pne board of directors · 2020. 2. 13. · master plan update 3 infrastructure strategy background...
TRANSCRIPT
![Page 1: PNE Board of Directors · 2020. 2. 13. · Master Plan Update 3 Infrastructure Strategy Background . 4 HP-PNE Master Plan is supplemented by an Infrastructure Strategy Aims to outline](https://reader033.vdocuments.us/reader033/viewer/2022060600/6054248472542f2ea937ce77/html5/thumbnails/1.jpg)
1
PNE Board of Directors Hastings Park Infrastructure Strategy Update
February 19, 2020
![Page 2: PNE Board of Directors · 2020. 2. 13. · Master Plan Update 3 Infrastructure Strategy Background . 4 HP-PNE Master Plan is supplemented by an Infrastructure Strategy Aims to outline](https://reader033.vdocuments.us/reader033/viewer/2022060600/6054248472542f2ea937ce77/html5/thumbnails/2.jpg)
2 2
1) Hastings Park Infrastructure Strategy Background
2) 2019 Infrastructure Strategy Update
3) Hastings Creek Daylighting Update
4) Next Steps
Agenda
![Page 3: PNE Board of Directors · 2020. 2. 13. · Master Plan Update 3 Infrastructure Strategy Background . 4 HP-PNE Master Plan is supplemented by an Infrastructure Strategy Aims to outline](https://reader033.vdocuments.us/reader033/viewer/2022060600/6054248472542f2ea937ce77/html5/thumbnails/3.jpg)
Master Plan Update
3 Infrastructure Strategy Background
![Page 4: PNE Board of Directors · 2020. 2. 13. · Master Plan Update 3 Infrastructure Strategy Background . 4 HP-PNE Master Plan is supplemented by an Infrastructure Strategy Aims to outline](https://reader033.vdocuments.us/reader033/viewer/2022060600/6054248472542f2ea937ce77/html5/thumbnails/4.jpg)
4 4
► HP-PNE Master Plan is supplemented by an Infrastructure Strategy
► Aims to outline infrastructure upgrades required to deliver the Master Plan and longer-term
needs for Hastings Park
► Infrastructure strategy: 2016 (original) and 2019 (refreshed)
Infrastructure Strategy Background
Master Plan Includes:
• Amphitheatre Renewal
• Playland Redevelopment
• Daylighted Stream
• Increased Green Space
• Greenways
• Parking
• New / Upgraded Facilities
• Roadways
![Page 5: PNE Board of Directors · 2020. 2. 13. · Master Plan Update 3 Infrastructure Strategy Background . 4 HP-PNE Master Plan is supplemented by an Infrastructure Strategy Aims to outline](https://reader033.vdocuments.us/reader033/viewer/2022060600/6054248472542f2ea937ce77/html5/thumbnails/5.jpg)
5 5
► HP-PNE Master Plan is supplemented by an infrastructure strategy
► Aims to outline infrastructure upgrades required to deliver the Master Plan and longer-term
needs for Hastings Park
► Infrastructure strategy: 2016 (original) and 2019 (refreshed)
Infrastructure Strategy Background
Infrastructure Includes:
• Water
• Sanitary Sewers
• Stormwater Management
• Combined Sewers
• Power (Electricity)
• Communications
• Natural Gas
• Green Infrastructure
![Page 6: PNE Board of Directors · 2020. 2. 13. · Master Plan Update 3 Infrastructure Strategy Background . 4 HP-PNE Master Plan is supplemented by an Infrastructure Strategy Aims to outline](https://reader033.vdocuments.us/reader033/viewer/2022060600/6054248472542f2ea937ce77/html5/thumbnails/6.jpg)
6 2019 Infrastructure Strategy Update
![Page 7: PNE Board of Directors · 2020. 2. 13. · Master Plan Update 3 Infrastructure Strategy Background . 4 HP-PNE Master Plan is supplemented by an Infrastructure Strategy Aims to outline](https://reader033.vdocuments.us/reader033/viewer/2022060600/6054248472542f2ea937ce77/html5/thumbnails/7.jpg)
7 7
Infrastructure Strategy | Timeline
Infrastructure Strategy Status Date
1) 2016 Master Plan Infrastructure Strategy Mar 2016
2) 2019 Infrastructure Strategy Update (Playland) Jan 2019
3) 2019 Infrastructure Strategy Update (Amphitheatre) Nov 2019
![Page 8: PNE Board of Directors · 2020. 2. 13. · Master Plan Update 3 Infrastructure Strategy Background . 4 HP-PNE Master Plan is supplemented by an Infrastructure Strategy Aims to outline](https://reader033.vdocuments.us/reader033/viewer/2022060600/6054248472542f2ea937ce77/html5/thumbnails/8.jpg)
8 8
Infrastructure Strategy | Scope
2016 2019
Scope
Site-wide infrastructure strategy and
analysis:
o To develop inventory, assess
