Page 1: PNE Board of Directors · 2020. 2. 13. · Master Plan Update 3 Infrastructure Strategy Background . 4 HP-PNE Master Plan is supplemented by an Infrastructure Strategy Aims to outline

1

PNE Board of Directors Hastings Park Infrastructure Strategy Update

February 19, 2020

Page 2: PNE Board of Directors · 2020. 2. 13. · Master Plan Update 3 Infrastructure Strategy Background . 4 HP-PNE Master Plan is supplemented by an Infrastructure Strategy Aims to outline

2 2

1) Hastings Park Infrastructure Strategy Background

2) 2019 Infrastructure Strategy Update

3) Hastings Creek Daylighting Update

4) Next Steps

Agenda

Page 3: PNE Board of Directors · 2020. 2. 13. · Master Plan Update 3 Infrastructure Strategy Background . 4 HP-PNE Master Plan is supplemented by an Infrastructure Strategy Aims to outline

Master Plan Update

3 Infrastructure Strategy Background

Page 4: PNE Board of Directors · 2020. 2. 13. · Master Plan Update 3 Infrastructure Strategy Background . 4 HP-PNE Master Plan is supplemented by an Infrastructure Strategy Aims to outline

4 4

► HP-PNE Master Plan is supplemented by an Infrastructure Strategy

► Aims to outline infrastructure upgrades required to deliver the Master Plan and longer-term

needs for Hastings Park

► Infrastructure strategy: 2016 (original) and 2019 (refreshed)

Infrastructure Strategy Background

Master Plan Includes:

• Amphitheatre Renewal

• Playland Redevelopment

• Daylighted Stream

• Increased Green Space

• Greenways

• Parking

• New / Upgraded Facilities

• Roadways

Page 5: PNE Board of Directors · 2020. 2. 13. · Master Plan Update 3 Infrastructure Strategy Background . 4 HP-PNE Master Plan is supplemented by an Infrastructure Strategy Aims to outline

5 5

► HP-PNE Master Plan is supplemented by an infrastructure strategy

► Aims to outline infrastructure upgrades required to deliver the Master Plan and longer-term

needs for Hastings Park

► Infrastructure strategy: 2016 (original) and 2019 (refreshed)

Infrastructure Strategy Background

Infrastructure Includes:

• Water

• Sanitary Sewers

• Stormwater Management

• Combined Sewers

• Power (Electricity)

• Communications

• Natural Gas

• Green Infrastructure

Page 6: PNE Board of Directors · 2020. 2. 13. · Master Plan Update 3 Infrastructure Strategy Background . 4 HP-PNE Master Plan is supplemented by an Infrastructure Strategy Aims to outline

6 2019 Infrastructure Strategy Update

Page 7: PNE Board of Directors · 2020. 2. 13. · Master Plan Update 3 Infrastructure Strategy Background . 4 HP-PNE Master Plan is supplemented by an Infrastructure Strategy Aims to outline

7 7

Infrastructure Strategy | Timeline

Infrastructure Strategy Status Date

1) 2016 Master Plan Infrastructure Strategy Mar 2016

2) 2019 Infrastructure Strategy Update (Playland) Jan 2019

3) 2019 Infrastructure Strategy Update (Amphitheatre) Nov 2019

Page 8: PNE Board of Directors · 2020. 2. 13. · Master Plan Update 3 Infrastructure Strategy Background . 4 HP-PNE Master Plan is supplemented by an Infrastructure Strategy Aims to outline

8 8

Infrastructure Strategy | Scope

2016 2019

Scope

Site-wide infrastructure strategy and

analysis:

o To develop inventory, assess

condition, determine capacity of

existing infrastructure

o To identify infrastructure required

to support the 2010 Master Plan

vision

o To develop a concept design for

the Hastings Creek daylighting

Update infrastructure strategy based

on conceptual design for Playland

Redevelopment and Amphitheatre

Renewal:

o To update capacity assessments

for Playland and Amphitheatre

o To align to best practices related

to climate response (green

infrastructure and GHG reduction)

Page 9: PNE Board of Directors · 2020. 2. 13. · Master Plan Update 3 Infrastructure Strategy Background . 4 HP-PNE Master Plan is supplemented by an Infrastructure Strategy Aims to outline

9 9

Infrastructure Strategy | Key Differences 2016 Infrastructure Strategy 2019 Infrastructure Strategy

(Playland)

2019 Infrastructure Strategy

(Amphitheatre)

Asset Age

& Capacity

• Much of site

infrastructure is

approaching end-of-life

• Capacity should be

increased to

accommodate future

demand

• Updated capacity

assessment for Playland

conceptual design

• More infrastructure

assets identified as end-

of-life

• Updated capacity

assessment for

Amphitheatre conceptual

design

Schedule

& Phasing

• Redevelop in 6 phases

(12 sub-phases) over 20

years

• Updated implementation

phasing to address

required upgrades per

development order

New Scope

• Added new green

infrastructure and storm

management strategy

• Updated to renewable

energy for Amphitheatre

and Playland projects

Page 10: PNE Board of Directors · 2020. 2. 13. · Master Plan Update 3 Infrastructure Strategy Background . 4 HP-PNE Master Plan is supplemented by an Infrastructure Strategy Aims to outline

