Narrows:

a) The minimum channel width required for transiting the MRA is 2.85 times the

vessel beam.

Page 20: Port of Vancouver Harbour Operations Manual

January 2014 Page 20 of 89

HARBOUR OPERATIONS MANUAL

b) A minimum 10% UKC clearance calculated using the static draught, i.e. the

draught of the vessel when it is not moving through the water, is required.

c) The pilot in conjunction with the master should evaluate these conditions

prior to the transit.

2) Vessels with an air draught in excess of 42 metres must report the maximum air

draught of the ship or floating equipment at least 24 hours in advance to the

Harbour Masters Office. The Harbour Master may approve the transit based on

calculation of the air draught clearance or require verification of the air draught by a

competent surveyor prior to transit.

3.3.4 Transit Speed

1) MRA vessels shall transit within the MRA at a speed through water no greater than 6

knots, except when safety of navigation requires otherwise.

2) All other vessels within the MRA shall proceed at a safe speed that will allow them to

properly react according to the prevailing circumstances and condition.

3.3.5 Clear Narrows

1) A Clear Narrows order is required for:

a) MRA tanker vessels carrying dangerous goods or pollutant cargoes in bulk.

b) Other vessels with special transit requirements that require the approval of

the Harbour Master.

2) Light tugs are permitted to transit through the Second Narrows bridges during a

Clear Narrows condition providing a ship to ship agreement has been reached with

the vessel(s) for which a clear Narrows has been announced.

3) All other vessels shall observe the Clear Narrows order and not interfere in any way

with the passage of a vessel for which a Clear Narrows has been issued. MCTS may

direct such vessels to a suitable Holding Area until conditions are such that a transit

of the Second Narrows Bridges can be made.

3.3.6 Order of Transit

The following order of priority applies to vessels transiting the MRA:

1) MRA vessels have priority over Non-MRA vessels when transiting the MRA

2) Vessels carrying dangerous goods have priority over other vessels within their

respective group when transiting the MRA

3.3.7 Wind Restrictions

There are no standing wind restrictions for the MRA. However, when wind warnings are in

effect, the Master and/or Pilot shall take into consideration such factors as light vessel

draught and/or high freeboard, when planning to transit the MRA.

Page 21: Port of Vancouver Harbour Operations Manual

January 2014 Page 21 of 89

HARBOUR OPERATIONS MANUAL

3.3.8 Visibility

Reduced visibility limits the ability to see aids to navigation and other vessels or landmarks.

These procedures outline safety requirements to be followed when transiting under the

Second Narrows Bridges during periods of reduced visibility.

1) Piloted vessels or vessels carrying over 6,000 tonnes of cargo, intending to transit

under the Second Narrows Bridges are restricted to a clear range of visibility,

through the entire portion of the passage that falls within the MRA, as observed from

the CN Bridge.

2) Pusher tug-barge combinations or tractor tugs towing alongside carrying between

6,000 tonnes and 10,000 and vessels carrying up to 6,000 tonnes of dangerous

goods, may transit during conditions of restricted visibility subject to the following

conditions:

a) An additional tug to assist with the transit is employed

b) Each tug’s shipboard navigation equipment include

i) An operational Electronic Chart Display and Information System

(ECDIS), as approved by IMO or meeting local industry guidelines,

ii) One operational radar

c) The transit is restricted to a reduced MRA Operational Period limited to 1 Knot

current.

d) The vessel operator has provided the Harbour Master’s Office in advance with

documentation which demonstrates to satisfaction of the Harbour Master

adequate internal safety systems that have been put in place for a safe transit

of the MRA and the degree of local knowledge of the MRA.

3) Nothing in this section shall be construed to require the Master of a vessel to

commence a transit in reduced visibility.

3.4 Communications

3.4.1 Harbour Master

The Harbour Master has overall authority in interpreting and overseeing the implementation

of these procedures. In doing so, the Harbour Master consults with other partners in safety

including pilots, other statutory agencies and industry experts, as required.

3.4.2 MCTS

1) Communication with vessels transiting or intending to transit the Second Narrow

MRA is provided, on behalf of the Harbour Master’s Office, by the Vancouver MCTS.

2) MCTS provides clearance to enter, move within or depart from the MRA subject to

conditions specified in these MRA Procedures. When a “clearance” is given to a vessel

to transit the Second Narrows MRA, MCTS shall provide information of any other

Page 22: Port of Vancouver Harbour Operations Manual

January 2014 Page 22 of 89

HARBOUR OPERATIONS MANUAL

known traffic intending to transit within 20 minutes of the transit time for which the

clearance is given.

3) MCTS shall also, at this time, advise of any specific orders regarding the transit

which may be issued by the Harbour Master’s Office.

4) Where certain vessels are required to wait pending the transit of another vessel, they

shall be so advised prior to leaving berth, weighing anchor, or entering the MRA.

5) Vessels requiring tugs shall indicate to MCTS that such tugs will be in place prior to

proceeding into or moving within the MRA.

3.4.3 CN Bridge

The CN Bridge operations, on receipt of an MRA vessel’s ETA, shall endeavour to make the

CN Bridge available with the lift span elevated 30 minutes prior to the ETA.

1) All vessels requiring the CN Bridge lift span be raised shall establish communication

on VHF Channel 12 with the CN Bridge Operator, immediately prior to approaching

the Second Narrows Bridges, indicating their intention to request for the lift span to

be raised.

2) The communication of the MRA Vessels shall include:

a) A statement of intentions, prior to departing from a Vancouver Harbour

location or upon entering English Bay, when underway

b) ETA at the CN Bridge; and

c) Confirmation of such ETA on reaching the MRA.

3) In the absence of clear verbal communication between vessel and bridge operator,

the vessel shall sound three (3) prolonged blasts, repeating this signal until

acknowledgement has been received from the bridge operator.

4) All vessels shall remain at a safe distance from the CN Bridge until the lift span is in

a fully raised position.

5) The CN Bridge operations, when the vessel’s request has been received, shall:

a) Verbally confirm their understanding on VHF Channel 12;

b) Display one (1) flashing red light on that side of the lift span facing the

approaching vessel which indicates that the lift span is in the process of being

raised to the fully raised position, or to the requested height; and

c) Display one (1) flashing green light on that side of the lift span facing the

approaching vessel which indicates that the lift span has been raised to the

fully raised position, or to the requested height.

d) Display a sector light for westbound MRA vessels that require the lift span in

the fully raised position.

6) No vessel shall approach the CN Bridge when the following signals are displayed:

a) Two (2) flashing red lights on that side of the lift span facing the approaching

vessel which indicates that the vessel is to stop at once or, if necessary, go

astern; or

Page 23: Port of Vancouver Harbour Operations Manual

January 2014 Page 23 of 89

HARBOUR OPERATIONS MANUAL

b) A vertical row of four (4) fixed white lights on the centre of the main lift span

which indicates that another vessel is approaching from the opposite

direction.

3.5 Vessel Traffic within the MRA

1) A non-MRA vessel may overtake another non-MRA vessel that is proceeding at a

speed of less than 6 knots in the MRA, provided the vessels concerned:

a) The passage does not occur within two cables of either side of the Second

Narrows Bridges

b) Have satisfactorily exchanged communication and signals between them

2) Under no circumstances shall a vessel attempt to overtake, or otherwise obstruct a

vessel that has approached the CN Bridge and has signaled or requested for the lift

span to be raised.

3) An MRA vessel shall not commence its transit until an MRA vessel transiting in the

opposite direction has completed its transit.

4) MRA vessels transiting in the same direction shall maintain a safe separation distance

between them.

5) MRA vessels proceeding to or departing from berths within the MRA shall give way to

and not interfere with the movement of MRA vessels transiting the MRA.

6) Non-MRA vessels shall plan their movements to give MRA vessels transiting or

moving within the MRA as unobstructed a passage as is practicable and consistent

with good seamanship.

7) All vessels, including sailing vessel, transiting the MRA shall be under adequate

mechanical power.

8) A vessel having a defect in the hull, main propulsion machinery, steering system, or

other communication or navigation system, that is detrimental to safe navigation,

require prior approval of the Harbour Master’s Office to transit the MRA.

9) Personal watercraft or jet skis are not permitted to move within or travel through the

MRA due to risks associated with commercial marine traffic and the narrow channels.

3.6 MRA Vessels Tug Requirements

3.6.1 General Requirements

1) All tugs employed at the stern of a vessel transiting the Second Narrows MRA must

be tethered tractor tugs.

2) Escort tugs shall be in attendance prior to entering the MRA until clear of the Second

Narrows Bridges by 3 cables unless otherwise specified in these rules.

Page 24: Port of Vancouver Harbour Operations Manual

January 2014 Page 24 of 89

HARBOUR OPERATIONS MANUAL

3) Tugs capable of generating more than 40 tonnes of bollard pull force shall have an

operational tension meter that the tug operator can easily read from the conning

position.

4) Loaded (in product) tanker vessels greater than 40,000 DWT intending to transit the

Second Narrows MRA require a minimum of two tugs through the First Narrows when

inward or outward bound.

3.6.2 Vessels - Tug Matrix

1) MRA vessels transiting through the Second Narrows MRA, must comply with the

standards for tug requirements outlined in Table 1: MRA Vessels Tug Matching

Matrix, which summarizes the bollard pull requirements and the configuration of the

tug package for such vessels.

2) Transit of vessel with a LOA + B > 265 and draught greater than 13.5 meters, is

subject to tug requirements and other aids to navigation system enhancement

presently not in place at the MRA.

3) Vessels with additional levels of redundancy in their propulsion and control systems,

which provide such vessel with extra maneuverability and safety features, may be

allowed to reduce the number of tugs required in accordance with Table 1: MRA

Vessels Tug Matching Matrix or Barges– Tug Requirements as applicable.

Vessel Dimensions (meters) Number of Tugs Bollard Pull (tonnes)

Draught LOA / LOA+B Bow Stern Bow Stern Total

> 12 LOA > 200 m 1 2 30 110 140

> 10 <12 LOA > 200 m 1 1 or 2 30 80 110

<10 (LOA+B) > 265 m 1 1 or 2 30 65 95

> 8 <10 LOA > 200m; (LOA+B) <

265m

1 1 or 2 30 65 95

< 8 LOA > 200m; (LOA+B) <

265m

1 1 or 2 30 50 80

> 10 LOA < 200 m 1 1 or 2 30 50 80

> 8 <10 LOA < 200 m 1 1 or 2 30 40 70

< 8 LOA < 200 m 1 1 20 30 50

Table 1: MRA Vessels Tug Matching Matrix

Page 25: Port of Vancouver Harbour Operations Manual

January 2014 Page 25 of 89

HARBOUR OPERATIONS MANUAL

3.7 Towing and Barge Traffic

3.7.1 General

1) A vessel towing another vessel through the MRA, shall limit the length of her towline,

measured from the stern of the towing vessel to the nearest portion of the vessel

being towed, to not more than 60 meters. Such towline may not be lengthened until

both vessels are completely clear of the bridge piers.

3.7.2 Tug Requirement for Barges

1) Barges moving within the Second Narrows MRA, must comply with the standards for

tug requirements outlined in Table 2: Barges– Tug Requirements, which summarizes

the bollard pull requirements and the number of required tugs to transit through the

MRA.

2) A towed vessel carrying dangerous goods requires an assist tug of adequate power

in addition to the tug requirements set in Table 2: Barges– Tug Requirements.

Capacity (Metric Tonnes) Number of Assist Tugs Total BP (tonnes)

<6,000 - -

>6,000 – <10.000 1 20

10,000 or greater 2 40

Table 2: Barges– Tug Requirements

3.7.3 Log Towing

1) The overall width of log booms within the MRA shall not exceed two sections wide.

2) When transiting the MRA with more than 10 sections overall length, the Master or

Person-in-Charge of a log boom shall engage, in addition to tugs required in the

towing operation, one or more tugs of adequate power, to:

a) Remain close inshore off the main channel, and

b) Be able to maintain such boom in the designated holding areas located on

both sides of the Second Narrows Bridges as shown on chart # 4964.

3.8 Bridge Transits – Fraser River

3.8.1 General Practices

1) Due regard is to be given to all dangers of navigation and potential collision and to

any special circumstances, including the limitations of the vessels involved, that may

make a departure from the following practices necessary to avoid immediate danger.

Page 26: Port of Vancouver Harbour Operations Manual

January 2014 Page 26 of 89

HARBOUR OPERATIONS MANUAL

2) Early and clear communications between the vessel and Bridge Operator must be

established. The Master and Bridge Operator must establish a point beyond which

the vessel will not proceed if prior confirmation that the bridge will open has not

been received. The Master must also have a predetermined point at which action

must be taken if the bridge is not open.

3) Communication can be established on either VHF channel 74 or by phone (see

specific bridge sections for contact information).

4) Once radiotelephone contact has been established with the Bridge Operator, a

listening watch is to be maintained on VHF channel 74 until the vessel has cleared

the bridge.

5) When visibility is less than 300 meters, a vessel towing loaded or empty barges is to

transit the swing span only when stemming the current.

6) Where a vessel is towing logs in excess of 20 sections (400 metres), it is to have an

assist tug.

7) Where unusual conditions, loads, or circumstances exist, the towing company or the

Master of the vessel is to advise the Harbour Master’s office, prior to the transit, of

the compensatory measures to be taken during the transit.

8) The Master of a vessel that has in tow any floating property such as, but not limited

to, a boom, barge or vessel, is not to overtake or attempt to overtake any part of a

tow of another vessel within 500 metres of a swing span. The master of a vessel

towing booms or floating property in the Port is to ensure that a distance of 500

meters is maintained between the vessel and the stern of any proceeding tow.

