Mittal Processors Private Limited (MPPL) January 2018 Report on Capacity Building of the AREU Staff PN. No. 15.2000.6001.04 Consulting Services for Capacity Building And Support to Afghanistan Renewable Energy Union Government of Afghanistan

Upload: others

Post on 31-Aug-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: PN. No. 15.2000.6 001.04 Consulting Services for Capacity … · 2019. 10. 10. · For the renewable energy system particularly solar energy system the major factor responsible for

Mittal Processors Private Limited (MPPL) January 2018

ReportonCapacityBuildingofthe

AREUStaff

PN.No.15.2000.6‐001.04ConsultingServicesforCapacityBuilding

AndSupporttoAfghanistanRenewableEnergyUnion

GovernmentofAfghanistan

Page 2: PN. No. 15.2000.6 001.04 Consulting Services for Capacity … · 2019. 10. 10. · For the renewable energy system particularly solar energy system the major factor responsible for

ReportonCapacityBuildingoftheAREUStaffProject–ConsultingServicesforCapacityBuildingandSupporttoAfghanistanRenewableEnergyUnion

© Mittal Processors Private Limited (MPPL) I

Contents1. INTRODUCTION............................................................................................................................1

1.0Abstract................................................................................................................................1

1.1ObjectivesofthisReport.................................................................................................2

1.2Deliverable..........................................................................................................................2

2. BRIEFDESCRIPTIONOFTHECAPACITYBUILDINGPROGRAM.....................................................3

3. CAPACITYBUILDINGOFAREUSTAFF........................................................................................5

3.1 DataGathering,CompilationandAnalysis...........................................................5

3.2 PVProject(s)Design...................................................................................................6

3.3 LatestknowledgeofPVProject(s)ManagementMethodologies/Mechanisms.................................................................................................8

3.4 PreparationofInformationBrochures/Documents........................................10

3.5 EventManagement.....................................................................................................12

4. RISKIDENTIFIEDANDMITIGATIONPLAN.................................................................................16

Page 3: PN. No. 15.2000.6 001.04 Consulting Services for Capacity … · 2019. 10. 10. · For the renewable energy system particularly solar energy system the major factor responsible for

ReportonCapacityBuildingoftheAREUStaffProject–ConsultingServicesforCapacityBuildingandSupporttoAfghanistanRenewableEnergyUnion

© Mittal Processors Private Limited (MPPL) II

Acronyms

Acronym Description

AREU AfghanistanRenewableEnergyUnion

GIZ DeutscheGesellschaftfurInternationaleZusammenarbeit

DABS DaAfghanistanBreshnaSherkat

RE RenewableEnergy

MPPL MittalProcessorsPrivateLimited

PEC ProvincialEnergyCommittee

T&D Transmission&Distribution

SPOC SinglePointofContact

GoA GovernmentofAfghanistan

STA SystematicTrainingApproach

TOT TraintheTrainers

OJT On‐the‐JobTraining

IDEA InstitutionalDevelopmentforEnergyinAfghanistan

RE RenewableEnergy

ToR TermsofReference

IPD InvestmentPromotionDesk

O&M Operation&Maintenance

Page 4: PN. No. 15.2000.6 001.04 Consulting Services for Capacity … · 2019. 10. 10. · For the renewable energy system particularly solar energy system the major factor responsible for

ReportonCapacityBuildingoftheAREUStaffProject–ConsultingServicesforCapacityBuildingandSupporttoAfghanistanRenewableEnergyUnion

© Mittal Processors Private Limited (MPPL) 1

1. Introduction

1.0Abstract

Renewableenergyresourcescouldplayavitalroleinthesustainableeconomic,social,andenvironmentaldevelopmentofAfghanistan.Heavyrelianceofruralhouseholdsonfirewood,risingcostsoffossilfuels,outdoorandindoorairpollution,andclimatechangearesomeofthechallengesthatcanbeaddressedbydiversifyingourpowerproductionfuelinputsandadoptingrenewableenergytechnologies.Inordertodeployandscaleuprenewableenergytechnologiesandimproveaccesstosustainableenergy,clearpoliciesandtargetsanddedicatedinstitutionsarecrucial.Fortunately,Afghangovernmentwiththesupportof internationalcommunity issettingambitioustargets for therenewableenergysectorandisencouragingnationalandinternationalinvestorstotakepartinthegeneration, transmission, and distribution of renewable energy especially electricitythroughPowerPurchaseAgreementsorverycheaplandleases.

