PMP Implementation at Deepwater Energy Center PCB PMP Conference October 22, 2012 May Johnson – Calpine Art Saunders – Cardno ENTRIX

Upload: others

Post on 25-Jul-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: PMP Implementation at Deepwater Energy Center€¦ · 22/10/2012  · Presentation Overview •Deepwater Energy Center Overview •PMP Requirements •Actions Taken –Stage 2 Monitoring

PMP Implementation at Deepwater Energy Center

PCB PMP Conference October 22, 2012

May Johnson – Calpine

Art Saunders – Cardno ENTRIX

Page 2: PMP Implementation at Deepwater Energy Center€¦ · 22/10/2012  · Presentation Overview •Deepwater Energy Center Overview •PMP Requirements •Actions Taken –Stage 2 Monitoring

Presentation Overview

•Deepwater Energy Center Overview

•PMP Requirements

•Actions Taken –Stage 2 Monitoring –Controls (BMPs) –Source Trackdown efforts –Source Removal efforts

•Load Reduction Results

2

Page 3: PMP Implementation at Deepwater Energy Center€¦ · 22/10/2012  · Presentation Overview •Deepwater Energy Center Overview •PMP Requirements •Actions Taken –Stage 2 Monitoring

3

“Disclaimer”: The Deepwater Energy Center is a very small facility (relative to some other dischargers), and our PCB discharges of concern were limited to 2 small DSN outfall areas, comprised of relatively few catch basins. Therefore, our PMP process has been relatively straight forward and “low tech”. (In other words, you may not find our short story to be very interesting, but it will likely be over before you find time to doze off!)

Deepwater Energy Center - Warning

Page 4: PMP Implementation at Deepwater Energy Center€¦ · 22/10/2012  · Presentation Overview •Deepwater Energy Center Overview •PMP Requirements •Actions Taken –Stage 2 Monitoring

Calpine: A generation ahead – today

• Largest independent power producer in the U.S.

• Fleet of 93 power plants

• More than 28,000 MW generation capacity in 20 states and Canada

• Majority of fleet powered by clean-burning natural gas and renewable geothermal energy

4

Page 5: PMP Implementation at Deepwater Energy Center€¦ · 22/10/2012  · Presentation Overview •Deepwater Energy Center Overview •PMP Requirements •Actions Taken –Stage 2 Monitoring

5

Plant Overview

Page 6: PMP Implementation at Deepwater Energy Center€¦ · 22/10/2012  · Presentation Overview •Deepwater Energy Center Overview •PMP Requirements •Actions Taken –Stage 2 Monitoring

Deepwater Energy Center – Site Location Map

6

Page 7: PMP Implementation at Deepwater Energy Center€¦ · 22/10/2012  · Presentation Overview •Deepwater Energy Center Overview •PMP Requirements •Actions Taken –Stage 2 Monitoring

Deepwater Energy Center – Aerial View

7

Page 8: PMP Implementation at Deepwater Energy Center€¦ · 22/10/2012  · Presentation Overview •Deepwater Energy Center Overview •PMP Requirements •Actions Taken –Stage 2 Monitoring

Deepwater Energy Center – Plant Overview

•Location –DE River Mile 68 –Directly South of DE Memorial Bridge

•Past –Commissioned circa 1929 –Coal, oil, natural gas

•2010 to Present –Oil, natural gas

8

Page 9: PMP Implementation at Deepwater Energy Center€¦ · 22/10/2012  · Presentation Overview •Deepwater Energy Center Overview •PMP Requirements •Actions Taken –Stage 2 Monitoring

9

PMP Requirements

Page 10: PMP Implementation at Deepwater Energy Center€¦ · 22/10/2012  · Presentation Overview •Deepwater Energy Center Overview •PMP Requirements •Actions Taken –Stage 2 Monitoring

PMP included monitoring, controls (BMPs), source trackdown, and source removal within DSN 002 and DSN 017 drainages;

10

Page 11: PMP Implementation at Deepwater Energy Center€¦ · 22/10/2012  · Presentation Overview •Deepwater Energy Center Overview •PMP Requirements •Actions Taken –Stage 2 Monitoring

11

PMP Actions Taken….

