port of vancouver | - c:usersmbellamydesktoptemp ......furnace temperature organic matter % 4.2 n/a...
TRANSCRIPT
-
WESTRIDGE MARINE TERMINAL OFFSHORE GEOTECHNICAL INVESTIGATIONS - GEOTECHNICAL FACTUAL REPORT
APPENDIX E-8Organic Content Tests – 2015
23 December 2016Report No. 1403337-023-R-Rev0
-
Project No.:Project: Sample:Location: Depth (m):Client: Lab ID No:Method:Oven TemperatureFurnace Temperature
Organic Matter % 5.0 N/A
UCS Description CLAYEY SILT, trace shells, grey, w > PL, soft
Average Organic Matter % 5.3
1 2
Ash Content % 95.0 N/A
DATE
SJ July 25, 2016 LH August 5, 2016
TESTED BY DATE CHECKED BY
Moisture, Ash, and Organic Matter of Peat and Other Organic Soils ReferenceASTM D2974-131403337/13000 Borehole: BH15-17
* The test data given herein pertain to the sample provided only. This report constitutes a testing service only. Interpretationof the data can be provided upon request.
Westridge Marine Terminal 2
Burnaby, BC 12.19 - 12.80
Trans Mountain Pipeline L.P. 152Other Remarks:Method C
110±5°C440±40°C
(W% as percent of oven dried mass)
78.1Moisture Content %
Trial #
Golder Associates Ltd. - Burnaby Lab#300 - 3811 North Fraser WayBurnaby, B.C. Canada V5J 5J2
-
Project No.:
Project: Sample:
Location: Depth (m):
Client: Lab ID No:Method:Oven TemperatureFurnace Temperature
* The test data given herein pertain to the sample provided only. This report constitutes a testing service only. Interpretation of the data can be provided upon request.
Westridge Marine Terminal 3
Burnaby, BC 18.46 - 19.07
Trans Mountain Pipeline L.P. 152Other Remarks:Method C
110±5°C440±40°C
(W% as percent of oven dried mass)
47.1Moisture Content %
Trial #
Moisture, Ash, and Organic Matter of Peat and Other Organic SoilsReference
ASTM D2974-131403337/13000 Test Pit: BH15-17B
DATE
SJ August 8, 2016 LH August 12, 2016
TESTED BY DATE CHECKED BY
1 0
Ash Content % 97.2 N/A
Organic Matter % 2.8 N/A
UCS Description SILTY CLAY, dark grey, w > PL, firm
Average Organic Matter % 2.8
Golder Associates Ltd. - Burnaby Lab#300 - 3811 North Fraser WayBurnaby, B.C. Canada V5J 5J2
-
Project No.:Project: Sample:Location: Depth (m):Client: Lab ID No:Method:Oven TemperatureFurnace Temperature
* The test data given herein pertain to the sample provided only. This report constitutes a testing service only. Interpretationof the data can be provided upon request.
Westridge Marine Terminal 4
Burnaby, BC 24.28-24.89
Trans Mountain Pipeline L.P. 152Other Remarks:Method C
110±5°C440±40°C
(W% as percent of oven dried mass)
49.0Moisture Content %
Trial #
Moisture, Ash, and Organic Matter of Peat and Other Organic Soils ReferenceASTM D2974-131403337/13000 Borehole: BH15-17B
DATE
SJ August 2, 2016 LH August 5, 2016
TESTED BY DATE CHECKED BY
1 2
Ash Content % 97.6 97.7
Organic Matter % 2.4 2.3
UCS Description SILTY CLAY, some shells, trace organics, grey, w>PL, soft to firm.
Average Organic Matter % 2.4
Golder Associates Ltd. - Burnaby Lab#300 - 3811 North Fraser WayBurnaby, B.C. Canada V5J 5J2
-
Project No.:Project: Sample:Location: Depth (m):Client: Lab ID No:Method:Oven TemperatureFurnace Temperature
Organic Matter % 4.1 N/A
UCS Description CLAYEY SILT, trace shells, grey, w > PL, soft to firm
Average Organic Matter % 5.3
1 2
Ash Content % 95.9 N/A
DATE
SJ July 19, 2016 LH August 5, 2016
TESTED BY DATE CHECKED BY
Moisture, Ash, and Organic Matter of Peat and Other Organic Soils ReferenceASTM D2974-131403337/13000 Borehole: BH15-17B
* The test data given herein pertain to the sample provided only. This report constitutes a testing service only. Interpretationof the data can be provided upon request.
Westridge Marine Terminal 5
Burnaby, BC 30.68 - 31.29
Trans Mountain Pipeline L.P. 152Other Remarks:Method C
110±5°C440±40°C
(W% as percent of oven dried mass)
51.9Moisture Content %
Trial #
Golder Associates Ltd. - Burnaby Lab#300 - 3811 North Fraser WayBurnaby, B.C. Canada V5J 5J2
-
Project No.:Project: Sample:Location: Depth (m):Client: Lab ID No:Method:Oven TemperatureFurnace Temperature
* The test data given herein pertain to the sample provided only. This report constitutes a testing service only. Interpretationof the data can be provided upon request.
Westridge Marine Terminal 6
Burnaby, BC 35.07 - 35.69
Trans Mountain Pipeline L.P. 152Other Remarks:Method C
110±5°C440±40°C
(W% as percent of oven dried mass)
48.3Moisture Content %
Trial #
Moisture, Ash, and Organic Matter of Peat and Other Organic Soils ReferenceASTM D2974-131403337/13000 Test Pit: BH15-17B
DATE
SJ July 11, 2016 LH August 5, 2016
TESTED BY DATE CHECKED BY
1 2
Ash Content % 98.8 N/A
Organic Matter % 1.2 N/A
UCS Description SILTY CLAY, trace shells,dark grey, w > PL, firm
Average Organic Matter % 5.3
Golder Associates Ltd. - Burnaby Lab#300 - 3811 North Fraser WayBurnaby, B.C. Canada V5J 5J2
-
Project No.:Project: Sample:Location: Depth (m):Client: Lab ID No:Method:Oven TemperatureFurnace Temperature
Organic Matter % 4.2 N/A
UCS Description SILTY CLAY, dark grey, w > PL, firm
Average Organic Matter % 5.3
1 2
Ash Content % 95.8 N/A
DATE
SJ July 11, 2016 LH August 5, 2016
TESTED BY DATE CHECKED BY
Moisture, Ash, and Organic Matter of Peat and Other Organic Soils ReferenceASTM D2974-131403337/13000 Test Pit: BH15-17B
* The test data given herein pertain to the sample provided only. This report constitutes a testing service only. Interpretationof the data can be provided upon request.
Westridge Marine Terminal 7
Burnaby, BC 41.05 - 41.66
Trans Mountain Pipeline L.P. 152Other Remarks:Method C
110±5°C440±40°C
(W% as percent of oven dried mass)
57.0Moisture Content %
Trial #
Golder Associates Ltd. - Burnaby Lab#300 - 3811 North Fraser WayBurnaby, B.C. Canada V5J 5J2
-
WESTRIDGE MARINE TERMINAL OFFSHORE GEOTECHNICAL INVESTIGATIONS - GEOTECHNICAL FACTUAL REPORT
APPENDIX FSpecialized Laboratory Testing Results
23 December 2016Report No. 1403337-023-R-Rev0
-
WESTRIDGE MARINE TERMINAL OFFSHORE GEOTECHNICAL INVESTIGATIONS - GEOTECHNICAL FACTUAL REPORT
APPENDIX F-1One-dimensional (1-D) Consolidation Tests - 2014
23 December 2016Report No. 1403337-023-R-Rev0
-
Project No.:
Project: Westridge Marine Terminal - Offshore Geotechnical Investigation
Location: Burnaby, BC
Client: Trans Mountain Pipeline L.P.
Saturation (%):
Plasticity Index:Plastic Limit:Liquid Limit:
MH-OH323668
Sample Type:
SILTY CLAY; trace shell fragments, brown, moist.
Trimmed
Visual Description:
Special RemarksValues of coefficient of consolidation and hydraulic conductivity are computed for loading stages generating positive excess pore water pressures
Specific Gravity of Solids (-): 2.7 2.7
Unit Weight (kN/m³): 14.70 17.47Dry Unit Weight (kN/m³): 8.21 12.13
Strain After Seating (%):
5.0
1600Reload to (kPa):
Loading Rate (%/hr):Ru at end of Loading (-): -2.2
50Unload to (kPa):96 100Void Ratio (-): 2.228
Test ConditionsInitial load to (kPa):
Axial DCDT:Load Cell No.:Station No.:Machine:
Back Pressure (kPa):
2.89685.7
20Seating Load (kPa):
TM/MM September 8, 2014 MS October 1, 2014
TESTED BY DATE CHECKED BY DATE
Classification:
LP-908682884Diameter (mm):
Equipment
2Sigma-1Initial Final
Specimen Characteristics
14.9522.10Height (mm):63.47
0
3
6.71 - 7.32
289
One Dimensional Consolidation Test Using Controlled Strain Loading ReferenceASTM D4186/D4186M-12
BH14-03
Lab ID No:
Depth (m):
Sample No.:
Borehole No.:1403337 Phase: 3000
63.47
Area (cm²): 31.64 31.64Volume (cm³): 69.92 47.30Wet Weight (g): 104.79 84.23
1.184
Solids Weight (g): 58.49 58.49Water Content (%): 79.16 44.01
Height of solids (mm): 6.847 6.847
0.80
1.05
1.30
1.55
1.80
2.05
2.30
1 10 100 1000 10000Average Vertical Effective Stress, 'v (kPa)
Loading 1
Loading 2
Golder Associates Ltd. - Burnaby LabUnit 300 3811 North Fraser WayBurnaby, B.C. Canada V5J 5J2
-
Project No.:
Project: Sample No.:
Location: Depth (m):
Client: Lab ID No:
One Dimensional Consolidation Test Using Controlled Strain Loading ReferenceASTM D4186/D4186M-121403337 Phase: 3000 Borehole No.: BH14-03
Summary of Consolidation Results
Westridge Marine Terminal - Offshore Geotechnical Investigation 3
Burnaby, BC 6.71 - 7.32
Trans Mountain Pipeline L.P. 289
DATE
TM/MM September 8, 2014 MS October 1, 2014
TESTED BY DATE CHECKED BY
1.0E05
1.0E04
1.0E03
1.0E02
1.0E01
1.0E+00
1.0E+01
1 10 100 1000 10000Average Vertical Effective Stress, 'v (kPa)
Loading 1
Loading 2
3.00
2.50
2.00
1.50
1.00
0.50
0.00
0.50
1.00
1 10 100 1000 10000Average Vertical Effective Stress, 'v (kPa)
1.0E09
1.0E08
1.0E07
1.0E06
1.0E05
1.0E04
1.0E03
0.80 1.05 1.30 1.55 1.80 2.05 2.30
Void Ratio, e
Golder Associates Ltd. - Burnaby LabUnit 300 3811 North Fraser WayBurnaby, B.C. Canada V5J 5J2
-
Project No.:
Project: Westridge Marine Terminal - Offshore Geotechnical Investigation
Location: Burnaby, BC
Client: Trans Mountain Pipeline L.P.
Saturation (%):
Plasticity Index:Plastic Limit:Liquid Limit:
ML183149
Sample Type:
SILTY CLAY; trace shell fragments, brown, moist.
