poly canyon - digital journalismdigitaljournalism.org/blog/wp-content/uploads/2019/... · framing...

8
SHEET NO. TITLE: SCALE: CHECKED BY: DRAWN BY: POLY CANYON OBSERVATION DECK CALIFORNIA POLYTECHNIC STATE UNIVERSTY SAN LUIS OBISPO CALIFORNIA 93407 KEVIN DONG NO. DATE DESCRIPTION 01 10/15/2017 15% CD ISSUED BY: CAED PROJECT NO: #### CONTRIBUTORS: JORDAN MOROFSKY SITORA VAXIDOVA EMIR KULJANCIC PROJECT INFO: THIS IS A STUDENT PROJECT AND NOT ENDORSED BY THE ARCE OR CM DEPARTMENTS, NOR BY THE CAED 02 4/16/2018 50% CD S1.0 TITLE SHEET SHEETS NAME NUMBER TITLE SHEET S1.0 FOUNDATION PLAN S2.0 FRAMING PLAN S2.1 Roof Framing Plan S2.2 Elevation S2.3 Bench Details S3.0 DETAILS S4.0 DETAILS S4.1 POLY CANYON OBSERVATION DECK A. GENERAL 1. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS PRIOR TO STARTING CONSTRUCTION. THE ARCHITECT SHALL BE NOTIFIED OF ANY DISCREPANCIES OR INCONSISTENCIES. 2. DO NOT SCALE THE DRAWINGS. 3. NOTES AND DETAILS ON THE DRAWINGS SHALL TAKE PRECEDENCE OVER THESE GENERAL NOTES AND THE TYPICAL DETAILS. 4. ALL WORK SHALL CONFORM TO THE MINIMUM STANDARDS OF THE FOLLOWING CODES: ASCE 7 - 10, NDS 2015, ACI 316, THE 2016 EDITION OF THE CALIFORNIA BUILDING CODE, AND OTHER REGULATING AGENCIES WHICH HAVE AUTHORITY OVER ANY PORTION OF THE WORK, AND THOSE CODES AND STANDARDS LISTED IN THESE NOTES AND IN THE PROJECT SPECIFICATIONS. 7. THE CONTRACT STRUCTURAL DRAWINGS AND SPECIFICATIONS REPRESENT THE FINISHED STRUCTURE. THEY DO NOT INDICATE THE METHOD OF CONSTRUCTION. 8. THE CONTRACTOR SHALL PROVIDE ALL MEASURES NECESSARY TO PROTECT THE STRUCTURE DURING CONSTRUCTION. SUCH MEASURES SHALL INCLUDE, BUT NOT BE LIMITED TO BRACING AND SHORING FOR LOADS DUE TO HYDROSTATIC, EARTH, WIND OR SEISMIC FORCES, CONSTRUCTION EQUIPMENT, ETC. OBSERVATION VISITS TO THE SITE BY THE STRUCTURAL ENGINEER SHALL NOT INCLUDE INSPECTION OF THE ABOVE ITEMS. 9. NOTIFY THE STRUCTURAL ENGINEER WHEN DRAWINGS BY OTHERS SHOW OPENINGS, POCKETS, ETC., NOT SHOWN ON THE STRUCTURAL DRAWINGS, BUT WHICH ARE LOCATED IN THE STRUCTURAL MEMBERS. 10. ALL SPECIFICATIONS AND CODES NOTED SHALL BE THE LATEST APPROVED EDITIONS AND REVISIONS BY THE GOVERNMENTAL AGENCY HAVING JURISDICTION OVER THIS PROJECT. 11. CONTRACTOR SHALL INVESTIGATE THE SITE DURING CLEARING AND EARTH WORK OPERATIONS FOR FILLED EXCAVATIONS OR BURIED STRUCTURES SUCH AS CESSPOOLS, CISTERNS, FOUNDATIONS, UTILITIES, ETC. IF ANY SUCH STRUCTURES ARE FOUND, THE STRUCTURAL ENGINEER SHALL BE NOTIFIED IMMEDIATELY. 12. CONSTRUCTION MATERIALS SHALL BE SPREAD OUT WHEN PLACED ON FRAMED FLOORS OR ROOFS. THE CONSTRUCTION MATERIAL LOAD SHALL NOT EXCEED THE DESIGN LIVE LOAD 50 POUNDS PER SQUARE FOOT. PROVIDE ADEQUATE SHORING AND/OR BRACING WHERE STRUCTURE HAS NOT ATTAINED DESIGN STRENGTH. 14. ARCHITECT S/ENGINEER S REVIEW OF THE SHOP DRAWINGS SHALL NOT BE CONSTRUED AS AN AUTHORIZATION TO DEVIATE FROM THE CONTRACT DOCUMENTS. 15. DESIGN LIVE LOADS: 16. WIND LOAD CRITERIA: BASIC WIND SPEED: 100 ft/s WIND IMPORTANCE FACTOR Iw = 1.0 WIND EXPOSURE: C 17. SEISMIC DESIGN CRITERIA: RISK CATEGORY: II SEISMIC IMPORTANCE FACTOR: I e = 1.0 SPECTRAL RESPONSE ACCELERATIONS: S s = 1.118g S 1 = 0.426g SPECTRAL RESPONSE COEFFICIENTS: S DS = 0.785g S D1 = 0.447g SITE CLASS: D SEISMIC DESIGN CATEGORY: SEISMIC FORCE RESISTING SYSTEM(S): BRACING SEISMIC RESPONSE COEFFICIENT: C s = RESPONSE MODIFICATION FACTOR(S): R = ANALYSIS PROCEDURE: DESIGN BASE SHEAR: 2.0 B. REVIEW OF SPECIALTY ITEMS AND PRE - ENGINEERED ELEMENTS 1. SPECIALTY ITEMS, PRE - ENGINEERED COMPONENTS, AND DESIGN/BUILD ELEMENTS ARE THOSE ITEMS WHICH ARE SPECIFIED IN THE CONSTRUCTION DOCUMENTS BUT WHICH REQUIRE DESIGN BY THE CONTRACTOR, THE MANUFACTURER, SUPPLIER, OR INSTALLER. SEE CONCRETE AND MASONRY NOTES FOR MIX DESIGN REQUIREMENTS. 