CODELL CONSTRUCTION COMPANY
Pogue Chrysler Building
Addendum # 2
3-7-13
The following documents change / add to the contract documents, as
follows:
1) PDF – Pogue Chrysler Add. Answers – 3pages
2) PDF – Finish Schedule A10-1 – 1 page
3) PDF – Casework Elevation A10-2 – 1 page
4) PDF – Carpet transitions 1- page
5) PDF – Underground Plumbing – 1 page
6) PDF – Sanitary & Water taps - 1 page
7) PDF – Downspout Drainage – 1 page
-
1. THE LATEST SITE INFORMATION CAN BE VIEWED ON THE ATTACHED REVISED SITE PLAN.
1. Sheet P1.0 showing the revised trench drain layout has been included as part of this
addendum.
2. GENERAL ARCHITECTURAL:
1. The vertical steel columns, pipe bollards, stair structure, step pans, railings and
stringers all get painted.
2. The glass in the Storefront is to be center glazed. The glass in the Curtain wall is to be
offset glazed.
3. The exterior metal siding color is factory finished
4. The vinyl wall covering that has been discontinued should be priced as if replaced by
an equal replacement.
5. The curtain wall is to be clear glass.
6. Tubelite and U,S. Aluminum are acceptable curtain wall and storefront manufacturers
for this project.
7. The coiling security doors called out in note 17 & 18 on sheet A10-2 are manually
operated non-fire rated doors.
8. All signage is the responsibility of the Owner.
9. All 3/4" plywood shown as part of the exterior wall systems is to be “Fire Rated”
Per the Kentucky Code.
3. HVAC PLAN QUESTIONS:
1. Luxair is an acceptable supplier for the AHU and RTU units.
2. The electric water heater EW H-1 is deleted
3. The units should have fresh air dampers with minimum air intake requirements.
4. Tie exhaust fans together when possible and duct thru the roof or to the closest
outside location, except thru ACM panels.
5. The AHU equip. should get 3/4" insulated condensate piping to a side wall dump.
The RTU condensate drains can dump onto the adjacent roof .
6. The waste oil storage tank will be supplied by the owner, but all other controls and
pumps should be included as part of your bid.
7. All supply and return ducts should be insulated with an internal liner.
8. All the AHU equipment should have automatic dampers to open when the unit is on.
-
4. PLUMBING QUESTIONS:
1. The plumbing plans have been approved by the State of Kentucky
And changes per the inspector can be view in the job site office of
C.M.
2. The trench drains have been revised per the inclosed plumbing plan.
They are poured concrete with metal grates and both drains now empty
Into a 4' collection box at the end of the Service Area drain per the plan.
3. The air compressor is the responsibility of the owner.
4. The Eye-W ash is a “HAW S Model 8300-8309 with a mixing valve
5. The roof drains over the Service W rite-Up drop down in the wall between
the two overhead entry doors and are enclosed.
UNDERGROUND EXHAUST SYSTEM:
1. Plan revisions to the Underground Exhaust System and manufacturer cut sheets
( Harvey Industries) are included as part of this addendum.
2. There is no sump pump required for this system.
3. Schedule 40 pvc or SDR 35 are acceptable for the system`s underground piping.
5. DOORS AND MISC. SPECIALTY QUESTIONS:
1. Oshkosh Architectural Door Company is an approve door manufacturer for this project.2. All interior PL surfaced doors to be “ W ilson Art Kensington Maple 10776"
6. CASEWORK ITEMS:
1 PL-1 is to be plastic laminate with a color to be selected later. Gr-1 is to be
Black Ubatuba (A.K.A Black Pearl Granite) as shown on revised sheet A10-2
Included in this addendum.
2. GR-1 is only on counter tops in the Coffee Bar, Reception, Parts Cashier- Upper top
only and the Toilet rooms.
3. Parts Cashier slat wall will include metal inserts.
4. The sales desk shown on 10-2 should be framed out of metal studs.
-
7. TOILET ACCESSORIES and BLOCKING QUESTIONS:
1. All wood blocking for all installation areas should be included. Metal strip blocking can be substituted in interior wall applications but must be a minimum of 18" in length at any location.
2. Per Specs 10810-2.02.G.1
MR-1 Install “Bobrick” B-165 Series mirror at each Toilet Room lavatory
location.
3. Per Specs 10810-2.03.E.1
SHD-1 Install “Bobrick” B-354 Series disposal unit at each W oman`s Toilet
Room water closet location.