9) A vessel towing two (2) or more scows or barges shall not pass through the draw of

a swing span bridge unless the scows or barges are close-coupled in such a manner

as to prevent the scows or barges from sheering.

10) Vessels are to fit moveable masts (whenever practical) and to transit in a mast-down

configuration whenever possible to ensure that openings of bridge swing spans are

minimized.

3.8.2 Queensborough Railway Bridge

CONTACTS: VHF channel 74 and 06; Bridge Operator Telephone: 604-522-3729

1) Every vessel transiting the Queensborough Railway Bridge is to make a safety call on

VHF channel 74 and 06 to determine if there is opposing traffic.

2) The Bridge is typically left in the open position and attended by a Bridge Operator.

The Bridge is unattended at the following times:

a) Monday to Friday, 08:00 – 16:00

b) Saturday 08:00 – Sunday 08:00

3) If work is underway, a Bridge Operator will be present regardless of the schedule

and make a safety broadcast.

Page 27: Port of Vancouver Harbour Operations Manual

January 2014 Page 27 of 89

HARBOUR OPERATIONS MANUAL

4) The Master must attempt to establish contact with the Bridge Operator well in

advance of the need for opening. An opening procedure will be established, taking

into account weather and river conditions as well as procedures specified by the

Bridge Operator.

5) Under most conditions, both the upriver and downriver vessels are to transit the

draw on the Queensborough side of the bridge.

6) A vessel towing a loaded barge with a carrying capacity of 4,500 short tons or more,

or an empty barge with a carrying capacity of 5,500 short tons or more, is to stem

the current or use an assist tug while transiting the span. If over 7,000 short tons,

shall use an assistant tug.

7) A vessel towing loaded barges in tandem is to have the barges close-coupled and,

where the length of the tow is in excess of 122 metres, is to use an assist tug.

8) A vessel towing a barge that has a beam or a load in excess of 18 metres in width is

to use one (1) assist tug, and two (2) assist tugs if over 22 metres. In both cases,

the vessel is to stem the current while transiting the swing span.

3.8.3 New Westminster Railway Bridge

CONTACTS: VHF channel 74; Bridge Operator Telephone: 604-589-6612

1) The north protection pier has a collar around it 3.66 metres (12 feet) below the

surface of the water (at 3.42-metre/11.2-foot tide) that projects out 1.53 metres (5

feet). Vessel Masters should assume the south pier of the south draw has the same

collar.

2) The Master is to establish contact with the Bridge Operator well in advance of the

need for opening. An opening procedure will be established, taking into account

weather and river conditions as well as procedures specified by the Bridge Operator.

3) VHF channel 74 is to be used to contact the Bridge Operator and the vessel master.

4) When calling in, the vessel is to provide the Bridge Operator with an estimated time

of arrival (ETA). If the ETA changes, the vessel is to notify the Operator of the

change.

5) In most conditions, upriver traffic is to transit the draw on the New Westminster side

of the bridge. Downriver traffic is to transit the draw on the Surrey side of the

bridge.

6) Where, for safety reasons, vessels are transiting the bridge counter to the procedure

described above, the vessel is to make at least two security broadcasts on VHF

channel 74, advising other marine users of their intentions.

7) A vessel towing a loaded barge with a carrying capacity of 5,000 short tons or more,

or an empty barge with a carrying capacity of 6,000 short tons or more, is to stem

the current or use an assist tug while transiting the span. If over 7,000 short tons,

shall use an assistant tug.

Page 28: Port of Vancouver Harbour Operations Manual

January 2014 Page 28 of 89

HARBOUR OPERATIONS MANUAL

8) A vessel towing loaded barges in tandem is to have the barges close-coupled and,

where the length of the tow is in excess of 122 metres, is to use an assist tug when

transiting on a fair current.

9) A vessel towing a barge that has a beam or a load in excess of 18 metres in width is

to use one (1) assist tug, and two (2) assist tugs if over 22 metres.

3.8.4 Pitt River Railway Bridge

CONTACTS: VHF channel 74; Bridge Operator Telephone: 604-941-0079

24-hour Emergency Line Telephone: 1-800-795-7851

1) The Master is to establish contact with the Bridge Operator well in advance of the

need for opening. An opening procedure will be established, taking into account

weather and river conditions as well as procedures specified by the Bridge Operator.

2) Marine traffic closures take place Monday to Friday (except statutory holidays) at the

following times:

a) 05:30 – 08:00

b) 16:15 – 19:30

3) The bridge will be in the closed position by 05:30 and 16:15 each day. However, the

bridge may open for a tug on request, immediately after the passing of a commuter

train, under the following conditions only:

a) Tug is ready to go;

b) No commuter train is waiting to pass over the bridge; and

c) Bridge closure can be done in time for the next commuter train.

4) Once an opening procedure is established, the Bridge Operator contacts the Port

Coquitlam Yard Supervisor and/or Rail Traffic Controller (may take up to 20

minutes), and then prepares the bridge to swing (may take up to 10 minutes).

5) Approximately 3-4 minutes are required to complete a swing once the bridge starts

to open.

6) Air draught gauges have been placed on the nose of the bridge pier to assist

mariners. These gauges indicate the distance from the bottom of the bridge to the

waterline and are intended only to provide estimated clearances. Actual clearances

will assist a vessel operator in judging if their vessel can clear the bridge without the

need for a bridge opening.

7) Emergency openings of the span are possible any time. An emergency situation is

defined as one that threatens life, property, and/or the environment. The procedure

to follow in an emergency situation is as follows:

Page 29: Port of Vancouver Harbour Operations Manual

January 2014 Page 29 of 89

HARBOUR OPERATIONS MANUAL

a) Mariners are to contact the Bridge Operator on VHF channel 74 or by phone

(604-941-0079).

b) Identify the emergency.

c) Bridge Operator will proceed to stop rail traffic and open the bridge for

emergency passage.

8) If a mechanical failure of the bridge is immediately apparent during the opening

sequence, a low level alarm sounds. In the event of an extended failure, MCTS will

be contacted.

9) Extreme weather conditions (extreme fog, cold or heat, high winds, snow and ice)

may affect operations.

10) If the vessel requires a cancellation of the swing, the Bridge Operator is to be

contacted by telephone (604-941-0079) or VHF channel 74 as soon as possible.

3.8.5 Pitt River Highway Bridge

CONTACTS: VHF channel 74; Bridge Operator Telephone: 604-552-5830

1) The Master is to establish contact with the Bridge Operator well in advance of the

need for opening. An opening procedure will be established, taking into account

weather and river conditions as well as procedures specified by the Bridge Operator.

2) Marine traffic closures take place Monday to Friday (except statutory holidays) at the

following times:

a) 05:00 – 09:00

b) 14:30 – 18:45

3) Time is needed for the Bridge Operator to contact the ambulance dispatch and

Massey Tunnel (informs Ministry of Transportation) and to clear vehicular traffic.

4) Approximately 7-10 minutes are required to complete a swing once the bridge starts

to open.

5) A mechanical failure of the bridge is immediately apparent, as alarms will sound. If a

failure occurs, the vessel will be immediately notified.

6) High winds may affect operations.

7) If the Bridge Operator has to cancel a swing, the vessel will be notified, followed by

notification of MCTS if closure is required.

Page 30: Port of Vancouver Harbour Operations Manual

January 2014 Page 30 of 89

HARBOUR OPERATIONS MANUAL

3.8.6 Westham Island/ Canoe Pass Bridge

CONTACTS: VHF channel 74; Bridge Operator Telephone: 604-946-0139

1) The Master is to establish contact with the Bridge Operator well in advance of the

need for opening. An opening procedure will be established, taking into account

weather and river conditions as well as procedures specified by the Bridge Operator.

2) Between December 01 and March 31, the bridge is unmanned at night (between

22:00 and 06:00), if the master is unable to make contact with the Bridge Operator

during this time; the Master is to contact the Annacis Swing Bridge Operator to assist

with an opening procedure (604-521-0964).

3) Approximately three (3) minutes are required to complete a swing once the bridge

starts to open.

4) A mechanical failure of the bridge is immediately apparent during the opening

sequence, as indicator lights alert the Bridge Operator. In the event of a failure, the

vessel will be contacted and MCTS will be alerted if the problem persists.

5) The Bridge Operator will not operate the bridge, at their discretion, if unsafe to do

so.

3.8.7 Annacis Swing Bridge

CONTACTS: VHF channel 74; Bridge Operator Telephone: 604-521-0964

1) The Master is to establish contact with the Bridge Operator well in advance of the

need for opening. An opening procedure will be established, taking into account

weather and river conditions as well as procedures specified by the Bridge Operator.

2) Time is needed for the Bridge Operator to contact the Southern Railway (may take

five (5) minutes) and to prepare the bridge for swinging (takes three (3) minutes).

3) Approximately six (6) minutes are required to complete a swing once the bridge

starts to open.

4) Masters are to transit the bridge through the North opening.

5) A mechanical failure of the bridge is immediately apparent during the opening or

closing sequence, but there are no alarms. In the event of a failure, the vessel, Main

road, and MCTS, if necessary, will be contacted.

6) Heavy winds exceeding 40 kilometres per hour (25 mph) may affect operations.

7) Thirty minutes (30) is required between openings to allow for cooling of equipment.

Page 31: Port of Vancouver Harbour Operations Manual

January 2014 Page 31 of 89

HARBOUR OPERATIONS MANUAL

3.8.8 Canadian Pacific Railway Bridge - Marpole

1) Vessels or ships proceeding upstream shall pass through the north channel (north

draw on the Vancouver side) of the navigation channel.

2) Vessels or ships proceeding downstream shall pass through the south channel (south

draw on the Richmond side) of the navigation channel.

3) Every vessel or ship transiting the navigation channels in the vicinity of the Canadian

Pacific Railway Bridge – Marpole shall maintain a listening watch on VHF channel 06.

4) Every vessel or ship transiting the navigation channels in the vicinity of the Canadian

Pacific Railway Bridge – Marpole shall make two (2) security calls on VHF channel 06

to determine if there are any opposing traffic. The call in points for such safety calls

are:

a) 1,250 metres upstream from the bottom of Mitchell Island (locally known as

Hodder’s Tug Boat Dock); and

b) The downriver end of Richmond Island.

5) Prior to departure from any berth or vessel tie-up at the call in points or from

Mitchell Slough or Morey Channel (the Middle Arm), the vessel or ship shall make at

least two (2) security calls on VHF channel 06 advising other vessels or ships in the

vicinity of its intentions.

6) Where for safety reasons, a vessel or ship is transiting the Canadian Pacific Railway

Bridge – Marpole counter to the above procedures, the vessel or ship shall make at

least two (2) security broadcasts on VHF channel 06, advising other marine users of

its intentions.

7) Notwithstanding the foregoing and subject to the Collision Regulations, alternative

arrangements may be made through bridge-to-bridge communications between

passing vessels or ships.

3.9 Dredging

3.9.1 Dredging and Construction

Construction and dredging operations are prohibited within the Port and in waterfront and

upland areas managed by the Authority, unless prior written approval has been obtained

from the Authority.

Applications for construction and dredging operations must be submitted to the Authority

and approval received from the Authority prior to commencement of such operations.

Page 32: Port of Vancouver Harbour Operations Manual

January 2014 Page 32 of 89

HARBOUR OPERATIONS MANUAL

Application forms may be obtained by contacting the Authority or may be downloaded

through the website.

Tenants are to apply for written authorization to carry out any maintenance dredging prior

to commencement of the activity.

The forms, Coordinated Project Review – Lease Application and Coordinated Project Review

– Dredging Application can be obtained by contacting the Authority.

3.9.2 Mooring of Floating Property

The owner or person in charge of a floating property, including but not limited to a vessel,

float home, barge, or log boom, shall ensure that the property is moored in a safe and

secure manner.

1) No person is to leave unmoored floating property unattended in the Port.

2) No person shall move a boom or floating property in the Port unless the boom or

floating property is in tow of a ship.

3) If, in the opinion of the Authority, floating property is not moored in a safe and

secure manner the owner or person in charge of the floating property will be ordered

to moor the floating property in a safe and secure manner.

4) If the owner or person in charge of the floating property fails to comply with the

order of the Authority, the Authority may take such action as is necessary to remedy

the situation at the risk and expense of the owner or person in charge of the floating

property.

5) Vessels moored at authorized locations in the Port are not to raft more than three (3)

vessels wide for the purpose of moorage or the transfer of fish or other cargo.

6) No person shall obstruct, with a boom or floating property, any channel in the Port.

7) While moored, vessels are to move as far off the navigable channel as is safe and

practical. Vessel Masters are responsible for ensuring their vessels are moored in

sufficient water to ensure safety at all stages of the tide and in all weather

conditions.

8) Unless authorized by the Authority pursuant to a water lot or foreshore lease, no

ship shall deposit logs in the waters or on the foreshore.

Page 33: Port of Vancouver Harbour Operations Manual

January 2014 Page 33 of 89

HARBOUR OPERATIONS MANUAL

3.10 Movement in Fraser River – South Arm

3.10.1 General

The owner or person in charge of a vessel engaged in towing is to ensure the tow is

securely fastened and under control while in transit in the harbour and is to ensure that the

vessel engaged in towing has sufficient power at all times to maintain full control over the

movements of the tow.

The owner or person in charge of a vessel engaged in towing is to ensure that the tow

vessel is not moored or stopped at a location where part of the boom, cargo, or ship being

towed lies under a bridge.

Do not overtake or attempt to overtake any part of a tow of another vessel within 500

meters of a swing span.

A vessel engaged in towing booms or floating property in the harbour is to ensure that a

distance of 500 metres is maintained between the vessel and the stern of any proceeding

tow.

The booms towed should be one (1) section in width (21 metres).