2. SUBMITTAL REQUIRED BY THE STRUCTURAL ENGINEER OF RECORD OR THE BUILDING DEPARTMENT: A. STRUCTURAL PRECAST CONCRETE FOOTINGS. B. TIMBER JOISTS AND GIRDERS. C. STAIRS, HANDRAILS, AND GUARDRAILS. E. WOOD BRACES. THE CONTRACTOR SHALL PROVIDE AND INSTALL ALL ANCILLARY MEMBERS INCLUDING BUT NOT LIMITED TO BEAMS, COLUMNS, HANGERS, FOOTINGS, STIFFENERS, GUSSETS, KICKERS, BRACES, ETC. AND INTENDED CONNECTIONS. 3. SUBMITTAL SHALL INCLUDE: A. CALCULATIONS, PREPARED BY A LICENSED ENGINEER LAWFULLY ELIGIBLE TO DESIGN THE ELEMENT OR COMPONENT (THE SPECIALTY ENGINEER) SEALED IN ACCORDANCE WITH STATE LAW. B. A DIAGRAM SHOWING LOAD MAGNITUDES AND LOCATIONS, SEPARATED INTO DEAD, LIVE, WIND AND/OR SEISMIC COMPONENTS - THAT ARE APPLIED TO THE PRIMARY STRUCTURE, PREPARED BY THE SPECIALTY ENGINEER AND SEALED IN ACCORDANCE WITH STATE LAW. C. ERECTION OR DESIGN DRAWINGS AS NECESSARY TO DESCRIBE THE SYSTEM OR COMPONENT AND ITS CONNECTION TO THE PRIMARY STRUCTURE WITH THE SPECIALTY ENGINEER'S SHOP DRAWING STAMP OR SEAL, AS IS APPROPRIATE, THE SHOP DRAWING STAMP OF THE ENGINEER, IF ANY, RESPONSIBLE FOR SPECIFYING THE ITEM, AND THE ARCHITECT'S STAMP INDICATING HIS REVIEW. 4. SUBMIT ONE WET SEALED COPY, AND ADDITIONAL COPIES AS NECESSARY FOR THE BUILDING DEPARTMENT. SUBMITTAL CONTAINING EXCEPTIONS, CORRECTIONS, OR OTHER REVIEW COMMENTS IS NOT ACCEPTABLE FOR SUBMITTAL TO THE BUILDING DEPARTMENT. 5. THE STRUCTURAL ENGINEER OF RECORD'S REVIEW IS STRICTLY LIMITED TO THE FOLLOWING DETERMINATIONS: A. NECESSARY APPROVALS HAVE BEEN OBTAINED. B. THE DRAWINGS AND CALCULATIONS ARE PROPERLY SEALED. C. THE LOAD CRITERIA IS CONSISTENT WITH THE CONTRACT DOCUMENTS AND CURRENT BUILDING CODE REQUIREMENTS. D. THE CONNECTIONS TO THE PRIMARY STRUCTURE ARE CONSISTENT WITH THE PRIMARY DESIGN. E. THE BASE STRUCTURE IS CAPABLE OF SUPPORTING THE IMPOSED LOADS. 6. THE STRUCTURAL ENGINEER OF RECORD WILL RELY UPON THE SPECIALTY ENGINEER'S SEAL AS CERTIFICATION THAT THE ITEMS DESIGNED BY THE SPECIALTY ENGINEER CONFORM TO THE CRITERIA SET FORTH IN THE CONTRACT DOCUMENTS AND APPLICABLE CODES AND STANDARDS INCORPORATED THEREIN BY REFERENCE. 7. IF THE LOADS IMPOSED ON THE STRUCTURE EXCEED THE LOAD ALLOWANCE PROVIDED BY THE STRUCTURAL ENGINEER OF RECORD THE SUBMITTAL WILL BE REJECTED. 8. ONLY AT THE CLIENT'S WRITTEN DIRECTION WILL MODIFICATIONS TO THE BASE STRUCTURE TO ACCOMMODATE THE SPECIALTY ITEMS BE MADE BY THE STRUCTURAL ENGINEER OF RECORD. P. WOOD 1. FRAMING LUMBER SHALL BE REDWOOD NO. 2 GRADE, COLUMNS SHALL BE REDWOOD SELECT STRCTURAL GRADE. MAXIMUM ALLOWABLE MOISTURE CONTENT SHALL BE 19% UNLESS OTHERWISE NOTED. 2. ALL PLYWOOD SHALL BE CC OR CD CONFORMING TO PRODUCT STANDARD PS 1. 3. ALL BOLTS SHALL CONFORM TO ASTM A307. BOLT HOLES SHALL BE 1/16 IN. MAXIMUM LARGER THAN THE BOLT SIZE. RETIGHTEN ALL NUTS PRIOR TO CLOSING IN. 4. STANDARD CUT WASHERS SHALL BE USED UNDER BOLT HEADS AND NUTS AGAINST WOOD. 8. DO NOT NOTCH JOISTS, RAFTERS OR BEAMS, EXCEPT WHERE SHOWN IN DETAILS. OBTAIN STRUCTURAL ENGINEERS' APPROVAL FOR ANY HOLES OR NOTCHES NOT DETAILED. HOLES THROUGH SILLS, PLATES, STUDS AND DOUBLE PLATES IN INTERIOR, BEARING AND SHEAR WALLS SHALL NOT EXCEED 1/3 THE PLATE WIDTH. USE BORED HOLES LOCATED IN THE CENTER OF THE STUD OR PLATE. 11. UNLESS NOTED OTHERWISE, PRE - MANUFACTURED FRAMING CONNECTORS CALLED FOR ON THE DRAWINGS SHALL BE SIMPSON STRONG - TIE CONNECTORS, OR APPROVED EQUAL. U. STRUCTURAL OBSERVATIONS 1. THE ENGINEER OF RECORD REQUIRES STRUCTURAL OBSERVATION AT STAGES OF CONSTRUCTION NOTED BELOW. THE OWNER SHALL EMPLOY THE ENGINEER OF RECORD RESPONSIBLE FOR THE STRUCTURAL DESIGN TO PERFORM STRUCTURAL OBSERVATIONS AS DEFINED IN SECTION 1704.5 OF THE 2013 CBC. 2. THE CONTRACTOR SHALL NOTIFY THE ENGINEER OF RECORD AT LEAST 48 HOURS BEFORE COMPLETION OR COVERING UP THE FOLLOWING STAGES OF CONSTRUCTION: A. FOUNDATION REINFORCING PLACEMENT B. ROUGH FRAMING AND CONNECTION, PRIOR TO BEING COVERED BY FINISHES SYMBOLS CARRIAGE BOLT CB CONCRETE CONC HURRICANE TIE HT LOCK WASHER LW NUT NT PRESSURE TREATED PT WASHER WS