Trimmed
Visual Description:
Special RemarksValues of coefficient of consolidation and hydraulic conductivity are computed for loading stages generating positive excess pore water pressures
Specific Gravity of Solids (-): 2.74 2.74
Unit Weight (kN/m³): 15.69 17.53Dry Unit Weight (kN/m³): 10.02 12.64
Strain After Seating (%):
5.0
1600Reload to (kPa):
Loading Rate (%/hr):Ru at end of Loading (-): -0.5
50Unload to (kPa):92 94Void Ratio (-): 1.684
Test ConditionsInitial load to (kPa):
Axial DCDT:Load Cell No.:Station No.:Machine:
Back Pressure (kPa):
11.99686.8
500Seating Load (kPa):
TM/MM September 8, 2014 MS October 1, 2014
TESTED BY DATE CHECKED BY DATE
Classification:
LP-909685728Diameter (mm):
Equipment
2Sigma-1Initial Final
Specimen Characteristics
17.7822.43Height (mm):63.50
0
6
27.43 - 28.04
289
One Dimensional Consolidation Test Using Controlled Strain Loading ReferenceASTM D4186/D4186M-12
BH14-03
Lab ID No:
Depth (m):
Sample No.:
Borehole No.:1403337 Phase: 3000
63.50
Area (cm²): 31.67 31.67Volume (cm³): 71.03 56.29Wet Weight (g): 113.57 100.58
1.127
Solids Weight (g): 72.52 72.52Water Content (%): 56.61 38.69
Height of solids (mm): 8.357 8.357
Golder Associates Ltd. - Burnaby LabUnit 300 3811 North Fraser WayBurnaby, B.C. Canada V5J 5J2
0.55
0.80
1.05
1.30
1.55
1 10 100 1000 10000Average Vertical Effective Stress, 'v (kPa)
Loading 1
Loading 2
-
Project No.:
Project: Sample No.:
Location: Depth (m):
Client: Lab ID No:
One Dimensional Consolidation Test Using Controlled Strain Loading ReferenceASTM D4186/D4186M-121403337 Phase: 3000 Borehole No.: BH14-03
Summary of Consolidation Results
Westridge Marine Terminal - Offshore Geotechnical Investigation 6
Burnaby, BC 27.43 - 28.04
Trans Mountain Pipeline L.P. 289
DATE
TM/MM September 8, 2014 MS October 1, 2014
TESTED BY DATE CHECKED BY
Golder Associates Ltd. - Burnaby LabUnit 300 3811 North Fraser WayBurnaby, B.C. Canada V5J 5J2
1.0E04
1.0E03
1.0E02
1.0E01
1.0E+00
10 100 1000 10000Average Vertical Effective Stress, 'v (kPa)
Loading 1
Loading 2
0.80
0.60
0.40
0.20
0.00
0.20
0.40
10 100 1000 10000Average Vertical Effective Stress, 'v (kPa)
1.0E11
1.0E10
1.0E09
1.0E08
1.0E07
1.0E06
1.0E05
1.0E04
1.0E03
0.55 0.80 1.05 1.30 1.55
Void Ratio, e
-
Golder Associates Ltd. - Burnaby Laboratory
Unit 300 - 3811 North Fraser Way
Burnaby, B.C. Canada V5J 5J2
Project No. : Client : Borehole: BH14-11Sch No. Project : Sample:Lab Work: Location: Depth (m) : 2.60 - 2.63
#DIV/0!
Advanced to 15kPa due to swelling.
April 26, 2016 May 20, 2016
TESTED BY DATE CHECKED BY DATE
MM DL/MS
Reference(s)One-Dimensional Consolidation Properties of Soils
1403337/13000152MM
ASTM D 2435/D 2435M-11Trans Mountain Pipeline L.P.Westridge Marine TerminalBurnaby, BC
2
1.000
1.100
1.200
1.300
1.400
1.500
1.600
1 10 100 1000 10000
Vertical Stress - kPa
Vold Ratio vs Stress
1.00E-04
1.00E-03
1.00E-02
1.00E-01
1.00E+00
1 10 100 1000 10000
Average Vertical Stress - kPa
Coefficient of Consolidation vs Stress
1.00E-08
1.00E-07
1.00E-06
1.00E-05
1 10 100 1000 10000
Average Vertical Stress - kPa
Coefficient of Permeability vs Stress
-
Golder Associates Ltd. - Burnaby Laboratory
Unit 300 - 3811 North Fraser Way
Burnaby, B.C. Canada V5J 5J2
Project No. : Client : Borehole: BH14-11Sch No. Project : Sample:Lab Work: Location: Depth (m) : 2.60 - 2.63
Machine: Initial Final Initial FinalMach No. Height (mm) = 22.21 16.97 115.05 99.04
Ring No. Diameter (mm) = 63.38 63.38 73.04 73.04
Drainage: Area (cm2) = 31.55 31.55 w (%) = 57.52 35.60
Volume (cm3) = 70.08 53.55 e = 1.543 0.943
wet (kg/m3) = 1642 1849
dry (kg/m3) = 1042 1364
ASTM Method: Gs = 2.65 Calculated S (%) = 99 100
Method for Cv : Hs (mm) = 8.74 Havg :
Time Increment: Liquid Limit:Plastic Limit:
N/A Plasticity Index:
Soil Classification:
t 90
(min)
1 5 0.03 22.18 0.07 13.45 1.539
2 12 0.11 22.14 0.26 13.41 1.535 8 1.54 11.08 1.24 1.4E-02 3.6E-07
3 24 0.16 22.02 0.83 13.28 1.520 18 1.53 11.04 1.01 1.7E-02 8.1E-07
4 48 0.34 21.71 2.19 12.98 1.485 36 1.50 10.93 1.65 1.0E-02 5.8E-07
5 96 0.67 21.09 5.01 12.35 1.414 72 1.45 10.70 2.02 8.0E-03 4.8E-07
6 192 0.80 20.36 8.30 11.62 1.330 144 1.37 10.36 1.81 8.4E-03 3.0E-07
7 383 0.46 19.97 10.07 11.23 1.285 287 1.31 10.08 1.43 1.0E-02 1.0E-07
8 766 0.79 19.29 13.11 10.55 1.208 575 1.25 9.81 1.52 8.9E-03 7.9E-08
9 1532 1.31 18.10 18.46 9.37 1.072 1149 1.14 9.35 0.89 1.4E-02 1.1E-07
10 766 -0.17 18.19 18.05 9.46 1.082
11 192 -0.27 18.34 17.36 9.61 1.100
12 48 -0.30 18.55 16.44 9.81 1.123
13 12 -0.40 18.94 14.70 10.20 1.168
Comments: Void Ratio Vs. Stress computed for end of primary consolidation. Final height calculated to 100% saturation.
Description: CLAYEY SILT; trace organics, brown, w > PL, soft to firm.
eavg
Burnaby, BC
MH
Remarks Sample Properties
Equipment
Stn1
Phase Relationships
Estimated Preconsolidation Stress:
Specimen GeometrySigma-1
4 Wet Wt (g) =
35
B - Constant Time Increment @ EOP
Taylor
Dry Wt (g) =
Double-sided
Atterberg Limits
53
Cv (cm2/sec)
Havg (mm)
k (cm/sec)
18
Half the specimen height
Stress avg (kPa)
H (mm)
360 min / 600 min
Stress (kPa)
Corrected d f
(mm)
H-Hs (mm)
One-Dimensional Consolidation Properties of Soils Reference(s)ASTM D 2435/D 2435M-11Trans Mountain Pipeline L.P.Westridge Marine Terminal
1403337/13000152MM
2
May 20, 2016
TESTED BY DATE CHECKED BY DATE
Load #
MM April 26, 2016
e(H-Hs)/Hs
DL/MS
-
Project No.:Project: Westridge Marine TerminalLocation: Burnaby, BCClient: Trans Mountain Pipeline L.P.
Saturation (%):
2655
Sample Type:
SILTY CLAY; some sand, greenish grey, moist, soft to firm.
Trimmed
Visual Description:
Special RemarksValues of coefficient of consolidation and hydraulic conductivity are computed for loading stages generating positive excess pore water pressures
Specific Gravity of Solids (-): 2.71 2.71
Unit Weight (kN/m³): 15.54 18.38Dry Unit Weight (kN/m³): 9.43 13.60
Strain After Seating (%):
2.0 - 5.0
N/AReload to (kPa):
Loading Rate (%/hr):Ru at end of Loading (-): -0.4
50Unload to (kPa):97 100Void Ratio (-): 1.816
Test ConditionsInitial load to (kPa):
Axial DCDT:Load Cell No.:Station No.:Machine:
Back Pressure (kPa):0.11
685.8
8.0Seating Load (kPa):
TM/MM/CS April 27, 2016 MS May 20, 2016
TESTED BY DATE CHECKED BY DATE
Classification:
LP-908682284Diameter (mm):
Equipment
1Sigma-1Initial Final
Specimen Characteristics
15.4922.35Height (mm):63.58
1600
One Dimensional Consolidation Test Using Controlled Strain Loading ReferenceASTM D4186/D4186M-12
63.58Area (cm²): 31.75 31.75Volume (cm³): 70.96 49.18
3
6.12 - 6.15
152
BH14-11
Lab ID No:Depth (m):Sample No.:Borehole No.:1403337 Phase: 3000
Plasticity Index:Plastic Limit:Liquid Limit:
CH29
Wet Weight (g): 112.39 92.16
0.952
Solids Weight (g): 68.29 68.29Water Content (%): 64.75 35.13
Height of solids (mm): 7.938 7.938
Golder Associates Ltd. - Burnaby Lab#300 3811 North FraserwayBurnaby, B.C. Canada V5J 5J2
0.80
1.00
1.20
1.40
1.60
1.80
2.00
1 10 100 1000 10000Average Vertical Effective Stress, 'v (kPa)
-
Project No.:Project: Sample No.:Location: Depth (m):Client: Lab ID No:
1403337 Phase: 3000 Borehole No.: BH14-11
One Dimensional Consolidation Test Using Controlled Strain Loading ReferenceASTM D4186/D4186M-12
Summary of Consolidation Results
Westridge Marine Terminal 3
Burnaby, BC 6.12 - 6.15
Trans Mountain Pipeline L.P. 152
DATE
TM/MM/CS April 27, 2016 MS May 20, 2016
TESTED BY DATE CHECKED BY
Golder Associates Ltd. - Burnaby Lab#300 3811 North FraserwayBurnaby, B.C. Canada V5J 5J2
1.0E 05
1.0E 04
1.0E 03
1.0E 02
1.0E 01
1.0E+00
1 10 100 1000 10000Average Vertical Effective Stress, 'v (kPa)
0.60
0.40
0.20
0.00
0.20
0.40
1 10 100 1000 10000Average Vertical Effective Stress, 'v (kPa)
1.0E 09
1.0E 08
1.0E 07
1.0E 06
1.0E 05
1.0E 04
0.50 0.75 1.00 1.25 1.50 1.75 2.00Void Ratio, e
-
Golder Associates Ltd. - Burnaby Laboratory
Unit 300 - 3811 North Fraser Way
Burnaby, B.C. Canada V5J 5J2
Project No. : Client : Borehole: BH14-11Sch No. Project : Sample:Lab Work: Location: Depth (m) : 9.62 - 9.65
Advanced to 15kPa due to swelling.
Reference(s)One-Dimensional Consolidation Properties of Soils
1403337/13000152MM/CS
ASTM D 2435/D 2435M-11Trans Mountain Pipeline L.P.Westridge Marine TerminalBurnaby, BC
4
April 26, 2016 May 20, 2016
TESTED BY DATE CHECKED BY DATE
MM/CS DL/MS
1.100
1.200
1.300
1.400
1.500
1.600
1.700
1 10 100 1000 10000
Vertical Stress - kPa
Vold Ratio vs Stress
1.00E-04
1.00E-03
1.00E-02
1.00E-01
1 10 100 1000 10000
Average Vertical Stress - kPa
Coefficient of Consolidation vs Stress
1.00E-09
1.00E-08
1.00E-07
1.00E-06
1.00E-05
1 10 100 1000 10000
Average Vertical Stress - kPa
Coefficient of Permeability vs Stress
-
Golder Associates Ltd. - Burnaby Laboratory
Unit 300 - 3811 North Fraser Way
Burnaby, B.C. Canada V5J 5J2
Project No. : Client : Borehole: BH14-11Sch No. Project : Sample:Lab Work: Location: Depth (m) : 9.62 - 9.65
Machine: Initial Final Initial FinalMach No. Height (mm) = 21.95 16.39 112.81 96.03
Ring No. Diameter (mm) = 63.42 63.42 70.47 70.47
Drainage: Area (cm2) = 31.58 31.58 w (%) = 60.08 36.27
Volume (cm3) = 69.32 51.76 e = 1.646 0.976
wet (kg/m3) = 1627 1855
dry (kg/m3) = 1017 1361
ASTM Method: Gs = 2.69 Calculated S (%) = 98 100
Method for Cv : Hs (mm) = 8.29 Havg :
Time Increment: Liquid Limit:Plastic Limit:
N/A Plasticity Index:
Soil Classification:
t 90
(min)
1 5 0.12 21.82 0.55 13.53 1.631
2 12 0.12 21.72 1.03 13.43 1.619
3 24 0.15 21.59 1.63 13.29 1.603 18 1.61 10.83 1.85 8.9E-03 4.5E-07
4 48 0.23 21.37 2.61 13.08 1.577 36 1.59 10.74 2.49 6.6E-03 2.7E-07
5 96 0.60 20.82 5.14 12.52 1.510 72 1.54 10.55 5.17 3.0E-03 1.6E-07
6 192 0.93 19.95 9.10 11.65 1.405 144 1.46 10.19 5.20 2.8E-03 1.2E-07
7 383 0.88 19.14 12.78 10.85 1.308 287 1.36 9.77 3.32 4.1E-03 8.6E-08
8 766 0.87 18.38 16.27 10.08 1.215 575 1.26 9.38 2.34 5.3E-03 5.6E-08
9 1532 0.87 17.68 19.43 9.39 1.132 1149 1.17 9.01 2.34 4.9E-03 2.4E-08
10 766 -0.26 17.79 18.96 9.49 1.144
11 192 -0.42 18.08 17.63 9.78 1.179
12 48 -0.41 18.43 16.01 10.14 1.222
13 12 -0.33 18.75 14.55 10.46 1.261
Comments: Void Ratio Vs. Stress computed for end of primary consolidation. Final height calculated to 100% saturation.