Theoverallscopeoftheentireprojectonabroaderperspectivecanbedefinedasbelow–

EnablingAREUtosothatitcanproviderelevantinformationtotheprivatepowercompaniesregardingpolicyframeworkandapprovalprocesses.

Developingafive‐yearstrategyforAREU. Developingskillsfortheanalysisofdatafromtheenergysectorfortheclient’suse. ToensurethatAREU/privatesectoriswell‐trainedonPVproject(s)designand

eventmanagement. DevelopingthetechnicalcapacityofAREU. ToensureAREUmembersareequippedwiththelatestknowledgeonPVproject

managementmethodologies/mechanisms. Recommending tax concessions for RE power projects including Custom Duty

concessionsforadvocacybyAERUwiththeGovernmentofAfghanistan.

Page 5: PN. No. 15.2000.6 001.04 Consulting Services for Capacity … · 2019. 10. 10. · For the renewable energy system particularly solar energy system the major factor responsible for

ReportonCapacityBuildingoftheAREUStaffProject–ConsultingServicesforCapacityBuildingandSupporttoAfghanistanRenewableEnergyUnion

© Mittal Processors Private Limited (MPPL) 2

1.1ObjectivesofthisReport

Theobjectivesofthisreportarebroadlystatedasfollows–

Developskillsfortheanalysisofdatafromtheenergysectorfortheclient’suse. ToensureAREU/privatesectoriswell‐trainedonPVproject(s)designandevent

management. DevelopthetechnicalcapacityofAREU. EnsureAREUmembersareequipped.

1.2Deliverable

ThedeliverableofthisassignmentandCapacityBuildingoftheAREUStaffwillbedefinedbyandboundtothefollowingparameters.

Datagathering,compilationandanalysis. PVproject(s)design.

LatestknowledgeofPVproject(s)managementmethodologies/mechanisms.

Preparationofinformationbrochures/documents.

Eventmanagement.

Page 6: PN. No. 15.2000.6 001.04 Consulting Services for Capacity … · 2019. 10. 10. · For the renewable energy system particularly solar energy system the major factor responsible for

ReportonCapacityBuildingoftheAREUStaffProject–ConsultingServicesforCapacityBuildingandSupporttoAfghanistanRenewableEnergyUnion

© Mittal Processors Private Limited (MPPL) 3

2. Brief Description of the CapacityBuildingProgram

TheCapacityBuildingProgramofAREUstaffsareformulatedafterdetaileddiscussionwithAREUofficialsontheirspecificneedsandrequirementsandthepresentstudiesoftherenewableenergysectorofthecountry.

TheCapacityBuildingoftheAREUStaffwillcompriseofeffectivepracticalandtheoreticalWorkshops,Class‐roomTrainingsandFieldVisitsthatwillenhancetheknowledgeandunderstandingofAREUOfficials toprepare,manageandhandleeffectiveand feasiblesolutions.

DevelopmentofAREUStaffandRESector

Sl.No. What How

1 ProgramandAgendas 1.Workshops

2.ClassroomTrainings

3.FieldVisits

2 ResourceAssessment 1.Site‐specificResourceAssessment

2.OrganizationalResourceAssessment

3.Market&TariffAssessment

3 Technology Development andDemonstration

1. Pilot Demonstration Programs (Stand‐alone,Roof‐topandMini‐Grid)

2.StandardDevelopments

3. International and Advanced TechnologyTransfer – Designs and Calculations ofIsolated,Grid‐ConnectedandRoof‐TopSolarPowerPlants/ROICalculations/Paybacks

4.RenewableEnergyMarkets

4 Commercials 1. Business Model Development andDemonstration

2. Demonstrate cost‐recovery by privatesector

3.FinancialriskmitigationforPPPs

4.Mechanismstoaccesscapital

5 People 1.Awarenessprograms

Page 7: PN. No. 15.2000.6 001.04 Consulting Services for Capacity … · 2019. 10. 10. · For the renewable energy system particularly solar energy system the major factor responsible for