Upload: others

Post on 18-Jul-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: POLY CANYON - Digital Journalismdigitaljournalism.org/blog/wp-content/uploads/2019/... · framing connectors called for on the drawings shall be simpson strong -tie connectors, or

SHEET NO.

TITLE:

SCALE:

CHECKED BY:

DRAWN BY:

POLY CANYON OBSERVATION DECK

CALIFORNIA POLYTECHNIC STATE UNIVERSTY

SAN LUIS OBISPO CALIFORNIA 93407

KEVIN DONG

NO. DATE DESCRIPTION

01 10/15/2017 15% CD

ISSUED BY: CAED

PROJECT NO: ####

CONTRIBUTORS:

JORDAN MOROFSKY

SITORA VAXIDOVA

EMIR KULJANCIC

PROJECT INFO:

THIS IS A STUDENT PROJECT AND NOT ENDORSED BY THE

ARCE OR CM DEPARTMENTS, NOR BY THE CAED

02 4/16/2018 50% CD

S1.0

TITLE SHEET

SHEETS

NAME NUMBER

TITLE SHEET S1.0

FOUNDATION PLAN S2.0

FRAMING PLAN S2.1

Roof Framing Plan S2.2

Elevation S2.3

Bench Details S3.0

DETAILS S4.0

DETAILS S4.1

POLY CANYON OBSERVATION DECK

A. GENERAL

1. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS PRIOR TO STARTING CONSTRUCTION. THE ARCHITECT SHALL BE NOTIFIED OF ANY DISCREPANCIES OR INCONSISTENCIES.