Page 12: PMP Implementation at Deepwater Energy Center€¦ · 22/10/2012  · Presentation Overview •Deepwater Energy Center Overview •PMP Requirements •Actions Taken –Stage 2 Monitoring

12

- Stage 2 monitoring collected from DSNs 017 and 002 (wet weather) during low tide to avoid tidal influence - Also collected wet weather river sample during each event for comparison - Penta-CB Loads calculated and included in PMP updates

PMP Actions Taken – Stage 2 Monitoring

Page 13: PMP Implementation at Deepwater Energy Center€¦ · 22/10/2012  · Presentation Overview •Deepwater Energy Center Overview •PMP Requirements •Actions Taken –Stage 2 Monitoring

PMP Actions Taken – Controls (BMPs)

BMPs/Controls Implemented • Initially, hay bales were deployed around storm drains and in strategic drainage areas

13

Page 14: PMP Implementation at Deepwater Energy Center€¦ · 22/10/2012  · Presentation Overview •Deepwater Energy Center Overview •PMP Requirements •Actions Taken –Stage 2 Monitoring

PMP Actions Taken – Controls (BMPs)

BMPs/Controls Implemented • Upgraded to using geotext filter baskets (used in addition to hay bales) for all storm drains & catch basins within DSNs 017 and 002

• maintained regularly

• Cost: $100-$120 per unit

14

Page 15: PMP Implementation at Deepwater Energy Center€¦ · 22/10/2012  · Presentation Overview •Deepwater Energy Center Overview •PMP Requirements •Actions Taken –Stage 2 Monitoring

PMP Actions Taken – Controls (BMPs) Basin Guard

And for extra measure…..

Replaced messy hay bales with Basin Guards

15

Page 16: PMP Implementation at Deepwater Energy Center€¦ · 22/10/2012  · Presentation Overview •Deepwater Energy Center Overview •PMP Requirements •Actions Taken –Stage 2 Monitoring

PMP Actions Taken – Controls (BMPs) Basin Guard

Basin Guards

• Prevent silt, sediment and hydrocarbons from entering storm drains

• Provide visual indicators to storm drain locations

• Help comply with NPDES, 40 CFR 122.26 (1999) when used as Best Management Practice in Storm Water Pollution Prevention Plans.

• Cost: $100-120 per unit

16

Page 17: PMP Implementation at Deepwater Energy Center€¦ · 22/10/2012  · Presentation Overview •Deepwater Energy Center Overview •PMP Requirements •Actions Taken –Stage 2 Monitoring

PMP Actions Taken – Controls (BMPs)

BMPs/Controls Implemented

• Installed filter socks in strategic areas to filter particulates from storm water drainage

• Cost ~$2/foot (2006)

17

Page 18: PMP Implementation at Deepwater Energy Center€¦ · 22/10/2012  · Presentation Overview •Deepwater Energy Center Overview •PMP Requirements •Actions Taken –Stage 2 Monitoring

PMP Actions Taken – Controls (BMPs)

BMPs/Controls Implemented • Contracted a street sweeping service to periodically clean paved areas within DSNs 017 and 002

• Cost: ~$400 per “sweep”

18

Page 19: PMP Implementation at Deepwater Energy Center€¦ · 22/10/2012  · Presentation Overview •Deepwater Energy Center Overview •PMP Requirements •Actions Taken –Stage 2 Monitoring

PMP Actions Taken – Source Trackdown Studies

• Basic plan was to “start simple”, and expand trackdown efforts as needed.

• Since most of the catch basins contained sediment both within the catch basin, and on the paved surface immediately adjacent to the catch basin, the sampling efforts started there.

