plm 2008 - the road to 3d pmi
TRANSCRIPT
-
8/2/2019 Plm 2008 - The Road to 3d Pmi
1/39
1
The Road to 3D PMI
Gili OmriLSRD Technion
-
8/2/2019 Plm 2008 - The Road to 3d Pmi
2/39
2
Technion - Land System R&D Division
Materialization of Academic Research projects
Connecting link Academy to Industry
Broad band of R&D Services
-
8/2/2019 Plm 2008 - The Road to 3d Pmi
3/39
-
8/2/2019 Plm 2008 - The Road to 3d Pmi
4/39
What is PMI?
Product Manufacturing Information
Information required to put across
design intent to production
-
8/2/2019 Plm 2008 - The Road to 3d Pmi
5/39
PMI Consists:
Dimensions (tolerances for each dimension)
Geometric tolerances of features (datums, featurecontrol frames)
Manufacturing information (surface finish, weldingnotation)
Inspection information (key location points)
Assembly instructions
Product information (materials, suppliers, partnumbers, bill of materials, revision history)
5
-
8/2/2019 Plm 2008 - The Road to 3d Pmi
6/39
Integrated PMI Vision (UGS)
-
8/2/2019 Plm 2008 - The Road to 3d Pmi
7/39
What are we waiting for?Lets DO IT!!!
Benefits of 3D PMI
Enhances and shortens the design cycle Fewer errors
Streamline design/manufacturing processes
Faster change management Accelerates decision making
Remove drawings from the supplier communicationchain
-
8/2/2019 Plm 2008 - The Road to 3d Pmi
8/39
Now What?
It Sounds so familiar
Is it really worth it?
Devise new process $
Training costs - $
Educate everyone???
Downtime during the above$$$
Faster Product development
Reduced Cost
Better success rate
Reduce Engineering Change cycle time
-
8/2/2019 Plm 2008 - The Road to 3d Pmi
9/39
Justifying new Technology
Technology can bring benefit
if, and only if
it diminishes a limitation.
Long before the availability of technology,
we developed modes of behavior(policies, measurements and rules)
to help us accommodate our limitations.
-
8/2/2019 Plm 2008 - The Road to 3d Pmi
10/39
STARTING THE QUEST TO3D PMI
After being Dazzled (and dismayed)
10
BRAINSTORMING
-
8/2/2019 Plm 2008 - The Road to 3d Pmi
11/39
Existing limitations
Product documentation process requires asignificant investment.
Data redundancy (in drawings)
Data inconsistencies (drawing - 3d models)
Interpretation errors (of drawings)
Time consuming change process (2D3D)
-
8/2/2019 Plm 2008 - The Road to 3d Pmi
12/39
Our Path to enlightenment
12
Learn the good book
ASME Y14.41 & ASME Y14.5m)
Self paced 3D PMI TrainingI-Deas / NX
Benchmark a mini project
(~20 drawing items)
Evaluate
-
8/2/2019 Plm 2008 - The Road to 3d Pmi
13/39
The key for Success
Engineering is the backbone of the organization
If they will not like it
Nothing
Will be worthy
Direct gain to the designer
IS THE KEY
13
-
8/2/2019 Plm 2008 - The Road to 3d Pmi
14/39
LEARN THE GOOD BOOKASME Y14.5MASME Y14.41
Phase 1
14
-
8/2/2019 Plm 2008 - The Road to 3d Pmi
15/39
ASME Y14.41-2003Digital Product Definition Data Practices
ASME Y14.41 is an extension of existing ASMEstandards
Two possible modes:
3.3.1 Model Only 3.3.2 Model and Drawing
Some requirements are applicable to models ONLY
Caution!!Down stream PMI to drawings
with care!!!
15
-
8/2/2019 Plm 2008 - The Road to 3d Pmi
16/39
ASME Y14.41
3.3.1 Model Only:
The following paragraphs describe requirementswhen complete product definition is contained in themodel.
(a) Product definition data, including but not limited tonotes, parts lists, marking requirements,dimensions, and tolerances shall be contained orreferenced in the data set.
16
-
8/2/2019 Plm 2008 - The Road to 3d Pmi
17/39
3.3.1 continued
b) The data elements of a drawing format as defined in ASME Y14.1or ASME Y14.1M are not required, except for the following, whichshall be contained in the data set:
(1) name and address of the company or design activitycorresponding to the Commercial and Government Entity
(CAGE) code for the data set
(2) data set title
(3) data set number
(4) approval indicators and approval dates
(5) contract number when required
(6) originators name and date
(7) CAGE Code when required for identification of the design activity
whose data set number is used 17
-
8/2/2019 Plm 2008 - The Road to 3d Pmi
18/39
3.4.2 Management Data on a Model
(a) ASME Y14.41M Note
(b) CAD Maintained Notation
(c) Design Activity Identification
(d) Duplicate Original Notation
(e) Item Identification
(f) Metric Notation
(g) Navigation Data
18
-
8/2/2019 Plm 2008 - The Road to 3d Pmi
19/39
3.5.1 Location of security marking
the security data annotation plane does not rotatewith the model.
19
-
8/2/2019 Plm 2008 - The Road to 3d Pmi
20/39
SELF PACED 3D PMI TRAINING
Phase 2
20
-
8/2/2019 Plm 2008 - The Road to 3d Pmi
21/39
I-DEAS12 / NX5 3D PMI
Both packages ~comply with ASME standards
Had fun playing with new toys
Liked I-DEAS Model Views Better
(did not know about tolerance feature editor in NX)
It was not a trip through the park
Online documentation is not sufficient Training is not to be over looked!!!