Description: SILTY CLAY, trace shell fragments, grey, w>PL, soft.
May 20, 2016
TESTED BY DATE CHECKED BY DATE
Load #
MM/CS April 26, 2016
e(H-Hs)/Hs
DL/MS
One-Dimensional Consolidation Properties of Soils Reference(s)ASTM D 2435/D 2435M-11Trans Mountain Pipeline L.P.Westridge Marine Terminal
1403337/13000152MM/CS
4
Half the specimen height
Stress avg (kPa)
H (mm)
360 min / 600 min
Stress (kPa)
Corrected d f
(mm)
H-Hs (mm)
Dry Wt (g) =
Double-sided
Atterberg Limits
37
Cv (cm2/sec)
Havg (mm)
k (cm/sec)
15
Sigma-13 Wet Wt (g) =
22
B - Constant Time Increment @ EOP
Taylor
eavg
Burnaby, BC
CI
Remarks Sample Properties
Equipment
AC2
Phase Relationships
Estimated Preconsolidation Stress:
Specimen Geometry
-
Project No.:Project: Westridge Marine TerminalLocation: Burnaby, BCClient: Trans Mountain Pipeline L.P.
Saturation (%):0.815
Solids Weight (g): 77.45 77.45Water Content (%): 49.16 30.53
Height of solids (mm): 9.174 9.174
63.45Area (cm²): 31.62 31.62Volume (cm³): 69.63 52.65Wet Weight (g): 115.39 100.96
5
15.27 - 15.30
152
One Dimensional Consolidation Test Using Controlled Strain Loading ReferenceSTM D4186/D4186M-BH14-11
Lab ID No:Depth (m):Sample No.:Borehole No.:1403337 Phase: 3000
TM/MM/CS May 4, 2016 MS June 9, 2016
TESTED BY DATE CHECKED BY DATE
Classification:
LP-908682284Diameter (mm):
Equipment
1Sigma-1Initial Final
Specimen Characteristics
16.6522.02Height (mm):63.45
1600Test Conditions
Initial load to (kPa):
Axial DCDT:Load Cell No.:Station No.:Machine:
Back Pressure (kPa):-0.10683.9
6.0Seating Load (kPa):
Special RemarksValues of coefficient of consolidation and hydraulic conductivity are computed for loading stages generating positive excess pore water pressures. Final dimensions measured after dissembling sample
Specific Gravity of Solids (-): 2.67 2.67
Unit Weight (kN/m³): 16.26 18.81Dry Unit Weight (kN/m³): 10.90 14.41
Strain After Seating (%):
5.0 - 10.0
N/AReload to (kPa):
Loading Rate (%/hr):Ru at end of Loading (-): -1.0
50Unload to (kPa):94 100Void Ratio (-): 1.400
Plasticity Index:Plastic Limit:Liquid Limit:
CI232548
Sample Type:
SILTY CLAY; some sand, greenish grey, soft to firm.
Trimmed from intact sample
Visual Description:
Golder Associates Ltd. - Burnaby Lab#300 3811 North FraserwayBurnaby, B.C. Canada V5J 5J2
0.70
0.80
0.90
1.00
1.10
1.20
1.30
1.40
1.50
1 10 100 1000 10000Average Vertical Effective Stress, 'v (kPa)
-
Project No.:Project: Sample No.:Location: Depth (m):Client: Lab ID No:
DATE
TM/MM/CS May 4, 2016 MS June 9, 2016
TESTED BY DATE CHECKED BY
Summary of Consolidation Results
Westridge Marine Terminal 5
Burnaby, BC 15.27 - 15.30
Trans Mountain Pipeline L.P. 152
One Dimensional Consolidation Test Using Controlled Strain Loading ReferenceSTM D4186/D4186M-1403337 Phase: 3000 Borehole No.: BH14-11
Golder Associates Ltd. - Burnaby Lab#300 3811 North FraserwayBurnaby, B.C. Canada V5J 5J2
1.0E 05
1.0E 04
1.0E 03
1.0E 02
1.0E 01
1.0E+00
1.0E+01
1 10 100 1000 10000Average Vertical Effective Stress, 'v (kPa)
1.401.201.000.800.600.400.200.000.200.40
1 10 100 1000 10000Average Vertical Effective Stress, 'v (kPa)
1.0E 09
1.0E 08
1.0E 07
1.0E 06
1.0E 05
1.0E 04
1.0E 03
0.70 0.80 0.90 1.00 1.10 1.20 1.30 1.40 1.50Void Ratio, e
-
Golder Associates Ltd. - Burnaby Laboratory
Unit 300 - 3811 North Fraser Way
Burnaby, B.C. Canada V5J 5J2
Project No. : Client : Borehole: BH14-11Sch No. Project : Sample:Lab Work: Location: Depth (m) : 23.05 - 23.08
Advanced to 15kPa due to swelling.
April 26, 2016 May 20, 2016
TESTED BY DATE CHECKED BY DATE
CS DL/MS
Reference(s)One-Dimensional Consolidation Properties of Soils
1403337/13000152CS
ASTM D 2435/D 2435M-11Trans Mountain Pipeline L.P.Westridge Marine TerminalBurnaby, BC
6
1.000
1.050
1.100
1.150
1.200
1.250
1.300
1.350
1.400
1.450
1 10 100 1000 10000
Vertical Stress - kPa
Vold Ratio vs Stress
1.00E-04
1.00E-03
1.00E-02
1.00E-01
1.00E+00
1 10 100 1000 10000
Average Vertical Stress - kPa
Coefficient of Consolidation vs Stress
1.00E-09
1.00E-08
1.00E-07
1.00E-06
1.00E-05
1 10 100 1000 10000
Average Vertical Stress - kPa
Coefficient of Permeability vs Stress
-
Golder Associates Ltd. - Burnaby Laboratory
Unit 300 - 3811 North Fraser Way
Burnaby, B.C. Canada V5J 5J2
Project No. : Client : Borehole: BH14-11Sch No. Project : Sample:Lab Work: Location: Depth (m) : 23.05 - 23.08
Machine: Initial Final Initial FinalMach No. Height (mm) = 22.04 17.90 117.74 106.23
Ring No. Diameter (mm) = 63.38 63.38 78.71 78.71
Drainage: Area (cm2) = 31.54 31.54 w (%) = 49.59 34.96
Volume (cm3) = 69.52 56.45 e = 1.402 0.951
wet (kg/m3) = 1694 1882
dry (kg/m3) = 1132 1394
ASTM Method: Gs = 2.72 Calculated S (%) = 96 100
Method for Cv : Hs (mm) = 9.17 Havg :
Time Increment: Liquid Limit:Plastic Limit:
N/A Plasticity Index:
Soil Classification:
t 90
(min)
1 5 0.07 21.98 0.32 12.80 1.396
2 12 0.08 21.92 0.56 12.75 1.390
3 24 0.09 21.88 0.77 12.70 1.385 18 1.39 10.95 1.01 1.7E-02 3.0E-07
4 48 0.13 21.80 1.14 12.62 1.376 36 1.38 10.92 1.27 1.3E-02 2.0E-07
5 96 0.18 21.66 1.78 12.48 1.361 72 1.37 10.86 1.05 1.6E-02 2.1E-07
6 192 0.37 21.35 3.18 12.17 1.327 144 1.34 10.75 2.05 8.0E-03 1.2E-07
7 383 1.01 20.42 7.38 11.25 1.226 287 1.28 10.44 4.70 3.3E-03 7.4E-08
8 766 1.01 19.51 11.51 10.34 1.127 575 1.18 9.98 3.47 4.1E-03 4.7E-08
9 1532 0.96 18.75 14.97 9.57 1.044 1149 1.09 9.56 2.28 5.7E-03 2.9E-08
10 766 -0.25 18.84 14.56 9.66 1.053
11 192 -0.40 19.09 13.40 9.92 1.081
12 48 -0.43 19.45 11.77 10.28 1.120
13 12 -0.43 19.84 10.02 10.66 1.162
Comments: Void Ratio Vs. Stress computed for end of primary consolidation. Final height calculated to 100% saturation.
Description: SILTY CLAY, some shells, greyish brown, w > PL, firm to stiff.
eavg
Burnaby, BC
CI
Remarks Sample Properties
Equipment
C1
Phase Relationships
Estimated Preconsolidation Stress:
Specimen GeometrySigma-1
5 Wet Wt (g) =
22
B - Constant Time Increment @ EOP
Taylor
Dry Wt (g) =
Double-sided
Atterberg Limits
35
Cv (cm2/sec)
Havg (mm)
k (cm/sec)
13
Half the specimen height
Stress avg (kPa)
H (mm)
360 min / 600 min
Stress (kPa)
Corrected d f
(mm)
H-Hs (mm)
One-Dimensional Consolidation Properties of Soils Reference(s)ASTM D 2435/D 2435M-11Trans Mountain Pipeline L.P.Westridge Marine Terminal
1403337/13000152CS
6
May 20, 2016
TESTED BY DATE CHECKED BY DATE
Load #
CS April 26, 2016
e(H-Hs)/Hs
DL/MS
-
WESTRIDGE MARINE TERMINAL OFFSHORE GEOTECHNICAL INVESTIGATIONS - GEOTECHNICAL FACTUAL REPORT
APPENDIX F-2Laboratory Vane Shear Tests - 2014
23 December 2016Report No. 1403337-023-R-Rev0
-
O:\Active\_2014\1447\1403337 KMC Offshore Geotech Westridge\9.0 Lab Testing\9.3 Lab Testing Reports\Lab Vane\1403337 Lab vanes.xlsx
Project No.:
Project: Westridge Marine Terminal - Offshore Geotechnical Investigation
Location:
Client: Lab ID No:
* The test data given herein pertain to the sample provided only. This report constitutes a testing service only. Interpretation of the data can be provided upon request.
(kPa) (kPa) (kPa)
58.6 11.4 Large vane used on the top, and small used for the bottom.
DATE
MM/TM September 10, 2014 LP October 3, 2014
TESTED BY DATE CHECKED BY
289Trans Mountain Pipeline L.P.