2. DO NOT SCALE THE DRAWINGS.

3. NOTES AND DETAILS ON THE DRAWINGS SHALL TAKE PRECEDENCE OVER THESE GENERAL NOTES AND THE TYPICAL DETAILS.

4. ALL WORK SHALL CONFORM TO THE MINIMUM STANDARDS OF THE FOLLOWING CODES: ASCE 7-10, NDS 2015, ACI 316, THE 2016 EDITION OF THE CALIFORNIA BUILDING CODE, AND OTHER REGULATING AGENCIES WHICH HAVE AUTHORITY OVER ANY PORTION OF THE WORK, AND THOSE CODES AND STANDARDS LISTED IN THESE NOTES AND IN THE PROJECT SPECIFICATIONS.

7. THE CONTRACT STRUCTURAL DRAWINGS AND SPECIFICATIONS REPRESENT THE FINISHED STRUCTURE. THEY DO NOT INDICATE THE METHOD OF CONSTRUCTION.

8. THE CONTRACTOR SHALL PROVIDE ALL MEASURES NECESSARY TO PROTECT THE STRUCTURE DURING CONSTRUCTION. SUCH MEASURES SHALL INCLUDE, BUT NOT BE LIMITED TO BRACING AND SHORING FOR LOADS DUE TO HYDROSTATIC, EARTH, WIND OR SEISMIC FORCES, CONSTRUCTION EQUIPMENT, ETC. OBSERVATION VISITS TO THE SITE BY THE STRUCTURAL ENGINEER SHALL NOT INCLUDE INSPECTION OF THE ABOVE ITEMS.

9. NOTIFY THE STRUCTURAL ENGINEER WHEN DRAWINGS BY OTHERS SHOW OPENINGS, POCKETS, ETC., NOT SHOWN ON THE STRUCTURAL DRAWINGS, BUT WHICH ARE LOCATED IN THE STRUCTURAL MEMBERS.

10. ALL SPECIFICATIONS AND CODES NOTED SHALL BE THE LATEST APPROVED EDITIONS AND REVISIONS BY THE GOVERNMENTAL AGENCY HAVING JURISDICTION OVER THIS PROJECT.

11. CONTRACTOR SHALL INVESTIGATE THE SITE DURING CLEARING AND EARTH WORK OPERATIONS FOR FILLED EXCAVATIONS OR BURIED STRUCTURES SUCH AS CESSPOOLS, CISTERNS, FOUNDATIONS, UTILITIES, ETC. IF ANY SUCH STRUCTURES ARE FOUND, THE STRUCTURAL ENGINEER SHALL BE NOTIFIED IMMEDIATELY.

12. CONSTRUCTION MATERIALS SHALL BE SPREAD OUT WHEN PLACED ON FRAMED FLOORS OR ROOFS. THE CONSTRUCTION MATERIAL LOAD SHALL NOT EXCEED THE DESIGN LIVE LOAD 50 POUNDS PER SQUARE FOOT. PROVIDE ADEQUATE SHORING AND/OR BRACING WHERE STRUCTURE HAS NOT ATTAINED DESIGN STRENGTH.

14. ARCHITECT’S/ENGINEER’S REVIEW OF THE SHOP DRAWINGS SHALL NOT BE CONSTRUED AS AN AUTHORIZATION TO DEVIATE FROM THE CONTRACT DOCUMENTS.

15. DESIGN LIVE LOADS:

16. WIND LOAD CRITERIA:BASIC WIND SPEED: 100 ft/sWIND IMPORTANCE FACTOR Iw = 1.0WIND EXPOSURE: C

17. SEISMIC DESIGN CRITERIA:RISK CATEGORY: IISEISMIC IMPORTANCE FACTOR: Ie = 1.0SPECTRAL RESPONSE ACCELERATIONS: Ss = 1.118g

S1 = 0.426gSPECTRAL RESPONSE COEFFICIENTS: SDS = 0.785g

SD1 = 0.447gSITE CLASS: DSEISMIC DESIGN CATEGORY: SEISMIC FORCE RESISTING SYSTEM(S): BRACINGSEISMIC RESPONSE COEFFICIENT: Cs = RESPONSE MODIFICATION FACTOR(S): R = ANALYSIS PROCEDURE: DESIGN BASE SHEAR: 2.0

B. REVIEW OF SPECIALTY ITEMS AND PRE-ENGINEERED ELEMENTS

1. SPECIALTY ITEMS, PRE-ENGINEERED COMPONENTS, AND DESIGN/BUILD ELEMENTS ARE THOSE ITEMS WHICH ARE SPECIFIED IN THE CONSTRUCTION DOCUMENTS BUT WHICH REQUIRE DESIGN BY THE CONTRACTOR, THE MANUFACTURER, SUPPLIER, OR INSTALLER. SEE CONCRETE AND MASONRY NOTES FOR MIX DESIGN REQUIREMENTS.

