pmo leadership: strategies for organizational development ... · pmo leadership strategies for...

47
PMO LEADERSHIP STRATEGIES FOR ORGANIZATIONAL DEVELOPMENT AND SUCCESS Presented by Ruffin Veal III MSPM, PMP Project Management Institute Minnesota Chapter August 17, 2016

Upload: vothien

Post on 15-Apr-2018

221 views

Category:

Documents


6 download

TRANSCRIPT

Page 1: PMO Leadership: Strategies for Organizational Development ... · pmo leadership strategies for organizational development and success presented by ... project portfolio management

PMO LEADERSHIP

STRATEGIES FOR ORGANIZATIONALDEVELOPMENT AND SUCCESS

Presented by

Ruffin Veal III MSPM, PMP

Project Management Institute

Minnesota Chapter

August 17, 2016

Page 2: PMO Leadership: Strategies for Organizational Development ... · pmo leadership strategies for organizational development and success presented by ... project portfolio management

PRESENTATION OVERVIEW

Our Challenges

Our Strategy

How do we as PMPs address these challenges and resulting effects?

Our PMO Evolutionary Goal

Project Portfolio Management or Enterprise Project Management

The PMO Evolutionary Journey

Our role as PMPs

Page 3: PMO Leadership: Strategies for Organizational Development ... · pmo leadership strategies for organizational development and success presented by ... project portfolio management

OUR CHALLENGES

Projects are increasing in size (financially and enterprise-wide).

Resources (financial and human) are becoming more geographically diverse.

Continued push for “faster and cheaper”.

More difficult to stay on time and within budget while producing required solutions/deliverables.

Ad hoc and disjointed project selection, initiation and implementation.

Continued 50-60%+ project failure rate.

Page 4: PMO Leadership: Strategies for Organizational Development ... · pmo leadership strategies for organizational development and success presented by ... project portfolio management

OUR STRATEGYHOW DO WE AS PMPS ADDRESS THESE CHALLENGES AND RESULTING EFFECTS?

The Natural Evolution of Project Management Organizations

Project Management Program Management Portfolio Management

This evolution is driven by the challenges we face and the resulting effects

upon our client organizations.

PMO Organizations must adapt to our ever changing client demands

Page 5: PMO Leadership: Strategies for Organizational Development ... · pmo leadership strategies for organizational development and success presented by ... project portfolio management

OUR PMO EVOLUTIONARY GOALPROJECT PORTFOLIO MANAGEMENT OR ENTERPRISE PROJECT MANAGEMENT

A Project Portfolio Management Office is an organizational unit that manages the organization’s project portfolio.

An organization that establishes a PPM office demonstrates commitment to achieving PPM maturity.

The practical indications of such maturity include the establishment of clearly defined PPM duties, the consistent application of PPM processes, and success in each and every aspect of project and portfolio management.

Page 6: PMO Leadership: Strategies for Organizational Development ... · pmo leadership strategies for organizational development and success presented by ... project portfolio management

OUR PMO EVOLUTIONARY GOALPROJECT PORTFOLIO MANAGEMENT OR ENTERPRISE PROJECT MANAGEMENT

PPM/EPM enforces the proper use of resources, employees, and timeframes to help management get a healthy queue of work established and deadlines met.

PPM/EPM is infinite for the life of the enterprise.

Provides the strategic methods for analyzing and managing groups of concurrent projects.

Attention is focused on the strategic viewpoint of the organization’s business and/or technological goals.

Organizational Goals are primary consideration when addressing project prioritization/sequencing, risk/resource management, standardization and communication.

