Page 1: PMRTechnical!WorkProgram! · o Definion! of the building block,’ and’ role’ in’ successful’ ETS’ operaon’ o A highlevel! presentaon! of’ theorecal’ and’ strategic’

 

 PMR  Technical  Work  Program  

UPDATE  

Eleventh  Mee/ng  of  the  Partnership  Assembly  London,  United  Kingdom  March  10-­‐11,  2015  

Ms.  Pauline  Kennedy  PMR  Secretariat  

Page 2: PMRTechnical!WorkProgram! · o Definion! of the building block,’ and’ role’ in’ successful’ ETS’ operaon’ o A highlevel! presentaon! of’ theorecal’ and’ strategic’

2

UPSTREAM  POLICY  

MRP  

u  Objec3ves  §  Facilitate  experience  and  knowledge  sharing  

§  Develop  prac/cal  guidance  on  common  issues  

§  Iden/fy  good  prac/ce  and  common  standards  

§  Build  capacity  

u  Audience  §  Policy  makers  and  technical  staff  in  PMR  countries  §  But  also  a  broader  audience  beyond  the  PMR  

u  PA  10  discussed  approach  to  strategic  planning  §  Need  coherence  of  different  pieces  and  con/nuous  

and  systema/c  support  §  More  targeted  and  in  /me  support  as  PMR  countries  

move  to  implementa/on  of  their  MRPs  §  Capture  and  share  lessons    §  Leverage  work  by  others  

u  PA  12  forward  work  plan  for  FY16  §  Today  provide  update  on  progress  

 

     Background  

TECHNICAL  WORK  PROGRAM  

Page 3: PMRTechnical!WorkProgram! · o Definion! of the building block,’ and’ role’ in’ successful’ ETS’ operaon’ o A highlevel! presentaon! of’ theorecal’ and’ strategic’

3

•  Provide  guidance,  lessons  learned,  just-­‐in  /me  knowledge  •  Technical  notes,  country  case  studies,  technical  briefs  

Knowledge  Products  

•  Engage  PMR  Par/cipants  in  specific  technical  discussions  with  experts  

Technical  Workshops  

•  Enable  technical    exchange  among  PMR  Par/cipants  • Mul/lateral,  regional  or  bilateral  mee/ngs      

County-­‐to-­‐Country  Exchange  

•  Develop  country  exper/se  •  Hands-­‐on  prac/cal  learning  (case  studies,  exercise)  

Technical  Trainings  

•  E-­‐Learning  to  disseminate  knowledge  to  a  wider  audience  • Webinars    •  PMR  website  

Web-­‐based  tools    

   Ac3vi3es  and  Organiza3on  

WORKING GROUPS

Page 4: PMRTechnical!WorkProgram! · o Definion! of the building block,’ and’ role’ in’ successful’ ETS’ operaon’ o A highlevel! presentaon! of’ theorecal’ and’ strategic’

4

u  PMR  products  now  published  on  the  World  Bank’s  Open  Knowledge  Repository  

     

 u  Working  with  interested  countries  to  translate  to  other  

languages  §  Chinese,  Russian  §  Please  let  us  know  if  this  would  be  useful  

Improved  Dissemina/on  and  Outreach  

§  Over  500  downloads  of  each  

§  Sta/s/cs  on  who  is  downloading  by  country,  mul/media  etc.    

Page 5: PMRTechnical!WorkProgram! · o Definion! of the building block,’ and’ role’ in’ successful’ ETS’ operaon’ o A highlevel! presentaon! of’ theorecal’ and’ strategic’

5

u Enhancing  country  specific  support    §  Expert  advice  §  Targeted  technical  support  §  Just-­‐in  /me  training  §  Country  case  studies  to  capture  and  share  lessons  

More  Targeted  and  in-­‐/me  Support  

Page 6: PMRTechnical!WorkProgram! · o Definion! of the building block,’ and’ role’ in’ successful’ ETS’ operaon’ o A highlevel! presentaon! of’ theorecal’ and’ strategic’

