port of gulfport restoration program p r e s u b m i t t a l m e e t i n g environmental services...
TRANSCRIPT
Port of GulfportRestoration ProgramPort of GulfportRestoration Program
P R E S U B M I T T A L M E E T I N G
Environmental Services Procurement 09-004P R E S U B M I T T A L M E E T I N G
Environmental Services Procurement 09-004
August 27, 2009
Objectives
Protection of Port, City, and Property.Plan the Port of Gulfport for the next 100 years.Leverage CDBG funds for greater return.Create well-paying jobs.Stimulate education in the workforce.Encourage a revitalized City Business District.Produce a context sensitive plan.
– Socially– Environmentally
Unique Opportunities
Only hurricane resistant port on Gulf Coast.Good and available labor pool.Modern more efficient operation.Direct access to interstate highway system.Direct access to national rail system.Potential future short-sea shipping opportunity.Significant support in local community.Active State Government support.Shovel-Ready Projects - High Benefit/Cost Ratio.
Port of Gulfport 2006
Baseline Plan
Comparison to Existing
10-Year Vision
Environmental Benefits
Beneficial Use of Dredged Materials.Develop a water circulation path.
– better water quality.– fish passage.
Higher Technology– low pollution.– reduced noise
Protecting view shed.
Total Port Job Benefits
At 750,000 TEU Throughput– 3,900 Direct Jobs– 4,000 Induced Jobs– 2,500 Indirect Jobs– 58,000 User-Supported Jobs.
At 3,000,000 TEU Throughput– 12,000 Direct Jobs– 12,200 Induced Jobs– 9,400 Indirect Jobs– 230,000 User-Supported Jobs.
Construction Jobs not included.
Training new job skillsDirect Jobs run the logistics system
– Longshoremen– Maritime Agents– Warehousing and Distribution Centers
Indirect Jobs support the logistics system– Construction– Maintenance and Repair– Retail and Wholesale Supply Services
Induced Jobs provide for quality of life– Restaurants– Housing, real estate– Health Care
User-Supported Jobs– Retail Jobs resulting from goods coming through the Port.
Total Port Economic Benefit
For 750,000 TEU Throughput– $ 2.5 Billion in personal income.– $10.2 Billion in total annual economic impact to Mississippi.– $ 970 Million annual direct business revenue.– $ 72 Million annual State and local tax revenue.
For 3 Million TEU Throughput– $ 9.8 Billion in personal income.– $40.7 Billion in total annual economic impact to Mississippi.– $ 3.6 Billion annual direct business revenue.– $ 228 Million annual State and local tax revenue
Construction contribution not included
Current ProgressMajor Milestones
– Selected Program Manager (June 6, 2008).– Performed Community Outreach.– Initiated HUD Compliance and Reporting.– Received HUD amendment approval documenting new concept
(October 24, 2008).– Signed Sub Recipient Agreement with MSPA (December 23, 2008).– CH2M HILL Program Mgmt. assigned to MSPA (December 23, 2008).– MSPA awarded 60-Acre Fill Project (January 12, 2009).– Approved new Port Restoration Program vision (January 14, 2009).– Initiate 60-Acre Fill Construction– Hired Director of Disaster Recovery (August 1, 2009)– Executed 5 Consultant Service Contracts (August 26, 2009)
Plan Going ForwardPermitting the Vision Plan beginning May 2009.Temporarily relocate existing tenants.Initiate environmental studies and permitting for vision plan.Encourage MDOT construction of connector road.Encourage USACE dredging of the navigation channel.Encourage CSX and KCS participation.Build new facilities for existing tenants.Bid first Concession.Finish infrastructure improvements.Build bridge, cut interior channel, complete landscaping.
Multi-Phase Program
Phase 1 – Program Development.– Create 50-Year Vision and define components.
– Complete Business and Economic Analysis.
Phase 2 – Tasks for Immediate Execution. – Part 1 - Re-construction of port with existing permits.
– Part 2 - Permitting for new port configuration.
Phase 3 – Construction of Vision Plan.
Phase 1 Activities
Program Development.– Improve Program Description.– Analyze coastal processes for Recreation Channel.– Gather field geotech data (material characterization).– Aerial survey.– Underground survey.– Improve cost estimates.– Revisit Economic and Business Analysis.
Phase 2 Activities (Part 1)
Re-construction of port with existing permits.– Environmental Services for HUD compliance.– Possible re-construction the freezer (RFP prepared).– 60-acre fill (under construction).– Tenant improvements.– Demolition of casino ramp (awarded).– Temporary roadways.– Land-side fill.– Emergency dredging of Navigation Channel (completed).
Phase 2 Activities (Part 2)
Permitting for new port configuration.– Environmental studies for NEPA compliance.– Alternatives Identification.– Coastal studies.– Preliminary Engineering (to support environmental
studies).– Complete Engineering where possible.– Economic Benefits Studies.– Permitting.
