Page 1: Pleasant Valley Factory Tour

Building Modular Homes For The Entire North East USA and Riverview Homes, Inc.

Click Mouse or Press Spacebar To Advance Presentation

Page 2: Pleasant Valley Factory Tour

2

Welcome To Pleasant Valley!

Pleasant Valley Modular Homes, Inc. operates the most modern modular home manufacturing facility the Northeast USA.

Pleasant Valley serves the Northeast & Mid-Atlantic regions of the USA with a complete line of high-quality, innovative, modular homes.

Page 3: Pleasant Valley Factory Tour

3

Our Factory…

Pleasant Valley’s modular homes are constructed in the climate-controlled environment of our huge 140,000 sq. ft., state-of-the-art manufacturing center.

Page 4: Pleasant Valley Factory Tour

4

Our “Circle of Strength”

Every modular home produced by Pleasant Valley features the superior construction of our motto - “Strength… Far Beyond The Standard”Standard Features include 100 lb roof system and 2x6 walls.

Page 5: Pleasant Valley Factory Tour

5

35+ Years of Industry Experience!

Pleasant Valley’s Management and Leadership teams have 100’s of combined years of experience in the housing industry.

Our Design Team is recognized as one our industries BEST! This Design Team can showcase the finest collection of designer kitchens and baths, including the originalaward-winning “Hearth Wall” Kitchen!

Page 6: Pleasant Valley Factory Tour

6

A Truly Unique Concept!

Pleasant Valley delivers unmatched innovation.

Nearly all of the exciting options available in our homes can be viewed in The Designcenter at Pleasant Valley. This is the industry’s largest indoor,climate-controlledshowroom.

Page 7: Pleasant Valley Factory Tour

7

Inside The Designcenter

Page 8: Pleasant Valley Factory Tour

8

Inside The Designcenter

Page 9: Pleasant Valley Factory Tour

9

Inside The Designcenter

Page 10: Pleasant Valley Factory Tour

10

Let’s Begin Our Factory Tour…

Page 11: Pleasant Valley Factory Tour

11

Touring Our Factory…

As with any assembly line production facility, we at Pleasant Valley have laid out our plant to for the most efficient use of space and manpower.

This allows us to maximize production, reduce costs & overhead and maintain the high product quality that has become expected with the Pleasant Valley product.

Page 12: Pleasant Valley Factory Tour

12

Touring Our Factory…

The following presentation may over simplify the complex nature of an assembly line base facility that can build 4 complete homes (8 floors) in a single 8-hour day.

However, it does provide a good overview of the production process.

Page 13: Pleasant Valley Factory Tour

13

Touring Our Factory…

A key advantage of the assembly line concept is that since a factory operates at a predictable volume, raw materials can be purchased in bulk at lower cost thus lowering the cost of the finished product while still being able to use quality goods.

Pleasant Valley has 100’s of sq. ft. dedicated to indoor storage of these raw materials.

Page 14: Pleasant Valley Factory Tour

14

Touring Our Factory…

The raw materials are moved from the storage area, as needed, into staging areas near the production line station that will use the specific items during the production process.

Page 15: Pleasant Valley Factory Tour

15

Touring Our Factory…

The obvious place to start our journey is at the beginning!

Our first stop through Pleasant Valley’s state of the art manufacturing plant is the Floor Shop.

Page 16: Pleasant Valley Factory Tour

16

The Floor Shop

The floor is laid out on a template and built to the ridged State Modular Code.

Page 17: Pleasant Valley Factory Tour

17

The Floor Shop

Pleasant Valley builds many different floor designs based upon your needs.

Each is built withsuperior qualityin mind.

Page 18: Pleasant Valley Factory Tour

18

The Floor Shop

Insulation is added, if optioned in, and the floor is decked.

All plumbing lines arestubbed through thefloor system as astandard feature.

Page 19: Pleasant Valley Factory Tour

19

Interior Walls

Next, interior walls are attached to the floor assembly with hardened washer head screws rather thannails. This providesadded strength and ensures no separation.

Page 20: Pleasant Valley Factory Tour

20

Interior Walls

Plumbing fixtures installed and attached to supply lines.

Page 21: Pleasant Valley Factory Tour

21

Interior Walls

Attic steps are set in place and interior drywall panels are installed using a one-part urethane adhesive andscrews.

Page 22: Pleasant Valley Factory Tour

22

Floor Vinyl

At this time the floor vinyl, which is purchased in bulk, is installed.

Don’t worry! The flooring isprotected with a specialcovering throughout theproduction process.

Upon completion of the floors,we move on to the walls.

Page 23: Pleasant Valley Factory Tour

23

Sidewall Assembly

All sidewalls are constructed on a template.

Each wall is a single long assembly, complete with drywall and insulation.

All door andwindow cut-outsare completed.

Page 24: Pleasant Valley Factory Tour

24

Sidewall Placement

Once complete, the sidewalls are lifted into place and attached to the floor assembly

Independent Right& Left Sidewallstations greatlyspeed up theprocess.

Page 25: Pleasant Valley Factory Tour

25

End walls

In a similar manner, the end walls are built on templates andset in place.

Page 26: Pleasant Valley Factory Tour

26

Finalizing Wall Attachments

All exterior walls are securely attached to the floor assemblyusing hardenedwasher-headscrews, lag boltsand steelreinforcementstraps.

Page 27: Pleasant Valley Factory Tour

27

Wrapping Up The Walls

At this point, all of the work on the interior walls, sidewalls and end walls has been completed.

Most of the interiordrywall panelsare also in place.