19

Page 20: PMP Implementation at Deepwater Energy Center€¦ · 22/10/2012  · Presentation Overview •Deepwater Energy Center Overview •PMP Requirements •Actions Taken –Stage 2 Monitoring

PMP Actions Taken – Source Trackdown Studies

• Collected surface sediment both within and adjacent to DSN 017 and 002 storm drains and at other strategic locations; analyzed using modified 8082 method (included ~50 congeners)

20

Page 21: PMP Implementation at Deepwater Energy Center€¦ · 22/10/2012  · Presentation Overview •Deepwater Energy Center Overview •PMP Requirements •Actions Taken –Stage 2 Monitoring

PMP Actions Taken – Source Trackdown Studies

21

Page 22: PMP Implementation at Deepwater Energy Center€¦ · 22/10/2012  · Presentation Overview •Deepwater Energy Center Overview •PMP Requirements •Actions Taken –Stage 2 Monitoring

PMP Actions Taken – Source Trackdown Studies

22

Page 23: PMP Implementation at Deepwater Energy Center€¦ · 22/10/2012  · Presentation Overview •Deepwater Energy Center Overview •PMP Requirements •Actions Taken –Stage 2 Monitoring

PMP Actions Taken – Source Trackdown Studies

23

Page 24: PMP Implementation at Deepwater Energy Center€¦ · 22/10/2012  · Presentation Overview •Deepwater Energy Center Overview •PMP Requirements •Actions Taken –Stage 2 Monitoring

PMP Actions Taken – Source Trackdown Studies

24

Page 25: PMP Implementation at Deepwater Energy Center€¦ · 22/10/2012  · Presentation Overview •Deepwater Energy Center Overview •PMP Requirements •Actions Taken –Stage 2 Monitoring

Initial (2005/2006) PCB Trackdown Sampling Locations

25

Page 26: PMP Implementation at Deepwater Energy Center€¦ · 22/10/2012  · Presentation Overview •Deepwater Energy Center Overview •PMP Requirements •Actions Taken –Stage 2 Monitoring

Additional (2007/2008) PCB Trackdown Sampling Locations

26

Page 27: PMP Implementation at Deepwater Energy Center€¦ · 22/10/2012  · Presentation Overview •Deepwater Energy Center Overview •PMP Requirements •Actions Taken –Stage 2 Monitoring

PMP Actions Taken – Source Trackdown Studies

• Outside of transformer areas, PCB concentrations were in the ug/kg (ppb) level for the majority of sediment samples

• Maximum PCB concentration was ~8 mg/kg (ppm)

27

Page 28: PMP Implementation at Deepwater Energy Center€¦ · 22/10/2012  · Presentation Overview •Deepwater Energy Center Overview •PMP Requirements •Actions Taken –Stage 2 Monitoring

PMP Actions Taken – Source Trackdown Studies

• Parallel sampling efforts were conducted around all transformer areas within 017 and 002

• Maximum PCB concentration was 0.99 mg/kg

28

Page 29: PMP Implementation at Deepwater Energy Center€¦ · 22/10/2012  · Presentation Overview •Deepwater Energy Center Overview •PMP Requirements •Actions Taken –Stage 2 Monitoring

PMP Actions Taken – Potential Source Removal Effort

– Proactively contracted to have DSN 002 and DSN017 piping and catch basins sealed off from the river and cleaned out. This effort addressed the potential for legacy contamination within the stormwater piping and sediments within catch basins.

29

Page 30: PMP Implementation at Deepwater Energy Center€¦ · 22/10/2012  · Presentation Overview •Deepwater Energy Center Overview •PMP Requirements •Actions Taken –Stage 2 Monitoring

PMP Actions Taken – Potential Source Removal Effort

– Clean out of DSN 017 and 002 lines and catch basins

• Sewer outfalls

were first plugged to keep wash water from being discharged into the river.

• Sediment was then flushed from two (12-inch to 24 inch) storm sewer lines and approximately 16 associated catch basins.

• ~2,200 ft of pipe

was cleaned out. 30

Page 31: PMP Implementation at Deepwater Energy Center€¦ · 22/10/2012  · Presentation Overview •Deepwater Energy Center Overview •PMP Requirements •Actions Taken –Stage 2 Monitoring

PMP Actions Taken – Potential Source Removal Effort

– Clean out of DSN 017 and

002 lines and catch basins

• Samples collected and analyzed to characterize the sediment for proper disposal.