2. SUBMITTAL REQUIRED BY THE STRUCTURAL ENGINEER OF RECORD OR THE BUILDING DEPARTMENT:

A. STRUCTURAL PRECAST CONCRETE FOOTINGS.B. TIMBER JOISTS AND GIRDERS.C. STAIRS, HANDRAILS, AND GUARDRAILS.E. WOOD BRACES.

THE CONTRACTOR SHALL PROVIDE AND INSTALL ALL ANCILLARY MEMBERS INCLUDING BUT NOT LIMITED TO BEAMS, COLUMNS, HANGERS, FOOTINGS, STIFFENERS, GUSSETS, KICKERS, BRACES, ETC. AND INTENDED CONNECTIONS.

3. SUBMITTAL SHALL INCLUDE:

A. CALCULATIONS, PREPARED BY A LICENSED ENGINEER LAWFULLY ELIGIBLE TO DESIGN THE ELEMENT OR COMPONENT (THE SPECIALTY ENGINEER) SEALED IN ACCORDANCE WITH STATE LAW.

B. A DIAGRAM SHOWING LOAD MAGNITUDES AND LOCATIONS, SEPARATED INTO DEAD, LIVE, WIND AND/OR SEISMIC COMPONENTS - THAT ARE APPLIED TO THE PRIMARY STRUCTURE, PREPARED BY THE SPECIALTY ENGINEER AND SEALED IN ACCORDANCE WITH STATE LAW.C. ERECTION OR DESIGN DRAWINGS AS NECESSARY TO DESCRIBE THE SYSTEM OR COMPONENT AND ITS CONNECTION TO THE PRIMARY STRUCTURE WITH THE SPECIALTY ENGINEER'S SHOP DRAWING STAMP OR SEAL, AS IS APPROPRIATE, THE SHOP DRAWING STAMP OF THE ENGINEER, IF ANY, RESPONSIBLE FOR SPECIFYING THE ITEM, AND THE ARCHITECT'S STAMP INDICATING HIS REVIEW.

4. SUBMIT ONE WET SEALED COPY, AND ADDITIONAL COPIES AS NECESSARY FOR THE BUILDING DEPARTMENT. SUBMITTAL CONTAINING EXCEPTIONS, CORRECTIONS, OR OTHER REVIEW COMMENTS IS NOT ACCEPTABLE FOR SUBMITTAL TO THE BUILDING DEPARTMENT.

5. THE STRUCTURAL ENGINEER OF RECORD'S REVIEW IS STRICTLY LIMITED TO THE FOLLOWING DETERMINATIONS:

A. NECESSARY APPROVALS HAVE BEEN OBTAINED.B. THE DRAWINGS AND CALCULATIONS ARE PROPERLY SEALED.C. THE LOAD CRITERIA IS CONSISTENT WITH THE CONTRACT DOCUMENTS AND CURRENT BUILDING CODE REQUIREMENTS.D. THE CONNECTIONS TO THE PRIMARY STRUCTURE ARE CONSISTENT WITH THE PRIMARY DESIGN.E. THE BASE STRUCTURE IS CAPABLE OF SUPPORTING THE IMPOSED LOADS.

6. THE STRUCTURAL ENGINEER OF RECORD WILL RELY UPON THE SPECIALTY ENGINEER'S SEAL AS CERTIFICATION THAT THE ITEMS DESIGNED BY THE SPECIALTY ENGINEER CONFORM TO THE CRITERIA SET FORTH IN THE CONTRACT DOCUMENTS AND APPLICABLE CODES AND STANDARDS INCORPORATED THEREIN BY REFERENCE.

7. IF THE LOADS IMPOSED ON THE STRUCTURE EXCEED THE LOAD ALLOWANCE PROVIDED BY THE STRUCTURAL ENGINEER OF RECORD THE SUBMITTAL WILL BE REJECTED.

8. ONLY AT THE CLIENT'S WRITTEN DIRECTION WILL MODIFICATIONS TO THE BASE STRUCTURE TO ACCOMMODATE THE SPECIALTY ITEMS BE MADE BY THE STRUCTURAL ENGINEER OF RECORD.

P. WOOD

1. FRAMING LUMBER SHALL BE REDWOOD NO. 2 GRADE, COLUMNS SHALL BE REDWOOD SELECT STRCTURAL GRADE. MAXIMUM ALLOWABLE MOISTURE CONTENT SHALL BE 19% UNLESS OTHERWISE NOTED.

2. ALL PLYWOOD SHALL BE CC OR CD CONFORMING TO PRODUCT STANDARD PS 1.

3. ALL BOLTS SHALL CONFORM TO ASTM A307. BOLT HOLES SHALL BE 1/16 IN. MAXIMUM LARGER THAN THE BOLT SIZE. RETIGHTEN ALL NUTS PRIOR TO CLOSING IN.