4. Per Specs 10810-2.05.D.1
PTD-W R Install 1 at each Toilet Room lavatory location and above the
counter at the Coffee Bar sink.
5. Per Specs 10810-2.04.D.1
Install 1 in Jan Closet on second floor next to men and women`s toilet rooms.
6. Per Specs 10810-2.06.D.1
TTD-1 Install “Bobrick” B-3942 Series toilet paper holder at each water
closet location.
7. Per Specs 10810-2.06.D.1
SD-1 Install 1“Bobrick” B-4112 Series in each Toilet Room & Rooms.
8. A CIVIL DRAWING IS INCLUDED TO CLARIFY ALL SITE UTILITIES andTHEIR LOCATIONS BEYOND 5' AWAY FROM THE BUILDING.
9. THE OWNER WILL FURNISH ALL DUMPSTERS AND PORT-A-JOHNSBUT NOT SMALL TRASH CANS AROUND THE PROJECT SITE.
END OF QUESTIONS
-
UP
UP
REF.
DN
DN
TING
IFT
WALKWAY
BAY
N BAY
BAY
OSTW
LIFT
OSTW
LIFTx 22' L
x 22' L
x 22' L
x 22' L
22' L
22' L
18'
ACT-1CT-1
P-2
ACT-1CT-1
P-2
ACT-1C-1
P-1
ACT-1C-1
P-1
ACT-1C-1
VWC-1
ACT-1C-1
P-1
ACT-1C-1
P-1
ACT-1C-1
P-1
ACT-1C-1
P-1
ACT-1C-1
P-1
ACT-1C-1
P-1ACT-1C-1
P-1
ACT-1C-1
P-1
ACT-1CT-1
P-1ACT-1CT-1
P-1
ACT-1CT-1
P-1
ACT-1CT-1
P-1
ACT-1CT-1
P-1ACT-1CT-1
P-1ACT-1C-1
P-1
ACT-1CT-1
P-1
ACT-1CT-1
P-1
ACT-1CT-2
P-1ACT-1CT-2
P-1
ACT-1VCT-1
P-1
ACT-1VCT-1
P-1
ACT-1CT-2
P-3
ACT-1CT-2
P-3
ACT-1CT-1
P-1
ACT-1CT-1
P-4
EP-1SC-1
P-4
EP-1SC-1
P-4
EP-1SC-1
P-1EP-1SC-1
P-1
ACT-1CT-1
P-1
ACT-1CT-2
P-3
CF-1
CF-1
EP-1SC-1
P-1
EP-1SC-1
P-1
FINISH MATERIALS SCHEDULE
CT-1
CT-1ALT
CT-2
CT-2
C-1
C-2
VCT-1
PL-1
PL-2
PL-3
PL-4
VB-1
ACT-1
EP-1
VWC-1
SC-1
P-1
P-2
P-3
P-4
GR-1
CERAMIC TILE
CERAMIC TILE
CERAMIC TILE
CERAMIC TILE
CARPET
CARPET
VINYL COMP TILE
PLASTIC LAMINATE
PLASTIC LAMINATE
PLASTIC LAMINATE
PLASTIC LAMINATE
RUBBER BASE
ACOUSTICAL CEILING PANEL
PAINT EXPOSED CEILING
VINYL WALL COVERING
SEALED CONCRETE
PAINT
PAINT
PAINT
PAINT
GRANITE
CREMA VENIZIANO
NAXOS SELECT
PIETRA SERENA
SILVER GROUND
INNOVATE
MOWHAW BROCATELLE II
VENUSLA
-------------
NOIR
TEFOR
974CK-07
--------------
BEVELED TEGULAR CIRRUS
DRY FALL
UMBRIA AZ50656IN
FIANDRE
FIANDRE
FIANDRE
FIANDRE
MOHAWK
KARASTAN
MOHAWK
FORMICA
ABET LAMINATI
WILSONART
MOHAWK
ARMSTRONG
SYMPHONY INTERMISSION
BENJAMIN MOORE
BENJAMIN MOORE
BENJAMIN MOORE
BENJAMIN MOORE
CREMA VENIZIANO POLISHED OR HONED
NAXOS SELECT POLISHED OR HONED
HONED
HONED
997 HIBACHI
20234 EBONY VELOUR
VEN-29
ENVISION
TC5
COLUMBIAN WALNUT
120WB
COLOR: #589 WHITE. GRID: 15/16" WHITE
------------
WHITE OPULENCE #879
SMOKE EMBERS #1466
LIGHT PEWTER # 1464
LONDON FOG #1541
AKA: BLACK PEARL GRANITE
24 X 24 X 3/8" THICK
24 X 24 X 3/8" THICK
12 X 12 X 5/16" THICK
12 X 12 X 5/16" THICK
-----------
12 X 12 X 5/16" THICK
18" X 18"
-----------
7500-58
-----------
-----------
-----------
24 X 24 X 3/4"
