polyflex®advanced pu - advanced pu material 7 finished expansion joint on our website, , you...

2
Further informaon: Exceponal long working life due to the absence of mechanical wear parts Maintenance-free, cleaning not required Quickly installed (e. g. overnight), lane-by-lane, with minimal impact on traffic No recess required for anchorage in structural concrete No noise from crossing traffic since surface is flush with adjacent road Total movements of 15–135 mm 100 % waterght Highlights POLYFLEX®ADVANCED PU

Upload: phungliem

Post on 30-Mar-2018

214 views

Category:

Documents


2 download

TRANSCRIPT

Switzerland www.mageba.ch

Dehnfugenmageba flexible plug expansion joint – the new generation

Further information:

• Exceptional long working life due to the absence of mechanical wear parts

• Maintenance-free, cleaning not required

• Quickly installed (e. g. overnight), lane-by-lane, with minimal impact on traffic

• No recess required for anchorage in structural concrete

• No noise from crossing traffic since surface is flush with adjacent road

• Total movements of 15–135 mm• 100 % watertight

Highlights

POLYFLEX®ADVANCED PU

32

7

1 4

65

Support / Contact

Reference projects – POLYFLEX®ADVANCED PU

Lehnenbrücke Biberbrugg (CH)

Hornbridge Kitzbühel (AT) Schiphol Airport (NL) Neudrossenfeld A 70 (DE)

Scope of application

Street designPOLYFLEX®ADVANCED PU joint for road bridges.

Vertical jointButt joints to horizontal joints can be easily casted in any shape.

• Bridge structures for all traffic types (street, pedestrian and railway bridges)

• Architectural and industrial struc tures

• Railway stations and parking decks• Airport buildings, hangars and

runways• Sterile joints for pharmaceutical

industries

• Chemical industries, where resistance to alkaline and acids is required

• Clinics, hospitals and laboratories• Replacement of traditional steel

joints• Sliding floors in heavy load

industries• and many more

Installation process in 7 steps

Lane-by-lane refurbishment and

re-opening to traffic possible

within 72 hours.

1 Marking and cutting of the previously applied surfacing

2 Removal of asphalt and cutting of support ribs

3 Cleaning, sandblasting and application of primer

4 Creating polymer-concrete base

5 Installation of steel angles and coverplate

6 Filling with POLYFLEX®ADVANCED PU material

7 Finished expansion joint

On our website, www.mageba.ch, you will find further product information. Our product specialists will be pleased to advise you in the selection of the optimal technical solution for your project, and to provide you with a quotation:mageba sa | T: +41 44 872 40 50 | E: [email protected]

Switzerland www.mageba.ch

mageba sa - Solistrasse 68 - CH-8180 Bülach - T +41 44 872 40 50 - [email protected] 2015.09 CH-EN ©mageba