4. STANDARD CUT WASHERS SHALL BE USED UNDER BOLT HEADS AND NUTS AGAINST WOOD.

8. DO NOT NOTCH JOISTS, RAFTERS OR BEAMS, EXCEPT WHERE SHOWN IN DETAILS. OBTAIN STRUCTURAL ENGINEERS' APPROVAL FOR ANY HOLES OR NOTCHES NOT DETAILED. HOLES THROUGH SILLS, PLATES, STUDS AND DOUBLE PLATES IN INTERIOR, BEARING AND SHEAR WALLS SHALL NOT EXCEED 1/3 THE PLATE WIDTH. USE BORED HOLES LOCATED IN THE CENTER OF THE STUD OR PLATE.

11. UNLESS NOTED OTHERWISE, PRE-MANUFACTURED FRAMING CONNECTORS CALLED FOR ON THE DRAWINGS SHALL BE SIMPSON STRONG-TIE CONNECTORS, OR APPROVED EQUAL.

U. STRUCTURAL OBSERVATIONS

1. THE ENGINEER OF RECORD REQUIRES STRUCTURAL OBSERVATION AT STAGES OF CONSTRUCTION NOTED BELOW. THE OWNER SHALL EMPLOY THE ENGINEER OF RECORD RESPONSIBLE FOR THE STRUCTURAL DESIGN TO PERFORM STRUCTURAL OBSERVATIONS AS DEFINED IN SECTION 1704.5 OF THE 2013 CBC.

2. THE CONTRACTOR SHALL NOTIFY THE ENGINEER OF RECORD AT LEAST 48 HOURS BEFORE COMPLETION OR COVERING UP THE FOLLOWING STAGES OF CONSTRUCTION:

A. FOUNDATION REINFORCING PLACEMENTB. ROUGH FRAMING AND CONNECTION, PRIOR TO BEING COVERED BY FINISHES

SYMBOLS

CARRIAGE BOLT CB

CONCRETE CONC

HURRICANE TIE HT

LOCK WASHER LW

NUT NT

PRESSURE TREATED PT

WASHER WS

Page 2: POLY CANYON - Digital Journalismdigitaljournalism.org/blog/wp-content/uploads/2019/... · framing connectors called for on the drawings shall be simpson strong -tie connectors, or

7

4

1

A C

12' - 0"

3

5

12

' - 0

"

2

6

1' -

0"

1' -

0"

4' -

0"

4' -

0"

1' -

0"

1' -

0"

S4.0

4Sim

SHEET NO.

TITLE:

SCALE:

CHECKED BY:

DRAWN BY:

POLY CANYON OBSERVATION DECK

CALIFORNIA POLYTECHNIC STATE UNIVERSTY

SAN LUIS OBISPO CALIFORNIA 93407

KEVIN DONG

NO. DATE DESCRIPTION

01 10/15/2017 15% CD

ISSUED BY: CAED

PROJECT NO: ####

CONTRIBUTORS:

JORDAN MOROFSKY

SITORA VAXIDOVA

EMIR KULJANCIC

PROJECT INFO:

THIS IS A STUDENT PROJECT AND NOT ENDORSED BY THE

ARCE OR CM DEPARTMENTS, NOR BY THE CAED

02 4/16/2018 50% CD

1" = 1'-0"

S2.0

FOUNDATION PLAN

1" = 1'-0"1

Foundation Plan

18" DIA 4000PSI CONCRETE FOOTING

Page 3: POLY CANYON - Digital Journalismdigitaljournalism.org/blog/wp-content/uploads/2019/... · framing connectors called for on the drawings shall be simpson strong -tie connectors, or

7

4

1

A C

3

5

12' - 0"

12

' - 0

"

2x6

@24"

O.C

. N

o. 2 G

r R

edw

ood T

YP

2

6

1' -

0"

1' -

0"

4' -

0"

4' -

0"

1' -

0"

1' -

0"

2x6

@24"

O.C

. N

o. 2 G

r R

edw

ood T

YP

3x12 N

o.

2 G

r R

edw

ood

3x12 N

o.

2 G

r R

edw

ood

3x12 N

o.

2 G

r R

edw

ood

4x4 Select Structural Gr. Redwood TYPS4.0

2Sim

S4.0

1Sim

S4.0

5Sim

S4.0

3Sim

S4.0

7Sim

SHEET NO.