Owners or persons in charge of a vessel intending to enter or depart the South Arm of the

Fraser River with log tows wider than one (1) section are to contact MCTS and the Harbour

Master’s office prior to transiting the river. This is to allow for the arrangement of any

special conditions needed to ensure the safe passage of the tow and deep-sea vessels that

may be transiting the harbour at the same time.

In the North Arm of the Fraser River the maximum towed boom dimensions are as follows:

1) In the waters between the Outer (Westerly) Light (Light No. 381) and the Inner

(Easterly) Light (Light No. 385) towed booms shall not exceed five (5) sections in

width and any tow wider than two (2) sections shall have sufficient assist tugs to

ensure safe passage;

2) In the waters of Morey Channel (the Middle Arm) towed booms shall not exceed

twelve (12) sections in length and one (1) section in width; and

3) In areas in the North Arm of the Fraser River other than a) or b) towed booms shall

not exceed thirty-six (36) sections in length or one (1) section in width.

Page 34: Port of Vancouver Harbour Operations Manual

January 2014 Page 34 of 89

HARBOUR OPERATIONS MANUAL

3.10.2 Triple Tows

The day prior to the arrival or departure of a tug with three (3) barges, the tow company is

to request a dispatch sheet from the Pacific Pilotage Authority showing the scheduled ship

movements for the next day.

On the day of the arrival or departure of a tug with three (3) barges, the towing company is

to:

1) Confirm with the Pacific Pilotage Authority’s dispatch (604-666-6776), the estimated

time of arrival or departure of deep-sea vessels.

2) Schedule the towing company’s arrival or departure so that movements cause the

least amount of conflict.

3) Where wind and/or current will not allow the tows to track in a straight line behind

the towing vessel, an assist tug is required for the transit.

The towing company is to reiterate to their Captains and Mates the need for good

communication with the Pilots to ensure safe meeting and passing of vessels

3.10.3 Deep-Sea Towing Gear

If using deep-sea gear outbound:

1) Lengthen the tow when the last scow or barge has proceeded outward of the Sand

Heads light station, unless weather does not permit, or

2) In the North Arm, lengthen the tow when the last scow or barge has proceeded

downstream of the Inner (Easterly) Light (Light No. 385).

If using deep-sea gear inbound:

1) Haul in the tow as close as possible on passing abeam of the Sand Heads light

station, or

2) In the North Arm, haul in the gear as close as possible before the last scow or barge

has proceeded upstream of the Inner (Easterly) Light (Light No. 385).

3.11 Movement of Fraser River – North Arm

3.11.1 Movement & Control of Floating Property and Booms

1) No person shall move a boom or floating property in the Port unless the boom or

floating property is in tow of a ship.

2) No person shall leave unmoored floating property unattended in the Port.

Page 35: Port of Vancouver Harbour Operations Manual

January 2014 Page 35 of 89

HARBOUR OPERATIONS MANUAL

3) No person shall obstruct, with a boom or floating property, any channel in the Port.

4) Where a boom or floating property is located in an unauthorized area of the Port, the

Authority may move the boom or floating property to any other location in the Port

and the owner shall pay to the Authority the cost thereof forthwith upon demand.

5) All owners or persons in charge of any boom or floating property entering the Port

must provide the Authority with all such information regarding the boom or floating

property prior to arrival or as soon thereafter as is practical.

6) Unless authorized by the Authority pursuant to a water lot or foreshore lease, no

ship shall deposit logs in the waters or on the foreshore.

7) In the event of a spill of logs or an escape of booms, the Authority may, by order in

writing suspend log salvage activities by any ship in any area of the harbour for a

period of up to ten days during which period the owner or his authorized agent shall

recover the spilled logs or escaped booms.

8) During such period and within such areas of the Port as are specified in the order

mentioned in Section 7, no person in charge of any ship, other than the owner of the

logs or booms or his authorized agent, shall attempt to recover the logs or booms

referred to in Section 7.

9) While transiting the navigation channels in the vicinity of the Canadian Pacific

Railway Bridge - Marpole:

a) ships proceeding upstream shall, subject to Section 11 and Section 12, pass

through the north channel (north draw on the Vancouver side) of the

navigation channel; and

b) ships proceeding downstream shall, subject to Section 11 and Section 12,

pass through the south channel (south draw on the Richmond side) of the

navigation channel.

10) Every ship transiting the navigation channels in the vicinity of the Canadian Pacific

Railway Bridge -Marpole shall:

a) maintain a listening watch on VHF Channel 06; and

b) make two security calls on VHF Channel 06 to determine if there is any

opposing traffic. The call in points for such safety calls are:

i) Hodder’s Tug Boat Dock; and

ii) the downriver end of Richmond Island.

Prior to departure from any berth or vessel tie-up at the call in points referred to in

subsection (i) or (ii) above, or from Mitchell Slough or the Middle Arm (Morey Channel), the

Page 36: Port of Vancouver Harbour Operations Manual

January 2014 Page 36 of 89

HARBOUR OPERATIONS MANUAL

ship shall make at least 2 security calls on VHF Channel 06 advising other ships in the

vicinity of its intentions.

1) Where for safety reasons, a ship is transiting the Canadian Pacific Railway Bridge -

Marpole counter to the procedure described in Section 9, the ship shall make at least

two security broadcasts on VHF Channel 06, advising other marine users of its

intentions.

2) Notwithstanding the foregoing and subject to the Collision Regulations, alternative

arrangements may be made through bridge-to-bridge communications between

passing ships.

3.11.2 Towing

1) The owner or person in charge of a ship that is towing a boom or floating property

shall keep the boom or floating property securely fastened or under control while in

transit in the Port.

2) If the owner or person in charge of a ship referred to in Section 1 fails to comply with

Section 1, the Authority may order such person to securely fasten the boom.

3) The owner or person in charge of a ship referred to in Section 1 shall forthwith

comply with any order of the Authority under Section 2 failing which the Authority

may take such corrective action as is necessary to remedy the situation and the

owner or person in charge of the ship shall pay to the Authority the cost thereof

forthwith upon demand.

4) The owner or person in charge of a ship that has in tow any boom, cargo or other

ship shall ensure that the tow ship is not moored or stopped at a location where part

of the boom, cargo or ship being towed lies under a bridge.

5) The owner or person in charge of a ship that has in tow any boom, cargo or other

ship shall ensure that the tow ship has sufficient power at all times to maintain full

control over the movements of the boom, cargo and other ship.

6) The owner or person in charge of a ship towing scows or barges shall ensure that the

ship:

a) if outbound, does not pay out its deep sea gear until the last scow or barge

has proceeded downstream of the Inner (Easterly) Light; and

b) if inbound and using deep sea gear, close couples its towing gear before the

last barge or scow has proceeded upstream of the Inner (Easterly) Light.

7) The owner or person in charge of a ship that has in tow any boom, cargo or other

ship shall not, within 500 metres of a swing span bridge, overtake or attempt to

overtake any part of the tow of any other ship.

Page 37: Port of Vancouver Harbour Operations Manual

January 2014 Page 37 of 89

HARBOUR OPERATIONS MANUAL

8) The owner or person in charge of a ship with two or more scows or barges in tow

shall not pass through the draw of a swing span bridge unless the scows or barges

are close coupled in such a manner as to prevent the scows or barges from sheering.

9) Subject to Section 10 and Section 11, the owner or person in charge of a ship shall

not tow, within the limits of the Port, any boom exceeding thirty-six (36) boom

sections in length or one boom section in width.

10) A boom in tow in the waters between the Outer (Westerly) Light and the Inner

(Easterly) Light shall not exceed five (5) boom sections in width. Any incoming tow

wider than two (2) sections shall have sufficient assist ships to ensure safe passage.

11) A boom in tow in the waters of the Middle Arm (Morey Channel) shall not exceed

twelve (12) sections in length or one (1) boom section in width.

3.12 Escorts

3.12.1 Tankers

The Harbour Master’s launch will be available to clear traffic and provide escort services

through First and Second Narrows during operational periods.

3.12.2 Cruise Ships

During high traffic times the Harbour Master’s launch will be available to provide escorts

through First Narrows.

3.12.3 Other Vessels

In extraordinary circumstances the Harbour Master’s launch will be available to provide

escorts through Vancouver harbour.

3.13 Speed Limits

Where necessary, a velocity relating to safe speed may be defined by the Authority and

posted.

Every vessel or ship in the Port shall at all times:

1) Move at a ‘Safe Speed’ - so that she can take proper and effective action to avoid

collision and be stopped within a distance appropriate to the prevailing circumstances

and conditions.

2) Have due regard for small craft, towing, log loading, bunkering, diving operations.

Notices to Shipping and Notices to Mariners will identify works in progress and

Page 38: Port of Vancouver Harbour Operations Manual

January 2014 Page 38 of 89

HARBOUR OPERATIONS MANUAL

vessels are to proceed past these works at the minimum speed at which the vessel

can be kept on course.

3) Obey five-knot speed limit within False Creek, Bedwell Bay, Belcarra Bay, Deep

Cove, Strathcona Park and Coal Harbour.

4) The wake and wash from a vessel or ship are not to cause a risk to the safety of life

or damage to property.

Section 4: Vessel Operations

4.1 Visits

Every vessel entering the Port may be subject to a visit from Port’s representative.

During its visit on board, the Port’s officer may accomplish several tasks or issue orders to

accomplish certain tasks (sealing of over-side discharge valve, handling documentation, air

emission program) and will, upon request, provide the master with information about the

Port.

4.2 Overside Discharges

4.2.1 Application

For the purpose of this procedure, the term “overside discharges” refers to the discharge of

any liquids from a vessel other than ballast water. (Ballast water is dealt within a separate

procedure.)

4.2.2 Sealing of Overside Discharge Valves

It is an offence to discharge into the Port any oil or other liquids containing oil. To help

protect vessels from the accidental discharge of oil or oily water, when on board the

Harbour Master’s Patrol Staff may seal, or request the sealing of, the engine room bilge

over side discharge valve(s), but it remains the master’s obligation to do so. This valve(s) is

normally located between the oily water separator and the engine room bilge discharge

port.

4.2.3 Hold Washing Discharge

Any request will be treated on the case-by-case basis through Transport Canada Marine

Safety at 604.666.5300 or after hours/emergency (604) 666-4765.

Page 39: Port of Vancouver Harbour Operations Manual

January 2014 Page 39 of 89

HARBOUR OPERATIONS MANUAL

4.2.4 Accidental Discharges

All accidental over side discharges must be reported immediately to MCTS. If the discharge

contains oil or other deleterious substances, the vessel must immediately activate its

pollution response plan.

4.3 Bunkering Practices and Procedures

4.3.1 General

4.3.1.1 Application

1) Bunkering may take place at anchor or alongside. It may be pumped from road tanker,

bunker barge or another tanker or ship. Regardless of the method and provider, the

Practices and Procedures (P&P) outlined herein apply to all vessels receiving bunkers

within Port Metro Vancouver (PMV’s) area of jurisdiction,

2) These procedures are developed to enhance safe bunkering operations within PMV

harbour areas. They cover pre-delivery, actual delivery and post-delivery requirements,

checks and documentation related to bunkering operations,

3) All parties involved in the planning and delivering of bunker services, must be fully

aware of the PMV Bunkering P&P as well as of any additional requirements issued and

enforced by specific terminal operators,

4) The PMV Bunkering P&P are designed to be used as complementary to other existing

safety controls and regulations that govern shipping safety and in no way supersede or

make such controls and regulations irrelevant.

4.3.1.2 Definitions

"Bunker oil": Fuel oils and other types of oil products to be used for the operation of the

vessel to which the oil is transferred.

"Receiving vessel": The vessel that receives bunker oil.

"Bunker vessel": An oil tanker (including a tanker barge) that is equipped to deliver bunker

oil to a receiving vessel.

"Bunkering” or “Bunker operations”: The planning and actual safe transfer of bunker oil

from a bunker vessel to another vessel.

“Bunkering checklist”: The bunkering checklist as referred to in the latest edition of

International Safety Guide for Oil Tankers & Terminals (ISGOTT).

Page 40: Port of Vancouver Harbour Operations Manual

January 2014 Page 40 of 89

HARBOUR OPERATIONS MANUAL

4.3.1.3 Bunker Suppliers

5) Companies that supply with bunker oil vessels that call at Port Metro Vancouver are

required to register with PMV and meet the following requirements:

a) Provide to PMV Operations & Security Department an up-to-date list of bunker

vessel’s and their particulars accompanied by:

i) Valid statutory certification documentation issued by Transport Canada or

another recognized organization;

ii) Documentation of successful assessment of suitability of vessels and/or barges in

accordance with the Oil Companies International Marine Forum (OCIMF) Ship

Inspection Report (SIRE) program (in the case of barges this should include also

the tugs that are used in the handling of these barges).

b) In addition to complying with Transport Canada’s minimum safe manning levels:

i) Conduct a comprehensive formal risk assessment of manning levels required to

execute bunkering operation safely and to deal with an emergency should one

occur;

ii) Advise PMV Operations and Security Department of the risk assessment results

as well as of the measures and strategies implemented to manage the identified

risks.

c) Keep a copy of the latest edition of ISGOTT onboard the bunker vessel at all times;

d) Maintain independently certified Safety, Environmental and Quality Management

Systems and provide regular auditing updates to PMV.

4.3.2 Planning Considerations

4.3.2.1 Port Areas

6) Bunkering may occur alongside a berth or at anchorage. Procedures and restrictions that

affect bunkering vary depending on the area of the port where the vessel is:

a) Burrard Inlet: English Bay anchorage areas, North and South; Vancouver Harbour

(West portion), which is the area between First and Second Narrows (also known as

Inner Harbour); Vancouver Harbour (East portion), which is the area east of Second

Narrows;

b) Fraser River: bunkering can only occur alongside a berth; there are no long term

designated anchorages in this area;

c) Roberts Bank: Transportation of bulk liquid cargoes at Roberts Bank area is not

currently permitted due to lack of adequate information on the potential impacts of

an oil spill. This restriction also applies to bunkering services in this area until such

time as a comprehensive assessment of the environmental impacts is conducted and

appropriate control measures are developed.