Page 7: PMO Leadership: Strategies for Organizational Development ... · pmo leadership strategies for organizational development and success presented by ... project portfolio management

PMO EVOLUTIONARY JOURNEYOUR ROLE AS PMPS

Remember foundational PMO functionality

- Monitoring and controlling Project performance (Project governance):

Reporting project status to upper management

Implement and operate a Project Management Information System (PMIS)

Develop and maintain a project score card

- Development of PM Competencies and Methodologies:

Develop implement and maintain a standard methodology

Promote project management within the organization

Develop competency of PM personnel through training and mentoring

Page 8: PMO Leadership: Strategies for Organizational Development ... · pmo leadership strategies for organizational development and success presented by ... project portfolio management

PMO EVOLUTIONARY JOURNEYOUR ROLE AS PMPS

Remember foundational PMO functionality

- Multi-project management:

Coordinate between projects, Identify/select and prioritize new projects

Manage one or more portfolios/programs

Allocate resources between projects

- Strategic management:

Provide advise to upper management

Participate in strategic planning

Page 9: PMO Leadership: Strategies for Organizational Development ... · pmo leadership strategies for organizational development and success presented by ... project portfolio management

PMO EVOLUTIONARY JOURNEYOUR ROLE AS PMPS

Remember foundational PMO functionality

. Organizational learning:

Monitor and control PMO performance

Manage archives of project documentation

Conduct post project reviews/audits

Implement and manage risk and lessons learned database

- Execute specialized tasks on behalf of project managers:

Scheduling/Risk/Contract management

Customer liaison/interface management

Page 10: PMO Leadership: Strategies for Organizational Development ... · pmo leadership strategies for organizational development and success presented by ... project portfolio management

PMO EVOLUTIONARY JOURNEYOUR ROLE AS PMPS

Establishing Project Portfolio Management Functionality

The Project Portfolio Management Maturity Model is an effective tool for organizations to decide quickly what PPM improvements they should make to enhance their organization's ability to optimize investments, execute big changes and deliver value.

Page 11: PMO Leadership: Strategies for Organizational Development ... · pmo leadership strategies for organizational development and success presented by ... project portfolio management

PMO EVOLUTIONARY JOURNEYOUR ROLE AS PMPS

Project

Portfolio

Management

Maturity

Model

Page 12: PMO Leadership: Strategies for Organizational Development ... · pmo leadership strategies for organizational development and success presented by ... project portfolio management

PMO EVOLUTIONARY JOURNEYOUR ROLE AS PMPS

Five interdependent core dimensions are of critical importance in PPM:

• People: The interdependencies among people in terms of their availability, their skills, their contribution to the work that needs to be done and their career aspirations are of critical importance. At higher levels of maturity, the leadership ability of the individuals involved in supporting PPM activities becomes essential.

• PPM practices and processes: Disciplines such as portfolio management, as well as program management and classic project management processes, such as risk and resource management. One of the most common activities also included in this dimension is the establishment of a PMO, be it a project management office, program office or portfolio management office.

Page 13: PMO Leadership: Strategies for Organizational Development ... · pmo leadership strategies for organizational development and success presented by ... project portfolio management

PMO EVOLUTIONARY JOURNEYOUR ROLE AS PMPS

Five interdependent core dimensions are of critical importance in PPM:

• Value and financial management: Systems that might be adequate at Level 1 (when projects are paid for as part of a lump sum) can be totally inadequate when forced to support a more-detailed look at multiple projects and programs. This dimension focuses on understanding how to ensure that projects and programs offer value for the money spent.

• Technology: The requirements for technology support tend to evolve in sync with the overall maturity of the approach to PPM. This dimension is designed to help organizations know which technology will yield the greatest return at a particular maturity level.

Page 14: PMO Leadership: Strategies for Organizational Development ... · pmo leadership strategies for organizational development and success presented by ... project portfolio management

PMO EVOLUTIONARY JOURNEYOUR ROLE AS PMPS

Five interdependent core dimensions are of critical importance in PPM:

• Relationships: PPM fundamentally is focused on teams of people working to create a specific outcome. This dimension offers appropriate guidance on the necessary touchpoints, including identifying who needs to be informed, who needs to be consulted and whose help is mandatory to achieve the desired outcome.