SHOWROOM FLOOR AND BASE- 8" X 24"
SHOWROOM FLOOR AND BASE - 8" X 24"
RESTRROM FLOOR TILE, TECH FLOOR / WALL TILE
RESTROOM WALL TILE
STANDARD OFFICE
DEALERS OFFICE & CONFERENCE ROOM
BREAK ROOM
COUNTERTOPS THROUGHOUT EXCEPT @ GR-1 LOCATIONS
BREAK ROOM COUNTEROP
BREAK ROOM CABINETRY
TYPICAL INTERIOR DOOR
RUBBER BASE THROUGHOUT
SHOWROOM - ALL CUSTOMER CONTACT AREAS
DEALERS OFFICE & CONFERENCE ROOM
GENERAL
SHOWROOM PAINT
CUSTOMER RESTROOM
TECH / RETAIL PARTS
CAFE, RECEPTION, PARTS CASHIER, RESTROOMS
CODE MATERIAL MANUFACTURER PRODUCT COLOR DIMENSION LOCATIONFINISH REMARKS1. FLOOR FINISH VARIES2. CEILING FINISH VARIES. REFER TO REFLECTED CEILING PLANS.3. WALL FINISH VARIES4. PROVIDE 6" HIGH WALL BASE IN "WET" ROOMS (TOILET, JANITOR, TECH.)5. EPOXY PAINT TO BE USED IN "WET" ROOMS UNLESS NOTED OTHERWISE
FINISH LEGENDXXXXXXXXX
FLOOR FINISH
WALL FINISHCEILING FINISH
ACT - ACOUSTICAL CEILING TILEC - CARPETPL - PLASTIC LAMINATEP - PAINTSS - SOLID SURFACEVB - VINYLVCT - VINYL COMPOSITION TILEVF - VINYL FLOORINGVWC - VINYL WALLCOVERING
FINISH GENERAL NOTESA. ALL HARD CEILINGS AND BULKHEADS TO BE PAINTED P1 UNLESS NOTED OTHERWISEB. ALL FLOORING TRANSITIONS SHALL OCCUR BENEATH THE CLOSED DOOR. PROVIDE STRIPSPER MANUFACTURER'S STANDARDS.
C. ALL WOOD DOORS SHALL BE WILSONART LAMINATE "KENSINGTON MAPLE" 10776.
D. PROVIDE POLYAMID EPOXY PAINT IN ALL SERVICE AREAS.E. PROVIDE VINYL BASE VB-1 IN ALL ROOMS WHERE CARPET OR VCT FLOORING IS SHOWN.
BLACK UBATUBA GRANITE
T
C
5911
RA EC TH I
OF
TK
NE UC
MOT
K.H
E DERNO.
G I SAS NT E
MR
O
T
OME R Y
G
COMMONWEALTH
KY
POG
UE
INVE
STM
ENT
GR
OU
P LL
C
003026
SHEET NO.
CERTIFIED BY
of building, the major architectural elements and, in
the trade contractors shall furnish all items required forOn the basis of the general scope indicated or described,and the completion of the requirements of the Contract.indicate or describe all work required for full performance
some cases, the structural, mechanical, and / orelectrical systems. The Drawings do not necessarily
the proper execution and completion of the work.
COMPUTER FILE:
in terms of architectural design concept, the dimensionsThese drawings indicate the general scope of the project
The Drawings, Specifications, and other documents
and due compensation to the Architect.or additions to this Project without written permissionthis Project and shall not be used on other projects
prepared by the Architect for this Project are instruments
Use of Documents
of the Architect's service for use solely with respect to
Scope Drawings
DATE:
317-441- 5265 &
DRAWN BY:
ISSUE:
CHECKED BY:
DATE:
FAX 317-471-1223
AUTOMOTIVE DESIGNAND TECHNOLOGY GROUP, LTD.