Page 41: Port of Vancouver Harbour Operations Manual

January 2014 Page 41 of 89

HARBOUR OPERATIONS MANUAL

4.3.2.2 English Bay

7) English Bay anchorages are more exposed to weather and sea conditions. The weather

conditions in this area may change at short notice. Cape size vessels only may carry out

bunkering operations in English Bay to allow better management of vessel traffic in

Inner Harbor. In such cases, the following restriction will apply:

a) Bunkering operations shall not proceed when winds are blowing or forecast to blow

above force 5 (i.e. 17 -21 knots);

b) An attending tug must remain on site and ready to render assistance during the

entire bunkering operation (does not apply to self propelled delivery vessels);

c) Nothing in this section shall relieve or preclude the master of the delivery vessel

from their responsibility to take or execute any decision which, in the master's

professional judgment, is necessary for the safe navigation of their vessel.

4.3.2.3 Fraser River

8) Bunkering of deep sea vessels calling at Fraser River terminals may occur only alongside

a safe berth. Due to changing river conditions, passing traffic and terminal layout, a tug

capable of handling the bunkering barge is required to be in attendance while bunkering

of deep sea vessels at any of the Fraser River terminals.

9) Bunkering operations at Fraser Surrey Docks may impede the safe movement of other

vessels at this terminal. To address this issue:

a) Bunkering supplier is required to coordinate with the terminal to avoid conflicts

between bunkering operations and vessel berthing schedules at Fraser Surrey Docks;

b) The master of the attending tug is required to maintain communication with Victoria

Traffic on VHF Channel 74 and:

i) continuously monitor for deep-sea traffic berthing at Fraser Surrey Docks;

ii) advise when bunkering operations begin and complete.

c) In the event a ship must transit past a berth within the same breakwater where a

bunkering operation is underway, the oil barge must be removed to allow for the

safe and timely transit of arriving, shifting or departing vessels.

4.3.2.4 Efficient Utilization of Anchorages and Port Areas

10) To allow for the efficient utilization of anchorages and not generate unnecessary extra

traffic in port areas, ships that have an opportunity to bunker alongside should do so.

11) Vessels in inner harbour that are unable to bunker alongside due to time constraints or

other safety reasons may bunker at anchorage.

12) In order to eliminate unnecessary traffic, tankers that plan to make a stop at an

anchorage east of Second Narrows should schedule to bunker in that location.

13) Cape size vessel requiring a transit of the First Narrows for bunkering purposes only,

should plan to do so prior to loading, when possible.

Page 42: Port of Vancouver Harbour Operations Manual

January 2014 Page 42 of 89

HARBOUR OPERATIONS MANUAL

4.3.3 Bunkering Operations

4.3.3.1 General Requirements

14) All bunkering operations must be carried out in accordance with the latest edition of

ISGOTT and the additional information provided in these Practices and Procedures

document.

15) The Master of every vessel engaged in bunkering operations shall appoint an officer to

be in charge of bunkering operations who is fluent in English. English is the language to

be used during all aspects of the bunkering operation.

16) The bunkering checklist must be kept on file for at least one year and a copy emailed to

PMV Operations Center at [email protected] after bunkering is

completed.

17) When bunkering alongside a berth, both receiving vessel and the bunker vessel or road

tanker must be fully aware of the specific requirements issued by the terminal operator

as applicable.

4.3.3.2 Notifications

18) The bunkering suppliers must advise their bunkering schedule by email at least 24 hours

in advance to:

a) PMV Operations Center at [email protected]; and

b) the appropriate terminal operator when bunkering occurs alongside berth.

19) The master of bunkering vessels (or the driver of the road tanker in the case of land

transfer) shall contact the PMV Operations Center via phone at 604.665.9086 or via

marine VHF providing:

a) the berth / anchorage and the time that bunkering will commence; and

b) a verbal report on the completion of requirements under clause 20).

4.3.3.3 Before Bunkering Transfer Commences

20) The master of a bunker barge shall not begin a transfer before:

a) The bunker barge is securely moored in accordance with a mooring plan that is pre-

arranged between the bunker vessel and the receiving vessel;

b) Reliable communication methods that will enable an immediate shutdown have been

established and can be maintained throughout the operation;

c) The receiving vessel has provided a safe means of access to the bunker vessel crew

in accordance with the relevant regulations made pursuant to the Canada Shipping

Act and the Marine Occupational Safety and Health Regulations;

d) The hoses are in good condition and tested in accordance with the appropriate

Canadian standard or as per ISGOTT;

e) The hoses are well supported, of sufficient length to allow for movement of vessels

and well rigged to not be damaged by the movement of the vessel;

Page 43: Port of Vancouver Harbour Operations Manual

January 2014 Page 43 of 89

HARBOUR OPERATIONS MANUAL

f) The bunker safety checklist has been truthfully completed and with all questions

answered in the affirmative completed and signed, by the masters of both the

bunker vessel and the receiving vessel;

g) PMV Operations Center has been contacted and notified accordingly.

4.3.3.4 Enforcement

21) PMV Harbour Patrol or any authorized officer of the Port may attend a bunkering

operation to verify that these procedures are being followed.

22) If deviation from these procedures is identified and if safety of the operation requires,

bunkering may be stopped until such time as the situation is remedied.

4.3.3.5 Spill Response

23) In the event of a spill during the handling and storage of bunker products all operations

must be immediately stopped and vessels involved must activate their SOPEP. The spill

must be reported to the Regional Marine Information Centre pollution line 1-800-889-

8852 or via VHF on channel 12 for Vancouver, channel 11 for Victoria 11 and channel 74

for Fraser River traffic.

24) The bunker vessel must be equipped to stop the bunkering supply pumps immediately

from a place close to the manifold on the bunker vessel.

25) Each bunker boat must have portable, approved VHF and portable sirens marked

“Emergency signal” for attracting attention in the event of an emergency.

4.3.3.6 Bunkering During Cargo Operations

26) When bunkering alongside berth, caution must be exercised to maintain a safe distance

between bunkering operations and other concurrent activities (i.e. cargo loading

operations, heavy equipment operating and movement of loads on and above dock).

27) Bunkering alongside must be scheduled so that:

a) there is no interference with cargo operations or other activities under way; and

b) personnel involved in the bunkering operation on board remain dedicated to this

operation only and have no other tasks.

4.3.3.7 De-Bunkering

28) Occasionally, vessels may need to off-load bunkers due to the vessel receiving wrong

grade(s) of bunker fuel or the need to enter a local shipyard for repairs, docking, etc.

Ships requesting de-bunkering operations will need to obtain permission from the PMV

Harbour Master and follow these practices and procedures as applicable.

Page 44: Port of Vancouver Harbour Operations Manual

January 2014 Page 44 of 89

HARBOUR OPERATIONS MANUAL

4.4 Tanker Operations

4.4.1 Definition

The term Tanker applies to all carriers of bulk petroleum or chemical products or other liquid

cargoes.

4.4.2 Reporting

The Master of a tanker in a loaded or non-gas free condition must obtain permission from

the Harbour Master’s Office to enter the Port limits.

In order to receive permission, the Master shall provide the Harbour Master’s Office with the

following information at least two working days in advance of the vessel’s arrival:

A complete list of all bulk liquid cargo on board;

The generic (technical) name of each product;

I.M.O. Class of each product when applicable;

Tank stowage and quantities of each product;

Slops remaining on board;

Products to be loaded, discharged and intended terminal rotation (if applicable);

Vessels estimated time of arrival and estimated time of departure.

Small locally owned tankers that regularly trade in and out of the Port might be exempt

from these reporting procedures.

4.4.3 Combination Carriers – Oil, Bulk, Ore

The above requirements shall not apply if either of the following criteria are met:

1) The vessel’s master or his representative produces, before arrival, a properly

completed Certificate of Class satisfying the Harbour Master’s Office that the vessel

has been re-classified for the Carriage of Dry-Bulk Cargoes only.

Or

2) There is produced to the Harbour Master’s satisfaction, a letter from the vessel’s

master or his representative, stating that the vessel has not carried oil cargoes of

any description since the last “Quadrennial Survey”.

Page 45: Port of Vancouver Harbour Operations Manual

January 2014 Page 45 of 89

HARBOUR OPERATIONS MANUAL

Prior to arriving at the loading berth for dry bulk cargo the vessel must have:

a) All cargo compartments designed for dry bulk loading thoroughly cleaned and

declared gas free. All other holds to be gas free, inerted or ballasted.

b) All wing or side tanks which have previously contained oil, but are not used

for dry bulk must be thoroughly cleaned, gas freed or inerted.

c) Oil slop tanks unless gas free must be inerted to maintain a maximum of 8

percent oxygen content in the system at constant positive pressure. The

conditions referred to in b) and c) above shall be maintained during the ship’s

stay in port.

d) A certificate from a qualified marine chemist for the current conditions

existing under items a), b) and c) as of time of arrival at the Port is required.

This certificate shall be valid for a period of 48 hours before entering a loading

berth. Should entry be delayed beyond that time, than a further check will be

required within 48 hours of the vessel proceeding of the loading berth.

4.4.4 Lightering

Conditions for cargo lightering to tankers at anchor:

1) The lightering of petroleum products to tankers at anchor introduces an additional

risk of pollution incidents by the double handling of the product. Therefore it will only

be allowed at the discretion of the Authority.

2) Permission to lighter may be granted after every effort has been made, including the

arrangement of loading rotation, to ensure that lightering is the only possible means

of loading.

3) Oil lightering operations to tankers will only take place at anchorages K, L or M.

4) Prior to pumping product, the form “Oil Safety Check List” must be completed by the

receiving vessel and the delivery barge.

5) When transferring petroleum products, a boat provided with a minimum crew of two,

equipped with cleanup materials and sufficient containment boom to surround the

ship and barge, will stand by at the ship at all times during transfer operation.

6) When the product being lightered is diesel fuel oil or heavier, the containment boom

must be deployed around the ship and barge at all times whilst product is being

transferred.

7) Only product being lightered from the local oil pipeline terminals will be considered

for transfer at anchor. Product being barged in for export from other sources, such

as the United States, will not be allowed to lighter to tankers at anchor.

8) Request, in writing, from the ship’s agent will be considered for the approval of a

transfer operation only after proof that all other alternatives have been exhausted.

Page 46: Port of Vancouver Harbour Operations Manual

January 2014 Page 46 of 89

HARBOUR OPERATIONS MANUAL

9) The Authority may alter these conditions at any time without notice.

10) The Authority may terminate the practice of lightering at its discretion without

consultation.

4.5 Anchorages

4.5.1 Introduction

1) These Practices and Procedures are made pursuant to the Canada Marine Act section 56

subsection (1) (b) and have been developed for the purpose of promoting safe and

efficient use of anchorages utilized by deep-sea ships calling at facilities within PMV.

2) Deep sea anchorages within Port Metro Vancouver (PMV) harbour areas are established

to serve vessels calling PMV that require anchorages as part of an international voyage.

3) All permanent anchorages are indicated in the appropriate nautical charts and

publications produced by the Canadian Hydrographic Services. Temporary short term-use

anchorages may also be authorised by the Harbour Master in case of emergency or

operations for which a suitable berth is not available.

4) Nothing in these procedures relieves the Master of the vessel from their obligations for

safety or from following the requirements under any applicable international or Canadian

statutes, regulations and guidelines.

4.5.2 General

4.5.2.1 Anchorages

5) The main anchorages serving ships calling PMV facilities are located in Burrard Inlet and

are known as: English Bay Anchorages (North and South), Inner Harbour Anchorages and

Indian Arm Anchorages.

6) Other anchorages include short term anchorages operating more as holding areas for

vessels calling Fraser River terminals and Roberts Bank terminals as well as a number of

emergency anchorages strategically located in the main anchoring areas. For a full list of

anchorages and their particulars see Annex A of this section.

7) Inner harbour anchorages are typically assigned as short period anchorages to vessels

that require sheltered waters and better accessibility to port services such as bunkering as

well to facilitate transit of 2nd Narrows when needed. With the exception of tankers, the

period might be extended on request if there are no other ships requiring inner harbour

anchorages.

Page 47: Port of Vancouver Harbour Operations Manual

January 2014 Page 47 of 89

HARBOUR OPERATIONS MANUAL

4.5.2.2 Anchorage Assignment

8) The Harbour Master assigns anchorages to deep sea ships on a first come first served

basis, as available and in accordance with suitability criteria and other restrictions outlined

in this document.

9) Anchorage requests are made using PMV’s online anchorage request system as soon as it

is known that a vessel requires the use of an anchorage facility. PMV Operations Center will

assign a suitable anchorage based on availability and vessel’s estimated time of arrival at

anchorage. PMV Operations can be contacted 24/7 at 604 665 9086,

[email protected].

4.5.2.3 Improperly Anchored Vessels

10) Should a vessel fail to anchor properly in its assigned anchorage or drag out of its

position in the anchorage, the vessel may be required to be repositioned by a BC Coast Pilot

if:

a) The vessel is endangering other vessels at anchor, or;

b) The vessel is obstructing the use of other anchorages.

11) The vessel master is responsible for all costs associated with the repositioning of their

vessel.

4.5.2.4 Non-Availability of Anchorages

12) Should a vessel fail to anchor properly in its assigned anchorage or drag out of its

position in the anchorage, the vessel may be required to be repositioned by a BC Coast Pilot

if:

a) The vessel is endangering other vessels at anchor, or;

b) The vessel is obstructing the use of other anchorages.