Page 28: Pleasant Valley Factory Tour

28

The Roof Assembly

Using another specialized template, the roof assembly is constructed. Drywall panels are then attached tothe trusses toform the ceiling.

Page 29: Pleasant Valley Factory Tour

29

The Roof Assembly

Pleasant Valley builds a variety of roof systems based upon the customer’s needs.

A 5/12 roofthat has theheaviest basicconstruction in ourindustry is standard.

Page 30: Pleasant Valley Factory Tour

30

Interior Ceiling Finish

Once complete, the roof assembly is moved, as a single unit, over the spray booth where theinterior ceiling iscompleted.

Inside this spraybooth, the drywallceiling is given aresidential finish.

Page 31: Pleasant Valley Factory Tour

31

Setting The Roof Assembly

Using one of three 10-ton cranes, the entire roof/ceiling assembly is lifted into place atop the home.

Each roof truss istoe-nailed to thetop wall plate &then reinforcedwith hurricanestraps.

Page 32: Pleasant Valley Factory Tour

32

Completion of the Framing

In this photo, you can see that the roof is now free from the crane and fully in place.

This completes boththe interior andexterior framingfor the home.

Page 33: Pleasant Valley Factory Tour

33

Electrical System – Rough In

Before completing the interior wall panels, the remainingelectrical wiringis roughed in.

Page 34: Pleasant Valley Factory Tour

34

Final Drywall Work

All remaining drywall panels are installed.

Panel joints andscrews areprepared for thefinal plasterfinish.

Page 35: Pleasant Valley Factory Tour

35

Plastering of The Walls

With the drywall panels the electrical wiring in place, the walls are ready for plaster.

A luxurious plasterfinish will beapplied by a teamof skilled craftsmen

Page 36: Pleasant Valley Factory Tour

36

Exterior Walls

For added strength, the sidewalls and end walls are wrapped withOSB (OrientedStrand Board).

The entire exterior isthen wrapped in avinyl moisturebarrier.

Page 37: Pleasant Valley Factory Tour

37

Installing The Windows & Doors

With the exterior surface complete, all of the door and windowassemblies areinstalled into theholes cut out onthe wall templates.

Page 38: Pleasant Valley Factory Tour

38

Vinyl Siding is Installed

The home is now sided with the style and color of vinyl sidingselected by thecustomer.

Pleasant Valleyonly uses qualityname-brandsiding for yearsof service!

Page 39: Pleasant Valley Factory Tour

39

Roof Is Decked & Shingled

The roof trusses have been covered with decking and shingled.

At Pleasant Valley,we have a varietyof shingle styles& colors for thecustomer tochoose from.

Page 40: Pleasant Valley Factory Tour

40

Completing The Home’s Exterior!

As you can see, this home’s exterior is just about complete.

While misc. itemsare addressed onthe outside, workcontinues insidethe home.

Page 41: Pleasant Valley Factory Tour

41

Plaster Gets Primered

With the drywall and plastering operations complete, the smooth finish is painted with a coat of white primer.

The walls will beready for the newhomeowner to addtheir personal splashof color!

Page 42: Pleasant Valley Factory Tour

42

Installing The Cabinets

After the walls have been painted, cabinets and countertops can be installed in the kitchen, bathsand utility areasof the home.

Page 43: Pleasant Valley Factory Tour

43

Our Cabinet Shop

As you may have guessed by now, all of the cabinets that go into every Pleasant Valley home is custommade on site inour very ownCabinet Shop!

Page 44: Pleasant Valley Factory Tour

44

Custom Countertops Too

With custom cabinets, we are not going to settle for just any work surface!

All of our countertopsare custom-madein house as well.

Page 45: Pleasant Valley Factory Tour

45

Cabinet Material & Laminates

All the material and countertop laminates used in our Cabinet Shop are bought in bulk.

We offer a varietyof styles & colorsto please the mostdiscriminating ofhome owners.

Page 46: Pleasant Valley Factory Tour

46

The Lift Station

The home makes its way through the factory to the Lift Station.

This is the start ofthe home’s finalfinish process!

Notice the blackplates on thefloor?

Page 47: Pleasant Valley Factory Tour

47

The Lift Station

The entire house is lifted up so…

Page 48: Pleasant Valley Factory Tour

48

The Lift Station

The carrier that will transport the home can be positioned under it.

Page 49: Pleasant Valley Factory Tour

49

Installing The Carpeting

As the home is being set onthe transportation carrier,carpeting is being installedinside.

Of course, quality padding isset in place before thecarpet is stretched usingtack strips.

Page 50: Pleasant Valley Factory Tour

50

Trim and Appliances

We now install custom cut trim and install appliances at this time.

Of course, onlybrand nameappliances areselected for aPleasant Valleyhome!

Page 51: Pleasant Valley Factory Tour

51

Hand-Laid Stone

At Pleasant Valley, we are famous for our unique use of hand-laid stone.

This is one exampleof the finishedproduct!

Page 52: Pleasant Valley Factory Tour

52

Our Stone Station

This is the Stone Station where our craftsmen create these works of art!

Page 53: Pleasant Valley Factory Tour

53

A Luxurious Pleasant Valley Home!

Attention to a few more details, an “OK” from the final Quality Assurance Manager and its out the door.

This fine Pleasant Valley home is ready to ship to Riverview Homesand then on toyour building site!

Page 54: Pleasant Valley Factory Tour

54

Thank You For Joining Our Tour!

Pleasant Valley Modular Homes& Riverview Homes

Look Forward To Providing Your Family With A Quality Lifestyle At An Affordable Price.

Call (724) 567-5647 to find the Riverview Sales Center Closest To You.