21
-
8/2/2019 Plm 2008 - The Road to 3d Pmi
22/39
MINI PROJECT
Phase 3
22
-
8/2/2019 Plm 2008 - The Road to 3d Pmi
23/39
Typical Project
The initial conceptwas
The analystSuggested
Engineeringsuggested
Accepted Solutionwas
This is whatmarketing described
projectdocumentation
What was eventuallyManufactured
The customer wascharged for
By the time thesystem wasdelivered
This is what thecustomer really
wanted
-
8/2/2019 Plm 2008 - The Road to 3d Pmi
24/39
Mini project scope
Small stand alone system
Start point Paperless (models only)
Platform I-DEAS 12
Data management TDM
Technologies involved:
Flame cutting
CNC
Welding
24
-
8/2/2019 Plm 2008 - The Road to 3d Pmi
25/39
Designer Focal points:
Documentation effort
Time
Ease of use
Tolerating changes
Designer Benefits
Best practice
What is the stage to introduce: Datums, tolerances, welding symbols
Things change (except BORN)
Timeline25
-
8/2/2019 Plm 2008 - The Road to 3d Pmi
26/39
Production Focal Points
Documentation errors (rework)
Interpretation errors
Ease of use
Timeline
26
-
8/2/2019 Plm 2008 - The Road to 3d Pmi
27/39
Common workflow
Manufacturing Design 2DAssemblies & PartsFunction Form Fit
Detailed Design Sub Assemblies & Parts in 3Dassembly Context
Function Form Fit
Conceptual Design 3DAssembly
Function Form Fit
27
-
8/2/2019 Plm 2008 - The Road to 3d Pmi
28/39
3D PMI workflow
Manufacturing Design 3DAssemblies & PartsFunction Form Fit
Detailed Design Sub Assemblies & Parts in 3Dassembly Context
Function Form Fit
Conceptual Design 3DAssembly
Function Form Fit
28
-
8/2/2019 Plm 2008 - The Road to 3d Pmi
29/39
Bonus designer benefit of 3D PMI
GD&T is about Interchangeability
Working on Parts directly in the assembly allows:
The designer to concentrate on Function Form & Fit
Datum definition & order reflects design intent
A step forward to PLM Vision
A single source of truth
The whole truth
and Nothing but the Truth
29
-
8/2/2019 Plm 2008 - The Road to 3d Pmi
30/39
In House Road Blocks
Training
Culture impose downstream GDT without regard toassembly, Function, Form & Fit
Infrastructure (data management) communication? How do we communicate 3D models offsite?
How can I make sure the offsite supplier is on thecorrect revision?
30
-
8/2/2019 Plm 2008 - The Road to 3d Pmi
31/39
Software tools
3D PMI templates (not out of the box)
Notes area annotation plane not supported - Yet
ASME Y14.41 6.2.1 Notes Area Annotation Plane.
When general notes, flagnotes, and special notations are placed in a
model, they shall be placed on a single annotation plane that does notrotate with the model.
This annotation plane shall be available for display with the annotatedmodel.
PMI is not fully associative (pattern recognition)
31
-
8/2/2019 Plm 2008 - The Road to 3d Pmi
32/39
Suppliers / Workshop
Hardware
Paper is cheaper then a laptop
Knowhow
3D PMI Models need to be interrogated
Culture!!!
The eye is quicker then the mouse
32
-
8/2/2019 Plm 2008 - The Road to 3d Pmi
33/39
WRAPPING UP
Phase 4
33
-
8/2/2019 Plm 2008 - The Road to 3d Pmi
34/39
Production
Zero engineering rework(sure, we were careful about everything)
Interpretation:
3D models were easier to understand
GDT savvy was not resolved by 3D models
Ease of use:
CNC loved 3D PMI
Back Paper was requested
Timeline
CNC programming
Tolerances were loosened (thanks to Tolerancing in assembly context)
34
-
8/2/2019 Plm 2008 - The Road to 3d Pmi
35/39
Designers
Syntax checker helped eliminating common errors
Braking of old habits was not easy
Once we did:
Decreased documentation effort
We had Fewer errors
Streamline design / manufacturing processes
Faster change management
35
-
8/2/2019 Plm 2008 - The Road to 3d Pmi
36/39
Designer Benefits
Memory strains
Non geometric related data documentation in 3Denvironment (Threads, welding champers) made life
easier
Syntax checker
GDT in assembly context
Major decrease in Tolerancing effort
maintain focus on design intent
They liked 3D PMI
36
Thats me jumping with joy
-
8/2/2019 Plm 2008 - The Road to 3d Pmi
37/39
Why Change?
Consolidating PMI data to 3D environment does:
Accelerates & improve decision making
Reduce drawing errors
Faster change management Streamline design/manufacturing processes
3D PMI Can
Enhance and shorten product cycle
37
-
8/2/2019 Plm 2008 - The Road to 3d Pmi
38/39
How
ASAP introduction of constraints (get item req.)
Document non geometric data as you go
(threads)
Due to software limitations(PMI is not fully associative - yet)
Stabilize design
Start Tolerancing
Hybrid has overhead on the designer & datamanagement
But has benefits down the road
38
-
8/2/2019 Plm 2008 - The Road to 3d Pmi
39/39
39
Questions?