13) The vessel master is responsible for all costs associated with the repositioning of their

vessel.

4.5.3 Ships at Anchor

4.5.3.1 Safety Factors

14) The master of a ship is ultimately responsible for assessing the suitability of the

anchorage assigned to them. In doing so, the master must ensure that the vessel is

equipped with sufficient anchor chain length to ensure that the anchor chain meets the

required scope for the depth of the assigned anchorage at all times.

Page 48: Port of Vancouver Harbour Operations Manual

January 2014 Page 48 of 89

HARBOUR OPERATIONS MANUAL

15) Ships proceeding at anchor are required to retain an adequate amount of ballast

onboard and ensure that a minimum trim by the stern as well as sufficient propeller

immersion, in order to not adversely affect ship manoeuvrability.

16) The master of a vessel at anchor must ensure that:

a) The anchor is properly and firmly set, prior to the pilot departing the vessel;

b) The latest edition of the largest scale chart is used at all times for taking vessel

positions.

17) Ships proceeding to the North English Bay anchoring area, specifically anchorage 16, 17

or 18, are required to:

a) Have a chain scope (i.e. ratio of chain length to depth) of six as the minimum

required to develop the full holding power of the anchor;

b) Exercise extra caution when exposed to winds over 20 knots from any direction,

including:

i) Closely monitor distances to shore and to adjacent ship at anchor, to

ensure that they are being maintained;

ii) Have the main engines and propulsion gear immediately available for use;

iii) Have the windlass arrangement and anchoring equipment in good working

condition.

18) Vessels at anchor must not immobilise their main engine or propulsion gear at anchor

without permission from the Harbour Master. If emergency repairs are required, permission

may be granted, provided a tug or tug(s) of adequate power are kept in attendance.

4.5.3.2 Watchkeeping Standards

19) All ships at anchor must maintain a continuous navigational watch at all times and

never leave the navigational bridge unattended.

20) The officer in charge of the navigational watch must follow the requirements contained

in the STCW Code, as amended as well as be guided accordingly by these practices and

procedures, complementary to the STCW watchkeeping standards.

21) In maintaining an anchor watch, the officer in charge must ensure to:

a) Correctly place the initial anchor position on the appropriate chart;

Page 49: Port of Vancouver Harbour Operations Manual

January 2014 Page 49 of 89

HARBOUR OPERATIONS MANUAL

b) Conducts position fixing by ranges and bearings to monitor anchor dragging and

uses radar and GPS alarm rings only as an additional warning tool;

c) Monitor weather conditions in case they change appreciably;

d) Check the anchor chain regularly;

e) Monitor reports of the local Vessel Traffic Services;

f) Immediately call the Master and take appropriate action if anchor starts dragging

or safety margins are otherwise compromised.

4.5.3.3 Adverse Weather Conditions

22) A Wind Warning Advisory will be broadcast on CH12 by Vancouver Traffic to all vessels

at anchor in Vancouver Harbour when winds from any direction reach or exceed 25 knots.

The Wind Warning Advisory will be cancelled when winds have abated below 25 knots for

over one hour.

23) When a wind warning advisory is in effect for ships at anchor, a continuous navigational

and engineering watch as when under way must be maintained by all ships at anchor.

24) Be prepared to take early and effective action including: letting out more chain, use of

engines to maintain position and calling for a pilot if repositioning of the vessel is required.

4.5.3.4 PMV Anchorages

South English Bay

Anchorage Latitude ° ’

Longitude ° ’ ” Max LOA Depth at

centre of

anchorage

Minimum

depth within

anchorage

area

Notes

1 49 17 57 N 123 14 19 W 400 60 48 Cape size

capable

2 49 17 33 N 123 13 53 W 260 37 14

3 49 18 04 N 123 13 33 W 400 45 37

4 49 17 39 N 123 13 11 W 260 37 28

5 49 17 15 N 123 12 42 W 230 21 12

Page 50: Port of Vancouver Harbour Operations Manual

January 2014 Page 50 of 89

HARBOUR OPERATIONS MANUAL

Anchorage Latitude ° ’

Longitude ° ’ ” Max LOA Depth at

centre of

anchorage

Minimum

depth within

anchorage

area

Notes

6 49 18 12 N 123 12 48 W 400 40 30 Cape size

capable

7 49 17 47 N 123 12 25 W 260 27 23

8 49 17 22 N 123 11 59 W 230 19 16

9 49 16 56 N 123 11 33 W 190 12.3 10

10 49 18 19 N 123 12 03 W 400 30 24 Cape size

capable

11 49 17 54 N 123 11 38 W 260 25 19

12 49 17 29 N 123 11 14 W 230 18 14

13 49 17 05 N 123 10 49 W 190 11.8 10

14 49 18 25 N 123 11 19 W 400 24 21 Cape size

capable

15 49 18 01 N 123 10 53 W 260 19 17

U 49 17 45 N 123 15 13 W 400 47 28 Short term

only

Z 49 17 09 N 123 10 00 W 100 10.3 9

North English Bay

Anchorage Latitude Longitude Max LOA Depth at

centre of

anchorage

Minimum

depth within

anchorage

area

Notes

16 49 19 57 N 123 13 08 W 260 40 20

17 49 19 56 N 123 13 54 W 260 52 32

Page 51: Port of Vancouver Harbour Operations Manual

January 2014 Page 51 of 89

HARBOUR OPERATIONS MANUAL

Anchorage Latitude Longitude Max LOA Depth at

centre of

anchorage

Minimum

depth within

anchorage

area

Notes

18 49 19 55 N 123 14 39 W 260 55 32

Inner Harbour

Anchorage Latitude Longitude Max LOA Depth at

centre of

anchorage

Minimum

depth within

anchorage

area

Notes

A 49 18 11 N 123 05 26 W 300 35 24

B 49 18 06 N 123 04 46 W 260 23 19.4

C 49 18 01 N 123 04 11 W 260 21 16.2

D 49 17 39 N 123 05 03 W 300 35 29.8

E 49 17 44 N 123 03 55 W 230 16 15.7

X 49 18 17 N 123 06 05 W 185 20 17

Y 49 18 01 N 123 03 35 W 260 16 14.8 Short term

only; pilot to

remain

onboard

W 49 17 43 N 123 05 54 W 300 55 30 Short term

only; pilot to

remain

onboard

Page 52: Port of Vancouver Harbour Operations Manual

January 2014 Page 52 of 89

HARBOUR OPERATIONS MANUAL

Indian Arm

Anchorage Latitude Longitude Max

LOA

Depth at

centre of

anchorage

Minimum

depth within

anchorage

area

Notes

K 49 17 51 N 122 56 52 W 260 30 23.5

L 49 17 55 N 122 56 07 W 260 18 15.7

M 49 18 23N 122 56 17W 260 26 19.9 Use only if no

other suitable

anchorages

are available

N 49 17 39 N 122 58 04 W 260 15.6 15.3 Outbound

vessels

waiting for

transit window

Roberts Bank

Anchorage Latitude Longitude Max

LOA

Depth at

centre of

anchorage

Minimum

depth within

anchorage

area

Notes

R 49 00 46 N 123 12 14 W 320 70 58 Short term

only; pilot to

remain

onboard

Sand Heads

Anchorage Latitude Longitude Max

LOA

Depth at

centre of

anchorage

Minimum

depth within

anchorage

area

Notes

S 49 07 45 N 123 18 29 W 320 70 55 Short term

only; pilot to

remain

onboard

Page 53: Port of Vancouver Harbour Operations Manual

January 2014 Page 53 of 89

HARBOUR OPERATIONS MANUAL

4.6 Berthing

4.6.1 General

Vancouver Fraser Port Authority manages the conduct of vessels berthing in the Port.

4.6.2 Overhang

Any vessel requiring overhanging a berth should contact the Harbour Master’s Office prior to

berthing or shifting. The Harbour Master’s office will require that the vessel:

Will not obstruct the passage of any other vessel.

Properly illuminates the overhang from sunset to sunrise

Does not, with regard to the prevailing weather conditions, tide or current pose a

potential danger to the port.

Does not impact on adjacent berths or facilities.

When assessing a request for a vessel to overhang, the interests of the terminal operator

must be considered. However, for overhangs in excess of 20% of the vessels length

additional requirements may be imposed on the vessel, including the use of tugs, and

additional mooring lines.

4.6.3 Shifting Along the Berth

Any vessel requiring to shift along a berth must inform the Harbour Master’s Office. Vessels

may shift without a Pilot providing:

Approval is received from the Harbour Master’s Office.

No tugs are to be employed

The berth is free from encumbrances (i.e. cranes, gangways, etc. are moved clear)

The Master is on the bridge in overall charge.

Main engines are on standby and ready for immediate use.

Linesmen are employed.

There are two head/stern lines and one spring each end under tension at all times.

Page 54: Port of Vancouver Harbour Operations Manual

January 2014 Page 54 of 89

HARBOUR OPERATIONS MANUAL

Vancouver Marine Communications and Traffic Services Centre (MCTS) is notified at

the commencement of any shift and also at its completion using CH. 12 or 74 VHF

depending on the positioning of the vessel.

CH 12 or 74 VHF is monitored throughout the shift.

For vessels berthed at Vancouver Wharves or Lynnterm, the maximum distance a vessel

may shift without a pilot is 30 meters.

In certain circumstances due to weather conditions, tide, current, distance of shift,

characteristics of vessel or where main engines are to be utilized, the Harbour Master may

require tugs and/or a pilot to be used. However, nothing in these procedures relieves the

master of the vessel from his obligations for safety, following additional precautions as

would be required by the normal practice of seamen or from employing a pilot and tug(s) if

he so requires. These procedures are to be considered the minimum requirements for

shifting.

4.6.4 Emergency Towing Lines

In the event of a fire or other emergency, it may be necessary to take a vessel off the

berth.

Vessels berthed in the Port shall rig a tow line at both bow and stern, securely fastened on

deck by one end and hanging over the offshore side of the vessel with an eye in the other

end positioned not more than 1 metre above the waterline.

Towlines for tankers are mandatory and they must be made of steel.

4.6.5 Immobilizing Main Engines or engaging propulsion

systems alongside

No vessel shall immobilize its main engines whilst alongside or engage/test its propulsion

systems and machinery whilst alongside without the approval of the Harbour Master’s

Office. The Harbour Master’s Office will consider:

The prevailing weather conditions, tide or current.

The type of berth and cargo operations.

The length of time the engines are expected to be immobilized or the machinery is to

be tested.

The characteristics of the vessel.

If approval is given, then the vessel will be required to:

Page 55: Port of Vancouver Harbour Operations Manual

January 2014 Page 55 of 89

HARBOUR OPERATIONS MANUAL

Provide a continuous vigilant deck watch.

Advise Vancouver Marine Communications and Traffic Services Centre (MCTS) at the

commencement and completion of the immobilization or machinery testing.

Provide continuous monitoring of VHF channel 12 in Burrard Inlet, VHF channel 74 in

the Fraser River or VHF channel 11 in Deltaport/Roberts Bank.

Ensure emergency towing lines are properly rigged. (See Section 5.4)

Provide a minimum of 4 head/stern lines and two springs each end, under even

tension. A vessel engaging/testing its propulsion systems and machinery requires

additional head and stern mooring lines to be deployed.

Note: In some circumstances a tug may be required to stand by the vessel. A tug must

stand by a vessel that requires immobilizing its engines whilst at anchor.

Nothing in these procedures relieves the Master of the vessel from his obligations for safety

or from following additional precautions as would be required by the normal practice of

seamen. These procedures are to be considered the minimum requirements.

4.6.6 Berthing of Non-Cruise vessel at Canada Place

The following marine conditions apply to this berth arrangement:

1) The opening and closing of hatch covers should be kept to a minimum and can only

take place between the hours of 0800 – 1800.

2) Any activity that creates excessive noise for building tenants may be prohibited,

particularly after 1800 hours.

3) Every effort is to be made to minimize funnel emissions in order to avoid intakes into

the building air conditioning system.

4) No maintenance or repair activities are to take place without specific approval by the

Harbour Master Office.

Additional security measures will be required to berth at Canada Place. The Harbour Master

will provide detailed requirements following the assessment your request.

4.6.7 Berthing Large Vessels at Dry-dock Pier

The Harbour Master Office will approve the berthing if usual mooring practices are met, and

in addition:

1) Port side to, bow south

Page 56: Port of Vancouver Harbour Operations Manual

January 2014 Page 56 of 89

HARBOUR OPERATIONS MANUAL

At least three lines from the port forward should lead to the dry dock to be

within 100 degrees of right angles to the centre line of the ship.

Bow not to project more than 18.3 metres (60 ft.) south of the extreme seaward

end of the dock.

Starboard anchor down.

2) Starboard side to, bow north

Stern not to project more than 12.2 metres (40 ft.) south of the extreme

seaward end of the dry dock. At least three aft breast lines to be led from the

shoulder to the dry dock, within 100 of right angles to the centre line of the ship.

If these conditions are met there will not be a requirement for a stand-by tug.

4.7 Air Emissions

The Authority is committed to reducing port-related air emissions that contribute to air

quality and climate change, including those from ocean going vessels (“OGVs”).

The VFPA takes a multi-pronged approach to reducing OGV emissions:

Prohibition of excessive exhaust opacity of any color with the exception of steam

(water vapor)

Recognition for vessels that implement eligible emission reduction measures

through:

reduced harbour due rates (air emissions standards)

public relations and communications

The VFPA responds to excessive exhaust opacity from OGVs by contacting and/or boarding

the vessel to inform the operators of the problem and to discuss resolutions.