3.4 Large vane
BH14-03 6 90-92 30.6 4.8
BOREHOLE
BH14-03 3 22-24 11.4 3.4 15.8
Laboratory VaneReference
ASTM D 4648-10
1403337 Phase 3000
Burnaby, BC
SAMPLE DEPTH (ft):TOP BOTTOM
REMARKSPeak Remoulded Peak Remoulded(kPa)
Golder Associates Ltd. - Burnaby Lab#300 - 3811 North Fraser WayBurnaby, B.C. Canada V5J 5J2
-
WESTRIDGE MARINE TERMINAL OFFSHORE GEOTECHNICAL INVESTIGATIONS - GEOTECHNICAL FACTUAL REPORT
APPENDIX F-3Triaxial Compression CK0U tests - 2014
23 December 2016Report No. 1403337-023-R-Rev0
-
Golder Associates Ltd - Burnaby Lab
Unit 300- 3811 North Fraser Way
Burnaby, B.C. Canada V5J 5J2
Trans Mountain Pipeline L.P. Drillhole: BH14-05
Westridge Marine Terminal - Offshore Geotechnical Investigation Sample: TP-3
Burnaby, BC Depth (m): 8.02 - 8.20
1403337 Phase 3000 Lab ID No: 109
Test
Sample
Ho (cm)
Do (cm)
Gs (calculated)
w (%)
o dry (kN/m3)
Sat. (%)
eo
BValue
CELL (kPa)
'3_final (kPa)
'1_final (kPa)
(cc)
K0_final
Hc (cm)
Dc (cm)
Ac (cm2)
Vc (cm3)
c dry (kN/m3)
ec
w (%)
Sat (%)
1'- 3' (kPa) :
f (%)
u (kPa)
3' (kPa)
' (kPa)
Initial Dimensions
15.27
31
9.10
100
100
79
1.75
-30.6
7.00
38.43
0.49
After Consolidation Dimensions
15.07
TM/MMDATE TESTED BY
March 26, 2015 MS April 16, 2015CHECKED BY DATE
10.06
579.1
60.2
1.61
7
Failure At Maximum Deviator Stress 1'- 3' :
75
67
0.96
7.13
2.68
69.6
9.56
731
39
Anisotropic Consolidation Results
Vc
Consolidated Undrained Triaxial Compression Test for SoilsReference
ASTM D4767-11
CKoU
Client:
Project:
Location:
Project No.:
-
Golder Associates Ltd - Burnaby Lab
Unit 300- 3811 North Fraser Way
Burnaby, B.C. Canada V5J 5J2
Trans Mountain Pipeline L.P. Drillhole: BH14-05
Westridge Marine Terminal - Offshore Geotechnical Investigation Sample: TP-3
Burnaby, BC Depth (m): 8.02 - 8.20
1403337 Phase 3000 Lab ID No: 109
Location:
Consolidated Undrained Triaxial Compression Test for SoilsReference
ASTM D4767-11
Client:
Project:
Project No.:
TM/MM March 26, 2015 MS April 16, 2015TESTED BY DATE CHECKED BY DATE
0
10
20
30
40
50
0 10 20 30 40 50 60 70 80 90
s'1 (kPa)
Anisotropic Consolidation
CKoU
-6.0
-5.0
-4.0
-3.0
-2.0
-1.0
0.0
0 20000 40000 60000 80000 100000
Time (min)
-
Golder Associates Ltd - Burnaby Lab
Unit 300- 3811 North Fraser Way
Burnaby, B.C. Canada V5J 5J2
Trans Mountain Pipeline L.P. Drillhole: BH14-05
Westridge Marine Terminal - Offshore Geotechnical Investigation Sample: TP-3
Burnaby, BC Depth (m): 8.02 - 8.20
1403337 Phase 3000 Lab ID No: 109
Consolidated Undrained Triaxial Compression Test for SoilsReference
ASTM D4767-11
TESTED BY DATE CHECKED BY DATE
TM/MM March 26, 2015 MS April 16, 2015
Client:
Project:
Location:
Project No.:
0
20
40
60
80
0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0
Axial Strain (%)
Deviator Stress
CKoU
0
10
20
30
40
0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0
Axial Strain (%)
-
Golder Associates Ltd - Burnaby Lab
Unit 300- 3811 North Fraser Way
Burnaby, B.C. Canada V5J 5J2
Trans Mountain Pipeline L.P. Drillhole: BH14-05
Westridge Marine Terminal - Offshore Geotechnical Investigation Sample: TP-3
Burnaby, BC Depth (m): 8.02 - 8.20
1403337 Phase 3000 Lab ID No: 109
nooo
Consolidated Undrained Triaxial Compression Test for SoilsReference
ASTM D4767-11
Project No.:
Client:
Project:
Location:
March 26, 2015CHECKED BY
MSTM/MM April 16, 2015DATE DATETESTED BY
0
10
20
30
40
50
0 10 20 30 40 50 60 70 80
p' = ( '1 + '3) / 2 (kPa)
Stress Paths
CKoU
0
20
40
60
0 20 40 60 80 100 120
Effective Principal Stress (kPa)
Mohr Circles Deviator Stress
Figure not to natural scale
Figure not to natural scale
Note: Plot shows Mohr circles of principal effective stresses at failure. Mohr circles of total stresses can be calculated using U reported in summary page. Failure criterion used is maximum deviator stress.
-
Golder Associates Ltd - Burnaby Lab
Unit 300- 3811 North Fraser Way
Burnaby, B.C. Canada V5J 5J2
Trans Mountain Pipeline L.P. Drillhole: BH14-05
Westridge Marine Terminal - Offshore Geotechnical Investigation Sample: TP-3
Burnaby, BC Depth (m): 8.02 - 8.20
1403337 Phase 3000 Lab ID No: 109
Type : Undisturbed Soil Classification: N/A
Saturation Method: Back Pressure Saturation Material Type
Visual Description
Other Remarks:
Machine:
Chamber:
Height (cm): Load Cell:
Diameter (cm): Axial DCDT:
Area (cm2): Cell Pressure:
Volume (cm3): Back Pressure:
dry (kN/m3): Pore Pressure:
sat (kN/m3): Feed Rate (%/hr):
Water content, w (%):
Saturation (%):
Void ratio, e:
Gs (calculated):
t50 (min):
Project:
Consolidated Undrained Triaxial Compression Test for SoilsReference
ASTM D4767-11
Client:
Location:
Project No.:
Sample Data Equipment
Before Consolidation
After Consolidation
Truepath Load Frame - Stn.4
KW
Soil
15.27 15.07 717074
7.13 7.00 LP-175
39.92 38.43 PS-3322
610 579 PS-3146
PS-3190
16.21 16.12 0.20
69.6 60.2 PHOTO AT END OF TEST
9.56 10.06
100 100
1.75 1.61
1' - 3' MAX: 67
pwp (kPa): 692
Strength Results
2.68 2.68
MS
31u (kPa):
Consolidation Results
'c = cell - pwp (kPa): 39
1' (kPa): 75
B value: 0.96
Volume Change (cc): -30.6
N/A
SILT; some clay; some sand, brown, moist, firm.
9.10
TESTED BY DATE CHECKED BY DATE
3' (kPa): 7
April 16, 2015TM/MM March 11, 2014
Strain, f:
-
Golder Associates Ltd - Burnaby LabUnit 300- 3811 North Fraser Way
Burnaby, B.C. Canada V5J 5J2
Trans Mountain Pipeline L.P. Borehole: BH14-11
Westridge Marine Terminal Sample: 6
Burnaby, BC Depth (m): 23.25 - 23.40
Lab ID No: 152
Test
Sample
Ho (cm)
Do (cm)
Gs (calculated)
w (%)
o dry (kN/m3)
Sat. (%)
eoBValue
CELL (kPa)
'3_final (kPa)
'1_final (kPa)
(cc)
K0_final
Hc (cm)
Dc (cm)
Ac (cm2)
Vc (cm3)
c dry (kN/m3)
ec
w (%)
Sat (%)
1'- 3' (kPa) :
f (%)
u (kPa)
3' (kPa)
' (kPa)
Initial Dimensions
14.94
29
0.62
100
205
After Consolidation Dimensions
-43.6
7.24
41.11
0.42
May 11, 2016 MS May 27, 2016
13.86
569.9
44.4
TM/MMDATE TESTED BY CHECKED BY DATE
62
Failure At Maximum Deviator Stress 1'- 3' :
7.23
2.69
50.4
11.18
86
Ko-Consolidation Results
209
147
1.19
12.03
1.00
100
1.36
Vc
Consolidated Undrained Triaxial Compression Test for SoilsReference
ASTM D4767-11
CKoU
789
215 kPa
Client:
Project:
Location:
Project No.: 1403337/13000
-
Golder Associates Ltd - Burnaby LabUnit 300- 3811 North Fraser Way
Burnaby, B.C. Canada V5J 5J2
Trans Mountain Pipeline L.P. Borehole: BH14-11
Westridge Marine Terminal Sample: 6
Burnaby, BC Depth (m): 23.25 - 23.40
Lab ID No: 152
CHECKED BY DATE
Location:
Consolidated Undrained Triaxial Compression Test for SoilsReference
ASTM D4767-11
Client:
Project:
1403337/13000Project No.:
TM/MM May 11, 2016 MS May 27, 2016TESTED BY DATE
0
20
40
60
80
100
0 50 100 150 200 250
s'1 (kPa)
Ko-Consolidation
CKoU
-8.0
-6.0
-4.0
-2.0
0.0
0 1000 2000 3000 4000 5000 6000 7000Time (min)
Volumetric Strain vs Time
-
Golder Associates Ltd - Burnaby LabUnit 300- 3811 North Fraser Way
Burnaby, B.C. Canada V5J 5J2
Trans Mountain Pipeline L.P. Borehole: BH14-11
Westridge Marine Terminal Sample: 6
Burnaby, BC Depth (m): 23.25 - 23.40
Lab ID No: 152
Consolidated Undrained Triaxial Compression Test for SoilsReference
ASTM D4767-11
TESTED BY DATE CHECKED BY DATE
TM/MM May 11, 2016 MS May 27, 2016
Client:
Project:
Location:
Project No.: 1403337/13000
0
50
100
150
200
0.0 2.5 5.0 7.5 10.0 12.5 15.0 17.5Axial Strain (%)
Deviator Stress
CKoU
0
15
30
45
60
75
0.0 2.5 5.0 7.5 10.0 12.5 15.0 17.5Axial Strain (%)
Excess Pore Water Pressure
-
Golder Associates Ltd - Burnaby LabUnit 300- 3811 North Fraser Way
Burnaby, B.C. Canada V5J 5J2
Trans Mountain Pipeline L.P. Borehole: BH14-11
Westridge Marine Terminal Sample: 6
Burnaby, BC Depth (m): 23.25 - 23.40
Lab ID No: 152
nooo
Consolidated Undrained Triaxial Compression Test for SoilsReference
ASTM D4767-11
Project No.:
Client:
Project:
Location:
1403337/13000
May 11, 2016CHECKED BY
MSTM/MM May 27, 2016DATE DATETESTED BY
0
50
100
150
0 50 100 150 200 250 300
p' = ( '1 + '3) / 2 (kPa)
Stress Paths
CKoU
0
50
100
150
0 50 100 150 200 250 300
Effective Principal Stress (kPa)
Mohr Stress Circles
Figure not to natural scale
Figure not to natural scale
Note: Plot shows Mohr circles of principaleffective stresses at failure. Mohr circles oftotal stresses can be calculated using Ureported in summary page. Failure criterionused is maximum deviator stress.
-
Golder Associates Ltd - Burnaby LabUnit 300- 3811 North Fraser Way
Burnaby, B.C. Canada V5J 5J2
Trans Mountain Pipeline L.P. Borehole: BH14-11
Westridge Marine Terminal Sample: 6
Burnaby, BC Depth (m): 23.25 - 23.40
Lab ID No: 152
Type : Intact Soil Classification: CI
Saturation Method: Back Pressure Saturation Material Type
Visual Description
Other Remarks: LL=37, PL=22, PI=15.
Machine:
Chamber:
Height (cm): Load Cell:
Diameter (cm): Axial DCDT:
Area (cm2): Cell Pressure:
Volume (cm3): Back Pressure:
dry (kN/m3): Pore Pressure:
sat (kN/m3): Feed Rate (%/hr):
Water content, w (%):
Saturation (%):
Void ratio, e:
Gs (calculated):
t50 (min):
Project:
Consolidated Undrained Triaxial Compression Test for SoilsReference
ASTM D4767-11
Client:
Location:
Project No.:
Sample Data Equipment
Before Consolidation
After Consolidation
Truepath Load Frame - Stn. 5
KW
Soil
1403337/13000
14.94 13.86 245132
7.23 7.24 LP-175
41.05 41.11 PS-3373
614 570 PS-3278
PS-3127
16.81 17.37 0.20
50.4 44.4 PHOTO AT END OF TEST
11.18 12.03
100 100
1.36 1.19
1' - 3' MAX: 147
pwp (kPa): 698
Strength Results
2.69 2.69
MS
29u (kPa):
Consolidation Results
'c = cell - pwp (kPa): 91
1' (kPa): 209
B value: 1.00
Volume Change (cc): -43.6
N/A
SILTY CLAY, some shells, dark grey, w > PL, firm.