ReportonCapacityBuildingoftheAREUStaffProject–ConsultingServicesforCapacityBuildingandSupporttoAfghanistanRenewableEnergyUnion

© Mittal Processors Private Limited (MPPL) 4

2.DevelopingCurricula/certifications

3.Advertisements

6 PoliticalWill 1.AwarenessofREbenefits

2.Coordinationwithgovernmentatdifferentlevels

3.Demonstrationofbenefittoconstituents

4.Demonstrationofeconomicbenefit

7 RegulatoryEnvironment 1.Developlegalbasisforprivatesector

2.Transparentguidelines

3.Technicalstandards

4.Oversight/monitoring(especiallyO&M)

Note:

On special considerations and approvals, a team of highly qualified and experiencedprofessionalsinDelhi/IndiacanarrangeeffectiveandstretchedWorkshopsandFieldVisitsfortheAREUStaffs,whichwilladdimmenseandmeasurablevaluestotheCapacityBuildingPrograms.

ThisparticularprogramhasbeenconsideredafterdiscussionwithGIZandAREUofficials.

Page 8: PN. No. 15.2000.6 001.04 Consulting Services for Capacity … · 2019. 10. 10. · For the renewable energy system particularly solar energy system the major factor responsible for

ReportonCapacityBuildingoftheAREUStaffProject–ConsultingServicesforCapacityBuildingandSupporttoAfghanistanRenewableEnergyUnion

© Mittal Processors Private Limited (MPPL) 5

3. CapacityBuildingofAREUStaff

3.1 DataGathering,CompilationandAnalysis

WithreferencetoMonitoringoftheSolarPowerPlants,keepingupthehealthoftheSolarPVSystemisofparamountimportance,andcontinuousmonitoringisrequired.AsmostoftheSolarPVPlantsareinstalledinremotelocations,theOperations&Maintenance(O&M)providerwillneedtouseallwaysandmeanstogetfirminformationabouttheplantperformancedaily.

TheO&Mproviderusuallywillhavealimitedknowledgeofthelocalweatherconditionsandtheeffectoftheterrainonplantperformance.WhentheGenerationgoesdown/dips,theirengineer’s/monitoringpersonnelcannotstepoutsidethecontrolroomalwaystoknowwhichpartoftheplantisunderperformingorifthereareweatherrelatedchangeswithintheplantinalargeacreageset‐up.

Therefore, to bridge the information gap and to get seamless updates about plantperformance,Monitoringsystemsareveryessential.Monitoringispossibleevenfromacentral office of the client or the O&M provider’s Headquarters (HQ) in a differentlocation,withproperauthenticationmeasures.Thelattercomplementstheeffortsofthemonitoring personnel at site and is more tweaked towards analysis of the data, asreceived.PredictiveanalyticsisthewayforwardfororganizationswhichhaveamaturedO&Mplantmonitoringsetup.

Irrespectiveof sizeof theplants, comprehensivemonitoring is important for trackingyieldsattheplantsminutebyminute.Therefore,toaidthisgoalthemonitoringsystemsshouldrununinterruptedatall the times.Monitoring thegeneration/yieldsregularlyprovidesvitalpieceofinformationinadvancewhenthesystemperformanceisloworislikely to fail. Based on the measures, preventive maintenance can be carried out toenhance theperformance and thehealth of the systemor themaintenance schedulesjudiciouslyplanned.

Itbecomesessentialtoensure:

Highlevelsofavailabilityandperformance, Lowerdowntimes Quickerfaultdetectiontools&techniques. Onsiteweatherstationdata, Productiondatafromthepanelstrings,arrays,inverter,andtransformers.

Page 9: PN. No. 15.2000.6 001.04 Consulting Services for Capacity … · 2019. 10. 10. · For the renewable energy system particularly solar energy system the major factor responsible for

ReportonCapacityBuildingoftheAREUStaffProject–ConsultingServicesforCapacityBuildingandSupporttoAfghanistanRenewableEnergyUnion

© Mittal Processors Private Limited (MPPL) 6

DataCommunication:

SolarPhotovoltaicmonitoringsystemscanhavewiredorwirelessdatacommunication.MostPhotovoltaicmonitoringsystemsarewirelessbased;Wirelessremotemonitoringisnotrestrictedbyregionanddistance,especiallyinremoteareasanditmayservethepurposebetter.