Additional information on Port Harbour dues air emission standards (gold, silver, bronze)

can be found in the VFPA Fee Detail Document at:

www.portmetrovancouver.com

Air emission standard applications (“Applications”) must be submitted online through:

www.pacificgatewayportal.com

Page 57: Port of Vancouver Harbour Operations Manual

January 2014 Page 57 of 89

HARBOUR OPERATIONS MANUAL

If you have any questions or comments regarding the Air emission standards, please

contact the Harbour Master’s office at (604) 665-9086 or via E-mail at

[email protected]

4.8 Vessel Service Request

The following vessel service requests:

Hot work request

Engine Immobilization

Cargo Hold Inspections

Bunker Notification

Lifeboat Servicing

Shift without a pilot

Must be requested electronically through PGP .To be able to access the service you must

register at: http://www.pacificgatewayportal.com/pgpsite/appnon/registration/intro.aspx

For more information contact Harbour Master’s office at (604) 665-9086

Section 5: Cargo Operations

5.1 General – Dangerous Goods

Dangerous Goods are substances to which regulations made under the Canada Shipping Act

or The Transportation of Dangerous Goods Act apply. Dangerous Goods that are to be

loaded, unloaded or remain on board the vessel (including barges) within the Port, are to be

in compliance with the above acts.

5.2 Movement of Dangerous Goods

The Harbour Master requires pre-notification of the movement of dangerous goods into the

port’s areas. A minimum of 24 hours advance notification is required for all dangerous

goods cargoes entering port waters or the port area (PMV).

Page 58: Port of Vancouver Harbour Operations Manual

January 2014 Page 58 of 89

HARBOUR OPERATIONS MANUAL

5.3 Containerized Dangerous Goods

Applications for containerized goods authorization are submitted and processed online at the

Pacific Gateway Portal (PGP) website: www.pacificgatewayportal.com. Notification and

authorization also applies to Cargo In-Transit (FROB), retained on board.

5.4 Time and Quantity Limitations – IMDG Class 1 & 7

Time and quantity limitations apply to containerized explosive and radioactive cargoes,

respectively IMDG Class 1.

Quantity limitations for Class 1 vary by terminal. See matrix below:

Download the Class 1 Net Explosive Quantity Limits for Port Metro Vancouver Terminals

If handling explosives, both the Terminal and Transport Canada – Compliance Enforcement

and Cargo Services (604-666-3636) are to be notified of the Operator’s plan prior to

proceeding.

In addition to these notifications, the operator must receive advance authorization to

proceed from the Authority. Authorization to proceed may be obtained by phoning the

Harbour Master’s office at (604) 665-9086 or email:

[email protected]

The Authority will not grant such authorization until the Harbour Master’s office has received

Transport Canada’s verbal or written confirmation of prior notification of the shipment and

of the vessel’s compliance with both Transport Canada and the terminals requirements.

On dock storage of such shipments (Class 1 and Class 7) is not permitted but is restricted to

immediate loading onto a vessel or removal by inland carrier as the case may be. Transport

Canada must be advised of all shipments prior to arriving or departing the Port of

Vancouver.

For Class 1 & 7, declarations and ERAP’s (if applicable) are to be sent to the Harbour

Master, and Transport Canada Marine Safety’s Office prior to the permit being approved.

5.5 Notification of the Loading or Unloading of Explosives or

Ammonium Nitrate

This section applies to UN0222, UN0223, UN1942, UN2067, UN 2068, UN2069, UN2070

AND UN2426.

At least 24 hours before 25 tonnes or more of explosives, other than explosives included in

Class 1.4S, or 150 tonnes or more of ammonium nitrate, are to be loaded on or unloaded

from a ship, the consignor of the dangerous goods or the consignor’s agent must notify the

following of the intended loading or unloading and the place where the loading or unloading

will take place:

Page 59: Port of Vancouver Harbour Operations Manual

January 2014 Page 59 of 89

HARBOUR OPERATIONS MANUAL

(a) The Marine Safety Office of Transport Canada nearest to the place

where the explosives or the ammonium nitrate is to be loaded or

unloaded; and

(b) The Harbour Master at the port where the explosives or the

ammonium nitrate is to be loaded or unloaded or, if there is no

Harbour Master, the person responsible for the port.

5.6 Ship/Shore Safety Check-List

5.6.1 Application

1) The approved ISGOTT Ship/Shore Safety Check-List must be used in the transfer of

Bulk Liquid cargoes from marine facility to vessel (ship-to-shore), the Practices and

Procedures (P&P) outlined herein apply to all Vessels, Terminals and Operators within

Port Metro Vancouver (PMV’s) area of jurisdiction;

2) These procedures are developed to enhance safe transfer operations within PMV

harbour areas. Representatives from the ship (Responsible Officer) and terminal

(Terminal Representative) must complete the Ship/Shore Safety Check-List prior to the

start of transfer operations, the purpose of such will:

Establish and follow written standard operating practice for routine and non-routine

activities;

Provide for adequate supervision during transfer operations;

Provide continuous supervision of the marine transfer operation, monitor and log

pertinent data.

3) All parties involved in the planning, delivering and/or receiving of liquid bulk products,

must be fully aware of the requirements of this section as well as of any additional

requirements issued and enforced by specific terminal operators;

4) These requirements are designed to be used as complementary to other existing safety

controls and regulations that govern shipping safety and in no way supersede or make

such controls and regulations irrelevant.

5) The Ship/Shore Safety Check-List comprises four parts:

Part ‘A’ – Bulk Liquids, Physical Checks;

Part ‘B’ – Bulk Liquids, Verbal Verification;

Part ‘C’ – Bulk Liquid Chemicals;

Page 60: Port of Vancouver Harbour Operations Manual

January 2014 Page 60 of 89

HARBOUR OPERATIONS MANUAL

Part ‘D’ – Bulk Liquefied Gases.

6) Parts ‘A’ and ‘B’ shall be applicable to all Vessels and Terminals engaged in the transfer

of Bulk Liquids.

7) Parts ‘C’ and ‘D’ shall only be applicable to those Vessels and Terminals engaged in the

transfer of Bulk Liquid Chemicals and/or Bulk Liquefied Gases.

5.6.2 General Requirements

1) All transfer operations must be carried out in accordance with the latest edition of

ISGOTT and the additional requirements provided in these Practices and Procedures.

2) The Master of every vessel engaged in transfer operations shall appoint an officer to be

used during all aspects of the transfer operations who is fluent in English. English is the

language to be used during all aspects of the transfer operation.

3) The Ship/Shore Safety Check-List must be kept on file for at least one year.

5.6.3 Definitions

ISGOTT: International Safety Guide for Oil Tankers and Terminals, latest edition.

Responsible Officer (or Person): A person appointed by the Company or the Master of the

ship and empowered to take all decisions relating to a specific task, and having the

necessary knowledge and experience for that purpose.

Tank Cleaning: The process of removing hydrocarbon vapours, liquid or residue from tanks.

Usually carried out so that tanks can be entered for inspection, Hot Work or to avoid

contamination between grades.

Tanker: A ship designed to carry liquid cargo in bulk, including a combination carrier when

being used for this purpose.

Terminal: A place where tankers are berthed or moored for the purpose of loading or

discharging liquid cargoes.

Terminal Representative: A person designated by the terminal to take responsibility for an

operation or duty.

Cargo Transfer: The transfer of cargo liquid and/or vapour to or from the ship.

Page 61: Port of Vancouver Harbour Operations Manual

January 2014 Page 61 of 89

HARBOUR OPERATIONS MANUAL

5.6.4 The Ship/Shore Check-List

For the complete version of ISGOTT’s Ship/Shore Safety Check-List, see Appendix A of this

manual.

Section 6: Non-Deep Sea Traffic

6.1 Commercial Fishing

6.1.1 General

Commercial vessel traffic and Fishers must be aware of the dangers posed by each others’

activities during fishery openings on the Fraser River, as unsafe and dangerous situations

can occur when commercial traffic attempts to maneuver around nets.

6.1.2 Communications

Fishers are to monitor VHF channel 74. During Area 29 (Fraser River) gillnet openings; all

commercial traffic movements are broadcast on this channel, providing warning to Fishers

of ship movements along the Fraser River.

6.1.3 Commercial Navigation Considerations

Vessels are to stay in the proper upriver or downriver designated channel. Operators of all

vessels are to take early and substantial action to keep well clear of all other vessels and

gear.

Vessels should not to alter course, as generally Fishers will judge by the speed of the

vessels and through broadcasts when to lift the net. Altering course may cause additional

hazards.

Any person using a gill net to fish in the North Arm of the Fraser River shall, upon being

notified by four (4) long whistle blasts from an approaching vessel or ship, haul in the net to

allow passage of the approaching vessel or ship.

When navigating in the vicinity of New Westminster Harbour, vessels are to navigate so as

to keep to the side of the main channel that lies on the port side of the vessel.

Fully extended gillnets are up to 200 fathoms (375 metres) long and supported on the

surface by small floats that may not be readily visible. During the day a plastic float

(Scotchman) is at the end of the net and at night the end of the net is marked by a white

Page 62: Port of Vancouver Harbour Operations Manual

January 2014 Page 62 of 89

HARBOUR OPERATIONS MANUAL

light. When approaching, vessels are to reduce speed until the floats are observed, or the

Operator signals by hand or with a spotlight at night, indicating the direction in which the

net is set.

The correct navigation lights or shapes are to be displayed at all times.

6.1.4 Fishing Vessel Considerations

When setting near swing bridges, Operators are to monitor VHF channel 74 for valuable

information on traffic intending to transit the bridge and be watchful for a bridge opening as

this indicates the approach of a larger vessel. Do not make a set that interferes with the

vessel’s transit of the bridge.

Fishing vessels are to work with a partner vessel that can render assistance if needed.

Fishers on a drift are to set their nets in the same direction, whenever possible, to permit

safe passage of other traffic.

In order to avoid impacting another vessel, and to reduce the possibility of serious injury,

loss of life, or damage to the vessel, vessels unable to manoeuvre quickly are to provide

whistle signals in accordance with the Collision Regulations and remain on course.

If collision with another vessel is imminent, Fishers are to either run the net out, so the net

sustains the damage, or “dog” the drum and attempt to tow the net out of danger, thus

reducing the possibility of loss of life or damage to the vessel.

At night, when approached by other vessels, Fishers are to use a searchlight to show the

direction of the net in the water, ensuring the searchlight does not blind the Operator of the

approaching vessel. Towboats are also to use searchlights, whenever possible, to show their

preferred direction of travel in order to help Fishers decide when and how far to move

6.2 Log Operations

6.2.1 Log Loading in the Fraser River

6.2.1.1 Permit Application

1) Log loading is permitted in Timberland Basin and at Fraser Surrey Docks upon

receipt of a permit from the Authority.

2) A Contractor wishing to load logs must complete an Application for Log Loading

Permit. The Application can be obtained by contacting the Harbour Master’s office

(telephone number) or downloading from (website) and faxed to the Harbour

Page 63: Port of Vancouver Harbour Operations Manual

January 2014 Page 63 of 89

HARBOUR OPERATIONS MANUAL

Master’s office (fax number) or electronically completed and e-mailed to (e-mail

address). The following information is required:

a) Name of company responsible for log loading;

b) Anticipated load date; and

c) hip/barge name.

3) Once approval has been granted, the Harbour Master’s office will fax or email the

permit back to the applicant.

6.2.1.2 Pre-Loading Requirements

A Notice to Shipping (Notship) is to be requested through the Canadian Coast Guard

Information Centre (fax: 604-666-8453; e-mail: [email protected]; phone: 604-666-

6012), forty-eight (48) hours in advance of the commencement of loading activity to ensure

that pilots and other users of Timberland basin are well informed of the proposed activities.

Notships should include the following information:

a) Start and end dates;

b) Loading berth;

c) Vessel name;

d) Standby channel; and

e) Contact information.

6.2.1.3 Storage

1) Logs for export are not to be positioned at Fraser Surrey Docks more than seven

days in advance of loading.

2) A Log Storage Manager will assign the area for storage.

3) The Contractor is responsible for control of the logs during the log loading activity.

6.2.1.4 Loading

1) It is the Contractor’s responsibility to ensure that all logs for export are located in

the assigned area and that booms remain intact during maneuvering for purpose of

loading.

2) When active loading or preparation is under way, the Contractor’s assist boats are to

monitor VHF channel 08 and respond promptly to clear channel.

Page 64: Port of Vancouver Harbour Operations Manual

January 2014 Page 64 of 89

HARBOUR OPERATIONS MANUAL

3) When placing logs alongside a ship, the Contractor is to ensure they are contained

within the structure of a boom. Loose logs and/or bundles are prohibited as they

endanger navigational safety and the environment within Timberland Basin.

4) The Contractor is to ensure only one (1) boom width is moored alongside the vessel

at any one time.

5) The Contractor is to ensure booms are not tied to training works, navigation aids, or

ladders.

6) Booms may only be tied to bollards on the dock face temporarily. To facilitate use of

dock bollards, the Contractor may hang wire straps from the bollard over the edge of

the dock.

7) The Contractor is not to release any logs, wires, or floating debris from the log

booms or bags.

8) The Contractor is responsible for the disposal of all debris generated by the

operation.

6.2.1.5 Completion

1) On completion of log loading, the Contractor is to complete the Remittance Report

section of the Log Loading Permit and fax the Authority at (fax number) or e-mail (e-

mail address). The following information is required:

a) Load site;

b) Load date; and

c) Quantity (Scribner).

2) The Authority will then issue an invoice in the amount of the current Scribner charge,

as detailed in the Authority’s Schedule of Port Fees, to generate funds to cover the

costs of cleaning up any chains, wires, or logs lost during the loading process. The

Schedule can be obtained by contacting the Authority (telephone number) or

downloaded from (website).