• Effort took ~4 days

• Cost <$30k (2006)

• ~8.1 tons of material removed and disposed

31

Page 32: PMP Implementation at Deepwater Energy Center€¦ · 22/10/2012  · Presentation Overview •Deepwater Energy Center Overview •PMP Requirements •Actions Taken –Stage 2 Monitoring

PMP Actions Taken – Source Removal Effort

– Spot Removal of PCB impacted soils 2007-2009 • Adjacent to transformers • over 600 g of total PCBs removed

32

Page 33: PMP Implementation at Deepwater Energy Center€¦ · 22/10/2012  · Presentation Overview •Deepwater Energy Center Overview •PMP Requirements •Actions Taken –Stage 2 Monitoring

PMP Actions Taken – Source Removal Effort

33

Page 34: PMP Implementation at Deepwater Energy Center€¦ · 22/10/2012  · Presentation Overview •Deepwater Energy Center Overview •PMP Requirements •Actions Taken –Stage 2 Monitoring

PMP Actions Taken – Source Removal Effort

34

Page 35: PMP Implementation at Deepwater Energy Center€¦ · 22/10/2012  · Presentation Overview •Deepwater Energy Center Overview •PMP Requirements •Actions Taken –Stage 2 Monitoring

PMP Actions Taken – Potential Source Removal Efforts

Several transformers and associated bushings adjacent to the power plant were removed for disposal.

35

Page 36: PMP Implementation at Deepwater Energy Center€¦ · 22/10/2012  · Presentation Overview •Deepwater Energy Center Overview •PMP Requirements •Actions Taken –Stage 2 Monitoring

PMP Actions Taken – Potential Source Removal Efforts

36

Page 37: PMP Implementation at Deepwater Energy Center€¦ · 22/10/2012  · Presentation Overview •Deepwater Energy Center Overview •PMP Requirements •Actions Taken –Stage 2 Monitoring

PMP Actions Taken – Potential Source Removal Efforts

37

Page 38: PMP Implementation at Deepwater Energy Center€¦ · 22/10/2012  · Presentation Overview •Deepwater Energy Center Overview •PMP Requirements •Actions Taken –Stage 2 Monitoring

38

PMP Implementation Results

Page 39: PMP Implementation at Deepwater Energy Center€¦ · 22/10/2012  · Presentation Overview •Deepwater Energy Center Overview •PMP Requirements •Actions Taken –Stage 2 Monitoring

PMP Implementation – Source Removal Summary

–Throughout the PMP implementation period to date, an estimated total mass of 29,354 grams of PCBs were removed from DSN 002 and 017 drainage areas through:

• Complete removal of transformers and associated electrical equipment;

• Retro-fitting/removal of dielectric fluids from transformers and other electrical equipment; and

• Removal of PCB contaminated sediments.

– All PCB contaminated waste was properly disposed.

39

Page 40: PMP Implementation at Deepwater Energy Center€¦ · 22/10/2012  · Presentation Overview •Deepwater Energy Center Overview •PMP Requirements •Actions Taken –Stage 2 Monitoring

0.284

0.115

0.012 0.0047

0.000

0.050

0.100

0.150

0.200

0.250

0.300

Baseline 2007 2009 2011

Pent

a-CB

Loa

ding

(mg/

day)

Year

Penta-CB Loading at Deepwater Energy Center Outfall 017

Cumulative Reduction of Penta-CBs: 98.3%

Deepwater Energy Center – Results of PMP Implementation

Page 41: PMP Implementation at Deepwater Energy Center€¦ · 22/10/2012  · Presentation Overview •Deepwater Energy Center Overview •PMP Requirements •Actions Taken –Stage 2 Monitoring

0.226

0.0097 0.00122

0.000

0.050

0.100

0.150

0.200

0.250

Baseline 2009 2011

Pent

a-CB

Loa

ding

(mg/

day)

Year

Penta-CB Loading at Deepwater Energy Center Outfall 002

Cumulative Reduction of Penta-CBs: 99.5%

Deepwater Energy Center – Results of PMP Implementation