CH2M HILL Role
Program Manager– NOT the Engineer.– NOT the Construction Manager.– NOT the Contractor.
CH2M HILL Team
T. L. Wallace Construction, Inc.N-Y Associates, Inc.
Other Consultants used by the Team:JJR, LLC.TransystemsMartin AssociatesMacPorts, LLC.Brad Julian
CH2M HILL Council of Experts
Gary Gilbert, Hutchison Port HoldingsStephen A. Curtis, Tetra Tech, Inc.John C. Corrough, Corrough Consulting GroupRichard A. Woodman (Retired)Wade Watson, kpff Consulting EngineersBrad Julian, Independent Consultant
HUD Compliance
Community Development Block Grant Program– A HUD grant program providing communities with
economic resources to address community needs.
Disaster Recovery Assistance– Grants to help cities, counties, and states to recover
from Presidentially declared disasters.
General HUD RequirementsCitizen participationFinancial managementEnvironmental sensitivityLabor standards (Davis-Bacon)Acquisition of real property/relocationAdministration/planning spending limitEligible and related to effects of covered disasterGrantee is responsible for day-to-day managementRecordkeeping (retain for three years)Grantee – HUD closeoutPrivacyFreedom of Information Act (FOIA)
Labor Standards
Health and Safety StandardsAnti-Kickback RulesWithholding of SalariesEqual Employment OpportunitiesAnti-DiscriminationPolitical ActivitiesMississippi Employment Protection Act
Recordkeeping
Retain records for three years after final paymentProvide access to records
– HUD, MSPA, MDA, State of Mississippi
CH2M HILL is implementing a document control program to help contractors manage their documents
Monitoring and Audits
All activities will be subject to State of Mississippi monitoring and HUD auditsMonitoring and audits can occur up to three years after the final payment
InvoicingMSPA must request funds from MDA.Prime contractor’s invoices received by MSPA by the 20th of the monthCH2M HILL will review and make recommendations by the 27th of the monthMSPA will request funds from MDA on approximately the 1st of the monthPort Commission Agenda for approval of invoice is set on the first Wednesday of the month
Invoicing (continued)
Port Commission Meeting for approval of invoices on the second Thursday of the monthMSPA makes a request for funds to MDAMSPA receives funds from MDA approximately two weeks after requestMSPA issues checks (or electronic transfer) within three days of receipt of fundsIt takes approximately six weeks to receive funds
Current Contracts
Aerial Survey and MappingUtility and Underground SurveyingGeotechnical Investigation and EngineeringGeneral Civil EngineeringConstruction Materials TestingConstruction Management
Future RFQs
GIS System Development and Maintenance.High-Voltage ElectricalElectrical DistributionWet UtilitiesCoastal Engineering (September 8)Dredging (October 12)Rail Design (October 12)Roadway Design (September 8)
General Information
Local MS and minority participation is encouraged.Mentoring of small MS firms is very desirable.
– Educating/Improving the MS workforce is the objective.– Doesn’t count without executed agreement.
Encouraging local (MS) participation as prime.Attempt to limit construction contracts to reasonable range.
General Information
Construction IDIQs bid based on unit prices and estimated quantities.IDIQs have no guarantee of work.Phase 2 expected to last 4 years.All contracts will be executed with the Port.CH2M HILL will manage all contracts.
General Information
Work is under a Federal Grant and will require compliance with HUD and other Federal regulations.May choose more than one firm per RFP.Try not to choose one firm for two RFPs.Selection Committee likely to be MSPA, MDA, and CH2M HILL staff.Interviews not planned, may in special cases.
General Information
• There will not be a mandatory site visit.• Firm must be licensed to work in MS.• Meetings will be in Gulfport.• MSPA Commissioners and MSPA, CH2M HILL, and
MDA staff should not be contacted.• Professional selection will be competitive; best
qualified.• Construction will be competitive; lowest and best.
Selection Process• Selection Committee will evaluate all submittals
– may select most qualified respondent– may define a “short-list” and conduct interviews
• After selection, will review submitted cost materials• Will initiate contract negotiations with most qualified• If unable to negotiate a satisfactory contract, will
proceed to the next most qualified• Time is of the essence
A Last Reminder• The Request for Proposals and Qualifications packets are filed in the
office of the Mississippi State Port Authority, Engineering Department, 2510 14th Street, Suite 1450, Gulfport, Mississippi 39501. These documents may be obtained by written request to the office indicated above, or by calling the Engineering Department at 228-865-4300
• Questions regarding this request shall be submitted via email to the Program Management Office:
• [email protected]• Questions must be submitted prior to August 31, 2009.• MSPA will provide a list of submitted questions and answers to all
potential respondents by September 2, 2009.• Proposal Submittal Due – September 8, 2009
Thank you for your attention.
Questions and Comments
Baseline Plan