condition, determine capacity of
existing infrastructure
o To identify infrastructure required
to support the 2010 Master Plan
vision
o To develop a concept design for
the Hastings Creek daylighting
Update infrastructure strategy based
on conceptual design for Playland
Redevelopment and Amphitheatre
Renewal:
o To update capacity assessments
for Playland and Amphitheatre
o To align to best practices related
to climate response (green
infrastructure and GHG reduction)
![Page 9: PNE Board of Directors · 2020. 2. 13. · Master Plan Update 3 Infrastructure Strategy Background . 4 HP-PNE Master Plan is supplemented by an Infrastructure Strategy Aims to outline](https://reader033.vdocuments.us/reader033/viewer/2022060600/6054248472542f2ea937ce77/html5/thumbnails/9.jpg)
9 9
Infrastructure Strategy | Key Differences 2016 Infrastructure Strategy 2019 Infrastructure Strategy
(Playland)
2019 Infrastructure Strategy
(Amphitheatre)
Asset Age
& Capacity
• Much of site
infrastructure is
approaching end-of-life
• Capacity should be
increased to
accommodate future
demand
• Updated capacity
assessment for Playland
conceptual design
• More infrastructure
assets identified as end-
of-life
• Updated capacity
assessment for
Amphitheatre conceptual
design
Schedule
& Phasing
• Redevelop in 6 phases
(12 sub-phases) over 20
years
• Updated implementation
phasing to address
required upgrades per
development order
New Scope
• Added new green
infrastructure and storm
management strategy
• Updated to renewable
energy for Amphitheatre
and Playland projects
![Page 10: PNE Board of Directors · 2020. 2. 13. · Master Plan Update 3 Infrastructure Strategy Background . 4 HP-PNE Master Plan is supplemented by an Infrastructure Strategy Aims to outline](https://reader033.vdocuments.us/reader033/viewer/2022060600/6054248472542f2ea937ce77/html5/thumbnails/10.jpg)
10 10
Impacts | Phasing
► New “Prerequisite” stage to address required
upgrades to substation
► Redevelop in 7 phases (13 sub-phases) over 20
years
► Updated implementation phasing
Prerequisite Phase (1-5
Years
![Page 11: PNE Board of Directors · 2020. 2. 13. · Master Plan Update 3 Infrastructure Strategy Background . 4 HP-PNE Master Plan is supplemented by an Infrastructure Strategy Aims to outline](https://reader033.vdocuments.us/reader033/viewer/2022060600/6054248472542f2ea937ce77/html5/thumbnails/11.jpg)
11 11
► Additional infrastructure assets have been identified as requiring “Renewal”
(approaching end-of-life)
Impacts | Asset Condition
Removal, 3%
New, 79%
2016 Costs by Program
New, 76%
Renewal,
18% Renewal,
22%
Removal,
2%
2019 Costs by Program
![Page 12: PNE Board of Directors · 2020. 2. 13. · Master Plan Update 3 Infrastructure Strategy Background . 4 HP-PNE Master Plan is supplemented by an Infrastructure Strategy Aims to outline](https://reader033.vdocuments.us/reader033/viewer/2022060600/6054248472542f2ea937ce77/html5/thumbnails/12.jpg)
12 Hastings Creek Daylighting Update
![Page 13: PNE Board of Directors · 2020. 2. 13. · Master Plan Update 3 Infrastructure Strategy Background . 4 HP-PNE Master Plan is supplemented by an Infrastructure Strategy Aims to outline](https://reader033.vdocuments.us/reader033/viewer/2022060600/6054248472542f2ea937ce77/html5/thumbnails/13.jpg)
13 13
Hastings Creek Daylighting | Opportunity
► $1.6 M in funding in 2019-2022 capital plan for Daylighted Stream
► Council-approved Integrated new City-wide Blue-Green Systems Planning
in November 2019
• Identified Hastings Watershed and related Hastings Creek Stream
Restoration as a priority initiatives for the current capital plan
• Presents opportunity to advance Master Plan development with broader City
initiatives
![Page 14: PNE Board of Directors · 2020. 2. 13. · Master Plan Update 3 Infrastructure Strategy Background . 4 HP-PNE Master Plan is supplemented by an Infrastructure Strategy Aims to outline](https://reader033.vdocuments.us/reader033/viewer/2022060600/6054248472542f2ea937ce77/html5/thumbnails/14.jpg)
14 14
► Be ecologically rich and diverse
► Connect us with nature
► Capture our imagination
► Teach us
► Engage us
► Provide experiences
The daylighted stream will….