Page 15: PMO Leadership: Strategies for Organizational Development ... · pmo leadership strategies for organizational development and success presented by ... project portfolio management

PMO EVOLUTIONARY JOURNEYOUR ROLE AS PMPS

Level 1: Reactive:

• The organization is more reactive than proactive when dealing with projects often with too few resources and very little time.

• Internal processes are centered on managing critical projects, so priority projects get staffing support.

• Larger projects are contracted out to vendors.

• Projects may have budgetary estimates, but quite often, the project work is simply funded out of the IT or other departmental budget.

Page 16: PMO Leadership: Strategies for Organizational Development ... · pmo leadership strategies for organizational development and success presented by ... project portfolio management

PMO EVOLUTIONARY JOURNEYOUR ROLE AS PMPS

Level 2: Emerging Discipline

• Level 2 can be a massive swing from a "just get it done" environment to a process-driven organization.

• Most organizations at this level have invested or will soon invest in a basic PPM tool.

• The concept of disciplined teams working on a project is developed, and project collaboration and team workspaces are supported.

• Tools with reliable data for value/financial management are generally still rudimentary.

Page 17: PMO Leadership: Strategies for Organizational Development ... · pmo leadership strategies for organizational development and success presented by ... project portfolio management

PMO EVOLUTIONARY JOURNEYOUR ROLE AS PMPS

Level 3: Initial Integration:

• At this level, organizations begin to find a balance among the competing demands of the five dimensions of our model — people, practices, value, technology and relationships.

• Level 3 organizations practice reasonable resource management.

• Organizations understand the difference between a project and a program. Therefore, they staff and manage a program when the scale, risk and complexity of the work justify it. Here, a good portfolio process ensures that the right projects and programs are approved.

Page 18: PMO Leadership: Strategies for Organizational Development ... · pmo leadership strategies for organizational development and success presented by ... project portfolio management

PMO EVOLUTIONARY JOURNEYOUR ROLE AS PMPS

Level 3: Initial Integration:

• The most useful competency for a PPM function at Level 3 is holistic thinking — focusing on the whole, not the parts. This entails being able to understand how a change in one area will affect others, how changes should be made and in what order to achieve maximum results.

• In a related development, joint decision making about projects and programs by the organization as a whole happens at Level 3.

Page 19: PMO Leadership: Strategies for Organizational Development ... · pmo leadership strategies for organizational development and success presented by ... project portfolio management

PMO EVOLUTIONARY JOURNEYOUR ROLE AS PMPS

Level 3: Initial Integration:

• This need for transparent decision making fuels a need for tools to provide visibility and support analysis. There is also a need for a reliable delivery mechanism and for some level of financial accountability.

• Level 3 tends to lack sophistication, but there is a conscious focus on investing in the individual to improve performance so additional compliance activities aren't required, laying the groundwork for Level 4.

Page 20: PMO Leadership: Strategies for Organizational Development ... · pmo leadership strategies for organizational development and success presented by ... project portfolio management

PMO EVOLUTIONARY JOURNEYOUR ROLE AS PMPS

Level 4: Effective Integration

• The organization begins to focus on being project-capable.

• An expectation that projects/programs contribute business value.

• Fastest, least expensive way to accomplish anything new and different is through the mechanism of setting up a project or program.

• Work that was started on the portfolio at Level 3 comes up a notch, and it's now possible to begin to talk about real strategy execution.

Page 21: PMO Leadership: Strategies for Organizational Development ... · pmo leadership strategies for organizational development and success presented by ... project portfolio management

PMO EVOLUTIONARY JOURNEYOUR ROLE AS PMPS

Level 4: Effective Integration

• A network of PPM leaders exists companywide.

• Centers of competency (most of them virtual) help improve workload management, and capacity planning is in place and operating.

• The portfolio is modeled and appropriately optimized, factoring in risk.

• Value and benefit realization are being tracked.

• Program management skills are being developed internally, most program managers are now being chosen from internal candidates.

