POPLIN INSTALLATION INSTRUCTIONS VANITY K-96016T-1/-4/-8 K-96017T-1/-4/-8 -1- · · · · · · Observe all local plumbing and building codes. Prior to installation, unpack the new lavatory and inspect it for damage. Return the lavatory to its protective carton until you are ready to install it. All information in these instructions are based the latest product information available at the time of publication. Kohler China reserves the right to make changes in product characteristics, packaging, or availability at any time without notice. Fixture dimensions are nominal and conform to tolerances established by ASME Standards (A112.19.2-2013). The product complies with GB 6952-2015. Please purchase 880089-CP as accessory to match with draw bar faucet of Kohler brand. Make sure that the wall and floor are square and plumb to ensure proper installation. IMPORTANT: · · · · · · ASME (A112.19.2- 2013) GB 6952-2015 880089-CP ORDERING INFORMATION Poplin Vanity Top 940mm .............................K-96016T-1/-4/-8 Poplin Vanity Top 1245mm ...........................K-96017T-1/-4/-8 940mm .................................K-96016T-1/-4/-8 1245mm ...............................K-96017T-1/-4/-8 REQUIRED MATERIALS/ (NOT SUPPLIED) TOOLS · · · · · · · Level Drill with bit 6mm 14mm wrench Framing square Channel lock pliers Tape measure Pencil · · · · · · · 6mm 14mm No.2 KOHLER ROAD, SANSHUI CENTRAL INDUSTRIAL PARK, LEPING TOWN, SANSHUI DIST., FOSHAN, GUANGDONG, PRC POST CODE 528137 2 528137 8# MENGSHAN RD, ECONOMIC DEVELOPMENT ZONE OF HUANTAI, ZIBO, SHANDONG, CHINA POST CODE: 256410 8 256410 © © Copyright Kohler China Investment Co., Ltd. 2016 2016 1305550-T01-A

Upload: others

Post on 01-Oct-2020

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: POPLIN - deyu-design.com · POPLIN INSTALLATION INSTRUCTIONS VANITY K-96016T-1/-4/-8 K-96017T-1/-4/-8-1-ASME (A112.19.2-Observe all local plumbing and building codes. Prior to installation,

POPLININSTALLATION INSTRUCTIONS

VANITY

K-96016T-1/-4/-8K-96017T-1/-4/-8

-1-

Observe all local plumbing and building codes.

Prior to installation, unpack the new lavatory and inspect itfor damage. Return the lavatory to its protective cartonuntil you are ready to install it.

All information in these instructions are based the latestproduct information available at the time of publication.Kohler China reserves the right to make changes inproduct characteristics, packaging, or availability at anytime without notice.

Fixture dimensions are nominal and conform to tolerancesestablished by ASME Standards (A112.19.2-2013).The product complies with GB 6952-2015.Please purchase 880089-CP as accessory to match withdraw bar faucet of Kohler brand.

Make sure that the wall and floor are squareand plumb to ensure proper installation.IMPORTANT:

� ASME (A112.19.2-

2013)GB 6952-2015

880089-CP

ORDERING INFORMATION

Poplin Vanity Top 940mm .............................K-96016T-1/-4/-8

Poplin Vanity Top 1245mm ...........................K-96017T-1/-4/-8

940mm .................................K-96016T-1/-4/-8

1245mm ...............................K-96017T-1/-4/-8

REQUIRED MATERIALS/

(NOT SUPPLIED)

TOOLS

Level

Drill with bit6mm

14mm wrench

Framing square

Channel lock pliers

Tape measure

Pencil

6mm

14mm

No.2 KOHLER ROAD, SANSHUI CENTRAL INDUSTRIAL PARK, LEPING TOWN, SANSHUI DIST., FOSHAN, GUANGDONG, PRC POST CODE 5281372 528137

8# MENGSHAN RD, ECONOMIC DEVELOPMENT ZONE OF HUANTAI, ZIBO, SHANDONG, CHINA POST CODE: 2564108 256410

©

©

Copyright Kohler China Investment Co., Ltd. 2016

20161305550-T01-A

Page 2: POPLIN - deyu-design.com · POPLIN INSTALLATION INSTRUCTIONS VANITY K-96016T-1/-4/-8 K-96017T-1/-4/-8-1-ASME (A112.19.2-Observe all local plumbing and building codes. Prior to installation,