SupervisoryControlandDataAcquisition(SCADA):

MonitoringandcontrolgohandinhandandinvariablySCADAsystemsarethebackboneofanyRemotemonitoringsystem.

KeyResultsobtainedfromCompilationandAnalysis:

Sunenergy[kWh/m²] ModulelevelData Radiation[W/m²] Thetotalenergyproduction[KWh] Energyforecast[kWh] CapacityUtilizationFactor[%] ThePerformanceRatio(PR[%]). The specific energy [kWh/kWp] ‐ An indicator of production based on the

availableirradiation

(locationandorientation).

WithcosteffectivenessbeingthemantratobeachievedinSolarPowerplantsacrosstheworldthepeople’sattentionwillnextbetowardsreducingO&Mcosts.Hereiswherearobustmonitoringsystemwillbeabigenabler.Thougheverypartoftheplantandeveryinputattributecannotbecontrolledtothedesiredlevels,continuousmonitoringoftheenergygenerationasperexpectedforecastandinsolationwillensurethattheefficiencyoftheplantismaintainedatahighlevelthroughthelifeoftheplant.ThelatestgenerationofSCADAcomplementingtheInternetOfThingswithextensivedatasecurityprotectionmeasureswillpossiblydrivethenextgenerationO&M.

3.2 PVProject(s)Design

For the renewable energy system particularly solar energy system the major factorresponsibleforincreasingtheyieldanddecreasingthecostisOptimallyDesigningthesystem.Variousmethodsarebeingutilizedbydifferentorganizations inplanningandsizingthegrid‐connectedPVsystems.

Thisoverviewofsolarphotovoltaicsystemsgivesabasicunderstandingof:

Evaluatingasiteforitssolarpotential Commongrid‐connectedPVsystemconfigurationsandcomponents

Page 10: PN. No. 15.2000.6 001.04 Consulting Services for Capacity … · 2019. 10. 10. · For the renewable energy system particularly solar energy system the major factor responsible for

ReportonCapacityBuildingoftheAREUStaffProject–ConsultingServicesforCapacityBuildingandSupporttoAfghanistanRenewableEnergyUnion

© Mittal Processors Private Limited (MPPL) 7

Considerationsinselectingcomponents ConsiderationsindesignandinstallationofaPVsystem TypicalcostsandthelaborrequiredtoinstallaPVsystem

“Theefficiencyofanysolarpowersystemdependsontwocriticalaspects

–Gooddesignandqualitycomponents.”

A high yielding solar power plant always starts with a good design. In most solarEPC/installationcompanies,designteamisacriticalelement.ASolarPVDesignerhastodesignanddevelopsiteplansforsolarpanelinstallation.TheDesignEngineertakestheinitialsystemconcept ideasandtranslates theminto fullydetailedconstructionreadydesigns.Coordinatingwithmultipleteammembersandcustomers,theDesignEngineerbalancesthenecessityofacustomersolutionwiththeefficiencyofstandardpractices.

SolarPVDesigningwillpredominantlyrevolvearoundfollowingthreepoints:

Calculations&Design BOMPreparationandCostingAnalysis Overseeingprojectexecution

TheAdvancedSolarPVPlantdesignprocedurecomprisesthefollowingsteps:

UsecustomsoftwaretoolstodesignPVsystems(Solarpro,PVCOMPLEATEetc.) Variousinputsliketheload,peakpower,modulevoltage,globalirradianceandtilt

anglearegiven,anddetailedtechnicalaspectsofthePVsystemareobtained. Performaccuratesystemsizingcalculations Createelectricalsingle‐linediagrams,panelschedules,orconnectiondiagramsfor

solarelectricsystems,usingcomputer‐aideddesign(CAD)/PVsystsoftware Run PVsyst reports for system production estimates, develop optimal designs

withSLD,PML,conduitandwirescheduling,routingandequipmentplans,andconceptual3‐Drenderings.

