please be aware of suspended load while using the cross path to line 1 operation plant do not walk...
TRANSCRIPT
PAGE 1 0F 4
PLEASE BE AWARE OF SUSPENDED LOAD WHILE USING THE CROSS PATH TO
LINE 1 OPERATION PLANT
DO NOT WALK UNDER SUSPENDED LOAD
PROCEED WITH CAUTION
Important ! Gopeng Plant
PAGE 2 0F 4
Important !
An innovative way to organize and manage the scheduling of venues with a vast amount of scheduling options for multiple locations within the Hume group.
An innovative way to organize and manage the scheduling of venues with a vast amount of scheduling options for multiple locations within the Hume group.
Is an easy to use web based software solution for tracking VIP attendance and current work status.
The provision of MIS services via the Internet. Services covered :-- Software issue such as Epicor, FMS and etc.- Hardware issue such as PABX, internet, networking, servers and etc.
PLANTPAGE 3 0F 4
Every Friday, 11.30 am- 5S FRIDAY
- MORNING ASSEMBLYEveryday, 8.30 am
- ZONE 12 MEETINGEvery Friday
- CEMENT MILL GENBA WALKEvery Friday, 3.30 pm
Morning Assembly
- FORUM22/9/2015, 4.00 pm
- GOTONG ROYONG15/9/2015, 4.30 pm
HO- INTERNAL AUDIT
17/9/2015, 11.00 am
PAGE 4 0F 4
HIB 5S Auditors Training14/9/2015 – 15/9/2015