0.62
3' (kPa): 62
May 27, 2016TM/MM May 11, 2016
Strain, f (%):
TESTED BY DATE CHECKED BY DATE
-
WESTRIDGE MARINE TERMINAL OFFSHORE GEOTECHNICAL INVESTIGATIONS - GEOTECHNICAL FACTUAL REPORT
APPENDIX F-4Triaxial Compression CIU Tests - 2014
23 December 2016Report No. 1403337-023-R-Rev0
-
Golder Associates Ltd - Burnaby Lab
Unit 300- 3811 North Fraser Way
Burnaby, B.C. Canada V5J 5J2
Trans Mountain Pipeline L.P. Borehole: BH14-03
Westridge Marine Terminal Sample: 5
Burnaby, BC Depth (m): 19.48 - 19.65
Lab ID No: 152
Test
Sample
Ho (cm)
Do (cm)
Gs (Assumed)
w (%)
o dry (kN/m3)
Sat. (%)
eo
BValue
CELL (kPa)
OCR
3c (kPa)
(cc)
Hc (cm)
Dc (cm)
Ac (cm2)
Vc (cm3)
c dry (kN/m3)
ec
w (%)
Sat (%)
1'- 3' (kPa) :
f (%)
u (kPa)
3' (kPa)
' (kPa)
430 kPa
1.00
Note: Stage consolidation results represent values at end of each loading.
Stage 5 (430 kPa)
1117
N/A
423
Client:
Project:
Location:
Project No.: 1403337/13000
29474
Stage 2 (80 kPa)
Vc
Stage 3 (150 kPa)
34
Consolidated Undrained Triaxial Compression Test for SoilsReference
ASTM D4767-11
CIU
N/AN/A
728
Stage 1 (40 kPa)
N/A
768 838
370
296
1.07
12.82
7.24
2.70
56.8
10.46
Stage Consolidation Results
1.53
100
74
Failure At Maximum Deviator Stress 1'- 3' :
Stage 4 (300 kPa)
-38.6
TM/MMDATE TESTED BY CHECKED BY DATE
-22.5
15.60
524.0
-1.0
June 4, 2016 MS June 23, 2016
39.5
-31.9 -19.3
144
After Consolidation Dimensions
33.59
100
6.54
341
13.02
988
Initial Dimensions
15.60
N/A
-
Golder Associates Ltd - Burnaby Lab
Unit 300- 3811 North Fraser Way
Burnaby, B.C. Canada V5J 5J2
Trans Mountain Pipeline L.P. Borehole: BH14-03
Westridge Marine Terminal Sample: 5
Burnaby, BC Depth (m): 19.48 - 19.65
Lab ID No: 152Project No.:
TM/MM June 4, 2016 MS June 23, 2016TESTED BY DATE CHECKED BY DATE
Location:
Consolidated Undrained Triaxial Compression Test for SoilsReference
ASTM D4767-11
Client:
Project:
1403337/13000
1.00
1.10
1.20
1.30
1.40
1.50
1.60
0.0 100.0 200.0 300.0 400.0 500.0
Total Stress (kPa)
Void Ratio vs Total Stress
Stage 1 (40 kPa)
Stage 2 (80 kPa)
Stage 3 (150 kPa)
Stage 4 (300 kPa)
Stage 5 (430 kPa)
1.00
1.10
1.20
1.30
1.40
1.50
1.60
0 1000 2000 3000 4000 5000 6000 7000 8000
Time (min)
Void Ratio vs Time
-
Golder Associates Ltd - Burnaby Lab
Unit 300- 3811 North Fraser Way
Burnaby, B.C. Canada V5J 5J2
Trans Mountain Pipeline L.P. Borehole: BH14-03
Westridge Marine Terminal Sample: 5
Burnaby, BC Depth (m): 19.48 - 19.65
Lab ID No: 152
Consolidated Undrained Triaxial Compression Test for SoilsReference
ASTM D4767-11
Client:
Project:
Location:
Project No.: 1403337/13000
TM/MM June 4, 2016 MS June 23, 2016TESTED BY DATE CHECKED BY DATE
1.00
1.10
1.20
1.30
1.40
1.50
1.60
10.0 100.0 1000.0
Total Stress (kPa)
Void Ratio vs Total Stress
-140
-120
-100
-80
-60
-40
-20
0
0 1000 2000 3000
Time (min)
Volume Change vs Time
Stage 1 (40 kPa)
Stage 2 (80 kPa)
Stage 3 (150 kPa)
Stage 4 (300 kPa)
Stage 5 (430 kPa)
Note: points represent values at end of each loading.
-
Golder Associates Ltd - Burnaby Lab
Unit 300- 3811 North Fraser Way
Burnaby, B.C. Canada V5J 5J2
Trans Mountain Pipeline L.P. Borehole: BH14-03
Westridge Marine Terminal Sample: 5
Burnaby, BC Depth (m): 19.48 - 19.65
Lab ID No: 152
June 23, 2016
Client:
Project:
Location:
Project No.: 1403337/13000
Consolidated Undrained Triaxial Compression Test for SoilsReference
ASTM D4767-11
TESTED BY DATE CHECKED BY DATE
TM/MM June 4, 2016 MS
0
50
100
150
200
250
300
350
0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0Axial Strain (%)
Deviator Stress
CIU
0
100
200
300
400
0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0Axial Strain (%)
Excess Pore Water Pressure
-
Golder Associates Ltd - Burnaby Lab
Unit 300- 3811 North Fraser Way
Burnaby, B.C. Canada V5J 5J2
Trans Mountain Pipeline L.P. Borehole: BH14-03
Westridge Marine Terminal Sample: 5
Burnaby, BC Depth (m): 19.48 - 19.65
Lab ID No: 152
nooo
DATETESTED BY
June 4, 2016CHECKED BY
MSTM/MM June 23, 2016DATE
Consolidated Undrained Triaxial Compression Test for SoilsReference
ASTM D4767-11
Project No.:
Client:
Project:
Location:
1403337/13000
0
50
100
150
200
250
0 50 100 150 200 250 300 350 400 450 500
p' = ( '1 + '3) / 2 (kPa)
Stress Paths
CIU
0
50
100
150
200
250
0 50 100 150 200 250 300 350 400 450 500
Effective Principal Stress (kPa)
Mohr Stress Circles
Figure not to natural scale
Figure not to natural scale
Note: Plot shows Mohr circles of principal effective stresses at failure. Mohr circles of total stresses can be calculated using U reported in summary page. Failure criterion used is maximum deviator stress.
-
Golder Associates Ltd - Burnaby Lab
Unit 300- 3811 North Fraser Way
Burnaby, B.C. Canada V5J 5J2
Trans Mountain Pipeline L.P. Borehole: BH14-03
Westridge Marine Terminal Sample: 5
Burnaby, BC Depth (m): 19.48 - 19.65
Lab ID No: 152
Type : Intact Soil Classification: CH
Saturation Method: Back Pressure Saturation Material Type
Visual Description
Other Remarks: Small sand cracks observed on the side of sample due to shells. Cracks patched.
LL=53, PL=27, PI=26. Sample taken from 28cm to 45cm.
Machine:
Chamber:
Height (cm): Load Cell:
Diameter (cm): Axial DCDT:
Area (cm2): Cell Pressure:
Volume (cm3): Back Pressure:
dry (kN/m3): Pore Pressure:
sat (kN/m3): Feed Rate (%/hr):
Water content, w (%):
Saturation (%):
Void ratio, e:
Gs (Assumed):
t50 (min):
TM/MM June 4, 2016
Strain, f (%):
TESTED BY DATE CHECKED BY DATE
1.00
Volume Change (cc): -118.5
N/A
SILTY CLAY; some sand; trace shells, brown, moist, firm.
13.02
3' (kPa): 74
June 23, 2016
2.70
MS
341u (kPa):
Consolidation Results
'c = cell - pwp (kPa): 415
1' (kPa): 370
B value:
100 100
1.53 1.07
1' - 3' MAX: 296
pwp (kPa): 702
Strength Results
2.70
PS-3134
16.39 17.88 0.20
56.8 39.5 PHOTO AT END OF TEST
10.46 12.82
41.18 33.59 PS-3265
642 524 PS-3264
15.60 15.60 227408
7.24 6.54 LP-1215
Project No.:
Sample Data Equipment
Before Consolidation
After Consolidation
Truepath Load Frame - Stn. 1
KW
Soil
1403337/13000
Project:
Consolidated Undrained Triaxial Compression Test for SoilsReference
ASTM D4767-11
Client:
Location:
-
Golder Associates Ltd - Burnaby Lab
Unit 300- 3811 North Fraser Way
Burnaby, B.C. Canada V5J 5J2
Trans Mountain Pipeline L.P. Borehole: BH14-11
Westridge Marine Terminal Sample: 6
Burnaby, BC Depth (m): 22.88 - 23.03
Lab ID No: 152
Test
Sample
Ho (cm)
Do (cm)
Gs (calculated)
w (%)
o dry (kN/m3)
Sat. (%)
eo
BValue
CELL (kPa)
OCR
3c (kPa)
(cc)
Hc (cm)
Dc (cm)
Ac (cm2)
Vc (cm3)
c dry (kN/m3)
ec
w (%)
Sat (%)
1'- 3' (kPa) :
f (%)
u (kPa)
3' (kPa)
' (kPa)
Initial Dimensions
15.10
N/A
904
165
9.70
100
6.88
-17.8
169
After Consolidation Dimensions
37.22
May 11, 2016 MS June 16, 2016
-12.5
15.10
562.2
-9.1
39.5
TM/MMDATE TESTED BY CHECKED BY DATE
Stage 4 (215 kPa)
-10.7
48
Failure At Maximum Deviator Stress 1'- 3' :
7.18
2.72
46.3
11.80
Stage Consolidation Results
1.26
226
179
1.08
12.85
N/A
740
Stage 1 (50 kPa)
N/A
789 859
Vc
Stage 3 (170 kPa)
50
Consolidated Undrained Triaxial Compression Test for SoilsReference
ASTM D4767-11
CIU
N/A
21499
Stage 2 (100 kPa)
100
Client:
Project:
Location:
Project No.: 1403337/13000
Note: Stage consolidation results represent values at end of each loading.
215 kPa
0.98
-
Golder Associates Ltd - Burnaby Lab
Unit 300- 3811 North Fraser Way
Burnaby, B.C. Canada V5J 5J2
Trans Mountain Pipeline L.P. Borehole: BH14-11
Westridge Marine Terminal Sample: 6
Burnaby, BC Depth (m): 22.88 - 23.03
Lab ID No: 152
CHECKED BY DATE
Location:
Consolidated Undrained Triaxial Compression Test for SoilsReference
ASTM D4767-11
Client:
Project:
1403337/13000Project No.:
TM/MM May 11, 2016 MS June 16, 2016TESTED BY DATE
1.05
1.10
1.15
1.20
1.25
1.30
0.0 50.0 100.0 150.0 200.0 250.0
Total Stress (kPa)
Void Ratio vs Total Stress
Stage 1 (50 kPa)
Stage 2 (100 kPa)
Stage 3 (170 kPa)
Stage 4 (215 kPa)
1.05
1.10
1.15
1.20
1.25
1.30
0 1000 2000 3000 4000 5000 6000
Time (min)
Void Ratio vs Time
-
Golder Associates Ltd - Burnaby Lab
Unit 300- 3811 North Fraser Way
Burnaby, B.C. Canada V5J 5J2
Trans Mountain Pipeline L.P. Borehole: BH14-11
Westridge Marine Terminal Sample: 6
Burnaby, BC Depth (m): 22.88 - 23.03
Lab ID No: 152
Consolidated Undrained Triaxial Compression Test for SoilsReference
ASTM D4767-11
Client:
Project:
Location:
Project No.: 1403337/13000
TM/MM May 11, 2016 MS June 16, 2016TESTED BY DATE CHECKED BY DATE
1.05
1.10
1.15
1.20
1.25
1.30
10.0 100.0 1000.0
Total Stress (kPa)
Void Ratio vs Total Stress
Note: points represent values at end of each loading.