Page 22: PMO Leadership: Strategies for Organizational Development ... · pmo leadership strategies for organizational development and success presented by ... project portfolio management

PMO EVOLUTIONARY JOURNEYOUR ROLE AS PMPS

Level 4: Effective Integration

• Very few companies have successfully reached Level 4, but we anticipate this number to begin to grow, because digital is changing everything.

• The new digital economy, where competition can emerge from the dark corners of possibility, forces organizations to begin to work together as a matter of course, which supports PPM in attaining the level of initial integration.

Page 23: PMO Leadership: Strategies for Organizational Development ... · pmo leadership strategies for organizational development and success presented by ... project portfolio management

PMO EVOLUTIONARY JOURNEYOUR ROLE AS PMPS

Level 5: Effective Integration

• Program management exists at Level 5 in the same sense that it does at Level 4.

• An enterprise PMO (EPMO) oversees strategy execution and value delivery.

• Other PMOs exist as necessary throughout the organization.

• Technology supports a robust knowledge management system, and resource management is enabled for all project resources.

• Team compositions change and adapt to each initiative, and work is structured and executed in a way that maximizes the odds of getting things done right.

Page 24: PMO Leadership: Strategies for Organizational Development ... · pmo leadership strategies for organizational development and success presented by ... project portfolio management

PMO EVOLUTIONARY JOURNEYOUR ROLE AS PMPS

Recommendations:

• At any level of PPM maturity, focus first on helping the organization make well-informed investment choices. This will improve the odds of project success more than any other factor.

• If your organization requires enterprise wide change and capabilities, it is worth the effort to pursue Level 4, where enterprise PPM practices are built.

• Identify objectives for your enterprise, and use them to identify the most cost effective improvement opportunities for your enterprise.

• Meticulously manage the change involved in maturing/improving your PPM capabilities.

Page 25: PMO Leadership: Strategies for Organizational Development ... · pmo leadership strategies for organizational development and success presented by ... project portfolio management

PMO EVOLUTIONARY JOURNEYOUR ROLE AS PMPS

Our Goal: A Project Portfolio Management Office

• A project portfolio management (PPM) office is an organizational unit whose function is to manage the organization's project portfolio.

• Includes prioritizing projects, allocating resources to projects, and, on a regular basis, identifying which projects to initiate, reprioritize, or terminate.

• A key focus is ensuring that the overall collection of projects creates the greatest possible value by maximally supporting the objectives of the enterprise.

• The PPM office collects and distributes data for reviewing, assessing, and managing individual projects to ensure that they are meeting their expected contributions to the portfolio.

Page 26: PMO Leadership: Strategies for Organizational Development ... · pmo leadership strategies for organizational development and success presented by ... project portfolio management

PMO EVOLUTIONARY JOURNEYOUR ROLE AS PMPS

Portfolio Management links Project Management and Enterprise Management.

Page 27: PMO Leadership: Strategies for Organizational Development ... · pmo leadership strategies for organizational development and success presented by ... project portfolio management

PMO EVOLUTIONARY JOURNEYOUR ROLE AS PMPS

Our Goal: A Project Portfolio Management Office

• Participants, Authorities, and Responsibilities

• The first step for establishing a PPM function is to decide who will participate as active managers of the project portfolio.

• A project portfolio manager, typically a senior manager, should be appointed with accountability for the success of the entire project portfolio.

• The successful PPM leader has a rare combination of talents.

Page 28: PMO Leadership: Strategies for Organizational Development ... · pmo leadership strategies for organizational development and success presented by ... project portfolio management

PMO EVOLUTIONARY JOURNEYOUR ROLE AS PMPS

Important skills/capabilities for the Portfolio Manager

• Good understanding of the organization's vision, mission, and strategy.

• Understanding of project and program management, including ability to assess project health based on high-level reporting documents.

• Leadership skills, including communication, presentation, and team building.

• Broad understanding of the business, including markets, customer base, partners, and applicable regulations.

• Able to interact effectively with senior executives.