6

ETS  –  Update  on  Progess  

         Technical  note   Handbook  for  emissions  trading   2015  

       Working  group                                                                                                                                                                                                                                                                                                                                                                                                        on  going    input  on  handbook  and  next  steps  for  work  program    

Page 7: PMRTechnical!WorkProgram! · o Definion! of the building block,’ and’ role’ in’ successful’ ETS’ operaon’ o A highlevel! presentaon! of’ theorecal’ and’ strategic’

7

Carbon  Tax  –  Update  on  Progess  

         Technical  note   Carbon  tax  guide   FY15  Q4  

         E-­‐Learning                                                                                                                                                                                                                                                                                                                                                                                                        Course  focusing  design  and  use  of  carbon  tax  

Later  in  2015  

       Working  group                                                                                                                                                                                                                                                                                                                                                                                                        on  going    input  on  guide  and  next  steps  for  work  program    

Page 8: PMRTechnical!WorkProgram! · o Definion! of the building block,’ and’ role’ in’ successful’ ETS’ operaon’ o A highlevel! presentaon! of’ theorecal’ and’ strategic’

8

MRV  –  Update  on  Progess  

         Technical  note   Design  guide  for  Mandatory  GHG  repor3ng  

April/May  2015  

         E-­‐Learning                                                                                                                                                                                                                                                                                                                                                                                                        Course  focusing  on  GHG          repor3ng  programs    

To  be  finalized  FY15  Q4  

       Working  group                                                                                                                                                                                                                                                                                                                                                                                                        on  going    input  on  design  guide  and  next  steps  for  work  program    

Page 9: PMRTechnical!WorkProgram! · o Definion! of the building block,’ and’ role’ in’ successful’ ETS’ operaon’ o A highlevel! presentaon! of’ theorecal’ and’ strategic’

9

u  Step  by  step  guidance  for  policy  makers  designing  mandatory  GHG  repor/ng  program  

u  Prepared  in  collabora/on  with  WRI  §  Has  been  reviewed  by  PMR  MRV  working  group  and  WRI  internal/external  

review  §  Expected  to  be  published  in  April/May  

Design  guide  for  mandatory  GHG  repor/ng  

 

Page 10: PMRTechnical!WorkProgram! · o Definion! of the building block,’ and’ role’ in’ successful’ ETS’ operaon’ o A highlevel! presentaon! of’ theorecal’ and’ strategic’

10

u  Focus  on  mandatory  GHG  repor/ng  at  the  corporate/facility  level  §  Building  on  material  in  the  Design  Guide  §  In  an  educa/onal  learning  course  

u  Objec/ves:  §  Understand  the  basic  steps  for  the  design  and  implementa/on  of  a  GHG  

repor/ng  program  §  Iden/fy  what  ins/tu/onal,  legal  and  regulatory  arrangements  are  necessary  

for  an  effec/ve  program  §  Recognize  and  understand  data  monitoring  methods  and  emissions  

calcula/on  approaches,  emissions  repor/ng  process  and  procedures,  and  verifica/on  op/ons  

§  Exchange  good  prac/ces  and  examples  of  the  development  of  GHG  repor/ng  systems  

u  Collabora/ng  with  World  Bank’s  Climate  Knowledge  and  Partnerships  team/CF-­‐assist  and  WRI  §  Will  be  hosted  by  the  World  Bank  E-­‐Ins/tute  

MRV  ELearning  

Page 11: PMRTechnical!WorkProgram! · o Definion! of the building block,’ and’ role’ in’ successful’ ETS’ operaon’ o A highlevel! presentaon! of’ theorecal’ and’ strategic’

11

Offsets  –  Update  on  Progess  

     Technical  note    Op3ons  to  use  interna3onal  offset  programs  in  a  domes3c  context    

May  2015    

 Technical  Briefs    Regular/3mely  insight  on  new  developments  &  technical  

issues  

Further  topics  under  

considera3on    

     Working  Group    Met  to  reflect  on  technical  work  

program  outputs     February  2015    

Page 12: PMRTechnical!WorkProgram! · o Definion! of the building block,’ and’ role’ in’ successful’ ETS’ operaon’ o A highlevel! presentaon! of’ theorecal’ and’ strategic’