-60
-50
-40
-30
-20
-10
0
0 500 1000 1500 2000 2500 3000
Time (min)
Volume Change vs Time
Stage 1 (50 kPa)
Stage 2 (100 kPa)
Stage 3 (170 kPa)
Stage 4 (215 kPa)
-
Golder Associates Ltd - Burnaby Lab
Unit 300- 3811 North Fraser Way
Burnaby, B.C. Canada V5J 5J2
Trans Mountain Pipeline L.P. Borehole: BH14-11
Westridge Marine Terminal Sample: 6
Burnaby, BC Depth (m): 22.88 - 23.03
Lab ID No: 152
Consolidated Undrained Triaxial Compression Test for SoilsReference
ASTM D4767-11
TESTED BY DATE CHECKED BY DATE
TM/MM May 11, 2016 MS June 16, 2016
Client:
Project:
Location:
Project No.: 1403337/13000
0
50
100
150
200
250
0.0 2.0 4.0 6.0 8.0 10.0 12.0Axial Strain (%)
Deviator Stress
CIU
0
50
100
150
200
0.0 2.0 4.0 6.0 8.0 10.0 12.0Axial Strain (%)
Excess Pore Water Pressure
-
Golder Associates Ltd - Burnaby Lab
Unit 300- 3811 North Fraser Way
Burnaby, B.C. Canada V5J 5J2
Trans Mountain Pipeline L.P. Borehole: BH14-11
Westridge Marine Terminal Sample: 6
Burnaby, BC Depth (m): 22.88 - 23.03
Lab ID No: 152
nooo
Consolidated Undrained Triaxial Compression Test for SoilsReference
ASTM D4767-11
Project No.:
Client:
Project:
Location:
1403337/13000
May 11, 2016CHECKED BY
MSTM/MM June 16, 2016DATE DATETESTED BY
0
50
100
150
0 50 100 150 200 250 300
p' = ( '1 + '3) / 2 (kPa)
Stress Paths
CIU
0
50
100
150
0 50 100 150 200 250 300
Effective Principal Stress (kPa)
Mohr Stress Circles
Figure not to natural scale
Figure not to natural scale
Note: Plot shows Mohr circles of principal effective stresses at failure. Mohr circles of total stresses can be calculated using U reported in summary page. Failure criterion used is maximum deviator stress.
-
Golder Associates Ltd - Burnaby Lab
Unit 300- 3811 North Fraser Way
Burnaby, B.C. Canada V5J 5J2
Trans Mountain Pipeline L.P. Borehole: BH14-11
Westridge Marine Terminal Sample: 6
Burnaby, BC Depth (m): 22.88 - 23.03
Lab ID No: 152
Type : Intact Soil Classification: CI
Saturation Method: Back Pressure Saturation Material Type
Visual Description
Other Remarks: Small sand cracks observed on the side of sample. Cracks patched.
LL=37, PL=22, PI=15.
Machine:
Chamber:
Height (cm): Load Cell:
Diameter (cm): Axial DCDT:
Area (cm2): Cell Pressure:
Volume (cm3): Back Pressure:
dry (kN/m3): Pore Pressure:
sat (kN/m3): Feed Rate (%/hr):
Water content, w (%):
Saturation (%):
Void ratio, e:
Gs (calculated):
t50 (min):
Project:
Consolidated Undrained Triaxial Compression Test for SoilsReference
ASTM D4767-11
Client:
Location:
Project No.:
Sample Data Equipment
Before Consolidation
After Consolidation
Truepath Load Frame - Stn. 4
KW
Soil
1403337/13000
15.10 15.10 682884
7.18 6.88 LP-174
40.54 37.22 PS-3322
612 562 PS-3146
PS-3190
17.27 17.94 0.2 and 1.0
46.3 39.5 PHOTO AT END OF TEST
11.80 12.85
100 100
1.26 1.08
1' - 3' MAX: 179
pwp (kPa): 692
Strength Results
2.72 2.72
MS
165u (kPa):
Consolidation Results
'c = cell - pwp (kPa): 212
1' (kPa): 226
B value: 0.98
Volume Change (cc): -50.1
N/A
SILTY CLAY, trace shells, greyish brown, w > PL, firm.
9.70
3' (kPa): 48
June 16, 2016TM/MM May 11, 2016
Strain, f (%):
TESTED BY DATE CHECKED BY DATE
-
Golder Associates Ltd. - Burnaby Laboratory
Unit 300 - 3811 North Fraser Way
Burnaby, B.C. Canada V5J 5J2
Client: Trans Mountain Pipeline L.P. Borehole: BH14-12
Project: Sample: TP-2
Location: Burnaby, BC Depth (m): 6.50-6.65
Project No.: Lab ID No:
Test
Sample
Ho (cm)
Do (cm)
Gs (assumed)
w (%)
o dry (kN/m3)
Sat. (%)
eo
BValue
CELL (kPa)
OCR
3c' (kPa)
(cc)
t50 (min)
Hc (cm)
Dc (cm)
Ac (cm2)
Vc (cm3)
c dry (kN/m3)
ec
w (%)
Sat (%)
1'- 3' (kPa) :
f (%)
u (kPa)
3' (kPa)
' (kPa)
Initial Dimensions
16.30
49
12.49
100
100
53
1.63
-52.1
6.81
36.44
N/A
After Consolidation Dimensions
16.30
TM/MMDATE TESTED BY
April 27, 2015 L.LeeCHECKED BY
May 13, 2015DATE
11.00
593.8
52.3
1.42
3
Failure At Maximum Deviator Stress 1'- 3' :
60
57
1.00
7.10
2.71
60.0
10.12
752
n/a
Consolidation Results
Vc
Consolidated Undrained Triaxial Compression Test for SoilsReference
ASTM D4767-11
CIU-1
64.2 kPa
1091403337
Westridge Marine Terminal - Offshore Geotechnical Investigation
-
Golder Associates Ltd. - Burnaby Laboratory
Unit 300 - 3811 North Fraser Way
Burnaby, B.C. Canada V5J 5J2
Trans Mountain Pipeline L.P. Drillhole: BH14-12
Sample: TP-2
Burnaby, BC Depth (m): 6.50-6.65
Lab ID No: 109
Consolidated Undrained Triaxial Compression Test for SoilsReference
ASTM D4767-11
TESTED BY DATE CHECKED BY DATE
TM/MM April 27, 2015 L.Lee May 13, 2015
Client:
Project:
Location:
Project No.: 1403337
Westridge Marine Terminal - Offshore Geotechnical Investigation
0
10
20
30
40
50
60
70
0 5 10 15 20 25
Axial Strain (%)
Deviator Stress
64.2 kPa
0
10
20
30
40
50
60
0 5 10 15 20 25
Axial Strain (%)
Excess Pore Water Pressure
-
Golder Associates Ltd. - Burnaby Laboratory
Unit 300 - 3811 North Fraser Way
Burnaby, B.C. Canada V5J 5J2
Trans Mountain Pipeline L.P. Drillhole: BH14-12
Sample: TP-2
Burnaby, BC Depth (m): 6.50-6.65
Lab ID No: 109
nooo
Consolidated Undrained Triaxial Compression Test for SoilsReference
ASTM D4767-11
Project No.:
Client:
Project:
Location:
1403337
Westridge Marine Terminal - Offshore Geotechnical Investigation
April 27, 2015CHECKED BY
L.LeeTM/MM May 13, 2015DATE DATETESTED BY
0
10
20
30
40
50
0 10 20 30 40 50 60 70 80 90 100
p' = ( '1 + '3) / 2 (kPa)
Stress Paths
64.2 kPa
0
10
20
30
40
50
0 10 20 30 40 50 60 70 80 90 100
Effective Principal Stress (kPa)
Mohr Circles Deviator Stress
Figure not to natural scale
Figure not to natural
Note: Plot shows Mohr circles of principal effective stresses at failure. Mohr circles of total stresses can be calculated using U reported in summary page. Failure criterion used is maximum deviator stress.
-
Golder Associates Ltd. - Burnaby Laboratory
Unit 300 - 3811 North Fraser Way
Burnaby, B.C. Canada V5J 5J2
Trans Mountain Pipeline L.P. BoreHole: BH14-12
Sample: TP-2
Burnaby, BC Depth (m): 6.50-6.65
Lab ID No: 109
Type : Undisturbed Soil Classification: N/A
Saturation Method: Back Pressure Saturation Material Type:
Visual Description:
Other Remarks:
Machine:
Chamber:
Height (cm): Load Cell:
Diameter (cm): Axial DCDT:
Area (cm2): Cell Pressure:
Volume (cm3): Back Pressure:
dry (kN/m3): Pore Pressure:
wet (kN/m3): Feed Rate (%/hr):
Water content, w (%):
Saturation (%):
Void ratio, e:
Gs (assumed):
t50 (min):
Project:
Consolidated Undrained Triaxial Compression Test for SoilsReference
ASTM D4767-11
Client:
Westridge Marine Terminal - Offshore Geotechnical Investigation
Location:
Project No.:
Sample Data Equipment
Before Consolidation
After Consolidation
Truepath Load Frame - Stn.2
KW
Soil
1403337
16.30 16.30 210894
7.10 6.81 LP-267
39.63 36.44 PS-3327
646 594 PS-3278
PS-3127
16.19 16.75 0.20
60.0 52.3 PHOTO AT END OF TEST
10.12 11.00
100 100
1.63 1.42
1' - 3' MAX: 57
pwp (kPa): 699
Strength Results
2.71 2.71
L.Lee
49u (kPa):
Consolidation Results
'eff = cell - pwp (kPa) 53
1' (kPa): 60
B value: 1.00
Volume Change (cc): -52.1
N/A
SILTY CLAY; trace sand, grey, moist, very soft.
12.49
TESTED BY DATE CHECKED BY DATE
3' (kPa): 3
May 13, 2015TM/MM April 27, 2015
Strain, f:
-
WESTRIDGE MARINE TERMINAL OFFSHORE GEOTECHNICAL INVESTIGATIONS - GEOTECHNICAL FACTUAL REPORT
APPENDIX F-5Isotropic Compression tests - 2014
23 December 2016Report No. 1403337-023-R-Rev0
-
Golder Associates Ltd - Burnaby Lab
Unit 300- 3811 North Fraser Way
Burnaby, B.C. Canada V5J 5J2
Trans Mountain Pipeline L.P. Borehole: BH14-11
Westridge Marine Terminal Sample: 5
Burnaby, BC Depth (m): 15.65 - 15.80
Lab ID No: 152
Ho (cm)
Do (cm)
Gs (calculated)
w (%)
o dry (kN/m3)
Sat. (%)
eo
BValue
CELL (kPa)
3c (kPa)
(cc)
CELL (kPa)
3c (kPa)
(cc)
CELL (kPa)
3c (kPa)
(cc)
CELL (kPa)
3c (kPa)
(cc)
Hc (cm)
Dc (cm)
Ac (cm2)
Vc (cm3)
c dry (kN/m3)
ec
w (%)
Sat (%)
Note: Stage consolidation results represent values at end of each loading.