• Good analytic skills, with understanding of the basic concepts and techniques for project valuation and risk assessment.

Page 29: PMO Leadership: Strategies for Organizational Development ... · pmo leadership strategies for organizational development and success presented by ... project portfolio management

PMO EVOLUTIONARY JOURNEYOUR ROLE AS PMPS

Our Goal: A Project Portfolio Management Office

• Adopt a Successful Portfolio Management Process

• The successful PPM process includes four major components. First, a structured process is used to acquire key information about all projects and to organize project data into one or more project portfolios.

• Second, consistent and objective methods are employed to analyze projects and compare their risks and benefits.

• Third, resource demands are compared with capacity so that the subset of projects that make best use of available resources can be selected.

• The final component consists of tracking portfolio performance for ongoing assessment and adjustment.

Page 30: PMO Leadership: Strategies for Organizational Development ... · pmo leadership strategies for organizational development and success presented by ... project portfolio management

PMO EVOLUTIONARY JOURNEYOUR ROLE AS PMPS

Our Goal: A Project Portfolio Management Office

• Components of Project Portfolio Management

Page 31: PMO Leadership: Strategies for Organizational Development ... · pmo leadership strategies for organizational development and success presented by ... project portfolio management

PMO EVOLUTIONARY JOURNEYOUR ROLE AS PMPS

Our Goal: A Project Portfolio Management Office

• Adopt a Successful Portfolio Management Process

• On a regular basis tied to the planning and budgeting cycle (i.e. annually, biannually, or quarterly), the portfolio team reviews all projects that are seeking funding, including ongoing projects and new project concepts.

• Projects are screened to determine which proposals require formal evaluation and prioritization.

• Projects exempted from formal evaluation include obvious "non-starters," very small projects, and projects that are more appropriately funded from other budgets.

• Ongoing projects and "mandated" projects may or may not be exempted.

Page 32: PMO Leadership: Strategies for Organizational Development ... · pmo leadership strategies for organizational development and success presented by ... project portfolio management

PMO EVOLUTIONARY JOURNEYOUR ROLE AS PMPS

Our Goal: A Project Portfolio Management Office

• Adopt a Successful Portfolio Management Process

• Typical portfolio management cycle

Page 33: PMO Leadership: Strategies for Organizational Development ... · pmo leadership strategies for organizational development and success presented by ... project portfolio management

PMO EVOLUTIONARY JOURNEYOUR ROLE AS PMPS

Our Goal: A Project Portfolio Management Office

• Adopt a Successful Portfolio Management Process

• Project managers with projects that pass the initial screening are authorized to use resources to complete additional analysis necessary to provide the data required for entry into project proposal templates.

• In some instances, the necessary resources can be non-trivial. For example, a proposed construction project may require some minimal level of engineering analysis to determine feasibility, set project scope, provide cost estimates and estimate project effectiveness at addressing needs.

Page 34: PMO Leadership: Strategies for Organizational Development ... · pmo leadership strategies for organizational development and success presented by ... project portfolio management

PMO EVOLUTIONARY JOURNEYOUR ROLE AS PMPS

Our Goal: A Project Portfolio Management Office

• Adopt a Successful Portfolio Management Process

• Mandated and ongoing projects

• Evaluating ongoing projects for continued funding is useful to ensure that struggling or obsolete projects do not prevent funds from being available to meet more-pressing needs. Where possible, large, long-duration initiatives should be reframed as a series of smaller projects.

• Not as much effort is required to re-evaluate an ongoing project because template inputs need only to be updated rather than generated "from scratch“. Estimates tend to get less uncertain as a project proceeds in its life cycle, and providing up-to-date inputs allows portfolio information to be kept current.

Page 35: PMO Leadership: Strategies for Organizational Development ... · pmo leadership strategies for organizational development and success presented by ... project portfolio management

PMO EVOLUTIONARY JOURNEYOUR ROLE AS PMPS

Our Goal: A Project Portfolio Management Office

• Adopt a Successful Portfolio Management Process

• Mandated and ongoing projects

• Gate Reviews

• Note that the evaluation of on-going projects for the purposes of project prioritization is not meant to replace other project progress evaluations.