P.O. BOX 39626INDIANAPOLIS, INDIANA 46268
CH
RYS
LER
- D
OD
GE
- JEE
P - R
AM F
ACIL
ITY
POW
DER
LY, K
ENTU
CKY
423
6722
50 W
EST
EVER
LY B
RO
THER
S BL
VD
Construction Manager
CODELL CONSTRUCTION COMPANY
Contact: Norm LeighMobile: 859-771-0308
Email: [email protected]
P.O. Box 3982250 West Everly Brothers Blvd
Powderly, KY 42367
02-02-2013REVISED
12-28-2012STATE SUBMITTAL
03-07-2013ADDENDUM ONE
A10-1
Roo
m F
inis
h Sch
edul
e
12-28-12KTM REVIT
Room ScheduleNumber Name Wall Finish Floor Finish Base Finish Ceiling Finish
100 Showroom P-2 CT-1 CT-1 ACT-1101 Sales P-1 C-1 VB-1 ACT-1102 Sales P-1 C-1 VB-1 ACT-1103 Sales P-1 C-1 VB-1 ACT-1104 General Mgr VWC-1 C-1 VB-1 ACT-1105 Sales P-1 C-1 VB-1 ACT-1106 Sales P-1 C-1 VB-1 ACT-1107 Sales Mgr P-1 CT-1 CT-1 ACT-1108 FF&I Offce P-1 C-1 VB-1 ACT-1109 FF&I Office P-1 C-1 VB-1 ACT-1110 Parts P-4 SEALED CONCRETE VB-1 PAINT EXPOSED STRUCTURE111 FF&I Waiting P-1 CT-1 CT-1 ACT-1112 Internet Sales P-1 C-1 VB-1 ACT-1113 Retail Parts Display P-4 CT-1 CT-1 ACT-1114 Mopar Displays P-1 CT-1 CT-1 ACT-1115 Customer Business Center P-1 CT-1 CT-1 ACT-1116 Coffee Bar P-1 CT-1 CT-1 ACT-1117 Customer Lounge P-1 CT-1 & C-1 VB-1 & CT-1 ACT-1118 Vending P-1 CT-1 CT-1 ACT-1119 Elec / Storage P-1 SEALED CONCRETE120 Kids P-1 C-1 VB-1 ACT-1121 Files P-1 C-1 VB-1 ACT-1122 Service Cashier P-1 CT-1 CT-1 ACT-1123 Service Writer P-1 CT-1 CT-1 ACT-1124 Stairs P-1 RUBBER TREADS & RISERS ACT-1125 Tech Toilet R-1 CT-2 CT-2 ACT-1126 Tech Lockers P-1 CF-2 CT-2 ACT-1127 Service Mgr P-1 VCT-1 VB-1 ACT-1128 Tech Lunchroom P-1 VCT-1 VB-1 ACT-1129 Men P-3 CT-2 CT-2 ACT-1130 Women P-3 CT-2 CT-2 ACT-1130A Powder P-1 CT-2 CT-2 ACT-1130B Jan P-1 SEALED CONCRETE VB-1 ACT-1131 Service P-1 SEALED CONCRETE PAINT EXPOSED STRUCTURE132 Bulk Oil P-1 SEALED CONCRETE PAINT EXPOSED STRUCTURE133 Service Write-Up P-1 SEALED CONCRETE VB-2 ACT-1134 Hall P-1 CT-1 CT-1 ACT-1134A Hall P-1 CT-1 CT-1 ACT-1135 New Car Delivery TEXTURED CONCRETE136 Hall P-1 CT-1 CT-1 ACT-1201 Parts P-2 SEALED CONCRETE PAINT EXPOSED STRUCTURE202 Future Expansion P-2 SEALED CONCRETE PAINT EXPOSED STRUCTURE
3/32" = 1'-0"3First Floor Finish Plan
1/16" = 1'-0"4Second Floor Finish Plan
ADD 1
ADD 1
ADD 1
ADD 1
-
2' -
6"1'
- 8"
2' -
10"