12

u  Aimed  to  support  those  countries  that  are  currently  planning  and/or  designing  a  domes/c  offset  program  

u  To  help  decide  how  best  to  leverage  exis/ng  programs  u  Guiding  framework  to  support  policy  makers,  including:  

§  Inventory  of  common  elements  of  offset  programs  §  Four  basic  scenarios  with  op/ons  §  Impact  assessment  of  different  op/ons  §  Iden/fica/on  of  key  ques/ons  for  policy  makers  

New  Technical  Note:  Op/ons  to  Use  Interna/onal  Offset  Programs  in  a  Domes/c  Context    

Page 13: PMRTechnical!WorkProgram! · o Definion! of the building block,’ and’ role’ in’ successful’ ETS’ operaon’ o A highlevel! presentaon! of’ theorecal’ and’ strategic’

13

Data  Management  and  Registries  –  Update  on  Progess  

   Technical  note    

Guidance  on  the  development  of  GHG  data  management  systems  for  Corporate/Facility  Level  

Repor3ng    

September  2015  

     Technical  note      Guidance  and  func3onal  

specifica3ons  for  transac3on  registry  

August  2015  

Page 14: PMRTechnical!WorkProgram! · o Definion! of the building block,’ and’ role’ in’ successful’ ETS’ operaon’ o A highlevel! presentaon! of’ theorecal’ and’ strategic’

14

Data  Management  and  Registries  –  Scope  

Page 15: PMRTechnical!WorkProgram! · o Definion! of the building block,’ and’ role’ in’ successful’ ETS’ operaon’ o A highlevel! presentaon! of’ theorecal’ and’ strategic’

15

u  Inform  sound  diagnos/c  and  decision-­‐making  on  the  development  of  and  administra/on  of  GHG  data  repor/ng  and  management  systems  at  the  corporate/facility-­‐level:  

§  IT  infrastructure:  repor/ng  tools  and  interfaces,  databases  etc.  

§  Suppor/ng  ins/tu/onal  and  regulatory  frameworks  

§  Administra/ve  and  management  processes    

§  Taking  into  account:  poten/al  exis/ng  repor/ng  plaborms  (e.g.  other  air  pollutants);  and  linkages  with  other  GHG  infrastructure  –  such  as  na/onal  inventories,  carbon  assets  registries  

u  Capture  exis/ng  experience  and  needs  of  countries  through  desk  research,  expert  inputs,  and  consulta/ons  

u  Selec/on  of  consultants  is  on-­‐going  (compe//ve)  

Guidance  on  the  Development  of  GHG  Data  Management  Systems  for  Corporate/Facility  Level  Repor3ng  

Page 16: PMRTechnical!WorkProgram! · o Definion! of the building block,’ and’ role’ in’ successful’ ETS’ operaon’ o A highlevel! presentaon! of’ theorecal’ and’ strategic’

16

Guidance  on  Transac3on  Registry  Development  and  Management  –  joint  PMR  and  FCPF  project  (1)  

u  Objec/ves:  Inform  decision-­‐making  in  PMR  and  FCPF  (REDD+)  Country  Par/cipants  on  transac/on  registries  –  in  par/cular:  

§  In-­‐house  development  vs.  acquisi/on  of  off-­‐the-­‐shelf  sofware  

§  Day-­‐to-­‐day  management  and  administra/on  (eg.  opera/ons,  skills,  resources)  

§  Ins/tu/onal  and  regulatory  frameworks  

u  Project  team  

§  Several  registry  experts  –  technical,  regulatory  and  administra/on  

§  PMR  and  FCPF  Secretariats  

u  Consulta/on  with  PMR  and  FCPF  (March-­‐May  2015)    

u  Workshop  to  present  project  findings,  discuss  feedback  with  countries  and  other  experts,  and  define  priori/es  for  follow-­‐up  work  (May/June  2015)    