Executedesignsthatadheretogridcomplianceandpermittingrequirements. Buildingdetailedbillsofmaterialsbasedonsystemspecificationsandperforming

costinganalysis. Coordinateswithmanagementteamtodevelopcompleteproposalpackages. Workacrossfunctionallywithsales,projectmanagementandinstallationteams

toensureclients’needsandinternaldeadlinesaremet. Troubleshootdesignandconstructionissuesinthefield.

Page 11: PN. No. 15.2000.6 001.04 Consulting Services for Capacity … · 2019. 10. 10. · For the renewable energy system particularly solar energy system the major factor responsible for

ReportonCapacityBuildingoftheAREUStaffProject–ConsultingServicesforCapacityBuildingandSupporttoAfghanistanRenewableEnergyUnion

© Mittal Processors Private Limited (MPPL) 8

3.3 LatestknowledgeofPVProject(s)ManagementMethodologies/Mechanisms

Each project has its own complexities in terms of financial models, managerialcapabilities,projectevaluation,projectstructures,technicalrequirementsetc.andrightProjectManagementMethodologyisrequiredtoovercomethese.

Solar PV Project Management aims to address the challenges in terms of projectmanagement, project construction, financial management and assessing the risksinvolvedintheprojectdevelopment.

Solar PV Project Management is a rapidly evolving field which require expertise inproviding solutions in financial, design engineering, construction, logistics and supplychain, equipment technology, applications and services with aim to reduce theconstructiontimeandimproveprojectperformance.

PVProject(s)ManagementMethodology/Mechanism:

A. ProjectPlanning&FeasibilityAnalysis‐

ProjectExecutionmodelassessment. Prefeasibility Study, Preliminary Site survey, Geo Technical survey, energy

resourceassessment. Planning‐ProjectTimelines,processflow,guidelinesetc. Who?What?When?Where?Why?How?Howmuch?Analysis FinancialAnalysis,Planning,RiskManagement,FundsArrangement,Budgeting. PreparationofDetailedProjectReport(DPR). NecessaryApprovals PreparationofqualifyingcriteriaforselectionofEPC,O&Mcontractors Guidance to Client about suitable practices for erection and commissioning of

powerplant. ProjectBenchmarking–Designs,Generation,etc. Risks,challenges,SuccessfactorsanalysisandExpertrecommendations. Projectdocumentation

B. EngineeringandDueDiligence‐

Making,Review/VettingofSystemDesignsandDiagrams(civil,mechanicalandelectrical) including drawings, layouts, specifications, Plant Orientation, Tilt ofPanels,positioning,SpacingandLayoutDesigningetc.

Selectionofbestavailableproducts&technologiesbasedontechnicalrationaleandClient’spriorities.

GenerationPatternAnalysis. GridAssessment

Page 12: PN. No. 15.2000.6 001.04 Consulting Services for Capacity … · 2019. 10. 10. · For the renewable energy system particularly solar energy system the major factor responsible for

ReportonCapacityBuildingoftheAREUStaffProject–ConsultingServicesforCapacityBuildingandSupporttoAfghanistanRenewableEnergyUnion

© Mittal Processors Private Limited (MPPL) 9

Resource&ClimateAssessment TechnologyAssessment EnergyYieldEstimationVerification Due Diligence ‐ Project Capacity, Project Layout, Project Performance, Power

Evacuationplanningetc.

C. Procurement‐

FinalizingEquipment‐TechnicalSpecifications&RFQs VendorIdentificationandDisseminationofRFQ, TechnoCommercialEvaluation ManufacturingFacilityInspection VendorFinalization Contractsassessmentandnegotiation. SupplyChainManagement

D. Installation&Commissioning‐

ProjectExecution Realtimeplanningandsitemanagement QualitymanagementAdherencetoworkplacesafetystandards Pre‐commissioning,CommissioningandTestingofthePlant ClientTraining,ProjectHand‐overtoClient

E. Operations&MaintenanceVendorFinalization‐

ServiceRequirementDiagnosis WarrantyofferingDiagnosis PreventiveMaintenance CorrectiveMaintenance InsuranceContracts Operation&MaintenanceManual Performanceanalysis Reporting