15.10
1.22
7.18
2.67
46.3
11.80
0.98
100
4.2
Client:
Project:
Location:
Project No.: 1403337/13000
Isotropic Compression Test for SoilsReference
ASTM D4767-11
216
789
101
730
Stage 1 (40 kPa)
41
767
Stage 5 (100 kPa)
838
Stage 3 (150 kPa)
Stage Consolidation Results
102
6.88
37.22
15.10
562.2
1.04
12.85
39.5
-6.3
740
-19.4
907 791
1489 1086
Stage 4 (215 kPa)Stage 2 (80 kPa)
989
Vc 3.4 -2.5
148
Vc -40.5
935
52 246 297 429
-15.1 -13.8 -20.9
907
TM/MMDATE TESTED BY CHECKED BY DATE
May 30, 2016 MS June 29, 2016
Stage 10 (430 kPa)
1119
After Consolidation Dimensions
100
Stage 6 (50 kPa) Stage 7 (100 kPa)
905
-23.9
Stage 8 (245 kPa) Stage 9 (300 kPa)
1120 1290
889 1098
Initial Dimensions
77
789
217 100 216 429 599
Stage 11 (215 kPa) Stage 12 (100 kPa) Stage 13 (215 kPa) Stage 14 (430 kPa) Stage 15 (600 kPa)
Vc 2.4 4.3 -2.8 -7.5 -14.5
-5.9
1490
798 395 198 406 799
Stage 16 (800 kPa) Stage 17 (400 kPa) Stage 18 (200 kPa) Stage 19 (400 kPa) Stage 20 (800 kPa)
Vc -17.9 2.7 2.6 -1.7
-
Golder Associates Ltd - Burnaby Lab
Unit 300- 3811 North Fraser Way
Burnaby, B.C. Canada V5J 5J2
Trans Mountain Pipeline L.P. Borehole: BH14-11
Westridge Marine Terminal Sample: 5
Burnaby, BC Depth (m): 15.65 - 15.80
Lab ID No: 152Project No.:
TM/MM May 30, 2016 MS June 29, 2016TESTED BY DATE CHECKED BY DATE
Location:
Isotropic Compression Test for SoilsReference
ASTM D4767-11
Client:
Project:
1403337/13000
0.90
1.00
1.10
1.20
1.30
1.40
1.50
1.60
1.70
0.0 100.0 200.0 300.0 400.0 500.0 600.0 700.0 800.0 900.0
Total Stress (kPa)
Void Ratio vs Total Stress
Stage 1 (40 kPa) Stage 2 (80 kPa)
Stage 3 (150 kPa) Stage 4 (215 kPa)
Stage 5 (100 kPa) Stage 6 (50 kPa)
Stage 7 (100 kPa) Stage 8 (245 kPa)
Stage 9 (300 kPa) Stage 10 (430 kPa)
Stage 11 (215 kPa) Stage 12 (100 kPa)
Stage 13 (215 kPa) Stage 14 (430 kPa)
Stage 15 (600 kPa) Stage 16 (800 kPa)
Stage 17 (400 kPa) Stage 18 (200 kPa)
Stage 19 (400 kPa) Stage 20 (800 kPa)
0.90
1.00
1.10
1.20
1.30
1.40
1.50
1.60
1.70
0 5000 10000 15000 20000 25000 30000 35000
Time (min)
Void Ratio vs Time
-
Golder Associates Ltd - Burnaby Lab
Unit 300- 3811 North Fraser Way
Burnaby, B.C. Canada V5J 5J2
Trans Mountain Pipeline L.P. Borehole: BH14-11
Westridge Marine Terminal Sample: 5
Burnaby, BC Depth (m): 15.65 - 15.80
Lab ID No: 152
Isotropic Compression Test for SoilsReference
ASTM D4767-11
Client:
Project:
Location:
Project No.: 1403337/13000
TM/MM May 30, 2016 MS June 29, 2016TESTED BY DATE CHECKED BY DATE
0.90
1.00
1.10
1.20
1.30
1.40
1.50
1.60
1.70
10.0 100.0 1000.0
Total Stress (kPa)
Void Ratio vs Total Stress
-180
-160
-140
-120
-100
-80
-60
-40
-20
0
0 500 1000 1500 2000 2500 3000 3500 4000 4500
Time (min)
Volume Change vs Time
Stage 1 (40 kPa) Stage 2 (80 kPa)Stage 3 (150 kPa) Stage 4 (215 kPa)Stage 5 (100 kPa) Stage 6 (50 kPa)Stage 7 (100 kPa) Stage 8 (245 kPa)Stage 9 (300 kPa) Stage 10 (430 kPa)Stage 11 (215 kPa) Stage 12 (100 kPa)Stage 13 (215 kPa) Stage 14 (430 kPa)Stage 15 (600 kPa) Stage 16 (800 kPa)Stage 17 (400 kPa) Stage 18 (200 kPa)Stage 19 (400 kPa) Stage 20 (800 kPa)
Note: points represent values at end of each loading.
-
WESTRIDGE MARINE TERMINAL OFFSHORE GEOTECHNICAL INVESTIGATIONS - GEOTECHNICAL FACTUAL REPORT
APPENDIX F-6Cyclic Direct Simple Shear tests (CDSS) – 2014
Note: The asymmetric cyclic shear stress-strain loops shown in the CDSS test reports were inferred to be caused by the localized sand and/or shell fragments inside the tested samples.
23 December 2016Report No. 1403337-023-R-Rev0
-
Cyclic Direct Simple Shear Testing of Soils Under Consolidated Constant-Volume Conditions
NORSOK G-001
Vertical LVDT Serial No.:Vertical Load Cell Serial No.:Shear Load Cell Serial No.:
Equipment Description: GDS - Station 2
Max. DU at N= n/a (zero load)
Min. DU at N= n/a (zero load)
Initial Vertical Stress (kPa)
Initial Shear Stress (kPa)
Applied Shear Bias (kPa)
Rate of Shearing (%/hr)
Peak Shear Strength (kPa)
CSR
Cycles to 3.75% Shear Strain
Initial Vertical Stress (kPa)
Max Cyclic Shear Stress (kPa)
Max. Shear Strain at N= n/a (zero load)
Min. Shear Strain at N= n/a (zero load)
Moist Tamping
23.20
70.54
39.08
64.79
8.09
Post Cyclic Monotonic Test Results
46.47
-0.79
0.017
Project No.:Project:Location:Client:
1403337/3000
Westridge Marine Terminal
Burnaby, BC
Trans Mountain Pipeline L.P.
Sample Number:Test ID:Depth (m):Lab ID No:
BH14-12 Sa 2
64.2kPa, 8kPa 1min Cyclic
6.10-6.70
109
Comments / Special InstructionsComments / Special InstructionsOnly 100 cycles requested
Maximum Shear Strain MAX (%) 20.00
Shear Strength at MAX (kPa) 20.80
3.75% not reached
3.75% not reached
Excess Pore Pressure at Peak (kPa) 29.35
Ratio of Peak / 'v 0.33
3.75% not reached
3.75% not reached
0.00
1.00
21.16
3.75% not reached
0.12
Cyclic Test Results
Frequency (Hz)
N/A
Axial Strain at end of Consol. % 7.05
Change in Height Hc (mm) 1.64
64.92
64.69Max Applied Vertical Stress (kPa)Vertical Stress at end of Consol (kPa)
Consolidation
Max. Axial Strain % 7.05N/AEffective Overburden Pressure (kPa)
>100
16.37
10.40
Weight Volume Relationships
Initial Wet Mass (g) Initial Water Content (%) 57.44
Dry Mass (g) Initial Saturation (%) 99.96
151.27
15.1 Liquid Limit 61
Tel: 604-412-6899 Fax: 604-412-6816 www.golder.com
Golder Associates Ltd.300, 3811 North Fraser Way, Burnaby, British Columbia, Canada V5J 5J2
Volume (cm3) Shear Strength est. (kPa) N/A
Specific Gravity (Measured) Sensitivity N/A
90.67Area (cm2) Fines Fraction (%) 84.9 Plastic Limit 29
Initial Wet Unit Weight (kN/m3) Final Water Content (%) 53.54
Initial Dry Unit Weight (kN/m3) Final Saturation (%)
General Remarks11897
38408
158877
Sample Properties
Preparation Method
TESTED BY DATE CHECKED BY DATE
The test data given herein pertain to the sample provided only. This report constitutes a testing service only.
G. Patton May 7, 2015 M. Sanin April 6, 2016
2.71
96.08
Laboratory OCR
Visual Description Clayey SILT, grey, moist, soft, some shells, some sand
Height (mm)
Diameter (mm) Sand Fraction (%)
-
Cyclic Direct Simple Shear Testing of Soils Under Consolidated Constant-Volume Conditions
NORSOK G-001Project No.:Project: Test ID:Location: Depth (m):Client: Lab ID No:
DATE
Golder Associates Ltd.300, 3811 North Fraser Way, Burnaby, British Columbia, Canada V5J 5J2
Tel: 604-412-6899 Fax: 604-412-6816 www.golder.com
The test data given herein pertain to the sample provided only. This report constitutes a testing service only.
G. Patton April 6, 2016
TESTED BY DATE
M. Sanin
CHECKED BY
May 7, 2015
Load (kN) 0.101 0.2537
Axial Strain (%) 1.89 7.05
Duration (min) 240 5328
Increment (kPa) 25
Stress at end of Consolidation (kPa)
Axial Strain at end of Consolidation (%)
OCR
Change in Height Hc (mm)
64.69
7.05
N/A
1.64
CommentsVolumetric strains during consolidation may not be comparable to those measured in an oedometer test due to seating of the platens and possible lateral sample deformation during loading.
64.2
1403337/3000 Sample Number: BH14-12 Sa 2Westridge Marine Terminal 64.2kPa, 8kPa 1min Cyclic
Consolidation Summary
Burnaby, BC 6.10-6.70
109Trans Mountain Pipeline L.P.
0.000.200.400.600.801.001.201.401.601.80
0 1000 2000 3000 4000 5000 6000Time (min)
0
10
20
30
40
50
60
700 1000 2000 3000 4000 5000 6000
Time (min)
-
Cyclic Direct Simple Shear Testing of Soils Under Consolidated Constant-Volume Conditions
NORSOK G-001Project No.:Project: Test ID:Location: Depth (m):Client: Lab ID No:
Golder Associates Ltd.300, 3811 North Fraser Way, Burnaby, British Columbia, Canada V5J 5J2
Tel: 604-412-6899 Fax: 604-412-6816 www.golder.com
G. Patton May 7, 2015 M. Sanin April 6, 2016
TESTED BY DATE CHECKED BY DATE
The test data given herein pertain to the sample provided only. This report constitutes a testing service only.
1403337/3000 Sample Number: BH14-12 Sa 2Westridge Marine Terminal 64.2kPa, 8kPa 1min Cyclic
Burnaby, BC 6.10-6.70
109Trans Mountain Pipeline L.P.
0.20
0.15
0.10
0.05
0.00
0.05
0.10
0.15
0.20
0.6 0.4 0.2 0 0.2 0.4 0.6Shear Strain (%)
N = 1
N = 100
10
8
6
4
2
0
2
4
6
8
10
0 10 20 30 40 50 60 70Effective Vertical Stress (kPa)
N = 1
N = 100
-
Cyclic Direct Simple Shear Testing of Soils Under Consolidated Constant-Volume Conditions
NORSOK G-001Project No.:Project: Test ID:Location: Depth (m):Client: Lab ID No:
Golder Associates Ltd.300, 3811 North Fraser Way, Burnaby, British Columbia, Canada V5J 5J2
Tel: 604-412-6899 Fax: 604-412-6816 www.golder.com
G. Patton May 7, 2015 M. Sanin April 6, 2016
TESTED BY DATE CHECKED BY DATE
The test data given herein pertain to the sample provided only. This report constitutes a testing service only.
1403337/3000 Sample Number: BH14-12 Sa 2Westridge Marine Terminal 64.2kPa, 8kPa 1min Cyclic
Burnaby, BC 6.10-6.70
109Trans Mountain Pipeline L.P.
0.50
0.40
0.30
0.20
0.10
0.00
0.10
0.20
0.30
0.40
0.50
0 20 40 60 80 100 120Number of Cycles (N)
N = 1
N = 100
0
0.05
0.1
0.15
0.2
0.25
0.3
0.35
0.4
0.45
0.5
0 20 40 60 80 100 120Number of Cycles (N)
N = 1
N = 100
-
Cyclic Direct Simple Shear Testing of Soils Under Consolidated Constant-Volume Conditions
NORSOK G-001Project No.:Project: Test ID:Location: Depth (m):Client: Lab ID No:
Golder Associates Ltd.300, 3811 North Fraser Way, Burnaby, British Columbia, Canada V5J 5J2
Tel: 604-412-6899 Fax: 604-412-6816 www.golder.com
The test data given herein pertain to the sample provided only. This report constitutes a testing service only.
G. Patton May 7, 2015 M. Sanin April 6, 2016
TESTED BY DATE CHECKED BY DATE
1403337/3000 Sample Number: BH14-12 Sa 2Westridge Marine Terminal 64.2kPa, 8kPa 1min Cyclic
Burnaby, BC 6.10-6.70
109Trans Mountain Pipeline L.P.
2
0
2
4
6
8
10
12
14
16
18
20
22
2 0 2 4 6 8 10 12 14 16 18 20Shear Strain (%)
0
5
10
15
20
25
30
35
2 0 2 4 6 8 10 12 14 16 18 20Shear Strain (%)
-
Cyclic Direct Simple Shear Testing of Soils Under Consolidated Constant-Volume Conditions
NORSOK G-001Project No.:Project: Test ID:Location: Depth (m):Client: Lab ID No:
Golder Associates Ltd.300, 3811 North Fraser Way, Burnaby, British Columbia, Canada V5J 5J2
Tel: 604-412-6899 Fax: 604-412-6816 www.golder.com
G. Patton May 7, 2015 M. Sanin April 6, 2016
TESTED BY DATE CHECKED BY DATE
The test data given herein pertain to the sample provided only. This report constitutes a testing service only.