TITLE:

SCALE:

CHECKED BY:

DRAWN BY:

POLY CANYON OBSERVATION DECK

CALIFORNIA POLYTECHNIC STATE UNIVERSTY

SAN LUIS OBISPO CALIFORNIA 93407

KEVIN DONG

NO. DATE DESCRIPTION

01 10/15/2017 15% CD

ISSUED BY: CAED

PROJECT NO: ####

CONTRIBUTORS:

JORDAN MOROFSKY

SITORA VAXIDOVA

EMIR KULJANCIC

PROJECT INFO:

THIS IS A STUDENT PROJECT AND NOT ENDORSED BY THE

ARCE OR CM DEPARTMENTS, NOR BY THE CAED

02 4/16/2018 50% CD

1" = 1'-0"

S2.1

FRAMING PLAN

1" = 1'-0"1

Floor Framing Plan

REFERENCE NOTES:

1. BENCH GRAYED OUT FOR CLARITY. SEE S4.2 FOR BENCH DETAILS.

Page 4: POLY CANYON - Digital Journalismdigitaljournalism.org/blog/wp-content/uploads/2019/... · framing connectors called for on the drawings shall be simpson strong -tie connectors, or

7

4

1

A C

3

5

12' - 0"

12' - 0"

2' -

0"

4' -

0"

4' -

0"

2' -

0"

12

' - 0

"

S4.1

2Sim

2

6

4"

O.C

. T

YP

.

1' -

6"

S4.1

1Sim

S4.0

6Sim

S4.1

3Sim

SHEET NO.

TITLE:

SCALE:

CHECKED BY:

DRAWN BY:

POLY CANYON OBSERVATION DECK

CALIFORNIA POLYTECHNIC STATE UNIVERSTY

SAN LUIS OBISPO CALIFORNIA 93407

KEVIN DONG

NO. DATE DESCRIPTION

01 10/15/2017 15% CD

ISSUED BY: CAED

PROJECT NO: ####

CONTRIBUTORS:

JORDAN MOROFSKY

SITORA VAXIDOVA

EMIR KULJANCIC

PROJECT INFO:

THIS IS A STUDENT PROJECT AND NOT ENDORSED BY THE

ARCE OR CM DEPARTMENTS, NOR BY THE CAED

02 4/16/2018 50% CD

1" = 1'-0"

S2.2

Roof Framing Plan

1" = 1'-0"1

Roof Framing Plan

3x10 N

o.2

Gr

Redw

ood T

YP

3x10 N

o.2

Gr

Redw

ood T

YP

3x10 N

o.2

Gr

Redw

ood T

YP

2x2 N

o.

2 G

r R

edw

ood @

4"

O.C

.

Page 5: POLY CANYON - Digital Journalismdigitaljournalism.org/blog/wp-content/uploads/2019/... · framing connectors called for on the drawings shall be simpson strong -tie connectors, or

Foundation Plan0' - 0"

A C

Floor Framing Plan1' - 7 1/2"

Roof Framing Plan11' - 0"

Bench Framing3' - 2 1/2"

2x6 Bench Framing

2x2 No. 2 Gr Redwood Posts4x4 Select

Structural Gr. Redwood Post TYP

2x2 No. 2 Gr Redwood Rafters

18" DIA 4000PSI Conrete Footing

SHEET NO.

TITLE:

SCALE:

CHECKED BY:

DRAWN BY:

POLY CANYON OBSERVATION DECK

CALIFORNIA POLYTECHNIC STATE UNIVERSTY

SAN LUIS OBISPO CALIFORNIA 93407

KEVIN DONG

NO. DATE DESCRIPTION

01 10/15/2017 15% CD

ISSUED BY: CAED

PROJECT NO: ####

CONTRIBUTORS:

JORDAN MOROFSKY

SITORA VAXIDOVA

EMIR KULJANCIC

PROJECT INFO:

THIS IS A STUDENT PROJECT AND NOT ENDORSED BY THE

ARCE OR CM DEPARTMENTS, NOR BY THE CAED

02 4/16/2018 50% CD

1" = 1'-0"

S2.3

Elevation1" = 1'-0"

1South Elevation

Page 6: POLY CANYON - Digital Journalismdigitaljournalism.org/blog/wp-content/uploads/2019/... · framing connectors called for on the drawings shall be simpson strong -tie connectors, or

12

' -

0"

1S4.2

2S4.2

24

" O

.C.

SST SDWS16300DBSCREWS @ 24" O.C. TYP

1' -

6"

1' - 4 1/2"

2x6 BENCH FRAMING

2x4 BENCH SUPPORT FRAMING

SST SDWS16300DB SCREWS@ 24" O.C.

2x6 BENCH FRAMING

2x4 FRAMING

2' - 0" O.C.

SST SDWS16300DB @ 24" O.C.

SHEET NO.

TITLE:

SCALE:

DATE:

DRAWN BY:

PROJECT:

NO. DATE DESCRIPTION

01 10/15/2017 15% DD

Poly Canyon Observation Deck

California Polytechnic State

University

San Luis Obispo,California

Senior ProjectAdvisor: Kevin Dong

STRUCTURAL

ENGINEERING

ENGINEER SEAL:

Emir Kuljancic & Sitora Vaxidova

1 1/2" = 1'-0"

6/15/2018 4:38:44 PM

S3.0

Bench Details

1 1/2" = 1'-0"1

BENCH PLAN

1 1/2" = 1'-0"2

BENCH TYP. SECTION

1 1/2" = 1'-0"3

BENCH TYP. SECTION 2

Page 7: POLY CANYON - Digital Journalismdigitaljournalism.org/blog/wp-content/uploads/2019/... · framing connectors called for on the drawings shall be simpson strong -tie connectors, or

