PM 1000 URM  – Up to 100% recycling of the existing ballast material  – Creation of a new supporting layer using existing material  – Lower disposal costs  – Up to 50% fewer logistical pauses than existing systems  – Higher track availability thanks to shorter periods in possession  – Rehabilitation capacity of up to 1400 metres per day  – 3 excavation chains  – Simultaneous installation of 2 geoplastics possible  – Installation of supporting and protective layer in one operation  – Ballast recycling with high-pressure washing  – Short set-up times  Y our com pe tent pa rt ner e u rail   p o Performance ø 12 hours 500 m Max. performance per hour 1 10 m Ballast Ecavation Chain Capacity 300 cbm/h Excavation width 4.200 - 6.000 mm Subgrade Ecavation Chain Capacity 1.000 cbm/h Excavation width 4.050 - 6.600 mm Excavation depth max. 1.300 mm Installation height up to 600 mm (PSS/FSS) Installation height, track formation layer 300 mm Material supply (container wagon backwards) BA 255 Evacuation (to the front) MFS 100  Yourcompeten tpartner eu rail  pool Working direction Dr ive uni t f ron t 23 ,2 4 m Wat er tr ea tmen t wag on 21 ,2 4 m Ba lla st wa sh in g wa gon 2 0,8 2 m Ba ll ast sc r ee ni ng w ag on 20, 82 m Mo to r w ag on 2 4, 41 m Ex ca va ti ng mach in e A33, 11 m Excavating machine B – 42,225 m Tampi ng ma ch in e 27 ,575 m Dr iv e un it re ar 27 ,4 2 m PM 1000-URM – Lenght over buffers 270,00 m  Austrianbran chofce Kl. NeusiedlerStr. 29–A-2401Fischamend Tel. +43(0)2230 9273 Fax +43(0)22309279061 eurailpoolGmbH Lise-Meitner-Straße9 –D-85737Ismaning Tel. +49(0)89 909397-20 Fax +49(0)89909397-26 6 [email protected] – www.eurailpool.com PM 1000-URM Spoil Excavated ballast  Mixed material Ballast bed residue New ballast Recycled ballast New FPLmaterial Intermediate layer Revolvinggrid Spiral conveyor  Finger screen Washingscreen Impact crusher  Vibratingscreen Excavatingchain1and2 InstallationofnewFPLmaterial Excavatingchain 3 Platecompactor Portalc Flankcompactor Ballast outlet hoppers Tampingunit Compactor intermediatelayer Packingdevice

Upload: popa-manuel

Post on 03-Jun-2018

214 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Pm 1000 Urm

 

PM 1000 URM 

 – Up to 100% recycling of the existing ballast material

 – Creation of a new supporting layer using existing material

 – Lower disposal costs

 – Up to 50% fewer logistical pauses than existing systems

 – Higher track availability thanks to shorter periods in possession

 – Rehabilitation capacity of up to 1400 metres per day

 – 3 excavation chains

 – Simultaneous installation of 2 geoplastics possible

 – Installation of supporting and protective layer in one operation

 – Ballast recycling with high-pressure washing

 – Short set-up times

 Your competent partner eu rail  po

Performance ø – 12 hours 500 m

Max. performance per hour 110 m

Ballast Ecavation Chain – Capacity 300 cbm/h

Excavation width 4.200 - 6.000 mm

Subgrade Ecavation Chain – Capacity 1.000 cbm/h

Excavation width 4.050 - 6.600 mm

Excavation depth max. 1.300 mm

Installation height up to 600 mm (PSS/FSS)

Installation height, track formation layer 300 mm

Material supply (container wagon backwards) BA 255

Evacuation (to the front) MFS 100

 

 Yourcompetentpartner eu rail  pool 

Working direction

D riv e un it fro nt – 2 3, 24 m Wa te r t re at me nt wag on – 2 1, 24 m B all as t w as hi ng w ago n – 20, 82 m B al las t sc re en ing wa gon – 20 ,8 2 m M ot or wa go n – 24 ,4 1 m E xc av at ing mac hi ne A 33 ,11 m Excavating machine B – 42,225 m Ta mp in g m ac hi ne – 2 7, 57 5 m D ri ve u ni t r ea r – 2 7, 42 m

PM 1000-URM – Lenght over buffers 270,00 m

 Austrianbranchoffice

Kl. NeusiedlerStr. 29–A-2401FischamendTel. +43(0)2230 9273Fax +43(0)22309279061

eurailpoolGmbH

Lise-Meitner-Straße9 –D-85737IsmaningTel. +49(0)89 909397-20Fax +49(0)89909397-266

[email protected] – www.eurailpool.com

PM 1000-URM Spoil 

Excavated ballast  

Mixed material

Ballast bed residue

New ballast 

Recycled ballast  

New FPLmaterial 

Intermediate layer 

Revolving grid Spiral conveyor  Finger screenWashing screen Impact crusher  Vibrating screen Excavating chain 1 and 2

Installationof newFPLmaterialExcavatingchain 3

Platecompactor 

 

Portal cranewithnewFPLmatFlank compactor Ballast outlet hoppers

TampingunitCompactor intermediate layer Packing device

Page 2: Pm 1000 Urm

Kl. Neusiedler Str. 29 – A-2401 Fischamend

Tel. +43 (0) 2230 92 73

Fax +43 (0) 2230 92 79 061

Lise-Meitner-Straße 9 – D-85737 Ismaning

Tel. +49 (0) 89 90 93 97-20

Fax +49 (0) 89 90 93 97-266

[email protected] – www.eurailpool.com