Page 13: PN. No. 15.2000.6 001.04 Consulting Services for Capacity … · 2019. 10. 10. · For the renewable energy system particularly solar energy system the major factor responsible for

ReportonCapacityBuildingoftheAREUStaffProject–ConsultingServicesforCapacityBuildingandSupporttoAfghanistanRenewableEnergyUnion

© Mittal Processors Private Limited (MPPL) 10

3.4 PreparationofInformationBrochures/Documents

The InformationBrochures onmultifarious topics in theRenewableEnergy Sector ofAfghanistanwillhelpthisGreenEnergySectortospreaditsawarenessandcapabilitiesamongtheconsumers,investors,policy‐makersanddevelopers.

The preparation of Information Brochures and their circulation will also help theRenewableEnergysectorofAfghanistantogrowitsoutreachonanationalandagloballevel.

PreparationMethods–

TheInformationBrochuresandDocumentsshouldbepreparedinone‐pagerstyle.

PictorialviewsandillustratingdiagramswilldominatetheInformationBrochurewithdatainbulletinpointswhichwilldescribethemainessenceofthediagrams.

TheapproachandoutlookoftheInformationDocumentsshouldbecolorful,touchyandvibrant.

ThiswillspreadoutthemessageoftheInformationBrochureeffectively.

TargetAudiences–

Consumers Investors Policy‐Makers Developers Power/Energy/Utilitysectorofficials

Page 14: PN. No. 15.2000.6 001.04 Consulting Services for Capacity … · 2019. 10. 10. · For the renewable energy system particularly solar energy system the major factor responsible for

ReportonCapacityBuildingoftheAREUStaffProject–ConsultingServicesforCapacityBuildingandSupporttoAfghanistanRenewableEnergyUnion

© Mittal Processors Private Limited (MPPL) 11

InformationBrochure/DocumentContents–

ThecontentsoftheInformationBrochureshouldbroadlycovertheTechnical,Financial,AwarenessandOpportunityaspectsoftherenewableenergysector,whichwillincludethemultifarioustopicsasstatedbelow.

TechnicalAspects

• Latest Photo‐Voltaic Solar Power Plant TechnologiesLatest Photo‐Voltaic Solar Power Plant Technologies

• Photo‐Voltaic Cell Technologies

• Inverter Technologies

• Battery Storage Technologies

• WindPowerGenerationTechnologies

• HydelPowerGenerationTechnologies

• Geo‐ThermalPowerGenerationTechnologies

FinancialAspects

• FinancialModels• Investor'sBenefits• Contractor'sBenefits• MultifariousCostAspectsInvolvedinaSolarPowerProject

• MultifariousCostAspectsInvolvedinaWindPowerProject

• MultifariousCostAspectsInvolvedinaHydelPowerProject

• MultifariousCostAspectsInvolvedinaGeo‐ThermalPowerProject

• SolarPowerTariffAspects

• WindPowerTariffAspects

• HydelPowerTariffAspects

• Geo‐ThermalPowerTariffAspects

AwarenessandOpportunitiesAspects

• PresentRenewableEnergyMarketScenario

• Predicted/ForecastedRenewableEnergyMarketScenario

• BenefitsofusingRenewableEnergy

• AboutSolarPower/Energy

• AboutWindPower/Energy

• AboutHydelPower/Energy

• AboutGeo‐ThermalPower/Energy

• OpportunitesofSolarPowerGenerationinAfghansitan

• OpportunitesofWindPowerGenerationinAfghansitan

• OpportunitesofHydelPowerGenerationinAfghansitan

• OpportunitesofGeo‐ThermalPowerGenerationinAfghansitan

• AwarenesstowardsGenerationandUseofRenewableEnergy

Page 15: PN. No. 15.2000.6 001.04 Consulting Services for Capacity … · 2019. 10. 10. · For the renewable energy system particularly solar energy system the major factor responsible for

ReportonCapacityBuildingoftheAREUStaffProject–ConsultingServicesforCapacityBuildingandSupporttoAfghanistanRenewableEnergyUnion

© Mittal Processors Private Limited (MPPL) 12

3.5 EventManagement

AnEventManagementplaysaverycriticalroleinthearrangementandmanagementofeventslikeseminars/functions/meetings/road‐showsinregardtotherenewableenergysector.