3) In the event a vessel or structure sustains damage or delay that can be attributed to

the log loading activity, the Contractor is responsible for the related costs of

resolving the problem.

Page 65: Port of Vancouver Harbour Operations Manual

January 2014 Page 65 of 89

HARBOUR OPERATIONS MANUAL

6.2.2 North Arm Log Transit and Scow Mooring Grounds

6.2.2.1 General

1) The Authority may determine the applicable period of temporary mooring for booms,

scows and barges, from time to time.

2) No ship shall, for the purposes of salvaging logs, enter the log transit grounds, the

Point Grey Log Storage Grounds or the scow mooring grounds.

3) The Authority may move a ship located in the log transit grounds or the scow

mooring grounds for more than seventy-two (72) hours to any other place in the

Port at the risk and expense of the owner of the ship.

4) All owners or persons in charge of any boom or floating property entering the North

Arm of the Fraser River must provide the Authority with all such information

regarding the boom or floating property prior to arrival or as soon thereafter as is

practical.

6.2.2.2 Scow Mooring Grounds

1) In order to promote safe and efficient navigation in the waters of the North Arm of

the Fraser River, the scow mooring grounds shall only be used for the temporary

moorage of scows and barges which are in transit through the Port.

6.2.2.3 Log Transit Grounds

1) In order to promote the safe and efficient navigation of the North Arm of the Fraser

River, the log transit grounds shall only be used for the temporary storage of booms

that are in transit through the Port.

2) No boom moored in the log transit grounds shall exceed:

a) When fronting mooring dolphins 1A to 71, inclusive, in the North Arm Jetty

log transit grounds, three (3) boom sections in width;

b) When fronting mooring dolphins 72 to 88, inclusive, in the North Arm Jetty

log transit grounds, four (4) boom sections in width;

c) When fronting mooring dolphins 1 to 9, inclusive, in the Sea Island (Sheeting)

log transit grounds, two (2) boom sections in width; and

d) Booms moored at dolphins 1 thru 88, inclusive, in the North Arm Jetty log

transit grounds longer than 72 hours will be charged a fee as detailed in the

(fee schedule) for each 24 hour period

Page 66: Port of Vancouver Harbour Operations Manual

January 2014 Page 66 of 89

HARBOUR OPERATIONS MANUAL

3) In order to promote the safe and efficient navigation of the North Arm of the Fraser

River, all ships using the log transit grounds must adhere to the following

procedures:

a) All available dolphin wires must be utilized when securing booms;

b) Tween ties (belly ties) must be made every four to six sections;

c) In the event a boom does not fit between dolphins, it must be moved into a

position which will enable tow ties and prevent the boom swinging onto the

beach area; and

d) When unusual circumstances make it necessary to temporarily moor a boom

that will exceed the limit of width for the area concerned, the vessel in charge

shall stand by its tow while so moored and immediately notify the Harbour

Master’s office.

6.2.3 Log Procedures in Burrard Inlet

6.2.3.1 Log Procedures in Burrard Inlet

The following procedures are to be followed for the storage, handling and movement of logs

within the Burrard Inlet area of the Port:

1) Up to 80 sections of logs may be stored at the Navy Buoys. Logs in excess of that

quantity must be stored at other log storage locations, including Chief George’s

Buoy. Tugs delivering logs to Burrard Inlet must notify MCTS “Vancouver Traffic” of

the number of sections being delivered and the intended storage site. MCTS will

provide the tug with the current number of sections stored at the Navy Buoys. If the

number of sections at the buoy, plus the intended delivery, exceeds 80 sections then

the delivering tug must make alternate arrangements and shall notify MCTS of their

intentions.

2) Harbour tugs shall inform MCTS of the number of sections being moved to/from the

Navy Buoys. When sections are removed from the Navy Buoys it is the responsibility

of the harbour tug removing those sections to ensure that the remaining sections are

properly re-secured.

3) MCTS shall maintain a running inventory tally of the number of sections at the Navy

Buoys. Burrard Towing, Seaspan and the Authority marine patrol staff shall visually

inventory the number of sections on a regular basis and shall report that number to

MCTS.

4) Tugs handling sections or boomsticks at Campbell Avenue shall maintain clear access

to either the Authority’s spoil ground or the Authority’s Campbell Ave Floats at all

times.

Page 67: Port of Vancouver Harbour Operations Manual

January 2014 Page 67 of 89

HARBOUR OPERATIONS MANUAL

5) Vessels requesting a minimum wash for log handling shall pass that request to

MCTS.

6) Boomsticks stored at the Navy Buoys must be properly secured at all times.

6.2.4 Suspension of Log Salvage Operations

In the event of a spill of logs or an escape of booms, the Authority may, by order in writing

suspend log salvage activities by any ship in any area of the Port for a period of up to ten

(10) days during which time the owner or his authorized agent shall recover the spilled logs

or escaped booms.

During such period and within such areas as determined by the Authority, no person in

charge of any ship, other than the owner of the logs or booms or his authorized agent, shall

attempt to recover the spilled logs or escaped booms.

6.3 Recreational Vessels - Anchoring

6.3.1 Derelict, Abandoned, Illegally Moored or Anchored

Vessels and Ships

6.3.1.1 Definitions

Vessel is any boat, watercraft, and barge, airboat, other than a seaplane on the water,

used or capable of being used as a means of transportation on water

Derelict Vessel means any vessel that is left, stored or abandoned within the Authority’s

Navigable Waters in a wrecked, junked, or substantially dismantled condition. Any vessels

left, sunk or moored or anchored at any location within the Authority’s Navigable Waters

without consent of the Authority and vessels left docked or grounded upon a property

without the property owner’s or the Authority’s consent are also derelict vessels for the

purposes of this definition. Note that this definition of derelict vessel may even include a

vessel with an owner on board or a vessel that is in a seaworthy condition.

6.3.1.2 Application

The Authority has management and control of the Port, which may include the

establishment of places of moorage within the port.

No vessel shall, except in an emergency, moor or anchor without approval and then only at

such place and in such manner as directed.

Where the owner or person in charge of a vessel in a harbour is not available or refuses or

neglects to obey any order to move the vessel, the Harbour Master’s Office may, at the risk

and expense of the owner of the vessel:

take possession of and move the vessel;

Page 68: Port of Vancouver Harbour Operations Manual

January 2014 Page 68 of 89

HARBOUR OPERATIONS MANUAL

use any means and force reasonably necessary to move the vessel;

order tugs to move the vessel; and

berth, anchor, moor the vessel at any place satisfactory to the Authority.

Remove the vessel out the water and store it at any place satisfactory to the Authority.

6.3.1.3 Anchoring in Fraser River

6.3.1.3.1 General

There are no permanent designated anchorages within Fraser River Port. Anchoring is only

at the discretion and authorization of the Harbour Master. Anchoring within Steveston

Harbour is strictly prohibited (see No Anchoring Zone map below)

Should a vessel need to anchor within the bounds of the Port, the operator is to notify the

Harbour Master’s office (phone: 604.665.9086) of the mitigating circumstances, as well as

the location and the duration of the anchorage, to ensure the safety of the vessel and other

Port users.

The Harbour Master’s office may not agree to the proposed anchorage and may direct the

vessel to another location.

6.3.1.3.2 Anchoring in Sites Authorized by the Harbour Master’s Office

Vessels moored or anchored at authorized locations are not to raft more than three vessels

wide for either the purpose of moorage or the transferring of fish or other cargo.

While mooring or anchoring, vessels are to move as far off the navigable channel as is safe

and practical. Vessel Masters are responsible for ensuring their vessels are anchored in

sufficient water to ensure safety at all stages of the tide and in all weather conditions.

Anchored vessels are to display the appropriate day and night signals.

Page 69: Port of Vancouver Harbour Operations Manual

January 2014 Page 69 of 89

HARBOUR OPERATIONS MANUAL

Figure 1: MAP of the NO ANCHORAGE ZONE STEVESTON HARBOUR

6.4 Small Craft

6.4.1 Small Craft

Including those under oars should keep well clear of all commercial vessels underway and

not impede their passage. In addition, a vessel at anchor or berthed at a terminal may be

expected to move without warning and a safe distance should be maintained. Particular

attention must be paid to navigation in the high activity areas, i.e. Approaches to Coal

Harbour, First Narrows, Second Narrows and Aircraft Operations Zones.

6.4.2 Reporting

Marine accidents, collisions, groundings, navigational hazards, deadheads, oil or similar

pollution incidents should be reported at the first opportunity to Vancouver Marine

Communications and Traffic Services Centre (MCTS).

6.4.2.1 Narrows

Tide and wind conditions may cause turbulent seas in both Narrows. Caution should be

exercised. Only adequately powered craft may pass through either Narrows. No craft under

sail or oars may transit either Narrows. One sail sheeted home is allowed for stability when

Page 70: Port of Vancouver Harbour Operations Manual

January 2014 Page 70 of 89

HARBOUR OPERATIONS MANUAL

under power in First/Second Narrows. Otherwise sails should be lowered in the non-sailing

areas indicated on the chart.

6.4.3 Harbour Master

All marine activities within the Port are under the jurisdiction of the Harbour Master.

Permission must be obtained at least 48 hours in advance of holding any organized aquatic

event such as a regatta, sail/power boat races, trials, etc. Please see 7.1 Marine Event.

6.4.4 Personal Watercraft

6.4.4.1 Definition

Personal Watercraft means a vessel of less than 5 metres in length which uses a motor

powering a water jet pump, as its primary sources of power and which is designed to be

operated by a person sitting, standing or kneeling on or being towed behind the vessel,

rather than in the conventional manner of sitting or standing inside the vessel.

6.4.4.2 Procedures

A personal watercraft is a boat and the Rules, Regulations, Laws and Traditions of Safe

Boating legally bind you.

No person shall operate a personal watercraft in any area of the Harbour of Vancouver at

night. Sunrise and Sunset are defined as the times published daily in the newspapers The

Province and The Vancouver Sun.

Any person operating a personal watercraft shall have attached to his person, clothing, or

personal flotation device, a lanyard-type engine cut-off switch.

No person shall operate a personal watercraft:

In the area between a line drawn from Ferguson Point 000 degrees True North to the

North Shore as the Western limit and a line drawn from Berry Point, 000 degrees

True North to the North Shore as the Eastern limit;

In a Traffic Separation Zone;

At a speed of more than 5 knots;

within 300 metres of a swimming area;

within 300 metres of a launch ramp; or

within 300 metres of a vessel at anchor.

Page 71: Port of Vancouver Harbour Operations Manual

January 2014 Page 71 of 89

HARBOUR OPERATIONS MANUAL

Notwithstanding the above, use of personal watercraft in exhibitions, parades and other

similar marine events will be allowed if the organizers of such an event have the written

permission of the Authority for the use of personal watercraft. Such permission may only be

granted after the Authority receives a written request giving a full description of the

intended use and details of the event and organizers.

Any person operating a personal watercraft must operate the vessel in a safe and prudent

manner, having regard for other waterborne traffic, posted speed and wake restrictions, and

all other attendant circumstances so as not to endanger the life, limbs or property of any

person.

6.4.5 Tugs

No vessel shall attempt to pass between a tug and its tow, nor close astern of the tow since

many have a trailing floating line.

6.4.6 Aircraft

Aircraft on the water must comply with the Rules for Preventing Collisions at Sea. An

aircraft traffic control tower is in operation at Granville Square to provide service to aircraft

using the Burrard Inlet inner harbour and the Fraser River. The Aircraft Operations Zones

marked on the chart are areas of high activity and operators of small craft are required to

keep clear.

6.4.7 Fueling

Refueling of gasoline-powered vessels shall only be done at recognized fuelling stations with

adherence to all posted safety procedures.

6.4.8 Speed Limits

Within False Creek, Bedwell Bay, Belcarra Bay, Deep Cove, Strathcona Park and Coal

Harbour – a maximum speed of five knots is enforced.

Safe Speed

Every vessel shall at all times proceed at a safe speed so that she can take proper and

effective action to avoid collision and be stopped within a distance appropriate to the

prevailing circumstances and conditions.

Page 72: Port of Vancouver Harbour Operations Manual

January 2014 Page 72 of 89

HARBOUR OPERATIONS MANUAL

6.4.9 Restricting Navigation

The Authority may, from time to time, issue restrictions with respect to movement, location

and speed of vessels or ships in order to maintain the safety of marine users and

navigation.

The Authority may, where it considers it necessary, prohibit vessel or ship movements in

any or all areas of the harbour for periods of time. This is particularly likely in periods of

high water during freshet in the Fraser River.

Where a vessel or ship, including floating property, represents a danger, the Authority may

order the owner or person in charge of the vessel or ship to remove that vessel or ship from

the harbour or prohibit that vessel or ship from entering the harbour.

The owner or person in charge of a vessel or ship shall comply with any restriction or

prohibition made by the Authority, failing which the Authority may take corrective action as

is necessary to remedy the situation at the risk and expense of the owner of the vessel or

ship.

6.4.10 Navigating in Patullo Bridge Area

Any vessel navigating the Fraser River between the quick flashing green light located on the

downstream end of the Annieville pile wall and the quick flashing green light located on the

Sapperton Dyke is to keep to the side of the channel that lies to the port side of the vessel.

6.4.11 Vessel Constrained by Draught – Fraser River

At the time of transiting the Fraser River’s deep-sea shipping channel, or portion thereof, all

vessels constrained by their draught and whose voyage has been set up for the inner

shipping channel by the Pacific Pilotage Authority, may exhibit where they can best be seen,

three (3) all-round red lights in a vertical line at night or a cylinder during the day in

addition to the lights prescribed for power-driven vessels of its characteristics.