Hastings Creek Daylighting | Benefits
![Page 15: PNE Board of Directors · 2020. 2. 13. · Master Plan Update 3 Infrastructure Strategy Background . 4 HP-PNE Master Plan is supplemented by an Infrastructure Strategy Aims to outline](https://reader033.vdocuments.us/reader033/viewer/2022060600/6054248472542f2ea937ce77/html5/thumbnails/15.jpg)
15 15
Hastings Creek Daylighting | Conceptual Design
![Page 16: PNE Board of Directors · 2020. 2. 13. · Master Plan Update 3 Infrastructure Strategy Background . 4 HP-PNE Master Plan is supplemented by an Infrastructure Strategy Aims to outline](https://reader033.vdocuments.us/reader033/viewer/2022060600/6054248472542f2ea937ce77/html5/thumbnails/16.jpg)
16 16
Hastings Creek Daylighting | Timing
► Master Plan originally contemplated over 2 phases
• Phase 1 in next 2-3 years
• Phase 2 in 5-8 years
► Looking to do both phases in tandem over next 2-3 years
► COV Engineering project team planning starting Fall 2020
► Important community Initiative that we are pleased to move forward
![Page 17: PNE Board of Directors · 2020. 2. 13. · Master Plan Update 3 Infrastructure Strategy Background . 4 HP-PNE Master Plan is supplemented by an Infrastructure Strategy Aims to outline](https://reader033.vdocuments.us/reader033/viewer/2022060600/6054248472542f2ea937ce77/html5/thumbnails/17.jpg)
Next Steps
![Page 18: PNE Board of Directors · 2020. 2. 13. · Master Plan Update 3 Infrastructure Strategy Background . 4 HP-PNE Master Plan is supplemented by an Infrastructure Strategy Aims to outline](https://reader033.vdocuments.us/reader033/viewer/2022060600/6054248472542f2ea937ce77/html5/thumbnails/18.jpg)
18 18
► Q1 2020:
• Initiate Prerequisite phase of Infrastructure Master Plan Implementation
• Initiate Hastings Park Renewable Energy Strategy
► Q3-Q4 2020:
• Initiate scoping and planning for Daylighted Stream in conjunction with City of
Vancouver
Infrastructure Strategy | Next Steps
![Page 19: PNE Board of Directors · 2020. 2. 13. · Master Plan Update 3 Infrastructure Strategy Background . 4 HP-PNE Master Plan is supplemented by an Infrastructure Strategy Aims to outline](https://reader033.vdocuments.us/reader033/viewer/2022060600/6054248472542f2ea937ce77/html5/thumbnails/19.jpg)
19 19
► Infrastructure Master Plan Implementation
Resolved that the HP-PNE Board approve the PNE moving forward with implementation of the proposed HP-PNE Infrastructure Plan “Pre-requisite stage” in Q2 2020 as contemplated.
► Initiate Hastings Park Renewable Energy Strategy
Resolved that the HP-PNE Board approve the PNE building a site wide Renewable Energy Strategy in consultation with the City of Vancouver to support Master Plan Implementation planning, to build on current PNE sustainability planning and to reduce GHE at HP-PNE.
► Endorse scoping and planning for Daylighted Stream
Resolved that the PNE Board endorse the PNE working with City of Vancouver on scoping and planning for Combined Phase 1/2 of the Daylighted Hastings Creek as contemplated in the vision for the Master Plan and as approved within the City’s One Water Strategy, with Planning to begin in Fall 2020 through City of Vancouver Engineering
PNE Board Motions