UPPER CABINETS W/ADJUSTABLE SHELVES
PL1
DRAWERS
BASE CABINETSW/ ADJ SHELVES
PL1
PL4
BULKHEAD
FILLER
BASE FILLER
3' - 3"3' - 0"3' - 0"3' - 0"
3' - 0"3' - 0"3' - 0"3' - 0"
ANGLEDWALL
BACKSPLASH GT-1 FROMCOUNTER TO BOTTOM OF
UPPER CABINETS
COUNTERTOP GR-1
1' - 0" 3' - 0"
2' -
0"2'
- 2"
2' -
10"
0' -
6"
UPPER CABINETS W/ADJUSTABLE SHELVES,
PL1
DRAWERS
BASE CABINETSW/ ADJ SHELVES PL1
4" TOE SPACE, PL4
FILLER
BASE FILLER
SINK BASE
BACKSPLASH GT-1 FROMCOUNTER TO BOTTOM OF
UPPER CABINETS
COUNTERTOP GR-1
3' - 0"3' - 0"3' - 0"3' - 0"
2' -
10"
1' -
8"
0' -
6" 2' -
0"
UPPER CABINETS W/ADJUSTABLE SHELVES
PLASTIC LAMINATE COUNTERTOPAND BACKSPLASH
DRAWERS
SINK BASE UNITBASE CABINETS
W/ ADJ SHELVES 4" TOE SPACE
1' -
0"
6
COILING DOOR HOUSING
OPEN
COILING DOOR TRACKS
COUNTERTOPGR-1
OPEN
1' - 6"5' - 5 1/2"2' - 4"
0' -
4"2'
- 6"
COILING DOOR HOUSING
COUNTERTOP,PL1
2" OVERHANG
PL2
0' -
4"
0' -
11" 0
' - 7
"
0' -
6 1/
2"
2' -
6"
1' - 6" 1' - 6"
DRAWERS
6
COUNTERTOPGR-1
OPENING
4' -
6"2'
- 6"
5' - 10 3/4"
PL4
PL2, THIS SECTIONTO PROTRUDE FROM
WALL 2" W/ PLAMRETURNS
PAINTEDDRYWALL
PL4
PLAM RETURN
2' -
10"
4" VINYL BASE
PLASTICLAMINATE TO
MATCH COUNTERTOP
OPENING
OPENING
COILING DOOR HOUSING
OPEN
COILING DOOR TRACKS
OPENINGIN WALL
STUB WALL
3/4" PLYWOODAND PLASTIC
LAMINATE BOTHSIDES
3' -
0"SUPPORTBRACKET
PLASTIC LAMINATECOUNTERTOP PL1
3' -
0"
COILING DOOR HOUSING
WRAP OPENINGW/ DRYWALL
PLASTIC LAMINATE3/4" PLYWOOD ON
METAL STUDS ANDPLASTIC LAMINATE
SUPPORT BRACKET
COUNTERTOP PL1
PL4
PL2
2' -
6"
-A10-26
A10-2 7
A10-2
9
8
A10-2 4
5
A10-2
10
PARTIAL HEIGHTWALLS WRAPPED W/
PLASTIC LAMINATESLATE GREY
2' - 0"
2' -
0"
PARTIAL HEIGHTWALLS WRAPPED W/
PLASTIC LAMINATESLATE GREY
GATE
2' -
6"
0' -
7"0'
- 4"
WALL BELOW
2' -
4"6'
- 11
1/2
"
4' - 0" 2' - 0"
5' -
10 3
/4"
2' -
7 5/
8"
12
13
6
2' -
6"5'
- 0"
EQEQ
DRYWALL
SLAT WALL
PL4BASE CABINETS PL2
COUNTERTOP PL1
DRYWALL
SLAT WALL
PL4BASE CABINETS PL2
COUNTERTOP PL1
2' -
6"EQ
5' -
0"EQ
PL1 COUNTERTOP
2" HIGH PL4 STRIP REVEAL
PL2 FRONT PROTRUSION
PL4 BASE
0' -
11"
2' -
7"
PL1 COUNTERTOPSCORK
OPEN BELOW
PL4 REVEAL
PL2 FRONT2" PROTRUSION
PL1 INFILL (4)SECTIONS
CLEAR ANODIZEDALUMINUM STOREFRONT
FRAME
6' - 10"
8' -
0"
PAINTED DRYWALLBEYOND
MIDDLESTOREFRONT
SUPPORT
PLAM TOOVERLAP FRAME
1/2" ALL SIDES.