Events like seminars/functions/meetings/road‐shows of the various verticals of therenewableenergysectorareextremelyimportantonanationalandagloballevelinordertoattractandfacilitatetheinvestors,policy‐makers,contractorsandconsumers.

Sotheentirearrangementandmanagementoftheeventsbecomeveryobvioustomakethoseeventsattractive,lively,worth‐makingandsuccessful.ReasonstoexhibitEvents

Get the chance to shake hands with industry experts and influential decisionmakers.

Showcaseyourproducts,brandandactivitiesinanexcitingsettingfocusedonthelatestinnovationsandmarkettrends.

Makenewcontactswhilstupdatinganddevelopingexistingrelationshipsfacetofacewithyourclientsandpartners.

Exploitagreatmarketing toolandourpromotionalsolutions tocreate interestandbusinessopportunitiesbefore,duringandaftertheevent.

By participating as an exhibitor you will have the opportunity to address anaudience of industry professionals and scientists, dealing directly with.individualswhichcanhelpelevateyourorganizationtonewheightsandmakeanimpactonfuturemarketsinthesecomplexeconomicaltimes.

Visitors’Profiletobedecided

GovernmentOfficials&PolicyMakers ProjectDevelopers&EPCContractors Distributors&ChannelPartners SystemIntegrators Banks,IPPs&Investors ArchitectsandConsultants FacilityManagers SeniorCorporateExecutives CaptivePowerConsumers R&DInstitutions TechnologyDevelopers ProjectProcurementOfficials

Page 16: PN. No. 15.2000.6 001.04 Consulting Services for Capacity … · 2019. 10. 10. · For the renewable energy system particularly solar energy system the major factor responsible for

ReportonCapacityBuildingoftheAREUStaffProject–ConsultingServicesforCapacityBuildingandSupporttoAfghanistanRenewableEnergyUnion

© Mittal Processors Private Limited (MPPL) 13

Thedifferentphasesandlife‐cycleofaneventmanagementsystemcanbebroadlydefinedasbelow.

Creatingaplanandwritingdownthegoalsandobjectives

SettingofBudget

EstablishmentofSponsorshipsandPartnerships

PreparationofaTeam

SettingandFinalizationofDates

MarketingoftheEvent

PerformingtheEvent

GettingfeedbackfromGuestsandParticipants

Page 17: PN. No. 15.2000.6 001.04 Consulting Services for Capacity … · 2019. 10. 10. · For the renewable energy system particularly solar energy system the major factor responsible for

ReportonCapacityBuildingoftheAREUStaffProject–ConsultingServicesforCapacityBuildingandSupporttoAfghanistanRenewableEnergyUnion

© Mittal Processors Private Limited (MPPL) 14

5‐StepstoaSuccessfulEvent

Evaluation

WrittenSurvey,AMonitor(Apersonwhoobservestheattendeesreactions),TelephoneSurvey,Internet/EmailSurvey,PreandPostEvaluationstofindouttheattendees'opinionbeforeand

aftertheirattendanceintheevent.

EventCoordination

CoordinatingminutebyminuteactivitiesoftheEventisbasedondecisonmaking.

Planning

Timing,SpaceandTempo

Design

Brain‐storming,MindMappingActivitiesandCreativeIdeastomapgoalsandobjectives.

CreativityInfluences;Caterer,Marketer,Writer,GraphicArtist,Entertainment

Management,Decorator,MusicalContractor

Research

Thebetterresearchyouconductbeforetheevent,morelikelytheeventwillbesuccessful.

CarryingouttheSWOTAnalysis;DeterminingtheStrengths,Weaknesses,

OpportunitiesandThreats.

Page 18: PN. No. 15.2000.6 001.04 Consulting Services for Capacity … · 2019. 10. 10. · For the renewable energy system particularly solar energy system the major factor responsible for

ReportonCapacityBuildingoftheAREUStaffProject–ConsultingServicesforCapacityBuildingandSupporttoAfghanistanRenewableEnergyUnion

© Mittal Processors Private Limited (MPPL) 15

5StepstoMaximizeBusinessGainsinanEvent

Theearlybirdgetstheworm(andgreatstallpreference!)