4x4 COLUMN

12x24 PIER FOOTING

SST CUSTOM COL BASE

0' - 7" 0' - 7 1/4"

16d NAILS TYP

101.77°

4x4 COLUMN

SST CUSTOM COL BASE

16d NAILS TYP

12x24 PIER FOOTING

4x4 COLUMN

SST CUSTOM COL BASE

16d NAILS TYP

TYP 3x12 GIRDER

TYP 2x6 JOIST

SST LUS26 JOIST HANGER

TYP 4-10d NAILS

2-10d DOUBLE SHEAR NAILS

MIN0' - 3"

0' - 2" MIN

#3 REBAR 0.375" DIA

#4 SPRIRAL TIES 0.5" DIA

SST CUSTOM COL BASE MIN CLEARANCE 2"

0' - 9"

2x6 DECKING W/ 1/8" GAP

2x DECORATIVE POST

2x12 GIRDER

SST DSVT3S SCREWS

0' - 6" O.C.

SST DSVT3S SCREWS

2x2 DECORATIVE JOIST

3x10 ROOF GIRDER

TYP 3x12 GIRDER

TYP 2x6 JOIST

SST LUS26 JOIST HANGER

TYP 4-10d NAILS

2-10d DOUBLE SHEAR NAILS

2x6 DECKING W/ 1/8" GAP

SST DSVT3S SCREWS TYP

SHEET NO.

TITLE:

SCALE:

CHECKED BY:

DRAWN BY:

POLY CANYON OBSERVATION DECK

CALIFORNIA POLYTECHNIC STATE UNIVERSTY

SAN LUIS OBISPO CALIFORNIA 93407

KEVIN DONG

NO. DATE DESCRIPTION

01 10/15/2017 15% CD

ISSUED BY: CAED

PROJECT NO: ####

CONTRIBUTORS:

JORDAN MOROFSKY

SITORA VAXIDOVA

EMIR KULJANCIC

PROJECT INFO:

THIS IS A STUDENT PROJECT AND NOT ENDORSED BY THE

ARCE OR CM DEPARTMENTS, NOR BY THE CAED

02 4/16/2018 50% CD

3" = 1'-0"

S4.0

DETAILS

3" = 1'-0"1

TYPICAL BEAM TO GIRDER TO COLUMNTO FOOTING @ BACK

3" = 1'-0"2

ANGLED GIRDER TO COLUMN @FRONT

3" = 1'-0"3

TYPICAL JOIST TO GIRDER

3" = 1'-0"4

FOOTING DETAILING

3" = 1'-0"5

DECORATIVE POST TO RIM JOIST3" = 1'-0"

6DECORATIVE JOIST TO ROOF GIRDER

3" = 1'-0"7

DECKING TO JOIST

Page 8: POLY CANYON - Digital Journalismdigitaljournalism.org/blog/wp-content/uploads/2019/... · framing connectors called for on the drawings shall be simpson strong -tie connectors, or

TYP 3x10 GIRDER

TYP 3x8 JOIST

SST W38 JOIST HANGER

TYP 2-10d NAILS

2-10d DOUBLE SHEAR NAILS

101.77°

TYP 3x10 GIRDER

TYP 3x8 JOIST

SST W38 JOIST HANGER

TYP 2-10d NAILS

2-10d DOUBLE SHEAR NAILS

101.77°

SST CUSTOM COL CAP

SST NAILS TBD PER CUSTOM CAP

TYP 3x8 BEAM

TYP 3x10 GIRDER

SST CUSTOM COL CAP

SST NAILS TBD PER CUSTOM CAP

TYP 4x4 COL

TYP 3x8 BEAM

3x8 GIRDER

SST KBS1Z KNEE BRACE

2x4 K-BRACE

4x4 COLUMN

SHEET NO.

TITLE:

SCALE:

CHECKED BY:

DRAWN BY:

POLY CANYON OBSERVATION DECK

CALIFORNIA POLYTECHNIC STATE UNIVERSTY

SAN LUIS OBISPO CALIFORNIA 93407

KEVIN DONG

NO. DATE DESCRIPTION

01 10/15/2017 15% CD

ISSUED BY: CAED

PROJECT NO: ####

CONTRIBUTORS:

JORDAN MOROFSKY

SITORA VAXIDOVA

EMIR KULJANCIC

PROJECT INFO:

THIS IS A STUDENT PROJECT AND NOT ENDORSED BY THE

ARCE OR CM DEPARTMENTS, NOR BY THE CAED

02 4/16/2018 50% CD

3" = 1'-0"

S4.1

DETAILS

3" = 1'-0"1

ROOF JOIST TO ROOF GIRDER

3" = 1'-0"2

ROOF GIRDER TO COLUMN

3" = 1'-0"3

KICKER DETAIL