1403337/3000 Sample Number: BH14-12 Sa 2Westridge Marine Terminal 64.2kPa, 8kPa 1min Cyclic
Burnaby, BC 6.10-6.70
109Trans Mountain Pipeline L.P.
5
0
5
10
15
20
25
0 10 20 30 40 50 60Vertical Stress (kPa)
0.05
0.00
0.05
0.10
0.15
0.20
0.25
0.30
0.35
2 0 2 4 6 8 10 12 14 16 18 20Shear Strain (%)
-
Cyclic Direct Simple Shear Testing of Soils Under Consolidated Constant-Volume Conditions
NORSOK G-001
Vertical LVDT Serial No.:Vertical Load Cell Serial No.:Shear Load Cell Serial No.:
General Remarks11897
38408
158877
Sample Properties
Preparation Method
TESTED BY DATE CHECKED BY DATE
The test data given herein pertain to the sample provided only. This report constitutes a testing service only.
G. Patton May 15, 2015 M. Sanin April 6, 2016
2.71
89.16
Laboratory OCR
Visual Description Clayey SILT, grey, moist, soft, some shells, some sand
Height (mm)
Diameter (mm) Sand Fraction (%) 15.1 Liquid Limit 61
Tel: 604-412-6899 Fax: 604-412-6816 www.golder.com
Golder Associates Ltd.300, 3811 North Fraser Way, Burnaby, British Columbia, Canada V5J 5J2
Volume (cm3) Shear Strength est. (kPa) N/A
Specific Gravity (Measured) Sensitivity N/A
91.36Area (cm2) Fines Fraction (%) 84.9 Plastic Limit 29
Initial Wet Unit Weight (kN/m3) Final Water Content (%) 59.46
Initial Dry Unit Weight (kN/m3) Final Saturation (%) >100
15.96
9.57
Weight Volume Relationships
Initial Wet Mass (g) Initial Water Content (%) 66.68
Dry Mass (g) Initial Saturation (%) >100
148.61
Consolidation
Max. Axial Strain % 8.75N/AEffective Overburden Pressure (kPa)
0.12
Cyclic Test Results
Frequency (Hz)
N/A
Axial Strain at end of Consol. % 8.75
Change in Height Hc (mm) 2.05
65.01
64.54Max Applied Vertical Stress (kPa)Vertical Stress at end of Consol (kPa)
BH14-12 Sa 2
64.2kPa, 8kPa 5min Cyclic
6.10-6.70
109
Comments / Special InstructionsPost cyclic monotonic test not requested
Comments / Special InstructionsOnly 100 cycles requested
Maximum Shear Strain MAX (%)
Shear Strength at MAX (kPa)
44.41
43.91
Excess Pore Pressure at Peak (kPa)
Ratio of Peak / 'v
2.41
0.16
84
Project No.:Project:Location:Client:
1403337/3000
Westridge Marine Terminal
Burnaby, BC
Trans Mountain Pipeline L.P.
Sample Number:Test ID:Depth (m):Lab ID No:
Equipment Description: GDS - Station 2
Max. DU at N=84 (zero load)
Min.
Initial Vertical Stress (kPa)
Initial Shear Stress (kPa)
Applied Shear Bias (kPa)
Rate of Shearing (%/hr)
Peak Shear Strength (kPa)
CSR
Cycles to 3.75% Shear Strain
Initial Vertical Stress (kPa)
Max Cyclic Shear Stress (kPa)
Max. Shear Strain at N=84 (zero load)
Min. Shear Strain at N=84 (zero load)
Moist Tamping
23.39
70.52
39.06
65.18
7.96
Post Cyclic Monotonic Test Results
0.003
-
Cyclic Direct Simple Shear Testing of Soils Under Consolidated Constant-Volume Conditions
NORSOK G-001Project No.:Project: Test ID:Location: Depth (m):Client: Lab ID No:
Consolidation Summary
Burnaby, BC 6.10-6.70
109Trans Mountain Pipeline L.P.
1403337/3000 Sample Number: BH14-12 Sa 2Westridge Marine Terminal 64.2kPa, 8kPa 5min Cyclic
Increment (kPa) 25
Stress at end of Consolidation (kPa)
Axial Strain at end of Consolidation (%)
OCR
Change in Height Hc (mm)
64.54
8.75
N/A
2.05
CommentsVolumetric strains during consolidation may not be comparable to those measured in an oedometer test due to seating of the platens and possible lateral sample deformation during loading.
64.2Load (kN) 0.1005 0.2539
Axial Strain (%) 1.47 8.75
Duration (min) 240 14362
DATE
Golder Associates Ltd.300, 3811 North Fraser Way, Burnaby, British Columbia, Canada V5J 5J2
Tel: 604-412-6899 Fax: 604-412-6816 www.golder.com
The test data given herein pertain to the sample provided only. This report constitutes a testing service only.
G. Patton April 6, 2016
TESTED BY DATE
M. Sanin
CHECKED BY
May 15, 2015
0.00
0.50
1.00
1.50
2.00
2.500 2000 4000 6000 8000 10000 12000 14000 16000
Time (min)
0
10
20
30
40
50
60
700 2000 4000 6000 8000 10000 12000 14000 16000
Time (min)
-
Cyclic Direct Simple Shear Testing of Soils Under Consolidated Constant-Volume Conditions
NORSOK G-001Project No.:Project: Test ID:Location: Depth (m):Client: Lab ID No:
1403337/3000 Sample Number: BH14-12 Sa 2Westridge Marine Terminal 64.2kPa, 8kPa 5min Cyclic
Burnaby, BC 6.10-6.70
109Trans Mountain Pipeline L.P.
Golder Associates Ltd.300, 3811 North Fraser Way, Burnaby, British Columbia, Canada V5J 5J2
Tel: 604-412-6899 Fax: 604-412-6816 www.golder.com
G. Patton May 15, 2015 M. Sanin April 6, 2016
TESTED BY DATE CHECKED BY DATE
The test data given herein pertain to the sample provided only. This report constitutes a testing service only.
0.20
0.15
0.10
0.05
0.00
0.05
0.10
0.15
0.20
8 6 4 2 0 2 4 6 8Shear Strain (%)
N = 1
N = 100
10
8
6
4
2
0
2
4
6
8
10
0 10 20 30 40 50 60 70Effective Vertical Stress (kPa)
N = 1
N = 100
-
Cyclic Direct Simple Shear Testing of Soils Under Consolidated Constant-Volume Conditions
NORSOK G-001Project No.:Project: Test ID:Location: Depth (m):Client: Lab ID No:
1403337/3000 Sample Number: BH14-12 Sa 2Westridge Marine Terminal 64.2kPa, 8kPa 5min Cyclic
Burnaby, BC 6.10-6.70
109Trans Mountain Pipeline L.P.
Golder Associates Ltd.300, 3811 North Fraser Way, Burnaby, British Columbia, Canada V5J 5J2
Tel: 604-412-6899 Fax: 604-412-6816 www.golder.com
G. Patton May 15, 2015 M. Sanin April 6, 2016
TESTED BY DATE CHECKED BY DATE
The test data given herein pertain to the sample provided only. This report constitutes a testing service only.
8.00
6.00
4.00
2.00
0.00
2.00
4.00
6.00
8.00
0 20 40 60 80 100 120Number of Cycles (N)
N = 1
N = 100
0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1
0 20 40 60 80 100 120Number of Cycles (N)
N = 1
N = 100
-
WESTRIDGE MARINE TERMINAL OFFSHORE GEOTECHNICAL INVESTIGATIONS - GEOTECHNICAL FACTUAL REPORT
APPENDIX F-7Monotonic Direct Simple Shear tests (DSS) - 2014
23 December 2016Report No. 1403337-023-R-Rev0
-
Direct Simple Shear Testing of Soils Under Consolidated Constant-Volume Conditions
NORSOK G-001
Vertical LVDT Serial No.:Vertical Load Cell Serial No.:Shear Load Cell Serial No.:
Peak Shear Strength (kPa)
Location: Burnaby, BC Depth (m): 7.90-7.95Client: Trans Mountain Pipeline L.P. Lab ID No: 109
Project No.: 1403337/3000 Sample Number: BH14-05 Sa 3Project: Westridge Marine Terminal-Offshore Invest. Test ID: 79.3kPa, Static (11%/hr)
Sample Properties
Preparation Method Trim from Undisturbed Visual Description Clayey SILT, grey, moist, soft, some shells
Height (mm) 23.57
General Remarks Equipment Description: GDS - Station 1113179
89612
30465
Area (cm2) 39.19 Fines Fraction (%) 90.4 Plastic Limit 36Diameter (mm) 70.64 Sand Fraction (%) 9.6 Liquid Limit 74
Volume (cm3) 92.37 Shear Strength est. (kPa) N/A
Specific Gravity (Measured) 2.68 Sensitivity N/A
Weight Volume Relationships
Initial Wet Mass (g) 143.95 Initial Water Content (%) 76.28
Dry Mass (g) 81.66 Initial Saturation (%) >100
Max Applied Vertical Stress (kPa) 79.35 Axial Strain at end of Consol. % 12.08
Vertical Stress at end of Consol (kPa) 79.20 Change in Height Hc (mm)
Initial wet (kN/m3) 15.29 Final Water Content (%) 65.67
Initial dry (kN/m3) 8.67 Final Saturation (%) >100
Consolidation
Effective Overburden Pressure (kPa) N/A Max. Axial Strain % 12.09
2.85
Initial Shear Stress (kPa) 0.23
Applied Shear Bias (kPa) 0.00
Maximum Shear Strain MAX (%) 20.00
Shear Strength at MAX (kPa) 23.27
Initial Vertical Stress (kPa) 79.12
Direct Simple Shear Test Results
23.78
Laboratory OCR N/A
Excess Pore Pressure at Peak (kPa) 35.57
Comments / Special Instructions
Tel: 604-412-6899 Fax: 604-412-6816 www.golder.com
TESTED BY DATE CHECKED BY DATE
Golder Associates Ltd.300, 3811 North Fraser Way, Burnaby, British Columbia, Canada V5J 5J2
The test data given herein pertain to the sample provided only. This report constitutes a testing service only.
G. Patton March 26, 2015 M. Sanin April 6, 2016
Ratio of Peak / 'v 0.30
Rate of Shearing (%/hr) 11.00
Test Condition Undrained
-
Direct Simple Shear Testing of Soils Under Consolidated Constant-Volume Conditions
NORSOK G-001Project No.:Project: Test ID:Location: Depth (m):Client: Lab ID No:
DATE
Golder Associates Ltd.300, 3811 North Fraser Way, Burnaby, British Columbia, Canada V5J 5J2
Tel: 604-412-6899 Fax: 604-412-6816 www.golder.com
The test data given herein pertain to the sample provided only. This report constitutes a testing service only.
G. Patton April 6, 2016
TESTED BY DATE
M. Sanin
CHECKED BY
March 26, 2015
9306
Load (kN) 0.0982 0.1959 0.311
Axial Strain (%) 2.36 5.89 12.09
Duration (min) 360 360
Increment (kPa) 25
Stress at end of Consolidation (kPa)
Axial Strain at end of Consolidation (%)
OCR
Change in Height Hc (mm)
79.20
12.08
N/A
2.85
CommentsVolumetric strains during consolidation may not be comparable to those measured in an oedometer test due to seating of the platens and possible lateral sample deformation during loading.
50 79.3
1403337/3000 Sample Number: BH14-05 Sa 3Westridge Marine Terminal-Offsh 79.3kPa, Static (11%/hr)
Consolidation Summary
Burnaby, BC 7.90-7.95
Trans Mountain Pipeline L.P. 109
0.00
0.50
1.00
1.50
2.00
2.50
3.000 2000 4000 6000 8000 10000 12000 14000
Time (min)
01020304050
60708090
0 2000 4000 6000 8000 10000 12000 14000Time (min)
-
Direct Simple Shear Testing of Soils Under Consolidated Constant-Volume Conditions
NORSOK G-001Project No.:Project: Test ID:Location: Depth