Page 17: PMRTechnical!WorkProgram! · o Definion! of the building block,’ and’ role’ in’ successful’ ETS’ operaon’ o A highlevel! presentaon! of’ theorecal’ and’ strategic’

17

Guidance  on  Transac3on  Registry  Development  and  Management  –  joint  PMR  and  FCPF  project  (2)  

u  Report  outline:    

Page 18: PMRTechnical!WorkProgram! · o Definion! of the building block,’ and’ role’ in’ successful’ ETS’ operaon’ o A highlevel! presentaon! of’ theorecal’ and’ strategic’

18

Baselines  and  Benchmarks  –  Update  on  Progress    

       Technical  note  Guidance  note  on  the  use  of  benchmarks  in  market  based  

mechanisms  Developing  proposal  

       Working  group    To  reflect  on  outcomes  of  the  study  on  credi3ng  ac3vi3es  

under  the  PMR  First  half  of  

2015  

Page 19: PMRTechnical!WorkProgram! · o Definion! of the building block,’ and’ role’ in’ successful’ ETS’ operaon’ o A highlevel! presentaon! of’ theorecal’ and’ strategic’

19

u  Iden/fied  as  an  issue  in  mul/ple  countries  and  lots  of  experience  within  the  PMR  to  capture  and  share  

u  New  Knowledge  product    ‘Carbon  leakage:  theory,  evidence  and  policy  design’  §  Will  synthesize  current  knowledge  and  experience  and  provide  guidance  for  PMR  countries  on  how  to  

address  the  issues.  

u  To  address  three  broad  ques/ons:  §  How  to  evaluate  the  expected  compe//veness  and  emissions  leakage  impacts  (nega/ve  and  posi/ve)  due  

to  carbon  pricing  policies  for  different  sectors  and  the  en/re  economy?  

§  How  to  mi/gate  the  risk  of  nega/ve  impacts  and  strengthen  the  posi/ve  impacts  from  carbon  pricing  (through  instrument  design  or  complementary  policies)  in  the  short  and  long  term,  and  for  different  levels  of  expected  decarboniza/on?  

§  How  to  manage  the  process  of  dialogue  between  a  government,  business  and  civil  society  on  the  implica/ons  for  compe//veness  and  risks  of  emissions  leakage,  and  their  mi/ga/on?    

u  Be  informed  by  and  reflect  country  and  sub-­‐na/onal  experiences  

u  Vivid  economics  has  been  engaged  

u  Draf  at  PA12  and  final  report  end  of  June  2015.    

New  project    -­‐  Compe33veness  and  leakage  

Page 20: PMRTechnical!WorkProgram! · o Definion! of the building block,’ and’ role’ in’ successful’ ETS’ operaon’ o A highlevel! presentaon! of’ theorecal’ and’ strategic’

20

Technical  Inputs  to  Discussions  on  Carbon  Markets  Post-­‐2020    

u  Objec/ves:  §  Build  knowledge  on  key  technical  market  related  issues  discussed  at  the  

interna/onal  level  

§  Exchange  views  and  facilitate  common  understanding  for  how  the  carbon  market(s)  will  develop  

§  Bridge  the  gap  carbon  markets  prac//oners  and  nego/ators  

§  Inform  PMR  ac/vi/es  accordingly  

u  Ac/vi/es    

§  Series  of  workshops  in  the  lead  up  to  Paris  2015  

§  Collabora/on  with  UNFCCC,  think-­‐tanks,  private  sector  

Page 21: PMRTechnical!WorkProgram! · o Definion! of the building block,’ and’ role’ in’ successful’ ETS’ operaon’ o A highlevel! presentaon! of’ theorecal’ and’ strategic’

21

Next  steps  

u Con/nue  to  roll  out  ac/vi/es  for  FY15  §  Many  ac/vi/es  underway  and  progressing  well  

§  Scope  for  more  targeted  and  country  specific  ac/vi/es  

u Planning  for  FY16  to  be          presented  at  PA12.  