PL1
PL1
PL1
PL1
TV SUPPLIEDBY OWNER
20
A10-2
OPEN LOCKERSHAT SHELF
(3) HOOKS
OPEN BELOW
4" BASEBY LOCKERSUPPLIER
3' - 0"1' - 0"
6' -
0"
OPEN LOCKERSHAT SHELF
(3) HOOKS
OPEN BELOW
4" BASEBY LOCKER
SUPPLIER
4' - 0" 1' - 0"
6' -
0"
1X1 MAPLESTAIN TO MATCHPL1
PL1 PLASTICLAMINATE ON3/4" PWOOD
TREATED 2X4FRAMING @16" O.C.
TYPICAL 4 1/2"X 2 1/2"STOREFRONTFRAMING
0' -
0 1/
2"OVERLAPSTOREFRONT1/2"
DRYWALLPARTITIONBEHIND
1
3
BD
A10-215
A10-2 16
2' -
9"5'
- 1
1/2"
3' -
0"7'
- 7
1/8"
4' - 8" 4' - 9 1/4"
3' - 0"
1' - 0"
1' -
0"
R 5' - 4 3/8"
0' - 2 5/8"
PLANNOTE 1
T
C
5911
RA EC TH I
OF
TK
NE UC
MOT
K.H
E DERNO.
G I SAS NT E
MR
O
T
OME R Y
G
COMMONWEALTH
KY
POG
UE
INVE
STM
ENT
GR
OU
P LL
C
003026
SHEET NO.
CERTIFIED BY
of building, the major architectural elements and, in
the trade contractors shall furnish all items required forOn the basis of the general scope indicated or described,and the completion of the requirements of the Contract.indicate or describe all work required for full performance
some cases, the structural, mechanical, and / orelectrical systems. The Drawings do not necessarily
the proper execution and completion of the work.
COMPUTER FILE:
in terms of architectural design concept, the dimensionsThese drawings indicate the general scope of the project
The Drawings, Specifications, and other documents
and due compensation to the Architect.or additions to this Project without written permissionthis Project and shall not be used on other projects
prepared by the Architect for this Project are instruments
Use of Documents
of the Architect's service for use solely with respect to
Scope Drawings
DATE:
317-441- 5265 &
DRAWN BY:
ISSUE:
CHECKED BY:
DATE:
FAX 317-471-1223
AUTOMOTIVE DESIGNAND TECHNOLOGY GROUP, LTD.
P.O. BOX 39626INDIANAPOLIS, INDIANA 46268
CH
RYS
LER
- D
OD
GE
- JEE
P - R
AM F
ACIL
ITY
POW
DER
LY, K
ENTU
CKY
423
6722
50 W
EST
EVER
LY B
RO
THER
S BL
VD
Construction Manager
CODELL CONSTRUCTION COMPANY
Contact: Norm LeighMobile: 859-771-0308
Email: [email protected]
P.O. Box 3982250 West Everly Brothers Blvd
Powderly, KY 42367
02-02-2013REVISED
12-28-2012STATE SUBMITTAL
03-07-2013ADDENDUM ONE
A10-2
Cab
inet
ry E
leva
tions
12-28-12Author Checker
1/2" = 1'-0"1Coffee Bar Elevation 1
1/2" = 1'-0"2Coffee Bar Elevation 2
1/2" = 1'-0"3Tech Lunchroom Elevation
3/8" = 1'-0"4Parts Cashier Elevation 1
3/8" = 1'-0"5Parts Cashier Elevation 2
3/8" = 1'-0"6Parts Cashier Elevation 3
3/8" = 1'-0"7Service Counter Elevation 1
3/8" = 1'-0"8Service Counter Elevation 2
3/8" = 1'-0"9Service Counter Elevation 3
3/8" = 1'-0"10Parts Cashier Elevation 4
3/8" = 1'-0"11Parts Enlarged Plan
3/8" = 1'-0"12Parts Cashier Elevation 5
3/8" = 1'-0"13Parts Cashier Elevation 6
1/4" = 1'-0"15Sales Manager Elev 1
1/4" = 1'-0"16Sales Manager Elev 2
3/8" = 1'-0"17Media Wall Elevation
1/2" = 1'-0"18Tech Locker Elevation 1
1/2" = 1'-0"19Tech Locker Elevation 2
1 1/2" = 1'-0"20MEDIA WALL DETAIL
1/4" = 1'-0"14Sales Manager Enlarged Plan
ADD 1
ADD 1
ADD 1
-
GAA
04-09-12
08-039
0
SCALE 1" =
50 50
50'
-
GAA
04-09-12
08-039
0
SCALE 1" =
50 50
50'