Page 73: Port of Vancouver Harbour Operations Manual

January 2014 Page 73 of 89

HARBOUR OPERATIONS MANUAL

Section 7: Special Events

7.1 Marine Events

7.1.1 Holding a Marine Event in the Port

7.1.1.1 Statement

This Standing Order governs events held within the Port and is designed to facilitate the

safe and orderly conduct of events.

For the purpose of this Standing Order a marine event includes but is not limited to the

following:

Yacht or boat race hang gliding or parascending

Water ski or personal water craft Demonstration

Swim meet or race Any sporting or

Sail past Recreational event

Sub-aqua meet Media productions

7.1.1.2 Procedures

The following procedures will be used for all marine events held within the Port including

events held on property owned or administered by the Authority.

No person shall conduct or participate in a yacht or boat race or other aquatic sport, or in

any other activity that is liable to interfere with navigation or operations in a harbour,

except with written permission of the Authority, which permission may be either general or

specific as to place and time.

The Authority shall incur no liability in respect of any injury or loss of life or loss of or

damage to property resulting from any activity conducted on land or water managed, owner

or administered by the Authority regardless whether or not the Authority has given

permission for such activity.

Persons wishing to hold an event in the Port shall apply for and complete an “Application to

hold a Marine Event in the Port” form. The form must be completed electronically on PGP.

To be able to access the service you must register at:

Page 74: Port of Vancouver Harbour Operations Manual

January 2014 Page 74 of 89

HARBOUR OPERATIONS MANUAL

http://www.pacificgatewayportal.com/pgpsite/appnon/registration/intro.aspx. For more

information contact Harbour Master’s office at (604) 665-9086.

The completed form shall be forwarded to the Harbour Master for approval. Allow 5 working

days for the application to be processed.

Organizers shall obtain the approval in writing of the Authority prior to the event.

If approval is given, the organizers shall abide by any requirements listed on the approved

application form.

In all cases, the Authority will require that the organizers obtain Comprehensive General

Liability insurance in an amount and coverage acceptable to the Authority. The Authority is

to be named as co-insured.

7.2 Other Activities

The Authority or the Harbour Master’s office must authorize the following activities:

Conducting salvage operations

Excavating or removing material

Transhipping, loading, or unloading cargo outside of designated areas

Placing or operating a light or day marker

Placing, altering, removing, relocating or damage caused to an aid to navigation,

buoy, float, marker or sign.

Depositing or removing landfill or other material

Causing an explosion, blasting or fireworks.

Any persons wishing to conduct any such activity must contact the Authority for

authorization to proceed prior to commencement of the activity.

7.2.1 Diving Operations

All persons wishing to perform recreational or commercial diving in the Port must attain

permission from the Harbour Master’s Office. The only exception to this will be diving within

the boundaries of dedicated Dive Sites. (I.e. the shores of Cates Park and Twin Islands).

Page 75: Port of Vancouver Harbour Operations Manual

January 2014 Page 75 of 89

HARBOUR OPERATIONS MANUAL

The Harbour Master’s Office may veto proposed diving operations where these conflict with

the safe operations of the Port.

Appropriate buoys, flags and lights shall properly identify the dive site.

7.2.2 Military Vessels

Where possible no ship or vessel, including any pleasure yacht, vessel of a non-commercial

activity, shall come within 100 metres of any military ship or vessel, whether Canadian or

foreign, while moving in the Port.

Section 8: Emergencies

8.1 General

If a situation causes or is likely to cause death, bodily injury or any other emergency

situation in a port damages or is likely to damage property or the environment, every

person directly involved in the situation and, in the case of an activity conducted under a

contract, lease, license or authorization, the person authorized to conduct the activity shall

1) without delay, notify the Harbour Master’s office at (604) 665-9086 or via E-mail at

[email protected] that there is an emergency situation;

2) submit a detailed report of the emergency situation to the Harbour Master’s office as

soon as possible after it begins; and

3) at the request of the Harbour Master’s office, submit with the report to the Authority

a copy of each report of the emergency situation that the person makes to

municipal, provincial and federal authorities.

8.2 Incidents / Accidents/ Pollution

A person who does anything in a port that results in an incident involving material loss or

damage or an explosion, fire, accident, grounding, stranding or incident of pollution shall

submit a detailed written report of the incident to the Harbour Master’s office at (604) 665-

9086 or via E-mail at [email protected]

8.3 Fire Protection

Every person in the Port shall follow the fire protection and prevention measures necessary

for the safety of persons and property in the Port.

Page 76: Port of Vancouver Harbour Operations Manual

January 2014 Page 76 of 89

HARBOUR OPERATIONS MANUAL

Section 9: Security

The International Maritime Organization (IMO) adopted the International Ship and Port

Facility Security Code (ISPS Code) in December 2002, which meant that all IMO contracting

governments, including Canada, were required to have adopted this Code and have

necessary regulations in place by July 1, 2004. This was done successfully in Canada

through the Marine Transportation Security Regulations, which brought into effect both the

mandatory ISPS Code Part A requirements as well as the majority voluntary Part B

requirements.

The Vancouver Fraser Port Master Security Plan outlines the security polices for compliance

within the VFPA jurisdiction. Each facility has a terminal specific approved security plan

outlining their requirements for compliance with regulation.

9.1 Security Requirement for Vessels Entering the Port

Vessels entering the Port must declare their MARSEC level to MCTS 96 hours prior to arrival.

Security incidents must be immediately reported to the Port Security Officer and the

Terminal Operator.

9.2 Port Security Officer

Yoss Leclerc, Director of Operations and Security and Harbour Master is the Port Security

Officer. The Port Security Officer can be contacted through the Harbour Masters Office at

604.665.9086.

9.3 Declaration of Security

The purpose of a Declaration of Security (DoS) is to ensure agreement is reached between

the vessel and the port facility, or with other vessels with which it interfaces, in relation to

security measures each must adopt according to the provisions of these security plans.

The Marine Facility Security Officer is responsible for ensuring a Declaration of Security is

completed when a vessel is in port and interfaces with this facility.

9.3.1 Declaration of Security Requirements

The marine facility interfaces with a vessel and if there is an imbalance in security levels

between the marine facility and the vessel, or;

The Vessel Security Officer or the Marine Facility Security Officer deems it necessary for

specific security reasons, or;

Page 77: Port of Vancouver Harbour Operations Manual

January 2014 Page 77 of 89

HARBOUR OPERATIONS MANUAL

There are specific activities identified with an interface (i.e., the movement of hazardous

goods, dangerous cargo, etc.) which pose a higher than normal risk to persons, property or

the environment, or;

If there is a change to the security level, for the vessel or the marine facility, while the

vessel is in port a new or revised Declaration of Security is required, or;

There has been a definite security threat or a security incident involving the vessel or

involving the marine facility, or;

Transport Canada declares it must be so.

9.3.2 Declaration of Security Completion

The DOS must be signed and dated by the Marine Facility Security Officer and the Vessel

Security Officer or the Master, and must include the duration, relevant security level and the

contact details once completed.

The Marine Facility Security Officer must implement a continuing Declaration of Security for

a vessel, or offshore facility, with which the marine facility frequently interfaces for the

period of:

90 days for MARSEC Level 1; and

30 days for MARSEC Level 2. ISPS part A s. 5.6. (contracting government)

If you have any questions regarding this requirement please contact the Harbour Master.

Page 78: Port of Vancouver Harbour Operations Manual

January 2014 Page 78 of 89

HARBOUR OPERATIONS MANUAL

Figure 2:D.O.S Decision Flow Chart

Page 79: Port of Vancouver Harbour Operations Manual

January 2014 Page 79 of 89

HARBOUR OPERATIONS MANUAL

Section 10: Miscellaneous

10.1 Bollards

10.1.1 Centerm

The only berth that may be used for bollard pushing/pulling is Centerm berth number 3.

The only bollards on Centerm 3 that may be used for pulling on are the five at the centre of

the berth (i.e. the three most easterly ones). The three most westerly ones are not to be

used. The central ones, which can be used, will be painted white, allowing for easier

identification. These bollards are rated at 50 tonnes and must not be subjected to forces

that exceed this limit.

Vessels may push on the berth face but only underneath one of the bollards described

previously, i.e. the ones that will be painted white. There is no maximum limit to the thrust

that can be exerted on the berth face while pushing. However, the Authority requires that it

be restricted to the minimum time necessary and if possible to an hour or so either side of

high water.

10.1.2 Deltaport

The use of the southernmost bollard to warp vessels on No.2 berth is restricted as follows:

a) no more than 3” diameter mooring ropes are used to the bollard, and

b) that the displacement of the vessel does not exceed 175 tonnes at the time of

warping.

10.2 Vessel Constrained by their Draught

At the time of transiting the Fraser River’s deep sea channel, or portion thereof, all vessels

constrained by their draught (as defined under Rule 3(h) of the Collision Regulations under

the Canada Shipping Act) and whose voyage has been set up for the inner shipping channel

by the Pacific Pilotage Authority, may exhibit where they can best be seen, three (3) all-

round red lights in a vertical line at night or a cylinder during the day in addition to the

lights prescribed for power-driven vessels of its characteristics.

10.3 Automatic Identification System (AIS)

Every vessel equipped with an Automatic Identification System shall maintain AIS in

operation at all times within VFPA’s jurisdiction except where International or national

agreements, rules or standards provide for the protection of navigational information; in

Page 80: Port of Vancouver Harbour Operations Manual

January 2014 Page 80 of 89

HARBOUR OPERATIONS MANUAL

that case, the master or its representative shall report this action and the reason for doing

so to the Harbour Master’s office at (604) 665-9086 or via E-mail at

[email protected]

10.4 Gangways

10.4.1 Cruise Gangway Terminal Procedures

Vessels are to remain securely made fast to the dock at all times the gangways are

attached. No singling up for departure is to take place unless properly trained personnel are

attending the gangway ready to disengage from the vessel.

Prior to the vessel moving off the berth, or making a close approach to the berth, the

gangways are to be stowed as follows:

a) Canada Place - gangways SAB’s and CAB’s folded, and gangway stowed

against the building;

b) Centerm - no part of the gangways to be closer than 20 feet to the dock face.

Prior to singling up, the vessel must release any safety lines or nets that may have been

attached to the SAB.

10.4.2 Other Terminal Gangway Procedures

Vessels are to remain securely made fast to the dock at all time the gangways are attached.

The gangways must be fastening safely and securely at all time in order to avoid any

incident or damage to person or property.

10.4.3 Gangways During Bunkering Operations (Vessel to

Vessel)

The use of a proper gangway between vessels is required during bunkering operations. The

gangway must be safely and securely fasten at all time.

10.5 Ship’s Garbage

Ship’s garbage must be retained on board in suitable containers with properly fitted covers.

Garbage removal services are available and must be used to prevent more than a minimum

of accumulation of garbage on board prior to sailing.

Garbage, dunnage and scrap materials must not be dumped in Canadian Territorial Waters.

Page 81: Port of Vancouver Harbour Operations Manual

January 2014 Page 81 of 89

HARBOUR OPERATIONS MANUAL

10.6 Procurement of Services

Where the Authority requires that a vessel or operation obtain the services of tugs, pilots,

agencies, or other services, those services will be procured at the expense and risk of the

vessel or operation.

10.7 Lifeboat Exercises and Ferrying

10.7.1 Lifeboat Exercises

The Harbour Master’s Office is aware of the various national requirements for the exercising

of lifeboats at designated intervals and will accommodate all such activities.

Prior to conducting Lifeboat Exercises the vessel must advise the Harbour Master’s Office

through MCTS of their intentions including start and finish time.

If Lifeboats are lowered into the water, cast off from the falls and exercise under oars or

power, they may do so provided that they remain within 50m of their vessel. Vessels at

Canada Place are to ensure their lifeboats remain well clear of seabus lanes and seaplane

landing areas.

10.7.2 Ferrying

The preferred practice is to use locally procured water taxis. If ships boats are used to ferry

crew to and from ships anchored in English Bay they must only land and embark persons at

‘E’ float in the fisheries Terminal on the south shore of False Creek east of Burrard Street

Bridge. This is the only a Canada Customs (CBSA) approved landing place. Only vessels

anchored in English Bay may use their own boats for ferrying.

Ship’s crews must not land at private marinas or the Kitsilano Coast Guard Base.

Ship’s boat engines must be fitted with an efficient muffler silencer system that complies

with recognized noise control standards.

Page 82: Port of Vancouver Harbour Operations Manual

January 2014 Page 82 of 89

HARBOUR OPERATIONS MANUAL

Annex A: The Ship/Shore Safety Check-List

Ship’s Name

Berth Port

Date of Arrival Time of Arrival

Page 83: Port of Vancouver Harbour Operations Manual

January 2014 Page 83 of 89

HARBOUR OPERATIONS MANUAL

Page 84: Port of Vancouver Harbour Operations Manual

January 2014 Page 84 of 89

HARBOUR OPERATIONS MANUAL

Page 85: Port of Vancouver Harbour Operations Manual

January 2014 Page 85 of 89

HARBOUR OPERATIONS MANUAL

Page 86: Port of Vancouver Harbour Operations Manual

January 2014 Page 86 of 89

HARBOUR OPERATIONS MANUAL

Page 87: Port of Vancouver Harbour Operations Manual

January 2014 Page 87 of 89

HARBOUR OPERATIONS MANUAL

Page 88: Port of Vancouver Harbour Operations Manual

January 2014 Page 88 of 89

HARBOUR OPERATIONS MANUAL

Page 89: Port of Vancouver Harbour Operations Manual

January 2014 Page 89 of 89

HARBOUR OPERATIONS MANUAL

The Ship/Shore Safety Check-List is reproduced by kind permission of authors of ISGOTT (International Safety Guide for Oil Tankers and Terminals) - ICS, OCIMF and IAPH