Plant Layout of Mineral Water Plant Cost of Production/ 1 Ltr Bottle The Table highlights the Cost incurred per 1 ltr bottle. Kindly Note , that the costs are not exact, also vary from plant to plant, season to season also. You are suggested to to talk to your Turn-key supplier to get these. Sr. No. Description Cost [Rs.] 1. Cost of Bottle + Cap 2.90 2. Shrink Label 0.30 3. Shrink Cap 0.80 4. R.O. Water 0.16 5. Misc Cost 0.10 6. packing Cost 0.20 7. Interest on Capital 0.05 8. Operating Cost 3.79 9. Selling Cost 5.50 Margin 1.71

Upload: soumitra-ghotikar

Post on 05-Dec-2014

1.555 views

Category:

Business


4 download

DESCRIPTION

This article gives you information about Plant Layout of Mineral Water Plant and Cost of Production of Mineral Water Bottle, Jar, Pouch. You can also read this article on ===> http://mineralwaterprojectinformation.org/layout-other-information/

TRANSCRIPT

Page 1: Plant layout of mineral water plant

Plant Layout of Mineral Water Plant

Cost of Production/ 1 Ltr Bottle

The Table highlights the Cost incurred per 1 ltr bottle.

Kindly Note , that the costs are not exact, also vary from plant to plant, season to

season also. You are suggested to to talk to your Turn-key supplier to get these.

Sr. No. Description Cost [Rs.]

1. Cost of Bottle + Cap 2.90

2. Shrink Label 0.30

3. Shrink Cap 0.80

4. R.O. Water 0.16

5. Misc Cost 0.10

6. packing Cost 0.20

7. Interest on Capital 0.05

8. Operating Cost 3.79

9. Selling Cost 5.50

Margin 1.71

Page 2: Plant layout of mineral water plant

Cost of Production/250 ml Pouch

The Table highlights the Cost incurred per 250 ml Pouch.

Kindly Note , that the costs are not exact, also vary from plant to plant, season to

season also. You are suggested to to talk to your Turn-key supplier to get these.

Sr. No. Description Cost [Rs.]

1. Empty Pouch with Printing 0.14

2. Water Cost 0.02

3. Transportation 0.02

4. Misc Cost 0.03

5. Interest on Capital 0.03

6. Operating Cost 0.23

7. Selling Cost 0.35

Margin 0.12

Cost of Production/20 ltr Jar

The Table highlights the Cost incurred per 20 ltr Jar.

Kindly Note , that the costs are not exact, also vary from plant to plant, season to

season also. You are suggested to to talk to your Turn-key supplier to get these.

Sr. No. Description Cost [Rs.]

1. Cost of Water 0.60

2. Cost of Maintenance 1.00

3. Transportation 1.00

4. Interest on Capital 0.60

5. Misc. Cost 0.40

6. Operating Cost 3.60

7. Selling Cost 20.00

Margin 16.40

*****