10 10

Impacts | Phasing

► New “Prerequisite” stage to address required

upgrades to substation

► Redevelop in 7 phases (13 sub-phases) over 20

years

► Updated implementation phasing

Prerequisite Phase (1-5

Years

Page 11: PNE Board of Directors · 2020. 2. 13. · Master Plan Update 3 Infrastructure Strategy Background . 4 HP-PNE Master Plan is supplemented by an Infrastructure Strategy Aims to outline

11 11

► Additional infrastructure assets have been identified as requiring “Renewal”

(approaching end-of-life)

Impacts | Asset Condition

Removal, 3%

New, 79%

2016 Costs by Program

New, 76%

Renewal,

18% Renewal,

22%

Removal,

2%

2019 Costs by Program

Page 12: PNE Board of Directors · 2020. 2. 13. · Master Plan Update 3 Infrastructure Strategy Background . 4 HP-PNE Master Plan is supplemented by an Infrastructure Strategy Aims to outline

12 Hastings Creek Daylighting Update

Page 13: PNE Board of Directors · 2020. 2. 13. · Master Plan Update 3 Infrastructure Strategy Background . 4 HP-PNE Master Plan is supplemented by an Infrastructure Strategy Aims to outline

13 13

Hastings Creek Daylighting | Opportunity

► $1.6 M in funding in 2019-2022 capital plan for Daylighted Stream

► Council-approved Integrated new City-wide Blue-Green Systems Planning

in November 2019

• Identified Hastings Watershed and related Hastings Creek Stream

Restoration as a priority initiatives for the current capital plan

• Presents opportunity to advance Master Plan development with broader City

initiatives

Page 14: PNE Board of Directors · 2020. 2. 13. · Master Plan Update 3 Infrastructure Strategy Background . 4 HP-PNE Master Plan is supplemented by an Infrastructure Strategy Aims to outline

14 14

► Be ecologically rich and diverse

► Connect us with nature

► Capture our imagination

► Teach us

► Engage us

► Provide experiences

The daylighted stream will….

Hastings Creek Daylighting | Benefits

Page 15: PNE Board of Directors · 2020. 2. 13. · Master Plan Update 3 Infrastructure Strategy Background . 4 HP-PNE Master Plan is supplemented by an Infrastructure Strategy Aims to outline

15 15

Hastings Creek Daylighting | Conceptual Design

Page 16: PNE Board of Directors · 2020. 2. 13. · Master Plan Update 3 Infrastructure Strategy Background . 4 HP-PNE Master Plan is supplemented by an Infrastructure Strategy Aims to outline

16 16

Hastings Creek Daylighting | Timing

► Master Plan originally contemplated over 2 phases

• Phase 1 in next 2-3 years

• Phase 2 in 5-8 years

► Looking to do both phases in tandem over next 2-3 years

► COV Engineering project team planning starting Fall 2020

► Important community Initiative that we are pleased to move forward

Page 17: PNE Board of Directors · 2020. 2. 13. · Master Plan Update 3 Infrastructure Strategy Background . 4 HP-PNE Master Plan is supplemented by an Infrastructure Strategy Aims to outline

Next Steps

Page 18: PNE Board of Directors · 2020. 2. 13. · Master Plan Update 3 Infrastructure Strategy Background . 4 HP-PNE Master Plan is supplemented by an Infrastructure Strategy Aims to outline

18 18

► Q1 2020:

• Initiate Prerequisite phase of Infrastructure Master Plan Implementation

• Initiate Hastings Park Renewable Energy Strategy

► Q3-Q4 2020:

• Initiate scoping and planning for Daylighted Stream in conjunction with City of

Vancouver

Infrastructure Strategy | Next Steps

Page 19: PNE Board of Directors · 2020. 2. 13. · Master Plan Update 3 Infrastructure Strategy Background . 4 HP-PNE Master Plan is supplemented by an Infrastructure Strategy Aims to outline

19 19

► Infrastructure Master Plan Implementation

Resolved that the HP-PNE Board approve the PNE moving forward with implementation of the proposed HP-PNE Infrastructure Plan “Pre-requisite stage” in Q2 2020 as contemplated.

► Initiate Hastings Park Renewable Energy Strategy

Resolved that the HP-PNE Board approve the PNE building a site wide Renewable Energy Strategy in consultation with the City of Vancouver to support Master Plan Implementation planning, to build on current PNE sustainability planning and to reduce GHE at HP-PNE.

► Endorse scoping and planning for Daylighted Stream

Resolved that the PNE Board endorse the PNE working with City of Vancouver on scoping and planning for Combined Phase 1/2 of the Daylighted Hastings Creek as contemplated in the vision for the Master Plan and as approved within the City’s One Water Strategy, with Planning to begin in Fall 2020 through City of Vancouver Engineering

PNE Board Motions