Polar QueenVessel & equipment specification
IMR / CSV / W2W Vessel
Polar Queen is a purpose-built W2W/ROV Survey/Construction Vessel. The vessel is specially designed for operation under severe weather conditions and with highmanoeuvrability and station-keeping capabilities.
Accomodation for 119p
Specification is subject to change. This version is updated in november 2019.
150t AHC Offshore Crane
Uptime W2W gangwayw/ cargo elevator
ROV hangar w/ moonpooland overside LARS
2 x Voith Schneider propellers for precise and efficientmaneuvering
Large deck area w/ moonpool
Boat landing for offshore personnel transfer
Previous vessel experience:- Extensive experience from offshore wind projects and from the
oil and gas industry.
- Walk-to-work (W2W) projects in North Sea and US Gulf withpersonnel transfer using gangway, crew transfer vessels and helicopters. Cargo transfer with trolleys and crane lifts. Accomodation services for more than 100 Charterer’s personnel.
- ROV support and light contruction work in US Gulf, includingsubsea installation, testing, flushing, and survey.
Helideck designed for Sikorsky S-92
GENERAL
DECK
Machinery MAN 9L21/31 Diesel electric propulsionMain engines 6 x 1800 kW / Total 10.8 mWMain propulsion 2 x Voith Schneider 3800 kWTunnel thruster 2 x 1350 kWAzimuth thruster 1 x 1400 kWAnti roll system Voith Roll Stabilization (VRS)
Classification DNV +1A1, ICE-C, COMF–V(3)C(3), HELDK-SH, E0, DYNPOS-AUTR, NAUT-OSV(A), CLEAN DESIGN, DK(+)
Flag Cyprus (CY)Design ST-254 LCDBuilt 2011, Freire Shipyard, SpainPlanned dry-docking Q3 2021SPS Code 2008IMO 9523378
Located Midship. PS. Crane coverage 1.1 t at 16 m outreach
Static push force 300 kN (approx. 30 t)Dynamic impact force 500 kN (approx. 50 t)Size Fender centre-to-centre distance of 1.8
m, and fender height of abt. 5 m, suitable for CTVs with bow height of abt. 3 m
Designed for Sikorsky S-92Certified CAA CAP437 / DNV (daylight ops only)Helideck diameter 20.88 mMax weight 12.8 t
MOB/Rescue boat Maritime Partner Weedo 700Enclosed lifeboats 2 x 80 pax Davit Launch life rafts 4 x 20 DKF
Equipment according to GMDSS regulations, Area 3 and NAUT-OSV notation. VSAT high speed, broadband satellite communications.
Length O.A 110.6 mBreadth moulded 20.0 mDepth moulded 9.8 m (to main deck)Max draught 6.8 mMoulded draft 6.8 mDeadweight max draft 3112 tTank capacity MDO 1715 m3
Tank capacity FW 1234 m3
DP System Kongsberg dual redundant (AUTR/DP2)Reference system Gangway as reference to DP
1 x DGPS DPS 1222 x HiPAP 500 Kongsberg1 x DGPS Seapath 3302 x Fugro SeaStar Inmarsat3 x MRU's1 x RADius 1000 QUAD System, 2 x 550X transponders
ERN DYNPOS-AUTR: 99,99,97,76 (2015) DYNPOS-AUTR: 99,99,99
MAIN DIMENSIONS
MACHINERY
SPEED AND FUEL CONSUMPTION
DYNAMIC POSITIONING SYSTEM
LIFTING EQUIPMENT
BOAT LANDING FOR CTV
DECK
SAFETY EQUIPMENT
HELICOPTER LANDING DECK
ACTIVE MOTION COMPENSATED GANGWAY
ACCOMODATION
NAVIGATION AND COMMUNICATIONS
ECO speed 10 kts., abt. 14 t/dayService speed 12 kts., abt. 20 t/day
DP operations speed 7-11 t/day, dependent on operation, weather and sea state.
Harbour mode 5 t/day
Total capacity 119SPS compliant SPS compliant for 136 in W2W modeMaritime Crew 9 single cabins + 11 double cabins
Total capacity for crew: 31Charterers' personnel 6 single cabins + 41 double cabins
Total capacity for charterer: 88Client offices 5Lounges 3
Other Toolbox talk room, conference room, hospital, fitness room, sauna, solarium.
Gangway UPTIME 23.4 AMC Gangway, mounted on pedestal midship
Operation lenght 19.4 m (+/- 4 m)Current landing height 20.5 m (+ 3/- 2 m)
Workability Typically Hs 2.5 m (subject to heading and wave spectra)
Stairtower Equipped with cargo lift: 750 kg SWLElectrical trolleys 2 x Jespi 350 kg SWL
Open deck area 960 m2
Deck strength 10 t/m2
Tugger winches 2 x 5 t
Main moonpool 7.2 m x 7.2 mVE. Both Moonpools have flush deck covers.
Work ROV Moonpool 5.4 m x 5.4 m (in hangar)
Power supply2 x 2.5 MVA. Can supply 110V - 230V -450V - 690V all 60 Hz.
Switchboard main deck 1 is installed in the ROV Hangar at Frame 82, port. 1 is installed by the main crane pedestal at Frame 35. Can supply FW, Sea Water, Fuel on back deck. 8 evenly distributed strong points to withstand 25 t in any direction.
Main crane TTS 150 t AHC with 2900 m wire
Max lifting capacity 150 t (radius 7 - 10 m) 25 t (radius 35 m)
Aux hook 12.5 t, 1 fall, 500 m, radius 7-36 mLARS 2 x ODIM LARS (AHC) for deployment
of (W)ROVs through moonpool and starboard side. SWL 12 t
Deck crane 2 x foldable cranes, capacity 1.1 tProvisions store crane Foldable crane, max capacity 0.94 t