§  Based  on  strategic  planning            approach  §  Will  consult  working  groups  

Page 22: PMRTechnical!WorkProgram! · o Definion! of the building block,’ and’ role’ in’ successful’ ETS’ operaon’ o A highlevel! presentaon! of’ theorecal’ and’ strategic’

22

 FOR  MORE  INFORMATION  ON  THE  PARTNERSHIP  FOR  MARKET  READINESS  

(PMR),  PLEASE  CONTACT:  

PMR  SECRETARIAT  [email protected]  

 WWW.THEPMR.ORG  

Thank  You  

Page 23: PMRTechnical!WorkProgram! · o Definion! of the building block,’ and’ role’ in’ successful’ ETS’ operaon’ o A highlevel! presentaon! of’ theorecal’ and’ strategic’

PA11  –  London,  United  Kingdom    10-­‐11  March,  2015  

Mr.  Pierre  Guigon,  PMR  Secretariat  Ms.  Constanze  Haug,  ICAP  Secretariat  

Update  on  the  ETS  Handbook  

Page 24: PMRTechnical!WorkProgram! · o Definion! of the building block,’ and’ role’ in’ successful’ ETS’ operaon’ o A highlevel! presentaon! of’ theorecal’ and’ strategic’

24

Content  

 

1.   Background  and  Objec3ves      

2.   Organiza3on  

3.   Expert  Consulta3on  Process    

4.   Joint  Deliverables    

Page 25: PMRTechnical!WorkProgram! · o Definion! of the building block,’ and’ role’ in’ successful’ ETS’ operaon’ o A highlevel! presentaon! of’ theorecal’ and’ strategic’

Background and Objectives

v Develop   a   ‘how   to’   handbook   on   the   prac3cali3es   of  establishing  and  opera3ng  an  ETS…  

o  Highligh/ng   design   op/ons   and   their   opera/onal,   economic   and   poli/cal   risks   and  benefits  

o  Empirically  rich  through  broad  consulta/on  of  ETS  prac//oners:  policy  makers,  private  sector,  academia,  and  NGOs  

o  Capturing  the  experience  accumulated  including  in  the  EU,  Norway,  Switzerland,  North  America,  China,  New  Zealand,  Kazakhstan,  Australia,  Republic  of  Korea,  and  Japan  

v …  to  provide  knowledge  and  prac3cal  guidance  to  policy  makers  interested  in  ETS  and  other  market-­‐based  mechanisms  

v Collabora3on   between   PMR   and   ICAP:   joining   resources,  exper3se,  and  par3cipants  

v Financial  support  from  Germany  (BMUB)  

Page 26: PMRTechnical!WorkProgram! · o Definion! of the building block,’ and’ role’ in’ successful’ ETS’ operaon’ o A highlevel! presentaon! of’ theorecal’ and’ strategic’

Organization (1)

v Project  team o  PMR  and  ICAP  Secretariats    

o  Editors  –  Mr.  Felix  Manhes  (Öko-­‐Ins/tut),  Mr.  Duan  Maosheng  (Tsinghua  University),  and  Mr.  Michael  Mehling  (MIT)    

o  Consultants   –   Environmental  Defense  Fund   (US)   and  Motu  Economic  and  Public  Policy  Research  (New  Zealand),  supported  by  a  roster  of  key  experts  from  various  organiza/ons  

o  ETS   Focal   Points   –   Policy   makers   in   ETS   jurisdic/ons   nominated   by   PMR   and   ICAP  Par/cipants         Project  

Management    Project  Strategy  

Technical  Inputs  

Wri3ng     Review  

PMR/ICAP    Secretariats  

√   √   √       √  

Editors       √   √       √  Consultants           √   √  ETS  Focal  Points           √        √    

Expert  Roster           √       √  PMR/ICAP  Par3cipants  

        √       √  

Page 27: PMRTechnical!WorkProgram! · o Definion! of the building block,’ and’ role’ in’ successful’ ETS’ operaon’ o A highlevel! presentaon! of’ theorecal’ and’ strategic’

Organization (2)

