PLCS and S1000D Technical Issues

Upload: douglas-miles

Post on 18-Jan-2018

222 views

Category:

Documents


0 download

DESCRIPTION

3 Updated Requirements Technical Issue – Linkage DM 1.1 DM 1.2 DM 1.3 Chillers Duct 1 Chiller 2 Duct 2 HVAC Sys Drawing2 DM 2.3 DM 2.2 HVAC Sys IETM 1 HVAC Sys IETM 2 ISEA IDE (Radar) DM 1.1 DM 1.2 Mod 1 Radar IETM Mod 1 DM 1.3 Mod 2 DM 2.1 Mod 2 Radar IETM DM 2.2 Chiller 1 HVAC Sys HVAC Ducts HVAC Sys Drawing1 Shipyard Design & IDE

TRANSCRIPT

Page 1: PLCS and S1000D Technical Issues. 2 ISE 6 Phase 2 Technical Issues S1000D PLCS DEX Need to exchange S1000D data modules and relationships to product

PLCS and S1000D Technical Issues

Page 2: PLCS and S1000D Technical Issues. 2 ISE 6 Phase 2 Technical Issues S1000D PLCS DEX Need to exchange S1000D data modules and relationships to product

2

ISE 6 Phase 2 Technical Issues

• S1000D PLCS DEX– Need to exchange S1000D data modules and relationships to

product model– Listed under Business DEX section of plcs-resources

• But non content defined

• Linkage between product data and data modules– If design change occurs, need to identify the data modules (TM

and training) affected so they can be reviewed and updated.

Page 3: PLCS and S1000D Technical Issues. 2 ISE 6 Phase 2 Technical Issues S1000D PLCS DEX Need to exchange S1000D data modules and relationships to product

3Updated

Requirements

Technical Issue – Linkage

DM 1.1

DM 1.2

DM 1.3

Chillers

Duct 1

Chiller 2

Duct 2

HVAC SysDrawing2

DM 2.3

DM 2.2

HVAC SysIETM 1

HVAC SysIETM 2

ISEA IDE (Radar)

DM 1.1

DM 1.2Mod 1RadarIETM

Mod 1

DM 1.3Mod 2

DM 2.1

Mod 2RadarIETM

DM 2.2

Chiller 1

HVAC Sys

HVAC Ducts

HVAC SysDrawing1

Shipyard Design & IDE

Page 4: PLCS and S1000D Technical Issues. 2 ISE 6 Phase 2 Technical Issues S1000D PLCS DEX Need to exchange S1000D data modules and relationships to product

4

Linkage• If design change occurs, need to identify the data modules (TM and

training) affected so they can be reviewed and updated.– 1. Create Ship Alt

• Identify affected support systems• Identify affected components

– 2. List DM related to affected components– Need mechanism to link a DM to equipment.

• Can’t always rely on DMC to provide linkage– Data modules may have been authored by vendor or other program– May utilize different business rules (applied at time of creation, not use)

• Must be relationship – – DMC is generated based on business rules in effect at the time DM was

created– Example – pump TM generated for carrier, reused on DDG

– Assume dual use DM used to manage training and tech pubs

Page 5: PLCS and S1000D Technical Issues. 2 ISE 6 Phase 2 Technical Issues S1000D PLCS DEX Need to exchange S1000D data modules and relationships to product

5

EuroSTEP Approach

Page 6: PLCS and S1000D Technical Issues. 2 ISE 6 Phase 2 Technical Issues S1000D PLCS DEX Need to exchange S1000D data modules and relationships to product

6

Linkage• Equipment level TM

– PM linked to piece of equipment– TDMIS would related PMC to APL

• System level TM– PM linked to system– Individual DM linked to equipment/components within system

• DM where used– Need to derive inverse relationship from PM– LSAR – already maintains relationships

Page 7: PLCS and S1000D Technical Issues. 2 ISE 6 Phase 2 Technical Issues S1000D PLCS DEX Need to exchange S1000D data modules and relationships to product

7

Questions / Issues• Linkage for DMC, PMC to product structure

– DDG 1000 linker must identify linkage

• GIA 0007