-2-

ROUGHING-IN DIMENSIONSROUGHING-IN DIMENSIONS

UNIT: mm:

Reference Value

K-96016T-1

K-96016T-4

K-96016T-8

Installation Side

Installation Side

Installation Side

79

79

79

19

19

19

190

190

190

139

139

139

303

303

303

569

569

569

356

356

356

467

467

467

940

940

940

79

79

79

303

303

303

35

3- 35

3- 35

45

45

45

102

203

1305550-T01-A

Page 3: POPLIN - deyu-design.com · POPLIN INSTALLATION INSTRUCTIONS VANITY K-96016T-1/-4/-8 K-96017T-1/-4/-8-1-ASME (A112.19.2-Observe all local plumbing and building codes. Prior to installation,

Fig.#11

Kohler reserves the right to change marked dimensions without prior notice.

K-96017T-1

K-96017T-4

K-96017T-8

-3-

35

3- 35

3- 35

45

45

45

1245

1245

1245

467

467

467

79

79

79

303

303

303

569

569

569

356

356

356

102

203

Installation Side

79

139

19

190

303

Installation Side

79

139

19

190

303

Installation Side

79

139

19

190

303

1305550-T01-A

Page 4: POPLIN - deyu-design.com · POPLIN INSTALLATION INSTRUCTIONS VANITY K-96016T-1/-4/-8 K-96017T-1/-4/-8-1-ASME (A112.19.2-Observe all local plumbing and building codes. Prior to installation,

-4-

�� Install the faucet and drain to the lavatory according to the

manufacture's instructions.

CAUTION: Risk of product damage. Do notovertighten the cap nuts.Overtightening may causedamage to the product.

Clean the lavatory top.�

�� Apply some sealant continuously and evenly around the

top of the vanity. Carefully place the lavatory on the

cabinet, and then gently press down until level. Wipe

away excess sealant.

Fig.#33

1. 2 3

2.

NOTE: 1. Height dimensions marked in fig. 2 and fig. 3 could

be adjusted per your the vanity height or the actual

height of the console leg.

2. Other fastening devices of sufficient size and

strength may also be used.

550m

m WasteOutlet

Waste

630m

m

80mm

Fig.#22

Install the Basin

Note! The lavatory tops must be installed on a cabinet or

matching metal stand (refer to Installation and User Guide

packed with the cabinet or stand for installation details).

Recommend Kohler metal square leg or Kohler bathroom

furniture for support or decoration.

(

)

76mm

� Rough-in the supplies and the drain piping.

The supply stop handles cannot extend more than

76mm from the finish wall when in the open position.

NOTE:

1305550-T01-A

Page 5: POPLIN - deyu-design.com · POPLIN INSTALLATION INSTRUCTIONS VANITY K-96016T-1/-4/-8 K-96017T-1/-4/-8-1-ASME (A112.19.2-Observe all local plumbing and building codes. Prior to installation,

-5-

IMPORTANT CONSUMER INFORMATIONIMPORTANT CONSUMER INFORMATION

CARE AND CLEANING

To keep your lavatory looking new, make sure you rinse it out

thoroughly after each use. on this

product, as they will scratch and ruin the surface. Stubborn

stains, paint, or tar can be removed with turpentine or paint

thinner.

DO NOT USE ABRASIVES

Caution! Risk of product damage.

Many cleaners contain abrasive and chemical substances,

and should not be used for cleaning stainless steel, enamel,

plated or plastic fittings.

These finishes should be cleaned using a mild washing up

detergent or soap solution, rinsed and then wiped dry with a

soft clean cloth.

1.

2.

3.

4.

Install the Plumbing

1. Install the drain in accordance with the manufacturer sinstructions.

Make sure a watertight seal exists on allbasin drain connections.

Provide access to the plumbing connectionsfor future plumbing maintenance.

2. Connect the hot and cold water supplies.

3. Open the hot and cold water valves, and check the supplyconnections for leaks.

4. Run water into the basin, and check the drain connectionsfor leaks.

Caution!

Caution!

,

Fig.#44

1305550-T01-A