Dec.  14   Oct.  15  Feb.  15   June  15   Sept.  15  July  15  

WRITING  

CONSULTATIONS  

REVIEW  

PUBLISHING  

LAUNCH  EVENT  

v Timeline

Page 28: PMRTechnical!WorkProgram! · o Definion! of the building block,’ and’ role’ in’ successful’ ETS’ operaon’ o A highlevel! presentaon! of’ theorecal’ and’ strategic’

Expert Consultation Process

v Ques3onnaire  (February-­‐March  2015)  First   engagement   with   ETS   Focal   Points   and   key   experts   (incl.   private   sector)   to   collect  feedback  on:  

o  Proposed  outline  

o  Common  misunderstandings  and  FAQ  on  ETS  design  and  implementa/on  

o  Most  important  lessons  learned  

o  Useful  policy  documents  and  references  (e.g.  ETS  evalua/ons)  

v Follow-­‐up  phone  interviews  (March-­‐April  2015)  

v Physical  working  mee3ngs  with   ETS   Focal   points   (and   relevant  colleagues)  in  ETS  jurisdic3ons  (April-­‐May  2015)  

v Review  draj  chapters  of  the  ETS  Handbook  (June-­‐July  2015)  

Page 29: PMRTechnical!WorkProgram! · o Definion! of the building block,’ and’ role’ in’ successful’ ETS’ operaon’ o A highlevel! presentaon! of’ theorecal’ and’ strategic’

Joint Deliverables (1)

§  Summary  for  policy  makers  

§  Introduc/on  and  roadmap  

q CORE  CHAPTERS  

§  Bring  it  all  together:  phase  implementa/on  

§  Technical  annexes  §  Bibliography  

o  Step  1:  Why  an  ETS?  o  Step  3:  Set  the  cap  o  Step  2:  Decide  the  scope    o  Step  4:  Distribute  allowances    o  Step  5:  Set  /meframes  for  compliance  o  Step  6:  Support  market  stability  o  Step  7:  Ensure  oversight  and  

compliance  o  Step  8:  Communicate  and  build  

capaci/es  o  Step  9:  Link  with  other  systems  o  Step  10:  Evaluate  and  improve  the  ETS  

v ETS  Handbook  -­‐  Outline  (under  review)  

Page 30: PMRTechnical!WorkProgram! · o Definion! of the building block,’ and’ role’ in’ successful’ ETS’ operaon’ o A highlevel! presentaon! of’ theorecal’ and’ strategic’

Joint Deliverables (2)

v ETS  Handbook  -­‐  Structure  of  chapters  (under  review)  

o  Summary  of  key  design  and  implementa/on  issues  o  Defini3on   of   the   building   block,   and   role   in   successful   ETS  

opera/on  o  A   high-­‐level   presenta3on   of   theore/cal   and   strategic  

considera/ons    o  Balanced  descrip/on  of  implica3ons  and  associated  benefits/risks  

for  different  op3ons  o  Descrip/ve   case   studies,   compara3ve   analysis   and   lessons  

learned,   highligh/ng   differing   ra/onales   and   evolu/onary  processes  across  jurisdic/ons  

o  Considera/on  of  phased  approaches  for  implementa/on  o  Quick  quiz  o  Short  list  of  Frequently  Asked  Ques/ons  

Page 31: PMRTechnical!WorkProgram! · o Definion! of the building block,’ and’ role’ in’ successful’ ETS’ operaon’ o A highlevel! presentaon! of’ theorecal’ and’ strategic’

Joint Deliverables (3)

v Carbon   Expo   (May   2015):   consulta3on   and   communica3on  (TBD)  

v Launch  event  (October  2015):  on  the  margins  of  a  PMR  or  ICAP  mee3ng  

v Possible  follow-­‐up  work  o  Support  in-­‐country  training?  

o  E-­‐learning?  

o  …  to  be  discussed  

Page 32: PMRTechnical!WorkProgram! · o Definion! of the building block,’ and’ role’ in’ successful’ ETS’ operaon’ o A highlevel! presentaon! of’ theorecal’ and’ strategic’

32

 PIERRE  GUIGON  

[email protected]    

CONSTANZE  HAUG  [email protected]    

   

Thanks  again  for  your  contribu/on!