• A large, multi-stage project may need to be evaluated at specified phases or "gates" to ensure that it is on track to meeting its milestones and deliverables.

• Project gate reviews involve in-depth evaluations based on real-time information, but they are typically made in relative isolation to the decisions made on other projects.

Page 36: PMO Leadership: Strategies for Organizational Development ... · pmo leadership strategies for organizational development and success presented by ... project portfolio management

PMO EVOLUTIONARY JOURNEYOUR ROLE AS PMPS

Our Goal: A Project Portfolio Management Office

• Project gate reviews – Coordinated with Project Portfolio Management

Page 37: PMO Leadership: Strategies for Organizational Development ... · pmo leadership strategies for organizational development and success presented by ... project portfolio management

PMO EVOLUTIONARY JOURNEYOUR ROLE AS PMPS

Our Goal: A Project Portfolio Management Office

• Adopt a Successful Portfolio Management Process

• Mandated and ongoing projects

• Gate Reviews

• With PPM, gate reviews can be used to trigger project re-prioritizations (prior to the next portfolio review) or even an immediate project cancellation.

• Gate reviews result in modifications to project tasks. At least at the early stage of PPM adoption, it is usually best to allow portfolio management activities and gate reviews to proceed more or less independently.

Page 38: PMO Leadership: Strategies for Organizational Development ... · pmo leadership strategies for organizational development and success presented by ... project portfolio management

PMO EVOLUTIONARY JOURNEYOUR ROLE AS PMPS

Our Goal: A Project Portfolio Management Office

• Adopt a Successful Portfolio Management Process

• Mandated and ongoing projects

• Priortizing Projects between Major Reviews

• Projects may sometimes have to be evaluated between the major budgeting cycles.

• Urgent new projects may need to be evaluated between planning periods.

• Evaluations between major reviews involve comparing such projects against the most-recently established project priorities.

Page 39: PMO Leadership: Strategies for Organizational Development ... · pmo leadership strategies for organizational development and success presented by ... project portfolio management

PMO EVOLUTIONARY JOURNEYOUR ROLE AS PMPS

Our Goal: A Project Portfolio Management Office

• Adopt a Successful Portfolio Management Process

• Mandated and ongoing projects

• Multiple Project Versions

• A very useful practice is to require multiple versions of proposals for large projects.

• By providing project alternatives, organizations can avoid "all-or-nothing" choices for important, but resource-demanding projects.

• Providing alternative project versions for projects can result in a significant increase in the value generated from the optimized project portfolio.

Page 40: PMO Leadership: Strategies for Organizational Development ... · pmo leadership strategies for organizational development and success presented by ... project portfolio management

PMO EVOLUTIONARY JOURNEYOUR ROLE AS PMPS

Our Goal: A Project Portfolio Management Office

• Adopt a Successful Portfolio Management Process

• Mandated and ongoing projects

• Proposed Evaluation and Process Management

• Projects are prioritized and "go," "no-go," "kill," and "hold" recommendations are made with the goal of creating a value-maximizing project portfolio.

• Project recommendations are reviewed by the executive committee and project funding for approved and authorized projects.

• Projects are phased based on critical paths to fit people and other resource constraints, with the most urgent projects starting first.

• Projects designated as "hold" may be resubmitted later.

Page 41: PMO Leadership: Strategies for Organizational Development ... · pmo leadership strategies for organizational development and success presented by ... project portfolio management

PMO EVOLUTIONARY JOURNEYOUR ROLE AS PMPS

Our Goal: A Project Portfolio Management Office

• Adopt a Successful Portfolio Management Process

• Mandated and ongoing projects

• Proposed Evaluation and Process Management

• The PPM office monitors the status of on-going projects to ensure that projects stay on track to achieve the anticipated benefits that motivate their being included in the selected project portfolio.