Exhibitorstendtobookstallspaceatashowandforgetaboutit;orbooklate.Setupaframeworkanddiscussrealisticsalesobjectiveswithyourteam,suchas– generatingaspecificnumberofleads,meetings,salesorsamples.

Pre‐showpromotion:Anexhibitor’stickettothewinningnumbers!

Promoteyourparticipationintheeventbyspreadingthewordamongyourexistingclientsandinthemarket

Anarmyisonlyasgoodasitssoldiers:Trainyourteam!

Bringyourteamtogetherbeforetheshowandtalkaboutyourobjectives.Briefthemabouttheproductsthatwillbeexhibitedandsuggestpointerstostartandendconversationswithbuyers.Alittlebitoftrainingcanmakeabigdifference.

Anexhibitionstallisasgoodasaninternationalshowroom!

Visitorsinanexhibitionglanceatastallforaboutfivesecondsbeforedecidingwhethertheyshouldcomeinrightaway,duringasecondroundornotatall.Makesureyourdisplayisneatandyourstaffiswelldressedandattentive.

Forgingalliancesforalifetime!

Ensurethatyougetpropercontactdetailsfromyourvisitors.Gettingintouchwithapotentialbuyerwithinaweekoftheshowgivesthemtheconfidencethatyoumeanbusiness.Remember,everyclientispotentiallyacustomerforlife.

Page 19: PN. No. 15.2000.6 001.04 Consulting Services for Capacity … · 2019. 10. 10. · For the renewable energy system particularly solar energy system the major factor responsible for

ReportonCapacityBuildingoftheAREUStaffProject–ConsultingServicesforCapacityBuildingandSupporttoAfghanistanRenewableEnergyUnion

© Mittal Processors Private Limited (MPPL) 16

4. RiskIdentifiedandMitigationPlan

DuringtheinteractionswiththeAREUmembers,variousissueshaveemergedthatneedtobeaddressedforsmoothexecutionoftheproject.

ThekeyissuesandtheprobablemitigationmeasuresfortheCapacityBuildingProgramsaredetailedherebelow.

Sl.No. KeyIssues MitigationMeasures

1 IncorrectInformation

Verificationandcross‐checksofinformationatvarious defined steps before final printing oftheInformationBrochures/Documents.

Legalvalidations. LegalDisclaimer.

2 PlannedCapacityBuildingProgramSessions not becarried out dueto sudden andunwarnedsecurity threatsandissues

AlternateplanningtobedonetocarryouttheCapacityBuildingProgramsinasafeplaceandwithtotalsecurityvisioninmind.

Proper communication made to client alongwithanarrangementtocarryouttheCapacityBuildingProgramson saiddate and timeat adifferent secured place or on a later defineddateandtimeatthesameplace.

Page 20: PN. No. 15.2000.6 001.04 Consulting Services for Capacity … · 2019. 10. 10. · For the renewable energy system particularly solar energy system the major factor responsible for

ReportonCapacityBuildingoftheAREUStaffProject–ConsultingServicesforCapacityBuildingandSupporttoAfghanistanRenewableEnergyUnion

© Mittal Processors Private Limited (MPPL) 17

This material and the information contained herein prepared by Mittal ProcessorsPrivateLimited(MPPL)isintendedtoprovidegeneralinformationonaparticularsubjectorsubjectsandisnotanexhaustivetreatmentofsuchsubject(s)andaccordinglyisnotintendedtoconstituteprofessionaladviceorservices.Theinformationisnotintendedtoberelieduponasthesolebasisforanydecisionwhichmayaffectyouoryourbusiness.Beforemakinganydecisionortakinganyactionthatmightaffectyourpersonalfinancesorbusiness,youshouldconsultaqualifiedprofessionaladviser.NoneofMPPL,MPPLitsmember firms, or its and their affiliates shall be responsible for any losswhatsoeversustainedbyanypersonwhoreliesonthismaterial.

©2017MittalProcessorsPrivateLimited(MPPL)