• Once the project is completed, the products (assets, services, etc.) delivered or enhanced by the project should be similarly monitored and evaluated to ensure that the forecasted benefits are realized.

• PPM managers provide the project portfolio manager with feedback on the extent to which actual benefits are in fact achieved. Without such feedback on actual performance, there is no real accountability.

Page 42: PMO Leadership: Strategies for Organizational Development ... · pmo leadership strategies for organizational development and success presented by ... project portfolio management

PMO EVOLUTIONARY JOURNEYOUR ROLE AS PMPS

Our Goal: A Project Portfolio Management Office

• Summary of Accountabilities

• Ensure consistent and accurate progress reporting on the costs and other critical resources consumed by projects.

• Define and develop the detailed, continuous process by which projects are evaluated, prioritized, selected, and managed.

• Enforce a collaborative effort that enables senior executives (the steering committee) to reach agreement on portfolio goals and objectives.

• Provide coaching and training to project managers to help then to understand project evaluation criteria and to enable them to efficiently generate inputs for the project template.

Page 43: PMO Leadership: Strategies for Organizational Development ... · pmo leadership strategies for organizational development and success presented by ... project portfolio management

PMO EVOLUTIONARY JOURNEYOUR ROLE AS PMPS

Our Goal: A Project Portfolio Management Office

• Summary of Accountabilities

• Communicate to project proponents and other stakeholders which projects are approved and project priorities.

• Provide stakeholders with timely assessments of portfolio progress, with early identification and correction of portfolio-level issues that may impact performance.

• Adjudicate resource conflicts between projects.

• Maintain visibility of key project information across the enterprise.

• Ensure that the project portfolio remains in tune with changing business objectives and strategy.

• Identify lessons-learned and continually refine the PPM process.

Page 44: PMO Leadership: Strategies for Organizational Development ... · pmo leadership strategies for organizational development and success presented by ... project portfolio management

PMO EVOLUTIONARY JOURNEYOUR ROLE AS PMPS

Conclusion

• Project management organizations are ever changing and naturally evolving entities.

• In order for our PMOs to remain relevant they must adapt to the ever changing organizational environments which they serve.

• We as PMPs, must approach our PMO management responsibilities with a vision of enterprise portfolio management as our organization’s goal.

• We as PMPs are obligated and must articulate this evolutionary vision to our client organizations.

• We must be the proactive facilitators of PMO evolution and not just maintainers of the status quo.

Page 45: PMO Leadership: Strategies for Organizational Development ... · pmo leadership strategies for organizational development and success presented by ... project portfolio management

PMO EVOLUTIONARY JOURNEYOUR ROLE AS PMPS

References

• Miley W. (Lee) Merkhofer, President Merkhofer Consulting

“Establish a Project Portfolio Management”

published on http://www.prioritysystem.com/reasons2c.html

• Gartner Research, analyst(s) Lars Mieritz

“IT Score Overview for Program and Portfolio Management”, 09 Nov 2015.

Page 46: PMO Leadership: Strategies for Organizational Development ... · pmo leadership strategies for organizational development and success presented by ... project portfolio management

PMO EVOLUTIONARY JOURNEYOUR ROLE AS PMPS

Additional Resources

• PMI Global Congress 2016 North America

• Pre-congress courses: 21 – 24 September (3 - 4 day seminars)

• The Evolving PMO: Governance, Portfolio Management, Resource Optimization and Performance Measurement by Ken Crawford

• Next Generation PMO and Portfolio Management by Jack Duggal

• PMO Building Blocks for Successful Strategic Initiative Management

by Claudia Baca & Ruth Anne Guerrero

Page 47: PMO Leadership: Strategies for Organizational Development ... · pmo leadership strategies for organizational development and success presented by ... project portfolio management

PMO EVOLUTIONARY JOURNEYOUR ROLE AS PMPS

Questions & Comments

Email: [email protected]

Web site: http://www.ruffin-veal-and-associates.com